DAFTAR SASARAN 2006

Periode bulan JUNE

TANGGAL TARGET
No NAMA SASARAN EFEKTIF WAKTU KETERANGAN
1 Purwanto 1.Maintenance oven kitchen dan oven pastry 1-Jun-06 1 Bulan
2.Maintenance freezer,chiller,under counter pastry dan gardemanger 1-Jun-06 1 Bulan
freezer,chiller general store dan ice cub.
3.Cleaning ac room lantai 3, 5, 6 1-Jun-06 1 Bulan
4.Cleaning ceiling kitchen 1-Jun-06 1 Bulan
5.Perbaikan dinding retak room lantai satu dan koridor cuil 1-Jun-06 1 Bulan
6.Cleaning GWT dan tandon roof top 1-Jun-06 1 Bulan

2 Gusti ketut S 1.Maintenance boiler 1-Jun-06 1 Bulan


2.Maintenance apar dan box hydrant 1-Jun-06 1 Bulan
3.Maintenance panel listrik di FO dan RBS panel 1-Jun-06 1 Bulan
4.Cleaning ceiling kitchen 1-Jun-06 1 Bulan
5. Perbaikan dinding retak room lantai dua dan koridor cuil 1-Jun-06 1 Bulan
6.Cleaning GWT dan tandon roof top 1-Jun-06 1 Bulan

3 Heri wijanarko 1.Maintenance STP dan laundry 1-Jun-06 1 Bulan


2.Back wash water treatment 1-Jun-06 1 Bulan
3.Setting hydropor air panas dan air dingin 1-Jun-06 1 Bulan
4.Cleaning ceiling kitchen 1-Jun-06 1 Bulan
5. Perbaikan dinding retak room lantai tiga dan koridor cuil 1-Jun-06 1 Bulan
6.Cleaning GWT dan tandon roof top 1-Jun-06 1 Bulan

4 Heru Aprilianto 1.Maintenance sound sistem equipment 1-Jun-06 1 Bulan


2.Maintenance fire alarm equipment dan hydrant 1-Jun-06 1 Bulan
3.Cleaning out door ac lantai basement 1-Jun-06 1 Bulan
4.Cleaning ceiling kitchen 1-Jun-06 1 Bulan
5.Perbaikan dinding retak room lantai lima dan koridor cuil 1-Jun-06 1 Bulan
6.Cleaning GWT dan tandon roof top 1-Jun-06 1 Bulan

5 Soeadi 1.Maintenance pompa sumpit,booster,pool,transfer,water treatment 1-Jun-06 1 Bulan


dan pompa pound
2.Cleaning filter air kitchen 1-Jun-06 1 Bulan
3.Snake driil drain kitchen 1-Jun-06 1 Bulan
4.Cleaning ceiling kitchen 1-Jun-06 1 Bulan
5.Perbaikan dinding retak room lantai enam dan koridor cuil 1-Jun-06 1 Bulan
6.Cleaning GWT dan tandon roof top 1-Jun-06 1 Bulan

TANGGAL TARGET
No NAMA SASARAN EFEKTIF WAKTU KETERANGAN
6 Engky Hargiyono 1.Maintenance semua kompor kitchen 1-Jun-06 1 Bulan
2.Cleaning exhaust wood kitchen,loker,pump room,driver room dan 1-Jun-06 1 Bulan
exhaust boiler
3.Cleaning room gas kitchen,laundry dan check pipa instalasi gas 1-Jun-06 1 Bulan
4.Cleaning ceiling kitchen 1-Jun-06 1 Bulan
5.Buat bak drain minyak exhaust wood di room chiller lantai 3 1-Jun-06 1 Bulan
6.Cleaning GWT dan tandon roof top 1-Jun-06 1 Bulan
7 Bambang 1.Pengecatan ceiling koridor yang flek semua lantai 1-Jun-06 1 Bulan
2.Bantu pengecatan canopy jembatan lantai 6, 5, 3. 1-Jun-06 1 Bulan
3.Pengecatan lantai ruangan genset cat pison abu - abu 1-Jun-06 1 Bulan
4.Bantu pengecoran batu koral pembatas paving blok dengan batu 1-Jun-06 1 Bulan
andesit depan ballroom
5.Pengecatan sun scren di tempat out door ac samping executive 1-Jun-06 1 Bulan
office
6.Cleaning Work shop dan room pompa 1-Jun-06 1 Bulan
7.Cleaning GWT dan tandon roof top 1-Jun-06 1 Bulan
8 Adi Panuntun 1.Cleaning out door ac area sungai dan basemen 1-Jun-06 1 Bulan
2.Cleaning out door ac roof top 1-Jun-06 1 Bulan
3.Check dan perbaikan semua troly belboy, HK, kitchen,operasional 1-Jun-06 1 Bulan
4.Cleaning chiller dan ahu lantai 2 dan lantai 3 1-Jun-06 1 Bulan
5.Bantu perbaikan dan pengecatan kursi dan meja pool deck 1-Jun-06 1 Bulan
6.Cleaning area grease trab 1-Jun-06 1 Bulan
7.Cleaning GWT dan tandon roof top 1-Jun-06 1 Bulan
9 Juamam 1.Maintenance room civil dan carpenter 1-Jun-06 1 Bulan
2.Perbaikan dan pengecatan kanopi jembatan 1-Jun-06 1 Bulan
3.Perbaikan dan pengecatan kursi dan pool deck
4.Pembuatan pembatas door stoper mobil diarea pakitr yang rusak 1-Jun-06 1 Bulan
5.Perbaikan meja kena rokok 1-Jun-06 1 Bulan
6.Pengecoran batu koral pembatas paving blok dengan batu andesit
depan ballroom
6.Cleaning work shop furniture 1-Jun-06 1 Bulan

Malang 01JUNE 2006


Prepared by Approved by
Hendra Setiawan Cahyo Kuswidianto
Spv Engineering Chief Engineering