Gridtech Company Profile 2022

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 68

WWW.GRIDTECH.CO.

ID
WWW.GRIDTECH.CO.ID
PT GRIDTECH INDONESIA
a Private Owned Indonesian and Manufacturing
Company, specializing on electrical and
mechanical engineering, supplies, construction,
maintenance and services in Electrical High
Voltage, Medium Voltage, and Low Voltage
Systems.

WWW.GRIDTECH.CO.ID
• Our asset: Panel Manufacturer (Low and
Medium Voltage Panels)
• Good relationship with reputable brand
such as: ABB/SCHNEIDER/SIEMENS/LS
ELECTRIC.
• We are an authorized agent of BORRI
AC/DC Systems combined with SAFT and
other reputable brand.
• We are a distributor of ERICO Lightning
Protection and Grounding System.

WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID
LOW VOLTAGE MAIN PANEL CAPACITOR
DISTRIBUTION BOARD BANK
(LVMDB)

SPECIFICATION: SPECIFICATION:
• 400 V, UP TO 6300A, • 400 V, 4000 KVar
UP TO 150 kA • 7032
• 7032 • IP 41, IP 42, IP 52
• IP 41, IP 42, IP 52

PANEL SYNCHRON PANEL CONTROL RELAY


GENSET PROTECTION

SPECIFICATION: SPECIFICATION:
• 400 V, UP TO 6300 A, • APPLICABLE FOR 150
UP TO 150 kA KV SUBSTATION
• 7032 SYSTEM WITH
• IP 41, IP 42, IP 52 TOSHIBA, ABB, NARI,
SIEMENS RELAY
PROTECTION

*Our panel box has been


WWW.GRIDTECH.CO.ID certified by Sucofindo
• LS has the innovative products for every
customer desires to present standards
for the future electric power solution as
leading industrial electrical/electronic
sectors with developing high-tech.

• Standard and certification: IEC, KEMA,


KERI,V-check (KESCO)

• Voltage: 7.2 kV – 36 kV

• Current capacity: 400 A – 5000 A

• Interrupting current: 12.5 kA – 50 kA

WWW.GRIDTECH.CO.ID
Protection relays are essential for network operators, electricity suppliers, and industrial enterprises in every sector.

Siemens has been offering successful and always innovative SIPROTEC and Reyrolle protection relays and technologies.
This means long-term user satisfaction with the products and solutions, with services, and with a partnership .

WWW.GRIDTECH.CO.ID
SAFT SBLE, SBM and SBH ranges of block batteries are the optimum solution where
power is required for an uninterruptible power supply, switching and transmission,
emergency and security systems, industrial fire monitors and alarms, process control
installations, substation switchgears, signaling systems and more.

WWW.GRIDTECH.CO.ID
NVENT ERICO, a global provider of industry-leading products, services and solutions
for its customers' diverse needs in water and other fluids, thermal management and
equipment protection.

LIGHTNING PROTECTION GROUNDING AND BONDING CONDUCTORS SURGE PROTECTION

DYNASPHERE AIR TERMINAL, MKIV GEM GROUND ENHANCEMENT ERICO CU-BOUND POWER SURGE PROTECTION
MATERIAL COMPOSITE CABLE

ACCESSORIES

EXOTHERMIC CONNECTIONS WELDING MATERIAL POTENTIAL EQUALIZATION ERICO CU-BOUND ROUND


CLAMP CONDUCTOR
WWW.GRIDTECH.CO.ID
01

ABB is a pioneering technology leader that works closely with utilities, industry, transportation
and infrastructure customers to write the future of industrial digitalization and realize value.

