Project : 132/11 kV SHKZBHST SUBSTATION

Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING-SUBSTRUCTURE ACK ASV

CONTENTS

Sl. No. DESCRIPTION Page No.

A Introduction 3

B Load calculations 12

C Software Model 32

C.1 Model Sketches 33

C.2 Applied Model 69

C.3 Used Parameters 134

D Analysis and Checks 140

E Design 165

E.1 Raft Design 166

E2 Column Design 296

E3 Wall Design 354

E4 Manhole Wall Design 527

E5 Shear Wall Design 563

E6 Trench Wall Design 626

F Transformer Plingth Design 638

G Annexure 643

1
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING-SUBSTRUCTURE ACK ASV

CONTENTS

Sl. No. DESCRIPTION Page No.

A Introduction 3

B Load calculations 16

C Software Model 47

C.1 Model Sketches 48

C.2 Applied Model 94

C.3 Used Parameters 171

D Analysis and Checks 176

E Design 201

E.1 Raft Design 202

E2 Column Design 298

E3 Wall Design 346

E4 Manhole Wall Design 525

E5 Shear Wall Design 559

E6 Trench Wall Design 568

F Transformer Plingth Design 579

G Annexure 582
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY

DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by 


Date:11/06/2022  SRI  ASV  VRP

A. Design Criteria
A.1. Introduction:
The structure:
This document presents analysis and substructure design of Main Building of
132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION.
Main features of the building are summarized as below:
 The plan size : 46 x 43 m
 Floors : Basement, Ground floor ,& First floor (B+G+1).
 Foundation level : Top of concrete (TOC) level for foundation is
-3.60 m lvl.
 Height of the building : Top slab level +16.7 m lvl for substation.
 Gate level is bench mark (0.00 lvl) for all other levels unless mentioned
otherwise.
 Ground water level : +19.55 m DMD
: -11.1 m below the natural ground level.
 Type of construction : cast in situ type

Software and model:


The building is modeled and analyzed in ETABS and Raft is modeled and analyzed
in SAFE by exporting all reactions from ETABS.
The building is modeled as 3D structure, with beams and columns idealized as line elements, raft,
wall and slabs are idealized as plate element & Membrane.
Units of Measurement:
The units of measurement adopted in design shall be the SI system of units.
A.2. Design Codes and References:
DEWA specification: Civil works for 132 kV Substations 1531001-Rev 17
Structural Use of Concrete ACI 318-14
Uniform Building Code (for Seismic design and detailing) UBC 1997
For building loading ASCE 7-05
Guide to concrete construction in Gulf Region CIRIA SP31
Soil report SD22000015-01

3
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
A.3. Material properties:

Strength for Design:


fc’ = Cylindrical strength of concrete (Grade C40) = 32 MPa
fy = Characteristic strength of rebar (Grade Fe460) = 460 Mpa
fy, ft = For shear check (Grade Fe420) = 420 Mpa
Fy = Yield strength of steel (ASTM A36) = 275 Mpa
γc = Weight of normal reinforced concrete = 25 kN/m3
Ec = Young's Modulus of concrete 4.7 x √fc' = 26587 Mpa
Ft = Tensile strength of rebar (Fe460) = 650 Mpa

Note: for shear check strength of steel should not be more than 420 MPa.

Unit weight of material for loads calculation:


 Floor screed : 24.00 kN/m3
 Lightweight concrete : 12.00 kN/m3
 Structural Steel : 78.50 kN/m3
 Unit weight of water : 10.00 kN/m3
 Solid block : 21.00 kN/m3
 Hollow block : 16.00 kN/m3
 Thermal block work : 17.50 kN/m3
 20 mm thick cement mortar : 20.00 kN/m3

The various types of block work walls used shall be as follows:

Sl. No. Location Description


1.0 Internal 150 mm thick precast wall.
2.0 External 270 mm thick Precast insulated wall

4
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
Unit weight of walls is calculated as follows:
Hence,
270 mm thick Precast insulated wall = 0.22 x 25 = 5.5 kN/m2
150 thick Solid block internal wall =0.15x 21.0 = 3.2 kN/m2
150 mm thick precast wall. = 0.15 x 25 = 3.8 kN/m2

A.4. Soil Parameters:

Refer Geotechnical Investigation report

Ф = angle of internal friction = 32 deg.

γs = bulk unit weight of soil = 18 kN/m3

qna = Net allowable soil bearing capacity (Raft Fdn.) = 350 kPa

Ks = Modulus of subgrade reaction = 14000 kN/m2/m


Ф
Ka = co.eff of active soil pressure = 0.25
Ф

K0 = co.eff of soil pressure at rest 1 – sin Ф = 0.41


Ф
Kp = co.eff of passive soil pressure = 3.85
Ф

Ground water level

i) +19.55 m DMD = -11.1 m lvl w.r.t natural ground level. ( As per soil report)

A.5. Load Combinations and Load Factors:

As per ACI:
Primary Load Cases:
LC1 = DL = Dead Load
LC2 = LL = Live Load
LC3 = SDL = Super Imposed Dead Load
LC4 = SP = Soil Pressure
LC5 = EQX = Earthquake Load in X-direction
LC6 = EQY = Earthquake Load in Y-direction
LC7 = EQX+ecc = Earthquake Load in X-direction + eccentricity
LC8 = EQX-ecc = Earthquake Load in X-direction - eccentricity
LC9 = EQY+ecc = Earthquake Load in Y-direction + eccentricity
LC10 = EQY-ecc = Earthquake Load in Y-direction - eccentricity

5
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
LC11 = WL+X = Wind Load in X-direction
LC12 = WL+Y = Wind Load in Y-direction
LC13 = BL = Blast Load-1
LC13 = BL-1 = Blast Load-2
LC14 = BL-2 = Blast Load-3
LC15 = BL-3 = Blast Load-4
LC15 = BL-4 = Blast Load-5
LC16 = CR-1 = Crane Load
LC17= CR-2 = Crane Load
LC18 = SPS = Soil Pressure Surcharge
LC19 = LLR = Live load on roof
LC20= WP(Tank full) = Water Presure
LC21 = WP(Tank Half-1) = Water pressure Half Tank-1
LC22 = WP(Tank Half-2) = Water Pressure Half Tank-2

where, BL = Blast load applied on Power Transformer, ET Room and Shunt Reactor RC walls.
BL-1 = Blast load applied on Power Transformer and ET Room-3 RC walls.
BL-2 = Blast load applied on Power Transformer-2 and ET Room RC walls.
BL-3 = Blast load applied on Power Transformer-1 and ET Room RC walls.
BL-4 = Blast load applied on Shunt Reactor RC walls.

CR-1 & CR-2 = in Case-1 'CR-1' Crane Load applied considering when crane is near the
corbel support at one end and far from the other corbel support. Similarly Case-2 'CR-2' is applied
taking into consideration the vice versa of first case.

Note: Oil/Water load in Power Transformer oil / water collection area is included in LL (Live
Load) case.
Ultimate Load Combinations : ULS
1.4DL                 500  Ref ACI318‐14 (CL:5.3.1) 
 1.2DL +1.6LL + 1.6SP+1.6SPS+ 0.5LLR        501  Ref ACI318‐14 (CL:5.3.1) 
 1.2DL +1.6LL + 1.6SP+1.6SPS+ 0.5LLR+1.6WP(FULL)     502  Ref ACI318‐14 (CL:5.3.1) 
 1.2DL +1.6LL + 1.6SP+1.6SPS+ 0.5LLR+1.6WP(HALF‐1)  503  Ref ACI318‐14 (CL:5.3.1) 
 1.2DL +1.6LL + 1.6SP+1.6SPS+ 0.5LLR+1.6WP(HALF‐2)  504  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:1     505  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:1+1.6WP(FULL)  506  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:1+1.6WP(HALF‐1)  507  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:1+1.6WP(HALF‐2)  508  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:2     509  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:2+1.6WP(FULL)  510  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:2+1.6WP(HALF‐1)  511  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:2+1.6WP(HALF‐2)  512  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL1     513  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL1+1.6WP(FULL)  514  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL1+1.6WP(HALF‐1)  515  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL1+1.6WP(HALF‐2)  516  Ref ACI318‐14 (CL:5.3.1) 

6
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL2     517  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL2+1.6WP(FULL)  518  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL2+1.6WP(HALF‐1)  519  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL2+1.6WP(HALF‐2)  520  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL3     521  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL3+1.6WP(FULL)  522  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL3+1.6WP(HALF‐1)  523  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL3+1.6WP(HALF‐2)  524  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0CR‐1           525  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0CR‐1+1.0WP(FULL)     526  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0CR‐1+1.0WP(HALF‐1)     527  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0CR‐1+1.0WP(HALF‐2)     528  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0CR‐2           529  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0CR‐2+1.0WP(FULL)     530  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0CR‐2+1.0WP(HALF‐1)     531  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0CR‐2+1.0WP(HALF‐2)     532  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL1           533  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL1+1.0WP(FULL)        534  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL1+1.0WP(HALF‐1)     535  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL1+1.0WP(HALF‐2)     536  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL2           537  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL2+1.0WP(FULL)        538  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL2+1.0WP(HALF‐1)     539  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL2+1.0WP(HALF‐2)     540  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL3           541  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL3+1.0WP(FULL)        542  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL3+1.0WP(HALF‐1)     543  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL3+1.0WP(HALF‐2)     544  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ+Y     546  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ+Y+1.1WP(FULL)  547  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ+Y+1.1WP(HALF‐1)  548  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ+Y+1.1WP(HALF‐2)  549  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ‐Y     550  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ‐Y+1.1WP(FULL)  551  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ‐Y+1.1WP(HALF‐1)  552  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ‐Y+1.1WP(HALF‐2)  553  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ+X     554  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ+X+1.1WP(FULL)  555  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ+X+1.1WP(HALF‐1)  556  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ+X+1.1WP(HALF‐2)  557  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y+1.6SP+0.33EQ‐X     558  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y+1.6SP+0.33EQ‐X+1.1WP(FULL)  559  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y+1.6SP+0.33EQ‐X+1.1WP(HALF‐1)  560  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y+1.6SP+0.33EQ‐X+1.1WP(HALF‐2)  561  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ‐Y     562  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ‐Y+1.1WP(FULL)  563  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ‐Y+1.1WP(HALF‐1)  564  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ‐Y+1.1WP(HALF‐2)  565  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ+Y     566  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ+Y+1.1WP(FULL)  567  Ref ACI318‐14 (CL:5.3.1) 

7
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY

DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by 


Date:11/06/2022  SRI  ASV  VRP

1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ+Y+1.1WP(HALF‐1)  568  Ref ACI318‐14 (CL:5.3.1) 


