Professional Documents
Culture Documents
Design LEVEL (M) Chainage (KM) : Employer
Design LEVEL (M) Chainage (KM) : Employer
Design LEVEL (M) Chainage (KM) : Employer
352
423.482
423.612
423.742
424.011
424.297
424.599
424.919
425.254
425.607
425.976
DESIGN
LEVEL(m)
44+515
44+520
44+525
44+530
44+540
44+550
44+560
44+570
44+580
44+590
44+600
CHAINAGE(Km)
431 431
430 430
429 429
428 428
427 427
426 426
425 425
424.511 424.864 423.114
424 424
424.276
424.554 424.856 423
423
0.4
423.478
423.554
423.614
423.768
424.054
424.356
424.676
425.011
425.364
425.733
SHOULDER
LEVEL(m)
Note:
1.All dimensions are in m unless noted otherwise.
2.This drawing are used in RCC Breast wall construction.
EMPLOYER: CONSULTANT: CONTRACTOR: PROJECT: SASEC Mugling–Pokhara Highway Improvement Phase-I Designed By : SCALE As shown
Government of Nepal Project – (SMPHIP) Skin wall details
Renardet S.A., Switzerland Checked By : DATE: JUN.2022
Ministry of Physical Infrastructure and Transport China Communications Construction Company Ltd. ADB Loan No. 3846 NEP Km-44+520-Km-44+540
in association with Mugling – Anbukhaireni – Pokhara Road (Section-1)
Department of Roads Verified By : DRG NO :
Soil Test (P) Ltd., Nepal and
Project Directorate (ADB)
CEMAT Consultants (P) Ltd., Nepal
(C.C.C.C) Contract No: SMHIP/OCB/MAP/01
Bishalnagar, Kathmandu, Nepal (Km 8+250 to Km 49+700) Approved By : SHEET NO :