12 15 Ratchet Wrench
Method Of Statement
Installation of Golden Arch
3.0 Method Statement
Ensure working area is free from hazards that can compromise safety.
ii. Ensure the skylift operator use suitable pads and cribbing –
operator and permit holder need to ensure that they are using the
correct pads or cribbing to avoid having an outrigger fail or sink
when operate.
Noted:
4 Install the Golden Two workers will use skylift and marking the position of the Golden Arch.
Arch The cover of the Golden Arch is removed. The back panel is lift by skylift
and install on building.
Drill the holes by using cordless hammer drill. 12 holes drill for Golden Arch.
Wall plug size 3/8 is used to install the Golden Arch. Then tighten the wall
plug using rachet.
After finish tighten the wall plug, install the cover of the Golden Arch.
5 Housekeeping Remove all debris and clear the work area. Make sure barricade and
warning sign remove from the site.