NAME: LOVELY G.

ABRAJANO

COURSE: BOT- CIVIL ENGINEERING TECHNOLOGY

STUDENT #: 18-0959

COMPANY/AGENCY: TECHNICAL EDUCATION AND SKILL DEVELOPMENT AUTHORITY

DAILY REPORT OF ACTIVITIES

DAY DATE ACCOMPLISHMENT

1 April 18,2022 -Orientation about the works


that the intern will do during
their On-the-Job training in
TESDA

-Turn over ceremony

-Mixing of Aggregates

-Poured Concrete for column

2 April 19,2022 -Layering of CHB

-Mixing of Mortar

3 April 20, 2022 -Installed bridges for preparation


of pouring concrete for slab

-Fabrication of formworka for


beam

4 April 21, 2022 -Digged a hole for excavation for


column and footing

-Estimated the cement, sand,


and gravel that will be used for
column

-Measured and cutted rebars and


tie wires

5 April 22, 2022 -Poured gravel to the excavation

-Installed of rebars for parella


footing

-Installed stirrups for column


-Checking and counting of materials in stockroom.
6 April 25,2022
-Fabrication of girders and bridges

-Installed of lumber for scaffolding


7 April 26,2022
-Cutted tie wires

-Removed stones and debris for preparation of hallow


8 April 27,2022
block sitting

-Digged holes , installed horizontal rebar and vertical


dowel

-Tied the reinforcement rebar for the preparation of


9 April 28,2022
pouring concrete for slab

-Measured spaces for dowels

-Installed dowels

-Mixed aggregates used for wall plastering


10 April 29,2022

-Poured concrete for slab


11 May 2, 2022
-Poured concrete for slab
12 May 3, 2022
-Poured concrete for slab
13 May 4, 2022
-Calculated the total cement used

14 May 5, 2022

15 May 6, 2022
16 May 9, 2022 - Worked on reports

17 May 10, 2022 -Finished the drafted reports

18 May 11, 2022 -Worked on report

19 May 12, 2022 Coured the concrete slab

-Removed scaffolding and


formwoks

20 May 13, 2022 -Mixed of aggregates for hallow


block sitting

21 May 16, 2022 -Removed formworks and


clearing the area

22 May 17, 2022 -Pulling nails and clearing the


area

23 May 18, 2022 -Removing of scaffolding

24 May 19, 2022 -Mixed aggregates and removing


other debris in the area
25 May 20, 2022 -Plastering of wall

26 May 23, 2022 -Plastering of wall

27 May 24, 2022 - Prepared layout , clearing of


wall debris, mixing mortar , and
applied plaster on wall

28 May 25, 2022 -Leveling surface by using a flat


steel and screeding the plastered
wall

29 May 26, 2022 - Wall plastering

30 May 27, 2022 -Wall finishing

31 May 30, 2022 -Wall Finishing

32 May 31, 2022 - Wall finishing and plastering

33 June 1, 2022 -Clearing and compaction of a


slab bed

34 June 2, 2022 -Pouring of gravel


-Wall Finishing

35 June 3, 2022 -Leveling and making layout

36 June 6, 2022 -Poured concrete for flooring

-Wall finishing

37 June 7, 2022 - Smooth out the surface of the


floor

-Wall Finishing

38 June 8, 2022 - Layout and levelling for making


porch and steps

39 June 9, 2022 -Hollow block sitting

-Plastering surface of porch

40 June 10, 2022 -Plastering surface of porch

-Smooth out the surface of the

Porch
41 June 13, 2022 -Prepared aggregates and
materials used for pouring
concrete slab on the second
building

42 June 14, 2022 -Pouring of concert for slab

43 June 15, 2022 -Pouring concrete for slab

44 June 16, 2022 -Calculated the total cement


used

45 June 17, 2022 -checked the materials left in the


stockroom