• ACB
• MCCB AND MCB
• CONTACTOR
• LBS
• CAPACITOR BANK
• POWER FACTOR CONTROLLER
• SOFTSTARTER
• INVERTER
• RELAYS
• LOW VOLTAGE INDUCTION MOTOR
• MEDIUM VOLTAGE PANEL

WWW.GRIDTECH.CO.ID
The GR-200 Series is the next generation of Toshiba protection and control
IEDs (implemented for protection of high voltage system). Flexible adaptation
is enabled using extensive hardware and module software combinations
enabling an application oriented implementation based upon independent
function blocks.
GBU200 Bay Control
GRZ200 Distance Protection
GRL200 Line Differential Protection
GRT200 Transformer Protection
GRB200 Busbar Protection
GRD200 Multi-Function Protection & Control
GRG200 Generator & Motor Protection
GRX200 Railway DC Protection
GRE110 TO GRE140 Feeder & Motor Protection and Control
GRE160 TO GRE170 Transformer & Machine Protection Control
WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID
Installation CB 500kV 7AB2 - GITET 500kV Cilegon Baru

WWW.GRIDTECH.CO.ID
Project GI 150kV Muara Rupit

WWW.GRIDTECH.CO.ID
Project Extension 2 Line Bay GI 150kV Sarolangun

WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID
T/L 150kV Pasaman - Simpang Empat

WWW.GRIDTECH.CO.ID
Foundation Project T.32 and T.33 - Project KM 9

WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID
Development Project T/L 150kV Jailolo - Sofifi

WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID
Installation of the Control Panel, Protection Panel and Complete MK
Control Bay Trafo 3 GI Rengasdengklok

WWW.GRIDTECH.CO.ID
Installation of the Control Panel, Protection Panel and Complete MK
Control Bay 150kV - Cikarang 1 & 2 GI Fajar Surya Wisesa

WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID
Scada-based Distribution Substance Monitoring Device

WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID
Commissioning Battery Test, Battery Charger
GI 150kV Perawang Pekanbaru

WWW.GRIDTECH.CO.ID
Commissioning Battery Charger Holcim Cilacap

WWW.GRIDTECH.CO.ID
Commissioning – PLTA Saguling

WWW.GRIDTECH.CO.ID
TRAFO SERVICES

Main Transformer Bushing Replacement for Holcim 70 KV

WWW.GRIDTECH.CO.ID
Installation of Battery 800AH Surge Arrester 150 kV
PT. Indonesia Power UJP Adipala OMU PLTA Garung
2019

WWW.GRIDTECH.CO.ID
Main Transformer Bushing PT Indonesia Power UJP Adipala
Maintenance and Replacement OMU 132kW Inverter
for PLTA Sidorejo 2018 Replacement

WWW.GRIDTECH.CO.ID
PLTA Timo Trafo Power Maintenance PLTA Jelok Trafo Maintenance

WWW.GRIDTECH.CO.ID
UPS 10kVA PT. Indonesia Power Inverter 5kVA x2 110VDC 220VAC
UJP Adipala OMU + Battery Redundant PT. Indonesia Power UP
FIAMM Mrica PLTA PBS 2017

WWW.GRIDTECH.CO.ID
Charger PLTA Bengkok + Inverter 5kVA PLTA
Battery SAFT SBM277AH Kedungombo 2019

WWW.GRIDTECH.CO.ID
Battery Replacement Battery Replacement
PLTA Plumbungan PLTA SITEKI

WWW.GRIDTECH.CO.ID
Instalasi Lightning Protection nVent Grounding System Addition Work
Erico Tower Gantry PT. TJB 1 & 2 PT. Indonesia Power UJP Adipala OMU

WWW.GRIDTECH.CO.ID
Trafo Erection SAT SIEMENS Main Transformer Bushing
PT. Indonesia Power UJP PLTU ADIPALA Maintenance and Replacement Work
OMU PT. Indonesia Power Mrica

WWW.GRIDTECH.CO.ID
Grounding System Addition Work Coaly Panel Revitalization
Area GT & UAT PT. Indonesia Power PT. Indonesia Power UJP Adipala OMU
UJP PLTU Adipala OMU

WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID
• Explosion Proof Panel for Pertamina Carousel, Tanjung Priok
• LV MDP Panel for Pertamina, Batam
• Modification MCC Panel - Cirata
• Distribution Panel 400Vac – Krakatau Steel
• LV Panel GITET 500kV & 150kV – PLN GI. Ujung Berung Project
• Control Relay Protection Panel – PLN GI. KANCI & Kiara Condong Project
• Erection - Commissioning Power Transformers - Service OLTC – Gunung Garuda

