Summary of Rate Analysis

Item No. Descriptions Unit Rate


CHAPTER-1
CARRIAGE OF MATERIALS
Loading and unloading of stone boulder / stone aggregates / sand / kanker / moorum. (Placing tipper at loading point, loading
1.1 with front end loader, dumping, turning for return trip, excluding time for haulage and return trip) cum 176.00

1.2 Loading and Unloading of Boulders by Manual Means cum 222.00


1.3 Loading and Unloading of Cement or Steel by Manual Means and stacking. tonne 309.00
1.4 Cost of Haulage Excluding Loading and Unloading
(i) Surfaced Road tonne.km 7.50
(ii) Unsurfaced Gravelled Road tonne.km 9.10
(iii) Katcha Track and Track in river bed / nallah bed and choe bed. tonne.km 18.30
Hand Broken Stone Aggregates 63 mm nominal size (Supply of quarried stone, hand breaking into coarse aggregate 63 mm
1.5 nominal size (passing 80 mm and retained on 50 mm sieve) and stacking as directed) cum 899.00

Crushing of stone aggregates 13.2 mm nominal size. (Crushing of stone boulders of 150 mm size in an integrated stone
1.6 crushing unit of 200 tonnes per hour capacity comprising of primary and secondary crushing units, belt conveyor and cum 547.00
vibrating screens to obtain stone aggregates of 13 mm nominal size.)

Crushing of stone aggregates 20 mm nominal size (Crushing of stone boulders of 150 mm size in an integrated stone
1.7 crushing unit of 200 tonnes per hour capacity comprising of primary and secondary crushing units, belt conveyor and cum 464.00
vibrating screens to obtain stone aggregates of 20 mm nominal size.)

Crushing of stone aggregates 40 mm nominal size (Crushing of stone boulders of 150 mm size in an integrated stone
1.8 crushing unit of 200 tonnes per hour capacity comprising of primary and secondary crushing units, belt conveyor and cum 391.00
vibrating screens to obtain stone aggregates of 40 mm nominal size.)

CHAPTER-2
SITE CLEARANCE
Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches
and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in MoRTH (5th
2.1 the depression/pit complete for finished item of work as per MoRT&H specification 201 (5th Revision) and as directed by Revision) Page
the Engineer-in-Charge No.38&39

(i) Girth from 300 mm to 600 mm each 334.00


(ii) Girth from 600 mm to 900 mm each 578.00
(iii) Girth from 900 mm to 1800 mm each 1153.00
(iv) Girth above 1800 mm each 2210.00
2.2 Clearing Grass and Removal of Rubbish hectare 24053.00
Clearing and Grubbing Road Land -Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,
shrubs, sapling and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top
2.3 organic soil not exceeding 150 mm thickness by mechanical means in area of light jungle and finished item of work as per
MoRT&H specification 201 (5th Revision) and as directed by the Engineer-in-Charge

(i) By Manual Means:-


A In area of light jungle hectare 72636.00
B In area of thorny jungle hectare 97165.00
By Mechanical Means MoRTH(5th
(ii) Revisoin) Page
No.37&38
A In area of light jungle hectare 30647.00
B In area of thorny jungle hectare 37496.00
Dismantling of Structures Dismantling of existing structures like culverts , bridges, retaining walls and other structures
comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting
2.4 the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m as
per MoRTH specification 202 , (5th revision)

(i) Lime /Cement Concrete


I By Manual Means

Page 1 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
A Lime Concrete, cement concrete grade M-10 and below cum 488.00
B Cement Concrete Grade M-15 & M-20 cum 584.00
C Prestressed / Reinforced cement concrete grade M-20 & above cum 1563.00
By Mechanical Means for items No. 202( b) & ( c) MoRTH(5th
II Revision)Page
No.40&42
A Cement Concrete Grade M-15 & M-20 cum 648.00
B Prestressed / Reinforced cement concrete grade M-20 & above cum 1122.00
(ii) Dismantling Brick / Tile work
A In lime mortar cum 295.00
B In cement mortar cum 391.00
C In mud mortar cum 257.00
D Dry brick pitching or brick soling cum 238.00
(iii) Dismantling Stone Masonry
A Rubble stone masonry in lime mortar cum 334.00
B Rubble stone masonry in cement mortar. cum 391.00
C Rubble Stone Masonry in mud mortar. cum 295.00
D Dry rubble masonry cum 276.00
E Dismantling stone pitching/ dry stone spalls. cum 257.00
F Dismantling boulders laid in wire crates including opening of crates and stacking dismantled materials. cum 295.00
(iv) Wood work wrought framed and fixed in frames of trusses upto a height of 5 m above plinth level cum 749.00
(v) Steel work in all types of sections upto a height of 5 m above plinth level excluding cutting of rivet.
A Including dismembering tonne 1984.00
B Excluding dismembering. tonne 1466.00
C Extra over item No( V ) A and( V ) B for cutting rivets. tonne 15.00
(vi) Scraping of bricks dismantled from brick work including stacking.
In lime/Cement mortar
A 1000 numbers 1684.00

In mud mortar
B 1000 numbers 601.00

(vii) Scraping of Stone from dismantled stone masonry


A In cement and lime mortar cum 676.00
B In Mud mortar cum 143.00
(viii) Scarping plaster in lime or cement mortar from brick/ stone masonry sqm 21.00
Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry MoRTH (5th
(ix) works as per MoRTH specification 202 , (5th revision) Revision) Page
No.40&42
A Up to 600 mm dia metre 250.00
B Above 600 mm to 900 mm dia metre 338.00
C Above 900 mm metre 578.00
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of MoRTH (5th
2.5 1000 metres, stacking serviceable and unserviceable materials separately) as directed by the Engineer-in-Charge and as per Revision) Page
MoRTH specification 202 II (5th revision) No.40&42
I By Manual Means
A Bituminous courses cum 902.00
B Granular courses cum 638.00
II By Mechanical Means
A Bituminous course cum 332.00
Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using
pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal
of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) as directed
2.6 by the Engineer-in-Charge and as per MoRTH specification 202 II (5th revision) cum 1583.00

Page 2 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Dismantling Guard Rails (Dismantling guard rails by manual means and disposal of dismantled material with all lifts and up to
2.7 a lead of 1000 metres, stacking serviceable materials and unserviceable materials separately.) metre 96.00

Dismantling Kerb Stone (Dismantling kerb stone by manual means and disposal of dismantled material with all lifts and up to
2.8 a lead of 1000 metre) metre 17.00

Dismantling Kerb Stone channel (Dismantling kerb stone channel by manual means and disposal of dismantled material with
2.9 all lifts and up to a lead of 1000 metre) metre 25.00

Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled MoRTH (5th
2.10 material with all lifts and lead upto 1000 m and back filling of pit.)as directed by the Engineer-in-Charge and as per MoRTH Revision) Page
specification 202 II (5th revision) No.40&42
A 5th KM stone each 484.00
B Ordinary KM Stone each 288.00
C Hectometre Stone each 58.00
Dismantling of Fencing (Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, back
2.11 filling of pit by manual means including disposal of dismantled material with all lifts and up to a lead of 1000 metres, stacking metre 67.00
serviceable material and unserviceable material separately. )

Dismantling of CI Water Pipe Line (Dismantling of CI water pipe line 600 mm dia including disposal with all lifts and lead upto
2.12 1000 metres and stacking of serviceable material and unserviceable material separately under supervision of concerned metre 164.00
department)

Removal of Cement Concrete Pipe of Sewer Gutter (Removal of cement concrete pipe of sewer gutter 1500 mm dia under
the supervision of concerned department including disposal with all lifts and up to a lead of 1000 metres and stacking of
2.13 serviceable and unserviceable material separately but excluding earth excavation and dismantling of masonry works.) metre #VALUE!

Removal of Telephone / Electric Poles and Lines (Removal of telephone / Electric poles including excavation and dismantling
of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of
2.14 1000 metres and stacking the serviceable and unserviceable material separately) each 228.00

CHAPTER-3
EARTH WORK, EROSION CONTROL AND DRAINAGE MoRTH (5th
Revision) Page
No.45 & 48
Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for
3.1 carrying of cut earth to embankment site with all lifts and lead upto1000 metres.) cum 269.00

Excavation in ordinary rock by manual means (Excavation in ordinary rock using manual means including loading in a truck
3.2 and carrying of excavated material to embankment site with in all lifts and leads upto 1000 metres ) cum 369.00

Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including
cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including
3.3 trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) cum 100.00

Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a
dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead
3.4 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) cum 170.00

Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres Excavation for roadway in hard rock (requiring
blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines,
grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres and finished item of
3.5 work as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge cum 187.00

Page 3 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in
soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side
slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location
3.6 within all lifts and lead upto 1000m complete finished item of work as per MoRT&H specification 301(5th Revision) and as cum 105.00
directed by the Engineer-in-Charge

Excavation in Ordinary Rockusing Hydraulic ExcavatorCK-90 and Tippers with disposal upto 1000 metres. (Excavation for
roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers,
transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with
3.7 requirements of lines, grades and cross sections.complete finished item of work as per MoRT&H specification 301(5th cum 134.00
Revision) and as directed by the Engineer-in-Charge

Excavation in Hard Rock (blasting prohibited) (Excavation for roadway in hard rock (blasting prohibited) with rock breakers
including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side
3.8 slopes in accordance with requirements of lines, grades and cross sections.)

A Mechanised cum 755.00


B Manual Method cum 1399.00
Excavation in Hard Rock (controlled blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock with
controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of
3.9 lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres ) cum 229.00

Excavation in Marshy Soil (Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including
3.10 cutting and loading in tippers and disposal with in all lifts and lead upto 1000 metres, trimming of bottom and side slopes in cum 117.00
accordance with requirements of lines, grades and cross sections.)

Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading
3.11 and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause cum 106.00
305.)

Pre-splitting of Rock Excavation Slopes (Carrying out excavation in hard rock to achieve a specified slope of the rock face by
controlled use of explosives and blasting accessories in properly aligned and spaced drill holes, collection of the excavated
3.12 rock by a 80 HP dozer, loading in tipper by a front end loader and disposing of the material with all lifts and lead upto 1000 m, sqm 122.00
all as specified in clause No. 303)

Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,
including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides
3.13 and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)

(i) Ordinary soil


A Manual Means (Depth upto 3 m) cum 385.00
B Mechanical Means (Depth upto 3 m) cum 77.00
(ii) Ordinary rock (not requiring blasting)
A Manual Means (Depth upto 3 m) cum 481.00
B Mechanical Means cum 103.00
(iii) Hard rock ( requiring blasting )
A Manual Means cum 739.00
(iv) Hard rock ( blasting prohibited )
A Mechanical Means cum 881.00
(v) Marshy soil
A Manual means ( upto 3 m depth) cum 640.00
MoRTH (5th
Revision) Page
No.63 & 69
Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means (Scarifying the existing granular road surface to
3.14 a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. complete as per MoRT&H (4th sqm 30.00
Revision) Specn. No.305.4.3 for finished item of work.

Page 4 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road
3.15 surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.as per MoRT&H (5th sqm 8.00
Revision) Specn. No.305.4.3

Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material
obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to
meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item
3.16 of work as per MoRT&H specification 305 (5th revision) cum 382.00

Construction of Embankment with Material Deposited from Roadway Cutting Construction of embankment with approved
materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and
compacted to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for
3.17 finished item of work as per MoRT&H specification 305 (5th revision) cum 141.00

Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material
obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to
meet requirement of table No. 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished
3.18 item of work as per MoRT&H specification 305 (5th revision) cum 436.00

3.19 Compacting Original Ground


Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade
Case-I level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) cum 96.00

Case-II :Compacting original ground supporting embankment cum 58.00


Stripping and Storing Top Soil (Stripping, storing of top soil by road side at 15 m internal and re-application on embankment
3.20 slopes, cut slopes and other areas in localities where the available embankment material is not conducive to plant growth) cum 269.00

Stripping, storing and re-laying top soil from borrow areas in agriculture fields. (Stripping of top soil from borrow areas located
in agriculture fields, storing at a suitable place, spreading and re-laying after taking the borrow earth to maintain fertility of the
3.21 agricultural field, finishing it to the required levels and satisfaction of the farmer.) cum 60.00

Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or
3.22 other locations shown on the drawing or as directed by the engineer including preparation of ground, fetching of rods and sqm 55.00
watering)

Seeding and Mulching (Preparation of seed bed on previously laid top soil, furnishing and placing of seeds, fertilizer, mulching
3.23 material, applying bituminous emulsion at the rate of0.23 litres per sqm and laying and fixing jute netting, including watering sqm 238.00
for 3 months all as per clause 308)

Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified
3.24 lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in
embankment within a lead of50 metres (average lead 25 metres))

A Mechanical means metre 118.00


B Manual Means metre 96.00
Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary
3.25 rock to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 to 309.
Excavated material to be used in embankment at site.)

A Mechanical Means metre 239.00


B Manual Means metre 144.00
Surface Drains in Hard Rock (Rate per metre may be worked out based on quantity of hard rock as per design.)
3.26 metre

Sub Surface Drains with Perforated Pipe (Construction of subsurface drain with perforated pipe of 100 mm internal diameter
of metal/ asbestos cement/ cement concrete/PVC, closely jointed, perforations ranging from 3 mm to 6 mm depending upon
size of material surrounding the pipe, with 150 mm bedding below the pipe and 300 mm cushion above the pipe, cross
3.27 section of excavation 450 x 550 mm. Excavated material to be utilised in roadway at site ) metre 1032.00

Page 5 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Aggregate Sub- Surface Drains (Construction of aggregate sub surface drain 300 mm x 450 mm with aggregates conforming
3.28 to table 300-4, excavated material to be utilised in roadway ) metre 163.00

Underground Drain at Edge of Pavement (Construction of an underground drain 1 m x 1 m (inside dimensions) lined with
3.29 RCC-20 cm thick and covered with RCC slab10 cm in thickness on urban roads) metre 2421.00

Preparation and Surface Treatment of formation. (Preparation and surface treatment of formation by removing mud and
slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile
3.30 and rolling with 8-10 tonne smooth wheeled roller, complete as per clause 310.) sqm 4.00

Construction of Rock fill Embankment (Construction of rock fill embankment with broken hard rock fragments of size not
exceeding 300 mm laid in layers not exceeding 500 mm thick including filling of surface voids with stone spalls, blinding top
3.31 layer with granular material, rolled with vibratory road roller, all complete as per clause 313) cum 89.00

Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting
3.32 and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) cum 169.00

Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary
3.33 rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with cum 243.00
all lift and lead upto 1000 metres )

Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in hard rock requiring blasting, by
3.34 mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres.) cum 298.00

Work in Urban Roads (The cost of earth work in urban roads inhabited area will be comparatively higher due to following
3.35 reasons:)
Embankment Construction with Fly ash/Pond ash available from coal or lignite burning Thermal Plants as waste material.
(Construction of embankment with fly ash conforming to table 1 of IRC: SP: 58 - 2001 obtained from coal or lignite burning
3.36 thermal power stations as waste material, spread and compacted in layer of 200mm thickness each at OMC, all as specified cum 176.00
in IRC: SP: 58-2001 and as per approved plans.)

CHAPTER-4
SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS
4.1 Granular Sub-base with Close Graded Material (Table:- 400-1)
Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at MoRTH (5th
A OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and Revision) Page
compacting with vibratory power roller to achieve the desired density, complete for finished item of work as per MoRT&H No.109 & 110
Specification 401 (5th revision) and as directed by the Engineer-in-charge.
(i) for grading- I Material cum 1620.00
(ii) for grading- II Material cum 1612.00
(iii) for grading-III Material cum 1525.00
(iv) for grading-V Material cum 1642.00
By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers
B with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory
roller to achieve the desired density, complete as per clause 401)

(i) for grading- I Material cum 1421.00


(ii) for grading- II Material cum 1413.00
(iii) for grading-III Material cum 1326.00
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse
graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with
4.2 rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)

(i) for grading- I Material cum 1494.00


(ii) for grading- II Material cum 1368.00
(iii) for grading-III Material cum 1292.00

Page 6 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Lime Stabilisation for Improving Subgrade (Laying and spreading available soil in the subgrade on a prepared surface,
pulverising, mixing the spread soil in place with rotavator with 3 % slaked lime having minimum content of 70% of CaO,
4.3 grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub
grade)

A By Mechanical Means cum 367.00


B By Manual Means cum 393.00
Lime Treated Soil for Sub- Base (Providing, laying and spreading soil on a prepared sub grade, pulverising, mixing the spread
soil in place with rotavator with 3 % slaked lime with minimum content of 70% of CaO, grading with motor grader and
4.4 compacting with the road roller at OMC to achieve at least 98%of the max dry density to form a layer of sub base.) cum 591.00

Cement Treated Soil Sub Base/ Base (Providing, laying and spreading soil on a prepared sub grade, pulverising, adding the
designed quantity of cement to the spread soil, mixing in place with rotavator, grading with the motor grader and compacting
4.5 with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base.) cum 755.00

Cement Treated Crushed Rock or combination as per clause 403.2 and table 400.4in Sub base/ Base (Providing, laying and
spreading Material on a prepared sub grade, adding the designed quantity of cement to the spread Material, mixing in place
4.6 with rotavator, grading with the motor grader and compacting with the road roller at OMC to achieve the desired unconfined
compressive strength and to form a layer of sub-base/base.)

(i) For Sub-Base course cum 1844.00


(ii) For Base course cum 1754.00
Making 50 mm x 50 mm Furrows (Making 50 mm x 50 mm furrows, 25mm deep, 450 to the center line of the road and at one
4.7 metre interval in the existing thin bituminous wearing coarse including sweeping and disposal of excavated material within sqm 1047.00
1000 metres lead)

Inverted Choke (Construction of inverted choke by providing, laying, spreading and compacting screening B type/ coarse
4.8 sand of specified grade in uniform layer on a prepared surface with motor grader and compacting with power roller etc) cum 644.00

Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound
macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in
4.9 stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the
interstices of coarse aggregate, watering and compacting to the required density.)

A By Manual Means
(i) Grading- I (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 1874.00
(b) Using Screening Type-A (13.2mm Agg.) cum 2187.77
(ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 1888.00
(b) Using Screening Type-A (13.2mm Agg.) cum 2038.00
(c) Using Screening Type-B (11.2mm Agg.) cum 2117.00
(iii) Grading- III (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 2166.00
(b) Using Screening Type-B (11.2mm Agg.) cum 2395.00
B By Mechanical Means:
(i) Grading- I (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 1629.00
(b) Using Screening Type-A (13.2mm Agg.) cum 1943.25
(ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 1643.00
(b) Using Screening Type-A (13.2mm Agg.) cum 1794.00
(c) Using Screening Type-B (11.2mm Agg.) cum 1872.00
(iii) Grading- III (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 1922.00
(b) Using Screening Type-B (11.2mm Agg.) cum 2151.00

Page 7 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Crushed Cement Concrete Sub-base / Base (Breaking and crushing of material obtained by breaking damaged cement
concrete slabs to size range not exceeding 75 mm as specified in table 400.7 transporting the aggregates obtained from
4.10 breaking of cement concrete slabs at a lead of L km., laying and compacting the same as sub base/ base course, constructed cum 340.00
as WBM to clause 404 except the use of screening or binding Material.)

MoRTH (5th
Revision) Page
No.131 & 140

Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification (
5th Revision) as per Table 400-13, including premixing the Material with water at OMC in mechanical mix plant carriage of
4.12 mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and cum 1980.00
compacting with vibratory roller to achieve the desired densit as directed by the Engineer-in-Charge and as per MoRT&H
specification.406 (5th revision) for finished item of work.
Construction of Median and Island with Soil Taken from Roadway Cutting (Construction of Median and Island above road
4.13 level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other cum 227.00
structures, spread, graded and compacted as per MoRT&H specification.408 (5th revision) and directed by the Engineer-in-
Charge.
Construction of Median and Island with Soil Taken from Borrow Areas (Construction of median and Island above road level
4.14 with approved material brought from borrow pits, spread, sloped and compacted as per clause 407) cum 463.00
MoRTH (5th
Revision) Page
Footpaths and Separators Construction of footpath/separator by providing a 150 mm compacted granular sub base as per No.143 & 144
4.16 clause 401 and 25 mm thick cement concrete grade M30, over laid with pre-cast concrete tiles in 12 mm cement sand mortar sqm 437.00
1:3 including provision of all drainage arrangements but excluding kerb channel as per MoRT&H specification.410 (5th
revision) and directed by the Engineer-in-Charge.
Crusher Run Macadam Base (Providing crushed stone aggregate, depositing on a prepared surface by hauling vehicles,
4.17 spreading and mixing with a motor grader, watering and compacting with a vibratory roller to clause 410 to form a layer of
sub-base/Base)

A By Mix in Place Method


(i) For 53 mm maximum size cum 1660.00
(ii) For 45 mm maximum size cum 1783.00
B By Mixing Plant :
(i) For 53 mm maximum size cum 1876.00
(ii) For 45 mm maximum size cum 1255.00
Lime, Fly ash stabalised soil sub-base (Construction of Sub-base using lime - fly ash admixture with granular soil, free from
organic matter/ deleterious material or clayey silts and low plasticity clays having PI between 5 and 20 and liquid limit less
than 25 and commercial dry lime, slaked at site or pre-slaked with CaO content not less than 50%, fly ash to conform to
4.18 gradation as per clause 4.3 of IRC: 88-1984, lime + fly ash content ranging between 10 to 30%, the minimum un-confined cum 501.00
compressive strength and CBR value after 28 days curing and 4 days soaking to be 7.5kg/sq, cm and 25% respectively, all
as specified in IRC: 88-1984. )

CHAPTER-5
BASES AND SURFACE COURSES (BITUMINOUS) MoRTH (5th
Revision) Page
No.166 to170
Prime coat -Providing and applying prime coat with bitumen emulsion (SS1) Bulk using emulsion pressure distributor on
5.1 prepared surface of granular base including clearing of road surface and spraying emulsion at the rate of 0.70 kg/sqm using sqm 39.00
emulsion pressure distributor for finished item of work etc., complete as per MoRT&H Specification 502 (5th revision) and as
Tack coat-
directed by theProviding and applying tack coat with bitumen Emulsion (RS1) (Bulk) using Emulsion pressure distributor at the
Engineer-in-charge
5.2 rate of 0.25 kgs per sqm on the prepared Granular surface treated with primer cleaned with mechanical broom for finished sqm 10.00
item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average
output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to
5.3 site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per
clauses 501.6 and 501.7 to achieve the desired compaction)

(i) for Grading I ( 40 mm nominal size ) cum 6157.00


(ii) for GradingII(19 mm nominal size) cum 6056.00
Bituminous Penetration Macadam (Construction of penetration macadam over prepared Base by providing a layer of
compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key
5.4 aggregates and rolling with a smooth wheeled steel roller 8-10 tonne capacity to achieve the desired degree of compaction)

Page 8 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
A 50 mm thick sqm 290.00
B 75 mm thick sqm 393.00
Built-Up-Spray Grout (Providing, laying and rolling of built-up-spray grout layer over prepared base consisting of a two layer
composite construction of compacted crushed coarse aggregates using motor grader for aggregates. key stone chips
spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the
5.5 second layer to serve as a Base conforming to the line, grades and cross-section specified, the compacted layer thickness sqm 287.00
being 75 mm)

Dense Graded Bituminous Macadam Providing and laying of Dense Graded Bituminous Macadam with 100 - 120 TPH batch
type hot mix plant producing an average output of 75 tones per hour using hard blasted granite crushed aggregates of
Grading - II as per table 500-10 of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade MoRTH (5th
5.6 @ 4.50% of weight of total mixture, transported to site, laid over a previously prepared surface with a hydrostatic paver Revision) Page
finisher with sensor control to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve No.174 to 178
the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and operational charges
all T&P and all other contingent charges necessary including cost of (excluding seigniorage) charges of all materials etc.,
complete in all respects as directed by Engineer-in-Charge and as per MoRT&H specification No. 505 (5th Revision)
(i) for Grading I ( 40 mm nominal size ) cum 7203.00
(ii) for Grading II (19 mm nominal size) cum 7200.00
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP
producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous
binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor
5.7 control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the
desired compaction as per MoRTH specification clause No. 508 complete in all respects)

(i) for Grading I ( 13 mm nominal size ) cum 7126.00


(ii) for GradingII(10 mm nominal size) cum 7516.00
Bituminous Concrete (Providing and laying of Bituminous Concrete with 100 - 120 TPH batch type hot mix plant using hard
blasted granite crushed aggregates of Grading – II as per Table 500-17, premixed with Bituminous binder of VG 30 Grade as
per jobmix formula with a minimum of 5.4 % by mass of total mix and filler, transporting the hot mix to work site, laying with MoRTH (5th
5.8 hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and Revision) Page
tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item No.188 to 189
of work in all respects as directed by Engineer-in-Charge
(i) for Grading-I ( 19 mm nominal size ) cum 8236.00
(ii) for Grading-II (13 mm nominal size) cum 8089.00
Surface Dressing (Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of
5.9 specified size on a layer of bituminous binder laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel
roller)

Case -1 :-19 mm nominal chipping size sqm 81.00


Case - II 13 mm nominal size chipping sqm 62.00
Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness
composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line,
5.10 grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and
rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.)

Case - I: Mechanical method using Penetration grade Bitumen and HMP of appropriate capacity not less than 75
(i) tonnes/hour . sqm 118.00

(ii) Case - II: Open-Graded Premix Surfacing using cationic Bitumen Emulsion sqm 144.00
Close Graded Premix Surfacing/Mixed Seal Surfacing (Mechanical means using HMP of appropriate capacity not less than 75
tonnes/hour. Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2
mm to 0.09 mm (Type-a) or 13.2 mm to 0.09 mm (Type-b) aggregates using penetration grade bitumen to the required
5.11 line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying sqm 140.00
and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade. )

Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and
5.12 cross fall using Type A and B seal coats)
(i) Case - I : Type A sqm 53.00
Case - II : Type B (Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 75 tonnes/
(ii) hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade.) sqm 43.00

Page 9 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Supply of Stone Aggregates for Pavement Courses (Supply of stone aggregates from approved sources confirming to the
physical requirement, specified in the respective specified clauses, including royalties, fees rents, collection, transportation,
stacking and testing and measured in cum as per clause 514.5 Competitive market rates to be ascertained. Alternatively,
5.13 rates for stone crushing given in chapter 1may be adopted, if found economical. In case for supply of aggregates at site are cum
not available, nearest crusher site may be ascertained. Loading and un-loading charges and cost of carriage may be added
to these rates to arrive at the cost at site.)

Mastic Asphalt (Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the
requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the
surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping of 13.2 mm nominal
5.14 size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed sqm 512.00
into surface when the temperature of surfaces not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all
complete as per clause 515.)

Slurry Seal Providing and laying slurry seal consisting of a mixture of fine aggregates, portland cement filler, bituminous
5.15 emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying and
compacting to provide even riding surface)

(i) 5 mm thickness sqm 72.00


(ii) 3 mm thickness sqm 49.00
(iii) 1.5 mm thickness sqm 30.00
Recycling of Bituminous Pavement with Central Recycling Plant (Recycling pavement by cold milling of exiting bituminous
layers, planning the surface after cold milling, reclaiming excavated material to the extent of 30 % of the required quantity,
hauling and stock piling the reclaimed material near the central recycling plant after carrying out necessary checks and
5.16 evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at site cum #VALUE!
and compacting to the required grade, level and thickness, all as specified in clause 517.)

5.17 Fog Spray sqm 40.00


added 1.In case it is decided by the engineer to blind the fog spray, the following may be added sqm 5.00
Bituminous Cold Mix ( Including Gravel Emulsion) (Providing, laying and rolling of bituminous cold mix on prepared base
5.18 consisting of a mixture of unheated mineral aggregate and emulsified or cutback bitumen, including mixing in a plant of
suitable type and capacity, transporting, laying, compacting and finishing to specified grades and levels.)

(i) Using bitumen emulsion and 9.5 mm or 13.2 mm nominal size aggregate cum #VALUE!
(ii) Using bitumen emulsion and 19 mm or 26.5 mm nominal size aggregate cum #VALUE!
(iii) Using cutback bitumen and 9.5 mm or 13.2 mm nominal size aggregate cum #VALUE!
(iv) Using cutback bitumen and 19 mm or 26.5 mm nominal size aggregate cum #VALUE!
Sand Asphalt Base Course (Providing, laying and rolling sand-asphalt base course composed of sand, mineral filler and
5.19 bituminous binder on a prepared sub-grade or sub-base to the lines, levels, grades and cross sections as per the drawings cum 6111.00
including mixing in a plant of suitable type and capacity, transporting, laying, compacting and finishing.)

Modified Binder (Supply of modified binder produced by mixing bitumen with modifier such as natural rubber or crumb rubber
or any other polymer found compatible with bitumen and which allows properties given in clause 521.3 and IRC: SP: 53
blending of modifier with bitumen to be done either at the refinery or at the site plant capable of producing the modified binder
5.20 to be delivered in drums which shall be agitated in melted condition using suitable device before use to ensure uniform tonne
dispersion.)

5.21 Crack Prevention Courses


Stress Absorbing Membrane (SAM) crack width less than 6 mm (Providing and laying of a stress absorbing membrane over
a cracked road surface, with crack width below 6 mm after cleaning with a mechanical broom, using modified binder
complying with clause 521, sprayed at the rate of 9 kg per 10 sqm and spreading 5.6 mm crushed stone aggregates @
(i) 0.11 cum per 10 sqm with hydraulic chip spreader, sweeping the surface for uniform spread of aggregates and surface sqm 50.00
finished to conform to clause 902.)

Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm (Providing and laying of a stress absorbing membrane
over a cracked road surface, with crack width 6 to 9 mm after cleaning with a mechanical broom, using modified binder
complying with clause 521, sprayed at the rate of 11 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @
(ii) 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause sqm 60.00
902.)

Page 10 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Stress Absorbing Membrane (SAM) crack width above 9 mm and cracked area above 50 % (Providing and laying a single
coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above
50 % after cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 15
(iii) kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for sqm 78.00
uniform spread of aggregates and surface finished to conform to clause 902.)

Case - IV : Bitumen Impregnated Geotextile (Providing and laying a bitumen impregnated geotextile layer after cleaning the
(iv) road surface, geotextile conforming to requirements of clause 704.3, laid over a tack coat with 1.05 kg per sqm of paving sqm 145.00
grade bitumen 80 - 100 penetration and constructed to the requirement of clause 704.4.5)

Recipe Cold Mix (Providing and laying of premix of crushed stone aggregates and emulsion binder, mixed in a batch type
5.22 cold mixing plant, laid over prepared surface, by paver finisher, rolled with a pneumatic tyred roller initially and finished with a
smooth steel wheel roller, all as per clause 519.3)

(i) 75 mm thickness cum #VALUE!


(ii) 40 mm thickness cum #VALUE!
(iii) 25 mm thickness cum #VALUE!
CHAPTER-6
CEMENT CONCRETE PAVEMENTS MoRTH (5th
Revision) Page
No.255 to 264
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with
coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio
not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/
6.1 cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 cum 2567.00
Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10
tonnes vibratory roller, finishing and curing complete for finished item of work as per MoRT&H (5th Revision) specification
1500,1700 & 601 and as directed by the Engineer-in-Charge for base coarse below CC Pavement.

Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared
sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid
with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of
6.2 contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, cum 4605.00
debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
complete for finished item of work as per MoRT&H specification 1500,1700 & 602 (5th Revision) and as directed by the
Engineer-in-Charge

Rolled Cement Concrete Base (Construction of rolled cement concrete base course with coarse and fine aggregate
conforming to IS:383, the size of coarse aggregate not exceeding 25 mm with minimum, aggregate cement ratio15:1 and
minimum cement content of 200 kg/cum, aggregate gradation to be as per table 600-4 after blending, mixing in batching plant
6.3 at optimum moisture content, transporting to site, laying with a paver with electronic sensor, compacting with 8-10 tonnes cum 2799.00
smooth wheeled vibratory roller to achieve, the designed flexural strength, finishing and curing.)

Transition section between rigid and flexible pavement (Due to change in the properties of materials and type of construction,
a gradual changeover from rigid pavement to flexible pavement is desirable to avoid any damage at the butting joint. After
provision of an expansion joint in the cement concrete slab, the thickness of slab should be tapered to 10 cm over a length of
6.4 3 m towards the flexible pavement. The deficiency of thickness caused due to tapering of the slab should be made up by the
asphaltic layers.)

Construction of Base/Sub-base of pavement with lean concrete - fly ash. (Construction of Base/sub-base using cement,
sand, fly ash and coarse aggregates proportioned as per table 4 of IRC: 74/1979 and with water content ratio, slump and
compressive strength as defined in the said table, mix prepared in a batching and mixing plant and compacted with a
6.5 vibratory roller 8-10 tonnes capacity within the time limit laid down vide clause 7.6.3 of IRC: 74-1979, construction joints cum 2133.00
properly formed at the end of day's work, cured for 14 days, all as specified in IRC: 74-1979 and as per approved plans.)

Page 11 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Cement - Fly ash concrete pavement. (Construction reinforced-reinforced, dowel jointed, plain cement concrete pavement
over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, replacing cement by fly ash to the extent of 15% and sand by 10%, mixed in a batching and
mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and
6.6 finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, cum 4343.00
separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing
compound, finishing to lines and grades as per drawing )

CHAPTER-7
GEOSYNTHETICS AND REINFORCED EARTH
Sub- Surface Drain with Geotextiles (Construction of sub surface drain 200 mm dia using geotextiles treated with carbon
black with physical properties as given in clause 702.2.3 formed in to a stable network and a planar geocomposite structure,
7.1 joints wrapped with geotextile to prevent ingress of soil, all as per clause 702 and approved drawings including excavation metre 673.00
and backfilling)

Narrow Filter Sub- Surface Drain (Construction of a narrow filter sub- surface drain consisting of porous or perforated pipe
7.2 laid in narrow trench surrounded by a geotextile filter fabric, with a minimum of 450 mm overlap of fabric and installed as per metre 1111.00
clause 702.3 and 309.3.5 including excavation and backfilling)

Laying Paving Fabric Beneath a Pavement Overlay (Providing and laying paving fabric with physical requirements as per
table 704-2 over a tack coat of paving grade Bitumen 80-100 penetration, laid at the rate of 1 kg per sqm over thoroughly
cleaned and repaired surface to provide a water resistant membrane and crack retarding layer. Paving fabric to be free of
7.3 wrinkling and folding and to be laid before cooling of tack coat, brooming and rolling of surface with pneumatic roller to sqm 84.00
maximise paving fabric contact with pavement surface)

Laying Boulder Apron in Crates of Synthetic Geogrids (Providing, preparing and laying of geogrid crated apron 1 m x 5 m,
600 mm thick including excavation and backfilling with baffles at 1 metre interval, made with geogrids having characteristics
as per clause 704.2, joining sides with connectors/ring staples, top corners to be tie tensioned, placing of suitable cross
interval ties in layers of 300 mm connecting opposite side with lateral braces and tied with polymer braids to avoid bulging,
constructed as per clause 704.3. filled with stone with minimum size of 200 mm and specific gravity not less than 2.65,
7.4 packed with stone spalls, keyed to the foundation recess in case of sloping ground and laid over a layer of geotextile to cum 680.00
prevent migration of fines, all as per clause 704 and laid as per clause 2503.3 and approved design.)

Reinforced Earth Retaining Wall (Reinforced earth retaining walls have four main components as under: a) Excavation for
foundation, foundation concrete and cement concrete grooved seating in the foundation for facing elements (facia material).
7.5 b) Facia material and its placement. c) Assembling, joining with facing elements and laying of the reinforcing elements. d)
Earthfill with granular material which is to be retained by the wall.)

(i) Facing elements of RCC sqm 1109.00


(ii) Assembling, joining and laying of reinforcing elements.
A With reinforcing element of steel / Aluminium strips / polymeric strips.
Type 1 1.Galvanised carbon steel strips metre 10.00
Type 2 2.Copper Strips metre 7702.00
Type 3 3.Aluminium Strips metre 10.00
Type 4 4.Stainless steel strips metre 10.00
Type 5 5.Glass reinforced polymer/fibre reinforced polymer/polymeric strips metre 53.00
B With reinforcing elements of synthetic geogrids sqm 15.00
CHAPTER-8
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES
Cast in Situ Cement Concrete M20 kerb (Construction of cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection
8.1 beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause
408)

A Using Concrete Mixer metre 272.00


B Using Concrete Batching and Mixing Plant metre 259.00

Page 12 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Cast in Situ Cement Concrete M 20 Kerb with Channel (Construction of cement concrete kerb with channel with top and
bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb
8.2 channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying
machine, foundation concrete laid manually, all complete as per clause 408)

A Using Concrete Mixer metre 487.00


B Using Concrete Batching and Mixing Plant metre 464.00
Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or
8.3 any other approved colour to give an even shade)
Hindi ( Matras commas and the like not to be measured and paid for Half letter shall be counted as half ) cm height per
(i) 1.20
letter
English and Roman cm height per
(ii) 0.70
letter
Retro- reflectorised Traffic signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as
asper IRC:67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm
thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly MoRTH (5th
8.4 designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved Revision) Page
drawing and finished item of work as per MoRT&H (5th Revision) specification 801 and as directed by the Engineer-in-Charge No.347 to 355

(i) 90 cm equilateral triangle each 2052.00


( ii ) 60 cm equilateral triangle each 1869.00
( iii ) 60 cm circular each 1988.00
( iv ) 80 mm x 60 mm rectangular each 2174.00
(v) 60 cm x 45 cm rectangular each 1976.00
(vi ) 60 cm x 60 cm square each 2061.00
( vii ) 90 cm high octagon each 2355.00
Direction and Place Identification signs upto 0.9 sqm size board. (Providing and erecting direction and place identification
retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over
aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6
8.5 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, sqm 2835.00
60 cm below ground level as per approved drawing) and finished item of work as per MoRT&H (5th Revision) specification
801 and as directed by the Engineer-in-Charge
Direction and Place Identification signs with size more than 0.9 sqm size board. (Providing and erecting direction and place
identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3,
fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75
8.6 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 sqm 5281.00
cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing and finished item of work as per MoRT&H (5th
Revision) specification 801 and as directed by the Engineer-in-Charge

Overhead Signs (Providing and erecting overhead signs with a corrosion resistant aluminium alloy sheet reflectorised with
high intensity retro-reflective sheeting of encapsulated lense type with vertical and lateral clearance given in clause 802.2 and
802.3 and installed as per clause 802.7 over a designed support system of aluminium alloy or galvanised steel trestles and
8.7
trusses of sections and type as per structural design requirements and approved plans)

A Truss and Vertical Support tonne 89519.00


B Aluminium alloy plate for over head sign tonne 516.00
Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all
8.8 shades on new plastered concrete surfaces) sqm 73.00

Painting on Steel Surfaces (Providing and applying two coats of ready mix paint of approved brand on steel surface after
8.9 through cleaning of surface to give an even shade) sqm 74.00

Painting on Wood Surfaces (Providing and applying two coats of ready mix paint of approved brand on wood surface after
8.10 through cleaning of surface to give an even shade) sqm 81.00

Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines, dashes, arrows etc on roads in two
8.11 coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including cleaning the
surface of all dirt, dust and other foreign matter, demarcation at site and traffic control )

(i) Over 10 cm in width sqm 135.00


(ii) Up to 10 cm in width sqm 112.00

Page 13 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on Old Work (Painting lines, dashes, arrows etc on roads in two
8.12 coats on old work with ready mixed road marking paint confirming to IS: 164 on bituminous surface, including cleaning the
surface of all dirt, dust and other foreign matter, demarcation at site and traffic control )

(i) Over 10 cm in width sqm MoRTH (5th 94.00


Revision) Page
(ii) Up to 10 cm in width sqm
No.338 to 339 and
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing 357 to 358
and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area,
8.13 thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and sqm 264.00
free from streaks and holes.Finished item of work as per MoRT&H (5th Revision) specification 803 and as directed by the
Engineer-in-Charge
Kilo Metre Stone Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in
8.14 position including painting and printing etc and and finished item of work as per MoRT&H (5th Revision) specification 805 and
as directed by the Engineer-in-Charge
(i) 5th kilometre stone (precast) each 3572.00
(ii) Ordinary Kilometer stone (Precast) each 2123.00
(iii) Hectometer stone (Precast) each 609.00
Road Delineators Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm
high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm dia
8.15 circular reflectorised panels at the top, buried or pressed into the ground and confirming toIRC-79 and the drawings.Finished each 1408.00
item of work as per MoRT&H (5th Revision) specification 806 and as directed by the Engineer-in-Charge

Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in
8.16 position including finishing and lettering but excluding painting and finished item of work as per MoRT&H (5th Revision) each 556.00
specification 807 and as directed by the Engineer-in-Charge
G.I Barbed wire Fencing 1.2 metre high (Providing and fixing 1.2 metres high GI barbed wire fencing with 1.8 m angle iron
posts 40 mm x 40 mm x 6 mm placed every 3 metres center to center founded in M15 grade cement concrete, 0.6 metre
below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on
8.17 one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn metre 256.00
buckles etc complete as per clause 807 )

G.I Barbed wire Fencing 1.8 metre high (Providing and fixing 1.8 metres high GI barbed wire fencing with 2.4 m angle iron
posts 50 mm x 50 mm x 6 mm placed every 3 metres center to center founded in M15 grade cement concrete, 0.6 metre
below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on
8.18 one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, metre 411.00
turn buckles etc complete as per clause 807 )

Fencing with welded steel wire Fabric 75 mm x 50 mm (Suggestive) (Providing 1.20 metre high fencing with angle iron posts
50 mm x 50 mm x 6 mm at 3 metre center to center with 0.40 metre embedded in M15 grade cement concrete, corner, end MoRTH (5th
8.19 and every 10th post to be strutted, provided with welded steel wire fabric of 75 mm x 50 mm mesh or 75 mm x 25 mm mesh metre Revision) Page No.
and fixed to iron posts by flat iron 50 x 5 mm and bolts etc. complete in all respects.) 359 to 363

Tubular Steel Railing on Medium Weight steel channel ( ISMC series) 100 mm x 50 mm (Providing, fixing and erecting 50 mm
8.20 dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres metre 2609.00
high above ground, 2 m centre to centre, complete as per approved drawings and finished item of work as per MoRT&H (5th
Revision) specification 809 and as directed by the Engineer-in-Charge
Tubular Steel Railing on Precast RCC posts, 1.2 m high above ground level (Providing, fencing and erecting 50 mm dia
8.21 painted steel pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high (1.2 m above GL) with 3 holes 50 metre 2283.00
mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing)

Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the
road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement
conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board,
8.22 keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH -
33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and finished item of work as per MoRT&H
(5th Revision) specification 811 and as directed by the Engineer-in-Charge

(i) M 40 grade concrete metre 9819.00


Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the
road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement
conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board,
8.22.A keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH -
33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and finished item of work as per MoRT&H
(5th Revision) specification 811 and as directed by the Engineer-in-Charge

(i) M 40 grade concrete metre 3453.00

Page 14 of 101
Summary of Rate Analysis
Item No. Descriptions Unit MoRTHRate
(5th
8.23 Metal Beam Crash Barrier Revision) Page No.
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick 361to 363
corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5
mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised
A by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a metre 2661.00
spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per MoRT&H (5th Revision) specification 811 and as
directed by the Engineer-in-Charge

Type - B, "THRIE" : Metal Beam Crash Barrier (Providing and erecting a "Thrie" metal beam crash barrier comprising of 3
mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post,
150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be
B galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post metre 6194.00
with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 810)

Road Traffic Signals electrically operated (Since it is a ready made item commercially produced and erected by specialised
8.24 firm in the electrical and electronic field, rate may be taken based on market enquiry from firms specialised in this field and ISI
certified for the approved design and drawing.)

