Design LEVEL (M) Chainage (KM) : Employer

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

423.

352

423.482

423.612

423.742

424.011

424.297

424.599

424.919

425.254

425.607

425.976
DESIGN
LEVEL(m)
44+515

44+520

44+525

44+530

44+540

44+550

44+560

44+570

44+580

44+590

44+600
CHAINAGE(Km)

431 431
430 430
429 429
428 428
427 427
426 426

425 425
424.511 424.864 423.114
424 424
424.276
424.554 424.856 423
423
0.4

422.978 423.054 423.114 423.268


422.878
422 422
421 421
420 420
423.348

423.478

423.554

423.614

423.768

424.054

424.356

424.676

425.011

425.364

425.733
SHOULDER
LEVEL(m)

Note:
1.All dimensions are in m unless noted otherwise.
2.This drawing are used in RCC Breast wall construction.

EMPLOYER: CONSULTANT: CONTRACTOR: PROJECT: SASEC Mugling–Pokhara Highway Improvement Phase-I Designed By : SCALE As shown
Government of Nepal Project – (SMPHIP) Skin wall details
Renardet S.A., Switzerland Checked By : DATE: JUN.2022
Ministry of Physical Infrastructure and Transport China Communications Construction Company Ltd. ADB Loan No. 3846 NEP Km-44+520-Km-44+540
in association with Mugling – Anbukhaireni – Pokhara Road (Section-1)
Department of Roads Verified By : DRG NO :
Soil Test (P) Ltd., Nepal and
Project Directorate (ADB)
CEMAT Consultants (P) Ltd., Nepal
(C.C.C.C) Contract No: SMHIP/OCB/MAP/01
Bishalnagar, Kathmandu, Nepal (Km 8+250 to Km 49+700) Approved By : SHEET NO :