Professional Documents
Culture Documents
Al AMAL COMPANY PROFILE 2022-2023
Al AMAL COMPANY PROFILE 2022-2023
Al AMAL COMPANY PROFILE 2022-2023
PRE-QUALIFICATION DOCUMENT
PRE-QUALIFICATION DOCUMENT
CONTENTS Page
INTRODUCTION_______________________________2-2
ORGANIZATION_______________________________5-5
SAFETY POLICY______________________________25-26
TRADE LICENSE______________________________27-27
DUBAI CHAMBER______________________________28-28
LOCATION MAP_______________________________29-29
PRE-QUALIFICATION DOCUMENT
Al Amal was established in 2004 as a specialized company in design and installation of MEP services.
Over the years Al Amal has rapidly expanded and grown from strength to strength. The company deliv-
ers exceptional performance in all the projects. It has earned a reputation of being a highly dependable
specialist MEP Contractor in UAE with great assurance of implementing the safety procedures in all pro-
jects.
Al Amal is professionally managed by an experienced management team who led the company to be-
come one of the best pioneer companies in MEP, Interior and FM industries.
Our Company has gained its credentials by hiring highly qualified staffs, engineers and technicians who
are always available to deliver the world-class quality MEP & FM projects while meeting our valuable cli-
ents’ demands in qualitative and timely manners.
Al Amal provides a complete range of Mechanical, Electrical ,Plumbing and Facilities Management
Services including:
We hope that you would find the enclosed company profile and detailed Experience meeting
your expectations. We are looking forward to the opportunity of working with you.
PRE-QUALIFICATION DOCUMENT
“PERFECT TEAM WORK TO PROVIDE HIGH QUALITY SERVICES TO OUR VALUABLE CLIENTS AS
PER THEIR REQUIREMENTS & ON TIME”
OBJECTIVES
-To achieve client satisfaction through quality based work as per ISO 9001:2008 standard, in
accordance with the contract documents, relevant costing, perfect timing, as per the local
laws.
-To gain profit by doing the job “right first time”, considering employee, customer and envi-
ronment satisfaction.
-To develop awareness of each employee about quality work and help each of them to be
more aware of individual responsibilities for the quality delivery of the work in all project
activities required.
PRE-QUALIFICATION DOCUMENT
CONTROL OF DOCUMENTS
LEVEL 4
LEVEL 3
LEVEL 2
QUALITY PROCEDURES
LEVEL 1
QUALITY MANUAL
PRE-QUALIFICATION DOCUMENT
PRE-QUALIFICATION DOCUMENT
PRE-QUALIFICATION DOCUMENT
PRE-QUALIFICATION DOCUMENT
(G+3+R) LABOUR ACCOMODATION @ PLOT 599-1866 JEBEL ALI INDUSTRIAL, DUBAI UAE
PRE-QUALIFICATION DOCUMENT
PRE-QUALIFICATION DOCUMENT
PRE-QUALIFICATION DOCUMENT
PRE-QUALIFICATION DOCUMENT
PRE-QUALIFICATION DOCUMENT
2B + G + 9 TYP FLR + HC COMMERCIAL & RESIDENTIAL BUILDING AT AL JADAF
CLIENT: MR. ABDULHAMID MOHAMMED SAEED ALAHMADI
CONSULTANT: NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR: ENGINEERING CONSTRUCTION & RECONSTRUCTION LLC
MEP CONTRACTOR: AL AMAL ELECTROMECHANICAL LLC
PRE-QUALIFICATION DOCUMENT
PRE-QUALIFICATION DOCUMENT
PRE-QUALIFICATION DOCUMENT
The Project is a huge Steel Factory with 750,000 Sq. Feet size at Dubai Industrial City.