Flexible Crash Barrier, Wire Rope Safety Barrier (Providing and erecting a wire rope safety barrier with vertical posts of
medium weight RS Joist (ISMB series) 100 mm x 75 mm (11.50 kg/m), 1.50 m long 0.85 m above ground and 0.65 m below
ground level, split at the bottom for better grip, embedded in M 15 grade cement concrete 450 x 450 x 450 mm, 1.50 m center
to center and with 4 horizontal steel wire rope 40 mm dia and anchored at terminal posts 15 m apart. Terminal post to be
embedded in M 15 gradecementconcretefoundation2400 x 450 x 900 mm (depth), strengthened by a strut of RS joist 100 x
8.25 75 mm, 2 m long at 450 inclination and a tie 100 x 8 mm, 1.50 m long at the bottom, all embedded in foundation concrete as metre 2542.00
per approved design and drawing, rate excluding excavation and cement concrete.)

8.26 Anti - Glare Devices in Median


Plantation (Plantation of shrubs and plants of approved species in the median. apart from cutting off glare from vehicle
A coming from opposite direction, these plants provide a pleasant envoirenment and are eco-friendly. The rate for this item is
available in the chapter 11 on horticulture. )

Anti - Glare Screen with 25 mm steel pipe framework fixed with circular and rectangular vans (Providing and erecting an
anti - glare screen with 25 mm dia vertical pipes fabricated and framed in the form of panels of one metre length and 1.75
mtr height fixed with circular vane 250 mm dia at top and rectangular vane 600 x 300 mm at the middle, made out of steel
B sheet of 3 mm thickness, end vertical pipes of the panel made larger for embedding in foundation concrete, applying 2 metre 5349.00
coats of paint on all exposed surfaces, all as per approved design and drawings.)

Anti - Glare Screen with Rectangular Vane of MS sheet (Providing and erecting anti - glare screen with rectangular vanes
of size 750 x 500 mm made from MS sheet, 3 mm thick and fixed on MS angle 50 x 50 x 6 mm at an angle of 450 to the
direction of flow of traffic, 1.5 m center to center, top edge of the screen 1.75 m above ground level, vertical post firmly
C embedded in cement concrete foundation 0.60 m below ground level, applying 2 coats of paint on exposed faces, all metre 755.00
complete as per approved design and drawings)

Street Lighting (Providing and erecting street light mounted on a steel circular hollow pole of standard specifications for street
8.27 lighting, 9 m high spaced 40 m apart, 1.8 m overhang on both sides if fixed in the median and on one side if fixed on the
footpath, fitted with sodium vapour lamp and fixed firmly in concrete foundation as per MoRTH Specification (5th
Revision)and as directed by the Engineer-in-Charge
(i) For Fixing in Median each 16163.00
(ii) For fixing in Footpath each 16084.00
Lighting on Bridges (Providing and fixing lighting on bridges, mounted on steel hollow circular poles of standard
8.28 specifications, 5 m high fixed on parapets with cement concrete, 20 m apart and fitted with sodium vapour lamp) each 11691.00

Cable Duct Across the Road (Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road
(new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at
both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3
m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to
8.29
minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher
than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 ,approved drawings and as per MoRTH
Specification (5th Revision)and as directed by the Engineer-in-Charge

(i) Single Row for one utility service metre 2561.00


(ii) Double Row for two utility services metre 4890.00
(iii) Triple Row for three utility services metre 7243.00

Page 15 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Highway Patrolling and Traffic Aid Post (It is proposed to locate one Traffic Aid Post every 50-60 km of the highway. )
8.30

Items related to under pass/ subway/ overhead bridge/ overhead foot bridge (The items involved for underpass/ subway/
overhead bridge/ overhead foot bridge are earthwork, plain cement concrete, plastering, painting, information sign etc. The
8.31 rates for these items are available in respective chapters which can be adopted for the quantities derived from the approved
designs and drawings)

Traffic Control System and Communication system (Providing a traffic control centre and communication system including
telecommunication facilities and related accessories, CCTV, radar, vehicle detection camera, central computer system These
are specialised item of telecommunication system and are the commercial products. The designer is required to contact the
8.32 manufacturers to ascertain market prices. In case of civil works required to be executed for these installations, pricing may be
done as per rates in relevant chapters for quantities derived approved design and drawing.)

Gantry Mounted Variable Message Sign board (Providing and erecting gantry mounted variable message sign board
8.33 electronically operated capable of flashing the desired message over a designed support system of aluminium alloy or
galvanised steel, erected as per approved design and drawings and with lateral clearance as per clause 802.3)

(i) Gantry Support System tonne 86843.00


Message Display (Message display board 6 sqm electronically operated with complete electronic fitments for flashing the
(ii) pre-determined messages.)
8.34 Traffic Impact Attenuators at Abutments and Piers
With Scrap Tyres (Provision and installation of traffic attenuators at abutment/pier of flyovers bridges using scrap tyres of
A size 100 x 20 retrieved from trucks laid in 2 rows and 4 tiers, one above the other and tied with 20 mm wire rope as per sqm 1797.00
approved design and drawings.)

Using Plastic/Steel Barrel, Filled with Sand (Provision and installation of traffic impact attenuator at abutment/pier of
B flyovers bridges using plastic/steel barrels 0.60 m dia and 1.0 m in height, filled with sand in three rows and tied with20 mm sqm 433.00
steel wire rope as per approved design and drawings)

With HI - DRO cell Sandwich (Patented) ((In this patented HI - DRO cell system, water gets discharged from plastic tubes
C on impact over a pre-determined time, thus absorbing the energy)) sqm 2860.00

Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium,
resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole
8.35 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973 and each 313.00
finished item of work as per MoRT&H (5th Revision) specification 804 and as directed by the Engineer-in-Charge

Traffic Cone (Provision of red fluorescent with white reflective sleeve traffic cone made of low density polyethylene (LDPE)
8.36 material with a square base of 390 x 390 x 35 mm and a height of 770 mm, 4 kg in weight, placed at 1.5 m interval, all as per each 4.00
BS 873)

8.37 Roadside Amenities


Rest Areas (Providing plainly furnished accommodation for rest rooms, dormitories, restaurants, stalls, shops, petrol pump,
telephone booth, first aid room, traffic aid post, police assistance booth, including electricity, toilet and sewerage system
A Pricing may be done based on current plinth area rates approved by PWD/CPWD/MES for a particular zone. Area is required
to be assessed for specific location as per actual site conditions)

Parking areas and Bus Laybyes for Trucks, Buses and Light vehicles (Pricing of parking areas may be done for the quantities
B of various items based on the approved dimensions and pavement design for a particular terrain and soil. Rates for items
may be from respective chapters.)

C Lawn (Providing a lawn planted with grass and its maintenance )


Rumble Strips (Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm
8.38 wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.) sqm

Policeman Umbrella (Provision of a 2 m high (floor to roof) umbrella for traffic policeman at road crossings, where necessary,
8.39 installed on a raised platform, built on a central support of a steel pipe 100 mm dia, roof made of 25 mm dia steel pipe to each
provide covered area of 3 sqm, roofed with CGI sheets, all steel parts to be given 2 coats of paint)

Page 16 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
High Mast Pole Lighting at Interchanges and Flyovers (Providing and erecting a high mast pole lighting with 30 m high hot dip
galvanised mast designed to withstand forces exerted with wind speeds of 180 km per hour with 3 seconds gust, as per
IS:875 (Part 3) - 1978, fitted with a base flange, door at the base of mast with heavy duty internal lock, lantern carriage,
suitable winching arrangement for safe working load of 750 kg and high powered electrically driven power tools for raising
and lowering of lantern carriage, flexible 8 core electric cable, lightening conductor, earthing terminal, and fixing 2 nos
8.40 aviation obstruction lights on top of the mast, all complete as per approved design and drawings This is a specialised work
and is generally done by firms who specialise in such jobs. The detailed designs and estimates are submitted by the firms
alongwith their tender for checks by the Department. The cost of this work is required to be worked out based on approved
design, drawings and estimate of the lowest tender. A separate contract for this work is concluded as the contractors for
road and bridge works generally donot undertake such jobs.)

Toll Plaza (The construction, operation and maintenance of Toll Plaza can be broken into separate items of work as under
8.41 based on the approved design and drawings:-)
Safety Devices and signs in Construction Zones (Provision and fixing of traffic signs for limited period at suitable locations in
construction zone comprising of warning zone, approach transition zone, working zone and terminal transition zone with a
minimum distance of 60 cm from the edge of the kerb in case of kerbed roads and 2 to 3 m from the edge of the carriageway
in case of un-kerbed roads, the bottom edge of the lowest sign plate to be not less than 2 m above the road level, fixed on
8.42 60 mm x 60 mm x 6 mm angle iron post, founded and installed as per approved design and drawings, removed and
disposed of after completion of construction work, all as per IRC:SP:55-2001)

Portable Barricade in Construction Zone (Installation of a steel portable barricade with horizontal rail 300 mm wide, 2.5 m in
length fitted on a 'A' frame made with 45 x 45 x 5 mm angle iron section, 1.5 m in height, horizontal rail painted (2 coats)
8.43 with yellow and white stripes, 150 mm in width at an angle of 450, 'A' frame painted with 2 coats of yellow paint, complete each 2653.00
as per IRC:SP:55-2001 )

8.44 Permanent Type Barricade in Construction Zone


With Steel Components (Construction of a permanent type barricade made of steel components, 1.5 m high from road
level, fitted with 3 horizontal rails 200 mm wide and 4 m long on 50 x 50 x 5 mm angle iron vertical support, painted with
A yellow and white strips, 150 mm in width at an angle of450, complete as per IRC:SP:55-2001 ) each 4113.00

With Wooden Components (Construction of a permanent type barricade made of wooden components, 1.5 m high from
road level, fitted with 3 horizontal planks 200 mm wide and 3.66 m long on 100 x 100mm wooden vertical post, painted
B with yellow and white striups, 150 mm in width at an angle of450, complete as per IRC:SP:55-2001 ) each 924.00

With Bricks (Construction of a permanent type barricade made with brick work in mud mortar, 1.5 m high, 4 m long, 600
C mm thick, plastered with cement mortar 1:6, painted with yellow and white strips) each 14415.00

Drum Delineator in Construction Zone (Provision of metal drum/empty bitumen drum delineator, 300 mm in diameter, 800
8.45 mm high, filled with earth for stability, painted in circumferential strips of alternate black and white 100 mm wide fitted with each 398.00
reflectors 3 Nos of 7.5 cm dia, all as per IRC:SP:55-2001)

Flagman (Positioning of a smart flagman with a yellow vest and a yellow cap and a red flag 600 x 600 mm securely fastened
8.46 to a staff 1 m in length for guiding the traffic) each 586.00

CHAPTER-9
PIPE CULVERTS MoRTH (5th
Revision) Page No.
519-524, 535-562 &
666
PCC 1:3:6 in Foundation Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate
9.1 and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour cum 3799.00
charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all
Laying Reinforced
T&P etc., completeCement Concrete
for finished Pipe
item of NP4/prestrssed
work as per MoRT&Hconcrete pipe on1500,1700,
specification first class bedding in single
2100 (5th row . and
Revision) Laying
as directed
Reinforced cement concrete pipe NP4/prestrssed
by the Engineer-in-Charge for foundations. concrete pipe for culverts on first class bedding of granular material in MoRTH (5th
9.2 single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete Revision) Page No.
and masonry works in head walls and parapets etc.as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 783 to785
(5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.
A 1000 mm dia metre 7341.00
B 1200 mm dia metre 11285.00
C 900 mm dia metre 7366.00

Page 17 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Laying Reinforced Cement Concrete Pipe NP 4 /prestrssed concrete pipe on first class bedding in double row . (Laying
Reinforced cement concrete pipe NP4 /prestrssed concrete pipe for culverts on first class bedding of granular material in
9.3 double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets etc. as per drawing and as per MoRT&H Specification 2900, 2905 and 2906
(5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.
A 1000 mm dia metre 14797.00
B 1200 mm dia metre 22694.00
C 900 mm dia metre 14846.00
9.4.B Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in Triple row Laying
A Reinforced
1000 mm dia cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material in metre 23157.00
Triple row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and
CHAPTER-10
masonry works in head walls and parapets etc .as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th
Revision) and IRC Special
MAINTENANCE Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.
OF ROADS
Restoration of Rain Cuts (Restoration of rain cuts with soil, moorum, gravel or a mixture of these, clearing the loose soil,
10.1 benching for 300 mm width, laying fresh material in layers not exceeding 250 mm and compacting with plate compactor or cum 233.00
power rammers to restore the original alignment, levels and slopes)

Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design
10.2 level by adding fresh approved soil and compacting it with appropriate equipment.) sqm 56.00

Maintenance of Earth Shoulder (stripping excess soil) (Stripping excess soil from the shoulder surface to achieve the
10.3 approved level and compacting with plate compactor) sqm 15.00

Filling Pot- holes and Patch Repairs with open - graded Premix surfacing, 20mm. (Removal of all failed material, trimming of
completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of
excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting,
10.4 trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2) sqm 128.00

Filling Pot- holes and Patch Repairs with - Bituminous concrete, 40mm. (Removal of all failed material, trimming of
completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of
10.5 excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting,
trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2)

(i) for grading I Material sqm 286.00


(ii) for grading II Material sqm 287.00
Crack Filling (Filling of crack using slow - curing bitumen emulsion and applying crusher dust in case crack are wider than
10.6 3mm.) metre 4.00

10.7 Dusting (Applying crusher dust to areas of road where bleeding of excess bitumen has occurred.) sqm 1.53
10.8 A Fog Seal (ref item 5.17) sqm 45.00
B Crack Prevention courses. (ref item 5.21)
(i) Stress Absorbing Membrane (SAM) crack width less than 6 mm sqm 50.00
(ii) Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm sqm 60.00
(iii) Stress Absorbing Membrane (SAM) crack width above 9 mm and cracked area above 50 % sqm 78.00
(iv) Bitumen Impregnated Geotextile sqm 145.00
C Slurry Seal (ref item 5.15)
(i) 5 mm thickness sqm 68.00
(ii) 3 mm thickness sqm 48.00
(iii) 1.5 mm thickness sqm 30.00
D Surface Dressing for maintance works. (ref item 5.9)
(i) 19 mm nominal chipping size sqm 81.00
(ii) 13 mm nominal size chipping sqm 62.00
Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and
10.9 expansion joints in concrete pavements using epoxy mortar or epoxy concrete) metre 513.00

Repair of old Joints Sealant (Removal of existing sealant and re sealing of contraction, longitudinal or expansion joints in
10.10 concrete pavement with fresh sealant material) metre 39.00

Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)
10.11 metre 50.00

Land Slide Clearance in soil (Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and
10.12 disposal of the same on the valley side) cum 52.00

Page 18 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Land slide Clearance in Hard Rock Requiring Blasting (Clearing of land slide in hard rock requiring blasting for 50% of the
10.13 boulders and disposal of the same on the valley side.) cum 94.00

Snow Clearance on Roads with Dozer (Snow clearance from road surface by a bull- dozer 165 Hp and disposing it on the
10.14 valley side) cum 4.00

Snow Clearance on Roads with Snow Blowers (Snow clearance from road surface by a snow blower and disposing on the
10.15 valley side.) cum #VALUE!

CHAPTER-11
HORTICULTURE
Spreading of Sludge Farm Yard Manure or/and good Earth (Spreading of sludge farm yard manure or/ and good earth in
11.1 required thickness (cost of sludge, farm- yard manure or/and good earth to be paid for separately)) cum 32.00

Grassing with ' Doobs' Grass (Grassing with 'Doobs' grass including watering and maintenance of the lawn for 30 days or
11.2 more till the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed)

(i) In rows 15 cm apart in either direction sqm 21.00


(ii) In rows 7.5 cm apart in either direction sqm 33.00
Making Lawns including Ploughing and Dragging with 'Swagha' Breaking of Clod (Making lawns including ploughing and
11.3 breaking of clod, removal of rubbish, dressing and supplying doobs grass roots and planting at 15 cm apart, including sqm 23.00
supplying and spreading of farm yard manure at rate of 0.18 cum per 100 sqm)

Maintenance of Lawns or Turfing of Slopes (Maintenance of lawns or Turfing of slopes (rough grassing) for a period of one
11.4 year including watering etc) sqm 318.00

Turfing Lawns with Fine Grassing including Ploughing, Dressing (Turfing lawns with fine grassing including ploughing,
11.5 dressing including breaking of clods, removal of rubbish, dressing and supplying doobs grass roots at 10 cm apart, sqm 29.00
including supplying and spreading of farm yard manure at rate of0.6 cum per 100 sqm)

11.6 Maintenance of Lawns with Fine Grassing for the First Year sqm 337.00
a) Planting Permanent Hedges including Digging of Trenches (Planting permanent hedges including digging of trenches,
11.7 60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard manure, supplied at the rate of 4.65 cum per metre 101.00
100 metres and supplying and planting hedge plants at 30 cm apart)

(b) Maintenance of Hedge for one year metre 250.00


11.8 a) Planting Flowering Plants and Shrubs in Central Verge km 51134.00
(b) Maintenance of Flowering Plants and Shrubs in Central Verge for one Year km 310583.00
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes,
11.9 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the each 1207.00
trench, watering, fixing the tree guard and maintaining the plants for one year)

Renovation Lawns including, Weeding, Forking the Ground, Top Dressing with Forked Soil (Renovation lawns including,
weeding, forking the ground, top dressing with forked soil, watering and maintenance the lawns, for 30 days or more, till
11.10 the grass forms a thick lawn, free from weeds, and fit for moving and disposal of rubbish as directed, including supplying sqm 23.00
good earth, if needed but excluding the cost of well decayed farm yard manure)

Supply at Site Well Decayed Farm Yard Manure (Supply at site of work well decayed farm yard manure, from any available
11.11 source, approved by the engineer in charge including screening and stacking) cum

Supply at Site of Work/ Store - Deoiled Neem Cake (Supply at site of work/ store- deoiled neem cake duly packed in used
11.12 gunny bags) quintal

11.13 Supplying Sludge (Supplying sludge duly stacked at site/ store) cum
Half Brick Circular Tree Guard, in 2nd class Brick, internal diametre 1.25 metres, and height 1.2 metres, above ground and
0.20 metre below ground (Half brick circular tree guard, in 2nd class brick, internal diametre 1.25 metres, and height 1.2
metres, above ground and 0.20 metre below ground, bottom two courses laid dry, and top three courses in cement mortar
11.14 1:6 ( 1 cement 6 sand) and the intermediate courses being in dry honey comb masonry, as per design complete) each 1707.00

Edging with 2nd class Bricks, laid dry lengthwise (Edging with 2nd class bricks, laid dry lengthwise, including excavation,
11.15 refilling, consolidation, with a hand packing and spreading nearly surplus earth within a lead of 50 metres) metre 35.00

Page 19 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Making Tree Guard 53 cm dia and 1.3 m high as per design from empty bitumen drum (Making tree guard 53 cm dia and 1.3
m high as per design from empty bitumen drum, slit suitably to permit sun and air, (supplied by the department at stock issue
11.16 rate) including providing and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets, complete in all respect) each 320.00

Making Tree Guard 53 cm dia and 2 metres high as per design from empty bitumen drums (Making tree guard 53 cm dia and
2 metres high as per design from empty bitumen drums, slit suitably to permit sun and air, ( supplied by the department at
stock issue rate) including providing and fixing four legs 40 cm long of 30 x 3 mm MS riveted to tree guard and providing
11.17 and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets complete in all respects) each 677.00

Wrought Iron and Mild Steel Welded Work (Wrought iron and mild steel welded work) (using angles, square bars, tees and
channel grills, grating frames, gates and tree guards of any size and design etc. including cost of screens and welding rods
11.18 or bolts and nuts complete fixed in position but without the cost of excavation and concrete for fixing which will be paid quintal 7807.00
separately)

Tree Guard with MS Iron (Providing and fixing MS iron tree guard 60 cm dia and 2 metre high above ground level formed of 4
Nos (25 x 6 mm) and 8 Nos (25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron rings in two halves, bolted together
each tree
11.19 with 8 mm dia and 30 mm long bolts including painting two coats with paint of approved brand over a coat of priming, 1811.00
guard
complete in all respects.)

Tree Guard with MS Angle Iron and Steel Wire (Providing and fixing tree guard 0.60 metre square, 2.00 metre high
fabricated with MS angle iron 30 x 30 x 3 mm, MS iron 25 x 3 mm and steel wire3 mm dia welded and fabricated as per each tree
11.20 3698.00
design in two halves bolted together) guard

Compensatory Afforestation (Planting trees as compensatory afforestation at the rate of 290 trees per hectare at a spacing of
6 m by grubbing and leveling the ground upto a depth of 150 mm, digging holes 0.9 m dia, 1 m deep, mixing farm
11.21 yard/sludge manure with soil, planting of sapling 2 m high with 25 cm dia stem, backfilling the hole and watering) hectare 102901.00

CHAPTER-12
FOUNDATIONS
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,
including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides
and bottom and backfilling with approved material and complete for finished item of work, excluding seigniorage charges, as MoRTH (5th
12.1 per MoRT&H specification 304 (5th Revision) and as directed by the Engineer-in-Charge Revision) Page no.
59 to 62

I Ordinary soil
A Manual Means
(i) upto 3 m depth cum 193.00
(ii) 3 m to 6 m depth cum 248.00
(iii) Above 6 m depth cum 330.00
B Mechanical Means
(i) Depth upto 3 m cum 110.00
(ii) Depth 3 m to 6 m cum 126.00
(iii) Depth above 6m cum 153.00
II Ordinary rock (not requiring blasting)
A Manual Means
(i) Depth upto 3 m cum 275.00
B Mechanical Means cum 141.00
III Hard rock ( requiring blasting )
A Manual Means cum 612.00
IV Hard rock ( blasting prohibited )
A Mechanical Means cum 714.00
V Marshy soil
(i) upto 3 m depth
A Manual means cum 695.00
B Mechanical Means cum 229.00
VI Back Filling in Marshy Foundation Pits cum 456.00

Page 20 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Filling Annular Space Around Footing in Rock (Lean cement concrete 1:3:6 nominal mix. Rate may be taken as per items
12.2 13.4.)
12.3 Sand Filling in Foundation Trenches as per Drawing & Technical Specification cum 729.00
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm
nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days as per
12.4 MoRT&H specification 2100 (5th Revision) and as directed by the Engineer-in-Charge cum 4359.00

Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and
12.5 technical specifications cum 5659.00

12.6 A Cement mortar1:3 (1cement :3 sand) cum 2657.00


B Cement mortar1:2 (1cement :2 sand) cum 3255.00
C Cement mortar1:4 (1cement :4 sand) cum 2259.00
D Cement mortar1:6 (1cement :6 sand) cum 1870.00
12.7 Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
(a) Square Rubble Coursed rubble masonry( first sort ) cum 6533.00
(b) Random Rubble Masonry cum 3640.00
Plain/Reinforced cement concretes HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for MoRTH (5th
machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational Revision) Page No.
12.8 charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) in open foundation 519-524, 535-562 &
666

A PCC Grade M15 cum 4837.00


B PCC Grade M20 cum 5331.00
C RCC Grade M20
Case I Using concrete mixer cum 5492.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 4657.00
D PCC Grade M25
Case I Using concrete Mixer cum 5557.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 4782.00
E RCC Grade M25
Case I Using concrete Mixer cum 5721.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 4877.00
F PCC Grade M30
Case I Using Concrete Mixer cum 5576.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 4800.00
G RCC Grade M30
Case I Using Concrete Mixer cum 5725.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 4896.00
H RCC Grade M35
Case I Using Concrete Mixer cum 5779.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 5008.00
Providing and constructing temporary island 16 m diameter for construction of well foundation for 8m dia. Well.
12.9

A Assuming depth of water 1.0 m and height of island to be 1.25m. each 58637.00
B Assuming depth of water 4.0 m and height of island 4.5 m. each 274639.00
Providing and constructing one span service road to reach island location from one pier location to another pier location
C metre 4363.00

Providing and laying cutting edge of mild steel weighing 40 kg per metre for well foundation complete as per drawing and
12.10 technical specification. tonne 86415.00

12.11 Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification
A Well curb
(i) RCC M20 Grade
Case I Using concrete mixer cum 6273.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5375.00

Page 21 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
(ii) RCC M25 Grade
Case I Using concrete mixer cum 6619.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5829.00
(iii) RCC M35 Grade
Case I Using concrete mixer cum 6734.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5949.00
B Well steining
(I) PCC M15 Grade cum 5118.00
(ii) PCC M20 Grade cum 5581.00
(iii) RCC M20 Grade
Case I Using concrete mixer cum 5750.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 4927.00
(iv) PCC M25 Grade
Case I Using concrete mixer cum 5894.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5071.00
(v) RCC M25 Grade
Case I Using concrete mixer cum 6067.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5344.00
(vi) PCC M30 Grade
Case I Using concrete mixer cum 5927.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5102.00
(vii) RCC M30 Grade
Case I Using concrete mixer cum 6086.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5263.00
(viii) RCC M35 Grade
Case I Using concrete mixer cum 6173.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5454.00
(ix) RCC M40 Grade 5500.00
C Bottom Plug
(i) PCC Grade M20
Case I Using Concrete Mixer cum 5727.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 4863.00
(ii) PCC Grade M25
Case I Using Concrete Mixer cum 5897.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 5031.00
(iii) PCC Grade M30
Case I Using Concrete Mixer cum 5929.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 5065.00
(iv) PCC Grade M35
Case I Using Concrete Mixer cum 6004.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 5139.00
D Intermediate plug
(I) Grade M20 PCC
Case I Using Concrete Mixer cum 5504.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 4666.00
(ii) Grade M25 PCC
Case I Using Concrete Mixer cum 5666.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 4826.00
(iii) Grade M30 PCC
Case I Using Concrete Mixer cum 5697.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 4859.00
E Top plug
(i) Grade M15 PCC
Case I Using Concrete Mixer cum 4653.00

Page 22 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
(ii) Grade M20 PCC
Case I Using Concrete Mixer cum 5074.00
(iii) Grade M25 PCC
Case I Using Concrete Mixer cum 5358.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 4610.00
(iv) Grade M30 PCC
Case I Using Concrete Mixer cum 5388.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 4638.00
F Well cap
(i) RCC Grade M20
Case I Using concrete Mixer cum 5404.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 4624.00
(ii) RCC Grade M25
Case I Using concrete Mixer cum 5721.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 4945.00
(iii) RCC Grade M30
Case I Using Concrete Mixer cum 5725.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 4950.00
(iv) RCC Grade M35
Case I Using Concrete Mixer cum 5779.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 5008.00
(v) RCC M40 Grade cum 5177.00
Sinking of 6 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil,
12.12 clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is
reckoned from bed level.

A Sandy soil
(i) Depth below bed level upto 3.0 M metre 8511.00
(ii) Beyond 3m upto 10m depth metre 12310.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 16259.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 30497.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . 36596.00
(v) Beyond 30m upto 40 m metre
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter 72455.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 86946.00
B Clayey soil ( 6m dia. Well )
(i) Depth below bed level upto 3.0 M metre 12315.00
(ii) Beyond 3m upto 10m depth metre 28583.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 37749.00
b Add for dewatering @ 5% of cost, if required. metre 39637.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 70807.00
b Add 5% of cost for dewatering of the cost, if required metre 92935.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 88509.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 168228.00
b Add 5% of cost for dewatering, if required metre 211967.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 201873.00
C Soft rock (6m dia well )
(i) Depth of soft rock strata upto 3m metre 36293.00
D Hard rock (6m dia well )
(i) Depth of soft rock strata upto 3m metre 37436.00

Page 23 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil,
12.13 clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is
reckoned from bed level.

A Sandy soil
(i) Depth below bed level upto 3.0 M metre 25899.00
(ii) Beyond 3m upto 10m depth metre 17780.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 23481.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 44044.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour) . metre 52853.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 104642.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 125571.00
B Clayey soil ( 7m dia. Well )
(I) Depth below bed level upto 3.0 M metre 17780.00
(ii) Beyond 3m upto 10m depth metre 25723.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 33971.00
b Add for dewatering @ 5% of cost, if required. metre 35670.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 63720.00
b Add 5% of cost for dewatering on the cost, if required metre 83632.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 79650.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 151388.00
b Add 5% of cost for dewatering, if required metre 190749.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). 181666.00
C Soft rock ( 7m dia well )
(i) Depth of soft rock strata upto 3m metre 32991.00
D Hard rock ( 7m dia well )
(i) Depth upto 3 m metre 41703.00
Sinking of 8 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil,
12.14 clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is
reckoned from bed level.

A Sandy soil
(i) Depth below bed level upto 3.0 M metre 16109.00
(ii) Beyond 3m upto 10m depth metre 19931.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 26323.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 49376.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 59251.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 17357.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 20828.00
B Clayey soil ( 8m dia. Well )
(i) Depth upto 3.0 M metre 21734.00
(ii) Beyond 3m upto 10m depth metre 31261.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 41285.00
b Add for dewatering @ 5% of cost, if required. metre 43349.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 77439.00

Page 24 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
b Add 5% of cost for dewatering on the cost, if required metre 101639.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 96799.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 183985.00
b Add 5% of cost for dewatering, if required metre 231821.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 220782.00
C Soft rock ( 8m dia well )
(i) Depth in soft rock strata upto 3m metre 36314.00
D Hard rock ( 8m dia well )
(i) Depth in hard rock strata upto 3 m metre 41367.00
Sinking of 9 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil,
12.15 clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is
reckoned from bed level.

A Sandy soil
(i) Depth below bed level upto 3.0 M metre 16259.00
(ii) Beyond 3m upto 10m depth metre 21903.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 28928.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 54262.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 65114.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 128921.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 154705.00
B Clayey soil ( 9m dia. Well )
(i) Depth below bed level upto 3.0 M metre 22876.00
(ii) Beyond 3m upto 10m depth metre 33728.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 44543.00
b Add for dewatering @ 5% of cost, if required. metre 46771.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 83552.00
b Add 5% of cost for dewatering on the cost, if required metre 109662.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 104440.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 198507.00
b Add 5% of cost for dewatering, if required metre 250119.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 238208.00
C Soft rock ( 9m dia well )
(i) Depth upto 3m metre 45584.00
D Hard rock ( 9m dia well )
(i) Depth of hard rock strata upto 3 m metre 47835.00
Sinking of 10 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy
12.16 soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of
sinking is reckoned from bed level.

A Sandy soil
(i) Depth below bed level upto 3.0 M metre 19752.00
(ii) Beyond 3m upto 10m depth metre 23057.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 30451.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 57117.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 68541.00
(v) Beyond 30m upto 40 m

Page 25 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 135702.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 162843.00
B Clayey soil (10m dia. Well )
(i) Depth below bed level upto 3.0 M metre 24880.00
(ii) Beyond 3m upto 10m depth metre 33175.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 43814.00
b Add for dewatering @ 5% of cost, if required. metre 46005.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 82184.00
'b Add 5% of cost for dewatering on the cost, if required metre 107867.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 102730.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 195261.00
b Add 5% of cost for dewatering, if required metre 246028.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). 234313.00
C Soft rock (10m dia well )
(i) Depth of soft rock strata upto 3m metre 46555.00
D Hard rock (10m dia well )
(i) Depth of hard rock strata upto 3 m metre 56547.00
Sinking of 11 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy
12.17 soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of
sinking is reckoned from bed level.

A Sandy soil
(i) Depth from bed level upto 3.0 M metre 45967.00
(ii) Beyond 3m upto 10m depth metre 34719.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 45854.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 86010.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 103212.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 204347.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 245216.00
B Clayey soil (11 m dia. Well )
(i) Depth from bed level upto 3.0 M metre 41351.00
(ii) Beyond 3m upto 10m depth metre 68263.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 90154.00
b Add for dewatering @ 5% of cost, if required. metre 94661.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 169105.00
b Add 5% of cost for dewatering on the cost, if required metre 221950.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 211381.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 401767.00
b Add 5% of cost for dewatering, if required metre 506226.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 482120.00
C Soft rock (11m dia well )
(i) Depth of soft rock strata upto 3m metre 104031.00
D Hard rock (11m dia well )
(i) Depth of hard rock upto 3 m metre 127994.00

Page 26 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Sinking of 12 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy
12.18 soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of
sinking is reckoned from bed level.

A Sandy soil
(i) I) Depth below bed level upto 3.0 M metre 94178.00
(ii) Beyond 3m upto 10m depth metre 104751.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 138342.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 259495.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 311393.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 616520.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 739824.00
B Clayey soil (12 m dia. Well )
(i) Depth below bed level upto 3.0 M metre 101861.00
(ii) Beyond 3m upto 10m depth metre 170944.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 225762.00
b Add for dewatering @ 5% of cost, if required. metre 237050.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 423471.00
b Add 5% of cost for dewatering on the cost, if required metre 555806.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 529339.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 1006107.00
b Add 5% of cost for dewatering, if required metre 1267694.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 1207328.00
C Soft rock (12m dia well )
(i) Depth of soft rock strata upto 3m metre 244418.00
D Hard rock (12m dia well )
(i) Depth of hard rock strata upto 3 m metre 295159.00
Sinking of Twin D Type well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey
12.19 soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is
reckoned from bed level.

A Sandy soil
(i) Depth from bed level upto 3.0 M metre 21418.00
(ii) Beyond 3m upto 10m depth metre 23041.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 30430.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 57078.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 68493.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 135609.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 162731.00
B Clayey soil (Twin D Type Well )
(i) Depth below bed level upto 3.0 M metre 24853.00
(ii) Beyond 3m upto 10m depth metre 36871.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 48696.00
b Add for dewatering @ 5% of cost, if required. metre 51131.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 91342.00

Page 27 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
b Add 5% of cost for dewatering on the cost, if required metre 119887.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 114178.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 217015.00
b Add 5% of cost for dewatering, if required metre 273439.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 260418.00
C Soft rock (Twin D Type well )
(i) Depth of soft rock strata upto 3m metre 54647.00
D Hard rock (Twin D Type well )
(i) Depth of hard rock strata upto 3 m metre 61661.00
Pneumatic sinking of wells with equipment of approved design, drawing and specifications worked by competent and trained
personnel and comprising of compression and decompression chambers, reducers, two air locks separately for men and
plant & materials, arrangement for supply of fresh air to working chambers, check valves, exhaust valves, shafts made
from steel plates of riveted construction not less than 6 mm thick to withstand an air pressure of 0.50 MPa, controlled
blasting of hard rock where required, staircases and 1 m wide landing plate forms with railing, arrangement for compression
12.20 and decompression, electric lighting of 50 V maximum, proper rooms for rest and medical examinations and compliance with
safety precautions as per IS:4138, all as per clause1207.6 of MoRTH Specifications.

12.21 Sand filling in wells complete as per drawing and technical specifications cum 729.00
Providing steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per
12.22 detailed drawing tonne 76758.00

Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and
12.23 removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-750 mm) as per MoRT&H specification 1100 metre 9120.00
(5th Revision) and as directed by the Engineer-in-Charge

Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and
12.24 removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1000 mm) as per MoRT&H specification 1100 metre 14420.00
(5th Revision) and as directed by the Engineer-in-Charge

Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and
12.25 removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) as per MoRT&H specification 1100 metre 17450.00
(5th Revision) and as directed by the Engineer-in-Charge

Driven cast-in-place vertical M35 grade R.C.C. pile excluding reinforcement complete as per drawing and & Technical
12.26 Specification (Pile diameter - 750 mm) metre #VALUE!

Driven cast-in-place vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.27 Specification (Pile diameter - 1000 mm) metre #VALUE!

Driven cast-in-place vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.28 Specification (Pile diameter - 1200 mm) metre #VALUE!

Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.29 Specification (Pile Diameter=500 mm) metre #VALUE!

Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.30 Specification (Pile Diameter=750 mm) metre #VALUE!

Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.31 Specification (Pile Diameter=1000 mm) metre #VALUE!

Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.32 Specification (Size of pile - 300 mm x 300 mm) metre #VALUE!

Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.33 Specification (Size of pile - 500 mm x 500 mm) metre #VALUE!

Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.34 Specification (Size of pile - 750 mm x 750 mm) metre #VALUE!

Driven vertical steel piles complete as per drawing and & Technical Specification (Section of the pile - H Section steel column
12.35 400 x 250 mm (ISHB Series) ) metre #VALUE!

