Saudi Aramco Inspection Checklist: Pre-Test Punch Listing of On-Plot Piping SAIC-A-2010 15-Nov-17 Piping
Saudi Aramco Inspection Checklist: Pre-Test Punch Listing of On-Plot Piping SAIC-A-2010 15-Nov-17 Piping
00 30-Jun-16
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pre-Test Punch Listing of On-Plot Piping SAIC-A-2010 15-Nov-17 Piping-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
NOTE: Use Pre-test Punch List Form, SATR-A-2007, for listing of specific deficiencies, indicating location and/or references
A Test Pack Verification & Review* (*Thorough & detailed review of specs for each new system's first package)
SAES-A-004,
Test Package has been verified to be approved and to contain the
Para. 5.8.1
A1 detailed elements of SAEP-1160, Sect 8 as detailed in SAIC-A-2003.
Schedule Q Att-
Use Attachments 1 & 2 of this checklist (quick reference).
IV Para 3.7
Contractor shall record and track production, inspection and testing of SAEP-1160,
A3 socket and fillet welds in a separate database or same database with Section 6.1
suitable legends and submit to Saudi Aramco on a weekly basis. Weld Database
B SIS Sheet Data Verification (Safety Considerations & Limiting Factors in Pressure Test Calculations)
SIS shall be prepared for all individual units of plant equipment which in
SAES-A-005
B1 view of size, pressure rating and application are within the scope of
Para 4.2
Saudi Aramco Engineering Standards and general industry codes