Download as pdf or txt
Download as pdf or txt
You are on page 1of 31

GROUND FLOOR LINE.

3 3 3 5 3
W W W W W

2
D

Toilet

Mens Sitting UP
1 3
W 5 W
D

2
D
2
D

2
D 3
1 2 D
D D UP
1

5 18 4
D
W

Toilet
14
9
2
5 12 D
W
4 4 4
W W W
6
W

3 5 5 4 5 3
W W W W W W

Toilet
Toilet
Toilet 5
D Mens Sitting 4
1 5 5
W
W D D

DN
UP 2
D
2 2 2
D D D
2
D

2 Toilet 5
D 5 W
2 2 D
D D
UP DN 22
22 3
D

5
1 D
W
4
Toilet W

14
30

12
2 5 6 3 4 4
W W W W W W
6
W

5 3
W W

Toilet

5
D 4
W

DN 2
D
2
D
2
D

2 Toilet 5
D 5 W
2 D
D
DN
3
D

4
W

6 3 4 4
W W W W
TOP OF STAIR CASE FIN. LEVEL EL.+ 11.25 MTS.
STAIR CASE ROOF FIN. LEVEL EL.+10.75 MTS.

ROOF DECK FIN. LEVEL EL+9.15 MTS.

FIRST FLOOR FIN. LEVEL EL+7.35 MTS.

GROUND FLOOR FIN. LEVEL EL+3.95 MTS.

GROUND FLOOR FIN. LEVEL EL.+.45 MTS.


NATURAL GRADE LINE EL.± 0.00 MTS.
DETAIL SECTION OF
EXTERIOR WALL (OPTIONAL)
DETAIL - W1 DETAIL - W2 DETAIL - W3

DETAIL - W4 DETAIL - W5 DETAIL - W5


u
5 8 jsgdP Hgfb'm Hglwljm

g:G ljv ',gD gbj{hidK

:lvM shr'm
'hf,R i,v]D tohvD

20 * 20 * 40

jtwdgm ) X (

:lvM shr'm H, phz' ovshkD


5 8 jsgdP Hgfb'm Hglwljm

g:G ljv ',gD gbj{hidK

'hf,R i,v]D tohvD

20 * 20 * 40

jtwdgm ) F (
u
jsgdP srT Hg],v HB,G
COMBINED FOOTING DETAILS

STAIR DETAILS

T
H

D
40 cm
W (typ.)
20 cm

RIBBED SLAB DETAIL

FOOTING DETAILS
STRUCTURAL DETAILS
BEAM REINFORCEMENT DETAIL-1

DROPPED BEAM WITH BENT-UP BARS


BEAM REINFORCEMENT DETAIL-2

CANTILEVER WITH CONTINUOUS BEAM DETAILS


KEY TO SYMBOLS
LAV LAVATORY
WC WATER CLOSET
KSK KITCHEN SINK
FCO FLOOR CLEANOUT
GCO GROUND CLEANOUT
BT BATH TUB
AD AREA DRAIN
FD FLOOR DRAIN
RD ROOF DRAIN
DS DOWNSPOUT
PVC POLYVINYL CHLORIDE

NOTES:
ANY RELOCATION REQUIRED FOR PROPER EXECUTION
OF THE PLUMBING WORK SHALL BE WITH PRIOR
APPROVAL OF THE DESIGNER / OWNER.
THE CONTRACTOR SHALL VERIFY ALL EXISTING
UTILITIES AT SITE AND COORDINATE THE WORK WITH THE
SEWER AND STORM DRAINAGE LINE EFFLUENT DISPOSAL POINT
AND WATER LINE SERVICE CONNECTING / TAPPING POINT.
KEY TO SYMBOLS
LAV LAVATORY
WC WATER CLOSET
KSK KITCHEN SINK
FCO FLOOR CLEANOUT
GCO GROUND CLEANOUT
BT BATH TUB
AD AREA DRAIN
FD FLOOR DRAIN
RD ROOF DRAIN
DS DOWNSPOUT
PVC POLYVINYL CHLORIDE

ANY RELOCATION REQUIRED FOR PROPER EXECUTION


OF THE PLUMBING WORK SHALL BE WITH PRIOR
APPROVAL OF THE DESIGNER / OWNER.
THE CONTRACTOR SHALL VERIFY ALL EXISTING
UTILITIES AT SITE AND COORDINATE THE WORK WITH THE
SEWER AND STORM DRAINAGE LINE EFFLUENT DISPOSAL POINT
AND WATER LINE SERVICE CONNECTING / TAPPING POINT.
GROUND FLOOR LIGHTING LAYOUT
FIRST FLOOR LIGHTING LAYOUT
SPEED AC

PB-1
SPEED AC

GROUND FLOOR POWER LAYOUT


PB-3
PB-5
FENCE ELEVATION

FENCE PLAN

FENCE FOUNDATION

You might also like