Driven vertical steel piles complete as per drawing and & Technical Specification (Section of the pile - H Section steel column
12.36 450 x 250 mm (ISHB Series) ) metre #VALUE!

12.37 Pile load test on single vertical pile in accordance with IS:2911(Part-IV)

Page 28 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification as per MoRT&H
12.38 specification 1100 (5th Revision) and as directed by the Engineer-in-Charge
A RCC Grade M20
(i) Using Concrete Mixer cum 5438.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 4697.00
B RCC Grade M25
(i) Using concrete mixer. cum 5747.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 5022.00
C RCC Grade M30
(i) Using concrete mixer. cum 5786.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 5045.00
D RCC Grade M35
(i) Using concrete mixer. cum 5868.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 5143.00
Levelling course for Pile cap
MoRTH (5th
Revision) Page
12.39 cum
No.527 to 532, 663
to 666
Providing HYSD bars of different diameters, wrought and put up bars of all diameters including cost and conveyance of
steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills,
placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item
12.40 of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 tonne 63286.00
& 2100 (5th revision) and as per I.S.1786 of 1985

Supplying, fitting and placing un-coated Mild steel reinforcement complete in foundation as per drawing and technical
12.41 specification tonne 60535.00

CHAPTER-13
SUB-STRUCTURE
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and technical
13.1 specifications cum 5477.00

13.2 Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical specifications sqm 704.00
13.3 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications sqm 1103.00
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
13.4

A Random Rubble Masonry cum 3516.00


B Coursed rubble masonry (first sort ) cum 3814.00
C Ashlar masonry ( first sort ) cum 8085.00
Vibrated reinforced cement concrete using crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per MoRTH (5th
approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item Revision) Page
13.5
as per MoRT&H specification 1500,1600,1700 & 2200 (5 th revision ) and as directed by the Engineer-in-Charge No.527 to 532, 669
to 672

A PCC Grade M15


(p) Height upto 5m cum 5118.00
B PCC Grade M20
(p) Height upto 5m cum 5581.00
C PCC Grade M25
(p) Height upto 5m
Case I Using concrete Mixer cum 5894.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5071.00
(q) Height 5m to 10m

Page 29 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Case I Using concrete Mixer cum 6108.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5256.00
(r) Height above 10m
Case I Using concrete Mixer cum 6376.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5486.00
D PCC Grade M30
(p) Height upto 5m
Case I Using concrete Mixer cum 5927.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5102.00
(q) Height 5m to 10m
Case I Using concrete Mixer cum 6142.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5287.00
(r) Height above 10m
Case I Using concrete Mixer cum 6412.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5519.00
E RCC Grade M20
(p) Height upto 5m
Case I Using concrete Mixer cum 5750.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 4927.00
(q) Height 5m to 10m
Case I Using concrete Mixer cum 5959.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5106.00
(r) Height above 10m
Case I Using concrete Mixer cum 6221.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5330.00
F RCC Grade M25
(p) Height upto 5m
Case I Using concrete Mixer cum 6067.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5344.00
(q) Height 5m to 10m
Case I Using concrete Mixer cum 6266.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5518.00
(r) Height above 10m
Case I Using concrete Mixer cum 6564.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5781.00
G RCC Grade M30
(p) Height upto 5m
Case I Using concrete Mixer cum 6086.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5263.00
(q) Height 5m to 10m
Case I Using concrete Mixer cum 6258.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5411.00
(r) Height above 10m
Case I Using concrete Mixer cum 6501.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5621.00
H RCC Grade M35
(p) Height upto 5m
Case I Using concrete Mixer cum 6173.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5454.00
(q) Height 5m to 10m
Case I Using concrete Mixer cum 6308.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5573.00
(r) Height above 10m
Case I Using concrete Mixer cum 6510.00

Page 30 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5751.00
Providing HYSD bars of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel
to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them
in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard
13.6 drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2200 (5th revision) and tonne 63514.00
as per I.S.1786 of 1985

Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification
13.7 tonne 59377.00

Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending through the
full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal
direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance
13.8 of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards each 402.00
stream side face etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 & 2200 (5th
Revision)

Back filling behind abutment, wing wall and return wall with gravel including cost ,conveyance of all materials to site etc.,
13.9 complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing
and technical specifications for finished item of work

A Granular material cum 973.00


B Sandy material cum 977.00
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in
clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and
bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height
13.10 compacted to a firm condition complete as per drawing and technical specification. cum 1396.00

Page 31 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX
13.11 and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. tonne capacity 7.00

Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to IRC: 83(Pt.-1) section IX
13.12 and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. tonne capacity #VALUE!

Supplying, fitting and fixing in position true to line and level sliding plate bearing with PTFE surface sliding on stainless steel
13.13 complete including all accessories as per drawing and Technical Specifications and BS: 5400, section 9.1 & 9.2 (for PTFE) tonne capacity #VALUE!
and clause 2004 of MoRTH Specifications.

Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and
clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. cubic
13.14 7.00
centimetre

Supplying, fitting and fixing in position true to line and level sliding plate bearing with stainless steel plate sliding on stainless
13.15 steel plate with mild steel matrix complete including all accessories as per drawing and Technical Specifications. tonne capacity #VALUE!

Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a
disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against
stainless steel mating surface, completre assembly to be of cast steel/fabricated structural steel, metal and elastomer
13.16 elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause tonne capacity #VALUE!
2006 of MoRTH Specifications complete asper drawing and approved technical specifications.

CHAPTER-14
SUPER-STRUCTURE MoRTH (5th
Revision) Page
No.527 to 532, 675
to 684
Vibrated reinforced cement concrete using crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per
14.1 approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item
as per MoRT&H specification 1500,1600,1700 & 2300 (5 th revision ) and as directed by the Engineer-in-Charge

A RCC Grade M20


Case I Using Concrete Mixer
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 6236.00
(q) Height 5m to 10m cum 6496.00
(r) Height above 10m cum 6756.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 6496.00
(q) Height 5m to 10m cum 6756.00
(r) Height above 10m cum 7015.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 5336.00
(q) Height 5m to 10m cum 5558.00
(r) Height above 10m cum 5780.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 5558.00
(q) Height 5m to 10m cum 5780.00
(r) Height above 10m cum 6003.00
B RCC Grade M25
Case I Using Concrete Mixer
(i) For solid slab super-structure, 20-30% of (a+b+c)

Page 32 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
(p) Height upto 5m cum 6593.00
(q) Height 5m to 10m cum 6868.00
(r) Height above 10m cum 7142.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 6868.00
(q) Height 5m to 10m cum 7142.00
(r) Height above 10m cum 7417.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 5697.00
(q) Height 5m to 10m cum 5935.00
(r) Height above 10m cum 6172.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 5935.00
(q) Height 5m to 10m cum 6172.00
(r) Height above 10m cum 6410.00
C RCC Grade M 30
Case I Using Concrete Mixer
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 6682.00
(q) Height 5m to 10m cum 6961.00
(r) Height above 10m cum 7239.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 6961.00
(q) Height 5m to 10m cum 7239.00
(r) Height above 10m cum 7517.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump.
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 5748.00
(q) Height 5m to 10m cum 5987.00
(r) Height above 10m cum 6227.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 5987.00
(q) Height 5m to 10m cum 6227.00
(r) Height above 10m cum 6466.00
D RCC/PSC Grade M35
Case 1 Using concrete mixer.
(i) For solid slab super-structure, 18-28% of (a+b+c)
(p) Height upto 5m cum 6664.00
(q) Height 5m to 10m cum 6946.00
(r) Height above 10m cum 7228.00
(ii) For T-beam & slab, 23-33% of (a+b+c)
(p) Height upto 5m cum 6946.00
(q) Height 5m to 10m cum 7228.00
(r) Height above 10m cum 7511.00
(iii) For box girder and balanced cantilever, 38-58% of cost of concrete.
(p) Height upto 5m cum 7793.00
(q) Height 5m to 10m cum 8358.00
(r) Height above 10m cum 8923.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 18-28% of (a+b+c)
(p) Height upto 5m cum 5743.00
(q) Height 5m to 10m cum 5986.00
(r) Height above 10m cum 6229.00

Page 33 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
(ii) For T-beam & slab, 23-33% of (a+b+c)
(p) Height upto 5m cum 5986.00
(q) Height 5m to 10m cum 6229.00
(r) Height above 10m cum 6473.00
(iii) For box girder and balanced cantilever, 38-58% of cost of concrete.
(p) Height upto 5m cum 6716.00
(q) Height 5m to 10m cum 7203.00
(r) Height above 10m cum 7689.00
E PSC Grade M-40
Case 1 Using concrete mixer.
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 7013.00
(q) Height 5m to 10m cum 7305.00
(r) Height above 10m cum 7597.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 7305.00
(q) Height 5m to 10m cum 7597.00
(r) Height above 10m cum 7889.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 18-28% of (a+b+c)
(p) Height upto 5m cum 5915.00
(q) Height 5m to 10m cum 6165.00
(r) Height above 10m cum 6416.00
(ii) For T-beam & slab, 23-33% of (a+b+c)
(p) Height upto 5m cum 6165.00
(q) Height 5m to 10m cum 6416.00
(r) Height above 10m cum 6666.00
(iii) For box girder and balanced cantilever, 38-58% of cost of concrete.
(p) Height upto 5m cum 6917.00
(q) Height 5m to 10m cum 7418.00
(r) Height above 10m cum 7920.00
F PSC Grade M-45
(i) For solid slab/voided slab super-structure, 16-26% of cost of concrete (a+b+c)
(p) Height upto 5m cum 6032.00
(q) Height 5m to 10m cum 6292.00
(r) Height above 10m cum 6552.00
For I-beam & slab including launching of precast girders by launching truss upto 40 m span, 21-31% of cost of concrete.
(ii)

(p) Height upto 5m cum 6292.00


(q) Height 5m to 10m cum 6552.00
(r) Height above 10m cum 6812.00
(iii) For cast-in-situ box girder, segmental construction and balanced cantilever, 36-56% of cost of concrete.
(p) Height upto 5m cum 7072.00
(q) Height 5m to 10m cum 7592.00
(r) Height above 10m cum 8112.00
G PSC Grade M-50
(i) For cast-in-situ box girder, segmental construction and balanced cantilever, 35-55% of cost of concrete
(p) Height upto 5m cum 7201.00
(q) Height 5m to 10m cum 7734.00
(r) Height above 10m cum 8267.00
H PSC Grade M- 55
(i) For cast-in-situ box girder, segmental construction and balanced cantilever, 35-55% of cost of concrete
(p) Height upto 5m cum 7484.00
(q) Height 5m to 10m cum 8038.00

Page 34 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
(r) Height above 10m cum 8592.70
Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods,
tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges
and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item
14.2 of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & tonne 65226.00
2300 (5th revision) and as per I.S.1786 of 1985

High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per
14.3 drawing and Technical Specifications tonne 64793.00

Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and
14.4 Technical Specifications cum 9760.00

Mastic Asphalt (Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat
with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to
required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained
hard stone chipping of 9.5 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm
14.5 center to center in both directions, pressed into surface when the temperature of surfaces not less than 100 deg. C, sqm 293.00
protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515.)

Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence
of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving
14.6 adequate space between vertical post for expansion, complete as per approved drawings and MoRTH (5th Revision) metre 1684.00
specifications2703.

Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of
vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving
14.7 adequate space between vertical post for expansion, complete as per approved drawings and MoRTH (5th Revision) metre 1633.00
specifications 2703.

14.8 Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification metre 2992.00
14.9 Drainage Spouts complete as per drawing and MoRTH (5th Revision) specifications2705. each 3150.00
PCC M15 Grade leveling course below approach slab complete as per drawing and MoRTH (5th Revision)
14.10 specifications2704. cum 4653.00

Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical
14.11 specification cum 8141.00

Providing anti-corrosive treatment to HYSD reinforcement with Fusion Bonded Epoxy Coating (FBEC) (To be taken as per
14.12 the prevailing market rates.) tonne

Precast - pretensioned Girders (Providing, precasting, transportation and placing in position precast pretensioned concrete
14.13 girders as per drawing and technical specifications) cum #VALUE!

14.14 Providing and fixing Helical pipes in voided concrete slabs metre 20979.00
Crash Barriers (The rate analysis for rigid crash barrier in reinforced cement concrete, semi-rigid crash barrier with metal
14.15 beam and flexible crash barrier with wire ropes have been made and included in chapter-8 on Traffic and Transportation.)

Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface
14.16 after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) metre 80.00

Burried Joint (Providing and laying a burried expansion joint, expansion gap being 20 mm, covered with 12 mm thick, 200
mm wide galvanised wieldable structural steel plate as per IS: 2062, placed symmetrical to centre line of the joint, resting
freely over the top surface of the deck concrete, welding of 8 mm dia. 100 mm long galvanised nails spaced 300 mm c/c
14.17 along the centre line of the plate, all as specified in clause 2604.) metre 1608.00

Filler joint MoRTH (5th


14.18 Revision) Page
No.725 to 726
Providing & fixing 2 mm thick corrugated copper plate in expansion joint complete as per drawing & as per the directions of
(i) the Engineer-in-Charge and MoRT&H specification 2604 (5th revision) metre 1581.00

Page 35 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & as per the directions
(ii) of the Engineer-in-Charge and MoRT&H specification 2604 (5th revision) metre 165.00

Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported
spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing
(iii) and as per the directions of the Engineer-in-Charge and MoRT&H specification 2604 (5th revision) metre 118.00

Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen
(iv) by weightas per the directions of the Engineer-in-Charge and MoRT&H specification 2604 (5th revision) metre 32.00

Asphaltic Plug joint (Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical
movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic
direction), covered with a closure plate of 200mm x 6mm of wieldable structural steel conforming to IS: 2062, asphaltic plug
14.19 to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat metre 10414.00
resistant foam caulking/backer rod, all as per approved drawings and specifications.)

Elastomeric Slab Steel Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or
skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved
drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring
14.20 compliance to the manufacturer's instructions for installation and clause 2606 of MoRTH specifications for road & bridge metre 72.00
works.)

Compression Seal Joint (Providing and laying of compression seal joint consisting of steel armoured nosing at two edges of
the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer
14.21 compressed and fixed into the joint gap with special adhesive binder to cater for a horizontal movement upto 40 mm and metre 41021.00
vertical movement of 3 mm.)

Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement
upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or
their authorised representative ensuring compliance to the manufacturer's instructions for installation as per the directions of
14.22 the Engineer-in-Charge and as per MoRT&H specification 2600 (5th revision) complete including all accessories as per metre 4897.00
drawing and Technical Specifications.

Modular Strip / Box Seal Joint (Providing and laying of a modular strip Box steel expansion joint including anchorage catering
to a horizontal movement beyond 70 mm and upto 140mm, complete as per approved drawings and standard specifications
14.23 to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's metre 67.00
instructions for installation.)

Modular Strip / Box Seal Joint (Providing and laying of a modular strip box seal expansion joint catering to a horizontal
movement beyond 140mm and upto 210mm, complete as per approved drawings and standard specifications to be installed
14.24 by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for metre 83.00
installation.)

CHAPTER-15
RIVER TRAINING AND PROTECTION WORKS
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40
15.1 kg each complete as per drawing and Technical specification.
A Boulder laid dry without wire crates. cum 1291.00
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire
15.2 conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid cum 1894.00
with stone boulders weighing not less than 40 kg each.)

Cement concrete blocks (size 0.5 x 0.5 x 0.5 m) (Providing and laying of apron with cement concrete blocks of size
15.3 0.5x0.5x0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete with a minimum cement content of 250 cum 4934.00
kg/cum as per IRC: 21-2000.)

Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of
15.4 embankment complete as per drawing and complete for finished item of work as per MoRT&H Specification 2504 (5th
Revision) and as directed by the Engineer-in-Charge

A Stone/Boulder cum 1291.00

Page 36 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
B Cement Concrete blocks of size 0.3x0.3 x0.3 m cast in cement concrete of Grade M15 cum 4934.00
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Tcomplete for finished item of
15.5 work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge cum 1649.00

Geotextile Filter (Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent
15.6 escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free sqm 23.00
movement of water without creating any uplift head on the pitching.)

Toe protection (A toe wall for toe protection can either be in dry rubble masonry in case of dry rubble pitching or pitching with
stones in wire crates or it can be in PCC M15 nominal mix if cement concrete block have been used for pitching . Rates for
toe wall can be adopted from respective clauses depending upon approved design. The rate for excavation for foundation,
15.7 dry rubble masonry and PCC M15 have been analysed and given in respective chapters.)

Providing and laying Flooring complete as per drawing and Technical specifications laid over cement concrete bedding.
15.8

A Rubble stone laid in cement mortar 1:3 cum 4144.00


B Cement Concrete blocks Grade M15 cum 6498.00
15.9 Dry rubble Flooring cum 1826.00
15.10 Curtain wall complete as per drawing and Technical specification
A Stone masonry in cement mortar (1:3) cum 6533.00
B Cement concrete Grade M15 cum 4837.00
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg
15.11 beyond curtain wall as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge cum 1379.00

Gabian Structure for Retaining Earth (Providing and construction of a gabain structure for retaining earth with segments of
wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised
steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating
15.12 conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with cum 1939.00
least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire)

Gabian Structure for Erosion Control, River Training Works and Protection works (Providing and constructing gabain
structures for erosion control, river training works and protection works with wire crates of size 2 m x 1 m x 0.3 m each
divided into 1m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum
tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with
15.13 double twist, mesh size not exceeding 100 mm x 100 mm, filled with boulders with least dimension of 200 mm, all loose cum 3153.00
ends to be securely tied with 4 mm galvanised steel wire.)

CHAPTER-16
REPAIR AND REHABILITATION
Removal of existing cement concrete wearing coat including its disposal complete as per Technical specification without
16.1 causing any detrimental effect to any part of the bridge structure and removal of dismantled material with all lifts and lead sqm 170.00
upto 1000m(Thickness 75 mm)

Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt
16.2 including disposal with all lift and lead upto 1000m. sqm 128.00

Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy
16.3 complete as per Technical specification sqm #VALUE!

Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications
16.4 including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with each 175.00
Cement/Epoxy

Sealing of cracks/porous concrete by injection process through nipples/Grouting complete as per Technical specification.
16.5

A Cement Grout kg 102.00


B Cement mortar (1:1) Grouting kg 225.00

Page 37 of 101
Summary of Rate Analysis
Item No. Descriptions Unit Rate
Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in
16.6 present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. sqm 190.00

Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
16.7 kg #VALUE!

Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete
16.8 as per Technical specification sqm 419.00

Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with
compressed air under pressure, comprising of cement, sand, coarse aggregates, water and quick setting compound in the
proportion as per clause 2807.1., sand and coarse aggregates conforming to IS: 383 and table 1 of IS: 9012 respectively,
16.9 water cement ratio ranging from 0.35 to 0.50, density of gunite not less than 2000 kg/cum, strength not less than 25 Mpa sqm #VALUE!
and workmanship conforming to clause 2807.6.

Applying pre-packed cement based polymer mortar of strength 45 Mpa at 28 days for replacement of spalled concrete
16.10 sqm 157.00

16.11 Eproxy bonding of new concrete to old concrete sqm 642.00


Providing external prestressing with high tensile steel wires/strands including drilling for passage of prestessing steel, all
16.12 accessories for stressing and stressing operation and grouting complete as per drawing and Technical specification tonne 253807.00

Providing external prestressing with high tensile steel wires/strands including drilling for passage of prestessing steel, all
16.13 accessories for stressing and stressing operation and grouting complete as per drawing and Technical specification tonne 255196.00

Providing external prestressing with high tensile steel wires/strands including drilling for passage of prestessing steel, all
16.14 accessories for stressing and stressing operation and grouting complete as per drawing and Technical specification tonne 233687.00

16.15 Replacement of bearings complete as per Technical specification each #VALUE!


16.16 Rectification of bearings as per Technical specifications each #VALUE!
16.17 Replacement of Expansion Joints complete as per drawings metre 2522.00
16.18 Replacement of damaged concrete railing. metre 358.00
16.19 Replacement of crash barrier. metre 657.00
16.20 Replacement of damaged mild steel railing metre 298.00
Repair of crash barrier (Repair of concrete crash barrier with cement concrete of M-30 grade by cutting and trimming the
16.21 damaged portion to a regular shape, cleaning the area to be repaired thoroughly, applying cement concrete after erection of metre 191.00
proper form work.)

16.22 Repair of RCC Railing (Carrying out repair of RCC M30 railing to bring it to the original shape.) metre 121.00
16.23 Repair of steel Railing (Repair of steel railing to bring it to the original shape) metre 280.00

As Per Building Supply of precast concrete blocks for paving of M-50 grade and thickness not less than 100 mm for Heavy traffic areas
SOR Item no. conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification and Labour charges for laying &
Sqm 604.00
BMT-D.15 & fixing of precast concrete blocks for paving of all grades, any thickness, all sizes & shapes including all labour charges for
D.17 loading & unloading, laying to desired lines and levels complete excluding cost of cement, sand, water, electricity et

Page 38 of 101
Cost Estimate for
Road DPR Works
Proposed under
NDB Project
(APMCRCIP)
MDRs & ODRs
Package 2,
Objective-2:
Mandal Head
GOVERNMENT OF ANDRA PRADESH ROADS AND BUILDING DEPARTMENT Dept. Name PEDDAPURAM
Quarters to
DIVISION- PEDDAPURAM Road Name Adjoining
Rajupalem to Ramavaram road - EGMD087
Mandal Head
Km 0 to Km 11.83 Section Quarters
WIDENING OF EXISTING ROAD Lane Configuration
Item Unit Quntity
Start Chainage m 0.000
End Chainage m 11830.000
Total Road Length m 11830.00
Length of Bypass m 0
Length of Realignment m 0.00
EX. BT Road length m 11830.00
EX. CC Road length m 0
Curve improvement Length m 1909
Length of section under cutting m 0
Length of fillling section m 0.00
Length of Overlay (if any) m 0
Length of Forest Section m 0
Length of Ghat Section m 0
No. of Major Bridges Nos. 0
No. of Minor Bridges Nos. 0
No. of Culverts Nos. 0
No. of Rail Level Crossings Nos. 0
No. of ROBs/RUBs Nos. 0
No. of Toll Plazas Nos. 0
No. of Bus Lay Byes Nos. 0 0
No. of Truck Lay Byes Nos. 0 0
Length of RCC Drain (Length of builtup) m 3530.00 7060
Length of Unlined Drain m 8300.00 16600
Length of Retaining wall m 0
Length of Toe Wall m
Existing Crust
BC m 0.030
DBM m 0.050
WMM m 0.250
GSB m 0.200

Proposed Crust
For Flexible C/W
BC m 0.03
DBM m 0.050
DBM for Overlay m 0.000
DBM for Profile Correction m 0.080
WMM-II m 0.150
WMM-II m 0.150
GSB m 0.200
Drainage Layer m 0.000
Subgrade m 0.500
For Rigid C/W
PQC m 0.280
DLC m 0.150
GSB/Drainage Layer m 0.200
Profile Correction with Subgrade Material m 0.000
Subgrade m 0.500
Quantity of Embankment Filling m
Thickness of Overlay
BC m 0.03 0.00
DBM m 0.05
Proposed Cross-Section Types 8300.00 Pro. c/w
Width Length Ex. c/w width
Type of Cross-section Unit Length
TCS-1B (b) -Widening of existing Flexible Pavement Road to Flexible (Open Area) m 0.00 10 0.00 3.5
TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) m 8300.00 10 8300.00 3.5
TCS-1C- New Aligment with Flexible Payment (Open area) m 0.00 10 0.00 3.5
TCS-1D(b)-Widening of existing Flexible pavement Road to Flexible (Built up area -ROW available) m 0.00 10 0.00 3.5
TCS-1D(a)-Widening of existing Flexible pavement Road to Flexible (Built up area -ROW available) m 0.00 10 0.00 3.5
TCS-1 E (b) Widening of Existing Flexible Road (Built up Area-8 Mtr. ROW) m 0.00 10 0.00 3.5
TCS-1 E (a) Widening of Existing Flexible Road (Built up Area-8.5 Mtr. ROW) m 0.00 10 0.00 3.5
TCS-1 m 0.00 10 0.00 3.5
TCS-1 m 0.00 10 0.00 3.5
TCS-2B(b)- Widening of existing Flexible road to Rigid Pavement (Built up area) m 0.00 10 0.00 3.5
TCS-2B(a)- Widening Flexible road to Rigid Pavement (Built up area) m 2810.00 10 2810.00 3.5
TCS-2C(b) Widening of Existing Rigid Pavement to Rigid (Built up Area- if PQC is Poor Condition) m 0.00 10 0.00 3.5
TCS-2C(a) Widening of Existing Rigid Pavement to Rigid (Built up Area- if PQC is Poor Condition) m 0.00 10 0.00 3.5
TCS-2D(b) Widening of Existing Rigid Pavement to Rigid (Built up Area-if Fair Condition) m 0.00 10 0.00 3.5
TCS-2D(a) Widening Rigid to Rigid Pavement(Built up Area-PQC in Fair Condition) m 720.00 10 720.00 3.5
TCS-2E(a)- Widening of Existing Rigid Pavement to Rigid (Built up Area-8.5 Mtr. ROW m 0.00 10 0.00 3.5
TCS-2E (b)- Widening of Existing Rigid Pavment to Rigid (Open Area) m 0.00 10 0.00 3.5

Deduction for Structures m 0.00 3.75


Overlay At Bypass Location Width
Overlay On Existing 10.0 m c/w (Proposed Bypass Location) m 0.00 0
whitetopping On Existing 7.0 m c/w (Proposed Bypass Location) m 1490.00 0 0.00 Ex Builtup for whitetopping
whitetopping On Existing 5.5 m c/w (Proposed Bypass Location) m 0.00 0

Width of Existing Carriageway m 5.5


Width of Existing Shoulders m 1.50
Ex. Formation Width m 8.5
Width of Proposed Carriageway (Open Area) m 10.0 Road Studds
Width of Proposed Carriageway (Built Up Area) m 8.0 2L+P.S. Particulars Length / Nos. Spacing Nos.
Width of Proposed Carriageway (Built Up Area) m 4L Built Up Sections 3530.00 9 785
Width of Proposed Shoulders m 1.5 Bridge/ROB ( 180. Both Side) 0.00 9 1
Proposed Formation width m 13.0 Curves
Upto 450 1909 6 636
451-750 0 9 0
751-2000 0 18 0
At Junctions (180m BS) 5 9 400
Padestrian Crossings 0.5 0
Total 1822

Traffic & Safety


Villages Nos. 5
Police Stations Nos. 0
Hospitals Nos. 0
Schools Nos. 0
Fuel Stations Nos. 0
Govt. Buildings/Temples/Toilets etc. Nos. 0
No. of Overhead Cable Crossings Nos. 0 Road Delineators
No. of Forest Areas Nos. 0 Curve Length
Length of Curve On Curve Before Curve Nos.
No. of Ghat Portions Nos. 0 Radius(m) (Transition)
Major 3 legged Junction Nos. 0 50 579 28 0 30 41
Major 4 legged Junction Nos. 0 100 770 30 0 40 51
Minor 3 legged Junction Nos. 5 200 560 17 0 60 66
Minor 4 legged Junction Nos. 0 300 0 45 0 90 0
No. of Curves Nos. 75 Upto 2000 400 0 60 0 120 0
Length of Curves m 1909 All 500 0 70 0 140 0
Length of Transition curves m 0 All >500 0 80 0 150 0
Length having Emb. Height more than 3m m 0 No. of Delineators 158
Procedure for estimating the value of minor bridge and Underpasses/overpasses

Stage of Payment Percentage- weightage Payment Procedure

A.1- Widening and repair of Cost of each minor bridge shall be


Minor Bridges (length>6 m determined on pro rata basis with
and < 60 m) Minor Bridges respect to the total linear length of the
#REF! minor bridge. Payment shall be made on
the completion of widening & repair
work of a minor bridge.

A.2- New minor Bridge


(i)Foundation + (i)Foundation+Substructure: Cost of
Substructure: On completion each minor bridge shall be determined
of the foundation work on pro rata basis with respect to the total
including foundation for wing linear (m) of the minor bridges.
and return walls, abutment, Payment against foundation +
piers upto the abutment/pier substructure shall be made on pro-rata
cap. basis on completion of a stage i.e. not
less than 25% of the scope of
Foundation+ Sub-structure of each
bridge suject to completion of atleast
two foundation along with sub-structure
#REF!
upto abutment/pier cap level of each
bridge. In case where load test is
required for foundation, the trigger of
first payment shall include load testing
also where specified.

(ii) Super- Structure: On (ii) Super- Structure: Payment shall be


completion of the super- made on pro-rata basis on completion of
structure in all respects a stage i.e. completion of super-
including wearing coat, structure of atleast one span in all
expansion joint, hand rails, respect as specified in the column of "
crash barrier, road sign & Stage of Payment" in this sub- clause.
#REF!
marking, tests on completion
etc. complete in all respect.

(iii) Approaches: On (iii) Approaches: Payment shall be


completion of appraches made on pro-rata basis on completion of
including Retaining walls, a stage i.e. completion of approaches in
stone pitching, protection all respect as specified in the column of
works complete in all respect #REF! " Stage of Payment" in this sub- clause.
and fit for use.

(iv) Guide Bunds and River (iv) Guide Bunds and River Training
Training works: On works: Payment shall be made on pro-
completion of Guide Bunds rata basis on completion of a stage i.e.
and river Training works completion of Guide Bunda and River
complete in all respects. #REF! training works in all respect as specified in
the column of " Stage of Payment" in this
sub- clause.

(v) Other Works

#REF!

A.3- Reconstruction of
minor Bridge
(i)Foundation + (i)Foundation+Substructure: Cost of
Substructure: On completion each minor bridge shall be determined
of the foundation work on pro rata basis with respect to the total
including foundation for wing linear (m) of the minor bridges.
and return walls, abutment, Payment against foundation +
piers upto the abutment/pier substructure shall be made on pro-rata
cap. basis on completion of a stage i.e. not
less than 25% of the scope of
Foundation+ Sub-structure of each
bridge suject to completion of atleast
#REF! two foundation along with sub-structure
upto abutment/pier cap level of each
bridge. In case where load test is
required for foundation, the trigger of
first payment shall include load testing
also where specified.
(ii) Super- Structure: On (ii) Super- Structure: Payment shall be
completion of the super- made on pro-rata basis on completion of
structure in all respects a stage i.e. completion of super-
including wearing coat, structure of atleast one span in all
expansion joint, hand rails, respect as specified in the column of "
crash barrier, road sign & Stage of Payment" in this sub- clause.
marking, tests on completion #REF!
etc. complete in all respect.

(iii) Approaches: On (iii) Approaches: Payment shall be


completion of appraches made on pro-rata basis on completion of
including Retaining walls, a stage i.e. completion of approaches in
stone pitching, protection all respect as specified in the column of
works complete in all respect #REF! " Stage of Payment" in this sub- clause.
and fit for use.

(iv) Guide Bunds and River (iv) Guide Bunds and River Training
Training works: On works: Payment shall be made on pro-
completion of Guide Bunds rata basis on completion of a stage i.e.
and river Training works completion of Guide Bunda and River
complete in all respects. #REF! training works in all respect as specified in
the column of " Stage of Payment" in this
sub- clause.

(v) Other Works

#REF!

B.1- Widening and Repair of Cost of each underpass/overpass shall


underpasses/ overpasses be determined on pro rata basis with
respect to the total linear length of the
under/overpass. Payment shall be made
#REF! on the completion of widening & repair
work of a underpass/overpass.

B.2- New underpasses/


overpasses
(i) Foundation + Sub- (i)Foundation+Substructure: Cost of
structure: On completion of each Underpass/Overpass shall be
the foundation work including determined on pro rata basis with
foundation for wing and return respect to the total linear (m) of the
walls, abutment, piers upto the Underpass/Overpass. Payment against
abutment/pier cap. foundation + substructure shall be made
on pro-rata basis on completion of a
stage i.e. not less than 25% of the scope
of Foundation+ Sub-structure of each
Underpass/overpasses suject to
completion of atleast two foundation
#REF! along with sub-structure upto
abutment/pier cap level of each
Underpass/overpass. In case where load
test is required for foundation, the
trigger of first payment shall include
load testing also where specified.

(ii) Super- Structure: Payment shall be


made on pro-rata basis on completion of
a stage i.e. completion of super-
structure of atleast one span in all
(ii) Super- Structure: On respect as specified in the column of "
completion of the super- Stage of Payment" in this sub- clause.
#REF!
structure in all respects
including wearing coat,
expansion joint, hand rails,
crash barrier, road sign &
marking, tests on completion
etc. complete in all respect.
Wearing Coat (a) in case of
Overpass- wearing coat
including expansion joint
complete in all respect as
specified and (b) in case of
underpass- rigid pavement
including drainage facility #REF!
complete in all respect as
specified as specified.
(iii) Approaches: Payment shall be
made on pro-rata basis on completion of
a stage i.e. completion of approaches in
(iii) Approaches: On all respect as specified in the column of
completion of appraches " Stage of Payment" in this sub- clause.
#REF!
including Retaining walls/
Reinforced Earth walls, stone
pitching, protection works
complete in all respect and fit
for use.
GOVERNMENT OF ANDRA PRADESH ROADS AND BUILDING DEPARTMENT
DIVISION- PEDDAPURAM
Cost Estimate for Road DPR Works Proposed under NDB Project (APMCRCIP) MDRs & ODRs Package 2,
Objective-2: Mandal Head Quarters to Adjoining Mandal Head Quarters
PROJECT NAME :- Rajupalem to Ramavaram road - EGMD087 (Km 0 to Km 11.83)
WIDENING OF EXISTING ROAD Length= 11.830 Kms.

BILL TOTAL AMOUNT TOTAL Weightage w.r.t


NO. DESCRIPTION (Rs.) AMOUNT to Civil Cost (%)
(Crores)
1 Cost of Road Works
a. Site-Clearance 755,967 0.076 0.28%
b. Earthwork 17,089,772 1.71 6.43%
c. Sub Base, Bases (Non Bituminous) & Shoulders 39,918,739 3.99 15.02%
d. Sub Base, Bases (Bituminous) 39,340,489 3.93 14.81%
e Cost of CC Pavement 26,133,163 2.61 9.84%
123,238,130 12.32 46.39%
2 Cost of Cross-Drainage structures
a. Major Bridges 68,494,583 6.85 25.78%
b. Minor Bridges 22,464,707 2.25 8.46%
c. Pipe Culverts,Slab Culverts & Box Culverts 35,777,821 3.58 13.47%
4 Traffic Signs, Marking and Road Appurtenances 4,853,634 0.49 1.83%
Street Lighting for Builtup section 0 0.00 0.00%
Cost of Retailing wall 7,320,655 0.73 2.76%
5 Cost of Junction Improvement 3,534,631 0.35 1.33%
Cost of Civil Works (Sub Total A) 265,684,160 26.57 100.00%
GST 12% 31,882,099 3.19
Total Cost with GST 12% 297,566,259 29.76
Per km Cost of Civil Works 25,153,530 2.52
6 Centages Charges
a Price Escalation (5% on Part A) 13,284,208 1.328
b Post Construction Maintenance Charges for 5Years 2,366,000 0.237
c L.S. for Avagahana sadassulu 5,000 0.001
d L.S. for Seigniorage charges 5,508,225 0.551
e LS Quality Control Charges @ 0.5% on Part A 1,328,421 0.133
f L.S. for Price adjustment @ 1 % on Part A 2,656,842 0.266
g L.S. for Provision for NAC @ 0.1 % on Part A 265,684 0.027
Centages 25,414,379 2.54
Total Project Cost 322,980,639 32.30
Per km Cost (of TPC) 27,301,829 2.73
7 LA,Utility Shifting and R&R Charges
b Electrical works & Water supply works 5,313,683 0.53
d Land acquisition and R&R cost 6,642,104 0.66
LA,Utility Shifting and R&R Charges 11,955,787 1.20
TOTAL CAPITAL COST OF THE PROJECT 334,936,426 33.49
Cost per km 28,312,462 2.83
PROJECT NAME :- Rajupalem to Ramavaram road - EGMD087 (Km 0 to Km 11.83)

loose Seigniorage
Quantity in Amount in
Si. No. Description of item Cum
quantity per Charges per
Rs.
cum unit

Road work
1 Earth work excavation 18434.0 1 30 553021
E/W for forming embankment with carted
2 34357 1 30 1030711
earth
3 GSB 9487.59 1.28 75 910809
4 WMM 12292.99 1.32 75 1217006
5 DBM 2993.63 1.46 75 327802
6 BC 1740.27 1.46 75 190560
7 DLC 2219.00
Metal 2219.00 0.9 75 149783
Sand 2219.00 0.45 50 49928
8 PQC 4438.00
Metal 4438.00 0.9 75 299565
Sand 4438.00 0.45 50 99855
9 VCC for foundations 4144.398 4144
Metal 4144.398 0.9 75 279747
Sand 4144.398 0.45 50 93249
10 VCC for Sub Structure 2181.2218 2181
Metal 2181.2218 0.9 75 147232
Sand 2181.2218 0.45 50 49077
11 VCC for Super Structure 1137.9566 1138
Metal 1137.9566 0.9 75 76812
Sand 1137.9566 0.45 50 25604
Total Rs. 5508225
Rajupalem to Ramavaram road - EGMD087

Existing Chainage Design Chainage


SR. Length Length Available Type of Name of village/
Land Use TCS No.
NO. (m) (m) ROW Terrain town
Km Km Km Km
1 0+000 0+300 0+300 0+000 0+300 0+300 12 Plain Built up RAUPALEM TCS-2B(a)
2 0+300 1+250 0+950 0+300 1+250 0+950 15 Plain Agriculture TCS-1B (a)
3 1+250 1+600 0+350 1+250 1+600 0+350 8.5 Plain Built up VEERAVARAM TCS-2B(a)
4 1+600 2+000 0+400 1+600 2+000 0+400 8.5 Plain Built up VEERAVARAM TCS-2D(a)
5 2+000 2+300 0+300 2+000 2+300 0+300 8.5 Plain Built up VEERAVARAM TCS-2B(a)
6 2+300 5+900 3+600 2+300 5+900 3+600 15 Plain Agriculture TCS-1B (a)
RAMCHANDRAP TCS-2B(a)
7 5+900 6+600 0+700 5+900 6+600 0+700 12 Plain Built up
URAM
8 6+600 6+900 0+300 6+600 6+900 0+300 12 Plain Agriculture TCS-1B (a)

9 6+900 7+220 0+320 6+900 7+220 0+320 10 Plain Built up GONEDA TCS-2B(a)
10 7+220 7+340 0+120 7+220 7+340 0+120 10 Plain Built up GONEDA TCS-2D(a)
11 7+340 7+500 0+160 7+340 7+500 0+160 10 Plain Built up GONEDA TCS-2B(a)
12 7+500 7+600 0+100 7+500 7+600 0+100 10 Plain Built up GONEDA TCS-2B(a)
13 7+600 11+050 3+450 7+600 11+050 3+450 15 Plain Agriculture TCS-1B (a)
14 11+050 11+064 0+014 11+050 11+350 0+300 12 Plain Built up RAMAVARAM TCS-2B(a)
15 11+064 11+079 0+015 11+350 11+550 0+200 12 Plain Built up RAMAVARAM TCS-2D(a)
16 11+079 11+830 0+751 11+550 11+830 0+280 12 Plain Built up RAMAVARAM TCS-2B(a)
Details of Quantities
Thickness/
Item No. Descriptions Unit Nos. Length Width Depth Quantity
CHAPTER-2
SITE CLEARANCE
Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees,
including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable
2.1 material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)

(i) Girth from 300 mm to 600 mm each 7 7.00


(ii) Girth from 600 mm to 900 mm each 81 81.00
(iii) Girth from 900 mm to 1800 mm each 469 469.00
(iv) Girth above 1800 mm each 51 51.00

Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting
rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of
stumps of trees cut earlier and disposal of unserviceable materials and stacking of
2.3 serviceable material to be used or auctioned up to a lead of 1000 metres including removal
and disposal of top organic soil not exceeding 150 mm in thickness.)

