Yanbu Synergy Project - Stage 2-Summary
Yanbu Synergy Project - Stage 2-Summary
1 Demolition Works
2 Dismantling/reinstallation Works
3 Repair of concrete surface and apply epoxy paint for the ramp at
27 M2 60.00
used car showroom entrance
DIVISION 09 - FINISHES
1 Floor finishes
Tile Adhesive Supplier: (Weber-Webercol plus/BASF/Fosroc).
Epoxy Grout Supplier: Weber - Epox Easy /Mapei/ BASF, scope
includes control joints, and all required accessories
Painting works
DIVISION 09 - FINISHES
1 Ceiling Finishes
C Partial Demolition of existing Ceiling and repair & paint of the ceiling
after completion of fire fighting.- existing lighting and diffusers to be
maintained , dismantled and reinstalled as necessary to complete 84 M2 25.00
the works
DIVISION 09 - FINISHES
1 Ceiling Finishes
C Partial Demolition of existing Ceiling and repair & paint of the ceiling
after completion of fire fighting.- existing lighting and diffusers to be
maintained , dismantled and reinstalled as necessary to complete 87 M2 25.00
the works
2 Painting of the low and high height ceiling 87 M2 55.00
7,960.00
3,500.00
2,025.00
1,620.00
15,105.00
Total Price (SR)
73,630.00
110,000.00
21,890.00
205,520.00
2,092.50
4,603.50
6,696.00
2,175.00
4,785.00
6,960.00
234,281.00
Fire Alarm for FORD & HYUNDAI Showroom
S.N Description Quantity Unit Rate
Supply new lights with 42W, 230V circular type recessed mounted
1a 40 No. 135.00
LED lighting fixture - supply
1 CCTV SYSTEM
Supply, installation, testing and commissioning of IP CCTV UPS
system, including power supply connection to panel, that is, works
shall be complete including supply and installations of conduits
and wires, and all interconnections as described on drawings
2 LAN SYSTEM
TO DIVISION SUMMARY
Total Electrical
m
Total Price (SR)
4,515.00
130.00
21,110.00
1,020.00
2,500.00
5,500.00
34,775.00
rm
Total Price (SR)
945.00
0.00
300.00
340.00
750.00
2,335.00
840.00
0.00
150.00
170.00
1,350.00
2,510.00
2,940.00
0.00
450.00
510.00
1,450.00
5,350.00
735.00
0.00
150.00
170.00
950.00
2,005.00
5,400
3,150
2,150
2,200
2,150
900
950
4,210
21,110
System
Total Price (SR)
8,650
5,500
8,650
22,800
90,885.00
Ford - Service Reception
S.N Description Quantity Unit Rate
1 Firefighting Pipes
Supply, installation, testing and commissioning of Firefighting
pipework, BS Sch 40 Grade A ERW, conforming to ASTM A53,
supports, pipe fittings and jointing by threaded connections up to
50mm. For pipe sizes 65mm and above grooved fittings with flange
connections, pipe expansion joints etc as per drawings.
A ø25 mm 6 M 55.00
B ø32 mm 10 M 75.00
C ø40 mm 6 M 90.00
D ø150 mm 20 M 380.00
Zone control valve assembly with check valve, pressure gauge, flow
3 switch, and all connected pipework as shown on the typical standard
detail drawing.
A FHC 1 No 4,850.00
5 Fire Extinguisher (Civil Defense approved)
1 Firefighting Pipes
Supply, installation, testing and commissioning of Firefighting
pipework, BS Sch 40 Grade A ERW, conforming to ASTM A53,
supports, pipe fittings and jointing by threaded connections up to
50mm. For pipe sizes 65mm and above grooved fittings with flange
connections, pipe expansion joints etc as per drawings.
A ø25 mm 6 M 55.00
B ø32 mm 10 M 75.00
C ø40 mm 6 M 90.00
Total
Workshop
S.N Description Quantity Unit Rate
DIVISION 21 - FIRE PROTECTION SYSTEM
1 Firefighting Pipes
B ø32 mm 65 M 75.00
C ø40 mm 30 M 90.00
D ø100 mm 15 M 280.00
E ø150 mm 78 M 380.00
Zone control valve assembly with check valve, pressure gauge, flow
switch, and all connected pipework as shown on the typical standard
detail drawing.
1 Firefighting Pipes
B ø150 mm (from Fire Pump to the building including the riser) 10 M 345.00
A
Wet alarm check valve assembly (150mm) with retarding chamber,
water alarm gong, OS& Y valve, pressure gauge, flow switch, tamper
1 No 7,500.00
switch, main drain valve including all trims and connected pipework
as shown on the typical standard detail drawing.
OPTION 2
4 Supply, install, test commission Civil Defense approved Electric,
Diesel and Jockey pumps as shown in the drawing, capacity as
mentioned below. Pump shall be installed complete with necessary
valves, flow meter, supports, fittings, flanges,nuts, bolts,gaskets,
thermometers, pressure gauges, flexible, strainers, pump room
piping, accessories and fittings with control panel, SS pressure
sensing lines, foot valve with strainer etc as a complete system.
PUMP DETAILS
A Electrical Fire Pump, Horizontal split case positive pressure fire
pump with capacity 500 GPM ELECTRICAL PUMP, 7 BARS 1 No
PRESSURE
B Diesel Fire Pump,Horizontal split case positive pressure fire pump
with capacity 500 GPM DIESEL, 7 BARS PRESSURE, 100 Ltr Oil 126,500.00
Tank 1 No
Dismantling existing PACU and Installing new weather proof roof top
Package airconditioning units. Installation shall also include test and
commission of new Unit, all ductwork connection, condensate drain
connection to the nearest point, Thermostat, cable connections.
A 22 gauge 45 M2 165
A FHC 1 No 3850
330.00
750.00
540.00
7,600.00
300.00
9,850.00
4,850.00
220.00
24,440.00
330.00
750.00
540.00
450.00
220.00
2,290.00
4,875.00
2,700.00
4,200.00
29,640.00
10,920.00
200.00
980.00
650.00
920.00
76,260.00
5,175.00
3,450.00
5,250.00
7,500.00
5,360.00
3,900.00
77,000.00
126,500.00
3,500.00
18,500.00
750.00
500.00
3,500.00
6,500.00
267,385.00
3,360.00
77,000.00
4,000.00
7,425.00
2,475.00
12,100.00
135.00
106495
3,850.00
720.00
4570
481,440.00