PRE-QUALIFICATION DOCUMENT
HERE ARE THE LIST THAT SUMMARIZES OUR PROJECTS SEPARATED IN CATEGORIES:
2 PROPOSED (G+3+R) MEP WORK IKK GROUP FREELINE ENGI- BLUE JEBEL ALI INDUS-
LABOUR ACCOMO- NEERING CON- PEARL CONTRAC TRIAL DUBAI, UAE
DATION @ PLOT 599 SULTANTS TING CO. LLC ON GOING
-1866 JEBEL ALI IN-
DUSTRIAL, DUBAI
UAE
3 PROPOSED FACTORY, AC WORK AM SECURITY AL SARAYA ENGI- SYSTEM CON- INTERNATIONAL
WAREHOUSE & OF- PRINTING NEERING CON- STRUCT MEDIA PRODUC-
FICE BLDG. TECHNOLO- SULTANTS TION ZONE IN
GY’S FT LLC DUBAI (IMPZ) 2013
4 AL GHAITH WARE- FIRE FIGHTING & AL GHAITH HISHAM LAHHAM MULTI LINK RAS AL KHOUR IN
HOUSE FIRE ALARM REAL ESTATE ENGG. CONTRACTING 2013
COMPANY LLC
5 AQUAGAS OFFICE & MEP WORK AQUA GAS AQUAGAS FNC/AML DIP IN 2011
FACTORY GROUP
6 ALQUSAIS WARE- MEP WORK AL QUSAIS AL ZAHED PROP AL ZAHID CON- QUSAIS IN 2010
HOUSE TRACT
PRE-QUALIFICATION DOCUMENT
2 PROPOSED MEP WORK DAR AL BER SOC- ENGR. ADNAN GEORGIA CON- AL NAHDA DUBAI,
2B+G+11 TYP CIETY SAFARINI TRACTING CO. UAE ON GOING
+HCR RESIDEN- LLC
TIAL BUILDING
PLOT#241-03-77
3 1B+G+6+R RESI- MEP WORK MAKEEN PROPER- GOLDEN SQUARE MODERN AL WARQA 1, DU-
DENTIAL BUILD- TIES LLC ENGINEERING BUILDING CON- BAI UAE ON GOING
ING CONSULTANT TRACTING CO
LLC
4 B+G+7TYP+RF -AL MEP WORK GOLDEN SQUARE MODERN MANKHOOL DUBAI
GHURAIR PROP- ENGINEERING BUILDING CON- IN 2016
ERTIES BUILDING CONSULTANT TRACTING CO
LLC
5 PROPOSED LABOR MEP WORK SEVILLE PRODUCTS PROLEED ME- AL JIHAN GULF DIP DUBAI IN 2015
ACCOMO- LLC CHANICAL ENGI- HORIZON
DOTAION PI375 NEERING CON- CONT. LLC
SULTANTS
6 B+G+1+R HOTEL MEP WORK AL WALEED REAL DESIGN CENTER AL WALEED UMM SUQEIM DU-
BUILDING ESTATE LLC CONTRACTING BAI IN 2015
CO. LLC
7 2B + G + 9 TYPI- MEP WORK MR. ABDULHAMID NATIONAL ENGI- ENGINEERING AL JADAF IN 2015
CAL FLOORS + MOHAMMED NEERING BU- CONSTRUC-
HC COMM. & RES. SAEED ALAHMADI REAU TION & RECON-
BUILDING STRUCTION
8 G+8 Commercial MEP WORK MOHAMED AB- ENG. ADNAN BECON CON- DUBAI SILICON
& Residential DULLA ABDULATIF SAFFARINI TRUCTION OASIS IN 2015
Building AL MULLA
PRE-QUALIFICATION DOCUMENT
11 CORAL RESIDENCE MEP WORK SH.AHMAD SAQER AL - NATIONAL ENG’G BIN ZAYED CON- AL BARSHA