(ii) By Mechanical Means


A In area of light jungle hectare
TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) hectare 1 8300.00 1.850 - 1.54
TCS-2B(a)- Widening Flexible road to Rigid Pavement (Built up area) hectare 1 2810.00 0.00 0.00
TCS-2D(a) Widening Rigid to Rigid Pavement(Built up Area-PQC in Fair Condition) hectare 1 720.00 0.00 0.00
TOTAL 1.54
Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth,
2.10 foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back
filling of pit.)

A 5th KM stone each 2 2.00


B Ordinary KM Stone each 9 9.00
C Hectometre Stone each 47 47.00
CHAPTER-3
EARTH WORK, EROSION CONTROL AND DRAINAGE
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000
metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity
including cutting and loading in tippers, trimming bottom and side slopes, in accordance
3.6 with requirements of lines, grades and cross sections, and transporting to the embankment cum From Earthwork Calculation 17881.02
location within all lifts and lead upto 1000m)

Excavation in Ordinary Rockusing Hydraulic ExcavatorCK-90 and Tippers with disposal


upto 1000 metres. (Excavation for roadway in ordinary rock with hydraulic excavator of 0.9
cum bucket capacity including cutting and loading in tippers, transporting to embankment
3.7 site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance cum From Earthwork Calculation 368.68
with requirements of lines, grades and cross sections.)

Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres (Excavation
for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of
bottom and side slopes in accordance with requirements of lines, grades and cross sections,
3.5 loading and disposal of cut road with in all lifts and leads upto 1000 metres ) cum From Earthwork Calculation 184.34

Scarifying existing bituminous surface to a depth of 50 mm by mechanical means


(Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of
3.15 scarified material with in all lifts and lead upto 1000 metres.)

TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) sqm 1 8300.00 3.50 29050.00
TCS-2B(a)- Widening Flexible road to Rigid Pavement (Built up area) sqm 1 2810.00 3.50 - 9835.00
TCS-2D(a) Widening Rigid to Rigid Pavement(Built up Area-PQC in Fair Condition) sqm 1 720.00
TOTAL 38885.00
Embankment Construction with Material Obtained from Borrow Pits (Construction of
embankment with approved material obtained from borrow pits with all lifts and leads,
3.16 transporting to site, spreading, grading to required slope and compacting to meet cum
requirement of table 300-2)

As per Earthwork Calculation (Vol. of filling) cum 7185.78


Deduct quantity available for reuse from roadway cutting ( Take 39.4% qty. of excavated
soil & Ordinary rock) cum 7190.38

TOTAL 0
Construction of Embankment with Material Deposited from Roadway Cutting
(Construction of embankment with approved materials deposited at site from roadway
3.17 cutting and excavation from drain and foundation of other structures graded and cum 7190.38
compacted to meet requirement of table 300-2)

TOTAL 7190.38
Page 47 of 101
Details of Quantities
Thickness/
Item No. Descriptions Unit Nos. Length Width Depth Quantity
Construction of Subgrade and Earthen Shoulders
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen
shoulders with approved material obtained from borrow pits with all lifts & leads,
3.18 transporting to site, spreading, grading to required slope and compacted to meet cum
requirement of table No. 300-2)

For Subgrade (CBR > 8%)


TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) Cum 2 8300.00 3.21 0.30 15985.80
TCS-2B(a)- Widening Flexible road to Rigid Pavement (Built up area) Cum 2 2810.00 0.00 0.50 0.00
TCS-2D(a) Widening Rigid to Rigid Pavement(Built up Area-PQC in Fair Condition) Cum 2 720.00 0.00 0.50 0.00
Curve Improvement Cum 1 1772.53 0.50 886.27
Earthen Shoulders Length Area
TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) Cum 2 8300.00 0.547 - 9080.20
TCS-2B(a)- Widening Flexible road to Rigid Pavement (Built up area) Cum 2 2810.00 0.300 - 1686.00

TCS-2D(a) Widening Rigid to Rigid Pavement(Built up Area-PQC in Fair Condition) Cum 2 720.00 0.300 - 432.00
Deduction for Structures cum 1 301.20 10.00 0.30 903.60
TOTAL 27166.67
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area
0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of
3.24 clause 301 and 309. Excavated material to be used in embankment within a lead of50
metres (average lead 25 metres))

A Mechanical means
TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) metre 2 8300.00 16600.00
TOTAL 16600.00

CHAPTER-4
SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 1) Plant Mix Method
(Construction of granular sub-base by providing close graded Material, mixing in a
mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform
4.1-A layers with motor grader on prepared surface and compacting with vibratory power roller
to achieve the desired density, complete as per clause 401 )

(i) for grading-v Material


For Drainage Layer
TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) cum 2 8300.00 2.56 0.150 6374.40
TCS-2B(a)- Widening Flexible road to Rigid Pavement (Built up area) cum 2 2810.00 3.650 0.100 2051.30
TCS-2B(a)- Widening Flexible road to Rigid Pavement (Built up area) cum 2 2810.00 1.900 0.100 1067.80
TCS-2D(a) Widening Rigid to Rigid Pavement(Built up Area-PQC in Fair Condition) cum 2 720.00 1.900 0.100 273.60
Curve Improvement Cum 1 1772.53 0.150 265.88
Deduction for Structures cum 2 266.20 3.500 0.150 279.51
TOTAL 9487.59

4.12 Wet Mix Macadam


(Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-
base / base course on well prepared surface and compacting with vibratory roller to achieve
the desired density.)

WMM-1
TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) 2 8300.00 3.60 0.15 8964.00
cum
Curve Improvement Cum 1 1772.53 0.150 265.88
Deduction for Structures cum 2 266.20 3.600 0.15 -287.50
WMM-2
TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) Cum 2 8300.00 1.975 0.100 3278.50
Curve Improvement Cum 1 1772.53 0.100 177.25
Deduction for Structures cum 2 266.20 1.975 0.10 -105.15
TOTAL 12292.99

CHAPTER-5
BASES AND SURFACE COURSES (BITUMINOUS)
5.1 Prime coat
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface
of granular Base including clearing of road surface and spraying primer at the rate of 0.60
kg/sqm using mechanical means.)

TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) sqm 2 8300.00 3.5 - 58100.00
Deduction for Structures sqm 2 266.20 0.000

Page 48 of 101
Details of Quantities
Thickness/
Item No. Descriptions Unit Nos. Length Width Depth Quantity

TOTAL 58100.00
5.6 Dense Graded Bituminous Macadam
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with
100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by
weight of total mix of mix and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired
compaction as per MoRTH

a) Using Batch Mix Plnt of appropriate capacity and


Paver finisher Hydraustatic with Sensor.
(i) for Grading I(50 mm nominal size )

TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) cum 2 8300.00 3.50 0.05 2905.00
Curve Improvement 1 1772.53 0.05 88.63
Deduction for Structures cum 2 266.20 0.000 0.05 0.00
TOTAL 2993.63
Grand Total 2993.63

Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor
at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with
5.2 mechanical broom.

Below DBM
TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) sqm 2 8300.00 3.60 - 59760.00
Deduction for Structures sqm 0 266.20 3.600 0.00
TOTAL 59760.00
Over DBM
TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) sqm 2 8300.00 3.50 - 58100.00
Deduction for Structures sqm 0 266.20 3.500 0.00
TOTAL 58100.00
GRAND
117860.0
TOTAL
Bituminous Concrete
Providing and laying bituminous concrete using crushed aggregates of specified grading,
premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix
to work site, laying with a hydrostatic paver finisher with sensor control to the required
grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to
5.8 achieve the desired compaction as per clause 507 of specification.
a) Using Batch Mix Plant of appropriate capacity andPaver Finisher Hydraustatic with Sensor
control.
(i) for Grading-I ( 50-65 mm thickness ) with 60/70bitumen (VG-30)

TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) cum 2 8300.00 3.50 0.03 1743.00
Curve Improvement 1 1772.53 0.03 53.18
Deduction for Structures cum -2 266.20 3.500 0.03 -55.90
TOTAL 1740.27

CHAPTER-6
CEMENT CONCRETE PAVEMENTS
Dry Lean Cement Concrete Sub- base Dry Lean Cement Concrete Sub- base (Construction of
dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine
aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per
table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to
be determined during trial length construction, concrete strength not to be less than 10
6.1 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with
electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)

TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) cum 2 8300.00 0.00
TCS-2B(a)- Widening Flexible road to Rigid Pavement (Built up area) cum 2 2810.00 3.50 0.10 1967.00
TCS-2D(a) Widening Rigid to Rigid Pavement(Built up Area-PQC in Fair Condition) cum 2 720.00 1.75 0.10 252.00
TOTAL 2219.00

Page 49 of 101
Details of Quantities
Thickness/
Item No. Descriptions Unit Nos. Length Width Depth Quantity
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement
concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum,
coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not
exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design,
transported to site, laid with a fixed form or slip form paver, spread, compacted and
finished in a continuous operation including provision of contraction, expansion,
6.2 construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint
sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound,
finishing to lines and grades as per drawing )

TCS-1B(a) -Widening Flexible to Flexible Pavement (Open Area) cum 2 8300.00 0.00
TCS-2B(a)- Widening Flexible road to Rigid Pavement (Built up area) cum 2 2810.00 3.50 0.20 3934.00
TCS-2D(a) Widening Rigid to Rigid Pavement(Built up Area-PQC in Fair Condition) cum 2 720.00 1.75 0.20 504.00
TOTAL 4438.00

CHAPTER-8
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES
Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective
sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a
mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of
8.4 properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60
cm below ground level as per approved drawing)

(i) 90 cm equilateral triangle each 47 47.00


( ii ) 60 cm equilateral triangle each 7 7.00
( iii ) 60 cm circular each 177 177.00
( iv ) 80 cm x 60 cm rectangular each 12 12.00
(v) 60 cm x 45 cm rectangular each 28 28.00
(vi ) 60 cm x 60 cm square each 12 12.00
( vii ) 90 cm high octagon each 7 7.00
Direction and Place Identification signs upto 0.9 sqm size board.Direction and Place
Identification signs upto 0.9 sqm size board. (Providing and erecting direction and place
identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective
sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not
exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly
8.5 fixed to the ground by means of properly designed foundation with M15 grade cement sqm 18 18.00
concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing)

Direction and Place Identification signs with size more than 0.9 sqm size board. (Providing
and erecting direction and place identification retro- reflectorised sign asper IRC :67 made
of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium
sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post
8.6 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed sqm 33 33.00
foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground
level as per approved drawing)

Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads
on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5
mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm
8.13 is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, sqm 5770.00 5770.00
uniform and free from streaks and holes.)

Kilo Metre StoneReinforced cement concrete M15grade kilometre stone of standard design
8.14 as per IRC:8-1980, fixing in position including painting and printing etc)

(i) 5th kilometre stone (precast) each 2.00 2.00


(ii) Ordinary Kilometer stone (Precast) each 9.00 9.00
(iii) Hectometer stone (Precast) each 47.00 47.00

Road Delineators Supplying and installation of delineators (road way indicators, hazard
markers, object markers), 80-100 cm high above ground level, painted black and white in 15
cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised
8.15 panels at the top, buried or pressed into the ground and confirming toIRC-79 and the each 158 158.00
drawings.)

Page 50 of 101
Details of Quantities
Thickness/
Item No. Descriptions Unit Nos. Length Width Depth Quantity
Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct,
300 mm dia, across the road (new construction), extending from drain to drain in cuts and
toe of slope to toe of slope in fills, constructing head walls at both ends, providing a
minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded
on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of
pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row
8.29 ducts, joints to be made leak proof, invert level of duct to be above higher than ground
level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.)

(i) Single Row for one utility service


In Open Area metre 1 16.60 15.00 249.00
(ii) Double Row for two utility services TOTAL 249.00
In Builtup Area metre 1 14.12 15.00 211.80
TOTAL 211.80
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100
mm, die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense
reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of
8.35 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part each 1822 1822.00
4:1973)

Page 51 of 101
Bill of Quantities
S.No. Item No. Descriptions Unit Quantity Rate Amount
CHAPTER-2
SITE CLEARANCE
Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees,
including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable
2.1 material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)

1.01 (i) Girth from 300 mm to 600 mm each 7.00 334.00 2338.00
(ii) Girth from 600 mm to 900 mm each 81.00 578.00 46818.00
(iii) Girth from 900 mm to 1800 mm each 469.00 1153.00 540757.00
(iv) Girth above 1800 mm each 51.00 2210.00 112710.00

Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of
trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to
2.3 be used or auctioned up to a lead of 1000 metres including removal and disposal of top
1.02 organic soil not exceeding 150 mm in thickness.)

(ii) By Mechanical Means


A In area of light jungle hectare 1.54 30647.00 47058.47

Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth,


foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back
2.10 filling of pit.)

1.03
A 5th KM stone each 2.00 484.00 968.00
B Ordinary KM Stone each 9.00 288.00 2592.00
C Hectometre Stone each 47.00 58.00 2726.00

TOTAL AMOUNT OF SITE CLEARANCE 755967.00

CHAPTER-3
EARTH WORK, EROSION CONTROL AND DRAINAGE
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000
metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity
including cutting and loading in tippers, trimming bottom and side slopes, in accordance with
3.6 requirements of lines, grades and cross sections, and transporting to the embankment location cum 17881.02 105.00 1877507
2.01-a within all lifts and lead upto 1000m)

As per Earthwork Calculation

Excavation in Ordinary Rockusing Hydraulic ExcavatorCK-90 and Tippers with disposal upto
1000 metres. (Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum
bucket capacity including cutting and loading in tippers, transporting to embankment site
3.7 within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with cum 368.68 134.00 49403
2.01-b requirements of lines, grades and cross sections.)

As per Earthwork Calculation


From
Earthwork
Calculation
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres (Excavation for
roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of
bottom and side slopes in accordance with requirements of lines, grades and cross sections,
3.5 loading and disposal of cut road with in all lifts and leads upto 1000 metres ) cum 184.34 187.00 34471.66
2.01-c

Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying


the existing bituminous road surface to a depth of 50 mm and disposal of scarified material
2.01-d 3.15 with in all lifts and lead upto 1000 metres.) sqm 38885.00 8.00 311080.00

Embankment Construction with Material Obtained from Borrow Pits (Construction of


embankment with approved material obtained from borrow pits with all lifts and leads,
2.02 3.16 transporting to site, spreading, grading to required slope and compacting to meet requirement cum 0.00 382.00 0.00
of table 300-2)

Construction of Embankment with Material Deposited from Roadway Cutting (Construction


of embankment with approved materials deposited at site from roadway cutting and
2.03 3.17 excavation from drain and foundation of other structures graded and compacted to meet cum 7190.38 141.00 1013843.92
requirement of table 300-2)

Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen


shoulders with approved material obtained from borrow pits with all lifts & leads, transporting
3.18 to site, spreading, grading to required slope and compacted to meet requirement of table No. cum 27166.67 436.00 11844666.38
2.04 300-2)

(Subgrade only)

Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area
0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause
3.24 301 and 309. Excavated material to be used in embankment within a lead of50 metres
2.05 (average lead 25 metres))

A Mechanical means metre 16600.00 118.00 1958800.00

Page 52 of 101
Bill of Quantities
S.No. Item No. Descriptions Unit Quantity Rate Amount
TOTAL AMOUNT OF EARTH WORK, EROSION CONTROL AND DRAINAGE 17089772.00

CHAPTER-4
SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 1) Plant Mix Method
(Construction of granular sub-base by providing close graded Material, mixing in a mechanical
mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with
4.1-A motor grader on prepared surface and compacting with vibratory power roller to achieve the
3.01 desired density, complete as per clause 401 )

(i) for grading-v Material cum 9487.59 1642.00 15578623

4.12 Wet Mix Macadam


(Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant
3.02 carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base /
base course on well prepared surface and compacting with vibratory roller to achieve the Cum 12292.99 1980.00 24340116
desired density.)

TOTAL AMOUNT OF SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS 39918739


CHAPTER-5
BASES AND SURFACE COURSES (BITUMINOUS)
5.1 Prime coat
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of
4.01 granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm
using mechanical means.) sqm 58100.00 39.00 2265900.00

5.6 Dense Graded Bituminous Macadam


Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with
100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by
weight of total mix of mix and filler, transporting the hot mix to work site, laying with a
4.02 hydrostatic paver finisher with sensor control to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction cum 2993.63 7203.00 21563092.40
as per MoRTH specification clause No. 507 complete in all respects.)
(i) for Grading I(40 mm nominal size )

5.2 Tack coat


Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at
4.03 the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with
mechanical broom. sqm 117860.00 10.00 1178600.00

5.8 Bituminous Concrete


Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type
hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler,
transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor
control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
4.04 tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509
complete in all respects) for Grading-I ( 13 mm nominal size ) cum 1740.27 8236.00 14332896.33
(i) for Grading-I ( 50-65 mm thickness ) with 60/70bitumen (VG-30)

TOTAL BASES AND SURFACE COURSES (BITUMINOUS) 39340488.73

CHAPTER-6
CEMENT CONCRETE PAVEMENTS
Dry Lean Cement Concrete Sub- base
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over
a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse
aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate
gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/
5.01 6.1 cum, optimum moisture content to be determined during trial length construction, concrete cum 2219.00 2567.00 5696173
strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site,
laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing
and curing.)

Cement Concrete Pavement


Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement
concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse
and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25
mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid
with a fixed form or slip form paver, spread, compacted and finished in a continuous operation
including provision of contraction, expansion, construction and longitudinal joints, joint filler,
5.02 6.2 separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, cum 4438.00 4605.00 20436990
admixtures as approved, curing compound, finishing to lines and grades as per drawing )

TOTAL AMOUNT OF CEMENT CONCRETE PAVEMENTS 26133163.00

CHAPTER-8

Page 53 of 101
Bill of Quantities
S.No. Item No. Descriptions Unit Quantity Rate Amount
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES
Retro- reflectorised Traffic signs
Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective
sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild
8.4 steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below
ground level as per approved drawing)

6.01 (i) 90 cm equilateral triangle Cautionary/Warning Sign each 47.00 2052.00 96444.00
(ii) 60 cm equilateral triangle Cautionary/Warning Sign each 7.00 1869.00 13083.00
(iii) 60 cm circular 'Mandatory/Regulatory Signs each 177.00 1988.00 351876.00
(iv) 80 cm x 60 cm rectangular Informatory Signs each 12.00 2174.00 26088.00
(v) 60 cm x 45 cm rectangular Informatory Signs/Cheveron Sign each 28.00 1976.00 55328.00
(vi) 60 cm x 60 cm square Informatory Signs each 12.00 2061.00 24732.00
(vii) 90 cm high octagon Stop Signs each 7.00 2355.00 16485.00

Direction and Place Identification signs upto 0.9 sqm size


board.
Direction and Place Identification signs upto 0.9 sqm size board. (Providing and erecting
direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated
lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with
6.02 8.5 area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm sqm 18.00 2835.00 51030.00
firmly fixed to the ground by means of properly designed foundation with M15 grade cement
concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing)

Direction and Place Identification signs with size more than 0.9 sqm size board.
(Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67
made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium
sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75
6.03 8.6 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed sqm 33.00 5281.00 174273.00
foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level
as per approved drawing)

Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on
Bituminous Surface
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on
Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick
including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive
6.04 8.13 of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free sqm 5770.00 264.00 1523280.00
from streaks and holes.)

Kilo Metre Stone Reinforced cement concrete M15 grade kilometre stone of standard design
8.14 as per IRC:8-1980, fixing in position including painting and printing etc)
(i) (i) 5th kilometre stone (precast) each 2.00 3572.00 7144.00
6.05 (ii) (ii) Ordinary Kilometer stone (Precast) each 9.00 2123.00 19107.00
(iii) (iii) Hectometer stone (Precast) each 47.00 609.00 28623.00
(iv) (iv) Boundary Stone each 0.00 556.00 0.00

Road Delineators
Supplying and installation of delineators (road way indicators, hazard markers, object
markers), 80-100 cm high above ground level, painted black and white in 15 cm wide stripes,
6.06 8.15 fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, each 158.00 1408.00 222464.00
buried or pressed into the ground and confirming toIRC-79 and the drawings.)

Cable Duct Across the Road


Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road
(new construction), extending from drain to drain in cuts and toe of slope to toe of slope in
fills, constructing head walls at both ends, providing a minimum fill of granular material over
top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular
material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to
8.29 minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert
6.10 level of duct to be above higher than ground level to prevent entry of water and dirt, all as per
IRC: 98 - 1997 and approved drawings.)

(i) Single Row for one utility service metre 249.00 2561.00 637689.00
(ii) Double Row for two utility services metre 211.80 4890.00 1035702.00

Road Markers/Road Stud with Lense Reflector


(Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant to corrosive
effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by
6.11 8.35 drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or each 1822.00 313.00 570286.00
epoxy mortar, all as per BS 873 part 4:1973)

TOTAL AMOUNT OF TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES 4853634.00

Page 54 of 101
Rajupalem to Ramavaram road - EGMD087
EARTHWORK CALCULATION SHEET
Total Cutting in Cum 18434.04 Total Filling in Cum 7185.78
Quantity of fill from emb Construction from
Excavation in Soil 97 %in Cum 17881 Borrow Area
0
Embankment with 39.4 % Material Deposited
Excavation in Ordinary Rock 2 %in Cum 369 from Roadway Cutting (CBR >5%)
7190
Quantity for construction of subgrade
Excavation in Hard Rock 1 %in Cum 184 (CBR>8%) as per TCS
27167

Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
0+000 0.00 2.40 0.00 0.00 0.00 0.00 0.00
0+010 10.00 1.48 0.77 19.43 3.84 19.43 3.84
0+013 2.95 1.92 0.00 4.96 1.25 4.96 1.25
0+016 3.53 1.48 0.55 5.92 1.08 5.92 1.08
0+020 3.53 1.79 0.40 5.61 1.86 5.61 1.86
0+025 4.92 1.90 0.00 9.09 0.98 9.09 0.98
0+030 5.08 1.92 0.00 9.69 0.00 9.69 0.00
0+033 3.32 1.80 0.04 6.16 0.06 6.16 0.06
0+035 1.94 1.94 0.06 3.74 0.07 3.74 0.07
0+038 2.37 1.90 0.09 4.70 0.14 4.70 0.14
0+038 0.20 1.89 0.09 0.38 0.01 0.38 0.01
0+040 2.18 1.80 0.12 4.14 0.18 4.14 0.18
0+043 3.33 1.59 0.16 5.81 0.37 5.81 0.37
0+045 1.73 1.63 0.20 2.85 0.24 2.85 0.24
0+047 1.60 1.75 0.08 2.75 0.17 2.75 0.17
0+050 3.33 1.70 0.10 5.74 0.31 5.74 0.31
0+053 3.29 1.73 0.09 5.60 0.38 5.60 0.38
0+057 3.29 1.31 0.61 5.00 1.15 5.00 1.15
0+060 3.42 1.67 0.32 5.09 1.59 5.09 1.59
0+070 9.99 1.29 0.77 14.73 5.83 14.73 5.83
0+070 0.01 1.29 0.77 0.02 0.01 0.02 0.01
0+073 3.33 1.31 0.86 4.31 2.98 4.31 2.98
0+077 3.33 1.81 0.01 5.19 1.59 5.19 1.59
0+080 3.33 1.63 0.48 5.71 0.93 5.71 0.93
0+083 3.33 1.56 0.51 5.28 1.89 5.28 1.89
0+087 3.33 1.81 0.29 5.53 1.53 5.53 1.53
0+090 3.33 1.88 0.38 6.03 1.28 6.03 1.28
0+092 1.56 2.11 0.50 3.12 0.69 3.12 0.69
0+099 7.57 1.40 0.38 13.29 3.31 13.29 3.31
0+100 0.87 1.52 0.45 1.27 0.36 1.27 0.36
0+100 0.36 1.57 0.48 0.56 0.16 0.56 0.16
0+110 9.64 2.27 0.01 18.57 2.26 18.57 2.26
0+115 5.00 1.83 0.35 10.28 0.86 10.28 0.86
0+120 5.00 1.71 0.16 8.93 1.21 8.93 1.21
0+125 5.00 1.87 0.12 9.01 0.67 9.01 0.67
0+125 0.34 1.87 0.12 0.63 0.04 0.63 0.04
0+130 4.66 1.68 0.26 8.30 0.84 8.30 0.84
0+135 5.00 1.53 0.17 8.04 1.03 8.04 1.03
0+139 4.48 1.47 0.29 6.72 1.01 6.72 1.01
0+140 0.53 1.48 0.31 0.78 0.15 0.78 0.15
0+145 5.00 1.61 0.15 7.70 1.15 7.70 1.15
0+150 5.00 1.60 0.25 7.98 1.04 7.98 1.04
0+153 2.86 1.61 0.49 4.58 1.07 4.58 1.07
0+155 2.14 1.43 0.44 3.24 1.01 3.24 1.01
0+160 5.00 1.38 0.55 6.98 2.52 6.98 2.52
0+162 1.89 1.59 0.37 2.79 0.89 2.79 0.89
0+165 3.11 1.53 0.39 4.83 1.23 4.83 1.23
0+170 5.00 1.48 0.46 7.50 2.18 7.50 2.18
0+177 6.88 1.37 0.61 9.77 3.68 9.77 3.68
0+180 3.12 1.35 0.66 4.24 1.99 4.24 1.99
0+181 0.60 1.41 0.67 0.82 0.40 0.82 0.40
0+184 3.60 1.44 0.66 5.13 2.40 5.13 2.40
0+190 5.80 1.92 0.00 9.73 1.93 9.73 1.93
0+193 3.21 2.11 0.00 6.46 0.01 6.46 0.01
0+200 6.79 2.16 0.32 14.51 1.05 14.51 1.05
0+204 4.20 2.08 0.07 8.93 0.80 8.93 0.80
0+210 5.80 2.03 0.00 11.94 0.20 11.94 0.20
0+220 9.51 1.72 0.05 17.84 0.21 17.84 0.21

Page 55 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
0+220 0.49 1.71 0.05 0.83 0.02 0.83 0.02
0+230 10.00 1.60 0.24 16.52 1.43 16.52 1.43
0+240 10.00 1.69 0.16 16.44 1.98 16.44 1.98
0+244 3.63 1.71 0.12 6.16 0.51 6.16 0.51
0+250 6.37 1.61 0.14 10.56 0.82 10.56 0.82
0+260 9.51 1.54 0.44 15.00 2.74 15.00 2.74
0+260 0.49 1.55 0.44 0.75 0.21 0.75 0.21
0+264 3.63 1.57 0.41 5.65 1.54 5.65 1.54
0+270 6.37 1.60 0.35 10.08 2.42 10.08 2.42
0+280 10.00 2.69 0.15 21.46 2.51 21.46 2.51
0+290 10.00 1.65 0.61 21.73 3.80 21.73 3.80
0+300 10.00 1.42 0.76 15.37 6.82 15.37 6.82
0+310 10.00 1.37 0.88 13.93 8.16 13.93 8.16
0+320 10.00 0.91 1.11 11.39 9.93 11.39 9.93
0+330 10.00 1.96 0.49 14.37 7.99 14.37 7.99
0+336 5.64 1.78 0.50 10.56 2.78 10.56 2.78
0+340 4.36 1.56 0.52 7.28 2.21 7.28 2.21
0+344 4.19 1.60 0.29 6.62 1.69 6.62 1.69
0+346 1.62 1.49 0.36 2.50 0.53 2.50 0.53
0+350 4.19 2.18 0.51 7.71 1.83 7.71 1.83
0+360 10.00 1.18 1.27 16.79 8.88 16.79 8.88
0+366 5.81 1.59 0.65 8.04 5.58 8.04 5.58
0+367 1.10 1.62 0.57 1.76 0.67 1.76 0.67
0+370 3.10 1.66 0.43 5.07 1.55 5.07 1.55
0+380 10.00 1.38 0.57 15.23 4.99 15.23 4.99
0+387 6.90 1.52 0.83 10.01 4.83 10.01 4.83
0+390 3.10 1.41 0.92 4.52 2.71 4.52 2.71
0+400 10.00 1.81 0.59 16.07 7.55 16.07 7.55
0+410 10.00 2.05 0.48 19.30 5.34 19.30 5.34
0+420 10.00 1.30 0.13 16.77 3.05 16.77 3.05
0+430 10.00 1.89 0.46 15.95 2.96 15.95 2.96
0+440 10.00 1.47 0.72 16.81 5.90 16.81 5.90
0+443 3.43 1.46 0.08 5.02 1.37 5.02 1.37
0+450 6.57 1.04 1.00 8.19 3.55 8.19 3.55
0+460 10.00 0.77 1.48 9.07 12.37 9.07 12.37
0+463 3.43 0.67 1.54 2.49 5.15 2.49 5.15
0+464 0.65 0.45 1.55 0.37 1.00 0.37 1.00
0+469 4.49 0.44 1.89 2.00 7.70 2.00 7.70
0+470 1.43 0.62 0.96 0.75 2.04 0.75 2.04
0+480 10.00 1.08 1.02 8.49 9.99 8.49 9.99
0+489 8.57 1.18 0.66 9.70 7.20 9.70 7.20
0+490 1.43 1.26 0.51 1.75 0.83 1.75 0.83
0+494 4.08 1.64 0.19 5.90 1.42 5.90 1.42
0+500 5.92 1.29 0.79 8.67 2.90 8.67 2.90
0+510 10.00 1.52 0.60 14.03 6.95 14.03 6.95
0+520 10.00 1.85 0.47 16.81 5.34 16.81 5.34
0+530 10.00 1.21 1.14 15.26 8.04 15.26 8.04
0+540 9.56 1.51 0.24 12.98 6.61 12.98 6.61
0+540 0.44 1.45 0.23 0.65 0.10 0.65 0.10
0+542 2.08 1.12 0.15 2.66 0.39 2.66 0.39
0+550 7.92 1.40 0.74 9.97 3.50 9.97 3.50
0+554 4.21 1.56 0.75 6.25 3.13 6.25 3.13
0+560 5.79 1.70 0.24 9.45 2.87 9.45 2.87
0+564 4.47 1.69 0.26 7.58 1.11 7.58 1.11
0+570 5.53 1.64 0.39 9.22 1.77 9.22 1.77
0+580 10.00 1.48 0.57 15.63 4.70 15.63 4.70
0+582 2.08 1.47 0.59 3.07 1.17 3.07 1.17
0+590 7.92 1.44 1.09 11.56 6.60 11.56 6.60
0+597 7.27 1.47 0.57 10.57 6.04 10.57 6.04
0+598 0.93 1.48 0.58 1.37 0.54 1.37 0.54
0+600 1.80 1.50 0.60 2.68 1.06 2.68 1.06
0+610 10.00 1.57 0.38 15.33 4.88 15.33 4.88
0+613 2.65 1.53 0.47 4.11 1.11 4.11 1.11
0+620 7.35 1.37 0.84 10.66 4.79 10.66 4.79
0+628 8.20 1.27 0.46 10.81 5.34 10.81 5.34
0+630 1.80 1.19 0.52 2.22 0.89 2.22 0.89
0+637 7.27 1.14 0.65 8.44 4.27 8.44 4.27
0+640 2.73 1.41 0.26 3.48 1.25 3.48 1.25
0+650 10.00 1.38 0.83 13.95 5.47 13.95 5.47
0+658 7.91 1.36 0.82 10.83 6.53 10.83 6.53

Page 56 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
0+660 2.09 1.344 0.92 2.83 1.82 2.83 1.82
0+669 8.95 1.155 1.442 11.18 10.56 11.18 10.56
0+670 1.05 1.647 1.304 1.48 1.45 1.48 1.45
0+680 9.70 2.322 0.349 19.24 8.02 19.24 8.02
0+680 0.30 2.357 0.304 0.71 0.10 0.71 0.10
0+690 10.00 1.772 0.398 20.65 3.51 20.65 3.51
0+700 10.00 1.758 0.438 17.65 4.18 17.65 4.18
0+710 10.00 1.485 0.352 16.21 3.95 16.21 3.95
0+720 10.00 1.499 0.383 14.92 3.67 14.92 3.67
0+720 0.12 1.499 0.384 0.18 0.05 0.18 0.05
0+727 6.88 1.385 0.842 9.93 4.22 9.93 4.22
0+730 2.99 1.494 0.504 4.31 2.02 4.31 2.02
0+740 10.00 1.618 0.499 15.56 5.02 15.56 5.02
0+750 10.00 1.192 1.193 14.05 8.46 14.05 8.46
0+750 0.12 1.211 1.193 0.15 0.15 0.15 0.15
0+760 9.88 1.342 0.86 12.61 10.14 12.61 10.14
0+770 10.00 1.316 0.93 13.29 8.95 13.29 8.95
0+780 10.00 1.683 0.554 14.99 7.42 14.99 7.42
0+790 10.00 1.179 1.427 14.31 9.90 14.31 9.90
0+795 5.14 1.495 1.062 6.87 6.40 6.87 6.40
0+800 4.86 1.145 1.321 6.41 5.79 6.41 5.79
0+806 6.46 1.196 0.498 7.56 5.88 7.56 5.88
0+810 3.54 1.303 0.311 4.42 1.43 4.42 1.43
0+820 10.00 1.642 0.451 14.73 3.81 14.73 3.81
0+825 5.14 1.292 0.952 7.54 3.61 7.54 3.61
0+830 4.86 1.267 0.751 6.22 4.14 6.22 4.14
0+836 6.37 1.623 0.47 9.20 3.89 9.20 3.89
0+840 3.63 1.678 0.299 5.99 1.40 5.99 1.40
0+850 10.00 1.533 0.522 16.05 4.10 16.05 4.10
0+860 10.00 1.339 0.528 14.36 5.25 14.36 5.25
0+866 6.37 1.689 0.155 9.64 2.17 9.64 2.17
0+869 2.64 1.663 0.253 4.42 0.54 4.42 0.54
0+870 0.99 1.647 0.298 1.64 0.27 1.64 0.27
0+880 10.00 1.653 0.178 16.51 2.37 16.51 2.37
0+890 10.00 1.702 0.061 16.79 1.18 16.79 1.18
0+894 4.01 1.665 0.03 6.75 0.18 6.75 0.18
0+895 0.79 1.675 0.023 1.31 0.02 1.31 0.02
0+896 1.40 1.697 0.015 2.36 0.03 2.36 0.03
0+900 3.80 1.464 0.534 6.02 1.05 6.02 1.05
0+910 10.00 2.795 0 21.25 2.67 21.25 2.67
0+920 10.00 1.523 0.322 21.54 1.61 21.54 1.61
0+921 1.20 1.793 0.032 1.98 0.21 1.98 0.21
0+925 3.66 1.788 0.038 6.55 0.13 6.55 0.13
0+930 5.15 1.33 0.671 8.02 1.83 8.02 1.83
0+940 10.00 1.512 0.438 14.21 5.55 14.21 5.55
0+950 10.00 1.489 0.43 15.01 4.34 15.01 4.34
0+960 10.00 1.601 0.273 15.45 3.52 15.45 3.52
0+970 10.00 1.521 0.41 15.61 3.42 15.61 3.42
0+980 10.00 1.586 0.647 15.53 5.29 15.53 5.29
0+990 10.00 1.744 0.212 16.65 4.30 16.65 4.30
0+998 7.99 1.474 1.063 12.86 5.10 12.86 5.10
1+000 2.01 1.306 1.171 2.79 2.24 2.79 2.24
1+006 5.56 1.973 0.476 9.12 4.58 9.12 4.58
1+010 4.44 1.282 0.605 7.22 2.40 7.22 2.40
1+018 7.99 1.013 1.331 9.17 7.73 9.17 7.73
1+020 2.01 1.084 0.977 2.11 2.32 2.11 2.32
1+021 0.71 1.293 0.931 0.84 0.68 0.84 0.68
1+022 1.72 1.51 0.493 2.41 1.23 2.41 1.23
1+030 7.57 1.463 0.542 11.25 3.93 11.25 3.93
1+031 0.99 1.455 0.555 1.44 0.54 1.44 0.54
1+040 9.01 1.491 0.818 13.27 6.19 13.27 6.19
1+040 0.43 1.459 0.844 0.63 0.36 0.63 0.36
1+050 9.57 1.717 0.269 15.20 5.32 15.20 5.32
1+052 2.50 1.719 0.277 4.29 0.68 4.29 0.68
1+060 7.50 1.535 0.943 12.20 4.57 12.20 4.57
1+060 0.29 1.542 0.911 0.45 0.27 0.45 0.27
1+070 9.71 1.675 0.412 15.61 6.42 15.61 6.42
1+072 2.19 1.691 0.374 3.69 0.86 3.69 0.86
1+080 7.81 1.701 0.343 13.24 2.80 13.24 2.80
1+090 10.00 1.23 0.207 14.66 2.75 14.66 2.75

Page 57 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
1+090 0.29 1.243 0.241 0.36 0.07 0.36 0.07
1+097 6.90 1.302 0.893 8.80 3.89 8.80 3.89
1+100 2.81 0.902 0.371 3.10 1.77 3.10 1.77
1+101 0.97 0.938 0.364 0.89 0.36 0.89 0.36
1+110 9.03 1.018 1.048 8.84 6.38 8.84 6.38
1+120 10.00 1.26 0.216 11.40 6.31 11.40 6.31
1+126 5.97 1.332 0.873 7.74 3.25 7.74 3.25
1+130 4.03 1.366 0.836 5.44 3.44 5.44 3.44
1+140 10.00 1.664 0.474 15.15 6.55 15.15 6.55
1+146 6.35 1.585 0.719 10.32 3.79 10.32 3.79
1+150 3.65 1.523 0.977 5.67 3.09 5.67 3.09
1+160 10.00 1.636 0.528 15.79 7.53 15.79 7.53
1+170 10.00 1.383 0.851 15.09 6.90 15.09 6.90
1+171 0.54 1.376 0.824 0.74 0.45 0.74 0.45
1+180 9.46 1.651 0.434 14.32 5.95 14.32 5.95
1+190 10.00 1.592 0.657 16.21 5.45 16.21 5.45
1+200 10.00 1.478 0.83 15.35 7.44 15.35 7.44
1+210 10.00 1.579 0.719 15.28 7.74 15.28 7.74
1+213 2.88 1.469 0.685 4.39 2.02 4.39 2.02
1+220 7.12 1.226 0.885 9.59 5.59 9.59 5.59
1+230 10.00 1.496 0.556 13.61 7.21 13.61 7.21
1+233 3.32 1.489 0.614 4.96 1.94 4.96 1.94
1+236 2.72 1.49 0.665 4.05 1.74 4.05 1.74
1+240 3.96 1.492 0.753 5.90 2.80 5.90 2.80
1+250 10.00 1.493 0.19 14.93 4.71 14.93 4.71
1+260 10.00 1.248 0.935 13.71 5.65 13.71 5.65
1+261 1.04 1.516 0.895 1.44 0.96 1.44 0.96
1+269 7.90 1.535 0.478 12.05 5.44 12.05 5.44
1+270 1.06 1.559 0.404 1.64 0.47 1.64 0.47
1+280 10.00 1.834 0.009 16.97 2.07 16.97 2.07
1+290 10.00 1.597 0.251 17.16 1.30 17.16 1.30
1+293 3.32 1.409 0.639 5.00 1.48 5.00 1.48
1+294 0.61 1.384 0.69 0.86 0.41 0.86 0.41
1+300 6.06 1.684 0.444 9.30 3.44 9.30 3.44
1+307 6.74 1.763 0.068 11.61 1.72 11.61 1.72
1+310 3.26 1.753 0.064 5.74 0.22 5.74 0.22
1+320 10.00 1.649 0.107 17.01 0.85 17.01 0.85
1+330 10.00 1.355 0.55 15.02 3.28 15.02 3.28
1+337 6.61 1.705 0.075 10.11 2.06 10.11 2.06
1+337 0.13 1.706 0.072 0.22 0.01 0.22 0.01
1+337 0.18 1.707 0.069 0.32 0.01 0.32 0.01
1+340 3.08 1.694 0.116 5.24 0.28 5.24 0.28
1+350 10.00 1.666 0.377 16.80 2.47 16.80 2.47
1+360 10.00 1.574 0.858 16.20 6.21 16.20 6.21
1+370 10.00 1.338 0.511 14.56 6.87 14.56 6.87
1+377 6.61 1.358 0.467 8.90 3.23 8.90 3.23
1+378 1.12 1.337 0.434 1.51 0.51 1.51 0.51
1+379 0.92 1.305 0.482 1.22 0.42 1.22 0.42
1+380 1.35 1.229 0.53 1.70 0.68 1.70 0.68
1+390 10.00 1.37 0.359 12.98 4.43 12.98 4.43
1+396 6.49 1.42 0.955 9.05 4.27 9.05 4.27
1+400 3.51 1.444 0.824 5.03 3.13 5.03 3.13
1+409 8.65 1.461 0.681 12.57 6.51 12.57 6.51
1+410 1.35 1.379 0.652 1.91 0.90 1.91 0.90
1+416 6.28 1.491 0.509 9.01 3.64 9.01 3.64
1+420 3.72 1.354 0.436 5.30 1.76 5.30 1.76
1+429 1.683 0.13 13.04 2.43 13.04 2.43
1+430 1.692 0.108 2.39 0.17 2.39 0.17
1+437 1.775 0.1 11.99 0.72 11.99 0.72
1+440 2.12 0 6.01 0.16 6.01 0.16
1+449 1.934 0 17.41 0.00 17.41 0.00
1+450 1.884 0 2.70 0.00 2.70 0.00
1+455 1.793 0.009 10.10 0.02 10.10 0.02
1+460 1.781 0.081 8.13 0.18 8.13 0.18
1+465 1.67 0.165 8.73 0.55 8.73 0.55
1+470 1.504 0.24 8.03 0.92 8.03 0.92
1+471 1.403 0.294 1.52 0.25 1.52 0.25
1+475 1.832 0.013 6.13 0.58 6.13 0.58
1+480 1.67 0.118 9.06 0.34 9.06 0.34
1+488 1.543 0.32 12.94 1.77 12.94 1.77