WWW.GRIDTECH.CO.ID
• UPS 15kVA BORRI – PLTG Kaltim (Peaking) Project • DC System (Battery & Rectifier) – GI Hanil Jaya
• Control Relay Protection Panel – GI Pesanggaran Steel
Project • ABB Uniswitch Medium Voltage Panel –
• LV Panel GI 150kV – GI Gumawang Project Gandacement Project
• DC System (Battery & Rectifier) – GI Tanjung Uban • Panel (Praya Project) – PT. Alstom Grid
• DC System (Battery & Rectifier) – GI Dolok Galang • Panel (Ampenan Project) – PT. Alstom Grid
• DC System (Battery & Rectifier) – GI Salak • Panel (Jeranjang Project) – PT. Alstom Grid
Sidikalang • Panel ACB 3200A – PT. Tirta Kencana Cahaya
• DC System (Battery & Rectifier& Inverter) – GI PLTU Mandiri
Kaltim • Control Relay Protection Panel, AC DC Board –
• DC System (Battery & Rectifier) – Cikarang Listrindo Cikarang Listrindo Project
Project • Construction of IPDN Papua Campus Building –
PT. Nindya Karya

WWW.GRIDTECH.CO.ID
• Panel CRP, MK, Control Panel – PELINDO • Battery Charger – PT. ABB Sakti Industri
Project • Battery Charger – PT. Daya Mitra Gema Unggul
• UPS & Battery Charger – PELINDO • Battery Charger – PT. Siemens Indonesia
Project • Battery Charger & Therma South – PT. Alstom Grid
• UPS & Battery Charger – GIS Teling • Distribution Board – PT. Siemens Indonesia
Manado • LV Panel (CRP & ACDC Distribution Board – PT. Alstom
• Accu Ranmor Project – Mabes TNI AU Grid)
• SUCAD VHF/UHF Project – Mabes TNI • Lubricant Pump – PT. Holcim Beton
AU • Panel Trafo Bay & Panel MK – PT. Schneider Indonesia
• Alins Alongins Project – Mabes TNI AU • Cable LiYCY – PT. Laneg Manunggal
• Variable Speed Drive ACS800 – PT. Holcim Indonesia
• Capex Assessment Tranformer A&B – PT. Holcim
Indonesia
• UPS & Battery Charger - Chevron Geothermal Project
WWW.GRIDTECH.CO.ID
• SPB Reinforcement - Motorized Valve Aux Air • OTR2, Re-Gasketing Transformer – PT. Holcim Indonesia
Damper Unit #1 Project – PT Indonesia Power • Pulogadung Project – PT. Alstom Grid
• Suralaya Front Panel Services – PT Indonesia • Modification Door Tanjung Priok & Plumpang – PT. Alstom Grid
Power UP Suralaya • Instalasi LVMDP 6300A – PT. Cemindo Gemilang
• Relay PLTA B - PT Indonesia Power • Recondition Trafo A & B Project – PT. Holcim Indonesia
• Alins Alongins Labsa Disdikau Skadik Project – • UPS 10KVA (PELINDO II Project) – PT. Alstom Grid
TNI AU • Battery & Panel AC/DC GI SATUI Project – PT. Hasta Karya Perdana
• Printer dan Scanner Project – TNI AU • Battery, Battery Charger & Inverter (EPCC Main Substation 150/6.3KV
• Motorized Valve Aux Air Damper Unit #1 – Indarung VI Project) – PT. Alstom Grid
PT. Indonesia Power • Spare Part RCB.e BORRI – PT. Siemens Indonesia
• Line Differential Protection Relay – PT. ABB Sakti Industri
• Battery Charger & Inverter (Rembang Project) – PT. Alstom Grid
• UPS Riello – PT. Holcim Indonesia
• Capacitor Bank (Cargill Project) – PT. Siemens Indonesia
• Distribution Board (Bantaeng Project) – PT. Siemens Indonesia
• Battery Charger (Bayan Project) – PT. Sejahtera Mulia Kencana
WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID

• LV MTR Seal Bushing Replacement Services at • RUM Project – PT. Hasta Karya Perdana
PLTA Wadaslintang Merica – PT Indonesia Power • Cheil Jedang – PT. Hasta Karya Perdana
UP Mrica • IBRD J3 – PT. Alstom Grid
• Front Panel Suralaya Services– PT Indonesia • Battery & Battery Charger GI 150kV Tebo – ABB Sakti Industri
Power UP Suralaya • ACDC Distribution Board IBRD S3 – Alstom Grid
• Differential Pressure Transmitter Ball Cleaning • Battery & Battery Charger GI 150kV Betung – Alstom Grid
Project – PT Indonesia Power UJP Banten 3 Lontar • ACDC Distribution Board SUMUT 4 Project – Alstom Grid
• Bushing Trafo Replacement at Wadaslintang – • ACDC Distribution Board GI 150kV Pulogadung – Alstom Grid
PT Indonesia Power UP Mrica • ACDC Distribution Board, Battery, Battery Charger & MK SUMUT 3 Project –
• Excitation Trafo Goods & Services – PT Indonesia Alstom ACDC, Battery, Battery Charger GI 150kV KalBar – PT. Bangun Prima
Power UP Mrica Semesta
• Accu Ranmor Project – TNI AU • ACDC, Battery, Battery Charger GI 150kV Silae – PT. Citra Riantara Sejahtera
• Battery & Battery Charger GI 150kV Celukan Bawang – PT. Dalima Putra Perdana
• Battery & Battery Charger GI 150kV Bolangi – PT. Dipa Jaya Sejahtera
• ACDC Distribution Board, Battery, Battery Charger & MK GI 150kV Pasang Kayu –
PT. Dipa Jaya Sejahtera
• ACDC Distribution Board GI 150kV Rungkut Perak – PT. Guntur Jaya Makmur
• Battery & Battery Charger GIS 150kV Kembangan II – PT. Hasta Karya Perdana
WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID

• Part C&I Rosemount – PT. PLN (Persero) Tanjung Jati B • Battery & Battery Charger GI 150kV Jayapura – PT. Indokomas
• Upgrading Mechanical Regulator Valve (AR) – PT Indonesia Stem of Main Turbine Valve – PT. KPJB
Power UJP Banten 3 Lontar • ACDC Distribution Board, Battery & Battery Charger – GI 150kV
• Regulator Valve – PT Indonesia Power UJP Banten 3 Lontar Pondok Indah II – PT. Hasta Karya Perdana
• Inverter - PLTA Soedirman – PT Indonesia Power UP Mrica • ACDC Distribution Board, Battery & Rectifier GI 150kV Duren Tiga
• Trafo Oil Purification & Topping – PT Indonesia Power UP II – PT. Hasta Karya Perdana
Mrica • ACDC Distribution Board, Battery & Battery Charger GI 150kV
• Excitation Trafo PLTA PBS 2017 – PT. Indonesia Power IP Pangakalan Bun – PT. Hasta Karya Perdana
Mrica • Battery & Rectifier Tanjung Selor Project – PT. Siemens Indonesia
• Trafo Bushing Mai Replacement - PB Soedirman – • Battery & Rectifier GI 150kV Tambun II – PT. Siemens Indonesia
PT Indonesia Power UP Mrica • 500kV Lengkong (Battery + Retifier), PT. ABB Sakti Industri
• Trafo Oil Purification & Topping - PT Indonesia Power UP • Enrekang (ACDC), PT. Indokomas Buana Perkasa
Mrica • Interconnection – Bekaert (Battery & Rectifier), PT. Indokomas
• Excitation Trafo PLTA PBS - PT Indonesia Power UP Mrica • Sangatta (ACDC), PT. Hasta Prajatama
• Flowmeter & Return HSD Calibration Services – PJB Pacitan • Safety Valve, PT. TJB Power Services
• Busbar Insulation – PT Indonesia Power PLTU Adipala • IGBT Modules – Pesanggaran, PT. Grid Solutions Indonesia
WWW.GRIDTECH.CO.ID

