Technical requirements:
Tighten (strength is 10.9) the fastening bolt of camshaft thrust plate with a torque of 29-
35N.m.
Check if the rotation of camshaft is blocked. Feel its axial clearance manually. The axial
is 0.1-0.4mm.
Tools: Curved wrench, extension rod, 13 # socket wrench, towel, oil pot and 242 glue.
Smear 242 thread sealant on Use 13# socket wrench to tighten Turn the camshaft manually to see
the thread of the thrust the bolt. if there’s any blocking.
plate bolt. Smear oil on 用13#的套筒拧紧螺栓 用手转动凸轮轴,无阻滞.
its supporting face.
止推片螺栓螺纹部涂242螺纹密
封胶,其支撑面涂油
1.3 Assembling of cylinder liner
Technical requirements:
Smear MoS2 powder evenly on the outer wall of the cylinder liner;
The cylinder liner should be higher than the upper surface of the cylinder block by
0.05~ 0.10mm.
气缸套外壁涂二硫化钼 放入机体缸孔中
Smear MoS2 powder on the Put it into the cylinder-hole 压入缸套
outer wall of the cylinder liner of the engine block Press into cylinder liner
2、Assembling of crankshaft and crankcase
Technical requirements:
1)Tighten main bearing bolts (M18,14 in total) cross-
symmetrically according to the order shown below.
Pre-tighten with 80N·m for the first time and
265~290N·m for the second time.
2) Tighten intermediate hexagon socket head cap screw (M8×25,22 in total). First tighten the
middle part and then both sides. The tightening torque is 22-29N·m;
3)Loosen and then tighten the intermediate hexagon head bolt (M8×110,5 in total). First tighten the
middle part and then both sides. The tightening torque is 22-29N·m;
4)The bolt with thread hole in the head should be installed in the sixth main bearing.
Tools:510 surface glue, lithium grease, towel, oil pot, 22 # socket and torque wrench
下止推片涂锂基脂并安装,油槽
朝外
将曲轴抬入机体
安装主轴瓦
Smear lithium grease on lower Put the crankshaft into engine block
Install main bearing
thrust washer and install it. The
oil groove is facing the outward.
2、曲轴及曲轴箱的装配2.Assembling of
crankshaft and crankcase
装入上止推片,其油槽外 机体与曲轴箱结合面涂510密封
Install upper thrust washer 胶
装胶圈
with the oil groove facing the The connecting face of
outward Install the rubber ring engine block and crankcase
should be coated with 510
sealant
2、曲轴及曲轴箱的装配2.Assembling of
crankshaft and crankcase
Two operators work in coordination Install the locating pin by Press the rear oil seal
to install the crankcase. punching down the middle inside
one first, and then the ones
on both sides.
2、曲轴及曲轴箱的装配2.Assembling of
crankshaft and crankcase
螺栓松装在飞轮壳上,注意螺栓
结合面涂连续均匀510平面胶 区分(七长六短) 按照技术要求拧紧飞轮壳螺栓
Smear 510 surface glue on the Install the bolts loosely on the Tighten the flywheel housing bolts
connecting face continuously and flywheel and notice the according to technical requirements
uniformly distinction of bolts (seven long
bolts and six short bolts)
4、飞轮及飞轮壳的装配 4.Assembling of
the flywheel and flywheel housing
2)飞轮装配过程 2)Process of flywheel assembling
用力矩扳手拧紧螺栓达到技术
用引导棒来对正销孔 将飞轮装上
要求
Align the pin holes by guiding Install the flywheel
Tighten the bolts by torque
rod
wrench according to technical
requirements
5、Assembly of lubricating oil pump
Technical requirements:
The tightening torque of two bolts(one is M10×55 ,one is M10×30)is 44~58N·m。
Tools: Torque wrench, copper hammer, towel, oil pot, 16# socket wrench and 242 glue.
装配过程:Assembling process:
在机体平面上涂上510密封胶 将中间齿轮组装入齿轮室
Smear 510 sealant on the Assemble the intermediate 抬齿轮室壳安放到机体上
engine block plane gear assembly into gear Lift the gear chamber and
chamber install on engine block
6、齿轮室的装配 6.Assembling of gear chamber
打入中间齿轮定位销
打入齿轮室定位销 中间齿轮盖板紧固螺栓螺纹部位涂242
Punch locating pin
Punch locating pin of 螺纹密封胶;按技术要求拧紧
of intermediate gear
gear chamber in. Smear 242 thread sealant to
in.
thread part of intermediate gear
cover plate fastening bolt;
tighten according to technical
requirements.
