Saudi Aramco Inspection Checklist
Saudi Aramco Inspection Checklist
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A. Document Review
Schedule Q
A1 Review documents for Material Receiving.
Att. IV Sec. 3
Schedule Q
A2 Identification procedure reviewed and implemented.
Att. IV Sec. 4
B. General Requirements
Schedule Q
B1 Documentation for traceability reviewed and implemented.
Att. IV Sec. 4
Schedule G
B2 Materials shall be new and unused.
Sec. 2
C. Cable Installation
Check proper terminals and crimping dies are used on cable and that
SAES-P-104
C4 crimping procedure is proper.
Sec. 4.1
NFPA 70, NEC 110.3
SAES-P-104
C7 Check cable color coding or phasing.
Sec. 6.10.3
D. Cable Pre-Commissioning
Page 1 of 4
Testing is to be carried out ONLY on de-energized cables. Cables shall
SAES-P-104
D1 be tested for their de-energized state before starting test on them.
Sec. 4.1
NFPA 70, NEC 110.3 & NETA ATS 2007, 5.1
Page 2 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
All ends under test shall be guarded from accidental contact as well as
SAES-P-104
D2 separation from all ends or elements not being subject to test.
Sec. 4.1
NFPA 70, NEC 110.3 & NETA ATS 2007, 5.1
All conductors should be left grounded when not on test, during the
testing of other conductors, until completely discharged of all DC SAES-P-104
D3
potential. Sec. 4.1
NFPA 70, NEC 110.3
Perform Megger test on each cable with respect to ground and adjacent
cables. For cables 250 volt and less use 500 volt megger; for cables 250 SAES-P-104
D6
volt to 600 volt use 1000 volt megger; for cables above 600 volt and less Sec. 4.1
than 1200 volt use 2500 volt megger.
SAES-P-104
D8 Perform continuity test to insure proper cable connection.
Sec. 4.1
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule G - Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), March 2006
2. Schedule Q - Quality Requirements (Pro Forma Contract), February 2008
3. Acceptance Testing Specifications - NETA (2007)
4. SAES-P-104 Wiring Methods and Materials, 13 January 2008
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the manufacturer
indicates compliance with appropriate standards or performance in a specified manner.
Page 3 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
Page 4 of 4