• Battery-Charger-Inverter-Panel ACDC – Pasaman – PT Adhi Karya • Control & Protection Relay Panel and Busbar Panel – PT. Jatimulia
• Stategic Part Inverter & VFD RO – PT Indonesia Power UJP PLTU Indonesia
Adipala • GI 150kV Marabahan (ACDC, Battery & Rectifier) – PT. Wisma Sarana
• Grounding & Lightning Protection Inspection Services – PT Indonesia Teknik
Power UJP PLTU Adipala • GI 150kV Molibagu (ACDC, Battery, Rectifier & Inverter) – PT. Baruga
• Bushing Trafo Replacement – PT Indonesia Power PLTA Wadaslintang Asrinusa Development
• Bushing Mai Trafo Replacement – PT Indonesia Power PLTA PB • GI 150kV Jatiwaringin (ACDC, Battery & Rectifier) – PT. Bira Jaya Tegal
Soedirman Danas Project (Panel CRP) – PT. Gridcon Elektrik Indonesia
• Surge Arrester – PT Indonesia Power PLTA Garung • GI 150kV Ketapang (ACDC, Battery & Rectifier) – PT. Intan Mufakat Raya
• Panel Cooling Revitalization Service – PT Indonesia Power UJP PLTU • GI 150kV Maumere (ACDC, Battery & Rectifier) – PT. Wisma Sarana Teknik
Adipala • GI Summerecon (ACDC, Battery & Rectifier) – PT. Multi Fabrindo Gemilang
• 6.3KV Cable Sleeve Supply – PT Indonesia Power PLTA Wadaslintang • GI 150kV Panyabungan (ACDC, Battery, Rectifier & Inverter) –
• RST LV MOTOR Phase Bushing Replacement – PT Indonesia Power UP PT. Rekadaya
Mrica • GI 150kV Krueng Raya (ACDC, Battery, Rectifier & Inverter) – PT. Bugak
• Arrester Installation Services & Trafo Generator Test – PT Indonesia Brawang Cemerlang
Power UJP PLTU Adipala • GI 150kV Tapak Tuan (ACDC, Battery, Rectifier & Inverter) – PT. Bugak
• Motor Drive Area Waste Water Treatment Plant Project – PT Indonesia Brawang Cemerlang
Power UJP PLTU Adipala • Grounding Rod, Terminal Kit Upper & Lower – PT. Anayah Berkah
• Panel ACDC Distribution Board – PT Pindad Cemerlang
• Accu Ranmor – TNI AU
WWW.GRIDTECH.CO.ID

• NGR-NCT-Transformator GI 150 KV Pasaman – • Hydrogen Plant Control Instrument Strategic Part Project
PT Adhi Karya – PT Indonesia Power UJP PLTU Adipala
• Project Strategic Part Filter OLTC Generator Trafo • Maintenance Service Trafo Jelok 4 & Timo 2 – PT Indonesia
and Auxiliary Trafo Unit – PT Indonesia Power UJP Power UP Mrica
PLTU Adipala • JMaintenance Service Trafo Services – PT Indonesia Power
• Low Voltage System Seal Bushing Replacement – UP Mrica
PT Indonesia Power UP Mrica • Motor Drive Area Wastewater Treatment Plant Project –
• Ship Unloader Routine Material Project 01-04 – PT Indonesia Power UJP PLTU Adipala
PT Indonesia Power UP Suralaya • Voltage Side Bushing Seal Supply – PLTA PBS UNIT 3 –
• SAT Trafo DC System Project – PT Indonesia Power PT Indonesia Power UJP PLTU Adipala
UJP PLTU Adipala • Battery dan Charger Replacement – PLTA Bengkok
• Revitalization of Chemical Treatment Coaly Waste Saguling PT Indonesia Power
Water Unit SPK 098 – PT Indonesia Power UJP PLTU • Project Strategic Part Inverter System BWRO UJP –
Adipala PT Indonesia Power UJP PLTU Adipala
• Hydrogen Plant Control Instrument Strategic Part • Magnetic Oil Level Indicator Project Main Transformer at
Project – PT Indonesia Power UJP PLTU Adipala MI PLTA PBS UNIT 2 – PT Indonesia Power UP Mrica
• Modul FBM SVH – PT Indonesia Power UP Suralaya
WWW.GRIDTECH.CO.ID

