Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Y0 For Approval / Za Odobrenje 03.2022.

Checked/ Approved/
Rev. Description of revision / Opis revizije Date / Datum Kontrolisao Odobrio

Investor/Investitor: ELEKTROPRIVREDA SRBIJE

Contractor/Izvođač: CHINA MACHINERY ENGINEERING CORPORATION

Designer/Projektant: CENTRAL SOUTHERN CHINA ELECTRIC POWER DESIGN INSTITUTE CO.,LTD.

Designer/Projektant: TERMOENERGO INŽENJERING

First and Last Name/Ime i prezime Signature/Potpis Building (structure) , Site location/Objekat , Mesto gradnje :
Resp. Designer/
Odg. projektant 道路与附属部分
B. Krunić, dipl. inž. maš. DBP110 INTERNAL ROADS AND EXTERNAL SPACE DESIGN
Licence number/
Broj licence 330 G313 08 PGD110 SAOBRAĆAJNICE, SPOLJAŠNJE INSTALACIJE I CEVOVODI
Date/ Type of technical documentation/ Scale/ Drawing Name/Naziv crteža :
Datum Vrsta tehničke dokumentacije: Razmera :
Design for execution - DFE PRORAČUNSKI IZOMETRIK CEVI: 1EGD10-DN125-FO-C10
03.2022. Projekat za izvođenje - PZI
STRESS ISOMETRIC OF PIPE: 1EDG10-DN125-FO-C10
6/5 - DESIGN OF MECHANICAL INSTALLATIONS
Part of design/ - Heavy oil connecting pipelines
Oznaka i naziv Drawing No.
dela projekta 6/5 - PROJEKAT MAŠINSKIH INSTALACIJA Sheet/sheets
/
List/listova : 2/2
- Međupogonski razvod cevovoda mazuta Crtež broj: