TR.NO : 11-Rev.

01
Date : 21-Oct-20
Project No. 95/2019

Project Name New Admin Capital

Building Name Multi Sports Hall

TRANSMITTAL FORM

DOCUMENT STATUS ACTION FOR OTHERS SUBJECT CODE


1 WORK MAY PROCEED 5 FOR APPROVAL DRAWINGS
E
2 REVISE AND SUBMIT WORK MAY 6 FABRICATION SUPPLIER DRAWING
V
PROCEED SUBJECT TO INCORPORATION 7 PRELIMINARY MATERIAL REQUISITION MR
OF CHANGES INDICATED
3 REVISE AND RESUBMIT WORK MAY 8 REFERENCE SPECIFICATIONS S
NOT PROCEED
4 REVIEW NOT REQUIRED WORK MAY 9 INFORMATION WELDING PROCEDURE
WPS
PROCEED CONFERENCE NOTES
ON
DESIGN CALCULATIONS SHEET
X
RESPONSE TO AN INQUIRY
Y
REGISTER
Z

S/N DOC / DWG NUMBER REV NO. TITLE ACTION CODE

Façade_Zone-3_GA
1 Façade_Zone-3_GA 0 5 E
(DWG.001 to 005)

Façade_Zone-6_GA
2 Façade_Zone-6_GA 0 5 E
(DWG.006 to 010)

Façade_Zone-4&5_GA
3 Façade_Zone-4&5_GA 0 5 E
(DWG.011 to 015)

Façade_Zone-1&2_GA
4 Façade_Zone-1&2_GA 0 5 E
(DWG.016 to 020)

5 Reply on Rev.00 comments 0 Reply on Rev.00 comments 5 E

6 Tekla Model 0 Tekla Model 5 E

TO FROM

Rowad Modern Engineering ElFateh