• Mean Inspection Periodic Material Project – • Narogong (Yearly Load Test) – PT. Holcim Indonesia Tbk
PT Indonesia Power UP Suralaya • GI 150kV Comal (Battery, rectifier, panel ACDC) – PT. Kembar
• Replacement of Unit 2 BCT Trafo Terminals at MI PLTA Abadi Prima
PBS Unit 2 – PT Indonesia Power UP Mrica • PLTA PBS Unit 2 (Terminal Bushing CT) – PT. Indonesia Power
• Magnetic Oil Level Indicator Project Main Transformer at • GI 150kV Pandean Lamper (Panel ACDC and Junction Box) –
PLTA PBS 1 – PT Indonesia Power UP Mrica PT. Indokomas Buana Perkasa
• MIMIC LED Semaphore Indicator – PT. Graha Sumber • Capacitor Bank and Electrical Panels – Istana Plaza
Prima Elektronik • GI 150kV Marabahan (Tescomm DC System & ACDC Panel) –
• GIS Pekanbaru (Fuse Box 110VDC & 48VDC) – High PT Wisma Sarana Teknik
Voltage Instrument Inverter Project - Perum Jasa Tirta I • Trafo Services – PT. Solusi Bangun Indonesia Tbk
• GITET 500kV New Aur Duri (Panel ACDC) – • Cilacap Factory ( Service Transformer) – PT. Solusi Bangun
PT. Indokomas Buana Perkasa Indonesia Tbk
• GI 150kV Topoyo (Battery, Rectifier, Panel ACDC) –
PT. ABB Sakti Industri
• Regasketing ID fan transformer TF03 – PT. Lafarge
Cement Indonesia
WWW.GRIDTECH.CO.ID

• Maintenance Service Motor 2 – PLTA WADASLINTANG 2 – • Jacking Oil Pump Material Project – PT Indonesia Power UP
PT Indonesia Power UP Mrica Suralaya
• KL Replacement of Low Voltage Side Bushing Seal on MI • CEMS Equipment Calibration Gas Regulator Installation
PLTA PBS Unit 2 – PT Indonesia Power UP Mrica Services – PT Indonesia Power UJP PLTU Adipala
• Low Voltage System Seal Bushing Replacement – • SF6 PMT Gas Testing and Addition Services – PT Indonesia
PT Indonesia Power UP Mrica Power UP Mrica
• 110VDC Battery Revitalization – PLTM SITEKI – • Mean Inspection Periodic Material Project Electrical &
PT Indonesia Power UP Mrica Control Coal Handling System unit 4 – PT Indonesia Power
• 110 VDC Battery Unit Replacement Service Board B UP Suralaya
Periode Maintenance Outage – PT Indonesia Power UJP • OH Project Parts Periodic Control Ash Handling Unit 2 – PT
PLTU Adipala Indonesia Power UP Suralaya
• Project Material Oil and Winding Temperature Indicator • Battery SBM112 – Plumbungan – PT Indonesia Power UP
– PT Indonesia Power PLTA PB Soedirman Mrica
• Power Cable 63 kV PAF & FDF – PT Indonesia Power UJP • DC110V System Supply and Installation – GI S.Rotan dan GI
PLTU Adipala Lamhotma – PLN UPT Medan
• Battery & UPS Ship Unloader – PT Indonesia Power UJP • DC110V System Supply and Installation – GI Denai dan GI
PLTU Adipala Tanjung Morawa – PLN UPT Medan
WWW.GRIDTECH.CO.ID

• Supply and installation of control panels, protection and • GI 150kV PLTMG Ternate (Battery dan
MK – Rengasdengklok – UPT Karawang Rectifier) – PT. Indokomas
• Supply and installation of control panels, protection and MK • Bank Capacitor Replacement – Lippo Plaza
– Fajar Surya Wisesa – UPT Karawang Kramat Jati
• GI 150kV Selayang (Battery, Rectifier, Panel ACDC, Fuse • GI 150kV Tanjung Merah (Battery and Rectifier) –
Box, Inverter, MK) – PT. Sapta Guna Utama PT. Citra Riantara
• GI 150kV Likupang (Battery dan Rectifier) – PT. Indokomas • GI 150kV Marisa (Panel ACDC) – PT. Citra
Buana Perkasa Riantara
• GI Caruban Baru (Battery, Rectifier, Panel ACDC) – • Erico Copper Bonded and Dynesphare System –
PT. Purnama Indonesia PT. Kencana Mitra Total Solusi
• GIS 150kV Kemayoran II (Panel ACDC) – PT. Siemens • GI 15OkV Tanjung Pura ( Battery, Rectifier, Fuse
Indonesia box, Inverter, Panel ACDC) – PT. Medan Smart
• GIS 150kV Kebon Sirih (Panel ACDC) – PT. Siemens Jaya
Indonesia • GI 150kV Samalanga (Battery, Rectifier, Fuse
box) – PT. Medan Smart Jaya
• GXU Touch Panel – PT Meitek Indo Solusi
• Analog Input Card – PT Meitek Indo Solusi
WWW.GRIDTECH.CO.ID

