IMPORTANT FACTORS FOR PLUMBING DESIGN
VIMP – Who is going to lead Design Development up to G.F.C. - Architect/Client/PMC
1- Details of Source of water.
a) Corporation Water inlet location and size
b) Bore Well and its water testing.
c) Tanker Inlet provision
2- Corporation Drainage and storm water final connecting location with I.L.
3- Waste Water Treatment – STP/GWTP/Not Applicable.
4- Location Of UGT and Water supply Distribution System.
5- Internal Drainage – Sunk/Suspended/Raised/Sunkless
6- Shaft Drainage – Single Stack/Two Stack.
7- CP Sanitary
A) Flush Valve or flush tank (Open or Concealed) B)Wall mixer or single lever diverter
C) Wall Hung EWC or floor mounted or IWC D) Wash Basin with Bottle trap/P Trap/Flexible Pipe.
E) Kitchen Sink Connection – Flexible pipe/P Trap and supply points .
8) Toilet Tile drop – Interlinked with drainage
9) Solar Hot Water System
10) Architectural drawing set and RCC beam framing plan 2
MATERIAL DETAILS WITH APPLICATION
Sr no Item Description Material
1 Top Terrace and balcony rain water pipes UPVC GRADE-A
2 Terrace rain water pipes UPVC GRADE-A
3 Internal Soil/waste pipes UPVC GRADE-B
4 Soil / Waste down take inside shaft UPVC GRADE-B

Soil/Waste pipe diversion at basement/podium ceiling


5 UPVC GRADE-B
upto 1st manhole

6 Water supply from UGT to OHT (Riser Pipes) G.I Heavy Class / UPVC Schedule-80
7 Water supply pipes at terrace level (Terrace loop) UPVC Schedule-40/80
8 Down take for flushing - inside ducts UPVC Schedule-40/80
9 Down take for Domestic - inside ducts UPVC Schedule-40/80
Down take & terrace loop for Hot water - inside ducts &
10
Terace loop Multilayer- Kitec/Geberit/Valsir
11 Domestic & drinking water supply (inside toilet) CPVC SDR-11
12 Flushing water supply (inside toilet) CPVC SDR-11
13 Hot water supply (inside toilet) CPVC SDR-11 with nitrite rubber 3
4
TYPES OF SHAFT DRAINAGE STACK
Two Pipe System With Common Vent Two Pipe System With Separate Vent

•Vents

5
TYPE OF SHAFT DRAINAGE STACK
One Pipe System With Partial Vent Two Pipe System With Fully Ventilated System

•Vents

6
TYPE OF SHAFT DRAINAGE STACK
Single Stack System Stack System With Ventilation Branch

•Vents

7
SINGLE STACK SYSTEM

Vents

8
SINGLE STACK SYSTEM – SOLUTION

Conventional Tee Swept Tee

Hydraulic closure of air circulation Column available for air circulation

9
COMPRASION - SINGLE STACK VS TWO STACK
Layout of Conventional Drainage system Layout of Single Stack Drainage system

19-06-2022

10
TYPES OF DRAINAGE SYSTEMS

19-06-2022

11
REQUIREMENT OF PRESSURE RELIEF LINE

Backflow of water seal due to connection in over


pressure zone

12
Hydraulic jump and water curtain at the base of vertical drainage piping will cause positive pressures in the stack
CASE STUDY PROJECT AT PUNE

13
CASE STUDY PROJECT AT PUNE
Single Stack System With Ventilation Branch
No. Of
Total Pipe
Sr No. Stack Per Building Height Pipe Size
Qty
Floor Space Saving
Soil &
160MM +160MM+110MM
Waste +150MM+150MM =730MM X 9
Two Stack
1 Pipe 9 No. 110 Meter 990 RMT 110MM No.=6570MM X 300MM width = 1.971
Sq.meter X 25 Floor =49.275 Sq.Meter
Two Stack Conventional System
110MM x 9 No =990MM X 300MM
No. Of Single Stack width = 0.297 Sq. Meter X 25 Floor
Sr Total Pipe
DT Stack Building Height Pipe Size = 7.4 Sq.Meter
No. Qty
Per Floor

1 Soil Pipe 9 No. 110 Meter 990 RMT 160MM


Waste
2 9 No. 110 Meter 990 RMT 160MM
Pipe NOTE : FLEXIBILITY OF CONNECTIVITY
3 Vent Pipe 9 No. 110 Meter 990 RMT 110MM

Total Pipe Quantity 2970 RMT 14


WATER SUPPLY SYSTEM

19-06-2022

15
WATER SUPPLY SYSTEM
TANK TRANSFER TANK TRANSFER TOP SERIES CONNECTED
FLOORS BOOSTED BOOSTER

19-06-2022

16
WATER SUPPLY SYSTEM
ZONED BOOSTERS SERIES TANK TRANSFER
DIRECT SUPPLY

19-06-2022

17
WATER SUPPLY SYSTEM

19-06-2022

18
RAIN WATER DRAINAGE SYSTEMS

19
SIPHONIC ROOF DRAINAGE SYSTEM

19-06-2022

20
SIPHONIC ROOF DRAINAGE SYSTEM

Stage-1 Stage-2

Stage-3 Stage-4
21
SIPHONIC ROOF DRAINAGE SYSTEM - HOW IT FUNCTIONS

19-06-2022

22
SIPHONIC ROOF DRAINAGE SYSTEM

CONVENTIONAL RAIN WATER SYSTEM


SIPHONIC RAIN WATER SYSTEM

19-06-2022

23
19-06-2022

24
POD TOILET CONCEPT

19-06-2022
THE SECTION SHOWING VARIOUS COMPONENTS OF A TYPICAL BATHPOD/DRYWALL
25
POD TOILET CONCEPT

ALL PLUMBING SERVICES – DRAINAGE, COLD AND HOT WATER SUPPLY PIPES INSTALLED AND TESTED.
19-06-2022

26
INTERNAL VIEW OF A FINISHED POD

19-06-2022

27
BENEFITS OF BATH PODS
•Factory produced bathrooms benefit site operations due to the
following;
• Superior quality
• Reduced workers, supervisors on-site.
• Reduced material storage.
• Reduced material handling.
• Reduced damages/breakages.
• Less snagging works, testing operations.
• Significant savings in the construction program, Site built
bathroom no longer on critical path
• Flexibility of choice-any type of finishes from Natural stones to