Page 58 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
1+490 1.59 0.23 3.05 0.54 3.05 0.54
1+491 1.609 0.204 1.48 0.20 1.48 0.20
1+491 1.611 0.202 0.18 0.02 0.18 0.02
1+500 1.528 0.287 14.07 2.19 14.07 2.19
1+510 1.583 0.202 15.55 2.45 15.55 2.45
1+511 1.584 0.192 1.47 0.18 1.47 0.18
1+516 1.701 0.107 7.60 0.70 7.60 0.70
1+519 1.704 0.15 6.18 0.48 6.18 0.48
1+520 1.703 0.161 1.39 0.13 1.39 0.13
1+526 1.553 0.257 10.28 1.34 10.28 1.34
1+530 1.537 0.248 5.68 0.94 5.68 0.94
1+536 1.616 0.202 8.75 1.26 8.75 1.26
1+540 1.432 0.545 6.77 1.66 6.77 1.66
1+546 1.507 0.401 9.29 2.99 9.29 2.99
1+550 1.538 0.24 5.60 1.18 5.60 1.18
1+560 1.557 0.256 14.94 2.40 14.94 2.40
1+560 1.557 0.258 0.54 0.09 0.54 0.09
1+570 1.642 0.315 16.00 2.87 16.00 2.87
1+577 1.568 0.402 10.81 2.41 10.81 2.41
1+578 1.497 0.435 2.14 0.59 2.14 0.59
1+580 1.453 0.49 2.76 0.86 2.76 0.86
1+590 1.491 0.973 14.72 7.33 14.72 7.33
1+590 1.468 1.059 0.55 0.38 0.55 0.38
1+592 1.309 0.48 1.89 1.05 1.89 1.05
1+595 2.814 0.05 6.76 0.87 6.76 0.87
1+600 1.854 1.221 11.68 3.16 11.68 3.16
1+610 1.676 0.087 17.65 6.54 17.65 6.54
1+610 1.676 0.087 0.01 0.00 0.01 0.00
1+617 1.699 0.094 11.47 0.61 11.47 0.61
1+620 1.701 0.083 5.43 0.28 5.43 0.28
1+624 1.7 0.081 6.31 0.31 6.31 0.31
1+630 1.644 0.176 10.51 0.81 10.51 0.81
1+640 1.35 0.568 14.97 3.72 14.97 3.72
1+642 1.318 0.617 2.41 1.07 2.41 1.07
1+650 1.5 0.268 11.55 3.62 11.55 3.62
1+652 1.663 0.14 3.47 0.45 3.47 0.45
1+660 1.781 0.191 13.45 1.29 13.45 1.29
1+663 1.597 0.334 4.42 0.69 4.42 0.69
1+670 1.498 0.312 11.42 2.38 11.42 2.38
1+677 1.671 0.292 10.71 2.06 10.71 2.06
1+680 1.681 0.264 5.42 0.92 5.42 0.92
1+682 1.445 0.357 3.42 0.70 3.42 0.70
1+690 1.574 0.163 11.76 2.08 11.76 2.08
1+692 1.602 0.122 2.73 0.25 2.73 0.25
1+694 1.763 0.042 3.00 0.15 3.00 0.15
1+698 1.753 0.091 7.21 0.29 7.21 0.29
1+700 1.715 0.097 4.12 0.24 4.12 0.24
1+705 1.659 0.138 8.41 0.62 8.41 0.62
1+710 1.537 0.332 7.97 1.21 7.97 1.21
1+712 1.408 0.455 2.52 0.69 2.52 0.69
1+715 1.262 0.807 4.36 2.08 4.36 2.08
1+718 1.588 0.409 4.59 1.99 4.59 1.99
1+720 1.54 0.443 2.74 0.79 2.74 0.79
1+725 1.463 0.513 7.15 2.40 7.15 2.40
1+730 1.309 0.671 6.62 2.94 6.62 2.94
1+730 1.325 0.655 0.53 0.27 0.53 0.27
1+735 1.436 0.519 6.89 3.01 6.89 3.01
1+740 1.286 0.511 6.80 2.62 6.80 2.62
1+748 1.414 0.536 10.52 4.15 10.52 4.15
1+750 1.461 0.491 3.13 1.15 3.13 1.15
1+760 1.004 0.738 12.28 6.21 12.28 6.21
1+763 1.102 0.447 2.71 1.53 2.71 1.53
1+765 1.191 0.264 2.32 0.72 2.32 0.72
1+770 1.342 0.7 6.84 2.60 6.84 2.60
1+776 1.426 0.596 8.56 4.00 8.56 4.00
1+780 1.149 0.858 4.92 2.78 4.92 2.78
1+790 1.56 0.426 13.55 6.42 13.55 6.42
1+790 1.557 0.428 0.10 0.03 0.10 0.03
1+795 1.483 0.672 7.55 2.73 7.55 2.73
1+800 1.202 1.109 6.70 4.36 6.70 4.36

Page 59 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
1+803 1.289 1.064 4.01 3.44 4.01 3.44
1+805 1.656 0.465 2.34 1.19 2.34 1.19
1+810 1.184 0.293 7.44 1.90 7.44 1.90
1+815 1.39 0.975 6.48 3.10 6.48 3.10
1+815 1.391 0.971 0.08 0.06 0.08 0.06
1+820 1.419 0.687 6.96 4.02 6.96 4.02
1+830 1.495 0.416 14.58 5.46 14.58 5.46
1+840 1.459 0.52 14.47 4.59 14.47 4.59
1+840 1.461 0.511 0.30 0.11 0.30 0.11
1+845 1.48 0.407 7.98 2.49 7.98 2.49
1+850 1.474 0.389 6.75 1.82 6.75 1.82
1+860 1.509 0.329 14.91 3.59 14.91 3.59
1+861 1.57 0.288 1.54 0.31 1.54 0.31
1+870 1.655 0.173 14.51 2.08 14.51 2.08
1+875 1.698 0.089 9.10 0.71 9.10 0.71
1+880 1.678 0.056 7.72 0.33 7.72 0.33
1+883 1.669 0.036 4.60 0.13 4.60 0.13
1+890 1.726 0.036 12.31 0.26 12.31 0.26
1+895 1.758 0.054 8.24 0.21 8.24 0.21
1+899 1.728 0.12 8.33 0.18 8.33 0.18
1+900 1.73 0.124 1.09 0.03 1.09 0.03
1+903 1.723 0.147 4.46 0.16 4.46 0.16
1+903 1.719 0.15 0.44 0.02 0.44 0.02
1+905 1.566 0.176 3.80 0.19 3.80 0.19
1+907 1.628 0.282 3.63 0.46 3.63 0.46
1+908 1.638 0.275 0.39 0.07 0.39 0.07
1+910 2.17 0.154 4.75 0.56 4.75 0.56
1+911 2.522 0.159 3.43 0.23 3.43 0.23
1+920 1.926 0.142 17.99 1.22 17.99 1.22
1+920 1.898 0.139 0.86 0.06 0.86 0.06
1+930 1.588 0.114 17.43 1.27 17.43 1.27
1+937 1.627 0.091 11.67 0.74 11.67 0.74
1+940 1.779 0 4.66 0.13 4.66 0.13
1+950 1.705 0.073 17.42 0.37 17.42 0.37
1+953 1.67 0.064 4.77 0.09 4.77 0.09
1+955 1.743 0.045 4.17 0.06 4.17 0.06
1+958 1.876 0.006 4.38 0.03 4.38 0.03
1+959 2.017 0 3.49 0.00 3.49 0.00
1+960 2.025 0 1.30 0.00 1.30 0.00
1+962 2.062 0 4.89 0.00 4.89 0.00
1+965 2.02 0 4.83 0.00 4.83 0.00
1+970 1.819 0 10.11 0.00 10.11 0.00
1+980 1.738 0.001 17.79 0.01 17.79 0.01
1+985 1.679 0.034 8.56 0.09 8.56 0.09
1+990 1.681 0.04 8.38 0.18 8.38 0.18
1+990 1.685 0.038 0.69 0.02 0.69 0.02
1+999 1.708 0.051 15.19 0.40 15.19 0.40
2+000 1.609 0.085 1.06 0.04 1.06 0.04
2+005 1.581 0.207 8.63 0.79 8.63 0.79
2+010 1.54 0.377 7.16 1.34 7.16 1.34
2+018 1.35 0.491 11.90 3.58 11.90 3.58
2+020 1.279 0.487 2.32 0.86 2.32 0.86
2+030 1.707 0.154 14.93 3.20 14.93 3.20
2+035 1.343 0.413 8.09 1.50 8.09 1.50
2+040 1.389 0.374 6.42 1.85 6.42 1.85
2+050 1.678 0.184 15.34 2.79 15.34 2.79
2+050 1.68 0.176 0.51 0.05 0.51 0.05
2+058 1.615 0.264 13.07 1.75 13.07 1.75
2+060 1.692 0.129 2.92 0.35 2.92 0.35
2+070 1.504 0.401 15.98 2.65 15.98 2.65
2+080 1.708 0.13 16.06 2.65 16.06 2.65
2+081 1.707 0.14 2.06 0.16 2.06 0.16
2+090 2.409 0.215 18.09 1.56 18.09 1.56
2+095 1.661 1.1 10.58 3.64 10.58 3.64
2+100 1.179 0.816 7.03 4.85 7.03 4.85
2+105 1.292 1.339 6.34 4.97 6.34 4.97
2+110 2.449 0.302 9.61 3.78 9.61 3.78
2+111 2.83 0.077 3.29 0.22 3.29 0.22
2+112 2.921 0.373 2.97 0.23 2.97 0.23
2+115 1.621 0.138 6.45 0.73 6.45 0.73

Page 60 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
2+120 1.608 0.119 7.94 0.63 7.94 0.63
2+130 1.588 0.199 15.99 1.59 15.99 1.59
2+132 1.587 0.184 3.44 0.42 3.44 0.42
2+135 1.568 0.145 4.60 0.48 4.60 0.48
2+140 1.58 0.089 7.74 0.58 7.74 0.58
2+150 1.89 0.028 16.78 0.57 16.78 0.57
2+150 1.89 0.029 0.64 0.01 0.64 0.01
2+160 1.839 0.058 18.71 0.42 18.71 0.42
2+162 1.801 0.07 3.96 0.14 3.96 0.14
2+170 1.767 0.053 14.01 0.47 14.01 0.47
2+180 1.501 0.329 16.34 1.91 16.34 1.91
2+182 1.496 0.304 2.55 0.54 2.55 0.54
2+186 1.402 0.271 5.58 1.11 5.58 1.11
2+190 1.459 0.27 6.36 1.20 6.36 1.20
2+200 1.532 0.167 14.95 2.19 14.95 2.19
2+206 1.556 0.286 8.58 1.26 8.58 1.26
2+210 1.702 0.352 7.24 1.42 7.24 1.42
2+214 1.744 0.289 6.48 1.21 6.48 1.21
2+218 1.621 0.324 7.01 1.28 7.01 1.28
2+220 1.805 0.266 3.56 0.61 3.56 0.61
2+222 1.783 0.286 3.05 0.47 3.05 0.47
2+230 1.706 0.158 14.47 1.85 14.47 1.85
2+240 1.877 0 17.90 0.80 17.90 0.80
2+243 1.862 0 5.46 0.00 5.46 0.00
2+250 1.851 0.024 13.12 0.09 13.12 0.09
2+254 1.833 0.041 6.58 0.12 6.58 0.12
2+260 1.732 0.065 11.44 0.35 11.44 0.35
2+261 1.731 0.067 1.17 0.05 1.17 0.05
2+270 1.714 0.093 16.05 0.75 16.05 0.75
2+270 1.711 0.094 0.49 0.03 0.49 0.03
2+279 1.651 0.176 13.94 1.12 13.94 1.12
2+280 1.643 0.203 2.34 0.27 2.34 0.27
2+290 1.487 0.433 15.65 3.18 15.65 3.18
2+300 1.386 0.602 14.37 5.18 14.37 5.18
2+303 1.233 0.794 3.29 1.76 3.29 1.76
2+310 1.152 0.945 8.93 6.51 8.93 6.51
2+320 0.989 0.906 10.71 9.26 10.71 9.26
2+322 1.094 0.664 1.69 1.27 1.69 1.27
2+327 1.539 1.04 7.71 4.99 7.71 4.99
2+330 1.728 0.664 4.12 2.15 4.12 2.15
2+340 1.773 0.382 17.48 5.24 17.48 5.24
2+350 2.106 0 19.35 1.92 19.35 1.92
2+357 1.269 0.624 12.59 2.31 12.59 2.31
2+359 1.404 0.138 2.07 0.59 2.07 0.59
2+360 1.719 0.111 1.52 0.12 1.52 0.12
2+370 1.536 0.495 16.25 3.06 16.25 3.06
2+378 1.587 0.586 12.21 4.25 12.21 4.25
2+380 1.632 0.431 3.51 1.11 3.51 1.11
2+389 2.239 0.652 17.47 4.89 17.47 4.89
2+390 2.078 0.639 2.10 0.63 2.10 0.63
2+400 1.75 0.407 19.10 5.21 19.10 5.21
2+400 1.75 0.409 0.04 0.01 0.04 0.01
2+410 1.824 0.305 17.87 3.57 17.87 3.57
2+420 1.179 0.418 15.01 3.61 15.01 3.61
2+430 1.08 0.662 11.29 5.40 11.29 5.40
2+430 1.109 0.662 0.14 0.09 0.14 0.09
2+440 1.281 0.521 11.79 5.84 11.79 5.84
2+445 1.527 0.774 7.67 3.54 7.67 3.54
2+449 1.486 0.675 5.23 2.52 5.23 2.52
2+450 1.469 0.641 1.57 0.70 1.57 0.70
2+460 1.344 0.317 14.06 4.81 14.06 4.81
2+460 1.333 0.311 0.17 0.04 0.17 0.04
2+470 1.569 0.76 14.32 5.28 14.32 5.28
2+475 1.477 0.756 8.33 4.11 8.33 4.11
2+476 1.479 0.777 0.74 0.38 0.74 0.38
2+480 1.418 1.13 5.86 3.83 5.86 3.83
2+490 1.648 0.603 15.34 8.64 15.34 8.64
2+500 1.697 0.779 16.72 6.90 16.72 6.90
2+506 1.401 0.505 9.23 3.83 9.23 3.83
2+510 1.599 0.64 6.06 2.31 6.06 2.31

Page 61 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
2+513 1.212 0.703 4.20 2.01 4.20 2.01
2+520 1.473 0.624 9.42 4.65 9.42 4.65
2+530 1.611 0.657 15.42 6.41 15.42 6.41
2+530 1.617 0.642 0.24 0.10 0.24 0.10
2+540 1.423 0.93 14.99 7.70 14.99 7.70
2+547 2.461 0.172 14.31 4.06 14.31 4.06
2+550 1.22 0.725 4.77 1.19 4.77 1.19
2+555 2.123 0.186 8.32 2.32 8.32 2.32
2+560 1.958 0.2 10.06 1.00 10.06 1.00
2+565 3.41 0 13.72 0.54 13.72 0.54
2+570 2.542 0.084 14.37 0.21 14.37 0.21
2+575 2.581 0.136 12.63 0.58 12.63 0.58
2+577 3.035 0.159 5.23 0.29 5.23 0.29
2+580 3.147 0.86 9.37 1.65 9.37 1.65
2+585 2.214 0.614 13.09 3.85 13.09 3.85
2+590 1.182 1.052 8.46 4.13 8.46 4.13
2+595 1.169 1.351 5.90 5.98 5.90 5.98
2+600 0.943 1.753 5.23 7.88 5.23 7.88
2+605 0.891 1.926 4.53 9.29 4.53 9.29
2+610 2.633 2.659 8.53 11.83 8.53 11.83
2+613 3.124 3.582 9.28 10.96 9.28 10.96
2+615 3.13 3.941 4.96 6.51 4.96 6.51
2+620 3.101 3.621 14.97 19.83 14.97 19.83
2+625 1.358 2.126 10.82 14.81 10.82 14.81
2+630 3.004 0.158 10.72 5.74 10.72 5.74
2+635 1.15 0.946 10.24 2.71 10.24 2.71
2+637 1.758 0.557 2.75 1.39 2.75 1.39
2+640 1 1.044 4.29 2.44 4.29 2.44
2+645 1.603 0.739 6.55 4.40 6.55 4.40
2+650 2.263 0.126 9.67 2.15 9.67 2.15
2+654 2.877 0.002 9.45 0.22 9.45 0.22
2+660 0.973 1.395 12.12 4.36 12.12 4.36
2+665 0.999 1.296 4.96 6.69 4.96 6.69
2+670 1.249 0.518 5.64 4.50 5.64 4.50
2+680 1.04 0.292 11.49 3.97 11.49 3.97
2+689 1.418 0.048 10.68 1.48 10.68 1.48
2+690 1.25 1.583 1.75 1.07 1.75 1.07
2+697 0.975 1.192 8.27 10.31 8.27 10.31
2+700 1.228 1.029 2.83 2.85 2.83 2.85
2+701 1.136 0.957 1.45 1.22 1.45 1.22
2+710 1.306 0.616 10.71 6.89 10.71 6.89
2+716 1.367 0.505 8.33 3.46 8.33 3.46
2+718 1.413 0.492 2.35 0.83 2.35 0.83
2+720 1.512 0.459 3.06 0.97 3.06 0.97
2+725 1.376 0.572 7.24 2.54 7.24 2.54
2+730 1.308 0.617 6.72 2.95 6.72 2.95
2+732 1.331 0.629 2.22 1.04 2.22 1.04
2+736 1.74 0.071 6.39 1.44 6.39 1.44
2+740 1.345 0.692 6.41 1.58 6.41 1.58
2+747 1.638 0.391 9.96 3.62 9.96 3.62
2+750 1.678 0.248 5.50 1.06 5.50 1.06
2+760 1.378 0.756 15.28 5.02 15.28 5.02
2+770 1.413 1.021 13.96 8.89 13.96 8.89
2+780 1.368 0.715 13.91 8.68 13.91 8.68
2+790 0.988 0.666 11.78 6.90 11.78 6.90
2+800 1.5 0.782 12.44 7.24 12.44 7.24
2+805 1.433 1.053 7.85 4.89 7.85 4.89
2+810 1.317 1.05 6.42 4.75 6.42 4.75
2+815 1.082 1.013 6.05 5.02 6.05 5.02
2+820 1.376 0.679 6.24 4.01 6.24 4.01
2+825 1.589 0.656 7.50 3.11 7.50 3.11
2+830 1.301 1.134 7.29 4.27 7.29 4.27
2+835 1.367 1.272 6.76 5.78 6.76 5.78
2+840 1.277 0.934 6.73 5.26 6.73 5.26
2+843 1.721 0.337 5.16 2.07 5.16 2.07
2+846 1.219 1.317 3.37 1.92 3.37 1.92
2+847 1.273 1.142 1.38 1.36 1.38 1.36
2+850 1.357 0.185 4.19 2.11 4.19 2.11
2+860 0.978 0.652 11.68 4.19 11.68 4.19
2+869 2.404 0.231 14.91 3.90 14.91 3.90

Page 62 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
2+870 2.324 0.309 2.56 0.29 2.56 0.29
2+870 2.316 0.315 0.24 0.03 0.24 0.03
2+880 1.318 0.784 18.17 5.50 18.17 5.50
2+890 1.355 0.105 13.37 4.44 13.37 4.44
2+896 1.291 0.559 8.21 2.06 8.21 2.06
2+900 1.448 1.148 5.20 3.24 5.20 3.24
2+905 1.306 1.025 7.02 5.54 7.02 5.54
2+910 1.381 0.861 6.59 4.62 6.59 4.62
2+920 1.374 0.772 13.77 8.16 13.77 8.16
2+923 1.465 1.027 4.13 2.62 4.13 2.62
2+928 1.1 1.263 6.41 5.76 6.41 5.76
2+930 1.31 0.968 2.59 2.34 2.59 2.34
2+933 1.445 1.103 4.62 3.46 4.62 3.46
2+937 1.66 0.5 5.16 2.74 5.16 2.74
2+940 1.411 1.149 5.10 2.76 5.10 2.76
2+943 1.443 0.047 4.81 2.00 4.81 2.00
2+946 1.318 0.169 3.72 0.27 3.72 0.27
2+947 1.5 0.229 0.94 0.13 0.94 0.13
2+950 1.055 0.281 4.26 0.87 4.26 0.87
2+953 1.423 0.023 3.58 0.46 3.58 0.46
2+953 1.354 0.801 0.51 0.18 0.51 0.18
2+957 1.288 1.138 4.25 3.66 4.25 3.66
2+960 1.674 0.42 4.87 2.56 4.87 2.56
2+960 1.673 0.422 0.24 0.06 0.24 0.06
2+965 1.661 0.534 8.63 2.48 8.63 2.48
2+970 2.594 0.003 10.26 1.30 10.26 1.30
2+980 0.846 0.393 17.20 1.97 17.20 1.97
2+985 0.803 0.618 4.27 2.60 4.27 2.60
2+990 0.832 0.879 3.94 3.59 3.94 3.59
3+000 0.901 0.291 8.66 5.83 8.66 5.83
3+010 1.772 0.771 13.32 5.34 13.32 5.34
3+020 2.234 0.361 20.02 5.67 20.02 5.67
3+027 0.843 1.361 10.44 5.80 10.44 5.80
3+030 2.926 0 6.09 2.19 6.09 2.19
3+040 1.465 0.659 21.95 3.30 21.95 3.30
3+045 2.038 0.72 9.52 3.75 9.52 3.75
3+047 1.239 0.85 2.18 1.05 2.18 1.05
3+050 1.495 0.676 4.41 2.46 4.41 2.46
3+060 1.388 0.759 14.41 7.18 14.41 7.18
3+070 1.055 0.91 12.21 8.34 12.21 8.34
3+075 1.036 0.466 5.69 3.74 5.69 3.74
3+080 1.082 0.122 4.83 1.34 4.83 1.34
3+090 1.051 0.832 10.67 4.77 10.67 4.77
3+100 1.743 0.586 13.97 7.09 13.97 7.09
3+110 0.978 0.768 13.60 6.77 13.60 6.77
3+120 1.407 0.044 11.93 4.06 11.93 4.06
3+130 1.582 0.232 14.95 1.38 14.95 1.38
3+135 0.923 0.775 6.12 2.30 6.12 2.30
3+140 2.362 0.002 8.41 1.83 8.41 1.83
3+145 1.318 0.378 9.20 0.96 9.20 0.96
3+146 1.067 0.454 1.15 0.41 1.15 0.41
3+150 1.231 0.422 4.66 1.82 4.66 1.82
3+155 1.135 0.674 5.95 2.65 5.95 2.65
3+160 1.478 0.555 6.57 2.87 6.57 2.87
3+165 1.733 0.283 8.16 1.97 8.16 1.97
3+170 1.854 0.363 9.14 1.48 9.14 1.48
3+175 1.969 0.037 9.65 0.92 9.65 0.92
3+180 1.287 1.313 8.16 3.37 8.16 3.37
3+185 1.436 0.777 6.81 5.19 6.81 5.19
3+190 1.431 0.637 7.22 3.46 7.22 3.46
3+195 1.5 0.686 7.38 3.23 7.38 3.23
3+200 1.448 0.622 7.41 3.21 7.41 3.21
3+206 1.599 0.585 8.42 3.33 8.42 3.33
3+206 1.61 0.547 0.71 0.25 0.71 0.25
3+210 1.655 0.468 6.58 2.05 6.58 2.05
3+220 1.386 0.817 15.21 6.42 15.21 6.42
3+230 1.71 0.283 15.48 5.50 15.48 5.50
3+240 1.058 1.57 13.84 9.27 13.84 9.27
3+250 1.116 0.662 10.87 11.16 10.87 11.16
3+260 1.061 1.108 10.89 8.85 10.89 8.85

Page 63 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
3+266 1.011 0.59 6.10 5.00 6.10 5.00
3+270 1.144 0.839 4.43 2.94 4.43 2.94
3+280 1.775 0.634 14.60 7.36 14.60 7.36
3+290 1.77 0.318 17.73 4.76 17.73 4.76
3+300 2.188 0.007 19.79 1.63 19.79 1.63
3+310 2.348 0.137 22.68 0.72 22.68 0.72
3+320 1.394 0.429 18.71 2.83 18.71 2.83
3+326 1.445 0.246 8.36 1.99 8.36 1.99
3+330 1.578 0.149 6.21 0.81 6.21 0.81
3+340 1.875 0.058 17.27 1.03 17.27 1.03
3+350 1.395 0.036 16.35 0.47 16.35 0.47
3+360 1.219 0.31 13.07 1.73 13.07 1.73
3+370 1.46 0.572 13.40 4.41 13.40 4.41
3+374 1.238 0.737 5.83 2.83 5.83 2.83
3+380 0.938 1.122 6.18 5.27 6.18 5.27
3+390 3.139 0.063 20.28 5.92 20.28 5.92
3+394 1.814 0.564 10.73 1.33 10.73 1.33
3+400 0.766 1.371 7.42 5.41 7.42 5.41
3+406 2.163 1.489 8.33 7.95 8.33 7.95
3+410 1.962 0.833 9.17 5.04 9.17 5.04
3+412 2.38 0.422 4.45 1.29 4.45 1.29
3+420 1.678 0.894 16.14 5.23 16.14 5.23
3+420 1.676 0.856 0.77 0.40 0.77 0.40
3+430 2.855 0 21.61 4.08 21.61 4.08
3+436 0.846 1.632 10.40 4.58 10.40 4.58
3+440 0.961 1.1 3.97 5.98 3.97 5.98
3+445 1.99 0.189 8.08 3.51 8.08 3.51
3+447 1.847 0.235 3.21 0.35 3.21 0.35
3+450 2.258 0.3 5.91 0.76 5.91 0.76
3+460 1.224 0.817 17.45 5.57 17.45 5.57
3+468 1.124 0.111 9.05 3.58 9.05 3.58
3+470 1.076 0.82 2.52 1.07 2.52 1.07
3+472 0.946 0.669 2.15 1.59 2.15 1.59
3+478 1.016 1.141 5.79 5.34 5.79 5.34
3+479 1.132 1.107 0.73 0.77 0.73 0.77
3+480 1.266 1.044 1.54 1.38 1.54 1.38
3+488 1.51 0.572 10.70 6.23 10.70 6.23
3+490 1.535 0.53 3.49 1.26 3.49 1.26
3+494 1.426 0.925 5.50 2.70 5.50 2.70
3+500 1.44 0.81 9.01 5.45 9.01 5.45
3+510 1.27 1.246 13.55 10.27 13.55 10.27
3+515 1.543 0.698 7.06 4.88 7.06 4.88
3+516 1.531 0.733 1.99 0.93 1.99 0.93
3+520 1.336 0.848 5.28 2.92 5.28 2.92
3+526 1.318 1.074 8.05 5.84 8.05 5.84
3+530 1.436 1.174 5.41 4.42 5.41 4.42
3+531 1.367 1.224 1.85 1.58 1.85 1.58
3+540 1.728 0.201 13.44 6.19 13.44 6.19
3+543 1.416 0.872 4.43 1.51 4.43 1.51
3+545 1.295 0.711 2.99 1.75 2.99 1.75
3+550 1.392 0.665 6.68 3.44 6.68 3.44
3+560 1.515 0.472 14.53 5.69 14.53 5.69
3+563 1.646 0.209 4.45 0.96 4.45 0.96
3+570 1.473 0.311 10.87 1.80 10.87 1.80
3+570 1.616 0.253 0.33 0.06 0.33 0.06
3+580 1.548 0.358 15.82 3.05 15.82 3.05
3+582 1.476 0.373 3.05 0.74 3.05 0.74
3+589 1.395 0.501 10.69 3.25 10.69 3.25
3+590 1.368 0.502 0.44 0.16 0.44 0.16
3+590 1.349 0.504 0.29 0.11 0.29 0.11
3+600 1.741 0.385 15.45 4.44 15.45 4.44
3+602 1.776 0.308 3.55 0.70 3.55 0.70
3+610 1.768 0.159 14.14 1.87 14.14 1.87
3+620 1.303 1.233 15.36 6.96 15.36 6.96
3+621 1.025 0.682 1.73 1.42 1.73 1.42
3+630 1.342 0.982 10.07 7.08 10.07 7.08
3+640 1.04 0.906 11.91 9.44 11.91 9.44
3+644 0.925 0.748 4.29 3.61 4.29 3.61
3+650 1.292 1.468 6.25 6.23 6.25 6.23
3+651 1.217 1.321 1.87 2.07 1.87 2.07

Page 64 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
3+660 1.943 0.448 13.45 7.52 13.45 7.52
3+665 2.18 0.141 10.09 1.44 10.09 1.44
3+670 1.128 0.761 8.44 2.30 8.44 2.30
3+680 1.136 0.975 11.32 8.68 11.32 8.68
3+689 1.075 0.87 10.12 8.44 10.12 8.44
3+690 1.09 0.844 0.92 0.73 0.92 0.73
3+700 0.913 0.582 9.52 6.78 9.52 6.78
3+700 0.91 0.592 0.45 0.29 0.45 0.29
3+705 1.793 0.367 6.70 2.43 6.70 2.43
3+710 1.744 0.113 8.78 1.25 8.78 1.25
3+715 2.749 0 10.11 0.27 10.11 0.27
3+719 1.191 0.497 9.15 1.23 9.15 1.23
3+720 1.419 0.451 1.11 0.42 1.11 0.42
3+725 1.098 0.748 6.36 3.07 6.36 3.07
3+730 1.135 0.867 5.67 4.04 5.67 4.04
3+735 1.364 0.31 6.34 2.92 6.34 2.92
3+740 1.405 0.779 7.01 2.58 7.01 2.58
3+743 2.2 0.262 6.13 1.65 6.13 1.65
3+750 1.843 1.011 13.40 4.15 13.40 4.15
3+758 1.095 1.185 12.37 9.24 12.37 9.24
3+760 1.032 1.025 1.68 1.75 1.68 1.75
3+767 1.147 0.888 8.09 7.11 8.09 7.11
3+770 1.172 0.982 2.98 2.40 2.98 2.40
3+774 1.453 0.994 4.91 3.70 4.91 3.70
3+780 1.159 1.038 8.17 6.37 8.17 6.37
3+789 1.48 0.97 12.08 9.20 12.08 9.20
3+790 1.264 1.029 1.17 0.85 1.17 0.85
3+792 1.291 1.147 3.12 2.64 3.12 2.64
3+800 1.316 1.42 9.52 9.36 9.52 9.36
3+800 1.314 1.427 0.37 0.40 0.37 0.40
3+810 1.111 0.817 12.12 11.28 12.12 11.28
3+820 1.167 0.805 11.39 8.17 11.39 8.17
3+825 1.457 0.377 6.19 2.79 6.19 2.79
3+830 1.264 0.716 7.19 2.89 7.19 2.89
3+839 1.535 0.462 13.01 5.48 13.01 5.48
3+840 1.542 0.439 1.08 0.32 1.08 0.32
3+841 1.555 0.398 1.98 0.54 1.98 0.54
3+850 1.511 0.272 13.37 2.92 13.37 2.92
3+860 1.59 0.114 15.51 1.93 15.51 1.93
3+866 1.563 0.653 8.82 2.15 8.82 2.15
3+870 1.601 0.52 6.97 2.58 6.97 2.58
3+880 2.577 1.17 20.89 8.45 20.89 8.45
3+890 1.477 0.477 20.27 8.24 20.27 8.24
3+900 1.504 0.541 14.90 5.09 14.90 5.09
3+910 1.558 0.607 15.31 5.74 15.31 5.74
3+920 1.269 0.844 14.14 7.25 14.14 7.25
3+928 1.466 0.584 10.46 5.46 10.46 5.46
3+930 1.438 0.704 3.41 1.51 3.41 1.51
3+940 1.514 0.467 14.76 5.86 14.76 5.86
3+950 1.29 0.956 14.02 7.12 14.02 7.12
3+953 1.46 0.928 3.64 2.50 3.64 2.50
3+956 1.164 1.05 3.80 2.86 3.80 2.86
3+957 1.225 1.078 1.67 1.49 1.67 1.49
3+960 1.425 1.073 4.05 3.29 4.05 3.29
3+970 1.583 0.726 15.04 8.99 15.04 8.99
3+980 1.616 0.48 16.00 6.03 16.00 6.03
3+983 1.638 0.387 4.30 1.11 4.30 1.11
3+986 1.647 0.331 4.78 1.02 4.78 1.02
3+986 1.642 0.344 1.28 0.26 1.28 0.26
3+990 1.646 0.708 5.96 1.96 5.96 1.96
3+995 1.519 0.679 7.76 3.51 7.76 3.51
4+000 1.942 0.555 8.52 3.18 8.52 3.18
4+004 2.601 0.737 9.29 2.86 9.29 2.86
4+008 3.435 0.087 12.62 1.72 12.62 1.72
4+010 3.456 0.185 5.29 0.21 5.29 0.21
4+010 3.449 0.186 0.35 0.02 0.35 0.02
4+020 1.582 0.466 25.16 3.26 25.16 3.26
4+020 1.581 0.465 0.20 0.06 0.20 0.06
4+030 1.271 1.069 14.08 7.57 14.08 7.57
4+035 1.397 0.707 6.66 4.43 6.66 4.43

Page 65 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
4+040 2.112 1.049 8.81 4.38 8.81 4.38
4+050 1.145 0.598 16.33 8.17 16.33 8.17
4+050 1.144 0.593 0.15 0.08 0.15 0.08
4+060 1.386 0.669 12.49 6.17 12.49 6.17
4+070 1.493 0.58 14.39 6.19 14.39 6.19
4+075 1.665 0.655 7.32 2.83 7.32 2.83
4+080 1.729 0.454 9.14 2.94 9.14 2.94
4+081 1.7 0.486 1.22 0.34 1.22 0.34
4+090 1.189 0.727 13.42 5.63 13.42 5.63
4+100 2.457 0 18.23 3.64 18.23 3.64
4+105 1.845 0.462 10.15 1.09 10.15 1.09
4+110 2.689 0.463 11.97 2.45 11.97 2.45
4+120 0.695 0.868 16.92 6.65 16.92 6.65
4+130 2.451 1.364 15.42 10.72 15.42 10.72
4+130 2.592 1.254 0.72 0.37 0.72 0.37
4+135 2.042 0.619 10.76 4.30 10.76 4.30
4+137 1.607 0.554 5.11 1.64 5.11 1.64
4+140 1.636 0.449 4.17 1.29 4.17 1.29
4+144 1.465 0.715 6.38 2.39 6.38 2.39
4+150 1.564 0.668 8.92 4.07 8.92 4.07
4+159 1.475 0.721 13.93 6.32 13.93 6.32
4+160 1.508 0.748 1.24 0.60 1.24 0.60
4+169 1.499 0.532 13.70 5.75 13.70 5.75
4+170 1.581 0.556 1.37 0.48 1.37 0.48
4+175 1.569 0.702 7.88 3.09 7.88 3.09
4+180 1.321 0.887 7.24 3.88 7.24 3.88
4+186 1.607 0.231 9.03 3.36 9.03 3.36
4+190 1.348 0.839 5.67 2.00 5.67 2.00
4+199 1.482 0.444 13.00 5.79 13.00 5.79
4+200 1.466 0.473 1.23 0.39 1.23 0.39
4+210 1.808 0.327 16.36 4.02 16.36 4.02
4+211 1.069 0.916 1.67 0.72 1.67 0.72
4+220 1.863 0.723 12.95 7.24 12.95 7.24
4+230 0.939 1.778 14.01 12.50 14.01 12.50
4+240 0.619 1.357 7.79 15.68 7.79 15.68
4+242 0.817 1.104 1.68 2.88 1.68 2.88
4+247 1.463 0.261 5.68 3.40 5.68 3.40
4+250 1.281 0.189 3.68 0.60 3.68 0.60
4+260 2.376 0.049 18.33 1.19 18.33 1.19
4+267 1.189 0.653 13.09 2.52 13.09 2.52
4+270 1.147 0.758 3.13 1.85 3.13 1.85
4+271 1.18 0.787 1.04 0.68 1.04 0.68
4+278 1.352 0.34 8.90 3.90 8.90 3.90
4+280 1.481 0.377 2.95 0.74 2.95 0.74
4+290 1.955 0.237 17.19 3.06 17.19 3.06
4+291 1.989 0.222 1.77 0.21 1.77 0.21
4+300 0.995 0.556 13.59 3.55 13.59 3.55
4+310 1.129 1.338 10.62 9.47 10.62 9.47
4+320 1.076 0.859 11.02 10.99 11.02 10.99
4+324 0.953 0.654 4.20 3.14 4.20 3.14
4+328 1.209 0.408 4.64 2.28 4.64 2.28
4+330 1.137 0.347 1.84 0.59 1.84 0.59
4+335 0.889 0.101 5.38 1.19 5.38 1.19
4+340 1.514 0.015 5.65 0.28 5.65 0.28
4+349 1.48 0.75 13.79 3.41 13.79 3.41
4+350 1.51 0.755 1.29 0.63 1.29 0.63
4+354 1.355 0.828 5.25 2.81 5.25 2.81
4+360 1.409 0.127 8.80 2.96 8.80 2.96
4+368 1.433 1.038 11.98 4.95 11.98 4.95
4+370 1.435 0.194 2.24 0.97 2.24 0.97
4+379 1.4 0.201 12.26 1.71 12.26 1.71
4+380 1.325 0.277 1.84 0.32 1.84 0.32
4+390 1.952 0.766 16.38 5.21 16.38 5.21
4+399 0.975 1.037 13.02 8.02 13.02 8.02
4+400 1.824 0.339 1.55 0.76 1.55 0.76
4+410 1.227 0.492 15.25 4.16 15.25 4.16
4+420 1.87 0.512 15.48 5.02 15.48 5.02
4+429 1.381 0.464 14.46 4.34 14.46 4.34
4+430 1.53 0.329 1.61 0.44 1.61 0.44
4+439 1.872 0.2 14.91 2.32 14.91 2.32

