Initial Voltage Bus Load: Location: Project: Date

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Project: S.

E CORPOELEC ETAP Page: 1

Location: CCM 19.0.1C Date: 07-01-2022

Contract: SN:

Engineer: R.VENERO Revision: Base


Study Case: LF
Filename: SE-TESIS Config.: Normal

ESCENARIO #2

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. kW kvar kW kvar kW kvar kW kvar

Bus2 0.480 1 99.0 0.0

Bus3 0.480 1 99.0 0.0

Bus4 0.480 1 99.0 0.0

Bus5 0.480 1 98.8 0.0

Bus6 0.480 1 98.8 0.0

Bus8 0.480 1 98.7 0.1 6.0 3.6

Bus9 0.480 1 98.6 0.1 6.0 3.6

Bus10 0.480 1 98.5 0.1 7.7 4.5

Bus11 0.480 1 98.5 0.1 7.7 4.5

Bus12 0.480 1 98.5 0.1 15.2 8.1

Bus13 0.480 1 98.3 0.1 19.2 10.0

Bus14 0.480 1 98.2 0.2 19.2 10.0

Bus15 0.480 1 98.2 0.2 19.2 10.0

Bus16 0.480 1 98.3 0.1 19.2 10.0

Bus17 0.480 1 98.5 0.1 29.8 14.5

Bus18 0.480 1 98.8 0.0

Bus19 0.208 1 99.5 -1.3

Bus23 0.208 1 98.9 -1.1 3.6 2.2

BusCCM 0.480 1 98.8 0.0

BusGEN 0.480 1 98.8 0.0

BusT1S 0.208 1 99.4 -1.3

BusTS1 0.208 1 99.4 -1.3 144.0 69.7

Total Number of Buses: 22 154.038 81.837 144.000 69.742 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation kvar Limits

ID kV Type Sub-sys % Mag. Angle kW kvar % PF Max Min

Bus2 0.480 Mvar/PF Control 1 99.0 0.0 160.0 77.5 90.0

Bus3 0.480 Mvar/PF Control 1 99.0 0.0 80.0 38.7 90.0

Bus4 0.480 Swing 1 99.0 0.0

240.000 116.237