Professional Documents
Culture Documents
Sellbem 3
Sellbem 3
Sr. No.
1 Allowable SBC=
2
P=
\ Pmax =
\ Pmin = Diff
2
7.48 35.03 0 0 0 0.00
0 0.15 3.41925 0 0 0 0
0 0.15 18 Section C-CM3 0 0 0 0 0.00 0.00
0 0.1 2.8875 Section D-DM3 0 0 0 0
0 0.1 3.24 Small TrenchM3 0 0 0 0
3 Reinforcement Steel Assume, Steel req. per cubic meter of concrete i.e. (Kg/Cum) = 80 3 Reinforcement Steel Assume, Steel req. per cubic meter of concrete i.e. (Kg/Cum) = 80
Mt. 0.000 Mt. 0.000 0.000