1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ+Y+1.1WP(HALF‐2)  569  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ‐X  570  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ‐X+1.1WP(FULL)  571  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ‐X+1.1WP(HALF‐1)  572  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ‐X+1.1WP(HALF‐2)  573  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y+1.6SP+0.33EQ+X  574  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y+1.6SP+0.33EQ+X+1.1WP(FULL)  575  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y+1.6SP+0.33EQ+X+1.1WP(HALF‐1)  576  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y+1.6SP+0.33EQ+X+1.1WP(HALF‐2)  577  Ref ACI318‐14 (CL:5.3.1) 
1.42DL+1.1(LL+LLR)+1.1EQX(+ecc)+1.6SP+0.33EQY(+ecc)  578  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQX(+ecc)+1.6SP+0.33EQY(+ecc)+1.1WP(FULL)  579  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQX(+ecc)+1.6SP+0.33EQY(+ecc)+1.1WP(HALF‐1)  580  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQX(+ecc)+1.6SP+0.33EQY(+ecc)+1.1WP(HALF‐2)  581  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQX(‐ecc)+1.6SP+0.33EQy(‐ecc)  582  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQX(‐ecc)+1.6SP+0.33EQy(‐ecc)+1.1WP(FULL)  583  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQX(‐ecc)+1.6SP+0.33EQy(‐ecc)+1.1WP(HALF‐1)  584  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQX(‐ecc)+1.6SP+0.33EQy(‐ecc)+1.1WP(HALF‐2)  585  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQY(+ecc)+1.6SP+0.33EQX(+ecc)  586  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQY(+ecc)+1.6SP+0.33EQX(+ecc)+1.1WP(FULL)  587  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQY(+ecc)+1.6SP+0.33EQX(+ecc)+1.1WP(HALF‐1)  588  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQY(+ecc)+1.6SP+0.33EQX(+ecc)+1.1WP(HALF‐2)  589  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQY(‐ecc)+1.6SP+0.33EQX(‐ecc)  590  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQY(‐ecc)+1.6SP+0.33EQX(‐ecc)+1.1WP(FULL)  591  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQY(‐ecc)+1.6SP+0.33EQX(‐ecc)+1.1WP(HALF‐1)  592  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQY(‐ecc)+1.6SP+0.33EQX(‐ecc)+1.1WP(HALF‐2)  593  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ+X(+ecc)+1.6SP+0.33EQ‐Y(+ecc)  594  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ+X(+ecc)+1.6SP+0.33EQ‐Y(+ecc)+1.1WP(FULL)  595  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ+X(+ecc)+1.6SP+0.33EQ‐Y(+ecc)+1.1WPHALF‐1)  596  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ+X(+ecc)+1.6SP+0.33EQ‐Y(+ecc)+1.1WPHALF‐2)  597  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+1.6SP+0.33EQ+Y(‐ecc)  598  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+1.6SP+0.33EQ+Y(‐ecc)+1.1WP(FULL)  599  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+1.6SP+0.33EQ+Y(‐ecc)+1.1WP(HALF‐1)  600  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+1.6SP+0.33EQ+Y(‐ecc)+1.1WP(HALF‐2)  601  UBC1997‐Cl‐1612.2.1 
1.44DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)  602  UBC1997‐Cl‐1612.2.1 
1.44DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(FULL)  603  UBC1997‐Cl‐1612.2.1 
1.44DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(HALF‐1)  604  UBC1997‐Cl‐1612.2.1 
1.44DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(HALF‐2)  605  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+1.6SP+0.33EQX(‐ecc)  606  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+1.6SP+0.33EQX(‐ecc)+1.1WP(FULL)  607  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+1.6SP+0.33EQX(‐ecc)+1.1WP(HALF‐1)  608  UBC1997‐Cl‐1612.2.1 
31.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+1.6SP+0.33EQX(‐ecc)+1.1WP(HALF‐2)  609  UBC1997‐Cl‐1612.2.1 
:1.42DL+1.1(LL+LLR)1.1EQ‐X(+ecc)+1.6SP+0.33EQ‐Y(+ecc  610  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)1.1EQ‐X(+ecc)+1.6SP+0.33EQ‐Y(+ecc+1.1WP(FULL)  611  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)1.1EQ‐X(+ecc)+1.6SP+0.33EQ‐Y(+ecc+1.1WP(HALF‐1)  612  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)1.1EQ‐X(+ecc)+1.6SP+0.33EQ‐Y(+ecc+1.1WP(HALF‐2)  613  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+0.33EQ‐Y(‐ecc)  614  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+0.33EQ‐Y(‐ecc)+1.1WP(FULL)  615  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+0.33EQ‐Y(‐ecc)+1.1WP(HALF‐1)  616  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+0.33EQ‐Y(‐ecc)+1.1WP(HALF‐2)  617  UBC1997‐Cl‐1612.2.1 

8
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)  618  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(FULL)  619  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(HALF‐1)  620  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(HALF‐2)  621  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ‐X(‐ecc)     622  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ‐X(‐ecc)+1.1WP(FULL)  623  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ‐X(‐ecc)+1.1WP(HALF‐1)  624  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ‐X(‐ecc)+1.1WP(HALF‐2)  625  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(+ecc)+1.6SP+0.33EQ+Y(+ecc  626  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(+ecc)+1.6SP+0.33EQ+Y(+ecc)+1.1WP(FULL)  627  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(+ecc)+1.6SP+0.33EQ+Y(+ecc)+1.1WP(HALF‐1)  628  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(+ecc)+1.6SP+0.33EQ+Y(+ecc)+1.1WP(HALF‐2)  629  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+0.33EQ+Y(‐ecc)     630  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+0.33EQ+Y(‐ecc)+1.1WP(FULL)  631  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+0.33EQ+Y(‐ecc)+1.1WP(HALF‐1)  632  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+0.33EQ+Y(‐ecc)+1.1WP(HALF‐2)  633  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)  634  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(FULL)  635  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(HALF‐1)  636  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(HALF‐2)  637  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ+X(‐ecc)     638  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ+X(‐ecc)+1.1WP(FULL)  639  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ+X(‐ecc)+1.1WP(HALF‐1)  640  UBC1997‐Cl‐1612.2.1 
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ+X(‐ecc)+1.1WP(HALF‐2)  641  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ+X+1.6SP+0.33EQ+Y        642  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ‐X+1.6SP+0.33EQ‐Y        643  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ+Y+1.6SP+0.33EQ+X        644  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ‐Y+1.6SP+0.33EQ‐X        645  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ+X+1.6SP+0.33EQ‐Y        646  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ‐X+1.6SP+0.33EQ+Y        647  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ+Y+1.6SP+0.33EQ‐X        648  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ‐Y+1.6SP+0.33EQ+X        649  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ+X(+ecc)+1.6SP+1.1EQ+Y(+ecc)     650  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQX(‐‐ecc)+1.6SP+0.33EQY(‐‐ecc)     651  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQY(+ecc)+1.6SP+0.33EQX(+ecc)     652  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQY(‐ecc)+1.6SP+0.33EQX(‐ecc)     653  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ+X(+ecc)+1.6SP+1.1EQ‐Y(+ecc)     654  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ‐X(‐‐ecc)+1.6SP+0.33EQ+Y(‐‐ecc)     655  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)     656  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ‐Y(‐ecc)+1.6SP+0.33EQ+X(‐ecc)     657  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ‐X(+ecc)+1.6SP+0.33EQ‐Y(+ecc)     658  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ‐X(‐ecc)+1.6SP+0.33EQ‐Y(‐ecc)     659  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ‐Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)     660  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ‐Y(‐ecc)+1.6SP+0.33EQ‐X(‐ecc)     661  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ+X(+ecc)+1.6SP+0.33EQ‐Y(+ecc)     662  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ‐X(‐ecc)+1.6SP+0.33EQ+Y(‐ecc)     663  UBC1997‐Cl‐1612.2.1 
31.09DL+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)     664  UBC1997‐Cl‐1612.2.1 
1.09DL+1.1EQ‐Y(‐ecc)+1.6SP+0.33EQ+X(‐ecc)     665  UBC1997‐Cl‐1612.2.1 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+X)     666  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+X)+1.0WP(FULL)  667  Ref 2.3.2 ASCE7‐05 

9
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+X)+1.0WP(HALF‐1)  668  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+X)+1.0WP(HALF‐2)  669  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐X)     670  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐X)+1.0WP(FULL)  671  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐X)+1.0WP(HALF‐1)  672  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐X)+1.0WP(HALF‐2)  673  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+Y)     674  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+Y)‐1+1.0WP(FULL)  675  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+Y)‐1+1.0WP(HALF‐1)  676  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+Y)‐1+1.0WP(HALF‐2)  677  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐Y)     678  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐Y)+1.0WP(FULL)  679  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐Y)+1.0WP(HALF‐1)  680  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐Y)+1.0WP(HALF‐2)  681  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+X)     682  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+X)+1.0WP(FULL)  683  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+X)+1.0WP(HALF‐1)  684  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+X)+1.0WP(HALF‐2)  685  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐X)     686  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐X)+1.0WP(FULL)  687  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐X)+1.0WP(HALF‐1)  688  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐X)+1.0WP(HALF‐2)  689  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+Y)     690  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+Y)+1.0WP(FULL)  691  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+Y)+1.0WP(HALF‐1)  692  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+Y)+1.0WP(HALF‐2)  693  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐Y)     694  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐Y)+1.0WP(FULL)  695  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐Y)+1.0WP(HALF‐1)  696  Ref 2.3.2 ASCE7‐05 
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐Y)+1.0WP(HALF‐2)  697  Ref 2.3.2 ASCE7‐05 
0.9 DL + 1.6 SP + 1.6( W+X)           698  Ref 2.3.2 ASCE7‐05 
0.9 DL + 1.6 SP + 1.6( W‐X)           699  Ref 2.3.2 ASCE7‐05 
0.9 DL + 1.6 SP + 1.6( W+Y)           700  Ref 2.3.2 ASCE7‐05 
0.9 DL + 1.6 SP + 1.6( W‐Y)           701  Ref 2.3.2 ASCE7‐05 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL        702  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL+1.6WP(FULL)  703  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL+1.6WP(HALF‐1)  704  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL+1.6WP(HALF‐2)  705  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL‐4     706  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL‐4+1.6WP(FULL)  707  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL‐4+1.6WP(HALF‐1)  708  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL‐4+1.6WP(HALF‐2)  709  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL           710  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL+1.0WP(FULL)        711  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL+1.0WP(HALF‐1)     712  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL+1.0WP(HALF‐2)     713  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL‐4           714  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL‐4+1.0WP(FULL)     715  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL‐4+1.0WP(HALF‐1)     716  Ref ACI318‐14 (CL:5.3.1) 
1.2DL+1.0 LL+1.6LLR+1.0BL‐4+1.0WP(HALF‐2)     717  Ref ACI318‐14 (CL:5.3.1) 

10
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 

Service Load Combinations: SLS


1.0DL        100  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP +1.0 LL     101  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP +1LL+1.0WP(FULL)  102  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP +1LL+1.0 WP (HALF‐1)  103  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP +1LL+1.0WP(HALF‐2)  104  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP +1.0 LLR  105  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP +1.0 LLR+1.0WP(FULL)  106  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP +1.0 LLR+1.0WP(HALF‐1)  107  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP +1.0 LLR+1.0WP(HALF‐2)  108  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP +0.75 LL + 0.75 LLR  109  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP +0.75 LL + 0.75 LLR+0.75WP(FULL)  110  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP +0.75 LL + 0.75 LLR+0.75WP(HALF‐1)  111  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP +0.75 LL + 0.75 LLR+0.75WP(HALF‐2)  112  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+ LL+LLR+SPS)  113  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+ LL+LLR+SPS)+1.0WP(FULL)  114  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+ LL+LLR+SPS)+1.0WP(HALF‐1)  115  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+ LL+LLR+SPS)+1.0WP(HALF‐2)  116  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+CR:1)+0.75(LL+LLR)  117  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+CR:1)+0.75(LL+LLR)+0.75WP(FULL)  118  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+CR:1)+0.75(LL+LLR)+0.75WP(HALF‐1)  119  Ref ACI318-14 (CL:2.4.1) 
119A.0(DL +SP+SPS+CR:1)+0.75(LL+LLR)+0.75WP(HALF‐2)  119A  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+CR:2)+0.75(LL+LLR)  121  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+CR:2)+0.75(LL+LLR)+0.75WP(FULL)  122  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+CR:2)+0.75(LL+LLR)+0.75WP(HALF‐1)  123  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+CR:2)+0.75(LL+LLR)+0.75WP(HALF‐2)  124  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+BL1)+0.75(LL+LLR)  125  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+BL1)+0.75(LL+LLR)+0.75WP(FULL)  126  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+BL1)+0.75(LL+LLR)+0.75WP(HALF‐1)  127  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+BL1)+0.75(LL+LLR)+0.75WP(HALF‐2)  128  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+BL2)+0.75(LL+LLR)  129  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+BL2)+0.75(LL+LLR)+0.75WP(FULL)  130  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+BL2)+0.75(LL+LLR)+0.75WP(HALF‐1)  131  Ref ACI318-14 (CL:2.4.1) 
:1.0(DL +SP+SPS+BL2)+0.75(LL+LLR)+0.75WP(HALF‐2)  132  Ref ACI318-14 (CL:2.4.1) 
 1.0(DL +SP+SPS+BL3)+0.75(LL+LLR)  133  Ref ACI318-14 (CL:2.4.1) 
1.0(DL +SP+SPS+BL3)+0.75(LL+LLR)+0.75WP(FULL)  134  Ref ACI318-14 (CL:2.4.1) 
 1.0(DL +SP+SPS+BL3)+0.75(LL+LLR)+0.75WP(HALF‐1)  135  Ref ACI318-14 (CL:2.4.1) 
 1.0(DL +SP+SPS+BL3)+0.75(LL+LLR)+0.75WP(HALF‐2)  136  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+1.0W+X  137  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+1.0W‐X  138  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+1.0W+Y  139  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+1.0W‐Y     140  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W+X  141  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W+X+0.75WP(FULL)  142  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W+X+0.75WP(HALF‐1)  143  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W+X+0.75WP(HALF‐2)  144  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐X  145  Ref ACI318-14 (CL:2.4.1) 

