This Area Must Be Confirmed With Landscape Package: D.F.01.03 D.F.01.02 D.F.01.05 D.F.01.01
This Area Must Be Confirmed With Landscape Package: D.F.01.03 D.F.01.02 D.F.01.05 D.F.01.01
Traffic Barrier [ x ]
SSL +01.000
SSL +01.000
FFL +01.000
FFL +01.000
CONECTION TO SITE M 14 CONDITIONS OF USE:
RAIN NETWORK CL=1.17 © Copyright Balmond Studio 2011.
The author asserts the right to be identified as such.
CAR PARK ENTRANCE CAR PARK EXIT FIRE SERVICE HARD STAND IL=-2.75 Documentation is to be used for the intended purpose only.
CONECTION TO SITE CONECTION TO SITE Balmond Studio accepts no liability, however arising, for
misuse of drawings and documents.
SSL +01.000
FFL +01.150
SSL +01.000
FFL +01.150
RAIN NETWORK RAIN NETWORK
Drawings must be read in conjunction with all relevant
HOTEL SERVICE AREA EXIT Contract Documentation including Preliminaries, Particular
A Conditions,
D.F.01.04 General Conditions, Particular Specifications, General
+ 01.167 Specifications and Drawings.
1.385
1.385
R=2
+ 01.000 + 01.000 G.07 Any discrepancies between any drawings, specifications,
"ACO MultiDrain 200" documents, etc., should be reported to the Engineer in
.615
COURIER VAN IL=-0.95 Security barrier IL=-0.95 MD200 BA H12 | D400 accordance with the Conditions of Contract.
See Drawing P-25814
The Contractor remains fully responsible for setting out the
ø1
035
6.01
STAFF AREA
works.
DRIVERS ROOM
038
6.01
039
033
MAINTENANCE
6.01
6.01
TELECOM ROOM
00
ø100
GENSET
0.5% Do not scale drawings. Use figured dimensions only.
THIS AREA MUST BE CONFIRMED WITH LANDSCAPE PACKAGE 5.01
Dimensions must be checked by the Contractor on site.
x;A-64751
x;1A-1B
033
FINAL LOCATION FOR EQUIPMENT
ø400
TO BE DEFINED BY CONTRACTOR
2.0%
ø1
00
BATHROOM
BATHROOM
BATHROOM
037
6.01
036
6.01
034
6.01
0.5%
x;A-64751
x;1A-1B
ø100
0.5%
John
Keells
0.260 Grating M125 IL=-1.05 Group
Grating MD 200 | D400 0.200 Grating MD 200 | D400 0.200 D.F.01.02 GREASE SEPARATOR
0.200 + 01.350 "LIPATOR" FFL + 01.120
SEE DRAWING P-25806
0.120
Grating MD200 | D400 Channel MD200 H120 | D400
0.120
SSL + 01.073
0.197
Channel MD200 H120 | D400 FIRE ESCAPE PLANT ROOM HOTEL SUBSTATION WATER TREATMENT EQUIPMENTS
0.120
DRAIN TO BE CONNECTED
G.02 - Rain Outlet FFL + 01.120 CAR PARK
0.197
Grating M125 TO EXTERNAL SERVICES
PACKAGE 5.01
DN 100 FFL + 01.167 SSL + 01.073
Channel MD 200 H12 | 001 ADÃO DA FONSECA
SSL + 00.473 engenheiros consultores
D400
0.075
ø100
de
0.110 Alfredo Costa Pereira e Raul Vasconcelos Bessa
DRAIN TO BE CONNECTED
ø1
TO EXTERNAL SERVICES IL=-1.10
