CRITICAL TASKS

A task is critical if there is no room in the schedule for it to slip.


Learn more about managing your project's critical path.

Name Start Finish % Complete Remaining Work Resource Names


Installation of Motorized Damper Sheet Wed 8/30/23 Mon 9/11/23 40% 115.2 hrs Mr
Ahmad(helper),M
r.Rana(helper),Mr
.akhtar(pipe
fabricator),Mr
Taqi(pipe
Status: Complete Status: Late fabricator),Mr.ishf
Status: Future Task aq(pipe
fitter),Mr.Wasee
m(pipe fitter),Mr
Azhar(plumber),
Mr. Sikander
(Welder)
Installation of Back Draft Damper Sheet Mon 9/11/23 Mon 9/25/23 0% 480 hrs Mr.Bilal(labor),Mr
Ahmar(labor),She
et Cutter,Mr.
Sikander
(Welder),Gas
Welding Set,Mr
Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr
Tahir(pipe fitter)
Testing of Air Side of the System Wed 9/27/23 Tue 10/17/23 0% 360 hrs Mr.Sajid(HVAC
Technician),hood
alnor velocity
meter,Mr.ashraf(
HVAC engineer)
Testing and commissioning of All Air Tue 10/17/23 Tue 11/14/23 0% 1,240 hrs MR
conditioning and Mechanical Misbah(electricia
ventilation n),Gas Welding
Set,Grinding
Machine,Mr.Meh
mood(helper),Mr
Ahmad(helper),M
r Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr
Tahir(pipe
fitter),Mr.ishfaq(p
ipe fitter),Mr
Azhar(plumber),
Mr. Sikander
(Welder)
Installation of European style coupled Wed Wed 1/10/24 0% 2,240 hrs Mr.Mehmood(hel
water closet. 11/15/23 per),Mr.Rana(hel
per),Mr.Bilal(labo
r),Mr Tahir(pipe
fitter),Mr.ishfaq(p
ipe fitter),Mr
Azhar(plumber),
Mr
Nabeel(plumber)
Installation of European style water Thu 1/11/24 Wed 1/31/24 0% 840 hrs Mr
closet for disabled persons. Ahmad(helper),M
r.Ibrahim(helper),
Mr.akhtar(pipe
fabricator),Mr
Taqi(pipe
fabricator),Mr.Wa
seem(pipe
fitter),Mr.Waqar(
pipe fitter),Mr
Azhar(plumber)
Installation of Asian Style Water Closet Thu 2/1/24 Thu 2/29/24 0% 1,280 hrs Mr.Mehmood(hel
per),Mr.Rana(hel
per),Mr.Bilal(labo
r),Mr Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr
Tahir(pipe
fitter),Mr.ishfaq(p
ipe fitter),Mr
Nabeel(plumber)
Fixing of Toilet Hand Spray Fri 3/1/24 Thu 3/7/24 0% 240 hrs hand
tool,Mr.Mehmoo
d(helper),Mr.Ran
a(helper),Mr.akht
ar(pipe
fabricator),Mr.Wa
seem(pipe
fitter),Mr
Nabeel(plumber)
Fixing of Wash Basin Cold and Hot Fri 3/8/24 Thu 4/4/24 0% 960 hrs Mr.Rana(helper),
Water Mixer Mr.Waseem(pipe
fitter),Mr.Waqar(
pipe fitter),Mr
Nabeel(plumber),
Mr.Maqbool(labo
r),Mr.Mehmood(h
elper)
Fixation of Shower set Fri 4/5/24 Tue 4/23/24 0% 320 hrs Mr.Mehmood(hel
per),Mr.Rana(hel
per),Mr.Bilal(labo
r),Mr
Azhar(plumber)
Fixture of Stainless Steel Kitchen Sink Wed 4/24/24 Tue 4/30/24 0% 280 hrs Mr.Mehmood(hel
with Accessories per),Mr
Ahmad(helper),M
r Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr
Tahir(pipe
fitter),Mr.ishfaq(p
ipe fitter),Mr
Azhar(plumber)
Installation of Grease trap Thu 5/2/24 Wed 5/22/24 0% 600 hrs Mr