11
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐X+0.75WP(FULL)  146  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐X+0.75WP(HALF‐1)  147  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐X+0.75WP(HALF‐2)  148  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W+Y  149  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W+Y+0.75WP(FULL)  150  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W+Y+0.75WP(HALF‐1)  151  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W+Y+0.75WP(HALF‐2)  152  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐Y  153  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐Y+0.75WP(FULL)  154  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐Y+0.75WP(HALF‐1)  155  Ref ACI318-14 (CL:2.4.1) 
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐Y+0.75WP(HALF‐2)  156  Ref ACI318-14 (CL:2.4.1) 
0.6DL+1.0SP+1.0W+X  157  Ref ACI318-14 (CL:2.4.1) 
0.6DL+1.0SP+1.0W‐X  158  Ref ACI318-14 (CL:2.4.1) 
0.6DL+1.0SP+1.0W+Y  159  Ref ACI318-14 (CL:2.4.1) 
0.6DL+1.0SP+1.0W‐Y     160  Ref ACI318-14 (CL:2.4.1) 
1.0DL+0.72EQ+X+1.0SP+0.22EQ+Y  161  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ‐X+1.0SP+0.22EQ‐Y  162  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ+Y+1.0SP+0.22EQ+X  163  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ‐Y+1.0SP+0.22EQ‐X  164  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ+X+1.0SP+0.22EQ‐Y  165  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ‐X+1.0SP+0.22EQ+Y  166  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ+Y+1.0SP+0.22EQ‐X  167  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ‐Y+1.0SP+0.22EQ+X  168  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc)  169  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ‐X(+Ecc)+1.0SP+0.22EQ‐Y(+ecc)  170  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ+Y(+Ecc)+1.0SP+0.22EQ+X(+ecc)  171  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)  172  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)  173  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ‐X(+ecc)+1.0SP+0.22EQ+Y(+ecc)  174  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)  175  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ+X(+ecc)  176  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ+X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)  177  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ‐X(‐Ecc)+1.0SP+0.22EQ‐Y(‐Ecc)  178  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ+Y(‐Ecc)+1.0SP+0.22EQ+X(‐ecc)  179  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc)  180  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ+X(‐ecc)+1.0SP+0.22EQ‐Y(‐ecc)  181  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)  182  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ+Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc)  183  UBC1997-Cl-1612.3.1 
1.0DL+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)  184  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ+Y  185  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ+Y+1.0WP(FULL)  186  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ+Y+1.0WP(HALF‐1)  187  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ+Y+1.0WP(HALF‐2)  188  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ‐Y  189  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ‐Y+1.0WP(FULL)  190  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ‐Y+1.0WP(TANK‐1)  191  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ‐Y+1.0WP(TANK‐2)  192  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ+X  193  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ+X+1.0WP(FULL)  194  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ+X+1.0WP(HALF‐1)  195  UBC1997-Cl-1612.3.1 

12
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ+X+1.0WP(HALF‐2)  196  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ‐X  197  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ‐X+1.0WP(FULL)  198  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ‐X+1.0WP(HALF‐1)  199  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ‐X+1.0WP(HALF‐2)  200  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ‐Y  201  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ‐Y+1.0WP(FULL)  202  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ‐Y+1.0WP(HALF‐1)  203  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ‐Y+1.0WP(HALF‐2)  204  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ+Y  205  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ+Y+1.0WP(FULL)  206  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ+Y+1.0WP(HALF‐1)  207  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ+Y+1.0WP(HALF‐2)  208  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ‐X  209  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ‐X+1.0WP(FULL)  210  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ‐X+1.0WP(HALF‐1)  211  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ‐X+1.0WP(HALF‐2)  212  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ+X  213  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ+X+1.0WP(FULL)  214  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ+X+1.0WP(HALF‐1)  215  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ+X+1.0WP(HALF‐2)  216  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc)  217  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc)+1.0WP(FULL)  218  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc)+1.0WP(HALF‐1)  219  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc)+1.0WP(HALF‐2)  220  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)  221  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(FULL)  222  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(HALF‐1)  223  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(HALF‐2)  224  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQY(+ecc)+1.0SP+0.22EQX(+ecc)  225  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQY(+ecc)+1.0SP+0.22EQX(+ecc)+1.0WP(FULL)  226  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQY(+ecc)+1.0SP+0.22EQX(+ecc)+1.0WP(HALF‐1)  227  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQY(+ecc)+1.0SP+0.22EQX(+ecc)+1.0WP(HALF‐2)  228  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQY(‐ecc)+1.0SP+0.22EQX(‐ecc)  229  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQY(‐ecc)+1.0SP+0.22EQX(‐ecc)+1.0WP(FULL)  230  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQY(‐ecc)+1.0SP+0.22EQX(‐ecc)+1.0WP(HALF‐1)  231  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQY(‐ecc)+1.0SP+0.22EQX(‐ecc)+1.0WP(HALF‐2)  232  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)  233  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(FULL)  234  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(HALF‐1)  235  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(HALF‐2)  236  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)  237  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(FULL)  238  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(HALF‐1)  239  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(HALF‐2)  240  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)  241  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(FULL)  242  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(HALF‐1)  243  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(HALF‐2)  244  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)  245  UBC1997-Cl-1612.3.1 

13
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)+1.0WP(FULL)  246  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)+1.0WP(HALF‐1)  247  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)+1.0WP(HALF‐2)  248  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)  249  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(FULL)  250  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(HALF‐1)  251  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(HALF‐2)  252  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ‐Y(‐ecc)  253  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ‐Y(‐ecc)+1.0WP(FULL)  254  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ‐Y(‐ecc)+1.0WP(HALF‐1)  255  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ‐Y(‐ecc)+1.0WP(HALF‐2)  256  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)  257  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(FULL)  258  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(HALF‐1)  259  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(HALF‐2)  260  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc)  261  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc)+1.0WP(FULL)  262  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc)+1.0WP(HALF‐1)  263  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc)+1.0WP(HALF‐2)  264  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)  265  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(FULL)  266  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(HALF‐1)  267  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(HALF‐2)  268  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)  269  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(FULL)  270  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(HALF‐1)  271  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(HALF‐2)  272  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)  273  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(FULL)  274  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(HALF‐1)  275  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(HALF‐2)  276  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)  277  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)+1.0WP(FULL)  278  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)+1.0WP(HALF‐1)  279  UBC1997-Cl-1612.3.1 
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)+1.0WP(HALF‐2)  280  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ+X+1.0SP+0.22EQ+Y  281  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ+Y+1.0SP+0.22EQ+X  282  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ+X+1.0SP+0.22EQ‐Y  283  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ+Y+1.0SP+0.22EQ‐X  284  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ‐X+1.0SP+0.72EQ‐Y  285  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ‐Y+1.0SP+0.22EQ‐X  286  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ+X+1.0SP+0.72EQ‐Y  287  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ+Y+1.0SP+0.22EQ‐X  288  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQX(+ecc)+1.0SP+0.22EQY(+ecc)  289  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQY(+ecc)+1.0SP+0.22EQX(+ecc)  290  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)  291  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)  292  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ‐X(+ecc)+1.0SP+0.72EQ‐Y(+ecc)  293  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)  294  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ+X(+ecc)+1.0SP+0.72EQ‐Y(+ecc)  295  UBC1997-Cl-1612.3.1 

14
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
0.90DL+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)  296  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQX(‐ecc)+1.0SP+0.22EQY(‐ecc)  297  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQY(‐ecc)+1.0SP+0.22EQX(‐ecc)  298  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)  299  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)  300  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ‐Y(‐ecc)  301  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc)  302  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)  303  UBC1997-Cl-1612.3.1 
0.90DL+0.72EQ+Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc)  304  UBC1997-Cl-1612.3.1 
0.6DL+0.7EQ+X+1.0SP+0.21EQ+Y  305  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ‐X+1.0SP+0.21EQ‐Y  306  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ+Y+1.0SP+0.21EQ+X  307  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ‐Y+1.0SP+0.21EQ‐X  308  Ref 2.4.1 ASCE7-05 
.0.6DL+0.7EQ+X+1.0SP+0.21EQ‐Y  309  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ‐X+1.0SP+0.21EQ+Y  310  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ+Y+1.0SP+0.21EQ‐X  311  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ‐Y+1.0SP+0.21EQ+X  312  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ‐X(+ecc)+1.0SP+0.21EQ‐Y(+ecc)  313  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ‐X(‐ecc)+1.0SP+0.21EQ‐Y(‐ecc)  314  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ‐Y(+ecc)+1.0SP+0.21EQ‐X(+ecc)  315  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ‐Y(‐ecc)+1.0SP+0.21EQ‐X(‐ecc)  316  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ+X(+ecc)+1.0SP+0.21EQ‐Y(+ecc)  317  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ‐X(‐ecc)+1.0SP+0.21EQ+Y(‐ecc)  318  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ+Y(+ecc)+1.0SP+0.21EQ‐X(+ecc)  319  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ‐Y(‐ecc)+1.0SP+0.21EQ+X(‐ecc)  320  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ+X(+ecc)+1.0SP+0.21EQ+Y(+ecc)  321  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ+X(‐ecc)+1.0SP+0.21EQ+Y(‐ecc)  322  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ+Y(+ecc)+1.0SP+0.21EQ+X(+ecc)  323  Ref 2.4.1 ASCE7-05 
0.6DL+0.7EQ+Y(‐ecc)+1.0SP+0.21EQ+X(‐ecc)  324  Ref 2.4.1 ASCE7-05 
1.0(DL +SP+SPS+BL)+0.75(LL+LLR)  325  Ref ACI318-14 (CL:5.3.1) 
1.0(DL +SP+SPS+BL)+0.75(LL+LLR)+0.75WP(FULL)  326  Ref ACI318-14 (CL:5.3.1) 
1.0(DL +SP+SPS+BL)+0.75(LL+LLR)+0.75WP(HALF‐1)  327  Ref ACI318-14 (CL:5.3.1) 
1.0(DL +SP+SPS+BL)+0.75(LL+LLR)+0.75WP(HALF‐2)  328  Ref ACI318-14 (CL:5.3.1) 
1.0(DL +SP+SPS+BL‐4)+0.75(LL+LLR)  329  Ref ACI318-14 (CL:5.3.1) 
1.0(DL +SP+SPS+BL‐4)+0.75(LL+LLR)+0.75WP(FULL)  330  Ref ACI318-14 (CL:5.3.1) 
1.0(DL +SP+SPS+BL‐4)+0.75(LL+LLR)+0.75WP(HALF‐1)  331  Ref ACI318-14 (CL:5.3.1) 
1.0(DL +SP+SPS+BL‐4)+0.75(LL+LLR)+0.75WP(HALF‐2)  332  Ref ACI318-14 (CL:5.3.1) 

Load Envelopes:

SLS = Service Load Envelope, for all Service loads.