Page 66 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
4+440 1.923 0.167 2.35 0.23 2.35 0.23
4+450 1.145 1.093 15.34 6.30 15.34 6.30
4+460 1.343 0.84 12.44 9.67 12.44 9.67
4+470 1.519 0.489 14.31 6.65 14.31 6.65
4+476 1.278 1.221 8.80 5.38 8.80 5.38
4+480 1.207 0.064 4.60 2.38 4.60 2.38
4+490 1.062 0.921 11.34 4.92 11.34 4.92
4+498 2.834 0.031 15.91 3.89 15.91 3.89
4+499 1.225 0.141 1.23 0.05 1.23 0.05
4+500 1.397 0.685 1.61 0.51 1.61 0.51
4+506 0.906 0.841 7.25 4.79 7.25 4.79
4+510 0.762 1.527 3.09 4.39 3.09 4.39
4+520 0.892 0.272 8.26 9.01 8.26 9.01
4+524 1.924 1.446 5.34 3.23 5.34 3.23
4+525 1.675 1.906 1.37 1.26 1.37 1.26
4+530 0.079 4.429 4.85 17.33 4.85 17.33
4+534 0.141 4.248 0.47 18.59 0.47 18.59
4+540 0.142 3.901 0.80 23.37 0.80 23.37
4+542 0.207 3.767 0.27 6.06 0.27 6.06
4+550 0.697 2.879 3.81 28.03 3.81 28.03
4+559 1.658 0.696 10.93 16.59 10.93 16.59
4+560 1.894 0.493 1.28 0.43 1.28 0.43
4+565 1.389 1.123 7.73 3.85 7.73 3.85
4+570 1.132 0.486 6.66 4.25 6.66 4.25
4+580 1.43 0.817 12.82 6.49 12.82 6.49
4+583 1.443 0.653 3.77 1.93 3.77 1.93
4+585 1.436 0.691 2.75 1.28 2.75 1.28
4+590 1.562 0.764 8.20 3.99 8.20 3.99
4+600 1.262 1.086 14.12 9.27 14.12 9.27
4+608 1.605 0.635 10.92 6.56 10.92 6.56
4+608 1.603 0.641 0.66 0.26 0.66 0.26
4+610 1.581 0.735 3.13 1.35 3.13 1.35
4+615 1.175 1.198 6.83 4.82 6.83 4.82
4+615 1.557 0.811 0.64 0.46 0.64 0.46
4+620 1.679 0.377 7.38 2.52 7.38 2.52
4+622 1.285 0.98 3.42 1.57 3.42 1.57
4+630 1.449 0.589 10.52 6.04 10.52 6.04
4+640 1.395 1.073 14.22 8.31 14.22 8.31
4+650 2.336 0.99 18.68 10.66 18.68 10.66
4+650 2.347 0.982 0.04 0.02 0.04 0.02
4+655 1.556 0.081 9.78 2.90 9.78 2.90
4+660 1.673 0.131 8.26 0.49 8.26 0.49
4+665 0.697 0.816 6.05 2.29 6.05 2.29
4+670 1.26 1.05 4.88 4.58 4.88 4.58
4+674 0.849 0.614 3.82 3.01 3.82 3.01
4+675 1.145 1.056 1.84 1.54 1.84 1.54
4+680 1.606 0.123 6.24 2.67 6.24 2.67
4+690 1.645 0.248 16.25 1.85 16.25 1.85
4+699 1.15 0.297 13.13 2.35 13.13 2.35
4+700 1.126 0.344 0.79 0.20 0.79 0.20
4+702 1.259 0.442 2.05 0.61 2.05 0.61
4+705 1.397 0.799 4.44 1.95 4.44 1.95
4+710 1.531 0.575 7.39 3.32 7.39 3.32
4+715 1.334 0.862 7.23 3.51 7.23 3.51
4+717 1.512 0.435 2.97 1.28 2.97 1.28
4+720 1.418 0.513 4.39 1.27 4.39 1.27
4+725 1.162 0.708 6.16 2.66 6.16 2.66
4+729 0.993 0.771 5.08 3.49 5.08 3.49
4+730 1.619 0.506 0.75 0.37 0.75 0.37
4+740 1.459 0.221 15.39 3.63 15.39 3.63
4+742 1.394 0.208 2.43 0.37 2.43 0.37
4+750 0.747 0.949 8.89 4.80 8.89 4.80
4+755 0.833 1.32 3.92 5.63 3.92 5.63
4+760 0.965 1.699 4.53 7.60 4.53 7.60
4+765 1.114 0.922 5.40 6.80 5.40 6.80
4+770 0.681 1.282 4.32 5.31 4.32 5.31
4+775 0.732 1.633 3.51 7.23 3.51 7.23
4+779 0.958 1.422 3.54 6.36 3.54 6.36
4+780 0.95 1.368 0.83 1.21 0.83 1.21
4+790 1.013 1.086 9.84 12.23 9.84 12.23

Page 67 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
4+799 1.397 0.446 11.00 6.99 11.00 6.99
4+800 1.361 0.48 1.20 0.40 1.20 0.40
4+805 2.283 0.303 9.92 2.13 9.92 2.13
4+810 1.982 0.657 9.72 2.19 9.72 2.19
4+815 1.279 1.364 8.63 5.35 8.63 5.35
4+820 1.135 1.84 5.82 7.78 5.82 7.78
4+825 0.569 2.576 4.23 11.25 4.23 11.25
4+825 0.582 2.579 0.11 0.50 0.11 0.50
4+830 0.963 2.459 3.67 12.31 3.67 12.31
4+833 1.365 2.214 4.01 8.09 4.01 8.09
4+835 1.434 2.025 2.23 3.37 2.23 3.37
4+840 2.17 1.294 9.16 8.37 9.16 8.37
4+842 2.425 1.033 3.82 1.93 3.82 1.93
4+844 2.784 0.647 6.54 2.11 6.54 2.11
4+850 1.291 1.129 11.87 5.18 11.87 5.18
4+860 1.707 0.225 14.99 6.77 14.99 6.77
4+870 1.409 0.708 15.58 4.66 15.58 4.66
4+880 1.002 0.671 12.06 6.90 12.06 6.90
4+890 1.351 0.394 11.76 5.33 11.76 5.33
4+893 1.447 0.624 4.79 1.74 4.79 1.74
4+900 1.379 0.374 9.29 3.28 9.29 3.28
4+906 1.182 1.052 7.22 4.02 7.22 4.02
4+910 1.23 0.657 5.26 3.73 5.26 3.73
4+920 1.402 0.185 13.16 4.21 13.16 4.21
4+930 2.167 0 17.84 0.93 17.84 0.93
4+935 2.014 0.003 11.16 0.01 11.16 0.01
4+940 1.192 0.7 7.47 1.64 7.47 1.64
4+948 2.198 0.023 13.98 2.97 13.98 2.97
4+950 1.74 0.091 3.49 0.10 3.49 0.10
4+955 1.324 1.202 8.19 3.44 8.19 3.44
4+956 1.416 1.154 0.83 0.71 0.83 0.71
4+960 2.02 0.539 6.98 3.42 6.98 3.42
4+962 2.33 0.298 3.55 0.68 3.55 0.68
4+970 1.393 0.997 15.622 5.415 15.622 5.415
4+980 1.359 0.930 13.768 9.622 13.768 9.622
4+982 1.351 0.922 2.204 1.506 2.204 1.506
4+990 1.663 0.425 12.621 5.643 12.621 5.643
5+000 1.205 0.414 14.339 4.199 14.339 4.199
5+010 1.073 1.386 11.389 9 11.389 9
5+020 1.168 0.427 11.204 9.064 11.204 9.064
5+030 1.681 0.341 14.243 3.842 14.243 3.842
5+040 1.595 0.651 16.381 4.961 16.381 4.961
5+042 2.023 0.266 3.812 0.966 3.812 0.966
5+046 1.677 0.283 6.36 0.944 6.36 0.944
5+050 2.379 0.009 9.038 0.651 9.038 0.651
5+060 1.285 1.631 18.319 8.203 18.319 8.203
5+061 1.266 1.105 1.358 1.437 1.358 1.437
5+066 1.764 0.723 6.847 4.117 6.847 4.117
5+070 2.423 0.391 9.601 2.48 9.601 2.48
5+072 1.405 0.329 4.113 0.723 4.113 0.723
5+075 1.082 0.659 3.318 1.303 3.318 1.303
5+077 1.111 0.919 2.258 1.659 2.258 1.659
5+080 1.297 1.220 3.247 2.884 3.247 2.884
5+080 1.301 1.251 0.534 0.508 0.534 0.508
5+090 1.723 0.246 15.118 7.483 15.118 7.483
5+100 1.958 0.289 18.402 2.673 18.402 2.673
5+107 2.066 0.271 13.926 1.936 13.926 1.936
5+110 1.773 0.499 5.906 1.184 5.906 1.184
5+112 1.501 0.610 3.717 1.26 3.717 1.26
5+120 2.271 0.258 14.585 3.356 14.585 3.356
5+130 0.953 0.988 16.131 6.243 16.131 6.243
5+139 1.007 1.272 8.84 10.196 8.84 10.196
5+140 1.052 1.250 1.01 1.235 1.01 1.235
5+142 1.047 0.277 2.383 1.733 2.383 1.733
5+150 1.486 0.451 9.799 2.814 9.799 2.814
5+160 1.902 0.310 16.962 3.782 16.962 3.782
5+169 1.67 0.624 16.106 4.224 16.106 4.224
5+170 1.514 0.682 1.561 0.646 1.561 0.646
5+180 1.898 0.445 17.087 5.646 17.087 5.646

Page 68 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
5+190 1.238 0.891 15.71 6.669 15.71 6.669
5+191 0.95 0.870 0.678 0.547 0.678 0.547
5+195 1.174 0.688 5.077 3.73 5.077 3.73
5+200 1.432 0.570 5.985 2.883 5.985 2.883
5+210 1.236 1.270 13.344 9.188 13.344 9.188
5+220 1.189 1.360 12.121 13.148 12.121 13.148
5+225 1.359 0.735 6.889 5.664 6.889 5.664
5+230 1.29 0.033 6.083 1.765 6.083 1.765
5+231 1.227 0.038 0.781 0.022 0.781 0.022
5+236 2.26 0.190 10.039 0.656 10.039 0.656
5+240 0.964 0.741 5.837 1.685 5.837 1.685
5+250 1.239 1.507 11.01 11.242 11.01 11.242
5+252 1.307 1.570 2.252 2.725 2.252 2.725
5+260 1.301 1.094 10.729 10.966 10.729 10.966
5+260 1.301 1.094 0.004 0.003 0.004 0.003
5+266 1.501 1.384 8.952 7.894 8.952 7.894
5+269 2.208 0.765 4.925 2.845 4.925 2.845
5+270 2.149 0.764 2.112 0.74 2.112 0.74
5+280 0.798 1.744 14.747 12.522 14.747 12.522
5+282 1.399 0.976 1.946 2.405 1.946 2.405
5+288 1.397 1.024 8.992 6.435 8.992 6.435
5+290 1.334 1.565 2.458 2.33 2.458 2.33
5+294 1.376 1.008 5.832 5.534 5.832 5.534
5+299 1.91 1.667 7.771 6.325 7.771 6.325
5+300 1.923 1.262 1.857 1.419 1.857 1.419
5+310 3.21 0.458 25.663 8.6 25.663 8.6
5+317 1.671 0.309 17.961 2.822 17.961 2.822
5+320 1.585 0.396 4.299 0.93 4.299 0.93
5+320 1.575 0.405 0.44 0.112 0.44 0.112
5+330 1.539 0.096 15.143 2.432 15.143 2.432
5+331 1.483 0.142 1.829 0.143 1.829 0.143
5+340 1.75 0.221 14.208 1.593 14.208 1.593
5+345 1.675 0.258 8.543 1.204 8.543 1.204
5+350 1.358 0.260 7.59 1.296 7.59 1.296
5+350 1.359 0.261 0.381 0.072 0.381 0.072
5+360 1.54 0.315 14.149 2.751 14.149 2.751
5+363 1.417 0.354 4.749 1.042 4.749 1.042
5+370 2.243 0.015 12.419 1.221 12.419 1.221
5+380 1.949 0.291 20.842 1.556 20.842 1.556
5+390 1.397 0.337 16.687 3.172 16.687 3.172
5+391 1.104 0.438 1.512 0.47 1.512 0.47
5+393 1.975 0.461 3.064 0.895 3.064 0.895
5+400 1.567 0.637 12.044 3.735 12.044 3.735
5+408 1.992 0.044 14.509 2.791 14.509 2.791
5+409 1.927 0.056 1.834 0.042 1.834 0.042
5+410 1.641 0.424 1.812 0.22 1.812 0.22
5+415 1.317 0.652 7.492 2.53 7.492 2.53
5+420 1.104 1.219 6.03 4.658 6.03 4.658
5+425 1.327 1.044 6.08 5.646 6.08 5.646
5+430 1.168 1.423 6.249 6.082 6.249 6.082
5+435 1.171 0.027 5.842 3.607 5.842 3.607
5+440 1.486 0.057 6.757 0.228 6.757 0.228
5+443 1.938 0.050 5.389 0.175 5.389 0.175
5+446 1.879 0.686 5.862 1.13 5.862 1.13
5+449 1.593 0.464 4.957 1.642 4.957 1.642
5+450 1.437 0.460 1.482 0.452 1.482 0.452
5+450 1.433 0.460 0.032 0.01 0.032 0.01
5+460 1.152 1.075 12.91 7.743 12.91 7.743
5+470 0.882 1.182 10.144 11.311 10.144 11.311
5+475 2.226 1.156 7.653 5.892 7.653 5.892
5+480 1.028 2.101 8.108 8.237 8.108 8.237
5+485 1.105 1.829 5.347 9.868 5.347 9.868
5+490 1.122 1.680 5.578 8.823 5.578 8.823
5+495 1.02 1.220 5.393 7.281 5.393 7.281
5+496 1.014 1.933 0.566 0.872 0.566 0.872
5+500 1.484 1.070 5.624 6.655 5.624 6.655
5+502 1.424 0.260 3.077 1.407 3.077 1.407
5+510 1.544 0.314 11.699 2.264 11.699 2.264
5+519 1.356 0.462 12.986 3.532 12.986 3.532
5+520 1.388 0.418 1.398 0.457 1.398 0.457

Page 69 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
5+530 2.117 0.494 17.439 4.659 17.439 4.659
5+534 1.234 0.377 6.922 1.854 6.922 1.854
5+540 1.216 1.039 7.087 4.22 7.087 4.22
5+550 1.387 0.635 12.959 8.467 12.959 8.467
5+560 2.167 0.025 17.804 3.28 17.804 3.28
5+570 1.31 0.212 17.425 1.163 17.425 1.163
5+580 1.504 0.760 14.063 4.887 14.063 4.887
5+590 1.607 0.546 15.546 6.627 15.546 6.627
5+590 1.606 0.548 0.123 0.042 0.123 0.042
5+595 1.47 0.639 8.045 3.07 8.045 3.07
5+600 1.479 0.658 6.944 2.983 6.944 2.983
5+610 1.749 0.189 16.191 4.141 16.191 4.141
5+614 1.523 0.427 6.914 1.301 6.914 1.301
5+620 1.183 0.497 7.812 2.665 7.812 2.665
5+630 1.919 0.593 15.513 5.45 15.513 5.45
5+638 1.163 1.522 12.583 9.605 12.583 9.605
5+640 1.142 0.878 2.046 2.327 2.046 2.327
5+645 1.611 0.511 6.808 3.661 6.808 3.661
5+650 1.697 0.243 8.238 2.057 8.238 2.057
5+651 1.458 0.537 1.392 0.35 1.392 0.35
5+655 1.634 0.431 6.395 2.051 6.395 2.051
5+660 1.367 1.218 7.496 4.287 7.496 4.287
5+663 1.134 0.570 4.098 2.988 4.098 2.988
5+667 1.459 0.437 4.234 1.644 4.234 1.644
5+670 1.454 0.247 5.051 1.185 5.051 1.185
5+680 1.184 1.080 13.191 6.636 13.191 6.636
5+683 1.969 0.456 4.681 2.187 4.681 2.187
5+690 0.253 2.561 8.001 10.481 8.001 10.481
5+691 2.767 0.892 1.256 1.52 1.256 1.52
5+695 2.202 1.856 10.073 5.589 10.073 5.589
5+700 2.467 0.588 11.914 5.756 11.914 5.756
5+703 1.372 0.366 6.282 1.417 6.282 1.417
5+705 1.306 0.285 2.357 0.543 2.357 0.543
5+710 1.636 0.129 7.335 1.009 7.335 1.009
5+715 1.542 0.540 7.992 1.653 7.992 1.653
5+720 1.28 0.828 7.067 3.405 7.067 3.405
5+722 1.902 0.573 3.891 1.713 3.891 1.713
5+730 1.262 0.283 11.95 3.234 11.95 3.234
5+740 0.967 0.202 11.145 2.428 11.145 2.428
5+747 1.293 0.446 7.356 2.111 7.356 2.111
5+750 1.265 0.752 4.462 2.09 4.462 2.09
5+760 1.553 0.371 14.076 5.614 14.076 5.614
5+763 1.871 0.344 5.53 1.16 5.53 1.16
5+766 2.103 0.265 5.218 0.806 5.218 0.806
5+770 2.43 0.235 9.318 1.041 9.318 1.041
5+777 2.295 0.442 15.312 2.201 15.312 2.201
5+780 2.308 0.287 8.003 1.267 8.003 1.267
5+787 1.128 0.827 12.326 3.986 12.326 3.986
5+790 1.121 0.697 3.156 2.128 3.156 2.128
5+800 1.48 0.790 13.012 7.397 13.012 7.397
5+810 2.036 0.650 17.627 7.14 17.627 7.14
5+815 2.216 0.168 9.614 1.823 9.614 1.823
5+820 1.123 0.742 9.183 2.489 9.183 2.489
5+825 1.044 1.257 5.569 5.135 5.569 5.135
5+830 1.152 0.681 5.34 4.703 5.34 4.703
5+840 1.815 0.448 14.842 5.625 14.842 5.625
5+845 2.135 0.473 8.903 2.076 8.903 2.076
5+850 1.348 1.123 9.563 4.38 9.563 4.38
5+859 1.238 0.381 12.278 7.138 12.278 7.138
5+860 1.223 0.335 0.622 0.181 0.622 0.181
5+865 1.564 0.567 7.163 2.316 7.163 2.316
5+870 1.426 0.594 7.269 2.817 7.269 2.817
5+879 1.562 0.407 14.185 4.749 14.185 4.749
5+880 1.565 0.410 0.79 0.207 0.79 0.207
5+881 1.572 0.414 1.368 0.359 1.368 0.359
5+887 1.613 0.463 10.521 2.896 10.521 2.896
5+890 1.604 0.456 4.051 1.156 4.051 1.156
5+897 1.671 0.238 10.76 2.278 10.76 2.278
5+900 1.673 0.236 5.734 0.813 5.734 0.813
5+901 1.669 0.250 1.458 0.212 1.458 0.212

Page 70 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
5+909 1.424 0.479 12.878 3.036 12.878 3.036
5+910 1.51 0.496 1.171 0.389 1.171 0.389
5+920 1.516 0.335 15.132 4.155 15.132 4.155
5+926 1.396 0.648 9.337 3.152 9.337 3.152
5+930 1.527 0.516 5.243 2.089 5.243 2.089
5+940 1.586 0.313 15.567 4.146 15.567 4.146
5+950 1.483 0.365 15.343 3.39 15.343 3.39
5+959 1.546 0.408 14.03 3.581 14.03 3.581
5+960 1.548 0.434 1.139 0.31 1.139 0.31
5+964 1.57 0.602 6.268 2.081 6.268 2.081
5+966 1.582 0.718 2.96 1.24 2.96 1.24
5+970 1.491 0.850 6.3 3.214 6.3 3.214
5+974 1.678 0.542 6.457 2.833 6.457 2.833
5+979 1.687 0.498 7.678 2.366 7.678 2.366
5+980 1.689 0.483 2.301 0.666 2.301 0.666
5+990 2.226 0.221 19.553 3.515 19.553 3.515
5+996 2.266 0.282 13.215 1.492 13.215 1.492
6+000 2.192 0.247 9.115 1.089 9.115 1.089
6+008 2.066 0.266 16.46 1.984 16.46 1.984
6+010 2.117 0.301 4.699 0.635 4.699 0.635
6+014 2.877 0.115 10.147 0.844 10.147 0.844
6+020 2.177 0.500 14.935 1.821 14.935 1.821
6+026 2.196 0.689 14.113 3.843 14.113 3.843
6+030 1.901 0.600 7.234 2.279 7.234 2.279
6+038 1.351 0.271 12.602 3.376 12.602 3.376
6+040 1.252 0.230 2.929 0.564 2.929 0.564
6+050 1.341 0.557 12.963 3.935 12.963 3.935
6+060 2.037 0.359 16.888 4.581 16.888 4.581
6+064 2.118 0.405 7.435 1.368 7.435 1.368
6+070 1.471 0.684 11.523 3.498 11.523 3.498
6+074 1.472 0.703 6.359 3 6.359 3
6+080 1.482 0.646 8.386 3.835 8.386 3.835
6+090 1.658 0.214 15.7 4.304 15.7 4.304
6+094 1.457 0.435 5.577 1.158 5.577 1.158
6+094 1.456 0.439 0.408 0.122 0.408 0.122
6+100 1.455 0.516 8.943 2.926 8.943 2.926
6+101 1.445 0.516 1.863 0.662 1.863 0.662
6+110 1.391 0.358 12.365 3.797 12.365 3.797
6+120 1.706 0.517 15.495 4.355 15.495 4.355
6+124 1.658 0.679 6.494 2.301 6.494 2.301
6+130 1.791 0.431 10.592 3.403 10.592 3.403
6+131 1.596 0.581 2.175 0.65 2.175 0.65
6+140 1.725 0.250 14.472 3.62 14.472 3.62
6+143 1.856 0.135 4.594 0.493 4.594 0.493
6+150 2.008 0.075 14.363 0.779 14.363 0.779
6+160 1.882 0.243 19.446 1.592 19.446 1.592
6+169 1.957 0.175 16.556 1.806 16.556 1.806
6+170 1.977 0.162 2.702 0.232 2.702 0.232
6+178 2.136 0.101 17.386 1.119 17.386 1.119
6+180 2.182 0.087 3.305 0.146 3.305 0.146
6+189 2.32 0.076 19.333 0.716 19.333 0.716
6+190 2.38 0.069 3.208 0.102 3.208 0.102
6+192 2.43 0.048 3.684 0.093 3.684 0.093
6+200 2.048 0.000 18.853 0.21 18.853 0.21
6+210 1.646 0.254 18.454 1.269 18.454 1.269
6+212 1.663 0.242 2.552 0.383 2.552 0.383
6+220 1.853 0.000 14.871 1.024 14.871 1.024
6+221 1.865 0.018 1.852 0.01 1.852 0.01
6+226 1.891 0.119 8.388 0.332 8.388 0.332
6+230 1.805 0.151 8.243 0.652 8.243 0.652
6+234 2.077 0.000 8.271 0.321 8.271 0.321
6+240 2.422 0.000 12.91 0 12.91 0
6+241 2.475 0.000 2.473 0 2.473 0
6+243 2.132 1.183 4.527 1.948 4.527 1.948
6+246 1.449 2.644 3.259 6.211 3.259 6.211
6+248 1.826 1.694 3.295 6.842 3.295 6.842
6+250 2.74 0.000 5.488 2.579 5.488 2.579
6+252 2.027 0.001 5.368 0 5.368 0
6+253 1.79 0.040 1.738 0.011 1.738 0.011
6+254 1.629 0.272 2.038 0.186 2.038 0.186

Page 71 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
6+260 2.066 0.247 10.818 1.519 10.818 1.519
6+262 1.773 0.384 3.591 0.589 3.591 0.589
6+267 1.833 0.297 8.862 1.672 8.862 1.672
6+270 1.629 0.429 5.564 1.167 5.564 1.167
6+280 1.445 1.036 15.383 7.314 15.383 7.314
6+290 1.151 0.838 12.995 9.361 12.995 9.361
6+290 1.114 0.793 0.379 0.273 0.379 0.273
6+300 1.647 0.308 13.343 5.329 13.343 5.329
6+307 1.643 0.430 12.128 2.722 12.128 2.722
6+310 3.003 0.829 6.102 1.654 6.102 1.654
6+320 0.454 3.948 17.285 23.885 17.285 23.885
6+330 1.923 1.168 11.884 25.578 11.884 25.578
6+340 1.619 0.174 17.71 6.711 17.71 6.711
6+350 1.723 0.169 16.71 1.717 16.71 1.717
6+360 1.74 0.218 17.314 1.936 17.314 1.936
6+367 1.797 0.664 11.762 2.934 11.762 2.934
6+370 1.692 0.907 5.844 2.632 5.844 2.632
6+380 1.435 1.003 15.633 9.552 15.633 9.552
6+381 2.04 1.041 2.267 1.334 2.267 1.334
6+390 0.98 1.813 13.128 12.407 13.128 12.407
6+400 0.54 4.739 7.597 32.758 7.597 32.758
6+401 0.502 5.004 0.527 4.928 0.527 4.928
6+410 2.878 0.007 15.186 22.522 15.186 22.522
6+418 3.373 0.018 24.348 0.098 24.348 0.098
6+420 3.228 0.178 7.291 0.216 7.291 0.216
6+426 2.105 0.333 15.141 1.45 15.141 1.45
6+430 2.141 0.370 9.178 1.516 9.178 1.516
6+438 1.46 0.567 14.087 3.65 14.087 3.65
6+440 1.499 0.494 3.231 1.153 3.231 1.153
6+446 1.62 0.283 8.858 2.192 8.858 2.192
6+450 1.692 0.266 7.159 1.175 7.159 1.175
6+450 1.69 0.265 0.678 0.105 0.678 0.105
6+458 1.631 0.225 12.279 1.794 12.279 1.794
6+460 1.613 0.214 3.586 0.482 3.586 0.482
6+470 1.719 0.025 16.665 1.187 16.665 1.187
6+470 1.733 0.013 0.692 0.007 0.692 0.007
6+480 1.544 0.198 15.73 1.011 15.73 1.011
6+490 1.654 0.185 15.989 1.915 15.989 1.915
6+500 1.598 0.178 16.261 1.815 16.261 1.815
6+510 1.638 0.240 16.18 2.091 16.18 2.091
6+520 1.69 0.135 16.636 1.874 16.636 1.874
6+522 1.689 0.139 3.019 0.245 3.019 0.245
6+524 1.687 0.145 4.218 0.355 4.218 0.355
6+525 1.686 0.148 1.896 0.165 1.896 0.165
6+530 1.681 0.158 7.724 0.702 7.724 0.702
6+537 1.578 0.207 11.338 1.27 11.338 1.27
6+540 1.612 0.160 4.848 0.557 4.848 0.557
6+545 1.757 0.061 9.116 0.595 9.116 0.595
6+550 1.769 0.105 8.095 0.377 8.095 0.377
6+550 1.767 0.104 0.123 0.007 0.123 0.007
6+559 1.695 0.093 14.924 0.844 14.924 0.844
6+560 1.697 0.075 2.229 0.11 2.229 0.11
6+570 1.719 0.083 17.081 0.785 17.081 0.785
6+570 1.72 0.083 0.12 0.006 0.12 0.006
6+580 1.76 0.159 17.277 1.2 17.277 1.2
6+590 1.827 0.160 17.935 1.595 17.935 1.595
6+600 1.805 0.527 18.162 3.435 18.162 3.435
6+604 1.892 0.272 6.776 1.464 6.776 1.464
6+606 1.924 0.223 4.232 0.549 4.232 0.549
6+610 1.934 0.212 7.005 0.79 7.005 0.79
6+610 1.932 0.212 0.938 0.103 0.938 0.103
6+620 1.551 0.005 17.416 1.085 17.416 1.085
6+626 1.196 0.721 8.082 2.138 8.082 2.138
6+630 2.343 0.358 7.283 2.222 7.283 2.222
6+632 2.71 0.354 4.834 0.698 4.834 0.698
6+640 1.497 0.731 16.857 4.457 16.857 4.457
6+642 1.444 0.698 2.359 1.146 2.359 1.146
6+650 1.619 0.506 12.856 5.052 12.856 5.052
6+660 1.33 0.902 14.744 7.04 14.744 7.04
6+670 1.688 0.512 15.091 7.074 15.091 7.074

Page 72 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
6+671 1.598 0.563 2.032 0.653 2.032 0.653
6+675 1.249 0.620 5.374 2.198 5.374 2.198
6+680 1.271 0.638 6.303 3.109 6.303 3.109
6+688 1.495 0.763 10.904 5.434 10.904 5.434
6+690 1.446 0.064 3.127 0.862 3.127 0.862
6+700 0.718 0.368 10.807 2.152 10.807 2.152
6+710 1.205 0.610 9.504 4.846 9.504 4.846
6+712 1.094 0.885 2.547 1.656 2.547 1.656
6+713 1.435 0.856 0.471 0.324 0.471 0.324
6+720 1.438 0.782 10.645 6.07 10.645 6.07
6+730 0.986 0.700 12.121 7.412 12.121 7.412
6+736 2.403 0.004 8.176 1.137 8.176 1.137
6+737 2.365 0.504 2.288 0.653 2.288 0.653
6+739 2.362 0.575 2.129 1.166 2.129 1.166
6+740 2.505 0.216 2.252 0.776 2.252 0.776
6+741 1.467 0.959 2.287 0.906 2.287 0.906
6+742 1.439 1.029 1.136 0.757 1.136 0.757
6+743 1.395 0.873 0.782 0.618 0.782 0.618
6+744 1.325 0.599 1.039 0.772 1.039 0.772
6+744 1.603 0.416 0.852 0.295 0.852 0.295
6+750 1.112 3.629 7.684 11.447 7.684 11.447
6+760 1.716 2.046 14.141 28.373 14.141 28.373
6+770 1.122 7.792 14.189 49.189 14.189 49.189
6+780 2.678 1.370 19.002 45.807 19.002 45.807
6+789 0.85 6.864 16.585 38.701 16.585 38.701
6+790 0.937 7.327 0.535 4.252 0.535 4.252
6+800 0.803 6.094 8.701 67.107 8.701 67.107
6+810 0.936 4.790 8.698 54.422 8.698 54.422
6+820 0.802 7.858 8.695 63.245 8.695 63.245
6+829 0.954 7.778 8.255 73.496 8.255 73.496
6+830 0.95 3.511 0.57 3.382 0.57 3.382
6+840 1.426 3.952 11.88 37.315 11.88 37.315
6+850 0.993 4.336 12.098 41.438 12.098 41.438
6+859 0.643 20.307 7.645 115.15 7.645 115.15
6+860 2.222 2.573 0.938 7.489 0.938 7.489
6+863 1.606 2.675 5.124 7.024 5.124 7.024
6+870 0.864 4.920 9.046 27.813 9.046 27.813
6+880 2.837 0.055 18.504 24.879 18.504 24.879
6+887 1.804 0.114 15.529 0.567 15.529 0.567
6+889 1.772 0.137 4.552 0.319 4.552 0.319
6+890 1.759 0.150 1.344 0.109 1.344 0.109
6+897 1.59 0.066 11.783 1.045 11.783 1.045
6+898 1.61 0.096 2.416 0.164 2.416 0.164
6+900 1.555 0.155 2.403 0.233 2.403 0.233
6+903 1.61 0.173 3.961 0.479 3.961 0.479
6+905 1.675 0.074 4.09 0.341 4.09 0.341
6+908 1.635 0.351 4.094 0.727 4.094 0.727
6+910 1.855 0.024 4.28 0.675 4.28 0.675
6+911 1.692 0.165 2.592 0.139 2.592 0.139
6+920 1.897 0.069 15.323 0.999 15.323 0.999
6+930 1.272 0.472 15.845 2.706 15.845 2.706
6+940 1.263 0.596 12.676 5.341 12.676 5.341
6+950 1.442 0.244 13.225 4.104 13.225 4.104
6+950 1.383 0.233 0.316 0.053 0.316 0.053
6+959 1.197 1.142 11.319 6.06 11.319 6.06
6+960 1.154 0.601 1.407 1.05 1.407 1.05
6+970 1.712 0.009 14.325 3.11 14.325 3.11
6+980 1.933 0.092 18.25 0.497 18.25 0.497
6+985 1.999 0.062 9.434 0.361 9.434 0.361
6+990 2.133 0.037 10.802 0.252 10.802 0.252
6+998 1.917 0.020 15.252 0.213 15.252 0.213
7+000 1.816 0.020 4.606 0.049 4.606 0.049
7+006 1.764 0.018 10.531 0.113 10.531 0.113
7+010 1.537 0.333 6.792 0.723 6.792 0.723
7+015 1.598 0.255 8.372 1.568 8.372 1.568
7+020 1.613 0.280 7.481 1.244 7.481 1.244
7+030 1.701 0.152 16.569 2.156 16.569 2.156
7+040 1.632 0.308 16.664 2.298 16.664 2.298
7+050 1.727 0.050 16.793 1.788 16.793 1.788
7+060 1.633 0.125 16.8 0.875 16.8 0.875

Page 73 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
7+070 1.728 0.024 16.806 0.747 16.806 0.747
7+080 1.66 0.126 16.939 0.748 16.939 0.748
7+081 1.696 0.115 2.376 0.17 2.376 0.17
7+088 1.691 0.132 11.071 0.807 11.071 0.807
7+090 1.692 0.128 3.464 0.267 3.464 0.267
7+099 1.712 0.185 15.116 1.683 15.116 1.683
7+100 1.876 0.000 1.68 0.107 1.68 0.107
7+103 1.508 0.238 5.553 0.469 5.553 0.469
7+106 1.434 0.367 3.927 0.914 3.927 0.914
7+107 1.433 0.399 0.906 0.259 0.906 0.259
7+110 1.556 0.498 4.999 1.519 4.999 1.519
7+113 1.461 0.719 5.056 1.979 5.056 1.979
7+117 1.36 0.639 4.804 2.083 4.804 2.083
7+120 1.297 0.941 4.455 2.526 4.455 2.526
7+123 0.842 1.453 3.514 4.049 3.514 4.049
7+127 1.444 1.138 3.849 4.276 3.849 4.276
7+127 1.246 1.576 0.719 0.732 0.719 0.732
7+130 1.277 0.586 3.47 3.131 3.47 3.131
7+131 1.597 0.727 2.03 0.928 2.03 0.928
7+140 1.349 0.992 12.65 7.381 12.65 7.381
7+143 1.601 0.561 4.077 2.147 4.077 2.147
7+145 1.084 0.844 3.241 1.747 3.241 1.747
7+148 1.515 0.634 3.183 1.699 3.183 1.699
7+150 1.418 0.632 3.574 1.445 3.574 1.445
7+152 1.461 0.598 2.91 1.204 2.91 1.204
7+154 1.47 0.378 2.97 0.989 2.97 0.989
7+160 1.383 0.504 8.483 2.622 8.483 2.622
7+170 1.509 0.397 14.458 4.505 14.458 4.505
7+172 1.5 0.404 3.466 0.923 3.466 0.923
7+180 1.642 0.324 12.092 2.801 12.092 2.801
7+182 1.612 0.336 2.956 0.576 2.956 0.576
7+184 1.566 0.325 2.741 0.548 2.741 0.548
7+190 1.741 0.021 10.704 1.082 10.704 1.082
7+195 1.738 0.245 8.731 0.642 8.731 0.642
7+200 1.963 0.225 9.318 1.131 9.318 1.131
7+205 2.181 0.189 10.44 0.996 10.44 0.996
7+210 1.997 0.300 10.321 1.153 10.321 1.153
7+210 1.959 0.300 0.216 0.031 0.216 0.031
7+212 1.969 0.281 4.721 0.697 4.721 0.697
7+220 2.182 0.218 15.769 1.894 15.769 1.894
7+230 2.394 0.001 22.878 1.093 22.878 1.093
7+240 2.49 0.102 24.418 0.513 24.418 0.513
7+246 2.393 0.017 14.427 0.286 14.427 0.286
7+250 2.108 0.001 10.138 0.032 10.138 0.032
7+253 1.858 0.007 6.756 0.01 6.756 0.01
7+257 1.741 0.017 6.065 0.034 6.065 0.034
7+260 1.722 0.009 5.798 0.038 5.798 0.038
7+263 1.744 0.016 4.607 0.03 4.607 0.03
7+265 1.78 0.013 4.68 0.038 4.68 0.038
7+270 1.776 0.007 8.336 0.047 8.336 0.047
7+280 1.914 0.000 18.449 0.036 18.449 0.036
7+283 1.818 0.005 6.254 0.009 6.254 0.009
7+290 1.72 0.004 11.763 0.03 11.763 0.03
7+300 2.22 0.000 19.745 0.02 19.745 0.02
7+302 1.672 0.022 4.27 0.025 4.27 0.025
7+305 1.586 0.202 5.267 0.369 5.267 0.369
7+310 1.621 0.182 7.326 0.89 7.326 0.89
7+318 1.604 0.296 13.454 2.017 13.454 2.017
7+320 1.517 0.315 2.569 0.508 2.569 0.508
7+321 1.553 0.298 1.42 0.287 1.42 0.287
7+325 1.465 0.359 5.529 1.234 5.529 1.234
7+325 1.362 0.448 1.213 0.353 1.213 0.353
7+330 1.528 0.385 6.557 1.884 6.557 1.884
7+340 1.292 0.949 14.117 6.652 14.117 6.652
7+350 1.7 0.355 14.971 6.521 14.971 6.521
7+355 1.146 0.935 6.908 3.128 6.908 3.128
7+356 1.129 1.021 1.221 1.049 1.221 1.049
7+360 1.272 1.949 4.889 6.049 4.889 6.049
7+369 0.687 4.053 9.136 27.985 9.136 27.985
7+370 0.699 3.921 0.468 2.692 0.468 2.692

Page 74 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
7+380 1.4 1.557 10.493 27.391 10.493 27.391
7+384 1.491 0.522 5.989 4.306 5.989 4.306
7+390 1.642 0.233 9.178 2.211 9.178 2.211
7+393 1.651 0.213 4.636 0.629 4.636 0.629
7+394 1.655 0.203 2.373 0.299 2.373 0.299
7+400 1.514 0.286 9.109 1.406 9.109 1.406
7+410 1.514 0.281 15.143 2.837 15.143 2.837
7+418 1.386 0.331 11.34 2.387 11.34 2.387
7+418 1.387 0.331 0.122 0.029 0.122 0.029
7+420 1.396 0.351 2.919 0.714 2.919 0.714
7+430 1.57 0.223 14.845 2.853 14.845 2.853
7+432 1.557 0.220 3 0.419 3 0.419
7+434 1.545 0.211 2.702 0.371 2.702 0.371
7+440 1.724 0.058 10.373 0.853 10.373 0.853
7+440 1.725 0.058 0.281 0.01 0.281 0.01
7+450 1.832 0.011 17.487 0.341 17.487 0.341
7+459 1.844 0.004 15.91 0.064 15.91 0.064
7+460 1.902 0.004 2.518 0.005 2.518 0.005
7+468 2.019 0.000 16.31 0.015 16.31 0.015
7+470 2.023 0.000 3.394 0 3.394 0
7+471 2.024 0.000 2.92 0 2.92 0
7+480 2.031 0.000 17.346 0 17.346 0
7+490 1.573 0.896 18.019 4.473 18.019 4.473
7+498 1.4 0.863 12.371 7.3 12.371 7.3
7+500 1.351 1.100 1.668 1.186 1.668 1.186
7+500 1.334 1.194 0.628 0.535 0.628 0.535
7+509 0.669 1.443 8.641 11.271 8.641 11.271
7+510 0.831 1.658 1.048 2.134 1.048 2.134
7+514 1.342 1.602 4.048 6.003 4.048 6.003
7+520 2.097 0.610 10.818 6.904 10.818 6.904
7+530 1.423 0.445 16.776 5.008 16.776 5.008
7+530 1.531 0.313 0.691 0.177 0.691 0.177
7+538 1.302 0.371 10.984 2.646 10.984 2.646
7+539 1.256 0.444 1.094 0.348 1.094 0.348
7+540 1.11 0.499 1.345 0.536 1.345 0.536
7+540 1.136 0.497 0.285 0.126 0.285 0.126
7+550 1.224 0.750 11.822 6.186 11.822 6.186
7+560 1.5 0.961 13.68 8.379 13.68 8.379
7+565 1.352 0.265 7.195 2.977 7.195 2.977
7+568 1.975 0.054 4.61 0.423 4.61 0.423
7+570 2.174 0.055 4.671 0.116 4.671 0.116
7+575 1.976 0.031 9.903 0.194 9.903 0.194
7+576 1.96 0.026 1.918 0.026 1.918 0.026
7+580 1.804 0.020 8.131 0.094 8.131 0.094
7+585 2.393 0.000 10.106 0.046 10.106 0.046
7+586 2.379 0.000 3.058 0 3.058 0
7+590 2.357 0.000 9.209 0 9.209 0
7+595 1.651 0.318 10.037 0.765 10.037 0.765
7+600 1.836 0.389 8.781 1.707 8.781 1.707
7+606 2.815 0.007 13.756 1.135 13.756 1.135
7+610 2.586 0.039 11.007 0.093 11.007 0.093
7+615 1.544 0.862 10.52 2.275 10.52 2.275
7+620 2.067 0.046 8.872 2.21 8.872 2.21
7+621 2.086 0.031 2.274 0.042 2.274 0.042
7+630 1.894 0.361 17.721 1.745 17.721 1.745
7+640 2.134 0.107 19.928 2.317 19.928 2.317
7+640 2.14 0.104 0.229 0.011 0.229 0.011
7+650 3.165 0.000 26.525 0.519 26.525 0.519
7+660 2.555 0.134 28.599 0.671 28.599 0.671
7+670 1.656 0.255 21.054 1.944 21.054 1.944
7+671 1.661 0.245 0.857 0.129 0.857 0.129
7+678 1.627 0.510 12.614 2.897 12.614 2.897
7+680 1.561 0.709 2.887 1.103 2.887 1.103
7+690 1.585 0.738 15.727 7.259 15.727 7.259
7+691 1.521 0.959 0.802 0.44 0.802 0.44
7+700 1.75 0.577 15.475 7.362 15.475 7.362
7+705 1.562 0.781 8.261 3.44 8.261 3.44
7+710 1.622 0.453 7.957 3.107 7.957 3.107
7+713 2.012 0.202 5.77 1.067 5.77 1.067
7+715 2.342 0.229 3.779 0.393 3.779 0.393