• Panel Distribusi – Jetty Area – PT Adhi Karya


• Battery & Charger – PASAMAN – PT Adhi Karya
• Grounding UAT & DCS PLTU Adipala – PT Indonesia Power UP Adipala
• Battery 48 VDC – PLTA PB. Soedirman – PT Indonesia Power UP Mrica
• Pengadaan Auxiliary Power System SAT PLTU JATENG 2 OMU – PT Indonesia Power UP
Adipala
• Pressure Relief Device – Mrica PLTA KDO – PT Indonesia Power UP Mrica
• Project Material Breaker MCC Turbine Unit 5 – PT Indonesia Power UP Suralaya
• SCADA-Based Distribution Substation Monitoring Device – PLN UID Disjaya
• Panel 400 VAC – Peranap – PT Waskita Karya
• Battery & Charger – GI Barru – PT Wijaya Karya
• Panel ACDC – GI Barru – PT Wijaya Karya
WWW.GRIDTECH.CO.ID

• Project Addition of UPS to Control System


• PLC Area BOP – PT Indonesia Power PLTU Jawa Tengah 2 Adipala
• Added Electricity Treatment System MCC Cabinet 380 Area EWS, Electronic Room,
DCS dan Sistem DC – PT Indonesia Power PLTU Jawa Tengah 2 Adipala
• Generator Transformer Grounding Inspection Services – PT Indonesia Power PLTU
Jawa Tengah 2 Adipala
• Mill and Coal Feeder Cable Replacement – PT Indonesia Power PLTU Jawa Barat 2
Pelabuhan Ratu
• Power Ship Unloader Cable Project 1 and 2 – PT Indonesia Power PLTU Jawa Barat 2
Pelabuhan Ratu
• Mean Inspection Periodic Material Project Control and Instrument and Electrical
Coal Handling System Unit 3 – PT Indonesia Power Suralaya Power Generation Unit
• MCC Coal Handling Control Room Battery Replacement Services – PT Indonesia
Power Suralaya Power Generation Unit
WWW.GRIDTECH.CO.ID

• Accessories and sparepart CT For Rectifier 47 VDC – PT ABB – GI Takengon


• Battery Charger 110 VDC – PT ABB – GI Indramayu
• Copper Bonded Ground Rod Section – PT Anugrah Langit Nusantara
• Capacitor Bank 100 KVAR 525 Volt 50Hz – PT. Anzen Pakarindo
• AC UPS 10kVA – PT Barata Indonesia – Luwuk 40 MW
• Sparepart Trafo – PT CG Power System – PLN MBS Sulawesi
• Powder Erico Cadweld – Cikarang Listrindo
• Panel 400/230 VAC, 110 VDC Distribution, 48 VDC Distribution Board – PT Dipa Jaya – GI 150
KV Tutuyan
• Relay differential Toshiba – PT Grid Solution – GA Perawang
• Battery & Charger 48 VDC, Panel 48 DCDB – PT Hasta Prajatama – PLTU Muara Jawa Kaltim
• 48 V DCDCDB, 110 V DCDB & 400 V ACDB – PT Indokomas – GIS 150kV Cikupa
WWW.GRIDTECH.CO.ID