ULS = Ultimate Load Envelop, for all Ultimate loads.
SLS(Seismic) = Service Load Envelope, for Seismic loads.
SLS(Gravity) = Service Load Envelope, for gravity loads.
SLS(Lateral) = Service Load Envelope, for all lateral loads.
ULS(Seismic) = Ultimate Load Envelop, for all Seismic loads.

15
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 

Stiffness modification factors:

Columns = 0.70 Ig
Beams = 0.35 Ig
Walls = 0.35 Ig
Slabs = 0.25 Ig

B. Load Calculations
Load values as applied in the software are calculated / explained as follows:

B.1 Dead Load:

Assumed thickness of floor slabs:

Raft = 700mm (Main Building Raft) /


400 ( transformer Raft)

Ground floor = 200mm(11 kV Switchgear room1&2, Capacitor Rooms)

Ground floor = 250 mm (GIS Room)

First floor = 200mm

Roof = 200mm

16
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks

1.0 MAIN BUILDING


B1: Dead Loads:
Loads in the Basement area (-3.30 m lvl)

Area Loads:

Dead Load on basement area


Applied as uniform Shell loads
Load due to screed under "SDL" load case
3 2
Below capcitor bank-1,2,3,4,5&6 basement area 3.300-2.45 0.85 m 24 kN/m 20.4 kN/m
3 2
In 11 kV Cable Basement -2 3.300-2.50 0.80 m 24 kN/m 19.2 kN/m
3 2
In 11 kV Cable Basement -1 3.300-2.970 0.33 m 24 kN/m 7.9 kN/m

Concrete Platforms:
3 2
Between Grid B & C and 8 & 9 3.300-1.72 1.58 m 24 kN/m 37.9 kN/m
3 2
Between Grid K & L and 7 & 8 3.300-2.55 0.75 m 24 kN/m 18.0 kN/m
3 2
Between Grid B & C and 7 & 8 3.300-2.37 0.93 m 24 kN/m 22.3 kN/m
3 2
Between Grid H & K and 7 & 8 3.300-2.37 0.93 m 24 kN/m 22.3 kN/m
3 2
Between Grid B' & C and 4 & 4' 3.300-1.85 1.45 m 24 kN/m 34.8 kN/m
3 2
Between Grid H & K and 4 & 5 3.300-1.52 1.78 m 24 kN/m 42.7 kN/m

3 2
132kV Cable basement 3.300-2.30 1.00 m 24 kN/m 24.0 kN/m
3 2
In Stair case-1 Area 3.300-1.68 1.62 m 24 kN/m 38.9 kN/m
3 2
In Stair case-2 Area 3.300-2.475 0.83 m 24 kN/m 19.8 kN/m
3 2
In Stair case-3 Area 3.600-1.48 2.12 m 24 kN/m 50.9 kN/m
3 2
In Stair case-4 Area 3.600-1.81 1.79 m 24 kN/m 43.0 kN/m
3 2
Load due to screed in Sump pit-1 3.600-3.000 0.60 m 24 kN/m 14.4 kN/m
3 2
Load due to screed in Sump pit-2 3.600-3.5 0.10 m 24 kN/m 2.4 kN/m
3 2
Load due to screed in Cable pulpit -1 3.300-2.900 0.40 m 24 kN/m 9.6 kN/m
3 2
Load due to screed in OWMH-1 3.600-2.200 1.40 m 24 kN/m 33.6 kN/m

17
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
3 2
Load due to screed in OWMH-2 3.600-2.700 0.90 m 24 kN/m 21.6 kN/m
3 2
Load due to screed in OWMH-3 3.600-2.850 0.75 m 24 kN/m 18.0 kN/m
3 2
Load due to screed in OWMH-5 3.600-3.525 0.08 m 24 kN/m 1.8 kN/m
3 2
Load due to screed in OWMH-6 3.600-3.450 0.15 m 24 kN/m 3.6 kN/m
3 2
Load due to screed in OWMH-7 3.600-3.375 0.23 m 24 kN/m 5.4 kN/m
3 2
Load due to screed in OWMH-8 3.600-3.300 0.30 m 24 kN/m 7.2 kN/m

Loads in the IDT Transformer -1,2,3


Applied as uniform Shell loads
Dead load in power transformer area (-3.600 m lvl) under "SDL" load case

3 2
Load due to screed in 11 kV cable trench area 3.6-3.2 0.40 m 24 kN/m 9.6 kN/m
3 2
Load due to screed in 11 kV cable trench area (IDT-3) cable crosing location 3.6-1.85 1.75 m 24 kN/m 42.0 kN/m
3 2
Load due to screed in 132 kV cable trench area 3.6-3.0 0.60 m 24 kN/m 14.4 kN/m
3 2
Load due to screed in oil water collection area ( in areas-1, 2 & 3) -Shorter 3.60-3.15 0.45 m 24 kN/m 10.8 kN/m
3 2
Load due to screed in oil water collection area ( in areas-1,2&3) -Longer 3.6-3 0.60 m 24 kN/m 14.4 kN/m
3 2
Load due to screed in oil water collection area ( in areas-2) -Longer cable crosing l 3.6-1.45 2.15 m 24 kN/m 51.6 kN/m
3 2
Load due to screed in oil water collection area ( in areas-3) -Longer cable crosing l 3.6-1.85 1.75 m 24 kN/m 42.0 kN/m
3 2
Load due to screed in 15 MVR transformer (cable protection screed) 3.6-1.85 1.75 m 24 kN/m 42.0 kN/m
3 2
Load due to pedestal 3.60+0.4 4.000 m 25 kN/m 100.0 kN/m
2
Load due to 0.250m thk trench walls 3.6+0.4 4.000 m 6.25 kN/m 25.0 kN/m

3 2
Load due to 0.2 m thk slab over cable trench 0.2 m 25 kN/m 5.0 kN/m
(Considering Maximum value of
8.8 kN/m^2 UDL is applied at
3 2
Load due to 0.350 m (grating + cobble stone layer) @ water collection area 0.35 m 25 kN/m 8.8 kN/m +0.4 m lvl
Loads are applied as Distributed
frame loads under 'SDL' load
Load on shorter span,lx = 7.66 m (W lx)/3 = (8.8x 7.66)/3 22.5 kN/m case

Load on longer span, ly= 11.015 m ( W lx / 6) (3-(lx/ly)2) (8.8x7.66/6)(3-(7.66/11.015)2) 28.3 kN/m

Loads in the ET-1,2,3

18
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
Applied as uniform Shell loads
Dead load in ET transformer area (-3.600 m lvl) under "SDL" load case

3 2
Load due to screed in 11 kV cable trench area ET-1 (sleeves area) 3.600-0.87 2.73 m 24 kN/m 65.5 kN/m
3 2
Load due to screed in 11 kV cable trench area ET-1 3.600-2.47 1.13 m 24 kN/m 27.1 kN/m
3 2
Load due to screed in 11 kV cable trench area ET-2 (sleeves area) 3.600-1.12 2.48 m 24 kN/m 59.5 kN/m
3 2
Load due to screed in 11 kV cable trench area ET-2 3.600-2.97 0.63 m 24 kN/m 15.1 kN/m
3 2
Load due to screed in 11 kV cable trench area ET-3 (sleeves area) 3.600-2.375 1.225 m 24 kN/m 29.4 kN/m
3 2
Load due to screed in 11 kV cable trench area ET-3 3.600-2.925 0.675 m 24 kN/m 16.2 kN/m
3 2
Load due to screed in LV cable trench area ET-1 (sleeves area) 3.600-2.9 0.7 m 24 kN/m 16.8 kN/m
3 2
Load due to screed in LV cable trench area ET-2&3(sleeves area) 3.600-1.48 2.12 m 24 kN/m 50.9 kN/m
3 2
Load due to screed in oil water collection area ( in ET-1) 3.600-1.95 1.65 m 24 kN/m 39.6 kN/m
3 2
Load due to screed in oil water collection area ( in ET-2 & 3) 3.600-2.450 1.15 m 24 kN/m 27.6 kN/m
3 2
Load due to screed in oil water collection area ( in ET-2 & 3)(Sleeves area) 3.300-1.520 1.78 m 24 kN/m 42.7 kN/m
3 2
Load due to pedestal 3.600+0.4 4.000 m 25 kN/m 100.0 kN/m
2
Load due to 0.250m thk trench walls 4.000 m 6.25 kN/m 25.0 kN/m
3 2
Load due to 0.2 m thk slab over cable trench 0.2 m 25 kN/m 5.0 kN/m
(Considering Maximum value
Load due to 0.350 m (grating + cobble stone layer) @ water collection area 0.35 m 25 kN/m3 8.8 kN/m2 of 8.8 kN/m^2 UDL is applied
at +0.400 m lvl
Loads are applied as Distributed
Load on shorter span,lx = 4.57 m (W lx)/3 = (8.8x 4.570)/3 13.4 kN/m frame loads under 'SDL' load
case
Load on longer span, ly= 5.655 m ( W lx / 6) (3-(lx/ly)2) (8.8x4.57/6)(3-(4.57/5.655)2) 15.7 kN/m

Loads in the SHUNT REACTOR-1


Applied as uniform Shell loads
Dead load in Shunt reactor-1 area (-3.600 m lvl) under "SDL" load case

3 2
Load due to screed in 132 kV cable trench area 3.600-3.000 0.6 m 24 kN/m 14.4 kN/m
3 2
Load due to screed in oil water collection area 3.600-3.0 0.6 m 24 kN/m 14.4 kN/m
3 2
Load due to screed in cable trench area 3.600-1.850 1.75 m 24 kN/m 42.0 kN/m
3 2
Load due to pedestal 3.600+0.4 4.000 m 25 kN/m 100.0 kN/m

19
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
2
Load due to 0.250m thk trench walls 3.994 m 6.25 kN/m 25.0 kN/m
3 2
Load due to 0.2 m thk slab over cable trench 0.2 m 25 kN/m 5.0 kN/m
(Considering Maximum value
of 8.8 kN/m^2 UDL is applied
3 2
Load due to 0.350 m (grating + cobble stone layer) @ water collection area 0.35 m 25 kN/m 8.8 kN/m at +0.4 m lvl
Loads are applied as Distributed
frame loads under 'SDL' load
Load on shorter span,lx = 8.090 m (W lx)/3 = (8.8x 8.09)/3 23.7 kN/m case
2 2
Load on longer span, ly= 9.25 m ( W lx / 6) (3-(lx/ly) ) (8.8x8.08/6)(3-(8.08/9.25) ) 26.5 kN/m