6、齿轮室的装配 6.Assembling of gear chamber
盘车是发动机在1,6缸上止点
正时齿轮紧固螺栓螺纹部位涂242螺纹 对正刻线
Turn crankshaft at top dead
密封胶;按技术要求拧紧 Align the engraved line
center of No.1 and No.6 cylinder Smear 242 thread sealant to thread
part of timing gear fastening bolt;
tighten according to technical
requirements
6、齿轮室的装配 6.Assembling of gear chamber
涂510平面密封胶
Smear 510 surface 放入胶圈 拧紧
glue Install the rubber Screw
ring
7、Assembling of cylinder head and valve
mechanism
1.Pre-assembling of cylinder head
Technical requirements:
① Smear MoS2 grease on intake and exhaust valves;
② Clearance between exhaust valve stem and valve guide is 0.025-0.053, clearance between
intake valve stem and valve guide is 0.02-0.048;
③ The plane valve of valve bottom recessed cylinder head exhaust/intake 1.08-1.48/0.85-1.05;
④ Notice that rotating direction of inner valve spring and outer valve spring should be opposite.
Tools:22mm fork wrench, special tools for disassembling and assembling cylinder head.
Technical requirements
The clearance between tappet and tappet hole should be 0.025~
0.089
Tools: Brush or oil pot, special tools or tappet
①挺柱涂油 ②下挺柱
① Smear oil on tappet
② Install tappet
7、Assembling of cylinder head and
valve mechanism
3.Assembling of cylinder head
Technical requirements
①The cylinder head gasket should only be used once and must be replaced in case of
repair.
②Tightening order of main bolts: The first tightening torque is 29+20Nm,the second is
198 Nm,and turn 90°clockwise in the third time, the torque should be in the range of
240-340Nm;
③Tightening order of assistant bolts: : The first tightening torque is 29+20Nm,the second
is 98 Nm,and turn 90°clockwise in the third time, the torque should be in the range of
120-160Nm;
Tools: Torque wrench, 17#, 22# socket, copper hammer and extension rod
Inspection before assembling
①Check if the inside of cylinder has sundries before assembling, wipe inner cylinder wall and
top of piston clean, and spray appropriate cleaning lubricating oil on inner cylinder wall;
②Check if components assembled correctly, include to check if valve sealing sleeve and valve
collets are on seat
③Need to knock the components of cylinder head to remove sundries by nylon rod on
workbench before assembling, and then wipe clean the bottom of cylinder head components
Inspection after assembling:
Check if the main and assistant bolts of cylinder head reach the required torque
7、气缸盖及配气机构的装配7、Assembling
of cylinder head and valve mechanism
装配过程 Assembling process
装气缸盖总成 铜锤敲击缸盖
装气缸盖衬垫 Knock cylinder head by
Install cylinder head assembly
Install cylinder head gasket cooper hammer
7、气缸盖及配气机构的装配7、Assembling
of cylinder head and valve mechanism
用出水管给缸盖找平
松装气缸盖主螺栓和带肩螺母 按技术要求拧紧
Level the cylinder head with
Loosely install the main bolts Tighten them according
water outlet pipe
of cylinder head and collar to technical
nut requirements
8、Assemble the rocket arm seat to
adjust valve clearance
Technical requirements:
① The clearance between rocket arm and rocket arm shaft is 0.012~0.066mm;
② Tightening torque of rocket arm seat is 98+10N·m;
③ Tightening torque of hexagon head bolt in cylinder head cover is (22~29)N·m
④ Adjustment of valve clearance: Turn the flywheel to make the No.1 cylinder in outbreak
position according to rotating directing of crankshaft, adjust intake valves of No.1, No.2
and No.4 cylinder and exhaust valves of No.1, No.3 and No.5 cylinder successively.
WD615.WD10Intake valve clearance is 0.30±0.03mm. Exhaust valve clearance is
0.40±0.03mm.WD12Intake valve clearance is 0.35mm. Exhaust valve clearance is
0.40mm. EVB valve clearance is 0.25±0.03mm. Adjust nut torque:(30~45)N·m,
turn crankshaft 360°according to rotating direction of crankshaft, and adjust the
remaining rocket arm clearance;
气门推杆涂油 飞轮壳和齿圈的刻度线对齐,找
按技术要求拧紧 到上支点
Smear oil on valve Tighten the bolts by
push rod Scale line of flywheel housing
torque wrench and gear ring should be aligned.
according to technical Find the top dead center.
requirements
8、装摇臂座调整气门间隙 8、Assemble the
rocket arm seat to adjust valve
clearance
1、Remove cylinder head cover of No.1 cylinder. Check if the piston of No.1 cylinder is near top
dead center by rotating the push rod and turn the crankshaft if not.