Page 75 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
7+720 4.444 0.006 17.105 0.615 17.105 0.615
7+725 3.693 0.033 20.249 0.099 20.249 0.099
7+730 2.225 0.081 14.686 0.29 14.686 0.29
7+740 7.734 0.000 49.743 0.408 49.743 0.408
7+750 0.836 1.301 42.593 6.464 42.593 6.464
7+750 2.348 0.306 0.095 0.048 0.095 0.048
7+750 2.293 0.421 0.73 0.11 0.73 0.11
7+760 1.887 0.213 20.331 3.008 20.331 3.008
7+765 1.793 0.218 10.039 1.194 10.039 1.194
7+770 2.186 0.231 8.963 1.022 8.963 1.022
7+780 1.478 0.852 18.246 5.438 18.246 5.438
7+790 1.45 0.743 14.623 8.009 14.623 8.009
7+790 1.41 0.731 0.679 0.35 0.679 0.35
7+800 1.946 0.381 15.987 5.295 15.987 5.295
7+802 1.557 0.506 3.043 0.77 3.043 0.77
7+810 1.42 0.351 12.299 3.54 12.299 3.54
7+811 1.338 1.104 0.888 0.468 0.888 0.468
7+820 1.801 0.000 14.688 5.166 14.688 5.166
7+830 1.973 0.022 18.872 0.11 18.872 0.11
7+840 1.669 0.652 18.213 3.369 18.213 3.369
7+843 1.157 0.817 3.949 2.053 3.949 2.053
7+850 1.286 0.126 8.801 3.4 8.801 3.4
7+860 2.933 0.000 21.095 0.632 21.095 0.632
7+861 2.944 0.000 2.585 0 2.585 0
7+870 1.724 0.202 21.286 0.923 21.286 0.923
7+880 1.317 0.746 15.204 4.742 15.204 4.742
7+885 1.42 0.579 6.96 3.369 6.96 3.369
7+890 2.527 0.445 9.705 2.513 9.705 2.513
7+899 1.45 0.722 17.332 5.075 17.332 5.075
7+900 1.454 0.669 1.874 0.896 1.874 0.896
7+908 1.414 0.760 12.093 6.024 12.093 6.024
7+910 1.422 0.652 2.222 1.107 2.222 1.107
7+912 1.418 0.557 2.85 1.213 2.85 1.213
7+920 1.687 0.249 12.412 3.223 12.412 3.223
7+922 1.658 0.383 3.149 0.596 3.149 0.596
7+930 1.729 0.098 13.749 1.954 13.749 1.954
7+938 1.719 0.117 14.538 0.904 14.538 0.904
7+940 1.458 0.360 2.491 0.371 2.491 0.371
7+942 1.471 0.358 2.762 0.67 2.762 0.67
7+945 1.227 0.637 3.645 1.338 3.645 1.338
7+948 1.283 0.630 3.937 1.987 3.937 1.987
7+950 1.323 0.628 2.973 1.434 2.973 1.434
7+958 1.449 0.600 10.936 4.843 10.936 4.843
7+960 1.453 0.558 3.056 1.221 3.056 1.221
7+968 1.451 0.429 11.209 3.812 11.209 3.812
7+970 1.604 0.405 3.485 0.952 3.485 0.952
7+975 1.546 0.377 7.215 1.792 7.215 1.792
7+980 1.51 0.404 8.277 2.116 8.277 2.116
7+990 1.611 0.502 15.605 4.528 15.605 4.528
8+000 1.75 0.158 16.809 3.299 16.809 3.299
8+010 1.254 1.273 15.023 7.154 15.023 7.154
8+020 1.277 0.421 12.656 8.471 12.656 8.471
8+023 1.115 0.613 3.269 1.414 3.269 1.414
8+030 1.353 0.441 8.968 3.832 8.968 3.832
8+039 1.464 0.205 12.178 2.793 12.178 2.793
8+040 1.477 0.186 1.999 0.266 1.999 0.266
8+050 1.203 0.242 13.405 2.141 13.405 2.141
8+053 1.035 1.022 3.059 1.732 3.059 1.732
8+060 1.147 0.559 7.926 5.766 7.926 5.766
8+069 2.318 0.131 14.952 2.996 14.952 2.996
8+070 2.321 0.135 3.147 0.182 3.147 0.182
8+080 1.565 0.790 19.413 4.618 19.413 4.618
8+089 1.309 0.878 12.274 7.095 12.274 7.095
8+090 1.289 0.966 1.903 1.345 1.903 1.345
8+098 1.583 0.650 11.218 6.293 11.218 6.293
8+100 1.583 0.671 3.469 1.444 3.469 1.444
8+110 1.115 0.977 13.494 8.228 13.494 8.228
8+119 1.386 0.636 10.676 6.886 10.676 6.886
8+120 1.464 0.545 2.086 0.865 2.086 0.865
8+128 1.524 0.622 11.667 4.558 11.667 4.558

Page 76 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
8+130 1.457 0.654 3.266 1.399 3.266 1.399
8+140 1.192 0.344 13.246 4.994 13.246 4.994
8+150 1.702 0.354 14.474 3.492 14.474 3.492
8+160 1.12 0.663 14.113 5.085 14.113 5.085
8+170 1.277 0.911 11.985 7.869 11.985 7.869
8+180 1.347 1.212 13.12 10.614 13.12 10.614
8+182 3.734 0.660 5.816 2.143 5.816 2.143
8+190 3.012 1.094 26.008 6.763 26.008 6.763
8+200 1.401 0.680 22.064 8.871 22.064 8.871
8+204 1.392 0.528 5.56 2.406 5.56 2.406
8+210 1.106 0.753 7.52 3.867 7.52 3.867
8+212 1.113 0.739 2.54 1.717 2.54 1.717
8+220 1.818 0.316 11.285 4.104 11.285 4.104
8+224 1.25 0.549 6.108 1.742 6.108 1.742
8+230 1.19 0.603 7.368 3.503 7.368 3.503
8+230 1.185 0.601 0.238 0.121 0.238 0.121
8+240 1.262 0.363 12.019 4.767 12.019 4.767
8+250 1.204 0.998 12.34 6.816 12.34 6.816
8+250 1.208 1.006 0.241 0.2 0.241 0.2
8+256 1.419 0.367 7.994 4.177 7.994 4.177
8+260 1.523 0.440 5.464 1.499 5.464 1.499
8+270 1.29 0.592 14.067 5.162 14.067 5.162
8+280 0.931 0.914 11.107 7.53 11.107 7.53
8+286 2.026 0.489 9.293 4.409 9.293 4.409
8+290 2.084 0.463 7.631 1.767 7.631 1.767
8+293 2.011 0.436 5.855 1.285 5.855 1.285
8+300 1.626 0.405 12.988 3.003 12.988 3.003
8+310 1.282 0.388 14.53 3.964 14.53 3.964
8+313 1.555 0.430 4.052 1.169 4.052 1.169
8+320 2.029 0.303 12.823 2.602 12.823 2.602
8+322 2.032 0.326 3.521 0.535 3.521 0.535
8+330 2.05 0.450 16.937 3.172 16.937 3.172
8+340 1.863 0.644 19.597 5.446 19.597 5.446
8+342 1.896 0.673 3.247 1.138 3.247 1.138
8+350 2.018 0.017 16.188 2.853 16.188 2.853
8+351 1.868 0.013 2.633 0.021 2.633 0.021
8+360 1.268 1.176 13.53 5.143 13.53 5.143
8+370 1.186 0.979 12.274 10.738 12.274 10.738
8+373 1.008 0.954 2.888 2.525 2.888 2.525
8+380 1.941 0.641 10.937 5.745 10.937 5.745
8+390 1.106 1.321 15.398 9.681 15.398 9.681
8+396 1.375 1.051 6.975 6.578 6.975 6.578
8+400 1.531 0.787 6.439 3.958 6.439 3.958
8+400 1.591 0.763 0.351 0.167 0.351 0.167
8+410 1.441 1.091 14.89 8.924 14.89 8.924
8+413 1.37 1.096 3.716 2.876 3.716 2.876
8+420 1.59 0.658 10.901 6.446 10.901 6.446
8+425 1.538 0.843 8.169 3.922 8.169 3.922
8+427 1.471 0.898 3.241 1.876 3.241 1.876
8+430 1.317 0.897 3.656 2.354 3.656 2.354
8+439 1.578 0.391 13.499 6.006 13.499 6.006
8+440 1.551 0.382 1.048 0.259 1.048 0.259
8+447 1.635 0.287 11.746 2.468 11.746 2.468
8+450 1.602 0.278 4.242 0.739 4.242 0.739
8+452 1.21 0.849 3.181 1.266 3.181 1.266
8+460 1.443 0.251 10.272 4.24 10.272 4.24
8+469 1.207 0.864 12.367 5.184 12.367 5.184
8+470 1.363 0.828 0.862 0.563 0.862 0.563
8+474 1.267 0.725 4.879 2.856 4.879 2.856
8+476 1.213 0.684 2.563 1.444 2.563 1.444
8+480 1.237 0.667 5.188 2.843 5.188 2.843
8+490 1.242 0.733 12.399 6.987 12.399 6.987
8+494 1.379 0.775 4.857 2.794 4.857 2.794
8+500 1.361 0.813 8.625 4.997 8.625 4.997
8+510 1.569 0.689 14.65 7.506 14.65 7.506
8+516 1.419 0.736 8.619 4.11 8.619 4.11
8+520 1.339 0.786 5.836 3.22 5.836 3.22
8+527 1.302 0.839 9.238 5.683 9.238 5.683
8+530 1.564 0.530 4.303 2.056 4.303 2.056
8+533 1.488 0.553 4.949 1.757 4.949 1.757

Page 77 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
8+539 1.468 0.678 9.097 3.791 9.097 3.791
8+540 1.44 0.696 0.871 0.412 0.871 0.412
8+550 1.441 0.527 14.39 6.141 14.39 6.141
8+558 1.622 0.547 12.613 4.478 12.613 4.478
8+560 1.659 0.365 2.88 0.811 2.88 0.811
8+567 1.416 0.663 10.759 3.621 10.759 3.621
8+570 1.262 0.687 4.023 2.035 4.023 2.035
8+580 1.25 1.169 12.56 9.309 12.56 9.309
8+590 1.122 0.879 11.857 10.238 11.857 10.238
8+596 1.278 0.474 7.479 4.239 7.479 4.239
8+600 1.379 0.513 4.967 1.884 4.967 1.884
8+610 1.304 0.487 13.369 5.077 13.369 5.077
8+620 1.115 1.210 11.981 8.43 11.981 8.43
8+620 1.111 1.214 0.085 0.092 0.085 0.092
8+630 1.113 0.855 11.145 10.297 11.145 10.297
8+636 1.047 0.582 6.777 4.475 6.777 4.475
8+640 1.187 0.251 4.203 1.563 4.203 1.563
8+650 1.254 0.021 12.214 1.36 12.214 1.36
8+660 1.481 0.893 13.674 4.588 13.674 4.588
8+670 1.619 0.447 15.493 6.742 15.493 6.742
8+680 1.605 0.548 16.116 5.023 16.116 5.023
8+687 1.518 0.751 11.032 4.587 11.032 4.587
8+690 1.412 0.938 4.301 2.48 4.301 2.48
8+700 1.744 0.168 15.783 5.53 15.783 5.53
8+710 1.37 0.673 15.573 4.203 15.573 4.203
8+713 1.49 0.563 3.695 1.598 3.695 1.598
8+720 1.569 0.729 11.34 4.79 11.34 4.79
8+730 1.223 0.311 13.963 5.198 13.963 5.198
8+740 1.302 0.585 12.63 4.484 12.63 4.484
8+745 2.199 0.228 8.092 1.882 8.092 1.882
8+750 2.155 0.430 11.694 1.772 11.694 1.772
8+760 1.275 0.648 17.144 5.386 17.144 5.386
8+770 2.451 0.283 18.64 4.646 18.64 4.646
8+780 2.113 0.988 22.837 6.357 22.837 6.357
8+782 1.953 1.357 4.549 2.622 4.549 2.622
8+790 1.562 1.078 13.648 9.464 13.648 9.464
8+800 2.059 0.185 18.105 6.325 18.105 6.325
8+810 1.377 0.637 17.186 4.102 17.186 4.102
8+813 1.531 0.572 4.363 1.811 4.363 1.811
8+819 1.324 0.402 8.255 2.816 8.255 2.816
8+820 1.33 0.384 1.613 0.478 1.613 0.478
8+829 0.97 0.712 10.227 4.87 10.227 4.87
8+830 1.314 0.716 1.268 0.792 1.268 0.792
8+840 0.975 0.832 11.445 7.738 11.445 7.738
8+850 1.88 0.512 14.277 6.719 14.277 6.719
8+858 1.248 1.070 13.146 6.647 13.146 6.647
8+860 1.305 1.295 2.036 1.886 2.036 1.886
8+870 0.887 1.279 10.945 12.892 10.945 12.892
8+878 1.897 0.470 11.738 7.323 11.738 7.323
8+878 1.896 0.470 0.019 0.005 0.019 0.005
8+880 1.766 0.466 2.921 0.726 2.921 0.726
8+884 2.864 0.135 9.654 1.225 9.654 1.225
8+890 1.949 0.801 14.15 2.76 14.15 2.76
8+898 0.922 3.817 12.08 19.435 12.08 19.435
8+900 0.643 3.996 1.241 6.191 1.241 6.191
8+903 0.702 3.567 2.337 13.141 2.337 13.141
8+910 1.872 0.629 8.407 13.686 8.407 13.686
8+920 2.379 0.000 21.27 3.139 21.27 3.139
8+924 1.285 1.132 7.59 2.346 7.59 2.346
8+930 2.091 0.010 9.885 3.345 9.885 3.345
8+933 2.256 0.000 7.558 0.018 7.558 0.018
8+935 2.34 0.000 4.635 0 4.635 0
8+940 1.984 0.123 9.774 0.275 9.774 0.275
8+950 1.903 0.262 19.46 1.925 19.46 1.925
8+960 2.681 0.301 22.905 2.822 22.905 2.822
8+965 2.968 0.000 15.504 0.826 15.504 0.826
8+966 2.962 0.000 0.387 0 0.387 0
8+970 2.377 0.657 11.693 1.439 11.693 1.439
8+971 2.283 0.676 2.263 0.647 2.263 0.647
8+980 1.962 0.171 19.164 3.823 19.164 3.823

Page 78 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
8+990 1.667 0.328 18.142 2.493 18.142 2.493
8+996 1.755 0.120 9.614 1.259 9.614 1.259
9+000 1.312 0.805 6.717 2.027 6.717 2.027
9+007 1.583 0.427 10.548 4.487 10.548 4.487
9+010 1.967 0.032 4.818 0.622 4.818 0.622
9+020 1.18 1.463 15.734 7.473 15.734 7.473
9+023 1.491 0.821 4.119 3.522 4.119 3.522
9+030 1.455 0.737 10.194 5.382 10.194 5.382
9+037 1.365 0.707 10.281 5.246 10.281 5.246
9+040 1.316 0.651 3.641 1.837 3.641 1.837
9+043 1.236 1.377 3.938 3.134 3.938 3.134
9+047 1.185 1.240 4.386 4.759 4.386 4.759
9+050 1.106 1.070 3.39 3.431 3.39 3.431
9+050 1.097 1.054 0.368 0.356 0.368 0.356
9+053 1.031 0.979 3.096 2.964 3.096 2.964
9+060 1.155 0.792 7.743 6.282 7.743 6.282
9+067 2.52 0.000 12.32 2.656 12.32 2.656
9+070 1.262 0.255 6.229 0.419 6.229 0.419
9+080 0.841 1.738 10.162 9.631 10.162 9.631
9+080 0.863 0.640 0.285 0.397 0.285 0.397
9+089 0.902 1.216 8.287 8.71 8.287 8.71
9+090 0.917 1.283 0.557 0.765 0.557 0.765
9+090 0.927 1.326 0.383 0.542 0.383 0.542
9+100 1.089 2.111 9.662 16.404 9.662 16.404
9+110 1.3 1.471 11.939 17.771 11.939 17.771
9+115 1.408 0.227 7.337 4.568 7.337 4.568
9+119 1.468 0.638 5.725 1.717 5.725 1.717
9+120 1.469 0.637 0.901 0.389 0.901 0.389
9+130 1.255 0.753 13.641 6.926 13.641 6.926
9+140 1.427 0.628 13.402 6.935 13.402 6.935
9+150 1.379 0.765 13.997 7.043 13.997 7.043
9+157 1.284 1.095 9.391 6.611 9.391 6.611
9+160 1.715 0.291 4.402 2.043 4.402 2.043
9+170 1.143 1.041 14.302 6.623 14.302 6.623
9+170 1.159 1.064 0.258 0.233 0.258 0.233
9+176 1.018 0.786 6.107 5.164 6.107 5.164
9+180 1.181 0.924 4.578 3.563 4.578 3.563
9+190 0.857 1.429 10.194 11.742 10.194 11.742
9+195 0.862 1.339 4.49 7.228 4.49 7.228
9+197 0.742 1.325 1.475 2.451 1.475 2.451
9+200 1.428 0.700 3.186 2.972 3.186 2.972
9+209 3.116 0.000 20.47 3.152 20.47 3.152
9+210 3.117 0.000 3.083 0 3.083 0
9+220 2.362 0.087 27.397 0.434 27.397 0.434
9+230 0.89 0.815 16.261 4.509 16.261 4.509
9+240 1.203 0.441 10.468 6.282 10.468 6.282
9+250 1.301 0.571 12.522 5.062 12.522 5.062
9+260 1.335 0.652 13.181 6.114 13.181 6.114
9+269 1.385 0.902 12.256 7 12.256 7
9+270 1.5 1.263 1.427 1.071 1.427 1.071
9+280 1.304 0.401 14.02 8.321 14.02 8.321
9+290 2.295 0.138 17.996 2.695 17.996 2.695
9+300 1.552 0.782 19.231 4.6 19.231 4.6
9+310 1.565 0.548 15.581 6.651 15.581 6.651
9+317 1.215 1.292 9.485 6.28 9.485 6.28
9+317 1.094 1.306 0.383 0.431 0.383 0.431
9+320 1.319 1.370 3.431 3.803 3.431 3.803
9+330 1.17 0.851 12.447 11.098 12.447 11.098
9+340 1.527 0.158 13.482 5.039 13.482 5.039
9+350 1.435 0.069 14.809 1.138 14.809 1.138
9+360 1.271 1.287 13.532 6.785 13.532 6.785
9+370 1.097 0.414 11.84 8.511 11.84 8.511
9+377 0.841 0.483 6.613 3.066 6.613 3.066
9+380 1.005 0.497 2.93 1.558 2.93 1.558
9+390 1.798 0.061 14.021 2.793 14.021 2.793
9+400 1.345 0.389 15.722 2.253 15.722 2.253
9+410 1.466 0.410 14.057 4.005 14.057 4.005
9+420 1.099 0.024 12.828 2.175 12.828 2.175
9+430 0.917 0.214 10.081 1.19 10.081 1.19
9+440 0.994 1.415 9.555 8.146 9.555 8.146

Page 79 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
9+450 1.168 1.054 10.81 12.349 10.81 12.349
9+454 1.105 0.372 4.044 2.537 4.044 2.537
9+457 2.026 0.636 4.655 1.499 4.655 1.499
9+460 1.719 1.728 6.496 4.101 6.496 4.101
9+470 0.885 1.067 13.024 13.973 13.024 13.973
9+475 2.475 0.317 8.944 3.684 8.944 3.684
9+478 2.763 0.275 6.891 0.778 6.891 0.778
9+480 2.923 0.254 5.834 0.539 5.834 0.539
9+490 0.963 0.163 19.48 2.078 19.48 2.078
9+500 1.059 0.838 10.158 4.93 10.158 4.93
9+500 1.081 0.860 0.348 0.269 0.348 0.269
9+510 1.359 0.216 11.867 5.112 11.867 5.112
9+517 1.083 1.180 8.008 4.473 8.008 4.473
9+520 0.816 1.033 3.307 3.762 3.307 3.762
9+523 0.814 0.764 2.621 2.808 2.621 2.808
9+526 0.962 0.602 2.913 2.161 2.913 2.161
9+530 1.074 0.771 3.642 2.392 3.642 2.392
9+540 0.94 0.258 10.127 5.095 10.127 5.095
9+548 1.466 0.768 9.866 4.205 9.866 4.205
9+550 1.22 0.702 2.417 1.323 2.417 1.323
9+560 1.237 0.620 12.286 6.612 12.286 6.612
9+566 1.206 0.780 7.882 4.517 7.882 4.517
9+570 0.983 0.794 3.88 2.791 3.88 2.791
9+580 0.978 0.630 9.807 7.122 9.807 7.122
9+590 0.846 0.960 9.12 7.952 9.12 7.952
9+600 1.26 0.758 10.248 8.362 10.248 8.362
9+600 1.274 0.765 0.338 0.203 0.338 0.203
9+610 1.852 0.086 15.629 4.256 15.629 4.256
9+620 1.158 0.379 15.048 2.323 15.048 2.323
9+630 1.256 1.162 12.07 7.705 12.07 7.705
9+640 1.686 0.321 14.709 7.417 14.709 7.417
9+650 1.481 0.626 15.834 4.739 15.834 4.739
9+660 1.456 0.785 14.296 6.871 14.296 6.871
9+660 1.447 0.784 0.387 0.209 0.387 0.209
9+670 1.542 0.715 14.949 7.497 14.949 7.497
9+680 1.601 0.525 15.715 6.202 15.715 6.202
9+690 1.54 0.506 15.705 5.158 15.705 5.158
9+700 1.628 0.489 15.842 4.975 15.842 4.975
9+710 1.361 0.952 14.559 7.015 14.559 7.015
9+710 1.356 0.944 0.354 0.247 0.354 0.247
9+717 1.104 0.576 8.851 5.47 8.851 5.47
9+720 1.015 0.424 2.971 1.402 2.971 1.402
9+730 1.183 1.001 10.989 7.126 10.989 7.126
9+740 1.584 0.673 13.832 8.368 13.832 8.368
9+750 1.406 0.630 14.561 6.343 14.561 6.343
9+750 1.401 0.630 0.365 0.164 0.365 0.164
9+760 1.443 0.660 14.219 6.451 14.219 6.451
9+770 1.377 1.162 14.097 9.111 14.097 9.111
9+771 1.292 1.205 1.21 1.074 1.21 1.074
9+780 1.617 0.551 13.222 7.984 13.222 7.984
9+790 1.345 0.853 14.809 7.012 14.809 7.012
9+791 1.381 0.861 0.684 0.429 0.684 0.429
9+800 2.115 0.160 16.602 4.842 16.602 4.842
9+810 1.163 0.665 16.382 4.125 16.382 4.125
9+816 1.003 1.557 6.31 6.481 6.31 6.481
9+820 1.055 1.327 4.288 6.016 4.288 6.016
9+830 1.121 0.651 10.873 9.889 10.873 9.889
9+831 1.124 0.625 0.563 0.32 0.563 0.32
9+840 1.361 0.994 11.794 7.695 11.794 7.695
9+850 1.663 0.378 15.119 6.866 15.119 6.866
9+860 1.647 0.409 16.554 3.934 16.554 3.934
9+870 1.415 0.636 15.315 5.225 15.315 5.225
9+871 1.376 0.650 1.414 0.651 1.414 0.651
9+880 1.408 0.837 12.51 6.684 12.51 6.684
9+885 1.184 0.855 6.307 4.117 6.307 4.117
9+890 1.188 0.871 6.088 4.432 6.088 4.432
9+900 1.423 0.586 13.051 7.291 13.051 7.291
9+910 1.461 1.023 14.414 8.059 14.414 8.059
9+911 1.48 0.237 1.489 0.64 1.489 0.64
9+920 1.341 0.447 12.672 3.074 12.672 3.074

Page 80 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
9+930 1.826 0.187 15.837 3.166 15.837 3.166
9+940 1.274 0.885 15.502 5.363 15.502 5.363
9+950 1.35 0.788 13.122 8.372 13.122 8.372
9+960 1.451 0.668 14.008 7.285 14.008 7.285
9+966 1.397 0.749 8.934 4.448 8.934 4.448
9+969 1.266 0.909 3.327 2.072 3.327 2.072
9+970 1.495 0.872 1.695 1.094 1.695 1.094
9+980 1.506 0.840 15.007 8.559 15.007 8.559
9+986 1.29 0.944 7.971 5.086 7.971 5.086
9+990 1.255 0.973 5.469 4.121 5.469 4.121
9+994 1.375 0.962 4.826 3.551 4.826 3.551
10+000 1.44 0.967 8.908 6.104 8.908 6.104
10+010 1.548 0.492 14.939 7.296 14.939 7.296
10+020 1.058 1.272 13.031 8.822 13.031 8.822
10+030 1.205 0.126 11.316 6.994 11.316 6.994
10+040 1.224 0.360 12.143 2.43 12.143 2.43
10+049 1.446 0.354 12.581 3.363 12.581 3.363
10+050 1.348 0.369 0.804 0.208 0.804 0.208
10+054 1.005 0.434 4.118 1.405 4.118 1.405
10+060 1.684 0.801 8.659 3.963 8.659 3.963
10+060 1.681 0.797 0.105 0.05 0.105 0.05
10+070 1.466 0.920 15.742 8.572 15.742 8.572
10+079 1.288 1.063 12.973 9.358 12.973 9.358
10+080 1.323 1.042 0.751 0.607 0.751 0.607
10+090 1.581 0.661 14.524 8.522 14.524 8.522
10+094 1.621 0.496 5.607 2.024 5.607 2.024
10+100 1.19 0.958 9.133 4.725 9.133 4.725
10+105 1.256 1.017 5.77 4.669 5.77 4.669
10+110 1.165 1.078 6.387 5.553 6.387 5.553
10+120 1.266 0.423 12.145 7.511 12.145 7.511
10+130 1.058 0.848 11.609 6.302 11.609 6.302
10+136 1.017 0.445 6.291 3.903 6.291 3.903
10+140 1.055 0.612 4.078 2.079 4.078 2.079
10+146 1.312 0.713 7.437 4.149 7.437 4.149
10+150 1.325 0.686 4.917 2.596 4.917 2.596
10+160 2.095 0.252 17.104 4.68 17.104 4.68
10+163 1.07 0.970 5.412 2.092 5.412 2.092
10+166 0.962 0.962 2.689 2.556 2.689 2.556
10+170 1.133 0.785 4.12 3.435 4.12 3.435
10+170 1.123 0.795 0.502 0.351 0.502 0.351
10+180 2.498 0.009 17.326 3.838 17.326 3.838
10+190 1.198 0.179 18.506 0.957 18.506 0.957
10+192 1.368 0.861 2.047 0.82 2.047 0.82
10+195 1.778 0.539 6.07 2.639 6.07 2.639
10+199 1.582 0.716 5.144 1.895 5.144 1.895
10+200 1.383 1.208 2.222 1.443 2.222 1.443
10+210 1.476 0.860 14.276 10.376 14.276 10.376
10+220 1.697 0.274 15.856 5.696 15.856 5.696
10+222 1.413 0.620 2.48 0.713 2.48 0.713
10+224 1.592 0.567 2.863 1.131 2.863 1.131
10+230 1.647 0.381 10.526 3.083 10.526 3.083
10+240 1.442 0.619 15.443 5 15.443 5
10+242 1.388 0.706 3.454 1.617 3.454 1.617
10+244 1.403 0.749 2.802 1.46 2.802 1.46
10+250 1.393 0.876 7.761 4.509 7.761 4.509
10+260 1.188 0.769 12.905 8.223 12.905 8.223
10+270 1.315 0.514 12.516 6.416 12.516 6.416
10+280 2.354 0.586 18.341 5.499 18.341 5.499
10+282 2.404 0.512 5.806 1.34 5.806 1.34
10+290 1.814 0.318 15.942 3.139 15.942 3.139
10+300 1.47 0.983 16.417 6.508 16.417 6.508
10+310 0.958 0.897 12.138 9.404 12.138 9.404
10+313 1.966 0.636 3.771 1.978 3.771 1.978
10+320 1.09 1.265 11.339 7.054 11.339 7.054
10+330 1.463 0.854 12.766 10.599 12.766 10.599
10+340 1.393 0.746 14.278 8 14.278 8
10+350 1.811 0.081 16.02 4.134 16.02 4.134
10+360 1.712 0.264 17.619 1.724 17.619 1.724
10+364 1.45 0.585 6.542 1.757 6.542 1.757
10+367 1.196 1.009 3.357 2.022 3.357 2.022

Page 81 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
10+370 1.158 0.960 3.914 3.273 3.914 3.273
10+380 1.436 0.936 12.967 9.476 12.967 9.476
10+390 1.054 1.340 12.449 11.377 12.449 11.377
10+397 1.123 0.619 7.265 6.536 7.265 6.536
10+400 2.174 0.497 5.481 1.856 5.481 1.856
10+410 1.85 0.435 20.121 4.665 20.121 4.665
10+412 0.981 0.553 2.205 0.77 2.205 0.77
10+420 1.103 0.506 8.795 4.471 8.795 4.471
10+430 1.105 0.575 11.038 5.407 11.038 5.407
10+440 1.612 0.811 13.583 6.929 13.583 6.929
10+450 1.543 0.888 15.773 8.492 15.773 8.492
10+454 1.594 0.550 6.511 2.984 6.511 2.984
10+460 1.481 0.486 8.992 3.03 8.992 3.03
10+470 1.453 0.512 14.67 4.995 14.67 4.995
10+472 1.484 0.502 2.287 0.79 2.287 0.79
10+480 1.494 0.817 12.57 5.566 12.57 5.566
10+490 1.942 0.150 17.181 4.835 17.181 4.835
10+490 1.954 0.142 0.837 0.063 0.837 0.063
10+500 1.968 0.115 18.778 1.224 18.778 1.224
10+510 1.531 0.790 17.5 4.536 17.5 4.536
10+515 1.597 0.393 8.508 3.206 8.508 3.206
10+518 1.341 0.831 3.653 1.514 3.653 1.514
10+520 1.006 1.620 2.46 2.571 2.46 2.571
10+524 1.083 1.496 4.666 6.993 4.666 6.993
10+530 0.953 1.301 5.619 7.796 5.619 7.796
10+540 2.004 0.010 14.774 6.597 14.774 6.597
10+548 1.443 0.018 13.636 0.11 13.636 0.11
10+549 1.485 0.285 2.281 0.236 2.281 0.236
10+550 1.42 0.950 0.776 0.33 0.776 0.33
10+560 1.121 0.919 12.702 9.344 12.702 9.344
10+570 1.56 0.350 13.401 6.346 13.401 6.346
10+580 1.533 0.736 15.465 5.431 15.465 5.431
10+590 1.519 0.562 15.262 6.489 15.262 6.489
10+592 1.372 0.694 2.939 1.276 2.939 1.276
10+600 1.387 0.855 10.989 6.169 10.989 6.169
10+610 1.328 0.841 13.576 8.482 13.576 8.482
10+620 1.16 1.139 12.44 9.899 12.44 9.899
10+629 1.307 0.790 10.653 8.328 10.653 8.328
10+630 1.195 0.791 1.706 1.08 1.706 1.08
10+632 1.453 0.158 2.692 0.967 2.692 0.967
10+640 2.176 0.277 14.421 1.756 14.421 1.756
10+650 1.068 0.735 16.188 5.172 16.188 5.172
10+654 2.341 0.251 6.158 1.841 6.158 1.841
10+660 1.59 0.115 12.421 1.182 12.421 1.182
10+662 1.833 0.039 2.845 0.124 2.845 0.124
10+664 2.222 0.009 5.71 0.067 5.71 0.067
10+665 2.28 0.007 1.139 0.004 1.139 0.004
10+670 2.689 0.000 12.391 0.02 12.391 0.02
10+673 1.859 0.025 6.583 0.035 6.583 0.035
10+680 1.035 1.206 10.406 4.427 10.406 4.427
10+686 1.362 0.728 7.566 6.103 7.566 6.103
10+690 1.478 0.229 5.257 1.756 5.257 1.756
10+698 1.397 0.082 11.327 1.223 11.327 1.223
10+700 1.428 0.051 2.997 0.14 2.997 0.14
10+703 1.519 0.960 3.91 1.341 3.91 1.341
10+708 1.332 0.922 7.772 5.131 7.772 5.131
10+710 1.404 1.013 2.592 1.833 2.592 1.833
10+720 1.669 0.299 15.367 6.56 15.367 6.56
10+730 1.461 0.568 15.653 4.336 15.653 4.336
10+731 1.33 0.655 1.046 0.458 1.046 0.458
10+740 1.43 0.721 12.768 6.362 12.768 6.362
10+749 1.467 0.120 13.012 3.778 13.012 3.778
10+750 1.466 0.118 1.491 0.121 1.491 0.121
10+760 1.301 0.258 13.837 1.88 13.837 1.88
10+770 1.814 0.393 15.577 3.254 15.577 3.254
10+770 1.844 0.413 0.593 0.131 0.593 0.131
10+780 1.726 0.529 17.268 4.559 17.268 4.559
10+781 1.697 0.565 0.919 0.258 0.919 0.258
10+785 1.198 0.854 6.95 3.179 6.95 3.179
10+790 1.011 0.107 5.271 2.235 5.271 2.235

Page 82 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
10+795 1.239 1.057 5.722 2.908 5.722 2.908
10+800 1.446 0.650 6.677 4.429 6.677 4.429
10+805 1.567 0.628 7.36 3.551 7.36 3.551
10+810 1.284 1.150 7.05 4.792 7.05 4.792
10+815 1.847 0.045 7.864 3.173 7.864 3.173
10+820 1.162 0.453 7.577 1.241 7.577 1.241
10+825 1.209 0.818 6.039 3.238 6.039 3.238
10+826 1.446 0.103 1.841 0.638 1.841 0.638
10+830 2.496 0.000 6.937 0.18 6.937 0.18
10+840 1.394 0.397 19.449 1.992 19.449 1.992
10+849 1.283 0.838 12.296 5.707 12.296 5.707
10+850 1.293 0.848 1.028 0.677 1.028 0.677
10+860 2.053 0.259 16.734 5.551 16.734 5.551
10+865 1.711 0.290 8.699 1.269 8.699 1.269
10+870 3.253 0.000 13.366 0.783 13.366 0.783
10+880 2.747 0.000 30.024 0 30.024 0
10+889 1.913 0.244 21.855 1.152 21.855 1.152
10+890 1.899 0.236 1.173 0.149 1.173 0.149
10+900 1.757 0.079 17.924 1.545 17.924 1.545
10+900 1.755 0.078 0.342 0.015 0.342 0.015
10+905 1.715 0.103 8.255 0.431 8.255 0.431
10+910 1.696 0.227 8.94 0.865 8.94 0.865
10+920 1.58 0.610 16.376 4.187 16.376 4.187
10+930 1.415 0.875 14.974 7.424 14.974 7.424
10+935 1.348 0.999 6.573 4.458 6.573 4.458
10+937 1.32 1.053 2.496 1.92 2.496 1.92
10+940 1.257 1.124 4.345 3.67 4.345 3.67
10+950 1.489 0.695 13.735 9.095 13.735 9.095
10+960 1.287 0.369 13.881 5.319 13.881 5.319
10+967 1.583 0.358 9.511 2.41 9.511 2.41
10+970 1.734 0.286 5.591 1.086 5.591 1.086
10+980 2.159 0.098 19.462 1.92 19.462 1.92
10+990 1.238 1.030 16.986 5.643 16.986 5.643
10+991 1.242 1.074 1.661 1.409 1.661 1.409
11+000 1.336 0.690 11.162 7.63 11.162 7.63
11+001 1.333 0.702 0.865 0.45 0.865 0.45
11+010 1.663 0.156 14.006 4.01 14.006 4.01
11+020 1.439 0.211 15.505 1.839 15.505 1.839
11+030 1.193 0.877 13.159 5.439 13.159 5.439
11+040 1.16 0.824 11.762 8.505 11.762 8.505
11+050 1.329 0.645 12.44 7.348 12.44 7.348
11+051 1.331 0.629 0.881 0.422 0.881 0.422
11+060 1.356 0.355 12.543 4.592 12.543 4.592
11+065 1.38 0.155 7.348 1.369 7.348 1.369
11+070 1.36 0.034 6.345 0.438 6.345 0.438
11+080 1.45 0.688 14.051 3.612 14.051 3.612
11+089 1.749 0.504 14.025 5.229 14.025 5.229
11+090 1.738 0.491 2.143 0.611 2.143 0.611
11+100 1.648 0.336 16.929 4.131 16.929 4.131
11+110 1.926 0.000 17.866 1.678 17.866 1.678
11+111 1.921 0.000 1.083 0 1.083 0
11+120 2.171 0.465 19.307 2.196 19.307 2.196
11+129 1.821 2.665 17.51 13.727 17.51 13.727
11+130 2.91 1.205 2.84 2.323 2.84 2.323
11+130 2.94 1.188 0.084 0.034 0.084 0.034
11+135 1.722 0.156 10.996 3.169 10.996 3.169
11+140 1.667 0.067 8.131 0.573 8.131 0.573
11+140 1.674 0.065 0.744 0.028 0.744 0.028
11+145 1.788 0.105 8.748 0.385 8.748 0.385
11+150 2.12 0.000 9.872 0.234 9.872 0.234
11+155 1.787 0.110 9.842 0.247 9.842 0.247
11+160 1.518 0.144 8.338 0.566 8.338 0.566
11+160 1.519 0.144 0.035 0.003 0.035 0.003
11+163 1.579 0.147 5.042 0.417 5.042 0.417
11+166 1.622 0.131 3.812 0.291 3.812 0.291
11+166 1.614 0.122 1.393 0.109 1.393 0.109
11+170 1.964 0.000 6.425 0.22 6.425 0.22
11+180 1.569 0.092 17.667 0.462 17.667 0.462
11+190 1.594 0.324 15.817 2.083 15.817 2.083
11+196 1.642 0.373 8.986 1.937 8.986 1.937

