Download as pdf
Download as pdf
You are on page 1of 8
hiranmaye energy HIRANMAYE ENERGY LIMITED (Formerly Known as India Power Corp. (Haldia) Ltd. Deptt: | CHP Doe Title : | SMP for Impactor Doe No. Revision No HP/SMP/AAMPACTOR/O2 R-00 15.12.2018 Standard Operation Procedure HEL/CHP/SMP/IMPACTOR/02 SMP for Crusher Document Revision status Record: Revision | Date Page Details of Changes Reason for No. no. changes | Document Approval : v [Document Controller | Mr.Suman Sourav (Dy manager) (Prepared by) | Technical Review by | MukundaKarmakar (Asstt. General Manager) Approved ~~ |Mahendra Pratap Singh (Plant Head) Page 1 of 7 hiranmaye energy HIRANMAYE ENERGY LIMITED (Formerly Known as India Power Corp. (Haldia) Ltd. Deptt: [CHP Z Doe Title: _| SMP for Impactor Doe No. Revision No Issue Date /SMP/IMPACTOR/OZ R-00 15.12.2018 Table of Content SI. No. | Topic Page No. 4 Purpose 3 2 Scope Sa ne 3 ai Responsibility 3 4 General Description / Technical Details 3 6 Procedure 3 6 Safety Precautions (Eqpt/Human) | 4 7 Spares parts details 4 8 Special Tools & Plants _—_ ‘| 4 9 ianpower 4 40 _| Input Tools 4 11 Other Department to be intimated 5 12 | Details of Hazard involve 5 43___| Output 5 14 | Permit Type 6 45 | Permit Approving authority 5 16 _| Frequency of Maintenance 5 17 Qui 5 18 | Environment 5 19 OHSAS 6 20 | Energy 6 241 Records 6 22 | Annexure-1 (Check list) 7 Page 2 of 7 hiranmaye energy | HIRANMAYE ENERGY LIMITED (Formerly Known as India Power Corp. (Haldia) Ltd. Deptt: | CHP [ Doe Title: | SMP for Impactor Issue Date i 018. IE) 1.0 PURPOSE: Preventive Maintenance of Crusher. 2.0 SCOPE:Preventive Maintenance. 3.0 RESPONSIBILITY: Maintenance Engineer & Maintenance in Charge 4.0 GENERAL DESCRIPTION: SIZE: 1200 @ X 1500 W Capacity- 250 Ton/ Hr. RPM: 453, Power: 160 KW Input Coal Size: 300 mm (Max) Output Coal Size: -20 mm 5.0 PROCEDURE 5.1 PTW APPLY PROCEDURE: Apply for PTW at CHP contro! room Isolate the corresponding HT/LT feeder properly. Removellsolate the Power fuses and control fuses if any. Lock-in Tag-in and put "DANGER & MEN AT WORK” Board. Obtain the PTW and confirm the isolation status with the respective control room. Ensure the receiver, issuer and isolator proper authorization. 5.2 PTW RETURN PROCEDURE: 1. Ensure workplace is clear from man and material after the procedure is performed. J Inform the operator on sight regarding the work completion and ask him to communicate to control room G Return the duly signed permit to Issuing authority; clearly mention the work performed and status. Take clearance from control room regarding all normalizations and clearance for running the conveyor. 5.3WORK PROCEDURE: 1 Ensure isolation from all the process related equipment's before and after the Conv. Page 3 of 7 hiranmaye energy HIRANMAYE ENERGY LIMITED (Formerly Known as India Power Corp. (Haldia) Ltd. Doc Title: _| SMP for Impactor Issue Date HP/SMP/IMPACTOR/O2 taken for P.M. (Ensure adequate illumination in conveyor. (1 Apply the EPB and pull chord before attending the job. Check materials in hanging condition, if any. Remove the flexible & fluid coupling safety guard Clean the equipment & and the surfaces first. Follow all instruction as per check list. oo 6.0SAFETY PRECAUTIONS 6.1 PPE’S REQUIRED: Du Safety safety Safety kar | st Safety Safety Mutt Gloves | Goggl Harness lelmet Shoe [Musk es jacket job_ Description /| PE EN 2% PE'S For a i, ‘onveyor If Xe) i M Work o Fequire | o equire 6.2 SAFETY PRECAUTIONS REQUIRED: Ensure good housekeeping of maintenance walk way Super vision and illumination in conveyor surrounding area. Ensure use of periodically tested proper lifting tools &tackles Hand gloves& cotton hand gloves to be used while handling thrust collar/hot surface. Use of ear plug is mandatory along with Safety shoes, helmet and all PPEs. Keep the fire extinguishers ready within reachable limit for any exigency. Put barricade tapes around the equipment under maintenance. Page 4 of 7 [ hinanmaye energy