Ahmad(helper),M
r.Ibrahim(helper),
Mr.Waseem(pipe
fitter),Mr.Waqar(
pipe fitter),Mr
Nabeel(plumber)
Installation of Polypropylene Pipe with Thu 5/23/24 Wed 5/29/24 0% 360 hrs hand
its Accessories tool,Mr.Mehmoo
d(helper),Mr.Ran
a(helper),Mr
Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr
Tahir(pipe
fitter),Mr.ishfaq(p
ipe fitter),Mr
Azhar(plumber),
Mr. Sikander
(Welder)
Fixing of Expanded Rubber Foam Thu 5/30/24 Wed 6/5/24 0% 280 hrs Mr.Mehmood(hel
Insulation of Pipes per),Mr.Rana(hel
per),Mr
Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr
Tahir(pipe
fitter),Mr.ishfaq(p
ipe fitter),Mr
Azhar(plumber)
Fitting Poly Ethylene Pipes For water Thu 6/6/24 Mon 6/24/24 0% 560 hrs Mr
Supply Ahmad(helper),M
r.Ibrahim(helper),
Mr.akhtar(pipe
fabricator),Mr
Taqi(pipe
fabricator),Mr.Wa
seem(pipe
fitter),Mr.Waqar(
pipe fitter),Mr
Nabeel(plumber)
Providing and fixing Jointing Testing Tue 6/25/24 Thu 6/27/24 0% 72 hrs Mr. Babar
Pipelines for Water Supply (Assistant
Electrical
Engineer),Mr.ashr
af(HVAC
engineer),Mr.Mo
hsin(QA & QC)
Fitting of Brass Body Float Valve Fri 6/28/24 Thu 7/4/24 0% 280 hrs Mr
Ahmad(helper),M
r.Ibrahim(helper),
Mr.akhtar(pipe
fabricator),Mr
Taqi(pipe
fabricator),Mr.Wa
seem(pipe
fitter),Mr.Waqar(
pipe fitter),Mr
Nabeel(plumber)
Fixing of Hoss Bib for Washing Area Fri 7/5/24 Fri 7/19/24 0% 640 hrs hand
tool,Mr.Mehmoo
d(helper),Mr.Ran
a(helper),Mr
Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr
Tahir(pipe
fitter),Mr.ishfaq(p
ipe fitter),Mr
Azhar(plumber)
Installation of Pressure reducing Valve Mon 7/22/24 Tue 7/30/24 0% 392 hrs Mr
Assembly Ahmad(helper),M
r.Ibrahim(helper),
Mr.akhtar(pipe
fabricator),Mr
Taqi(pipe
fabricator),Mr.Wa
seem(pipe
fitter),Mr.Waqar(
pipe fitter),Mr
Nabeel(plumber)
Installation of Motor Control Electrical Wed 7/31/24 Tue 8/13/24 0% 240 hrs Mr.Mehmood(hel
Panel with Protection per),MR
Misbah(electricia
n),Mr.Rana(helpe
r)
installation of hot water storage heater Thu 8/15/24 Wed 9/4/24 0% 1,320 hrs MR
( Electric) Suitable for 30 psi working Misbah(electricia
pressure n),hand
tool,Mr.Mehmoo
d(helper),Mr.Ran
a(helper),Mr
Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr
Tahir(pipe
fitter),Mr.ishfaq(p
ipe fitter),Mr
Azhar(plumber),S
heet Cutter,Mr.
Sikander (Welder)
Fixing of uPVC Pipes of approved Size Thu 9/5/24 Wed 9/18/24 0% 320 hrs hand
with accessories tool,Mr.Mehmoo
d(helper),Mr
Ahmad(helper),M
r Azhar(plumber)
Fixing of Floor Trap including Grating Thu 9/19/24 Wed 10/2/24 0% 240 hrs Mr.Rana(helper),
Floor Trap, inlet outlet Connection Mr.Ibrahim(helpe
r),Mr
Nabeel(plumber)
Fixing of Cleanout for soil, waste pipes Thu 10/3/24 Wed 10/9/24 0% 280 hrs Mr.Mehmood(hel
of approved make. per),Mr
Ahmad(helper),M
r.Bilal(labor),Mr
Ahmar(labor),Mr.
