Professional Documents
Culture Documents
مخطط البنلء
مخطط البنلء
3 3 3 5 3
W W W W W
2
D
Toilet
Mens Sitting UP
1 3
W 5 W
D
2
D
2
D
2
D 3
1 2 D
D D UP
1
5 18 4
D
W
Toilet
14
9
2
5 12 D
W
4 4 4
W W W
6
W
3 5 5 4 5 3
W W W W W W
Toilet
Toilet
Toilet 5
D Mens Sitting 4
1 5 5
W
W D D
DN
UP 2
D
2 2 2
D D D
2
D
2 Toilet 5
D 5 W
2 2 D
D D
UP DN 22
22 3
D
5
1 D
W
4
Toilet W
14
30
12
2 5 6 3 4 4
W W W W W W
6
W
5 3
W W
Toilet
5
D 4
W
DN 2
D
2
D
2
D
2 Toilet 5
D 5 W
2 D
D
DN
3
D
4
W
6 3 4 4
W W W W
TOP OF STAIR CASE FIN. LEVEL EL.+ 11.25 MTS.
STAIR CASE ROOF FIN. LEVEL EL.+10.75 MTS.
:lvM shr'm
'hf,R i,v]D tohvD
20 * 20 * 40
jtwdgm ) X (
20 * 20 * 40
jtwdgm ) F (
u
jsgdP srT Hg],v HB,G
COMBINED FOOTING DETAILS
STAIR DETAILS
T
H
D
40 cm
W (typ.)
20 cm
FOOTING DETAILS
STRUCTURAL DETAILS
BEAM REINFORCEMENT DETAIL-1
NOTES:
ANY RELOCATION REQUIRED FOR PROPER EXECUTION
OF THE PLUMBING WORK SHALL BE WITH PRIOR
APPROVAL OF THE DESIGNER / OWNER.
THE CONTRACTOR SHALL VERIFY ALL EXISTING
UTILITIES AT SITE AND COORDINATE THE WORK WITH THE
SEWER AND STORM DRAINAGE LINE EFFLUENT DISPOSAL POINT
AND WATER LINE SERVICE CONNECTING / TAPPING POINT.
KEY TO SYMBOLS
LAV LAVATORY
WC WATER CLOSET
KSK KITCHEN SINK
FCO FLOOR CLEANOUT
GCO GROUND CLEANOUT
BT BATH TUB
AD AREA DRAIN
FD FLOOR DRAIN
RD ROOF DRAIN
DS DOWNSPOUT
PVC POLYVINYL CHLORIDE
PB-1
SPEED AC
FENCE PLAN
FENCE FOUNDATION