Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

1. ___________developed product meets it’s specification.

A. Quality B. Software C. Hardware D. None of these


2. ___________ensures that required level of product quality is achieved that user wants.
A. Software Management B. Quality Management C. Software Quality D.
Project Management
3. Higher __________ will result in greater customer satisfaction.
A. Reliability B. Security C. Reusability D. Complexity
4. A ________corresponds to unexpected runtime behavior observed by a user.
A. Static B. failure C. Software D. None
5. Presence of a fault doesn’t necessarily imply the occurrence of a failure.
A. True B. False
6. The _______ plan is reviewed by all the team members including Project Managers, and
Developers.
A. SRS B. SQA C. SCM D. SQM
7. Identify reasons that project fail
A. LACK OF SKILLED PROFESSIONALS
B. LOW PAY SCALE
C. DUAL JOBS
D. All of These
8. Ultimately responsible for the Project’s Success
A. Project Administrator B. Project Manager C. Project members D. Stakeholder
9. _________ gain consensus or agreement on project outcome.
A. PM B. FM C. SM D. QM
10. The application of knowledge, skills, tools and techniques to project activities to meet
project requirements.
A. Software Management B. Quality Management C. Software Quality D.
Project Management
11. Quality movement started around
A. 1930-1950 B. 1920-1930 C. 1940-1950 D. 1960-1970
12. ________is discipline-based on measurements and statistics.
A. SRS B. SQT C. SCM D. SQM
13. It perceives quality as fitness for purpose.
A. Manager View B. Customer View C. User View D. Product View
14. Quality is viewed as inherent characteristics.
A. Manager View B. Customer View C. User View D. Product View
15. represents behavioral characteristics of system.
A. Quality Factor B. Quality Criteria C. User Criteria D. Product
16. Is an attribute of Quality Factor that can be related to Software Development.
A. Quality Factor B. Quality Criteria C. User Criteria D. Product
17. In the absence of any corrective action by the system is called ________.
A. Fault B. Error C. Failure D. None
18. In which we includes code review, inspection, walk-through, algorithm analysis, and
proof of correctness.
A. Static Analysis B. Software Analysis C. Dynamic Analysis D. User Analysis
19. It involves actual program execution with input values.
A. Static Analysis B. Software Analysis C. Dynamic Analysis D. User Analysis
20. Input value which is valid but is not property timed is called _______.
A. inopportune Input B. inopportune output C. inopportune Error D. None of thes
21. ______ is a process oriented and focuses on defect prevention.
A. Quality Control B. Quality Assurance C. Quality View D. User Analysis
22. _______ is a product oriented and focuses on defect identification.
A. Quality Control B. Quality Assurance C. Quality View D. User Analysis
23. Which is reactive process?
A. Quality Control B. Quality Assurance C. Quality View D. User Analysis
24. Finding out Output Test Results out of Input Test Cases is called_______.
A. Static Testing B. Software Testing C. Dynamic Testing D. User Testing
25. In which meant for Doing Measurement of Some Property of the Program.
A. Consistency Testing B. Random Testing C. Measurement Testing D.
Functional Testing
26. Which of the following is type of dynamic testing?
A. Structure Testing B. consistency Testing C. Measurement Testing D. None
27. Unwanted and unexpected release of energy.
A. Mishap B. Hazard C. Accident D. None
28. A condition that can lead to a mishap or failure
A. Mishap B. Hazard C. Accident D. None
29. Unplanned event or series of events
A. Mishap B. Hazard C. Accident D. None
30. Probability of a failure state occurring
A. Mishap B. Hazard C. Accident D. Risk
31. Large number of discrete states without repetitive structure
A. Software B. Hardware C. Disk D. None
32. Probability that system will perform intended function
A. Reliability B. Safety C. Testing D. None
33. Default is to correct fault and continue with operational mission
A. Fail-safe B. Fail-operation C. Fail-soft D. None
34. Verify that the software under review meets its requirements
A. FTR B. SRR C. TTP D. FRT
35. Abbreviation of SRS
A. Software Requirements System B. Software review Specification C. Software
Requirement Specification D None of these