fence BOQ

ITEM UNIT total


No.DESCRIPTION UNIT QTY
PRICE PRICE
SUB STRUCTURE
1 Excavation and earth work
1.1 Site clearing Removing top soil 200mm thick. M2 41.96 27.25 1143.41
1.2 trench excavation in ordinal soil to depth not exceeding 150 cm M3 10.07 286.35 2883.5209
1.4 back Fill Around masonary Wall &Under Hard Core imported Form M3 8.39 630.62
insite 5290.9018
1.3 Cart away The Excavated Material1km from the site M3 18.46 281.14 5189.7983
sub total 14507.6309

2 Masonary work
2.1 50cm Thick Stone Masonary Below NGL M3 10.07 2068.98 20834.606
2.2 50cm Thick Stone Masonary Above NGL M3 10.07 2214.17 22296.706
sub total 43131.3124

3 Concrete work
3.1 C-7 Lean concrete M2 16.78 119.66 2007.8345
3.2 C-25 Reinforced concrete (in Sub Structure) M3 1.68 4675.57 7854.9655
3.3 Form Work (for Sub Structure) M2 16.78 603.59 10128.177
3.4 Reinforcement
b φ6mm Reinforcement bars Kg 41.92 86.77 3637.2824
d φ12mm Reinforcement bars Kg 148.7 78.13 11617.975
sub total 35246.2341
SUPER STRUCTURE
4 Concrete work
4.1 C-25 Reinfoced Concrete in elevation column M3 1.44 5134.97 7394.3574
4.2 Form Work in elevation column M2 26.4 627.82 16574.545
4.3 Reinforcement
a φ6mm Reinforcement bars Kg 36.67 86.77 3181.7544
b φ12mm Reinforcement bars Kg 132.55 78.13 10356.17
sub total 37506.8269

5 Block Work
5.1 20cm Thick HCB Wall CLASS C M2 91.09 531.31 48396.612
sub total 48396.6123
6 METAL WORK
6.1 RHS for fence 40x40x2.5mm kg 0 97.89 0
6.2 Metal Doors M2 12.16 4382.85 53295.457
sub total 53295.4568
7 PLASTERING WORK
7.1 Apply three coats of plaster in cement mortar Inter & Exte. Surface M2 182.2 230.20 41942.44
sub total 41942.44
8 PAINTING WORK
Apply three coats of plastic paint to plasterd vertical
8.1 surfaces,beams & columns. M2 182.2 86.72
15800.384
sub total 15800.384

sarzna Engineering Consultancy PLC


Address:- Woldia
Mobile:- 0913319697

Owner :- BAYE MOGES


Project:- fence
Address:- Gashena 02 kebele
fence BOQ Summary
A-SUB STRUCTURE
1 Excavation and earth work.......................... Birr 14,507.63
2 Stone masonry work ........................... Birr 43,131.31
3 Concrete work.................................... Birr 35,246.23
TOTAL A........................ Birr 92,885.18
B. SUPER STRUCTURE
4 Concrete work................................ Birr 37,506.83
5 Block work......................................... Birr 48,396.61
6 Metal Work........................ Birr 53,295.46
7 Plastering .................................... Birr 41,942.44
8 Painting .................................... Birr 15,800.38
Total B .......................... Birr 181,141.34
Total A + B ............................ Birr 274,026.51
ITEM UNIT
No. DESCRIPTION UNIT QTY
PRICE
1 Excavation and earth work
1.1 Site clearing Removing top soil 200mm thick. M2 142.6 18.56
1.2 trench excavation in ordinal soil to depth not exceeding 150 cm M
3
15.36 175.8
back Fill Around masonary Wall &Under Hard Core imported Form
1.3 M3 16 579.59
out side
1.4 Cart away The Excavated Material1km from the site M3 23.68 171.45
sub total
2 Masonary work
2.1 50cm Thick Stone Masonary Below NGL M3 5.76 1418.9
2.2 50cm Thick Stone Masonary Above NGL M3 17.1 1523.9
sub total

3 Concrete work
3.1 C-7 Lean concrete M2 9.6 87.24
sub total
SUPER STRUCTURE

4 METAL WORK
4.1 RHS for fence 40x40x2.5mm kg 378.37 97.89
4.2 Metal door M 2
10.5 4218.3
sub total
5 POINTING WORK
5.1 Pointing On Stone Masonary M2 48 46.48
sub total

summary
A-SUB STRUCTURE

1 Excavation and earth work.......................... Birr 18,680.32


2 Stone masonry work ........................... Birr 34,231.55
3 Concrete work.................................... Birr 837.50
TOTAL A........................ Birr 53,749.38

B. SUPER STRUCTURE
8 Metal Work........................ Birr 81,330.79
10 pointing .................................... Birr 2,231.04

Total B .......................... Birr 83,561.83

Total A + B ............................ Birr 137,311.21


total
PRICE

2646.656
2700.288

9273.44
4059.936
18680.32

8172.864
26058.69
34231.554

837.504
837.504

37038.639
44292.15
81330.7893

2231.04
2231.04

164 145.222
0.8855
21.6
41 145.22
27 95.63268

106.4