• Battery 110 VDC – PT. Information Data System – GITET 275/150 AUR Duri
• Installation and Setting Proteksi LV Panel – PT Cemindo Gemilang
• Numerical Line Differential Protection Relay TOSHIBA GRL200 – PT Citra Riantara Sejahtera
• Battery 110 VDC & 48 VDC, Rectifier 110 VDC & 48 VDC – GITET Muara 275kV ENIM – PT
CitramasjayaTeknikmandiri
• Supply and Installation Main Control Cabinet, Panel Synchron – PT Hanang Gema Instrument
• 110 VDC Switchboard, 48 VDC Switchboard & 400/230 VAC Switchboard – GIS 150kV Cikupa
– PT Indokomas Buana Perkasa
• Battery 110 VDC & Rectifier 110 VDC – GI 150kV Polman – PT Kelinci Mas Unggul
• Inverter 5kVA BORRI IMB.e – GI 150kV Sorong – PT Malista Konstruksi
• Panel Lighting Outdoor Type C Box Panel – SKTT 150kV Gajah Tunggal Incomer – PT Persada
Priyatna
• Neutral Current Transformer (NCT) – GI 150kV Timika – PT Rudhio Dwiputra
WWW.GRIDTECH.CO.ID

• 110V DC Power Supply System Installation in UPT Karawang, UPT Bandung, UPT Cirebon,
UPT Purwokerto, UPT Semarang, and UPT Salatiga – PT PLN Unit Induk Transmisi Jawa
Bagian Tengah
• Installation of Relay Defense Scheme – PT PLN UIP3BS UP2B Sumbagut
• Integration of RC Scada Bay Substation Facilities – PT PLN UID Jakarta Raya UP2D Jakarta
• Power Ship Unloader Cable Replacement 1 & 2 – Pelabuhan Ratu – PT Indonesia Power
PLTU Jawa Barat
• DC Drive Slewing Project – PT Indonesia Power Suralaya
• 110V Battery Installation in Various GI Locations – PT PLN UPT Palembang
• Installation of UPS and Battery Control Center – PT PLN UIP2B Jawa, Madura & Bali
• Construction of T/L 150kV at GI Piru – GI Kairatu – PT Rekadaya – PT PLN UIP Maluku
• 24VDC Battery Charger Project – PT Indonesia Power PLTA Jelok

WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID

• Panel ACDC – YiChu Projecy – PT ABB • Battery-Charger-Panel – Batulicin – PT Indokarya


• Charger-Battery-Panel-Inverter – Yongyau Project – PT • Amplifier Vibrator – PT Solusi Bangun Indonesia
ABB • DSCL2 Surge Counter, Digital – PT Stal Teknika
• Breaker (ACB) – ADARO – PT Makmur Sejahtera Wisesa • Pipe, Welded, Galvanized – PT Tozinda Harindra
• Grounding Enchancement Material – PT Mitra Sarana Karya
Focusindo • Supply & Instalation Pipe, Welded, Galvanized –
• Battery NiCd SCM 59 – PT Solusi Bangun Indonesia PT Tozinda Harindra Karya
• Grounding Enchancement Material - PT Solusi Bangun • Battery Saft – PT Bekaert Indonesia
Indonesia • Cable Double Shield Erico – PT Cahaya Bintang
• Charger-Battery-Panel-Inverter – Haijing Project – PT • Replacement Sparepart Panel 20kV – PT
ABB Cemindo Gemilang
• LV Panel Arrester + MV Panel Arrester – PT Cemindo • Rectifier 110VDC – PT Indorama
Gemilang
• Panel 400VAC – GI Negeri Dolok – PT Enam Enam Group
• Saft Battery – Project ACS Lumut Balai – PT Grid
Solution
was established in 2011 with the
certificat as follows

WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID
WWW.GRIDTECH.CO.ID

We have implemented and integrated Quality, Health, Safety, and Environment Management
System ISO 9001:2015 by Bureau Veritas Certification, ISO 14001:2015 and ISO 45001:2018 by QA
Technic, and SMK3 by Kementerian Ketenagakerjaan Republik Indonesia
SIUP Izin Industri

WWW.GRIDTECH.CO.ID
Nomor Induk
Izin Lokasi
Berusaha (NIB)

WWW.GRIDTECH.CO.ID
Distribution Letter NPWP SIUJPTL

WWW.GRIDTECH.CO.ID
SBUJPTL Gardu Induk SBUJPTL Transmisi SBUJPTL PLTS

WWW.GRIDTECH.CO.ID
Kartu Gabung Pelaksanaan
SBUJK
Konstruksi Nasional

WWW.GRIDTECH.CO.ID
SIUJK PKP

WWW.GRIDTECH.CO.ID

You might also like