0 0
0.5%
PACKAGE Connects to grease Network
B See drawing P-21906
FFL + 01.333 0.5%
Concelead pipe
ø400
SSL + 00.473 2.0%
G.03 FFL + 01.120 FFL + 01.333
G.07 "ACO XtraDrain100" 0.5% 0.5% AZ76 Consultores
0
SSL + 01.073 SSL + 01.073
ø16
"ACO MultiDrain 200" de Investimentos
ø1 6
XD100 H7.5 | Grating B125
D.F.01.01 D.F.01.02 D.F.01.03 D.F.01.05 MD200 BA H12 | D400 See Drawing P-25815
Electric cable for connection
e Engenharia, Lda
0
FFL + 01.333 FFL + 01.333 pumping equipment to pump
See Drawing P-25814 FLOOR TRENCH (refer to E-040040) controller, provided with
1 : 20 1 : 20 1 : 20 1 : 20
SSL + 01.073 SSL + 01.073
WS
ø110
pumping equipment
DRAIN TO BE CONNECTED
TO EXTERNAL SERVICES + 01.308
COURIER SECURITY CHECK
0.5%
VS-A
ø100
ø1
0.5% 0.5%
0
PACKAGE
0
0.5%
IL=0.15
ATELIER DO BECO
2.0%
+ 01.333
0.35
ritaguedes DA BELA VISTA
ARQUITECTURA
PAISAGISTA, LDA
arquitecturapaisagista www.atelierbbv.com
ø20
MANHOLE TO BE MANHOLE TO BE FFL + 01.167
ø200
TELECOM ROOM HOTEL SUBSTATION
Core 2.7 KEY PLAN
0
CONNECTED TO EXTERNAL CONNECTED TO EXTERNAL DRAIN TO BE CONNECTED IL=-1.00
M 08 SERVICES PACKAGE M 09 SERVICES PACKAGE TO EXTERNAL SERVICES SSL + 01.073
PACKAGE
IL=-0.83
CL=1.05 CL=1.05 + 01.333 + 01.333
IL=-2.46 IL=-2.30 CHANNEL DEFINED IN B + 01.167
IL=-1.00
+ 01.167 0.5%
2.0%
M 13 6
LANDSCAPE DESIGN SB 18 CL=1.17 4
0
ø400
0
5
ø1
CL=1.07 FFL + 01.333 ø2
1600X1800 mm SB 19 M 12 0.5% 00 IL=-2.46
1600X1800 mm IL=-1.55 SSL + 00.473 CL=1.17 WAITING AREA 2.0% CL=1.17
IL=-1.68 0 1600X1800 mm
IL=-2.29
ø1
60 1600X1800 mm 2
SB 16 ø40
SB 17 HOTEL SUBSTATION 0.5%
CL=1.05 CL=1.05
ø100
ø1
3 1
00
IL=-1.37 0.5%
DRAIN TO BE CONNECTED
1600X1800 mm IL=-1.42 1600X1800 mm 0.5% 0.5% TO EXTERNAL SERVICES 0.5% SB 20 0.5%
124.50 Level 30
116.50 Level 28
112.50 Level 27
+ 01.167 0.5%
108.50 Level 26
103.00 Level 25
0
97.00 Level 24
0
ø1
91.00 Level 23
0.5%
ø100
SB 22 SB 23
85.00 Level 22
80.50 Level 21
D.F.01.02 0.5%
76.50 Level 20
ø100
72.50 Level 19
68.50 Level 18
IL=0.50 IL=0.57
64.50 Level 17
56.50 Level 15
30
D.F.01.01 D.F.01.01 D.F.01.01 D.F.01.01
ø1
52.50 Level 14
D.F.01.01
48.50 Level 13
0
44.50 Level 12
0
40.50 Level 11
36.50 Level 10
15.00 Level 6
Level 5
10.50 Level 4
01.50 Level 1
-02.33 Level 0
-05.00 Level B1
ø100
IL=-1.05 SB 35
HOTEL SERVICE AREA ENTRANCE FINAL LOCATION FOR EQUIPMENT CL=1.12 02 Specialist Interiors.
FINAL LOCATION FOR EQUIPMENT
Security barrier
TO BE DEFINED BY CONTRACTOR TO BE DEFINED BY CONTRACTOR IL=-1.81 This drawing corrently represents the specialist
interiors.