HOTEL (G+6+HC) NAHYAN & SPA BUREAU - ARCAN TRACTOR
MANG
12 MOVENPICK RESI- MEP WORK KHALIFA SAYED MO- ADNAN SAFARINI BUSET CON- OUD METHA IN 2006
DENTIAL APART- HAMAD ENG. TRACTING/BIN
MENT (B+G+11FLR) ZAYED CONTRAC-
TOR
13 EMIRATES AIRLINE PLUMBING&A/C MUSABAH ALFATAN ARC INTERNATION- ASGC ALSHAFAR AL QUSAIS IN 2005
RESIDENTIAL BLDG. WORK AL GEMAC (MEP)
(B+G+6FLR)
15 AKRAM JORD BUILD- MEP WORK I.B.G GROUP I.B.G GROUP AL AMAL SHARJAH IN 2007
ING (G+8FLR)
16 HEALTH CARE CITY AC WORK ALNAFIS NATIONAL NATIONAL ENG’G BUHLEBA CON- HEALTH CARE CITY IN
OFFICE BLDG. (G+3 TRADING GROUP BUREAU ECC ME- TRACTING/ALKO 2006
FLR) #52 CHANICAL
17 LIBERTY HOUSE MEP WORK LIBERTY HOUSE AL REYAMI AL REYAMI DIFC IN 2009
PRE-QUALIFICATION DOCUMENT
CAT 3. HEALTH INSTITUTES; LABORATORIES; FITNESS
2 AKOYA CLUB-HOUSE MEP WORK DAMAC PROP- DYNAMIC ENGI- SEIDCO GENERAL AL HEBIAH 3RD IN
B + G + 1 FLOOR ERTIES NEERING CON- CONTRACTING 2015
CLUB-HOUSE SULTANTS
3 AL ROYA MEN HIGHER MEP WORK DUBAI MUNICI- DAR CONSULTANT ALMOSA PIONEER/ ACADEMIC CITY IN
COLLEGE (G+1) PALITY ARJ 2007
4 WELLNESS SPA MEP WORK LAND MARK ARKI PLAN DESIGN INTERNAL LINE OASIS CENTER DUBAI
INTERIOR DESIGN IN 2011
5 FITNESS FIRST (2 MEP WORK FITNESS FIRST FITNESS FIRST ENG’G. DIPLOMAT ENGI- TECOM TOWER IN
FLOORS) GROUP (land NEERING 2008
mark)
6 FITNESS FIRST MEP WORK FITNESS FIRST FITNESS FIRST ENG’G. DIPLOMAT ENGI- ALHANA CENTER AL
GROUP (land NEERING DIAFA ROAD IN 2008
mark)
7 FITNESS FIRST CENTER MEP WORK FITNESS FIRST FITNESS FIRST ENG’G. DIPLOMAT ENGI- BURJUMAN IN 2007
(4 FLOORS) GROUP NEERING
8 FITNESS FIRST CENTER) MEP WORK FITNESS FIRST FITNESS FIRST ENG’G. DIPLOMAT ENGI- SAFEER MALL SHAR-
GROUP NEERING JAH IN 2008
9 SKY CLINIC MEP WORK SKY CLINIC SKY CLINIC RAM INTERIORS BURJUMAN OFFICE
TOWER IN 2007
10 CITY PHARMACY MEP WORK CITY PHARMA- CITY PHARMACY CITY PHARMACY SHARJAH IN 2009
CY
11 UMM AL QUAIN GEN- A/C WORK ABU DHABI HDP OVERSEAS CON- STS BPOWER UMM SUQEIM
ERAL HOSPITAL GOVERNMENT SULTANT
12 HEALTH CARE CITY AC WORK ALNAFIS NA- NATIONAL ENG’G BUHLEBA CON- HEALTH CARE CITY IN
OFFICE BLDG. (G+9FLR) TIONAL TRAD- BUREAU ECC ME- TRACTING/ALKO 2006
# 53 ING GROUP CHANICAL
13 HEALTH CARE CITY AC WORK MAZAYA NATIONAL ENG’G BUHLEBA CON- HEALTH CARE CITY IN