Loads on the Basement at firepump

Applied as uniform Shell loads


Dead Load on Raft under "SDL" load case
3
Load due to 1.6 m thick height upstand supporting duct bank(3 No.s) 1.6 0.4 m 25.00 kN/m 16.0 kN/m
3 2
Load due to 0.45 m slab for cable protection 0.45 m 24.00 kN/m 10.80 kN/m
3 2
Load due to screed at drain pit 3.300-0.975 2.325 m 24.00 kN/m 55.80 kN/m
3 2
Load due to screed at cable trench 3.300-0.725 2.575 m 24.00 kN/m 61.80 kN/m
3 2
Load due to 1.39 m thick screed at Fire Pipe trench 3.300-1.39 1.91 m 24.00 kN/m 45.84 kN/m
2
Load due to 0.250m thk trench walls 2.750 m 6.25 kN/m 17.2 kN/m
Applied as uniform Shell loads
2
Blast load in IDT, ET & Shunt reactor-1 Walls 5.0 kN/m under "SDL" load case

Wall Loads:
Loads are applied as Distributed
frame loads under 'SDL' load
Load due to 150 mm thick solid block work case

Height of the solid block work 1.42-(-3.3)-0.5 4.22 m


2
Density for 150 thk solid block work (0.15*21) 3.2 kN/m 13.3 kN/m
Total 13.3 kN/m
Along Grid-7 from Grid-J to A 13.3 kN/m

20
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
Loads are applied as Distributed
frame loads under 'SDL' load
Load due Removable Handrail case

Along Grid-8 from Grid-L to B' 2.0 kN/m

Loads are applied as Distributed


Load due to Front enclosure of IDT Room, and Shunt reactor applied above basement wall frame loads under 'SDL' load
case
Load due to Front enclosure
3
Unit weight of Front enclosure 27.0 kN/m
Height of front enclosure IDT room 9.80-0.70-0.40 8.70 m
Thickness of front enclosure = 150 mm 0.15 m
Load due to Front enclosure 35.2 kN/m
Allowing 50% for openings, therefore load 17.6 kN/m

Loads are applied as Distributed


Load due to Front enclosure of ET applied above basement wall frame loads under 'SDL' load
case

Load due to Front enclosure


3
Unit weight of Front enclosure 27 kN/m
Height of front enclosure ET room 4.9-0.60-0.40 3.9 m
Thickness of front enclosure 0.15 m
Load due to Front enclosure 15.8 kN/m
Allowing 50% for openings, therefore load 7.9 kN/m

Loads in the Ground floor area (+1.420 m lvl)

Area Loads:

Dead Load in Ground floor area


Self Wt. of slab, 0.25m Thk (132 kV GIS Room)

Self Wt. of slab, 0.20m Thk (Except 132 kV GIS Room & offloading platform)

21
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
3 2
Load due to screed 80 mm screed 1.50-1.42 0.080 m 24 kN/m 1.9 kN/m

Applied as uniform Shell loads


2
Total 1.9 kN/m under "SDL" load case

Wall Loads:
Loads are applied as Distributed
frame loads under 'SDL' load
Load due to 270 thk (250 Thermal Block wall+20 mm outside plaster) Thermal Block wall @ +1.420 m lvl case

Height of the Thermal Block wall


2
Density for 250 thk Thermal Block wall + Plastering (0.25*17.5)+(0.02*20) 4.78 kN/m
2
Density for 270 thk RCC Screed supporting Upstand (0.27*25) 6.75 kN/m

Along Grid-7 from Grid M to L 7.5-1.42-0.6 5.48 m 26.2 kN/m


Along Grid-7 from Grid C to B 7.5-1.42-0.6 5.48 m 26.2 kN/m
Along Grid-10 from Grid A to B' 4-0.19-0.6 3.21 m 15.3 kN/m
Along Grid-10 from Grid A to B'(Screed Supporting RCC Upstand) 0.19+0.4 0.59 m 4.0 kN/m
Along Grid-11 from Grid D to M 7.5-1.42-0.6 5.48 m 26.2 kN/m
Along Grid-11 from Grid B' to D 6.7-0.2-0.6 5.90 m 28.2 kN/m
Along Grid-11 from Grid B' to D(Screed Supporting RCC Upstand) 0.2+0.4 0.60 m 4.1 kN/m
Along Grid-A from Grid 9 to 10 4-0.19-0.6 3.21 m 15.3 kN/m
Along Grid-A from Grid 9 to 10(Screed Supporting RCC Upstand) 0.19+0.4 0.59 m 4.0 kN/m
Along Grid-B from Grid 7 to 8 7.5-1.42-0.6 5.48 m 26.2 kN/m
Along Grid-B' from Grid 10 to 11 6.7-0.2-0.6 5.90 m 28.2 kN/m
Along Grid-B' from Grid 10 to 11(Screed Supporting RCC Upstand) 0.19+0.4 0.59 m 4.0 kN/m
Along Grid-C from Grid 4 to 4' 4.5-1.42-0.6 2.48 m 11.8 kN/m
Along Grid-C from Grid 6 to 7 4.5-1.42-0.6 2.48 m 11.8 kN/m
Along Grid-M from Grid 7 to 8 & from Grid 9 to 11 7.5-1.42-0.6 5.48 m 26.2 kN/m

Loads are applied as Distributed


frame loads under 'SDL' load
Load due to 150 mm thick Hollow Block wall @+1.420 m lvl case
Height of the Hollow Block

22
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
2
Density for 150 thk Hollow Block (0.15*16) 2.4 kN/m
2
Density for 270 thk RCC Screed supporting Upstand (0.27*25) 6.75 kN/m
2
Density for 150 thk RCC Screed supporting Upstand (0.15*25) 3.75 kN/m

Along Grid-7 from Grid-J to C' 7.5 -1.42-0.6 5.48 m 13.2 kN/m
Along Grid-8 from Grid-L to B 7.5 -1.42-0.6 5.48 13.2 kN/m
Along Grid-9 from Grid-L to B' 7.5 -1.42-0.6 5.48 m 13.2 kN/m
B/W Grids-H & K from Grid-9 to 11 7.5 -1.42 6.08 m 14.6 kN/m
Near Grid-F from Grid-9 to 11 7.5 -1.42-0.6 5.48 m 13.2 kN/m
Along Grid-D from Grid-9 to 11 6.7 -1.42-0.6 4.68 m 11.2 kN/m
Along Grid-B' from Grid-9 to 10 4-0.2-0.6 3.20 m 7.7 kN/m
Along Grid-B' from Grid 9 to 10(275 thk Screed Supporting RCC Upstand) 0.2+0.4 0.60 m 4.1 kN/m
Around Toilet in service room 4-0.19 3.81 m 9.1 kN/m
150 thk RCC Screed supporting Upstand Around Toilet in service room 0.19+0.4 0.59 m 2.2 kN/m

Loads are applied as Distributed


frame loads under 'SDL' load
Load due to 150 mm thick Hollow Block wall @+1.420 m lvl case
Height of the Hollow Block
2
Density for 150 thk Hollow Block (0.15*16) 2.4 kN/m

Along Grid-4 from Grid-H' to C' 13.3 -1.42-0.6 11.28 m 27.1 kN/m

Along Grid-J from Grid-4 to 7 4.9 -1.42-0.6 2.88 m 6.9 kN/m

Load due to chequered plate (cable riser-1,2,3,4 & 5)


3 2
Load due to 10 mm thk chequered plate 0.01 m 78.5 kN/m 0.8 kN/m

Load due to 10 mm thk chequered plate on beam for 1,2,3 0.83*0.8/2 0.83 m 0.3 kN/m (Considered 1 kN/m in SDL)

Load due to 10 mm thk chequered plate on beam for 4&5 0.375*0.8/2 0.375 m 0.1 kN/m (Considered 1 kN/m in SDL)

23
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
Loads are applied as Distributed
Load due to Chain link Fence at capacitor bank rooms frame loads under 'SDL' load
case
At capacitor bank locations 5.0 kN/m

Loads are applied as Distributed


Load due to Miscallaneous Staircases, Ramps & Removable handrail at offloading platforms frame loads under 'SDL' load
case
3
Dead load due to 2 typical staircases near off-loading platform (2.4 x 0.25 x 25)/2 0.25 m 25.0 kN/m 7.5 kN/m
3
Dead load due to ramp (from Grid-9 to 11) & Grid M to K (6.4 x 0.25 x 25)/2 0.25 m 25.0 kN/m 20.3 kN/m

Load due to Removable handrail in Offloading platform area 2.0 kN/m

Loads in the First floor area (3.000, 4.000, 4.500, 4.900, 7.500 lvl)

Area Loads:

Dead Load in first floor area in Corridor, Offloading platform, LVAC


Room, OT Room, CCTV Room,Control, Protection & Charger Room, Applied as uniform Shell loads
Nitrogen Room, Battery Room-1 & 2, Capacitor Room Roof under "SDL" load case

Load due to 800 mm screed in Off-loading platform area, HVAC Shaft &
3 2
Nitrogen Room 7.5-8.3 0.80 m 24 kN/m 19.2 kN/m
Load due to cable routing in Control, Protection & charger room, OT room,Few
Corridors, LVAC Room, CCTV Room and load due to services,raised floor. 1+1 kN/m
2
2.0 kN/m2
3 2
Load due to 900 mm screed in Battery Room-1 & 2 7.5-8.4 0.90 m 24 kN/m 21.6 kN/m
3 2
Load due to screed in Capacitor Room Roof 7.725-7.5 0.23 m 24 kN/m 5.4 kN/m

3 2
Load due to 400 mm screed on staircase-4 @ 3.00 m lvl 3.40-3.00 0.40 m 24 kN/m 9.6 kN/m
Load due to 600 Imperial Gallon tank weight (600*4.55) Liters 2730.00 liters
2
(Assuming 3000 kG total weight of the tank) 30 kN 1.365 2 30/(1.365*2)= 10.5 kN/m

3 2
Load due to 100 mm screed on Service room roof @ 4.00 m lvl 100mm 0.10 m 25 kN/m 2.5 kN/m

24
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks

Load due to 1000 Imperial Gallon tank weight (1000*4.55) Liters 4550.00 liters
2
(Assuming 4700 kG total weight of the tank) 47 kN 1.52 2 47/(2)= 25.9 kN/m
2
(Assuming 200 kG total weight of transfer pumps) 2 kN 2.275 1.372 0.6 kN/m

3 2
Load due to 230 mm screed on Staircase-3 & ET room roof @ 4.90 m lvl 5.135-4.90 0.23 m 24 kN/m 5.6 kN/m

Loads are applied as Distributed


frame loads under 'SDL' load
Load due to Cable riser-1,2,3,4 & 5 RCC Slab case

2
Density for 200 thk RCC Slab with tiles (0.20*25+0.02*20) 5.40 kN/m

Load around cable riser 1,2,3 on beams 0.83*5.4/2 0.83 m 4.5 kN/m
Load around cable riser 4,5 on beams 0.33*5.4/2 0.33 m 1.8 kN/m

Wall Loads:
Loads are applied as Distributed
Load due to 270 thk (250 Thermal Block wall+20 mm outside plaster) Thermal Block wall @ +4.500 m lvl frame loads under 'SDL' load
case
Height of the Thermal Block wall
2
Density for 250 thk Thermal Block wall + Plastering (0.25*17.5)+(0.02*20) 4.78 kN/m

Along Grid-C' from Grid-4 to 4' 13.30-4.5-0.6 8.20 m 39.2 kN/m


Along Grid-C' from Grid-4' to 6 13.30-7.1-0.6 5.60 m 26.7 kN/m
Along Grid-C' from Grid-6 to 9 13.30-4.5-0.6 8.20 m 39.2 kN/m
Loads are applied as Distributed
frame loads under 'SDL' load
Load due to 270 thk (250 Thermal Block wall+20 mm outside plaster) Thermal Block wall @ +4.000 m lvl @ +4.900 m lvl case
Height of the Thermal Block wall
2
Density for 250 thk Thermal Block wall + Plastering (0.25*17.5)+(0.02*20) 4.78 kN/m
2
Density for 270 thk RCC Screed supporting Upstand (0.27*25) 6.75 kN/m

