General Specifications Legends and Symbols: Phase 6
General Specifications Legends and Symbols: Phase 6
1. DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY. WHATEVER IS CALLED FOR IN EITHER IS BINDING AS W
THOUGH CALLED FOR IN BOTH. FCU - FAN COIL UNIT
S
2. ALL WORK SHALL CONFORM WITH ALL APPLICABLE BUILDINGS CODES, FIRE CODES, AND ALL AUTHORITIES
ACCU - ACCU OUTDOOR UNIT N
HAVING JURISDICTION.
M - ROLL-UP DOOR
R
3. THE EQUIPMENT SPECIFIED ON THE DRAWINGS HAVE BEEN SELECTED AS THE BASIS OF DESIGN. THE USE OF E
REVIEWED OR SPECIFIED EQUALS SHALL BE COORDINATED BY THE CONTRACTOR FOR SPACE REQUIREMENTS,
- EXHAUST FAN
EQUIPMENT DIMENSIONS, AND PERFORMANCE.
4. DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL DESIGN INTENT, ARRANGEMENT, AND GENERAL
EXTENT OF SYSTEMS. DO NOT SCALE DRAWINGS NOR USE AS SHOP DRAWINGS. WHERE ALTERNATIVE ROUTING,
OFFSETS, AND TRANSITIONS ARE REQUIRED FOR FIELD COORDINATION OF ALL OTHER TRADES, THIS CONTRACTOR
SHALL FIELD COORDINATE WITH ALL OTHER TRADES, AND SHALL MAKE CHANGES WITHOUT ADDITIONAL COSTS.
5. CONTRACTOR SHALL CLOSELY COORDINATE NEW MECHANICAL WORK WITH ALL NEW AND EXISTING
MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION, ARCHITECTURAL, AND STRUCTURAL MEMBERS.
RELOCATE EXISTING MECHANICAL, PLUMBING AND FIRE PROTECTION WORK AS REQUIRED TO ACCOMMODATE ALL
SITE DEVELOPMENT PLAN
NEW WORK (ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, FIRE SCALE: NTS
ALARM, LOW VOLTAGE, A/V, ETC. LINE
ERTY
PROP
INNOREV FACILITY
AREA
6. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION UNLESS
SPECIFICALLY DIRECTED OTHERWISE.
7. COORDINATE ALL DIFFUSER AND GRILLE LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS, FIRE 112000
PROTECTION AND ELECTRICAL DRAWINGS. PROPERTY LINE
METAL
8. INSTALL CONDENSATE DRAINS FOR ALL COOLING COILS WITH TRAP DEPTH EQUAL TO 1.5 TIMES THE UNIT'S FENCE
TOTAL STATIC PRESSURE. DISCHARGE CONDENSATE TO FLOOR SINK/FLOOR DRAIN UNLESS NOTED OTHERWISE.
9. CONTRACTOR SHALL FIELD VERIFY ALL MECHANICAL ITEMS PRIOR TO SUBMITTING A BID.
10
10. PROVIDE ACCESS PANELS IN HARD CEILINGS FOR ACCESS TO ALL MECHANICAL EQUIPMENT, FIRE DAMPERS,
FIRE/SMOKE DAMPERS, ISOLATION VALVES, ETC. THIS SHALL INCLUDE ALL NEW MECHANICAL ITEMS REQUIRING
4000
LINE
ACCESS. ERTY 9
PROP
11. THE MECHANICAL DIAGRAMS SHALL BE INCORPORATED INTO THE ASSOCIATED WORK AND PROVIDE GENERAL
CLEANFIT
GUIDANCE AS TO THE INSTALLATION INTENT WHETHER REFERENCED TO OR NOT. IT IS THE CONTRACTOR'S 5530
5530 4000
4000 Down
Elevator Shaft TECHNOLOGIES 6500
6830
6830
RESPONSIBILITY TO PROVIDE ALL NECESSARY COMPONENTS FOR A COMPLETE INSTALLATION, AND INSURE THAT 3472
3470 KKM DI WATER
ALL INSTALLATIONS ARE IN ACCORDANCE WITH THE EQUIPMENT'S MANUFACTURER'S WRITTEN INSTALLATION
Switch- Guard
Roof Line
INTERNATIONAL TREATMENT AREA
8
INSTRUCTIONS. Gear House
3020 (BLDG. 4) 4000
12. COORDINATE AND VERIFY ACTUAL APPROVED EQUIPMENT DIMENSIONS PRIOR TO POURING CONCRETE
EQUIPMENT PADS. 7
5000
GATE ENTRANCE
4000 6
5000
4000 BLDG. 1 BLDG. 2 BLDG. 3
5
4000
6000
PARKING AREA
VICINITY MAP
RO
4000 4
SCALE: NTS
6000
AD
4000
CANTEEN
3
W
4000
S
5000
2
N
4000
CLEANFIT TECHNOLOGIES
E
EAST AVE.
PROPERTY LINE
5000
INTERNATIONAL INC. 4000
1
LOT 3281-1, PHASE 6,
PHASE 6
MAIN RO
4000
4000
BLDG
TO METAL
BALIBAGO LAND FENCE
6.64
5.85
6.44
K PROPERTY LINE
13.96
5.12
6.59
E WAL
7.32
10.70
WALK
11.36
SID
SIDE
11.75
41.50
12.40
10.00
20.00
LTI - PEZA
GATE LTI - PEZA ROAD
GATE
A B C D E F G H I J