OFFICE BLDG. (G+6FLR) BUREAU ECC ME- TRACTING/ALKO 2006
#25 CHANICAL
PRE-QUALIFICATION DOCUMENT
CAT 4. LUXURY, RECREATIONS & RESTAURANTS
2 BURJUMAN MALL MEP WORK BURJUMAN BURJUMAN ENGINEER- AL RYAMI BURJUMAN IN 2008
(ENTRANCE, CORRI- MALL ING
DORS,
HALLS,BASEMENTS)
3 EMIRATES HILL MEP WORK PALACE GROUP NEW TECH PALACE CON- EMIRATES HILL IN
TRACTING 2009
4 PAUL RESTAURANT MEP WORK PAUL RESTAU- AZADEA GROUP DUBAI CIVIL AVIA- DUBAI AIRPORT IN
RANT TION 2008
5 RUSSIAN RESTAURANT- MEP WORK RUSSIAN RES- PALACE CONTRACT- PALACE CON- JBR IN 2008
JBR TAURANT-JBR ING TRACTING
6 MASHAWI RESTAURANT MEP WORK MASHAWI RES- PALACE CONTRACT- MASHAWI IMAR BLDG. MALL IN
TAURANT ING 2008
7 PULP JUICE-COFFEE MEP WORK PULP JUICE- AZADEA GROUP DUBAI CIVIL AVIA- DUBAI AIRPORT IN
SHOP AIRPORT COFFEE SHOP TION 2008
AIRPORT
8 PAPA JOHNS RESTAU- MEP WORK PAPA JOHNS FIT & FUNCTION JAWAD GROUP JEBEL ALI IN 2009
RANT RESTAURANT
9 SUSHI RESTAURANT-JBR MEP WORK SUSHI RESTAU- PALACE CONTRACT- PALACE CON- JBR IN 2008
RANT-JBR ING TRACTING
10 FAT BURGER RESTAU- MEP WORK FAT BURGER FAT BURGER LLC EIGHTY 8 DESIGN DUBAI MALL IN 2008
RANT RESTAURANT
11 LE PAIN BAKERY 1 & 2- MEP WORK LE PAIN BAKERY AL SHAYEA GROUP & AL SHAYEA GROUP JBR IN 2008
JBR 1 & 2-JBR AMBB & AMBB
12 KITCHEN & RESTAU- MEP WORK KITCHEN & BAB ALSHAMS HOTEL BAB ALSHAMS BAB ALSHAMS HOTEL
RANT (OUTSIDE KITCH- RESTAURANT IN 2008
EN) (OUTSIDE
KITCHEN)
PRE-QUALIFICATION DOCUMENT
CAT 4. LUXURY, RECREATIONS & RESTAURANTS
14 TOAST RESTAURANT MEP WORK TOAST RESTAU- PALACE CONTRACT- TOAST DUBAI MALL IN 2008
RANT ING
15 THAI EXPRESS RESTAU- MEP WORK THAI EXPRESS CREATIVE LINE DÉ- DESIGN & BUILT JEBEL ALI IN 2009
RANT RESTAURANT COR
16 STARBUCKS-JBR (2&3) MEP WORK STARBUCKS-JBR AL SHAYEA GROUP & AL SHAYEA GROUP JBR IN 2008
(2&3) AMBB & AMBB
17 CHILI’S RESTAURANT AC WORK CHILI’S RESTAU- AL GAITH REAL ES- CHILI’S JUMEIRAH, DUBAI IN
RANT TATE 2009
18 PYRAMID CAFÉ MEP WORK PYRAMID CAFÉ DASS CONTRACTING DASS CONTRACT- 2009
ING
19 MOT MACDONALD MEP WORK MOT MACDON- MOT MACDONALD PJCS, MOT MAC- DUBAI FESTIVAL CITY
(CONSULTANT OFFICE) ALD CONSULTANT DONALD TOWER IN 2008
(CONSULTANT
OFFICE)