Along Grid-J from Grid-4 to 7 13.30-5.135-1.2 6.97 m 33.3 kN/m


Along Grid-J from Grid-4 to 7 270 thk RCC Screed supporting Upstand 5.135-4.9 0.23 m 1.6 kN/m

25
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
Along Grid-4 from Grid-J to H' 13.30-5.135-1.2 6.97 m 33.3 kN/m
Along Grid-4 from Grid-J to H' 270 thk RCC Screed supporting Upstand 5.135-4.9 0.23 m 1.6 kN/m
Along Grid-7 from Grid-J to L 7.50-5.09-0.6 1.81 m 8.6 kN/m
Along Grid-7 from Grid-J to L 270 thk RCC Screed supporting Upstand 5.09-4.9 0.19 m 1.3 kN/m
Along Grid-B' from Grid-9 to 10 6.7-4-0.6-0.15 1.95 m 9.3 kN/m
Along Grid-B' from Grid-9 to 10 270 thk RCC Screed supporting Upstand 0.15 0.15 m 1.0 kN/m
Loads are applied as Distributed
frame loads under 'SDL' load
Load due to 270 thk (250 Thermal Block wall+20 mm outside plaster) Thermal Block wall @ +7.500 m lvl case
Height of the Thermal Block wall
2
Density for 250 thk Thermal Block wall + Plastering (0.25*17.5)+(0.02*20) 4.78 kN/m
2
Density for 270 thk RCC Screed supporting Upstand (0.27*25) 6.75 kN/m

Along Grid-7 from Grid-J to M 13.30-8.5-0.6 4.20 m 20.1 kN/m


Along Grid-7 from Grid-A to C 13.30-8.5-0.6 4.20 m 20.1 kN/m
Along Grid-9 from Grid-K to L 13.30-8.5-0.6 4.20 m 20.1 kN/m
Along Grid-11 from Grid-D to K 13.30-8.5-0.6 4.20 m 20.1 kN/m
Along Grid-A from Grid-7 to 8 13.30-8.5-0.6 4.20 m 20.1 kN/m
Along Grid-K from Grid-9 to 11 13.30-8.5-0.6 4.20 m 20.1 kN/m
Along Grid-M from Grid-7 to 8 13.30-8.5-0.6 4.20 m 20.1 kN/m

Load due to 270 thk. RC wall upstand @ +7.500 lvl


Along Grid-7 from Grid-J to M 8.5-7.5 1.00 m 6.8 kN/m
Along Grid-7 from Grid-A to C 8.5-7.5 1.00 m 6.8 kN/m
Along Grid-9 from Grid-K to L 8.5-7.5 1.00 m 6.8 kN/m
Along Grid-11 from Grid-D to K 8.5-7.5 1.00 m 6.8 kN/m
Along Grid-A from Grid-7 to 8 8.5-7.5 1.00 m 6.8 kN/m
Along Grid-K from Grid-9 to 11 8.5-7.5 1.00 m 6.8 kN/m
Along Grid-M from Grid-7 to 8 8.5-7.5 1.00 m 6.8 kN/m

Loads are applied as Distributed


frame loads under 'SDL' load
Load due to 150 mm thick Hollow block work @+7.500 m lvl case
Height of the hollow block work
2
Density for 150 thk hollow block work (0.15*16.0) 2.4 kN/m

26
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
2
Density for150 thk RCC Screed supporting Upstand (0.15*25) 3.75 kN/m

Along Grid-7 from Grid-J to C 13.30-8.5-0.5 4.30 m 10.3 kN/m


Between Grid-8 & 9 from Grid-C to K 13.30-8.5 4.80 m 11.5 kN/m
Along Grid-9 from Grid-D to K 13.3-8.5-0.5 4.30 m 10.3 kN/m
Between Grid-B' & C from Grid-7 to between 8 & 9 13.3-8.5-0.5 4.30 m 10.3 kN/m
Along Grid- F from Grid-7 to between 8 & 9 13.30-8.50-0.5 4.30 m 10.3 kN/m
Along Grid- G from Grid-7 to between 8 & 9 13.30-8.50-0.5 4.30 m 10.3 kN/m
Between Grid-E & F from between Grid-9 & 11 13.3-8.5 4.80 m 11.5 kN/m
Between Grid-G & H from between Grid-9 & 11 13.3-8.5 4.80 m 11.5 kN/m
Around HVAC Shaft 13.3-8.5-0.5 4.30 m 10.3 kN/m
Around CCTV Room 13.3-8.5 4.80 m 11.5 kN/m

Load due to 150 thk. RC wall upstand @ +7.500 lvl


Along Grid-7 from Grid-J to C 8.5-7.5 1.00 m 3.75 kN/m
Between Grid-8 & 9 from Grid-C to K 8.5-7.5 1.00 m 3.75 kN/m
Along Grid-9 from Grid-D to K 8.5-7.5 1.00 m 3.75 kN/m
Between Grid-B' & C from Grid-7 to between 8 & 9 8.5-7.5 1.00 m 3.75 kN/m
Along Grid- F from Grid-7 to between 8 & 9 8.5-7.5 1.00 m 3.75 kN/m
Along Grid- G from Grid-7 to between 8 & 9 8.5-7.5 1.00 m 3.75 kN/m
Between Grid-E & F from between Grid-9 & 11 8.5-7.5 1.00 m 3.75 kN/m
Between Grid-G & H from between Grid-9 & 11 8.5-7.5 1.00 m 3.75 kN/m
Around HVAC Shaft 8.5-7.5 1.00 m 3.75 kN/m
Around CCTV Room 8.5-7.5 1.00 m 3.75 kN/m

3
Load due to upstand at offloading platform 1.1 m 0.20 m 25 kN/m 5.50 kN/m
Load due removable hand rail at offloading platform 2.0 kN/m
Load due to removable chequered plate on Equipment lifting area (assume
0.01 m 3.00 m 78.5 kN/m3
thickness = 10 mm)
0.010*3.0*78.5/2 1.18 kN/m
Total dead load around opening in offloading area = 8.7 kN/m

27
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks

Load due to parapet wall of 4.5 m height @+3.00 m lvl(Above staircase-4)


Load due to 4.50 m RCC Precast wall
2
Load due to 200mm Thk RCC 4.5 m 5.00 kN/m 22.5 kN/m
Total 22.5 kN/m
Along Grid-4 from Grid-A' to C' 22.5 kN/m
Along Grid-A' from Grid-3 to 4 22.5 kN/m

Load due to parapet wall of 3.85 m height @+4.00 m lvl(Above Service Room)
Load due to 3.85 m RCC Precast wall
2
Load due to 200mm Thk RCC 3.85 m 5.00 kN/m 19.3 kN/m
Total 19.3 kN/m
Along Grid-A from Grid-9 to 10 19.3 kN/m
Along Grid-10 from Grid-A to B' 19.3 kN/m

Load due to parapet wall of 1.5 m height @+4.90 m lvl(Above ET Room)


Load due to 1.5 m RCC Precast wall
2
Load due to 200mm Thk RCC 1.5 m 5.00 kN/m 7.5 kN/m
Total 7.5 kN/m
Along Grid-3 from Grid-L to H' 7.5 kN/m
Along Grid-L from Grid-3 to 7 7.5 kN/m

Load due to parapet wall of 1.5 m height @+7.50 m lvl(Above Capacitor Room)
Load due to 1.5 m RCC Precast wall
2
Load due to 200mm Thk RCC 1.5 m 5.00 kN/m 7.5 kN/m
Total 7.5 kN/m
Along Grid-M from Grid-9 to 11 7.5 kN/m
Along Grid-11 from Grid-M to K 7.5 kN/m

Load due to roof shed on parapet wall over Staircase-4 & Service Room

Distance between the channels 0.6 m

28
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
2
Dead Load due to shed on beams 1.5 x 0.6 1.50 kN/m 0.90 kN/m

Loads in the Roof Floor (+9.80, +13.30 ,+16.70 m lvl)

Loads in the Roof floor area +9.80 m (Power transformer Roof & Shunt Reactor-1)

Loads are applied as Distributed


Load due to 200 thk parapet above Power transformer walls 1.5 m 5.0 kN/m2 7.50 kN/m frame loads under 'SDL' load
case

Assume 1.5 kN/m2 as roof truss weight


Load due to Roof Truss above transformer walls(Along Grid F',D', C') 7.66 m 1.5 kN/m2 11.5 kN/m
Load due to Roof Truss above transformer walls (Along Grid A' & H') 5.7 kN/m

Applied as uniform Shell loads


Area Loads: under "SDL" load case
Dead Load in Roof area @ +13.30 m lvl
Self Wt. of slab, 200mm Thk

[(13.7-13.3)+(13.45-
3
Load due to 275 mm screed (Average thick of screed) 13.3)]/2 0.275 m 24 kN/m 6.6 kN/m2
3
Load due to 0.04 m thk concrete tiles 0.04 m 24 kN/m 1.0 kN/m2
Load due to water proofing 0.5 kN/m2
Total 8.1 kN/m2
Load due to HVAC pedestals 0.4*0.6*25 6.0 kN/m

Wall Loads:

Load due to parapet wall 3.7 m height


Load due to 3.70 m RCC Precast wall
2
Load due to 200mm Thk RCC 3.7 m 5.00 kN/m 18.5 kN/m
Total 18.5 kN/m

29
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
Along Grid-J from Grid-4 to 7 18.5 kN/m
Along Grid-7 from Grid-J to M 18.5 kN/m
Along Grid-M from Grid-7 to 8 18.5 kN/m
Along Grid-9 from Grid-L to K 18.5 kN/m
Along Grid-K from Grid-9 to 11 18.5 kN/m
Along Grid-11 from Grid-K to B' 18.5 kN/m
Along Grid-B' from Grid-9 to 11 18.5 kN/m
Along Grid-9 from Grid-B to B' 18.5 kN/m
Along Grid-A from Grid-7 to 8 18.5 kN/m
Along Grid-7 from Grid-A to C 18.5 kN/m
Along Grid-C from Grid-4 to 7 18.5 kN/m
Along Grid-4 from Grid-C to J 18.5 kN/m

Wall Load due to pent house around HVAC openings

Maximum Height of the wall around HVAC opening 3.7 m


2
Load due to 200 mm thk RC wall load around HVAC opening 3.7 m 5.0 kN/m 18.5 kN/m
Load due to beam 0.2*0.25*25 1.25 kN/m
3 2
Load due to precast panel 0.125*25 25.00 kN/m 3.125 kN/m
3.125*3/2 4.7 kN/m
Total 24.4 kN/m
Loads in the Staircase head room area (+16.70 m lvl)
2
Dead Load due to 0.3m parapet - Staircase -1, 2 0.3 m 5.00 kN/m 1.5 kN/m

Loads are applied as Uniform


Dead Load in stairacse head room @ +16.700 m lvl (Staircase-1 &2) shell in 'SDL' load case
Self Wt. of slab, 200mm Thk
3 2
Load due to 0.09 m screed 16.79-16.7 0.090 m 24 kN/m 2.2 kN/m
3 2
Load due to 0.04 m thk concrete tiles 0.04 m 24 kN/m 1.0 kN/m
2
Load due to water proofing 0.5 kN/m
2
Total 3.6 kN/m

30
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
Loads due to Staircase
Dead Load due to Staircase,
3 2
Self weight of waist slab 0.25 m 25 kN/m Total 6.25 kN/m
Self weight of steps 0.5*0.170*0.30*25*10 6.38 kN/m
2
Load due to Epoxy paint on staircase 0.5 kN/m

