Professional Documents
Culture Documents
No Description Qty Material (IDR) Labor (IDR)
No Description Qty Material (IDR) Labor (IDR)
No Description Qty Material (IDR) Labor (IDR)
A. Purchase Order
No Description Qty Material (IDR) Labor (IDR)
1 Dimanthing Ceiling 887 m2 - 44,350,000
2 Reinstal Ceiling 887 m2 - 66,525,000
3 Paint Ceiling 887 m2 - 26,610,000
4 Rent Scafolding 1 m2 - 7,500,000
Total 144,985,000
Diskon 5% 7,249,250
Total 137,735,750
Grand Total 137,735,750
PPn 10 % -
PPH 21 3% dari labor 4,132,073
Total Payment 133,603,677
B. Ivoice
No Descrition Total
1 Payment 133,603,667
DP 30 % 31-10-2021 40,081,100
Pembayaran dapat dilakukan di No. Rek : BCA 1990701608 A/N AWI WIBOWO
Terima Kasih
AWI WIBOWO
Invoice 4 Progres 25%
Invoice Date 14-01-2022
Invoice No AWI/BIA/X/2021
A. Purchase Order
No Description Qty Material (IDR) Labor (IDR)
1 Dimanthing Ceiling 887 m2 - 44,350,000
2 Reinstal Ceiling 887 m2 - 66,525,000
3 Paint Ceiling 887 m2 - 26,610,000
4 Rent Scafolding 1 m2 - 7,500,000
Total 144,985,000
Diskon 5% 7,249,250
Total 137,735,750
Grand Total 137,735,750
PPn 10 % -
PPH 21 3% dari labor 4,132,073
Total Payment 133,603,677
B. Ivoice
No Descrition Total
1 Payment 133,603,667
Progres 25 % 14-01-2022 33,400,916
Pembayaran dapat dilakukan di No. Rek : BCA 1990701608 A/N AWI WIBOWO
Terima Kasih
AWI WIBOWO
Invoice 4 Progres 25%
Invoice Date 14-01-2022
Invoice No AWI/BIA/X/2021
A. Purchase Order
No Description Qty Material (IDR) Labor (IDR)
1 Level 1 Part A 1 lot 63,600,000 49,000,000
2 Level 2 Part A 1 lot 121,130,000 81,145,000
3 Level 2 Part B-C 1 lot 105,920,000 72,620,000
4 Level 3 Part A 1 lot 83,820,000 50,425,000
5 Level 3 Part B 1 lot 56,700,000 40,290,000
6 Wine Rooms 1 lot 10,920,000 6,210,000
7 Lain-lain 1 lot 7,500,000
8 Civil Work - -
Total 449,590,000 299,690,000
Diskon - -
Total 449,590,000 299,690,000
Grand Total 749,280,000
PPn 10 % -
PPH 21 3% dari labor 8,990,700
Total Payment 740,289,300
B. Ivoice
No Descrition Total
1 Payment 740,289,300
Progres 25 % 14-01-2022 185,072,325
Pembayaran dapat dilakukan di No. Rek : BCA 1990701608 A/N AWI WIBOWO
Terima Kasih
AWI WIBOWO
Invoice 1 Progres 100%
Invoice Date 07-04-2022
Invoice No AWI/BIA-SBY/IV/2022
A. Purchase Order
No Description Qty Material (IDR) Labor (IDR)
1 Ongkos kerja + Material 1 Lot 1,500,000 6,500,000
2 Sekafolding 1 Lot - 500,000
3 Savety 1 Lot - 500,000
4 SWAP ANTIGEN 4 Org 400,000 -
5 Akomodasi dan alat kerja 1 Lot - 3,500,000
Pembayaran dapat dilakukan di No. Rek : BCA 1990701608 A/N AWI WIBOWO
Terima Kasih
AWI WIBOWO
Penawaran Pekerjaan repair ducting exhaus STP Shangrila Surabaya
21 Mei 2022
No Description Qty Vol Unit Total
1. Ducting BJLS 0,80mm (Lokfom) 53 m2 600,000 31,800,000
2. Box Filter PLAT 0,100mm 9 m2 750,000 6,750,000
3. Ganti Flexibele/Terpal 1 lot 4,000,000 4,000,000
4. Bongkar Ducting Esisting 1 lot 6,500,000 6,500,000
5. Akumudasi dan alat bantu kerja 1 lot 6,000,000 6,000,000
6. Material bantu 1 lot 5,000,000 5,000,000
Total 60,050,000
AWI WIBOWO
Penawaran Isolasi + Jaketing evap dan pipa suction chiller RTAA 090are BL 3 Chiller 2 di PT. Meiji Bangil
01 - 06 - 2022
Unit Price (IDR) Total Price (IDR)
No Description Qty Vol
Material Labor Material Labor
1. Evap 1 Unit 6,000,000 0 6,000,000
2. Pipa 3" 3 mtr 500,000 0 1,500,000
3. Elbow 3" 4 Unit 250,000 0 1,000,000
4. Insulflek 2 Roll 2,500,000 5,000,000 0
5. Insulflek Tube 6 mtr 60,000 360,000 0
6. Lem 7 kg 200,000 1,400,000 0
7. Silen 5 Tub 45,000 225,000 0
8. Aluminium 0,50 1 Roll 6,000,000 6,000,000 0
9. SWAP Antigen 3 Orang 100,000 0 300,000
10. Akumudasi dan alat bantu 1 Lot 3,500,000 0 3,500,000
AWI WIBOWO