Bill of Materials: Technological University of The Philippines
Bill of Materials: Technological University of The Philippines
Bill of Materials: Technological University of The Philippines
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT
AYALA BLVD. ERMITA MANILA
BILL OF MATERIALS
ITEM NO. DESCRIPTION UNIT QTY UNIT COST AMOUNT
I `CONCRETE WORKS
1 FOUNDATION
a. WALL FOOTING
1 CEMENT BAGS 74 230 17020
2 SAND CU.m 4.1 750 3075
3 GRAVEL(3/4)'' CU.m 8.2 800 6560
2 GROUND FLOOR
a. SLAB(SOG)
1 CEMENT BAGS 66 230 15180
2 SAND CU.m 7.335 750 5501.25
3 GRAVEL(3/4)'' CU.m 14.67 800 11736
b. STAIRS
1 CEMENT BAGS 36 230 8280
2 SAND CU.m 1.98 750 1485
3 GRAVEL(3/4)'' CU.m 3.96 800 3168
3 SECOND FLOOR
a. SLAB
1 CEMENT BAGS 68 230 15640
2 SAND CU.m 7.56 750 5670
3 GRAVEL(3/4)'' CU.m 15.12 800 12096
b. GIRDER
1 CEMENT BAGS 27 230 6210
2 SAND CU.m 1.5 750 1125
3 GRAVEL(3/4)'' CU.m 3 800 2400
c. Lintel beam
1 CEMENT BAGS 16 230 3680
2 SAND CU.m 0.8 750 600
3 GRAVEL(3/4)'' CU.m 1.6 800 1280
4 ROOF
a. ROOF BEAM
1 CEMENT BAGS 44 230 10120
2 SAND CU.m 2.4 750 1800
3 GRAVEL(3/4)'' CU.m 4.8 800 3840
SUMMARY