Page 83 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
11+200 1.615 0.459 7.24 1.852 7.24 1.852
11+210 1.298 0.369 14.568 4.143 14.568 4.143
11+210 1.351 0.364 0.539 0.142 0.539 0.142
11+215 1.662 0.283 7.279 1.434 7.279 1.434
11+220 1.58 0.214 7.921 1.049 7.921 1.049
11+223 1.683 0.166 5.495 0.562 5.495 0.562
11+227 1.638 0.174 5.528 0.56 5.528 0.56
11+230 1.704 0.039 5.56 0.361 5.56 0.361
11+233 1.685 0.117 4.416 0.176 4.416 0.176
11+233 1.677 0.112 1.235 0.072 1.235 0.072
11+237 1.736 0.065 5.705 0.253 5.705 0.253
11+240 1.672 0.096 5.702 0.229 5.702 0.229
11+240 1.678 0.096 0.4 0.023 0.4 0.023
11+250 1.593 0.276 15.965 1.817 15.965 1.817
11+258 1.624 0.334 13.483 2.533 13.483 2.533
11+260 1.62 0.298 2.629 0.506 2.629 0.506
11+265 1.57 0.286 7.966 1.437 7.966 1.437
11+270 1.676 0.156 8.102 1.081 8.102 1.081
11+271 1.649 0.137 1.476 0.13 1.476 0.13
11+273 1.592 0.104 2.776 0.206 2.776 0.206
11+279 1.692 0.101 10.758 0.672 10.758 0.672
11+280 1.739 0.109 1.47 0.086 1.47 0.086
11+285 1.67 0.152 8.558 0.625 8.558 0.625
11+287 1.681 0.165 2.725 0.245 2.725 0.245
11+290 1.621 0.190 5.614 0.575 5.614 0.575
11+293 1.613 0.211 5.101 0.634 5.101 0.634
11+300 1.673 0.248 11.246 1.571 11.246 1.571
11+310 1.92 0.032 17.965 1.397 17.965 1.397
11+317 2.093 0.000 13.278 0.105 13.278 0.105
11+318 2.139 0.000 2.197 0 2.197 0
11+320 2.191 0.000 5.076 0 5.076 0
11+320 2.192 0.000 0.075 0 0.075 0
11+325 2.277 0.000 11.072 0 11.072 0
11+330 2.218 0.000 11.131 0 11.131 0
11+335 2.07 0.020 10.622 0.054 10.622 0.054
11+340 2.3 0.000 10.801 0.054 10.801 0.054
11+347 2.035 0.000 15.395 0 15.395 0
11+348 2.002 0.000 1.115 0 1.115 0
11+350 1.847 0.000 4.512 0 4.512 0
11+352 1.709 0.012 3.691 0.013 3.691 0.013
11+360 1.581 0.104 13.033 0.461 13.033 0.461
11+360 1.444 0.188 0.202 0.023 0.202 0.023
11+363 1.637 0.146 3.748 0.515 3.748 0.515
11+365 1.724 0.051 4.102 0.342 4.102 0.342
11+368 1.72 0.155 4.32 0.151 4.32 0.151
11+370 1.654 0.277 4.206 0.54 4.206 0.54
11+372 1.343 0.126 2.881 0.519 2.881 0.519
11+374 1.661 0.103 2.916 0.222 2.916 0.222
11+377 1.703 0.078 5.373 0.29 5.373 0.29
11+380 1.653 0.117 4.908 0.286 4.908 0.286
11+387 1.795 0.000 12.92 0.438 12.92 0.438
11+390 1.741 0.074 4.431 0.092 4.431 0.092
11+397 1.787 0.000 12.001 0.251 12.001 0.251
11+400 1.778 0.000 5.696 0 5.696 0
11+410 1.664 0.065 17.207 0.322 17.207 0.322
11+412 1.8 0.056 4.321 0.149 4.321 0.149
11+414 1.874 0.053 2.869 0.083 2.869 0.083
11+420 1.797 0.160 10.937 0.615 10.937 0.615
11+422 1.67 0.180 3.135 0.298 3.135 0.298
11+426 1.582 0.312 7.57 1.121 7.57 1.121
11+430 1.474 0.470 5.428 1.376 5.428 1.376
11+439 1.658 0.252 14.181 3.262 14.181 3.262
11+440 1.658 0.242 1.569 0.234 1.569 0.234
11+446 1.64 0.205 10.445 1.417 10.445 1.417
11+450 1.647 0.212 6.023 0.764 6.023 0.764
11+451 1.669 0.261 2.407 0.343 2.407 0.343
11+460 1.625 0.369 14.08 2.693 14.08 2.693
11+467 1.565 0.430 11.094 2.778 11.094 2.778
11+470 1.537 0.458 4.72 1.351 4.72 1.351
11+479 1.549 0.462 13.529 4.032 13.529 4.032

Page 84 of 101
Chainage Distance Cut Area Fill Area Cut Volume Fill Volume Cum. Cut Volume Cum. Fill Volume
m m sqm sqm cum cum cum cum
11+480 1.528 0.450 1.898 0.563 1.898 0.563
11+490 1.669 0.226 15.986 3.381 15.986 3.381
11+494 1.641 0.235 5.932 0.823 5.932 0.823
11+500 1.599 0.299 10.396 1.711 10.396 1.711
11+508 1.673 0.199 13.742 2.091 13.742 2.091
11+509 1.658 0.249 0.614 0.083 0.614 0.083
11+510 1.605 0.274 2.011 0.324 2.011 0.324
11+515 1.544 0.336 7.861 1.534 7.861 1.534
11+520 1.42 0.431 7.399 1.931 7.399 1.931
11+524 1.428 0.429 5.097 1.551 5.097 1.551
11+525 1.458 0.393 2.041 0.584 2.041 0.584
11+530 1.508 0.259 7.415 1.616 7.415 1.616
11+533 1.566 0.218 5.032 0.757 5.032 0.757
11+535 1.556 0.222 1.949 0.264 1.949 0.264
11+540 1.803 0.032 9.238 0.672 9.238 0.672
11+550 1.615 0.256 17.118 1.413 17.118 1.413
11+560 1.666 0.193 16.425 2.221 16.425 2.221
11+562 1.649 0.152 3.957 0.411 3.957 0.411
11+563 1.648 0.159 1.449 0.137 1.449 0.137
11+570 1.817 0.045 11.666 0.687 11.666 0.687
11+580 1.8 0.040 18.082 0.425 18.082 0.425
11+590 1.834 0.072 18.167 0.56 18.167 0.56
11+595 1.856 0.070 8.323 0.32 8.323 0.32
11+600 1.887 0.065 10.271 0.371 10.271 0.371
11+601 1.894 0.064 2.177 0.075 2.177 0.075
11+610 1.895 0.082 16.763 0.649 16.763 0.649
11+620 1.928 0.117 19.116 0.995 19.116 0.995
11+629 1.513 0.255 15.733 1.699 15.733 1.699
11+630 1.574 0.268 1.321 0.224 1.321 0.224
11+631 1.604 0.274 1.83 0.312 1.83 0.312
11+636 1.492 0.423 7.866 1.821 7.866 1.821
11+640 1.475 0.282 5.551 1.324 5.551 1.324
11+641 1.478 0.251 1.064 0.195 1.064 0.195
11+644 1.554 0.175 4.757 0.667 4.757 0.667
11+650 1.724 0.062 10.07 0.727 10.07 0.727
11+652 1.706 0.049 3.032 0.087 3.032 0.087
11+656 1.945 0.000 7.582 0.09 7.582 0.09
11+660 1.874 0.013 7.931 0.023 7.931 0.023
11+666 1.786 0.006 10.193 0.051 10.193 0.051
11+670 1.682 0.012 7.681 0.039 7.681 0.039
11+671 1.671 0.018 1.205 0.011 1.205 0.011
11+680 1.632 0.115 15.33 0.619 15.33 0.619
11+680 1.632 0.116 0.053 0.004 0.053 0.004
11+686 1.701 0.135 10.649 0.825 10.649 0.825
11+690 1.751 0.011 6.147 0.268 6.147 0.268
11+700 2.194 0.000 19.712 0.056 19.712 0.056
11+710 1.727 0.070 19.611 0.339 19.611 0.339
11+712 1.731 0.111 3.346 0.17 3.346 0.17
11+716 1.639 0.086 7.591 0.432 7.591 0.432
11+720 1.629 0.040 5.831 0.221 5.831 0.221
11+730 1.752 0.212 16.9 1.267 16.9 1.267
11+731 1.759 0.180 2.467 0.278 2.467 0.278
11+737 1.638 0.220 9.388 1.105 9.388 1.105
11+740 1.589 0.287 4.949 0.778 4.949 0.778
11+750 1.687 0.059 16.38 1.728 16.38 1.728
11+760 1.919 0.022 18.029 0.404 18.029 0.404
11+761 1.916 0.037 2.695 0.042 2.695 0.042
11+770 1.869 0.132 16.262 0.727 16.262 0.727
11+780 1.939 0.062 19.037 0.974 19.037 0.974
11+787 1.999 0.000 13.617 0.216 13.617 0.216
11+790 2.009 0.000 6.181 0 6.181 0
11+800 1.858 0.340 19.335 1.701 19.335 1.701
11+807 1.72 0.256 12.373 2.062 12.373 2.062
11+810 1.96 0.142 5.675 0.614 5.675 0.614
11+819 1.968 0.070 17.169 0.928 17.169 0.928

Page 85 of 101
Nos. of
Estimate for Bus Shelter Location 10

SOR No. Item Particular Unit Nos. Length width Depth Qty Rate Amonunt
Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting rankvegetation,
grass, bushes, shrubs, saplings and trees girth up to 300mm, removal
Ch 2-2.3

of stumps of trees cut earlier and disposal ofunserviceable materials


and stacking of serviceable material to beused or auctioned up to a
lead of 1000 metres including removal anddisposal of top organic soil
not exceeding 150 mm in thickness.

ii- A In area of light jungle Ha 1 3.3 1.5 0.0005 30,647.00 15.17

Construction of Embankment with Material Deposited from


Roadway
Construction of Embankment with Material Deposited from Roadway
Ch 3-3.17

Cutting (Construction of embankment with approved materials


Cu.m. 1 3.3 1.5 0.25 1.24 141.00 174.49
deposited at site from roadway cutting and excavation from drain
and foundation of other structures graded and compacted to meet
requirement of table 300-2)

Embankment Construction with Material Obtained from


Borrow Pits
Construction of embankment with approved material having
Ch 3-3.16

CBR>7obtained from borrow pits with all lifts and leads, transporting
Cu.m. 1 3.3 1.5 0.25 1.24 382.00 472.73
to site,spreading, grading to required slope and compacting to
meetrequirement of table 300-1, 300-2 and as per relevent clauses
ofsection-300.

Granular Sub-base with Well Graded Material (CBR>30 or more)


(Table:- 400-1 & Table 400-2)
Construction of granular sub-base by providing well graded material
like natural sand crushed gravel or crushed stone having CBR >30,
Ch 4-4.1

spreading in uniform layers with motor grader on prepared surface,


Cu.m. 1 3.3 1.5 0.100 0.50 1,642.00 812.79
mixing by mix in place method with rotavator or plant mix method at
OMC, and compacting with vibratory rollers of 80 to 100 kN static
weight to achieve the desired density, complete as per Clause 401 of
Specification.rial
Ch 12-12.8-C

Plain/Reinforced cement concrete in open foundation complete as Cu.m. 1 3.3 1.5 0.3 1.49 4,657.00 6915.65
per drawing and technical specifications- M-20

Cast in Situ Cement Concrete M20 kerb (Construction of cement


concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade
foundation 150 mm thick, foundation having 50 mm projection
Ch 8-8.2

beyond kerb stone, kerb stone laid with kerb laying machine,
foundation concrete laid manually, all complete as per clause 408) LM 1 24 464.00 11136.00
(i) Using Concrete Mixer

Footpaths and Separators


Construction of footpath/ separator by providing a 150 mm
compacted granular sub base as per clause 401 and 25 mm thick
Ch 4-4.16

cement concrete grade M15, over laid with precast concrete tiles
in cement mortar 1:3 including provision of all drainage Sqm 1 3.3 1.5 4.95 437.00 2163.15
arrangements but excluding kerb channel.
SOR No. Item Particular Unit Nos. Length width Depth Qty Rate Amonunt

Tubular Steel Railing on Medium Weight steel channel (ISMC series)


100 mm x 50 mm
Providing, fixing and erecting 50 mm dia steel pipe (weighing 3.56
kg per mts.) railing in 3 rows duly painted on medium weight steel
Ch.8-8.2

channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above


ground, 2 m centre to centre, complete as per approved drawings. RM 1 3.3 1.5 3.3 2609.00 8609.70

Providing and fixing Liter bin complete as per Techical Specification.


No 1 1.00 35,000.00 35000.00

Providing shelter for Bus Passanger as per Drawing and techical


No 1 1.00 130,000 130000.00
specification 1500,1600,1700.
TOTAL Cost of One Shelter 195299.67
Bus Shelter Nos. & Total Cost 10 0.00
Quantity for Road Marking
Lane, Centerline, Edge marking, Stop Line, Warning
Description of Item : lines, Edge markings along island and other markings.

Sl.
No. Descrption Length in m Unit

(A) Lane marking For Rural Areas ► 9921.00 9.921km


Length of Strip d 3.00 m
Clear Gap between Strip 3.00 m
C/c Spacing 6.00 m
No of Strip Per Km e 167.00 Nos
Width of strip f 0.15 m
Area of strip required 745.56 Sqm

(B) Lane marking For Curve ► 1909.00 1.909km


Length of Strip d 3.00 m
Clear Gap between Strip 3.00 m
C/c Spacing 6.00 m
No of Strip Per Km e 167.00 Nos
Width of strip f 0.15 m
Area of strip required 143.46 Sqm

(C) Edge Marking ► 11830.00 11.83 km


Length of Strip g 11830.00 m
Width of strip h 0.15 m
Area of strip required 2xgxh 3549.00 Sqm

(D) Total area Lane Marking and Edge marking A+B+C= 4438.02 Sqm

(E) Miscellaneous Work


i Area for stop line, warning marking and Junction 1331.41 Sqm

Total qty Required D+E= 5769.43 Sqm


Say 5770.00 Sqm
RCC Covered Drain
Estimate for RCC Covered Drain
CHAPTER-12 Length- 2 x 3530Mtr. = 7060 Mtr.

Sr.No. Item No. Item Particular Unit Nos. Length width Depth Qty Rate Amonunt

Excavation for Structures (Earth work in excavation of foundation of structures


as per drawing and technical specification, including setting out, construction
of shoring and bracing, removal of stumps and other deleterious matter,
12.1 dressing of sides and bottom and backfilling with approved material.)
1

B Mechanical Means

(i) Depth upto 3 m cum 2 2420 1 1.00 4840 110.00 532400.00


Provdiing and laying Plain/Reinforced cement concrete in open foundation
including form work shuttering etc. complete as per drawing and technical
specifications and as per relevant clauses of sections 1500, 1700 & 2100 with .
12.8

2 A PCC Grade M15 cum 2 2420 1 0.15 726.00 4837.00 3511662

C RCC Grade M20


Side Wall cum 4 2420 1 0.10 968.00
Cover & Base cum 4 2420 0.1 1.00 968.00
1936.00 5492.00 10632512

Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation


complete as per drawing and technical specifications . Provide 70 kg/Cum For
12.4

3 Drain tonne 1 1936.00 0.045 87.12 63286.00 5513476.3

Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,


wing wall/return wall with 100 mm dia AC pipe, extending through the full
width of the structure with slope of 1V :20H towards drawing foce. Complete as
13.8

4
per drawing and Technical specifications

Interval @ 1.5 m c/c on both Side Of Drain Each 3227 0.10 322.70 402.00 129725.40

Total Amount for Bill No-6 (`) = 0


Per Run Meter 0.00
Estimate for Retaining Wall (2.5 mtr. Height)

S.No. Particulars Unit No. L B D Qty. Rate Amount


Excavation for Structures (Earth work in excavation of foundation of
structures as per drawing and technical specification, including
setting out, construction of shoring and bracing, removal of stumps
1 and other deleterious matter, dressing of sides and bottom and
backfilling with approved material.)

Ordinary soil
Upto 3 m depth
Retaining Wall cum 1 400 2.60 0.85 884.00 110.00 97240.00

Plain/Reinforced cement concrete in open foundation complete as


2 per drawing and technical specifications

Using concrete mixer


PCC Grade M15
Retaining Wall cum 1 400 2.60 0.15 156.00 4837.00 754572.00

Plain/Reinforced cement concrete in open foundation complete as


3 per drawing and technical specifications.

RCC Grade M25


Toe and Heel cum 1 400 2.400 0.30 288 4877.00 1404576.00

Providing and laying Plain/Reinforced cement concrete in sub-


structure complete as per drawing and technical specifications
4 section 1500, 1700 and 2200 (Newly laid concrete shall be covered
by gunny bags). RCC Grade M25

Height upto 5m

With Batching Plant, Transit Mixer and Concrete Pump


Retaining Wall
Stem cum 1 400 2.2 0.350 308 5344.00 1645952.00

Supplying, fitting and placing HYSD bars reinforcement in sub-


5 structure complete as per drawing and technical specifications
section 1600 and 2200.

Reinforcement @70 kg/m3 MT 41.720 63286.00 2640291.92

Providing weep holes in Brick masonry/ Plain/ Reinforced concrete


abutment, wing wall/return wall with 100 mm dia. AC pipe,
extending through the full width of the structure with slope of 1 V:
6 20 H towards drawing face. Complete as per drawing and Technical
specifications section 2706 and 2200.

Retaining Wall Meter 3 0.351 1.05 402.00 423.31

Back filling behind abutment, wing wall and return wall complete as
7 per drawing and Technical specification
Granular material cum 1 400 0.600 2.000 480.00 1620.00 777600.00

Total Amount for Bill (`) = 7320655.23


Per Rmt. 0.0
Junction Improvement

Avg. cost per Cost of


Particulars Nos.
Junction Improvement
No. of minor 3-Legged Junctions 5 574436.33 2872182
No. of minor 4-Legged Junctions 0 1148872.66 0
Cost of Balancing Culverts 662449 662449
Total Cost of minor junction improvement 3534631

Quantities for Minor 3 Legged Junction Improvement (Flexible)


Depth/
S. No. Item Area Qty Rate Amount
Thickness
1 C&G 0.02 0.02 30354.00 455
2 Dismantling Ex. Flexible Pavement 325.00 0.10 32.50 329.00 10,693
3 Excavation in soil 131.25 0.40 52.50 103.00 5,408
4 Subgrade 483.00 0.25 120.75 374.00 45,161
5 Shoulders 150.00 0.32 48 374.00 17,952
6 Granular Sub Base 483.00 0.20 96.6 1574.00 152,048
7 WMM 333.00 0.25 83.25 1910.00 159,008
8 DBM 333.00 0.04 13.32 7327.00 97,596
9 BC 333.00 0.03 9.99 8302.00 82,937
10 Lines, Dashes & Arrows 15.00 15.00 212.00 3,180
Total 574,436

Quantities for Minor Cross Road Intersection Improvement (Flexible)

S. No. Item Area Depth/ Qty Rate Amount


Thickness
1 C&G 0.03 0.03 30354.00 911
2 Dismantling Ex. Flexible Pavement 650.00 0.10 65.00 329.00 21,385
3 Excavation in soil 262.50 0.40 105.00 103.00 10,815
4 Subgrade 966.00 0.25 241.5 374.00 90,321
5 Shoulders 300.00 0.32 96 374.00 35,904
6 Granular Sub Base 966.00 0.20 193.2 1574.00 304,097
7 WMM 666.00 0.25 166.5 1910.00 318,015
8 DBM 666.00 0.04 26.64 7327.00 195,191
9 BC 666.00 0.03 19.98 8302.00 165,874
10 Lines, Dashes & Arrows 30.00 30.00 212.00 6,360

Total 1,148,873
Estimate for Major 3-Legged Junction Improvement

S.No. Descriptions Unit No. L B D Qty. Rate Amount

Construction of Subgrade
Embankment Construction with Material Obtained from
Borrow Pits Construction of embankment with approved
material having CBR>7 obtained from borrow pits with
all lifts and leads, transporting to site, spreading, grading
1 to required slope and compacting to meet requirement
of table 300-1, 300-2 and as per relevent clauses of
section-300.

Y OR T Type Major Junction


cum 1 Area= 3307.50 0.50 1653.75
cum 1 Area= 3579.60 0.50 1789.80
Deduct project road cum 1 300.00 10.00 0.50 -1500.00
1943.55 436.00 847387.80

Granular Sub-base with Close Graded Material (Table:-


400-1)
Plant Mix Method (Construction of
granular sub-base by providing close graded Material,
mixing in a mechanical mix plant at OMC, carriage of
mixed Material to work site, spreading in uniform layers
2 with motor grader on prepared surface and compacting
with vibratory power roller to achieve the desired
density, complete as per clause 401 )

Y OR T Type Major Junction


cum 1 Area= 3307.50 0.200 661.50
cum 1 Area= 3579.60 0.200 715.92
Deduct project road cum 1 300.00 10.00 0.200 -600.00
777.42 1642.00 1276523.64

Wet Mix Macadam


Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers with paver in sub-
base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired
density in accordance to Table No. 400-12, 400-13 and
as per clause of section 406 of specifications

Y OR T Type Major Junction


cum 1 Area= 3307.50 0.250 826.88
cum 1 Area= 1970.00 0.250 492.50
Deduct project road cum 1 300.00 10.00 0.250 -750.00
569.38 1980.00 1127362.50

Dense Graded Bituminous Macadam (Providing and


laying dense bituminous macadam with 100-120 TPH
batch type HMP producing an average output of 75
tonnes per hour using crushed aggregates of specified
grading, premixed with bituminous binder @ 4.0 to 4.5%
by weight of total mix of mix and filler, transporting the
hot mix to work site, laying with a hydrostatic paver
finisher with sensor control to the required grade, level
3 and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as
per MoRTH

Y OR T Type Major Junction


cum 1 Area= 3307.50 0.050 165.38
cum 1 Area= 1970.00 0.050 98.50
Deduct project road cum 1 300.00 10.00 0.050 -150.00
Total Qty. 113.88 7203.00 820241.625

Page 92 of 101
Estimate for Major 3-Legged Junction Improvement

S.No. Descriptions Unit No. L B D Qty. Rate Amount

Providing and laying bituminous concrete using crushed


aggregates of specified grading, premixed with
bituminous binder @ 5.4 to 5.6 % of mix and filler,
transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the
required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the
desired compaction as per clause 507 of specification.
4 a) Using Batch Mix Plant of appropriate capacity
andPaver Finisher Hydraustatic with Sensor control.
(i) for Grading-I ( 50-65 mm thickness ) with
60/70bitumen (VG-30)

Y OR T Type Major Junction


cum 1 Area= 3307.50 0.03 99.23
cum 1 Area= 1970.00 0.03 59.10
Deduct project road cum 1 300.00 10.00 0.03 -90.00
Total Qty. 68.33 8236.00 562724.7

Construction of Shoulders with approved


material/selected soil i/c excavation all lifts & leads i/c
grading to required slope & camber of 4% and
compacting using vibratory roller of 80 to 100 kN static
5 weight to meet requirement as per relevant clause of
400. ) (A. Earthen Shoulders (CBR Value > 7))

Y OR T Type Major Junction Cum 1 Area= 804.8 0.33 265.584 1642.00 436088.928

Construction of Median and Island with Soil Taken from


Roadway Cutting (Construction of Median and Island
above road level with approved material deposited at
site from roadway cutting and excavation for drain and
6 foundation of other structures, spread, graded and
compacted as per clause 407)

Y OR T Type Major Junction cum 3 50 1.5 0.65 146.25 227.00 33198.75

Cast in Situ Cement Concrete M20 kerb (Construction of


cement concrete kerb with top and bottom width 115
and 165 mm respectively, 250 mm high in M 20 grade
PCC on M-10 grade foundation 150 mm thick,
foundation having 50 mm projection beyond kerb stone,
7 kerb stone laid with kerb laying machine, foundation
concrete laid manually, all complete as per clause 408)

Y OR T Type Major Junction M 6 53 318.00 464.00 147552.00

8 Site Clearance & Misclaneous Work


Y OR T Type Major Junction Lumpsum 1 250000 250000.00

Total Cost 5501079.94


No. of Major 3-legged Junctions 0
Cost of Major 3-legged junction Improvement 0

Page 93 of 101
Estimate for Major 4-Legged Junction Improvement
S.No. Descriptions Unit No. L B D Qty. Rate Amount
Construction of Subgrade Embankment Construction
with Material Obtained from Borrow Pits Construction of
embankment with approved material having CBR>7
obtained from borrow pits with all lifts and leads,
transporting to site, spreading, grading to required slope
1 and compacting to meet requirement of table 300-1,
300-2 and as per relevent clauses of section-300.

X Type Major Junction


cum 1 Area= 3307.50 0.50 1653.75
cum 2 Area= 3579.60 0.50 3579.60
Deduct project road cum 1 300.00 10.00 0.50 -1500.00
3733.35 436.00 1627740.60

Granular Sub-base with Close Graded Material (Table:-


400-1)
Plant Mix Method (Construction of granular
sub-base by providing close graded Material, mixing in
a mechanical mix plant at OMC, carriage of mixed
2 Material to work site, spreading in uniform layers with
motor grader on prepared surface and compacting with
vibratory power roller to achieve the desired density,
complete as per clause 401 )

X Type Major Junction


cum 1 Area= 3307.50 0.200 661.50
cum 2 Area= 1970.00 0.200 788.00
Deduct project road cum 1 300.00 10.00 0.200 -600.00
849.50 1642.00 1394879.00

(Providing, laying, spreading and compacting graded


stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers with paver in sub-
base / base course on well prepared surface and
3 compacting with vibratory roller to achieve the desired
density.)

X Type Major Junction


cum 1 Area= 3307.50 0.25 826.88
cum 2 Area= 1970.00 0.25 985.00
Deduct project road cum 1 300.00 10.00 0.25 -750.00
1061.88 1980.00 2102512.5

Dense Graded Bituminous Macadam (Providing and


laying dense bituminous macadam with 100-120 TPH
batch type HMP producing an average output of 75
tonnes per hour using crushed aggregates of specified
grading, premixed with bituminous binder @ 4.0 to 4.5%
by weight of total mix of mix and filler, transporting the
hot mix to work site, laying with a hydrostatic paver
4 finisher with sensor control to the required grade, level
and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as
per MoRTH

X Type Major Junction


cum 1 Area= 3307.50 0.050 165.38
cum 2 Area= 1970.00 0.050 197.00
Deduct project road cum 1 300.00 10.00 0.050 -150.00
212.38 7203.00 1529737.125

Providing and laying bituminous concrete using crushed


aggregates of specified grading, premixed with
bituminous binder @ 5.4 to 5.6 % of mix and filler,
transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the
required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the
desired compaction as per clause 507 of specification.
a) Using Batch Mix Plant of appropriate capacity
andPaver Finisher Hydraustatic with Sensor control.
5 (i) for Grading-I ( 50-65 mm thickness ) with
60/70bitumen (VG-30)

Page 94 of 101
Estimate for Major 4-Legged Junction Improvement
S.No. Descriptions Unit No. L B D Qty. Rate Amount
X Type Major Junction
cum 1 Area= 3307.50 0.03 99.23
cum 2 Area= 1970.00 0.03 118.20
Deduct project road cum 1 300.00 10.00 0.03 -90.00
127.43 8236.00 1049472.3

Construction of Shoulders with approved


material/selected soil i/c excavation all lifts & leads i/c
grading to required slope & camber of 4% and
compacting using vibratory roller of 80 to 100 kN static
6 weight to meet requirement as per relevant clause of
400. ) (A. Earthen Shoulders (CBR Value > 7))

X Type Major Junction Cum 1 Area= 1609.6 0.33 531.168 1642.00 872177.856

Construction of Median and Island with Soil Taken from


Roadway Cutting (Construction of Median and Island
above road level with approved material deposited at
site from roadway cutting and excavation for drain and
6 foundation of other structures, spread, graded and
compacted as per clause 407)

X Type Major Junction cum 4 50 1.5 0.65 195.00 227.00 44265.00

Cast in Situ Cement Concrete M20 kerb (Construction of


cement concrete kerb with top and bottom width 115
and 165 mm respectively, 250 mm high in M 20 grade
PCC on M-10 grade foundation 150 mm thick,
foundation having 50 mm projection beyond kerb stone,
7 kerb stone laid with kerb laying machine, foundation
concrete laid manually, all complete as per clause 408)

X Type Major Junction M 8 53 424.00 464.00 196736

8 Site Clearance & Misclaneous Work


X Type Major Junction Lumpsum 1 500000 500000.00

Total Cost 9317520.38


No. of Major 4-legged Junctions 0
Cost of Major 4-legged junction Improvement 0

Page 95 of 101
Locations for provision of Metal Beam Crash Barriers
At High Embankments
Length of Crash
S. No. From To Length Sides Remarks
Barrier
1 0+000 352+200 0+000 2 0
2 352+600 353+200 0 1 0
3 353+400 353+700 0 1 0
4 382+600 382+640 0 1 0
Near Minor & Major Bridges
1 MNB 0 25 4 0
2 MJB 0 50 4 0
3 Miscellaneous locations 1000
Length of Crash Barriers 1000

Locations for provision of Retaining Wall


S. No. From To Length Sides Length of Height Remarks
Retaining Wall

2 Miscellaneous locations 300 4.5


Length of Retaining Wall 0

Parapet Wall
Length of
S. No. From To Length Sides
Parapet Wall Remarks
1 352+200 352+600 400 1 400 On RHS
2 353+200 353+400 200 1 200 On RHS

Total Length 0

Toe Wall
Length of Toe
S. No. From To Length Sides Wall
1 352+000 352+150 150 1 150

150

Pitching on Slope
1 352+000 352+150 150 1 150

150
Estimate for Bus Lay Bye (Refer Fig. 12.2, Page 129 of IRC:SP:73-2015)
Item Description Unit Quantity Rate (Rs) Amount (Rs)
1.00 Clearing and Grubbing Road Land (Clearing and grubbing road
land including uprooting rank vegetation, grass, bushes,
shrubs, saplings and trees girth up to 300 mm, removal of
stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or Ha 0.18 0.18 Err:509 Err:509
auctioned up to a lead of 1000 metres including removal and
disposal of top organic soil not exceeding 150 mm in
thickness.)
(Area as per Drawing)
3.00 Embankment Construction with Material Obtained from Borrow
Pits (Construction of embankment with approved material
obtained from borrow pits with all lifts and leads, transporting to cum 1791.00 0.5 896 Err:509 Err:509
site, spreading, grading to required slope and compacting to
meet requirement of table 300-2)
4.00 Construction of Subgrade and Earthen Shoulders
(Construction of subgrade and earthen shoulders with
approved material obtained from borrow pits with all lifts &
leads, transporting to site, spreading, grading to required slope cum 1791.00 0.5 896 Err:509 Err:509
and compacted to meet requirement of table No. 300-2)

5.00 Construction of Median and Island with Soil Taken from


Roadway Cutting (Construction of Median and Island above
road level with approved material deposited at site from
roadway cutting and excavation for drain and foundation of cum 10.05 0.55 6 Err:509 Err:509
other structures, spread, graded and compacted as per clause
407)

6.00 Err:509 Sqm 756.00 756 431.00 325,836.00


7.00 Granular Sub-Base with Coarse Graded Material ( Table:- 400-
2) (Construction of granular sub-base by providing coarse
graded material, spreading in uniform layers with motor grader
cum 1791.00 0.2 358 Err:509 Err:509
on prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with vibratory roller to
achieve the desired density, complete as per clause 401)
8.00 Wet Mix Macadam
Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical mix
plant carriage of mixed Material by tipper to site, laying in cum 1020.00 0.25 255 1980.00 504,900.00
uniform layers with paver in sub- base / base course on well
prepared surface and compacting with vibratory roller to
achieve the desired density in accordance to Table No. 400-
12, 400-13 and as per clause of section 406 of specifications

9.00 Providing and laying dense bituminous macadam using


crushed aggregates of specified grading, premixed with
bituminous binder @ 4.0 to 4.5% by weight of total mix of mix
and filler,transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required cum 1020.00 0.085 87 7203.00 624,500.10
grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction
as per clause 505 of specification complete in all respects.
10.00 Providing and laying bituminous concrete using crushed
aggregates of specified grading, premixed with bituminous
binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix
to work site, laying with a hydrostatic paver finisher with sensor
control to the required grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem rollers to achieve the cum 1020.00 0.04 41 8236.00 336,028.80
desired compaction as per clause 507 of specification.
a) Using Batch Mix Plant of appropriate capacity andPaver
Finisher Hydraustatic with Sensor control.
(i) for Grading-I ( 50-65 mm thickness ) with 60/70bitumen (VG-
30)
11.00 Retro- reflectorised Traffic signs (Providing and fixing of retro-
reflectorised cautionary, mandatory and informatory sign as per
IRC :67 made of encapsulated lens type reflective sheeting
vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick
supported on a mild steel angle iron post 75 mm x 75 mm x 6
mm firmly fixed to the ground by means of properly designed
foundation with M15 grade cement concrete 45 cm x 45 cm x
60 cm, 60 cm below ground level as per approved drawing)
60 cm circular each 1 1 Err:509 Err:509
90 cm high octagon each 1 1 Err:509 Err:509
90 cm equilateral triangle each 1 1 Err:509 Err:509
80 cm x 60 cm rectangular each 2 2 Err:509 Err:509
12.00 Cast in Situ Cement Concrete M 20 Kerb with Channel
(Construction of cement concrete kerb with channel with top
and bottom width 115 and 165 mm respectively, 250 mm high
in M 20 grade PCC on M10 grade foundation 150 mm thick,
kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, #NAME? 452 #NAME? #NAME?
sloped towards the kerb, kerb stone with channel laid with kerb
laying machine, foundation concrete laid manually, all complete
as per clause 408)

13.00 Road Marking with Hot Applied Thermoplastic Compound with


Reflectorising Glass Beads on Bituminous Surface (Providing
and laying of hot applied thermoplastic compound 2.5 mm thick
including reflectorising glass beads @ 250 gms per sqm area,
thickness of 2.5 mm is exclusive of surface applied glass sqm 40 Err:509 Err:509
beads as per IRC:35 .The finished surface to be level, uniform
and free from streaks and holes.) (For Ghost Island)

14.00 Providing and fixing Litter bins complete as per Technical


Specifications. Nos. 4 5000.00 20,000.00

15.00 Providing water kiosks at bus bays


Nos. 4 20000.00 80,000.00

16.00 Providing shelters for bus passengers as per drawing and


Nos. 1 500000.00 500,000.00
Technical Specifications 1500, 1600 and 1700
17.00 Provision of Lighting
Nos. 1 1000000.00 1,000,000.00

Total For 1 no Err:509


Total cost of Bus Lay Byes For 0 Err:509

Grand Total of Bus Lay byes -


Pitching on Slopes
S. No. Particulars Unit No. Length Width Depth Quantity Rate Amount
Providing and laying Pitching on slopes laid over prepared
filter media including boulder apron laid dry in front of toe of
1 embankment complete as per drawing and Technical
specifications
Area
Stone/Boulder cum 1 1500 0.3 450 2033.00 914850.00

Providing and laying Filter material underneath pitching in


slopes complete as per drawing and Technical specification cum 1 1500 0.15 225.00 1265.00 284625
2

Total 0.00
Retaining Wall (3.0 m)

S.No. Particulars Unit No. L B D Qty. Rate Amount

Excavation for Structures (Earth work in excavation


of foundation of structures as per drawing and
technical specification, including setting out,
construction of shoring and bracing, removal of
1
stumps and other deleterious matter, dressing of
sides and bottom and backfilling with approved
material.)

Ordinary soil
Upto 3 m depth
Retaining Wall cum 1 0 2.80 1.05 0.00 #REF! #REF!

Plain/Reinforced cement concrete in open foundation


2 complete as per drawing and technical specifications

Using concrete mixer


PCC Grade M15
Retaining Wall cum 1 0 2.80 0.15 0.00 #REF! #REF!

Plain/Reinforced cement concrete in open foundation


3 complete as per drawing and technical specifications.

RCC Grade M25


Toe and Heel cum 1 0 2.500 0.30 0 #REF! #REF!

Providing and laying Plain/Reinforced cement


concrete in sub-structure complete as per drawing
4 and technical specifications section 1500, 1700 and
2200 (Newly laid concrete shall be covered by gunny
bags). RCC Grade M25

Height upto 5m

With Batching Plant, Transit Mixer and Concrete


Pump
Retaining Wall
Stem cum 1 0 2.600 0.40 0.00 #REF! #REF!

Supplying, fitting and placing HYSD bars


reinforcement in sub-structure complete as per
5 drawing and technical specifications section 1600 and
2200.
Reinforcement @80 kg/m3 MT 0.000 #REF! #REF!

Providing weep holes in Brick masonry/ Plain/


Reinforced concrete abutment, wing wall/return wall
with 100 mm dia. AC pipe, extending through the full
width of the structure with slope of 1 V: 20 H towards
6
drawing face. Complete as per drawing and Technical
specifications section 2706 and 2200.

Retaining Wall Meter 0 0.401 0.00 #REF! #REF!

7 #REF!
#REF! #REF! 1 0 0.600 1.900 0.00 #REF! #REF!

Total Amount for Bill (`) = #REF!


Retaining Wall (4.5 m)

S.No. Particulars Unit No. L B D Qty. Rate Amount

Excavation for Structures (Earth work in excavation


of foundation of structures as per drawing and
technical specification, including setting out,
construction of shoring and bracing, removal of
1
stumps and other deleterious matter, dressing of
sides and bottom and backfilling with approved
material.)

Ordinary soil
Upto 3 m depth
Retaining Wall cum 1 0 3.50 1.15 0.00 #REF! #REF!

Plain/Reinforced cement concrete in open foundation


2 complete as per drawing and technical specifications

Using concrete mixer


PCC Grade M15
Retaining Wall cum 1 0 3.50 0.15 0.00 #REF! #REF!

Plain/Reinforced cement concrete in open foundation


3 complete as per drawing and technical specifications.

RCC Grade M25 Area


Toe and Heel cum 1 0 1.166 1.00 0 5324.00 0.00

Providing and laying Plain/Reinforced cement


concrete in sub-structure complete as per drawing
4 and technical specifications section 1500, 1700 and
2200 (Newly laid concrete shall be covered by gunny
bags). RCC Grade M25

Height upto 5m

With Batching Plant, Transit Mixer and Concrete


Pump
Retaining Wall
Stem cum 1 0 4.050 0.375 0.00 5972.00 0.00

Supplying, fitting and placing un-coated Mild steel


5 reinforcement complete in foundation as per drawing
and technical specification

Reinforcement @80 kg/m3 MT 0.000 48797.00 0.00

Providing weep holes in Brick masonry/ Plain/


Reinforced concrete abutment, wing wall/return wall
with 100 mm dia. AC pipe, extending through the full
width of the structure with slope of 1 V: 20 H towards
6
drawing face. Complete as per drawing and Technical
specifications section 2706 and 2200.

Retaining Wall Meter 0 0.375 0.00 #REF! #REF!

Back filling behind abutment, wing wall and return


7 wall complete as per drawing and Technical
specification
Granular material cum 1 0 0.600 3.500 0.00 880.00 0.00

Total Amount for Bill (`) = #REF!


Rajupalem to Ramavaram road - EGMD087
HORIZONTAL ALIGNMENT & RECOMMENDED CURVATURE WIDENING DETAILS Qty.
Radius Up to 20 to 40 m 1.5 M Length 251.93 377.895
Radius Up to 41 to 60 m 1.2 M Length 482.03 578.436
Radius Up to 61 to 100 m 0.9 M Length 518.89 467.001
Radius Up to 101 to 300 m 0.6 M Length 582 349.2
Total Qty. in Sqm 1772.532