20 MANGO SHOP/ CITY MEP WORK MANGO SHOP/ AZADEA GROUP MANGO INT’L. CITY CENTER IN 2008
CENTRE CITY CENTRE
21 TED LAPIDUS MEP WORK TED LAPIDUS PARIS GROUP PARIS GROUP DFC IN 2008
23 BALMAIN SHOP MEP WORK BALMAIN SHOP MARINA MALL PARIS GROUP MARINA MALL IN
2008
24 GLOBAL DIAMOND MEP WORK GLOBAL DIA- GLOBAL DIAMOND MICHAEL BAYEVA ALMAS TOWER IN
MOND 2008
PRE-QUALIFICATION DOCUMENT
26 ARCOS EAST MEP WORK ARCOS DIA- ARCOS EAST MICHAEL BAYEVA ALMAS TOWER IN
MOND 2008
27 FIRE TRAP SHOP MEP WORK PARIS GROUP FIRE TRAP SHOP PARIS GROUP DFC IN 2008
3 VILLA E-101 MEP WORK PALACE GROUP AAS CREATION PALACE CON- PALM JUMEIRAH IN
TRACTING 2010
PRE-QUALIFICATION DOCUMENT
CAT 6. BANKS & OFFICES
2 AUSTRALIAN CONSU- MEP WORK DEPARTMENT GHD GLOBAL PTY AL HABTOOR BURJUMAN IN 2014
LATE OF IMMIGRA- LTD LEIGHTON
TION AND
BOARDER PRO-
TECTION
3 HORIZON AND CO LAW MEP WORL HORIZON AND DESIGN WORK PORT- AL HABTOOR 48 & 49 FLOOR,
TH TH
4 HILAL BANK-BUR DUBAI MEP WORK HILAL BANK BRAND UNION AL REYAMI INTERI- BUR DUBAI IN 2008
ORS LLC
5 HILAL BANK-AL GAR- MEP WORK HILAL BANK BRAND UNION AL REYAMI AL GARHOOD IN
HOOD 2008
6 MASHREQ BANK MEP WORK MASHREQ BANK MASHREQ BANK AL REYAMI AL AIN IN 2008
7 BURJUMAN 11 FLR.
TH
AC WORKS BURJUMAN BURJUMAN ENGINEER- AL AMAL BURJUMAN IN 2010
MALL ING
8 BURJUMAN 12 FLR.
TH
AC WORKS BURJUMAN BURJUMAN ENGINEER- AL AMAL BURJUMAN IN 2010
MALL ING
9 EMIRATES BANK MEP WORK EMIRATES BANK AL REYAMI DESIGN & BUILT AL AIN IN 2008
PRE-QUALIFICATION DOCUMENT
CAT 6. BANKS & OFFICES
12 BURJUMAN MGT OFFIC- MEP WORK BURJUMAN MGT BURJUMAN MALL BURJUMAN ENG’G. BURJUMAN DUBAI IN
ES (BASEMENT) OFFICES 2008
(BASEMENT)
13 AUSTRALIAN CONSU- MEP WORK AUSTRALIAN AUSTRALIAN EMBAS- AL REYAMI BURJUMAN OFFICE
LATE CONSULATE SY TOWER IN 2008
14 KEO ENG’G. OFFICE MEP WORK KEO ENG’G. KEO INTERNATIONAL KEO CONSULTANT BURJUMAN OFFICE
(CONSULTANT OFFICE) OFFICE TOWER IN 2007
(CONSULTANT
OFFICE)
15 EMCC OFFICE MEP WORK EMCC OFFICE STERLING DESIGNS DESIGN & BUILT DFC, DUBAI IN 2009
16 HERA GLOBAL MEP WORK HERA GLOBAL AL REYAMI HERA GLOBAL BUSINESS TOWER
(TWIN TOWER) IN
2008
17 PETRONAS OVERSEAS MEP WORK PETRONAS PETRONAS OVERSEAS AL REYAMI BURJUMAN OFFICE
OVERSEAS TOWER IN 2007
18 BAKER BOOTS OFFICE MEP WORK BAKER BOOTS BAKER BOOTS AL REYAMI BURJUMAN OFFICE
OFFICE TOWER IN 2007
19 PWC LOGISTICS OFFICE MEP WORK PWC LOGISTICS PWC LOGISTICS AL REYAMI PARK PLACE TOWER
OFFICE IN 2008
21 FLUTRAN FINANCIAL MEP WORK FLUTRAN FI- FLUTRAN FINANCIAL AL REYAMI ACADEMIC CITY IN
HOLDING NANCIAL HOLD- HOLDING 2008
ING
PRE-QUALIFICATION DOCUMENT
The responsibility for implementing health and safety policies rests with the
safety officer, in turn is accountable to the Project Manager. The effective imple-
mentation and operation of these policies are kept under continual review by the
Project Manager who shall receive information from the Safety Officer concerning
accidents, dangerous occurrence and overall safety performance.
Within the frame work provided by these policies, all employees have a part
to play in maintaining the highest standards of health and safety and in achieving
full compliance with legal requirements. The basic need is for every employee to
take care of her/himself, his colleagues and the general public.
The whole site, except the site office compound will be a hard hot area and
wearing of safety helmets is mandatory.
The safety officer is responsible for ensuring that all employees received the
necessary training to carry out their duties in a healthy and safe manner. And that
staffs are charged with particular responsibilities for health and safety. They must
be able to fulfill those duties and obligations.
The policy forms the basis for a reduction in hazards and an improvement in
health, safety and environment at work. Its effectiveness will come from the individ-
ual and combined efforts of everybody to make it successful.
26
AL AMAL ELECTROMECHANICAL LLC
Where Quality Counts
PRE-QUALIFICATION DOCUMENT
SAFETY AUDITS: In addition to carrying out regular site inspections, the site
safety officer will establish and maintain a health and safety audit program de-
signed to provide in depth examinations of all operations and activities on the
project including sub contractors.
INSTRUCTION AND SUPERVISION: The site safety officer will give clear, unambig-
uous instruction of the work in hand to the personnel for whom they are respon-
sible, to ensure that all operations are undertaken safety and without risks to
health.
PRE-QUALIFICATION DOCUMENT
LE
PRE-QUALIFICATION DOCUMENT
LEGAL STATUS (DUBAI CHAMBER 2021-2022)
PRE-QUALIFICATION DOCUMENT