Hasil Perhitungan Volume Plafond
Hasil Perhitungan Volume Plafond
Area of suspended
Floor Name Associated Room Girth(m)
ceiling(m2)
C-PLAFOND LOKET
7.887 11.949
SHERA PELAYANAN
RANGKA METAL
FURING JAYA Subtotal 7.887 11.949
BMS
D-SHERA HALL 14.685 32.038
SPLENDID
PLANK
RANGKA Subtotal 14.685 32.038
HOLLOW
Subtotal 262.397 283.860
AREA TANGGA 9.256 14.900
BALKON 9.801 13.750
PANTRY 35.759 39.326
R. ARSIP 8.447 11.650
R. KASI
PENATAAN DAN 14.255 15.300
PEMBERDAYAAN
A-PLAFOND R. KASI
GYPSUM 9MM PENGADAAN
MERK JAYABOAD TANAH DAN 11.760 14.400
FINISH CAT PENGEMBANGA
LIST SHADOW N
LINE, PLAT SIKU R. KASI
L 40.40.3 PENGENDALIAN
RANGKA METAL DAN 11.690 14.400
FURING PENANGANAN
Lantai 2 JAYABMS SENGKETA
R. KEPALA
33.040 23.000
KANTOR
R. SEKRETARIS 26.557 23.600
R. SEKSI 3 28.045 23.800
R. SEKSI 4 35.580 25.000
R. SEKSI 5 25.038 20.600
Subtotal 249.230 239.726
B-PLAFOND R. PANEL DAN
5.041 9.150
GYPSUM WR T: 9 SERVER
MM FINISH CAT TOILET KEPALA
LIST SHADOW 5.272 9.400
KANTOR
LINE
TOILET PRIA 2.750 6.774
RANGKA METAL
FURING TOILET WANITA 2.750 6.774
JAYABMS Subtotal 15.814 32.098
Subtotal 265.043 271.824
AREA TANGGA 9.256 14.900
A-PLAFOND AREA TANGGA
GYPSUM 9MM 22.556 32.620
PLAFOND
MERK JAYABOAD
PANTRY 60.090 57.900
FINISH CAT
LIST SHADOW R. KASI SURVEY 9.065 12.100
LINE, PLAT SIKU DAN PEMETAAN
L 40.40.3 R. OPERATOR 13.110 14.900
RANGKA METAL
R. RAPAT 100.249 40.550
FURING
JAYABMS R. SEKSI 1 60.854 38.450
Subtotal 275.181 211.420
B-PLAFOND TOILET WANITA 8.354 11.583
Lantai 3 GYPSUM WR T: 9
MM FINISH CAT
LIST SHADOW
LINE Subtotal 8.354 11.583
RANGKA METAL
FURING
JAYABMS
D-SHERA AREA PLAFOND
39.115 139.655
SPLENDID EKSTERIOR
PLANK
RANGKA Subtotal 39.115 139.655
HOLLOW
Subtotal 322.649 362.658
Total 850.090 918.342