2、Turn crankshaft counterclockwise (check from flywheel end) by special tool to make the fuel
supply advanced angle scale according to technical requirements in flywheel should align
with “OT” scale line in flywheel housing. (Note: Allow to turn flywheel clockwise first to make
the “OT” scale line in flywheel housing reaches more than two times of scale line of fuel
supply advanced angle, and then turn crankshaft counterclockwise.)
3、Flange mechanical pump models: Loosen the fastening bolt of high pressure oil pump and
flange; Coupling models: Loosen the bolts of angle adjusting plate.
4、Seal the oil-return port of fuel injection pump; remove hollow bolt in oil-inlet port of fuel
injection pump, connect oil-inlet port with special fuel supply pipe, and tighten connector; use
special oil-return pipe to connect oil-inlet port of fuel injection pump No.1 cylinder, and
tighten connecting bolt. The special oil return pipe consist of oil-resistant transparent rubber
hose and connecting elbow, among which, the total length of connecting elbow is less than
150mm.
10、Adjustment of fuel supply advanced
angle
5、Start fuel supply advanced angle adjustment device, turn flange mechanical fuel
injection pump clockwise(seen from free end) or turn coupling mechanical fuel
injection pump flange counterclockwise (see from free end), make the diesel oil flow
out from oil outlet port of oil pump linearly. The fuel injection pump with delivery
valve, fuel supply pressure of fuel supply advanced angle adjustment device is
2MPa approximately; fuel injection pump without delivery valve, fuel supply pressure
of fuel supply advanced angle adjustment device is 0.5MPa approximately
6、Turn pump body of flange-structured fuel injection pump counterclockwise (seen
from free end) or turn coupling-structured fuel injection pump flange clockwise (seen
from free end) to make the high pressure oil from linear change to drop, use
stopwatch to detect after dropping 10s continuously. Visual drip count, 1 drop / sec
in average, the flow rate unchanged and last 10s.
7、Flange-structured fuel injection pump: Tighten fastening bolt between flange fuel
injection pump bracket and fuel injection pump seat first according to technical
requirements, and then tighten fastening bolt between fuel injection pump and
flange; Coupling-structured fuel injection pump: Tighten fastening bolt of angle
adjusting plate according to technical requirement, and smear sealant on fastening
bolt. The operator should check visually if the high pressure diesel oil is 1 drop/sec
after tightening bolts.
11、喷油器、高压油管的安装 11.Assembling of
fuel injector and high pressure oil pipe
装高压油管
装喷油器 Install high pressure oil pipe
Install fuel injector
12、Assembling of water outlet pipe,
intake and exhaust pipes
Technical requirements: Inspection before assembling:
Smear MoS2 on the sealing ring of exhaust Check if the gasket is intact; check the
pipe. The tightening torque is 49~68.6Nm. sealing ring of exhaust pipe.
Bolts not in this range should be replaced Inspection after assembling:
Tools: Steering handle ,13mm and16mm Check if the bolts are tightened.
socket
13、Assembling of oil pan
Technical requirements:The sealing gasket should be smooth and not distorted. Cross-
symmetrically tighten the oil pan bolts and the torque is 22-29N·m;
Tools:13mm socket and 32 open-end wrench
Inspection before assembling: Check if the suction strainer and oil pan are interferential.
Inspection after assembling: Check if magnetic screw plug is tightened.
14、Assembling of water pump
Technical requirements: Inspection before assembling:
1、Clean the water pump and gear chamber surface Check if water pump impeller is rotating flexibly.
to install the water pump sealing gasket. Tools: 13# wrench
2、Install water pump
3、Install generator bracket
Inspection after assembling:
Check if water pump bolts are tightened.
4、Fasten water pump bolts
5、Install water inlet pipe assembly of water pump
15、Assembling of air compressor
Technical requirements of air compressor
Tools:13# socket and crank
assembling:
1. The connecting face of air compressor and gear chamber has Inspection after assembling:
rubber ring and smear 510 flat glue. Check if the air compressor bolt is tightened.
2. Connect water inlet pipe and water return pipe of air
compressor respectively.
Inspection before assembling: Check if air compress
gear is rotating flexibly.
16、Assembling of shock absorber and
pulley
Technical requirements:The torque of crankshaft connecting bolt and pulley is
60+10N·m;
Inspection before assembling: Check if the shock absorber and pulley are intact.
Tools: 16#socket and torque wrench
Inspection after assembling: Check if the torque reaches the requirement.