Dead Load on staircase landing beam 3.7 m 31 kN/m


2
Live load on staircase slab 5 kN/m
Live Load on staircase landing beam 3.7 m 18.5 kN/m

B2: Live Loads: Applied as uniform Shell loads


under "LIVE LOAD" load case
Live load on Basement area
2
Live load in basement Area other than plinth area 5.0 kN/m
2
Total 5.0 kN/m

3 2
Load due to oil/water in Sump Pits & OWMH 1m 10 kN/m 10.0 kN/m

Live load on Fire pump room & Service Basement area


2
Live load in Fire pump room & Service Basement area 2.0 kN/m
2
Total 2.0 kN/m

3 2
Load due to oil/water in Sump Pits & OWMH 1m 10 kN/m 10.0 kN/m

Live load in power transformer-1,2,3 transformers area


3 2
Load due to oil/water 2.5 m 10 kN/m 25.0 kN/m
Load due to 50 MVA transformer - transformer area 900 kN
2 2
Area of pedestal 2.450*8.265 20.2 m 44.4 kN/m

2
Live load at 0.4m level in transformer area 10.0 kN/m
Load on shorter span,lx = 7.66 m (W lx)/3 = (10x 7.66)/3 25.5 kN/m

31
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
2 2
Load on longer span, ly= 11.015 m ( W lx / 6) (3-(lx/ly) ) (10x7.66/6)(3-(7.66/11.015) ) 32.1 kN/m

Live load in ET-1,2,3 area


3 2
Load due to oil/water 2.5 m 10 kN/m 25.0 kN/m
Load due to 50 MVA transformer - ET area 50 kN
2 2
Area of pedestal 1.10*3.635 4.0 m 12.5 kN/m

2
Live load at 0.4m level in ET area 10.0 kN/m
Load on shorter span,lx = 4.57 m (W lx)/3 = (10x 4.57)/3 15.2 kN/m
2
Load on longer span, ly= 5.655 m ( W lx / 6) (3-(lx/ly) ) (10x4.57/6)(3-(4.57/5.655)2) 17.9 kN/m

Live load in Shunt Reactor-1 area


3 2
Load due to oil/water 2.5 m 10 kN/m 25.0 kN/m
Load due to 50 MVA transformer - Shunt reactor-1 area 540 kN
2 2
Area of pedestal 2.400*6.85 16.4 m 32.8 kN/m

2
Live load at 0.4m level in Shunt Reactor-1 area 10.0 kN/m
Load on shorter span,lx = 8.09 m (W lx)/3 = (10x 8.09)/3 27.0 kN/m
2 2
Load on longer span, ly= 9.25 m ( W lx / 6) (3-(lx/ly) ) (10x8.09/6)(3-(8.09/9.25) ) 30.1 kN/m

2
Live load due to roof truss on IDT transformer area @ +9.80 m lvl 1.00 kN/m
(Live load considered 0.75 kN/m2 Inaccessible roof)
Loads are applied as Distributed
Live Load due to Roof Truss above IDT walls(Along Grid D' & F') 7.66 m 1.0 kN/m2 7.7 kN/m frame loads under 'LL' load case

Live Load due to Roof Truss above IDT walls (Along Grid H') 3.8 kN/m

2
Live load due to roof truss on Shunt Reactor-1 area @ +9.800 m lvl 1.00 kN/m
(Live load considered 0.75 kN/m2 Inaccessible roof)
Live Load due to Roof Truss above Shunt reactor walls(Along Grid C') 8.09 m 1.0 kN/m2 8.1 kN/m
Live Load due to Roof Truss above Shunt reactor walls (Along Grid A') 4.0 kN/m

32
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
2
Live load due to roof truss on Staircase-3 & ET Room 1,2,3 area @ +4.900 m lvl 1.00 kN/m
(Live load considered 0.75 kN/m2 Inaccessible roof)
LLive oad due to Roof Truss above ET walls(Along Grid 5 & 6') 4.570 m 1.0 kN/m2 4.6 kN/m
Live Load due to Roof Truss above ET walls (Along Grid 4 & 7) 2.3 kN/m

Live load in Ground floor area

Live load in 132 kV GIS room, Air lock room & Off loading platfom (including
2
cable tray load) 15.0 kN/m
2
Live load in 11 kV switch gear room 1 & 2 (including cable tray load) 11.0 kN/m
2
Live load in Capacitor rooms 10.0 kN/m

Live load at the off-loading platform near Offloading Platform area


Loads are applied as Distributed
Live load due to staircase Along Grid B' between Grid 4 & 4' Live load = 15 kN/m2 2.4 m 15 kN/m
2
18.0 kN/m frame loads under 'LL' load case

Live load due to staircase Along Grid E beside Grid 11 Live load = 10 kN/m2 2.1 m 10 kN/m
2
10.5 kN/m
2 2
Live load due to ramp (from Grid-K to L) & Grid 8 to 10 Live load = 10 kN/m 6.4 m 10 kN/m 32.0 kN/m

Live load in First floor area @ +7.500

2
Live load in First floor area 10.0 kN/m
Loads are applied as Distributed
frame loads under 'SDL' load
Live Load on Cable riser-1,2,3,4 & 5 RCC Slab case

2
Live Load (0.20*25+0.02*20) 5.00 kN/m

Load around cable riser 1,2,3 beams 0.83 m 4.2 kN/m


Load around cable riser 4,5 beams 0.33 m 1.6 kN/m

2
Live load on chequered plate (Equipment lifting area) 5.0 kN/m
Live load on chequered plate as line load on upstand 5*3.0/2 7.5 kN/m

33
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
2
Live load on Service room & Staircase-4 roof 1.5 kN/m

Live load in Roof floor area (+13.300 m lvl)


2
Load due to HVAC equipment (including accesible roof) 5.0 kN/m
2
Additional Roof Live load (due to pipe etc) 1.0 kN/m

B3: Crane Loads

Applied as concentrated frame


loads in "LIVE LOAD" load
Load due to Monorail case
Live load due to monorail on roof at off loading platform area @ +13.300 m lvl
Capacity of monorail 20.0 kN
Impact factor 1.25*20 25.0 kN
Crab weight 5.0 kN
Total load due to monorail 30.0 kN
Total 30.0 kN
Crane Girder Loads (+9.350 m lvl)

Crane Capacity, Wcap 50.00 kN


Weight of crab (Hoist + Trolley Wt.) Wcb 5.00 kN
Concentrated load due to hoist, trolly & lifted wt. 50+5 55.00 kN
Impact factor (for electrically operated crane) 1.25

Concentrated load due to hoist, trolly & lifted wt. (with impact factor) 55*1.25 69 kN
Bridge assembly (Excluding hoist and trolley) 50 kN
Span of crane bridge, Lc 12.75 m
UDL on crane girder (Selfweight), WG 50/12.75 3.92 kN/m
Minimum hook approach, Hm 0.65 m

69 kN WG = 4 10 kN/m

34
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
69 kN WG = 4.10 kN/m

12.750 m

To find reactions at RA& RB,


Sum of vertical forces ∑ V = 0 => RA + RB = 69 + (3.92 x 12.75) = 118.8 kN

Taking moment along A, ∑ MA = 0 => 0 = [69 x 0.65 + (3.92 x 12.75x 12.75/2) - (RB x 12.75)

Therefore, RB = 363.4/12.75 = 28.5 kN

Therefore, RA = 118.80 - RB = 90.2 kN

Maximum reaction at A, RA = 90.2 kN Say 91.0 kN


Maximum reaction at B, RB = 28.5 kN Say 29.0 kN

Gantry girder (for maximum reaction from crane girder)

Assumed Grantry Girder member UB 457x197x67


Selfweight, Wg' = 67 kg/m
= 0.67 kN/m
= 1 kN/m

Wheel spacing in the end carriage, aw = 2.25 m


Max. reaction from crane girder, RA = 91 kN

Load on each wheel including impact factor, Wv RA/2 = 46 kN


Similarly, Load on each wheel excluding imp. Factor = 36 kN
Maximum span of Gantry girder = 5.71 m

35
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks

46 kN
46 kN

5.71 m

To find reactions at RC & RD,


Sum of vertical forces ∑ V = 0 => RC + RD = 46+ 46+ (1x 5.71) = 96.71 kN

Taking moment along C, ∑ MC = 0 => [46 x 2.855 + (1 x 5.71x5.71/2) - (RD x 5.71)

Therefore, RD = 118.677/5.71 = 20.8 kN

Therefore, RC = 96.71 - RD = = 75.9 kN

Maximum Reaction at C, Rc = = 75.9 kN Say 76.0 kN

Reaction without impact factor 76/1.25 = 60.74 kN

When Crane is near the Corbel:

Vertical load on corbel 76.0 kN Applied : 76 kN


Horizontal load Across the rails(20%) 15.2 kN Applied : 15.5 kN
Horizontal load along rails(10%) 7.6 kN Applied : 8 kN

36
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
When Crane is far from the Corbel:

Considering Reaction at RB = = 28.5 kN

Assumed Grantry Girder member UB 457x197x67


Selfweight, Wg' = 67 kg/m
= 0.67 kN/m
= 1 kN/m

Wheel spacing in the end carriage, aw = 2.3 m


Min. reaction from crane girder, RB = 28.5 kN

Load on each wheel including impact factor, Wv RB/2 = 14.3 kN 15 kN


Similarly, Load on each wheel excluding imp. Factor = 11 kN
Maximum span of Gantry girder = 5.71 m

5.71 m

To find reactions at RC & RD,


Sum of vertical forces ∑ V = 0 => RC + RD = 15 + 15 + (1x 5.71) = 35.71 kN

Taking moment along A, ∑ MC = 0 => [15 x 2.855 + (1 x 5.71 x 5.71/2) - (RD x 5.71)]

37
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
Therefore, RD = 50.06/5.71 = 8.77 kN

Therefore, RC = 35.71 - RD = = 26.9 kN

Maximum Reaction at C, Rc = 26.9 kN

Reaction without impact factor 26.9/1.25 = 22

Vertical load on corbel 26.9 kN Applied : 27 kN


Horizontal load Across the rails(20%) 4.3 kN Applied : 5 kN
Horizontal load along rails(10%) 2.7 kN Applied : 3 kN

2
Live load on the staircase head room roof floor area 1.5 kN/m

B4: Wind Load:

Effective wind speed considered,Ve = 45.0 m/s


2
Velocity pressure qz = 0.613*Kz*Kzt*Kd*Ve^2*I 0.613*1.27*1*0.85*45^2*1.15 = 1.54 kN/m
Pressure coefficient for cantilever=1.5
2
wind load on walls( Pe = qs *Cpe * Ca) 1.5*1.34 2.31 kN/m

Wind load at +3.00 m lvl (Stair case-4)


Height of Parapet 4.5 m
Load on beam / wall 2.36*4.5 10.4 kN/m
Moment on beam / wall 2.36*4.5*4.5/2 23.4 kN/m

Wind load at +4.00 m lvl (Above Service Room)


Height of Parapet 3.85 m
Load on beam / wall 2.36*3.85 8.9 kN/m
Moment on beam / wall 2.36*3.85*3.85/2 17.1 kN/m

38
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks

Wind load at +4.90 m lvl (Above ET Room)


Height of Parapet 1.5 m
Load on beam / wall 2.36*1.5 3.5 kN/m
Moment on beam / wall 2.36*1.5*1.5/2 2.6 kN/m

Wind load at +7.50 m lvl (Above Capacitor Room)


Height of Parapet 1.5 m
Load on beam / wall 2.36*1.5 3.5 kN/m
Moment on beam / wall 2.36*1.5*1.5/2 2.6 kN/m

