BS 8110 Data Given: Calculation Sheet
BS 8110 Data Given: Calculation Sheet
Job Title:
Subject:
Preliminary Sizing
Assume Thickness of slab = 125 mm
Diameter of bar = 12 mm
Effective depth for the short span, d1 = 79 mm d1 = 79
Effective depth for the long span, d2 = 67 mm d2 = 67
Loading
Short Span, lx = 2 m 2 lx = 2
Long Span, ly = 2 m ly = 2
2 0.056
0.055 0
Therefore, z = 75.05 mm
Cracking Check
max. spacing = 250 mm c/c
min. spacing = 100 mm c/c Cracking Check
Therefore, z = 63.65 mm
z= 79 ( 0.95d = 75.05 )
Therefore, z = 75.05 mm
z= 67 ( 0.95d = 63.65 )
Therefore, z = 63.65 mm
T 10 extend from
@ 200 the edge a
T 10 minimum
@200 distance of
T 10 0.4 m
@ 200
2 T 10
@ 200 T 10
@ 200
T 10
@ 200
1 0 1 1 1
Surcharge
WATER
Tw
Hw
H
LE LS
Lw
Assume propped cantilever. Worst case is during construction when the drain is
empty without water.
Max height, H = 700 mm (=Hw)
Drain near road pavement = 450 mm
ANALYSIS
Assume Φ = 30 °
Ka = 1 sin = 0.333
1 sin
γsat = 18 kN/m3
γw = 10 kN/m3
(a) Surcharge
q = 10 kN/m2
PS = Ka x q x H = 2.33 kN/m
Ls = 0.35 m
Moment, Ms = PS x Ls = 0.82 kNm/m
(b) P (Earth)
PE = 0.5 x Ka x γsat x H2 = 1.47 kN/m
Le = 0.23 m
Moment, Me = PE x Le = 0.34 kNm/m
(c) P (Water)
PW = 0.5 x Ka x γw x Hw2 = 0.82 kN/m
Le = 0.23 m
Moment, Me = PE x Le = 0.19 kNm/m
Total Moment, M = Ms + Me + Mw
= 1.35 kNm/m
DESIGN
fcu = 20 N/mm2
fy = 460 N/mm2
Design width, b = 1000 mm
Wall Thickness, Tw = 100 mm
Cover, c = 25 mm
Effective depth, d = Tw - c = 75 mm
K = M = 0.012 < 0.156 SINGLY
bd 2 f cu
z= 74.0 mm > 0.95d = 71.25 mm
Therefore, z = 71.3 mm
Checking Deflection
Basic Span/d = 7
fs = 2 f y A sreq = 102.3 N/mm2
3 A sprov
Tension MF = 3.3 > 2
Therefore MF = 2.0
δ allowable = 14