SPECIEFIC TASK METHOD STATEMENT

Date of the work scheduled: 14 -June-22 Project ID: CAMCE


PUMP, GENERATOR
Facility/Area/Location ,AND WATER TANK CPF Block 9
Facility Area Location

SAP Work Order №: As required (Optional to be filled if the job has a SAP order #).
OFFLOADING NEW PILING MACHINE PARTS FROM THE TRUCKS TO THE GROUND
General Work Title: USING CRANE & USING ANOTHER CRANE TO LIFTING THE CARAVANS

A CRANE
Equipment Info/№:

Type of Permit: ☒ CWP / ☐ HWP / ☐ SPWP

Type of Certificate: ☐ CSEC / ☐ EXC / ☐ RC / ☐ SCAFFOLDING / ☐


Others:…N/A…………….
Type of Isolation: ☐ EIC / ☐ MIC / ☒ N/A
PH confirms that the task will be carried out as per defined steps in this MS
Permit Holder: Name ZHUAJIANG Signature

PRA accepts and endorses steps of work defined in this MS


Person Responsible for the Area: Name _ Signature

Approved – SF Contract holder & HSE: Name Signature

№ Main steps of the work process Equipment / Tools


Required
1 Conducting TBT for the people who are involved in lifting operation TBT format
2 Identifying the risks, and avoiding them by full HSE actions and RA RA
3 Preparing appropriate personal protective equipment
4 Checking the crane first and the lifting accessories
5 Preparing appropriate area for lifting with barricade
6 Ensure that all lifting operations start in a calm weather
7 Distributing the involved people like rigger ,slinger and banksman around the crane
8 Starting lifting operation using the crane with valid and inspected lifting accessories using the
lifting plan one
9 Lifting the pump
10 Checking the lifting points of the PEDESTAL
11 Following prepared lifting plan statistic ways
12 Using wire rope slings with shackles
13 Getting the PEDESTAL
14 Starting lifting plan No. 2 for WALKING SHIP
15 Checking the lifting points
16 Using lifting accessories according to the prepared plan
17 Getting the WALKING SHIP DOWN
18 Starting the lifting plan No. 3 for SUPPORTERS
19 Using appropriate accessories for lifting these items
20 Finishing the lifting operation
21 Starting TOWERS lifting operation with ensuring that lifting points are ready to lift this load
21 Finishing the towers lifting operation then parking the crane and trucks
22 Using another crane to lifting caravans