ø1
00
1600X1800 mm sh.01 - Geberit Shower Channel CleanLine 60
ø100
SSL + 01.067 IL=-1.10 0.5%
d.01 - Geberit Floor Drain - CleanLine Series
00
+ 01.167
ø1
0.5% IL=-1.05 Grating Staineless Steel
+ 01.167 + 01.333 see drawing P-25815
+ 01.993 aav - Geberit GRB50
SECURITY CHECK
+ 01.167
+ 02.333
04 - General Notes
ø630
D.F.01.03 SSL + 01.067 - Guly - See drawing P-25814 and P-25815
LOADING BAY
- All cores must have Maintenance Access
ø100
D
05 Samples and technical data sheets of all
ø125
1% 1% 1% 0.5% SC5.03 materials should be submitted for approval.
IL=-1.05 SB 25 5.01
1.0% 1.0% G.07 G.07
IL=0.50 002 06 Technical data sheets of all equipment should
"ACO MultiDrain 200" "ACO MultiDrain 200"
MD200 BA H12 | D400 MD200 BA H12 | D400 + 01.155 + 01.179 STAIRCASE SC2.07
FFL + 00.167
be submitted for approval.
See Drawing P-25814
ø1
See Drawing P-25814 00
00
ø1 SSL + 00.067
07 All material and equipment submitted for
ø100
0.5% 0.5%
approval should be in accordance with the project
specifications.
ø100
IL=-1.15 IL=-1.87
0.5%
1.0% Standards and grating manufacturers instructions.
ø125
TO DISCHARGE INTO THE BEIRA
LAKE
(a) To level below. See level below ceiling
0.5%
(b) To ceiling. See same level celing
(c) From level above. See level above floor
ø800 (d) From floor. See same level floor
(e) To floor filling level
1600X1800 mm
SEE LEVEL 00 CEILING SB 27 SB 26
ø100
TO OIL SEPARATOR IL=0.36 0.5% IL=0.44 ARCHITECTURE NOTES
ø125
THIS DISCHARGE MUST BE NOTE 11 Information for hatched area in
1.0%
1.0%
ø125
CONFIRMED WITH LANDSCAPE abeyance.
ø125
FFLD.F.01.01 D.F.01.01 D.F.01.01 D.F.01.01 D.F.01.01 1.0%
PACKAGE NOTE 12 Information to be provided with B3
ø100
+ 01.120 FFL + 01.120
ø110 documentation
ø110
1.0%
SSL + 01.067 SSL + 1.0%
01.167
E G.02 G.02 G.02 G.02 G.02 G.02 G.02 G.02 NOTE 13 Area subject to future F&B change.
"ACO Passavant" "ACO Passavant" "ACO Passavant" "ACO Passavant" "ACO Passavant" "ACO Passavant" "ACO Passavant" "ACO Passavant"
DN 100 | M125 DN 100 | M125 DN 100 | M125 DN 100 | M125 DN 100 | M125 DN 100 | M125 DN 100 | M125 DN 100 | M125
LANDSCAPE PACKAGE See Drawing P-25814 See Drawing P-25814 See Drawing P-25814 See Drawing P-25814 See Drawing P-25814 See Drawing P-25814 See Drawing P-25814 See Drawing P-25814 NOTE 14 Area subject to future SPA change.
