GENERAL NOTES :
1 ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS OTHERWISE SPECIFIED.
2 DO NOT SCALE FROM THE DRAWING.
3 ALL DIMENSIONS TO BE VERIFIED.
4 THIS DRAWING TO BE READ IN CONJUNCTION WITH RELEVANT ARCH., MEP DETAIL AND
SPECIFICATION. CONTRACTOR SHALL COORDINATE THESE DRAWING AND REPORT IF ANY
DISCREPANCY FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
5 ALL THE LEVELS IN THE SETTING OUT PLAN IS TENTATIVELY SHOWN. THE ACTUAL LEVELS
HAS TO BE DECIDED AT THE SITE BY THE CONTRACTOR & SHOULD BE BROUGHT TO THE
ATTENTION OF ENGINEER.
6 SHOP DRAWING TO BE SUBMITTED FOR ALL THE WORK BEFORE EXECUTING AT SITE.
7 THE CONTRACTOR IS THE ONLY RESPONSIBLE PARTY FOR ANY WORK CARRIED AT THE
SITE WITHOUT THE CONSULTANT'S KNOWLEDGE & APPROVAL.
8 THE DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAS TO BE EXECUTED AS PER
THE SITE CONDITION BY THE CONTRACTOR.
9 BEFORE TENDERING THE JOB, SITE SURVEY TO BE CARRIED OUT& ALL LEVELS TO BE
VERIFIED BY THE CONTRACTOR AT SITE. CONTRACTOR IS RESPONSIBLE FOR THE LEVELS.
10 THIS DRAWING IS THE PROPERTY OF CAPITAL ENGINEERING CONSULTANCY. COPYRIGHT IS
RESERVED BY THEM AND THE DRAWING IS ISSUED ON THE CONDITION THAT IT IS NOT COPIED
REPRODUCED RETAINED OR DISCLOSED TO ANY UNAUTHORIZED PERSON EITHER WHOLLY OR
IN PART WITHOUT IN WRITING OF CAPITAL ENGINEERING CONSULTANCY.
IMPORTANT NOTE
1 EXTERNAL ROAD LEVEL IS CONSIDERED AS ±0.00 FOR ENTIRE PROJECT.
2 MAIN CONTRACTOR TO MAINTAIN FLOOR FINISH PLINTH LEVEL OF EACH BUILDING TO BE +0.45M
MINIMUM ABOVE EXTERNAL ROAD LEVEL.
3 ALL FLOOR FINISH LEVELS SHALL BE READ IN CONJUNCTION WITH THE SETTING LAYOUT
H G F E D C B A H G F E D C B A PLAN DRAWING NO.A-010
20200 20200 4 ANY DISCREPANCY OBSERVED SHALL BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TO
EXECUTION OF WORK AND SHALL PROCEED WITH THE WORK ONLY AFTER OBTAINING CLEARANCE
FOR THE SAME OR THE MAIN CONTRACTOR WILL BE RESPONSIBLE TO DEMOLISH / RECTIFY SUCH
4100 2500 1200 2000 4550 1600 4250 4100 2500 1200 2000 4550 1600 4250 WORK AT HIS OWN COST & NO VARIATION WILL BE ENTERTAINED
200
9635 10565
1 1
19400 600
1555
1555
2155
3100
3100
5550
600
+0.50MF.F.L
2 2
AS REVISED
7235
6835
5480
+0.05MF.F.L
4880
4235
4235
+0.00MPAV.LVL
200
9700 1600 SD
17200 2550 400 2750
F
3 3
700
750
7200 RAMP
1100
1400
DRY SLOPE = 1:8
16735
16735
1400
2400
1500
STORE
16835
W1
1200
+4.15MF.F.L
D5
2800
COUNTER
KITCHEN
3900
UP
4100
PROJECT :
4100
2750 1000
4000
1200
1600
3900
4350
3900
+0.60MF.F.L
1000
PASTRY RAMP
2200
D5 AREA SEATING AREA SLOPE = 1:8
PREP EXISTING 01 +0.50MF.F.L
+4.15MF.F.L 50 02
(VILLA UNIT-JCV-08, PLOT NO. 3420621,
200
AREA 1200 1150
2400
BUILDING
3200
6000
B +4.15MF.F.L 3000 200 EDGE LINE
UP
1000
1400
1000
1200
1200
A108
D5 D5
JUMEIRAH 2, DUBAI)
A108
7500
200
200
200
4
1200
1150
400
1450
200
1150 2500 2800 400 5755 400 1045 2800 400 5735 UP
2650 200 2300
900
8100
8100
9600
MAIN
DRAWING TITLE :
1150
2000
1150
DUMP DUMP
SEATING AREA
1500
WAITER WAITER D1 ENTRANCE
900
D10 +4.15MF.F.L
2100
+0.50MF.F.L
1000
D5
850
COUNTER
5300
1000
2300
5300
600
600
1100
D3
5100
5100
2700
2300
1450
DOUGH PREP. 3800 MALE TOILET
4200
& BAKING
800
450
3550
(DISABLED D7
900
FRIENDLY)
300
450
1800
COUNTER
RELEASE FOR :
1000
200
D3 01
+3.45MF.F.L EXPOSED
1000
1100 D7
800
3800 WATER TANK FEMALE TOILET 600 7400
ELECTRICAL
1500
1450
LOCATION
1200
1200
(DISABLED
1000
1000
ROOM
DB-02
DB-01
PUMP
800
FRIENDLY)
200
1000
+0.50MF.F.LSMDB-08
600
550
SHADE/COVER
550
450
2300 2800
5 5
14300 20200
DRAWING NO :
A108b A108b
A101 A101
SCALE : 1:150 SCALE : 1:150
A-101
1:150 R3 A2
CLIENT:
LUNE LOUNGE
CONSULTANT :
CAPITAL
ENGINEERING CONSULTANCY
TEL.: +971 4 2546155 ٤ ٢٥٤٦١ ٥٥
FAX: +971 4 2546177 ٤ ٢٥٤٦١٧٧
P.O.BOX : 92301, Dubai - U.A.E. يبد٩٢٣٠١
Web.: www.capitalengineeringconsultancy.com