Ref: DSCC/07/08/2021 Date: 07 Aug, 2021

To
M.A. Azam Chowdhury
SUS Trade International
House: 05, Road: 34, Gulshan-2, Dhaka-1212.
Sub: Offer Rate of Temporary Safety Fancy at Muktangon Play ground

Unit Price, Total


Sl No Description Quantity Remarks
Tk Amount.Tk
1 Steel Work
Vertical post (2”*2”), 3 mm
1.a 300 kg 75 22500
M.S angle bar
Bracing (1.5”*1.5”), 2 mm
1.b 400 kg 75 30000
M.S angle bar
1.c Tin Hook L.S N/A 8000
1.d Color Tin (0.32 mm), H-7’ 16 Ban 6500 104000
2 Casting Work
2.a Cement 3 bag 470 1410
2.b Sand 6 cft 30 180
2.c Khoa 12 cft 100 1200
3 Worker Fee
Frame making with R.C.C
3.a 2100 sft 30 63000
Casting & Tin Installation
3.b Transportation L.S N/A 10000
Grand Total 240290.00

With Regards

Md. Zinnat Ali


Proprietor

663, Nabinbag, New Road Sipahibag, Dhaka-1219


Mob: 01935946258, 01686465286, 01726915227,01839756971
Mokka
Eng Engineering Works
Ref: DSCC/07/08/2021 Date: 07 Aug, 2021

To
M.A. Azam Chowdhury
SUS Trade International
House: 05, Road: 34, Gulshan-2, Dhaka-1212.
Sub: Offer Rate of Street Light Pole at Muktangon Play ground

Unit Price, Total


Sl No Description Quantity Remarks
Tk Amount.Tk
1 Street light Pole (H-20’)
Vertical post (4”), 1.8 mm, M.S
1.a 10 ft 380 3800
Pipe
Vertical post (3”), 1.8 mm , M.S
1.b 10 ft 270 2700
Pipe
1.c 1’*1’ Base Plate 1 sft N/A 500
Double Coat Silver Color
1.d L.S N/A 500
(Enamel)
2 Casting Work
2.a Cement 1 bag 470 470
2.b Sand 2.5 cft 30 75
2.c Khoa 5 cft 100 500
3 Worker Fee
Pole making & Installation with
3.a 1 nos N/A 2000
R.C.C Casting
3.b Transportation L.S 1000
Grand Total 11545.00

With Regards

Md. Zinnat Ali


Proprietor

663, Nabinbag, New Road Sipahibag, Dhaka-1219


Mob: 01935946258, 01686465286, 01726915227,01839756971
Mokka Engineering Works
Ref: DSCC/07/08/2021 Date: 07 Aug, 2021

To
M.A. Azam Chowdhury
SUS Trade International
House: 05, Road: 34, Gulshan-2, Dhaka-1212.
Sub: Offer Rate of Temporary Cement godown at Muktangon Play ground

Unit Price, Total


Sl No Description Quantity Remarks
Tk Amount.Tk
1 Cement godown (12’*10’)
Vertical Post (1.5”*1.5”), 3 mm
1.a 70 kg 75 5250
M.S angle bar
Bracing (1.5”*1.5”), 2 mm M.S
1.b 30 kg 75 2250
angle bar
1.c Tin Hook L.S N/A 3000
1.d Color Tin (0.32 mm), L-6’ & 7’ 2 Ban 6500 13000
2 Casting Work
2.a Cement 1 bag 470 470
2.b Sand 2.5 cft 30 75
2.c Khoa 5 cft 100 500
3 Worker Fee
Frame making with R.C.C Casting
3.a 120 50 6000
& Tin Installation
3.b Transportation L.S 5000
Grand Total 35545.00

With Regards

Md. Zinnat Ali


Proprietor

663, Nabinbag, New Road Sipahibag, Dhaka-1219


Mob: 01935946258, 01686465286, 01726915227,01839756971