Professional Documents
Culture Documents
Fluid Codes Limits Process Flow Connections Valve Symbology: IG N E D
Fluid Codes Limits Process Flow Connections Valve Symbology: IG N E D
REDUCING FLANGE
KNIFE VALVE / SLIDE GATE (MANUAL) INSULATING FLANGE ND SODIUM HYDROSULFIDE (NaHS)
SEQUENTIAL LINE NUMBER
6 NG NITROGEN 5
confidencial y/o de propiedad de Bechtel que no debe ser usada, divulgada o reproducida de ninguna forma por ninguna
E 8
FACILITY NUMBER X%
SLOPE DOWNWARD END COMPONENTS 3
DIAPHRAGM VALVE WC COOLING WATER
TIE-IN DISCIPLINE WD POTABLE WATER
TP CAP (WELDED)
9999 FACILITY NUMBER X% E DIAPHRAGM - NORMALLY CLOSED
0001 SLOP WE WASTE EFFLUENT ; CHEMICAL WASTE
SLOPE UPWARD
SEQUENCE NUMBER
CAP (THREADED)
WF FIRE WATER
(EXIST. LINE) (NEW LINE) Y STRAINER
WG GLAND SEAL WATER
ANGLE VALVE WM RECLAIM WATER D
BLIND FLANGE
T STRAINER
PIPING CONNECTIONS WP PROCESS WATER
WR MAKEUP WATER (FRESH)
TS WT TREATED WATER 9
STARTUP STRAINER
FROM APRON FEEDER DESCRIPTION ANGLE - NORMALLY CLOSED WW FLUSH WATER 3
0240-FEA-007
VICTAULIC CAP / FLANGE WWS SANITARY WASTE
100
Todos los derechos reservados
MT MOISTURE TRAP
FROM / TO DRAWING ROTARY VALVE
M (MOTOR OR OPERATED)
CONNECTOR N°
AUTOMATIC VENT VALVE
FIRE AND SAFETY
2675 CONNECTOR N° PINCH VALVE
FLUID CODE 10
E
ATMOSPHERIC VENT 3
PINCH - NORMALLY CLOSED
between Bechtel Chile Ltda. and Compañia Minera Teck Quebrada Blanca S.A., contains information
confidential and/or proprietary to Bechtel that is not to be used, disclosed, or reproduced in any form
by any person or entity other than Bechtel or Compañia Minera Teck Quebrada Blanca S.A. without
2 WAY 3 WAY
Confidential. © 2018 Bechtel Chile Ltda. This document, prepared under Contract 25800
DART VALVE
F
AIR FILTER
BECHTEL
DESIGNED
F25800-D.dgn - 863.3 MM X 558.8 MM
TECK
3 09-AUG-2018 ISSUED FOR CONSTRUCTION R.A. G.B F.A. PM/EG CHECKED
L. COFFRE
NEGS: F. GONZALEZ 21-SEP-2011 GENERAL
G
BY:
2 03-AGO-2017 RE-ISSUED FOR CONSTRUCTION R.A. G.B. F.A. PM/EG
SI
PROJ. MANAGER: K. Stein PROJ. ENGINEER: P. O'SHANNESSY 01-FEB-2013 PIPING STANDARD SYMBOLOGY
1 15-JAN-2014 ISSUED FOR CONSTRUCTION R.F. RA/WC F.G. PO/ND ENG. MANAGER: N. DZOAN 01-FEB-2013 P & ID
1.- VALVE SYMBOLOGY SHOWN IS IN ACCORDANCE WITH THE PREVIOUS ISA STANDARD (1992).
0 01-FEB-2013 ISSUED FOR CONSTRUCTION C.C. L.C. F.G. PO/ND BECHTEL DRAWING N° : TECK DRAWING N° : REV. 10
Rev. Job No. 25800 25800-220-M6-0000-00002 2400-DW-0000-M-1002
NO.
DATE REVISION BY CHK. EGS. PE/PEM TECK REFERENCE DOCUMENTS NUMBER NOTES 3
This document has been prepared by Bechtel Chile Ltda. exclusively for Compañia Minera Teck Quebrada Blanca S.A. under Contract 25800 and is not to be relied upon by any person or entity other than Compañia Minera Teck Quebrada Blanca S.A. or used in conjuction with any other project.
Este documento ha sido preparado por Bechtel Chile Ltda. exclusivamente para Compañia Minera Teck Quebrada Blanca S.A. bajo el Contrato 25800 y no debe ser considerado como válido por ninguna persona o entidad distinta a Compañia Minera Teck Quebrada Blanca S.A o utilizado en relacion con cualquier otro proyecto. DATE: 8/13/2018 TIME: 10:30:59 AM US ER: CVEGA
1 2 3 4 5 6 7 8 FILE: L:\STO-25800\General\DocumentoEmitir\Mechanical\Drawings\25800-220-M6-0000-00002_Rev3.pdf