Saudi Aramco Test Report
Saudi Aramco Test Report
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Secure and isolate the area where the test is to be conducted. Place
SAES-P-116
A2 safety fences and sign boards around the perimeter.
Sec. 3.2
(NETA ATS 2007, 5.1)
Check that the unit to be tested is not energized using a voltmeter before SAES-P-116
A4
beginning the test. (NETA ATS 2007, 5.1) Sec. 3.2
Record the voltage and the current for the test report and for future SAES-P-116
A6
reference. Sec. 3.2
B. TEST EQUIPMENT
SAES-P-116
B1 Test shall be performed using a current-source power supply.
Sec. 3.2
The test equipment calibration cycle shall not exceed twelve months.
Schedule Q,
B2
Att. IV, Sec. 7
C. TEST RESULTS
Thermal Overload Class# Actual Trip Time Voltage Current Pass Fail Re-Test Date
D. CONCLUSIONS
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Overload trip times shall be in accordance with manufacturer's published SAES-P-116
D1
data. (NETA ATS 2007, 7.16.1.1.3.2.6) Sec. 3.2
Test results are acceptable and in accordance with Saudi Aramco Schedule Q,
D2
Engineering Standards and contractual requirements. Att. II
Page 1 of 3
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
F. FUNCTIONAL TESTING
Verify that the unit operates in accordance with applicable drawings as SAES-P-116
F1
follows: (NETA ATS 2007, 7.16.1.1.1.1) Sec. 3.2
REFERENCE DOCUMENTS:
1. Schedule G - Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), March 2006
2. Schedule Q - Quality Requirements (Pro Forma Contract), February 2008
3. SAES-P-116 Switchgear and Control Equipment , 01 March 2008
4. Acceptance Testing Specifications - NETA (2007)
5. NEMA AB4 Guidelines for Inspection and Preventive Maintenance of MCCB Used in Commercial and Industrial Applications, 2002 Edition
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the manufacturer
indicates compliance with appropriate standards or performance in a specified manner.
Page 2 of 3
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED
Page 3 of 3