VIAF No.

: 0509-9-P-Q1-22

Vendor Name: JGENTECH ENTERPRISES Issue Date: 06/29/2022 Reply Due Date: 07/04/2022
VPE Form Date: 02/17/2022 PO No.: 8300008431
Project Name and Location: Supply of Labor - SOUTHWEST LUZON POWER BU: SCOE - FS Engines
Auditor(s): PEBuenaventura Auditee(s): Mr. John Espejo
MRMarigondon
Audit Summary Report: Notable Findings:

CUSTOMER NAME: SOUTHWEST LUZON POWER End-users verbatim:


LOCATION: Brgy. San Rafael, Calaca, Batangas Cooperation-Response to Problems/Requests: Vendor being unresponsive thru
MODEL: C32 SERIAL NO.: 0NRC00100 KW RATING: 1000KW text call and viber on time and date agreed during preparations in site
- Supply of labor, tools & equipment, and technical supervision and requirements (RT PCS, Medical, Govt. Docs.)
necessary materials for Surge Test
Overall Rating: 7.88 Manpower-Staff Availability/Professionalism: Call time around 8AM. Arrival at
Failed on the ff Performance Factors: site around 10AM
- Cooperation
- Compliance w/ Requirements

Rootcause of the Problem: Fishbone Diagram Permanent Action Plan(s):

Assign monitoring staff to focus information dissemination.


Design of new procedure for more effective coordination.
Advanced notice to operations team.
Allot a time reserve for possible delay due to acquisition of
materials.

Prepared by: Luzviminda Florendo 062922


Signature over Printed Name (VMP) and Date

Responsible: Engr. Rowel Facunla, SO 070522


Signature over Printed Name (Vendor) and Date

Approved by:
Signature over Printed Name (End-user) and Date

Noted and Acknowledged by:

F-PAS-023-01
EFF: 10/06/21