ø500
ø100
0.5% 0.5%
x;1B ø1 0.5%
0 00
x;A-24001 ø10
+ 01.500
D.F.01.04 D.F.01.04
FFL + 01.480
IL=-1.05 IL=-1.05
FFL + 01.480 SSL VAR. IL=-1.05
SSLG.07
VAR. construction joint
G.07
"ACO MultiDrain 200"
"ACO MultiDrain 200"
MD200 BA H12 | D400
MD200 BA H12 | D400
D.F.01.01 See Drawing P-25814
See Drawing P-25814
EASTERN CONFERENCE LOBBY
G.02 LANDSCAPE PACKAGE
"ACO Passavant"
ø75
EQUIPMENT SPECIFICATION
AND MEP PROVISION FFL + 02.333
IN F&B PACKAGE Drainage on F&B package SSL + 02.233
2.88
LOADING BAY /
2.00 RECEIVING PLATFORM
0.60
x;C x;C
SB .S
5.60 2.75 Smoke curtain CL=1.00
CONFERENCE
HOTEL BANQUET SHUTTLES
LIFT LOBBY SECURITY RECEIVING IL=-1.77
OFFICE OFFICE
0.40
0.40
SHAFT
SEE DETAIL DRAWING P-24802
CORRIDOR
PL2.13 PL2.18 PL2.19 SL2.08
1.33
VIP LIFT SHUTTLE BANQUET SHUTTLE BANQUET LIFT LOBBY STAIRCASE SC2.05 SHAFT SL2.09 KITCHEN
HOTEL-ENTERTAINM. 1.5-85.0 1.5-85.0 D.F.01.01 KITCHEN SERVICE LIFT SERVICE LIFT 1600X1800 mm
1.5-124.5 5.80 FSL2.07 -2.17-25.5 -2.17-25.5
0.40
Smoke curtain
SERVICE /
FIRE FIGHTING LIFT
5.60 G.02 L 30.10.2018 Minor Amendments FR FV
FFL + 02.333 2.75
STAIRCASE SC2.03 "ACO Passavant" K 19.04.2018 General Amendments FR FV
FSL2.05 FSL2.06 STAIRCASE SC2.04
SERVICE / SERVICE / DN 100 | M125 SSL + 02.233 LIFT SHAFT
J 31.05.2017 HKN-RFI-AR-00627 FR FV
Smoke curtain
HKN-RFI-ME-00380
IL=1.67 IL=1.68 IL=1.70 SHAFT LIFT SHAFT HKN-RFI-ME-00397
SSL + 00.900 0.5% (a) ø110 (b) Core 2.11 E 29.01.2016 GENERAL REVISION FR FV
(a) (a)
D 07.07.2015 CONSTRUCTION ISSUE FR FV
ø110 Specialist Interiors
G G G G G GAS C 15.05.2015 GENERAL REVISION FR FV
to to to to
B 07.02.2015 CONSTRUCTION ISSUE FR FV
0.5% 0.5% PLANT ROOM PLANT ROOM
LIFT LOBBY FFL + 01.500 Instalation Details
SHAFT SHAFT
x;STAIRCASE A 07.06.2014 CONSTRUCTION ISSUE FR FV
SSL + 01.450 SC2.04
x;C
SHAFT Detail Distribuition
PIT
PL2.21 PL2.25 ur
PL2.17
SHUTTLE BANQUET SPA CLIENTS LIFT Rev Date Issue Dwn Ckd
TROLLEY
PARKING
0.35
0.35
PRE-WASH
LIFT SHAFT LIFT SHAFT LIFT SHAFT PLANT ROOM SHAFT SHAFT
ø63
ø63
wb wb PROJECT
TD
PRE-WASH
F&B PACKAGE FFL + 02.513 FFL + 02.333
Core 2.13 Core 2.3 IL=1.70 REFER TO FB-... SSL + 02.233 BLACK BOX SSL + 02.233 COLOMBO
SRI LANKA
TROLLEY PARKING PARKING PARKING
TROLLEY TROLLEY TROLLEY
PARKING
ES2.1a
TROLLEY
SEAFOOD
PARKING PRE-WASH
Fire curtain
TROLLEY
DISCIPLINE
PARKING
ES2.1b VEGETABLE
HOLDING
CHILLER
SEAFOOD
HOLDING
CHILLER
MEAT/POULTRY
HOLDING
CHILLER
PORK HOLDING CHILLER STAFF TOILET
PLUMBING
Fire curtain
DRY REFUSE
DRAWING TITLE
x;C
INFO
WASTE & RAIN WATER
Fire curtain
INFO BUILDING 2
FFL + 01.500
EMPTY BOTTLES/
RECYCLE REFUSE
CAN WASH/
SORTING AREA LEVEL 01 - FLOOR
H SPECIALIST INTERIORS PACKAGE SSL + 01.450 CHARCOAL
SOUTH
STORAGE
FFL + 01.480
REFER TO I-211101 SSL VAR.
Date Drawing No Revision
WET REFUSE CHILLER
07.06.2014
Scale