HIRANMAYE ENERGY LIMITED Z (Formerly Known as India Power Corp. (Haldia) Ltd. Deptt: | CHP Doe Title: | SMP for Impactor | Doc No. Hi (CHP/SMP/IMPACTOR/02 | ___ Issue Date 018 7.0 SPARE PARTS DETAILS: Following are the required spares and Consumables for Preventive Maintenance. Bearing, Plummer Blocks, Adapter Sleeves. Bolts, Nuts, V-Belts Consumables Grease, Lube Oil, Hydraulic Oil, Cotton waste etc. 8.0 SPECIAL TOOLS AND PLANTS: Venire Calliper, Micro metre, Torque Wrench, 9.0 MANPOWER REQUIRED: 1 fitter, 1 rigger, 2 helper, 1 Welder 10.0INPUT / TOOLS:Tool box containing Spanners set, Hammer, Filler Gauge, Cotton waste, Grease gun, chain blocks 2 nos. 3T ete., 11.0 OTHER DEPARTMENT TO BE INTIMATED: Electrical and C&l 12.0 OUTPUT: Equipment reliability 13.0 DETAILS OF HAZARD INVOLVE: Fallislip due to oily surface. Fallislip due to wet surface. Fall down due to unwanted material in work place. Fire, Failure of lifting tools & tackles. Exposure of high noise/dust. Contact with hot surface. Contact with oil Eye injury. Hand and finger injury. 14.0 PERMIT TYPE: Permit to work order. 15.0 PERMIT APPROVING AUTHORITY:- Shift In charge ( CHP Control room ). 16.0 FREQUENCY OF MAINTENANCE; - Fortnightly. Page $ of 7 hiranmaye energy HIRANMAYE ENERGY LIMITED (Formerly Known as India Power Corp. (Haldia) Ltd. SMP for Impactor > Allthe parameters, activities are maintained within prescribed Check list. > Any deviation from the norms is recorded and corrective action is taken accordingly. > Illumination level >70 lux dust particles i.e. pm10<100 yg/m? and pm 2.5 < 60 ug/m®. 18.0 ENVIRONMENT: After completion of work, housekeeping should be done in the working area and waste oil, oil soaked cotton and wastes are separately collected. 19.0 OHSAS: > Persons deployed on the work must use safety helmets, shoes, goggles, dust masks & hand gloves. > Before starting any operation, ensure all standard clearance from main control room and shift INCHARGE. > The persons deployed for the job should have valid PPGCL Gate pass. The oxygen level in tunnel (if) should be more than 20% V/V. > All emergency contact number such as FIRST AID, AMBULANCE, FIRE STATION, SAFETY, SECURITY. Etc. should be with all the operators. v 20.0 ENERGY: > Ensure the belt joints condition for any peel off, patches and the belt condition. > Ensure good housekeeping of maintenance area > Ensure periodically the thickness of the belt. 21.0 RECORDS: » Maintenance Check List. >» Communication registers. Page 6 of 7 hiranmaye energy HIRANMAYE ENERGY LIMITED | (Formerly Known as India Power Corp. (Haldia) Ltd, Deptt: CHP Doc Title: | SMP for Impactor Doc No. Revision No _ Issue Date H i IPAMPACTOR/02 R-00 22. Annexure -1 (Check List) Before starting the PM Ensure isolation from all the process related equipment's before and after the Crusher taken for P.M. Ensure adequate illumination in Crusher floor. Apply the EPB before attending the job. 1. Clean the area if required. Clean the dust on equipment surface. 2, Remove the fluid coupling safety guard. 3. Check the motor base bolt tightness. 4, Check the fluid coupling oil level and top up if required. 5. Check the fluid coupling fusible plug & oil condition, 6. Check the tightness of all plumber blocks like Rotor, Drive unit 7. Check the Plummer block dust seal condition, replace if find damage. 8. Check the V-Belt belt condition 9. Check the Condition of V-Belt Pulley. 10. Check the clearance of Crusher Bearing. 11. Check the Crusher Rotor condition. 12. Check the condition of Crusher Impact Hammer. 18. Check the condition of grinding zib. 14. Check the condition of Crusher discharge chute liner. 18. Apply grease / lubricant for the bearing. 16. Ensure no Grease / Oil / Cotton waste left on equipment body or surrounding area 17. Place the coupling cover plate and tighten the base bolts. 18. Remove all tools and tackles from work place. Page 7 of 7 ee cea ey ies oe pore eee ree os Eerie thi ne, fe oe

You might also like