6) Erection of edge 1) Scaffold moves unexpectedly tips 1) 2 persons to assist in scaffold erection.
protection, ladder over causing fall 2) Scaffold adequately braced to prevent movement
and toe boards. 2) Fall from unprotected working whilst edge protection is fixed.
platform 3) Handrail positioned not below 900mm and above
3) Fall from the edge of the working 1100mm the working platform on all sides.
platform 4) Mid rail to be installed.
4) Fall through ladder access Hatch 5) Hatch to be closed whilst working on deck..
5) Fall whilst gaining access to 6) No climbing up or down the outside of the scaffold.
working platform 7) Ladder access to be installed.
6) Injury due to scaffold Collapse 8) Ladder to be positioned internally for scaffold more
7) Edge protection Incomplete than 3 meters in height and at the appropriate angle
8) Ladder access hatch (trap door) in 1:4 i.e. for every 4 meters in height 1 meter out from
working deck the base.
9) Inappropriate access to working 9) Ladder to be secured at the top and bottom.
deck 10) Ladder to project at least 1 meter above the working
10) tools and / or equipment lying on platform.
working platform 11) Ladder to access the working platform through a trap
door.
12) Toe boards to be fitted to the working platform.
13) Exclusion zone around scaffold
14) Positioned in a public or work area.
15) Area around base of scaffold to be barricaded off.
7) Use of scaffold 1) Injury due to scaffold collapse 1) Scaffold not positioned too close to plant operating
2) Fall from scaffold or working area.
Platform 2) Plant not operated in a defined exclusion zone
3) Scaffold accessed by experienced 3) Un-authorized removal of or interference with scaffold
person or scaffold falls onto components.
person. 4) Scaffold inspected by competent person prior to use.
4) Vehicle or mobile plant strikes 5) Isolation system used for incomplete scaffolds e.g.
scaffold. barricades and signs.
5) Incomplete scaffold. 6) Complete edge protection to working platform.
6) Scaffold left unattended and 7) Scaffold to be barricaded to prevent unauthorized use.
unsecured.
8) Dismantling and or 1) Fall from scaffold. 1) No un-authorized removal of or interference with
alteration 2) Injury due to scaffold Collapse scaffold components.
3) Scaffold collapse or fall from 2) Scaffold to be inspected by competent person prior to
Scaffold use.
4) Scaffold incomplete or partly 3) Isolation system for incomplete scaffold Sufficient skills
dismantled to complete the required task.
5) Unstable or incorrect dismantling 4) Qualified scaffold used for dismantling Competent
of scaffold person used for scaffold alteration.
6) Inappropriate alterations to 5) Qualified scaffold used for complex alterations
scaffold