Waseem(pipe
fitter),Mr.Waqar(
pipe fitter),Mr
Azhar(plumber)
Fixing of PVC Yard Drain of Approved Thu 10/10/24 Wed 10/16/24 0% 320 hrs Mr
Design Ahmad(helper),M
r.Ibrahim(helper),
Mr.Maqbool(labo
r),Mr Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr.ishf
aq(pipe
fitter),Mr.Waqar(
pipe fitter),Mr
Nabeel(plumber)
Fixing of Catch Basin with Ductile Iron Thu 10/17/24 Fri 10/25/24 0% 280 hrs Gas Welding
grating with frame and fixing material Set,Mr.Waseem(p
ipe
fitter),Mr.Waqar(
pipe fitter),Mr
Nabeel(plumber),
Mr. Sikander
(Welder)
testing of all uPVCs Mon Thu 10/31/24 0% 192 hrs Mr. Babar
10/28/24 (Assistant
Electrical
Engineer),Mr.Meh
mood(helper),Mr
Ahmad(helper),M
r.ashraf(HVAC
engineer),Mr.Mo
hsin(QA & QC),Mr
Azhar(plumber)
Installation of Accessories and Fri 11/1/24 Tue 11/12/24 0% 320 hrs Mr.Mehmood(hel
materials for Sump Pit. per),Mr
Ahmad(helper),M
r.ishfaq(pipe
fitter),Mr.Wasee
m(pipe fitter),Mr
Azhar(plumber)
Installation of Motot Control Panel for Wed Wed 11/20/24 0% 240 hrs MR
Duplec Submersible Pumps including 11/13/24 Misbah(electricia
auto sequencing of pumps n),Mr.Imran(elect
rician),hand
tool,Mr.Rana(help
er),Mr.Ibrahim(he
lper)
testing of work Fri 1/10/25 Mon 1/13/25 0% 32 hrs Mr.Mohsin(QA &
QC),Mr
Shouqat(mason)
Provision of Submittals, samples, shop Tue 1/14/25 Mon 2/3/25 0% 120 hrs shareef
drawings, inspections, As-Built architechture
drawings, operation and maintenance engineer
manuals
Painting, identification and tagging to Tue 2/4/25 Fri 2/14/25 0% 192 hrs Mr.Rana(helper),
the P&S installations and equipments. Mr. Ishaq(
Painter),Mr
Nabeel(plumber)
Testing, and commissioning entire P&S Mon 2/17/25 Wed 2/19/25 0% 144 hrs Mr. Asif(
installation as per Engineer's approval. plumber),hand
tool,Mr.Mehmoo
d(helper),Mr
Ahmad(helper),M
r Tahir(pipe
fitter),Mr.ishfaq(p
ipe fitter)
Installation of fire hose cabinet with Thu 2/20/25 Wed 3/12/25 0% 312 hrs Mr. Asif(
two fire extinguishers and accessories plumber),hand
tool,Mr
Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr
Tahir(pipe
fitter),Mr.Ibrahim
(helper),Mr.Waqa
r(pipe fitter)
Installation of landing valve including Thu 3/13/25 Thu 3/20/25 0% 144 hrs Mr
valve cabinet with front breakable glass Ahmad(helper),M
r.Rana(helper),Mr
Azhar(plumber)
installation of fire department Fri 3/21/25 Fri 4/4/25 0% 256 hrs Mr.akhtar(pipe
breeching connection as per approval fabricator),Mr.Imr
an(electrician),Mr
.Mehmood(helper
),Mr. Asif(
plumber)
Fitting of pressure relief valve Mon 4/7/25 Fri 4/11/25 0% 160 hrs Mr. Asif(
plumber),Mr.Meh
mood(helper),Mr
Ahmad(helper),M
r Azhar(plumber)
Fitting of Automatic air relief valve Mon 4/14/25 Fri 4/18/25 0% 200 hrs Mr.Rana(helper),
Mr.Ibrahim(helpe
r),Mr.Waseem(pi
pe
fitter),Mr.Waqar(
pipe fitter),Mr
Nabeel(plumber)
Fitting of float switvh for low water Mon 4/21/25 Fri 4/25/25 0% 200 hrs Mr. Asif(
level cut off plumber),Mr.Meh
mood(helper),Mr.
