Masara, Maco, Davao De Oro

MBF MINE OPERATIONS


EXECUTIVE SUMMARY
Wednesday, 16 March 2022
SAFETY No incident/accident happened within 24hrs
MANPOWER HEADCOUNT
SHIFT TOPICS DISCUSSED
AMCI CONCON
1st shift 20 0
2nd shift 28 Safety first; Check the ground condition before doing the
12
job; Wear complete PPE; S.L.A.M.; Housekeeping;
PEPTALK 3rd shift 22 11
Follow company policies and procedures; Wear mask at
TOTAL MANPOWER 70 23 all times; Maintain physical distancing

COMMITMENT - PRODUCTION
ACTIVE WORKING AREAS FORECAST(MT) ACTUAL (MT) REMARKS
ON VEIN DEVELOPMENT
L440 MST2 FWS 41N ODE 70
L455 MST2 MV 40N ODW 100 210
L485 SDN 15s ODE
L485 SDN 15s ODW 70 42
L500 BHWS 22S ODE (explo drive) 70
L500 MAS Split 32S ODW 70 98
L500 MAS 38S ODW
L500 MAS Split 39S ODW
L500 MAS Split 39S ODE
L515 BFWS 16S ODW 126
L515 BHWS 16S ODE
L515 BHWS 16S ODW
CONCON/ STOPING
L500 SDN 14s RAISE(SHRINKAGE) 10 for Continue muck out

L509 BHWS 36S-33S C/Fill For backfill


L500 BHWS 13s (S/S) STOP pull out
L500 BHWS 16s (S/S) STOP pull out
L500 BHWS 18s (S/S) STOP pull out
L500 BHWS 21s (S/S) STOP pull out
TOTAL ORE TONNAGE 390 Tons 476 Tons 122% Accomplishment (Tonnage)
OFF VEIN DEVELOPMENT Remaining to complete
L440 MST2 MV 40N XC For muck waste 0.0 m
L440 MST2 41N DECLINE TO L425 112 For muck out waste 75.8 m
L485 MAS 15S Decline to L470 For Regrade 90.1 m
L515 BHWS 16s XC For backfill 0.0 m
waiting for sample at muckbay of ore
TURNED TO WASTE ORE DRIVES
drives
L470 MST2 43N XC to Arkbro ongoing advance by NAVEP
L530 Masarita sump 1 and 2 ongoing advance by NAVEP

TOTAL WASTE TONNAGE 112 Tons Backfilled


TARGET (m) ACTUAL (m) REMARKS
COMMITMENT – METERAGE
9.9 0% Accomplishment (Meterage)
DAILY ORE AVE. (UG to MINEYARD) 390 413 106% Accomplishment (Tonnage)
TRACKLESS EQUIPMENT
ESTIMATED TOTAL
EQUIPMENT STATUS REMARKS/CONCERN
HOURS BREAKDOWN
JUMBO DRILL
DR28 (SANDVIK) Operational Spare (Old unit)
DR37 (EPIROC) Operational
DR41 (EPIROC) Operational
DR47 (SANDVIK) Operational
DR48 (SANDVIK) Operational
DR53 (EPIROC) Operational
LHD
LD47 (SANDVIK) Operational 4.00 hrs Busted Hose
LD50 (SANDVIK) Operational 10.50 hrs Flat Tire, Low Power
LD77 (SANDVIK) Operational 1.00 hrs Aircon Malfunction
LD82 (SANDVIK) Operational
ST2D
EQUIPMENT ALLOCATION LD83 (AMCI) Operational
LD60 (AMCI) Operational
LPT
TR33 (SANDVIK) Operational
TR41 (EPIROC) Operational
TR47 (EPIROC) Breakdown 24.00 hrs Oscillation Repair
TR49 (SANDVIK) Operational
BACKHOE
BH05 Operational
LOCOMOTIVE
LCM01 Operational
TRANSPORTER 07
PCU07 Operational
DEPARTMENT AND SUPPORT GROUPS
SAFETY No major concern
Already connected and drill pinholes at L485 SDN RAR and L500 MAS RAR-not utilize due to no available blower as per Mine
VENTILATION
Ventilation
COMMUNICATON No major concern
ELECTRICAL Request to Energize Intake Blower at L485 SDN
MINE INFRA No major concern
MINE SURVEY No major concern
SHOTCRETE No major concern
MINE PLANNING No major concern
MECHANICAL No major concern
EXPLOSIVES No major concern
GEOLOGY No major concern
ROCK MECHANICS No major concern
LOGISTICS No major concern
LD50 Blocked Access to L440 MST2 (11:00PM-9:30AM)
DELAYS AND OTHER CONCERNS
2nd Shift: Only 2 LHD/LPT Operators