JSA FOR SCAFFOLDING WORK

Name of the site -- Nissan (2ASDU Project)

Date of the Preparation -- 15/01/2014

S.no Scope of Hazard Control Measures Requested


Activities by
1) General Planning 1) Inadequate training 1) Sufficient skills to complete the required task correctly.
2) Task specific injuries due to 2) Adequate consultation with relevant employees.
inexperience 3) Competent person used for scaffold erection up to 4
3) Inadequate Consultation meters in height.
4) Unstable scaffold due to lack of 4) 4) Qualified scaffold used to erect scaffold in excess of
competency in erection. 4 meters in height or where complex
5) Injury due to scaffold collapse. 5) Qualified scaffold used to erect scaffold where the
6) Overload of scaffold working platform exceeds 4 meters in height or if the
7) Component person scaffold has cantilevers or outriggers.
8) Collapse causing fall from height. 6) Foundation or ground suitable for scaffold. Different
9) Unstable or incorrect erection of scaffold systems not mixed together.
scaffold. 7) Appropriate type of scaffold used for the job. Light,
10) Injury due to scaffold collapse or medium or heavy duty.
partial collapse. 8) Scaffold components not overloaded beyond the
design limits.
9) Different scaffold systems not mixed together. (Mix &
match problems).
10) Sub contractor Instructions provided to be clear.
11) Scaffold maintained in good condition by supplier.
12) Visual checks for defects on every installation&
dismantle.
13) A scaffold inspection every week on continuous hire.
2) Planning by 1) Electric shock 1) Earth leakage switch installed on mains supply or P&M/Site
principal contractor 2) Electrocution portable generator. Engineer
or subcontractor . 2) No working on or moving scaffold too close to live
power lines.
3) No scaffold components or material handled are over 4
meters in length.
4) No scaffold components or material contacts power
lines.
5) Tiger tails(insulation) not in place on power lines or wet
conditions make them ineffective
6) . Be wary of strong winds that cause power lines to
swing closer to work area.
7) No scaffold components being handled striking and
shatters unprotected light bulb
3) Erection of base 1) Frames or standards falls 1) Sole boards to be correct length for soft ground.
frames, standards 2) over striking person erecting 2) Bracing or team member used to support first frames
and bracing scaffold or standards.
3) Unsupported frames 3) Base plates or screw jacks used under all frames and
standards.
4) Foundation to be level or screw jacks to be used. Castor
wheels
5) Locked and fitted correctly.
4) Erection of 2nd level 1) Scaffold tips over causing fall. 1) No climbing un braced scaffold.
frames, standards 2) Instability / collapse of scaffold 2) 2 persons used to assist in scaffold erection.
and bracing causing fall 3) Foundation to be level or screw jacks to be used.
3) Scaffold topples over causing a 4) Scaffold to be built square with plan bracing installed.
fall from height 5) Sufficient and correctly fixed diagonal bracing.
4) Base frames or standards not 6) General height of scaffold not to exceed 3 times the
adequately braced or supported base width unless out riggers are used or the scaffold is
5) Climbing un braced scaffold tied to a secure structure.
during erection
5) Erection of working 1) Strains, sprains or injuries such as 1) 2 persons used to pass materials to higher lifts.
platforms back damage. 2) Working decks to be at same height.
2) Step backward off higher deck
causing fall from height.
3) Split (uneven) decks Installed

6) Erection of edge 1) Scaffold moves unexpectedly tips 1) 2 persons to assist in scaffold erection.
protection, ladder over causing fall 2) Scaffold adequately braced to prevent movement
and toe boards. 2) Fall from unprotected working whilst edge protection is fixed.
platform 3) Handrail positioned not below 900mm and above
3) Fall from the edge of the working 1100mm the working platform on all sides.
platform 4) Mid rail to be installed.
4) Fall through ladder access Hatch 5) Hatch to be closed whilst working on deck..
5) Fall whilst gaining access to 6) No climbing up or down the outside of the scaffold.
working platform 7) Ladder access to be installed.
6) Injury due to scaffold Collapse 8) Ladder to be positioned internally for scaffold more
7) Edge protection Incomplete than 3 meters in height and at the appropriate angle
8) Ladder access hatch (trap door) in 1:4 i.e. for every 4 meters in height 1 meter out from
working deck the base.
9) Inappropriate access to working 9) Ladder to be secured at the top and bottom.
deck 10) Ladder to project at least 1 meter above the working
10) tools and / or equipment lying on platform.
working platform 11) Ladder to access the working platform through a trap
door.
12) Toe boards to be fitted to the working platform.
13) Exclusion zone around scaffold
14) Positioned in a public or work area.
15) Area around base of scaffold to be barricaded off.

7) Use of scaffold 1) Injury due to scaffold collapse 1) Scaffold not positioned too close to plant operating
2) Fall from scaffold or working area.
Platform 2) Plant not operated in a defined exclusion zone
3) Scaffold accessed by experienced 3) Un-authorized removal of or interference with scaffold
person or scaffold falls onto components.
person. 4) Scaffold inspected by competent person prior to use.
4) Vehicle or mobile plant strikes 5) Isolation system used for incomplete scaffolds e.g.
scaffold. barricades and signs.
5) Incomplete scaffold. 6) Complete edge protection to working platform.
6) Scaffold left unattended and 7) Scaffold to be barricaded to prevent unauthorized use.
unsecured.
8) Dismantling and or 1) Fall from scaffold. 1) No un-authorized removal of or interference with
alteration 2) Injury due to scaffold Collapse scaffold components.
3) Scaffold collapse or fall from 2) Scaffold to be inspected by competent person prior to
Scaffold use.
4) Scaffold incomplete or partly 3) Isolation system for incomplete scaffold Sufficient skills
dismantled to complete the required task.
5) Unstable or incorrect dismantling 4) Qualified scaffold used for dismantling Competent
of scaffold person used for scaffold alteration.
6) Inappropriate alterations to 5) Qualified scaffold used for complex alterations
scaffold