Rana(helper),Mr.
Waseem(pipe
fitter),Mr.Waqar(
pipe fitter)
Fitting of anti Vortex Suction platesfor Mon 4/28/25 Mon 5/5/25 0% 280 hrs Mr. Asif(
suction pipes plumber),Mr.Meh
mood(helper),Mr.
Rana(helper),Mr
Taqi(pipe
fabricator),Mr.ishf
aq(pipe
fitter),Mr.Wasee
m(pipe fitter),Mr
Nabeel(plumber)
Fitting of Check valve with Flanges Tue 5/6/25 Tue 5/13/25 0% 288 hrs Mr.Mehmood(hel
per),Mr
Ahmad(helper),M
r.Rana(helper),Mr
.Ibrahim(helper),
Mr
Azhar(plumber),
Mr
Nabeel(plumber)
Installation of Fire Hydrant System Wed 5/14/25 Tue 5/27/25 0% 560 hrs Mr.Mehmood(hel
per),Mr
Ahmad(helper),M
r.Rana(helper),Mr
.Ibrahim(helper),p
ipe vice set,Mr
Azhar(plumber),
Mr
Nabeel(plumber)
Testing of Fire Hydrant System Wed 5/28/25 Thu 5/29/25 0% 64 hrs Mr. Asif(
plumber),hand
tool,Mr.Mehmoo
d(helper),Mr.Moh
sin(QA & QC)
Installation of Wall Mounted Sprinkler Fri 5/30/25 Tue 6/10/25 0% 48 hrs Mr Tahir(pipe
fitter),Fire work
technician
Installation of Fire Extinguishers with Wed 6/11/25 Mon 6/16/25 0% 64 hrs Fire work
fixing accessories technician,Mr.Bila
l(labor)
Installation of Zone Control Valve Tue 6/17/25 Mon 6/23/25 0% 160 hrs Fire work
Assembly technician,Mr.
Asif(
plumber),Mr.Maq
bool(labor),Mr.M
ehmood(helper)
Fitting of Zone Contol Test Valve with Tue 6/24/25 Mon 7/14/25 0% 480 hrs Mr
sight glass and sectional drain valve Nabeel(plumber),
Mr
Shahwar(labor),M
r.Mehmood(helpe
r),Mr.Waqar(pipe
fitter)
MS insulated Diesel Engine Flue pipe up Tue 7/15/25 Mon 8/11/25 0% 320 hrs Mr. Babar
to outside the building as per (Assistant
Consultant's approval. Electrical
Engineer),MR
Misbah(electricia
n)
Making of AS BUILT drawings on Tue 8/12/25 Tue 9/2/25 0% 240 hrs saqib(AUTO CAD
AutoCAD 2013 with sectional details Oprator),shareef
with Technical / Operational manual, architechture
LOG book for each A/C Unit as per engineer
instruction of Consultant.
Painting, identification and tagging to Wed 9/3/25 Wed 9/17/25 0% 280 hrs Mr.Imran(electrici
the installations and equipments. an),Mr.Mehmood
(helper),Mr
Ahmad(helper),M
r. Ishaq( Painter)
Testing, and commissioning of entire Thu 9/18/25 Mon 9/22/25 0% 48 hrs Mr.ashraf(HVAC
fire fighting installation as per engineer),Mr.Mo
Consultant's approval. hsin(QA & QC)
<Grand Celebration of Project Mon 9/22/25 Mon 9/22/25 0% 0 hrs Mr.Aamir(Project
Completion> Manager)