Wind load at +9.80 m lvl (Above IDT & Shunt reactor)


Height of Parapet 1.5 m
Load on beam / wall 2.36*1.5 3.5 kN/m
Moment on beam / wall 2.36*1.5*1.5/2 2.6 kN/m

Wind load at +13.50 m lvl


Height of Parapet 3.7 m
Load on beam / wall 2.36*3.7 8.6 kN/m
Moment on beam / wall 2.36*3.7*3.7/2 15.8 kN/m

Wind load at +16.7 m lvl


Height of Parapet above staircase-1 and 2 0.3 m
Load on beam / wall 2.36*0.3 0.7 kN/m
Moment on beam / wall 2.36*0.3*0.3/2 0.1 kN/m

2.0 FIRE PUMP ROOM AND FIRE WATER TANK

Loads on ground floor @ -0.400 m lvl

Dead load in fire pump room floor

39
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
3 2
Load due to 0.600 m screed 0.40+0.2 0.6 m 24.00 kN/m 14.40 kN/m
3 2
Load due to 945 mm thick disel pump pedestal 0.945 m 25.00 kN/m 23.63 kN/m
3
Load due to 945 mm thick electrical pump pedestal 0.945 m 25.00 kN/m 23.63 kN/m2
3 2
Load due to 900 mm thick Jockey pump pedestal 0.9 m 25.00 kN/m 22.50 kN/m
2
Load due to 150 mm thk RC upstand around Cable trench 0.6 m 3.75 kN/m 2.25 kN/m
2
Load due to 150 mm thk RC bund wall fuel tank 1.4 m 3.75 kN/m 5.06 kN/m

Dead load in Service room floor


3
Load due to 0.590 m screed in service room and toilet 0.45+0.19 0.59 m 24.00 kN/m 14.16 kN/m2

2
Live load on Maintainance platform @ +6.1m lvl 1.50 kN/m

Load due to monorail

Capacity of monorail (3MT) 30.00 kN


Crab weight 5.00 kN
Load due to monorail with 25% impact factor (1.25*30)+5 42.50 kN

Loads on Fire water tank bottom slab @ +6.750 m Lvl

3
Load due to 0.075 m screed on Maintainance platform @+6.7m lvl 7.1-6.7 0.4 m 24.00 kN/m 9.60 kN/m2
3
Load due to 0.075 m screed on Maintainance platform @+6.1m lvl 6.175-6.1 0.075 m 24.00 kN/m 1.80 kN/m2

Load due to water


3
Density of water 10.0 kN/m
Height of water 5.5 m
2
Pressure on wall at top of water 0.00 kN/m
2
Pressure on wall at the bottom of water 55.00 kN/m
2
Pressure of water on bottom slab at +6.750 m Lvl 55.00 kN/m
2
Water pressure at sump location 59.00 kN/m

40
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP

Load Calculations
Height/ Unit
Thickness Weight Remarks
Loads on Fire water tank roof @ +13.300 m Lvl

2
Load due to 200 mm thk upstand around opening 0.55 5.00 kN/m 2.75 kN/m
Live load on roof 5.00 kN/m2

41
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
B.4 Wind Load:
Wind loads are calculated in accordance with ASCE7-05 of American Standards.

Site wind pressure, qz = 0.613 KzKztKdV2(N/m2)


Where,
Basic wind speed, V = 45 m/sec (As per specifications)
Wind directionality factor, Kd = 0.85 Table 6.4 ASCE7-05.
Velocity pressure exposure Kz = 1.27 Table 6.3 ASCE7-05
coefficient
Importance coefficient I = 1.15 Table 6.1 ASCE7-05

Topographic factor
Kzt = (1 + K1K2K3)2 CL.6.5.7.2 ASCE 7-05
= 1
Net Wind Load, p = qGCp– qi(GCpi)
Gf = gust-effect factor CL 6.5.8 ASCE 7-05
(For enclosed building)p = qGfCp– qi(GCpi)
External surface pressures, pe = qGCp
Internal surface pressures, pi = qi(GCpi)
Cp = external pressure coefficient
(Figs.6.6, 6.7 and 6.8 ASCE 7-05)

(GCpi) = internal pressure coefficient


(Fig 6.5 ASCE 7-05)
Cp = Net pressure co-efficient for the canopy surface or element given in 2.5.9&2.7

42
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
B.5: Seismic Loads:
Seismic forces are calculated in accordance with UBC-97, the following factors shall be applied.
Soil profile type SC (As per soil report)
W is total seismic dead load of the structure as defined in section 1630.1.1
Cv is the seismic coefficient.
Zone 2A: Z = 0.15
Seismic coefficients, Ca =0.18 & Cv = 0.25 (Ref. Soil Report)
Soil type & parameters (as per approved soil report)
I is the Importance Factor
I = 1.00 (Table 16K).
T is the Fundamental Period of Vibration, in Seconds, of the structure.
T = Ct x (h) ¾, with (Ref. UBC97:Cl:1630.2.2)
Ct = 0.0731 for Reinforced Moment Resisting Frames and Eccentrically
Braced Frames.
= 0.0853 for Structural Steel Frames.
h = Height to Top of Building from Base Level.
T = 0.0731 (h) ¾
R is Numerical Coefficient representative of the Inherent over Strength and Global Ductility
Capacity of Lateral-Force-Resisting Systems
R = 5.5 for Intermediate Moment Resisting Concrete Frames (Table 16-N)

. .
Design Base Shear, 𝑉 ,𝑉 (Ref. UBC97:Cl:1630.2.1, Eq.30-4)
.

.
𝑉

.
But, 𝑉 , (Ref. UBC97:Cl:1630.2.1, Eq.30-5)
. . .
𝑉
.

𝑉 0.08 𝑊

43
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
Also,
𝑉 0.11 𝑥𝐶 𝑥𝐼𝑥𝑊,𝑉 0.11 𝑥 0.18 𝑥 1.00 𝑥𝑊 (Ref. UBC97:Cl:1630.2.1, Eq.30-6)

𝑉 0.02 𝑊

The Earthquake Load E, on an element of the structure resulting from combination of the horizontal
component Eh, and Vertical Component Ev,

𝐸 𝑟𝑥𝐸 𝐸 (Ref. UBC97:Cl:1630.1.1)


Where, Eh = the earthquake load due to base shear V. Eh shall be evaluated to provide an equivalent
service load for use in BS-8110 system of calculations

. .
𝐸 𝑥 (Ref. UBC97:Cl:1630.1.1)
.

0.045𝑥𝑊 1.1
𝐸 𝑥
𝑇 1.4

.
𝐸
Ev = The Load Effect resulting from the Vertical Component of the earthquake
Ground Motion.

.
𝐸 0.5 𝑥𝐶 𝑥𝐼𝑥𝐷𝑥 (Ref.UBC97:Cl:1630.1.1)
.

𝐸 0.0707𝐷

r = 1 (Reliability / Redundancy factor.)


D = Dead Load

44
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY   
 
DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date:11/06/2022  SRI  ASV  VRP         
 
Base shear thus obtained will be distributed at different floor levels as lateral loads in mutually
perpendicular directions.
i. Lateral loads acting in global X- direction
ii.Lateral loads acting in global Y- direction
Note:
Seismic forces will be calculated by ETABS Program either by UBC or 0.07g whichever is
greater. The base shear for wind load and seismic load should be calculated and the design shall
be carried out for the governing load case. Considered orthogonal effect in combinations.

B.6: Soil Pressure (SP), Soil Pressure Surcharge (SPS):


Soil Data:
Bulk unit weight weight of soil (γs) = 18kN/m3
Coefficient of soil pressure at rest (K0) = 0.1
Coefficient of active soil pressure(Ka) = 0.25
Height of the soil (H) = 4.0 m
Surcharge (ws) = 33.33 kN/m2
Water table below NGL, as per soil report = -11.1 m lvl
Considering 1m seasonal variation, depth of water table = -10.1 m lvl
`(Water table not encountered for this substation main building)

‐3.30 TOC 

45
END USER:  132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY

DOC NO:STRU‐C‐15‐317  Prepared by  Checked by  Approved by 


Date:11/06/2022  SRI  ASV  VRP

1. Soil pressure

Soil pressure at H (-3.6 m lvl) depth = γs * K0 * H


= 18x 0.41 x 4.0
=     29.52 kN/m2

2. Surcharge
Soil pressure due to surcharge = ws x impact factor x K0
         (Basement Walls)            =  33.33 x 1.25 x 0.41
= 17.01 kN/m2
3.Surcharge
Surcharge load on manholes & sump pits = ws x impact factor
= 33.33 x 1.25
= 41.66 kN/m2

B.7: Blast Load:

Blast Load = 5 kN/m2


(Applied on RC walls in Power Transformer areaand auxilary transformer area)

46
Project : 132/11 KV SHKZBHST S/S
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV

47
Project : 132/11 KV SHKZBHST S/S
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV

48
ETABS 17.0.1

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View

49
ETABS 17.0.1

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View

50
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FPR GF - Z = -0.4 (m)

51
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m)

52
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - GF +1.420 m - Z = 1.42 (m)

53
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m)

54
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m)

55
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - RefPl Level 8.15 - Z = 8.15 (m)

56
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m)

57
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m)

58
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m)

59
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

200 THK
OPEN
PE
200200
THK
200
THK
200
THKTHK
200
200
200
200THK
THK
THK
200
THK
200
THKOPEN
200PE
THKTHK
200 THK
C'
C
200 THK C'
C

200200
THKTHK
200 THK
200 THK
B'
200 THK B'
B B

A'
200 THK A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FPR GF - Z = -0.4 (m)

60
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

250 THK250 THK250 THK 250 thk Landing


L L

250 thk Landing


K K

J J

H'
H H'
H

G G

250 THK
F'
F F'
F

E E

250 THK
D' D'

D D

200 THK
C'
C C'
C

B' B'
250 THK
B
250 THK B

250 THK
A'
250 thk Landing 250 THK 250 thk Landing A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m)

61
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

200 THK
M
200 THK M

200 THK
200 THK 200 THK
L 200 THK L

200 THK 200 THK


K K

200 THK
J J

200 THK 200 THK


H'
H 200 THK 200 THK H'
H

200 THK
G 200 THK G
250 THK
200 THK
F'
F
200 THKF'
F

E E

200 THK
D' D'

250 THK
D D

200 THK
200 THK
C'
C C'
C

250 THK
250 THK250 THK
B' B'
B B

200 THK 200 THK


250 THK
A'
A 200 THK 200 THK A'
A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - GF +1.420 m - Z = 1.42 (m)

62
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

200 THK
L L

K K

PC 200 THK
200 THK
J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B'
PC 200 THK B'
B B

A' 200 THK 200 THK A'


A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m)

63
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

200 THK
L
200 THK L

K
200 THK K

J
200 THK J

H'
H 200 THK H'
H

200 THK
G G

200 THK
200 THK
F'
F
200 THK F'
F

200 THK
200 THK
E E

D'
200 THK D'

200 THK
D D

400 thk
400 thk
400
400
thkthk
C'
C 400 thk C'
C

400 thk 200 THK


400 thk
400
400
thkthk
B'
200 THK 200 THK 400 thk B'
B B

A' 200 THK200 THK 200 THK A'


A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m)

64
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

200 THK
L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' 200 THK A'


A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - RefPl Level 8.15 - Z = 8.15 (m)

65
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

200 THK
L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' 200 THK A'


A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m)

66
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

200 THK
L
200 THK L

K
200 THK K

J J

H'
H H'
H

G G

F'
F
200 THK 200 THK F'
F

200 THK
E E

D' D'

D D

200 THK 200 THK


C'
C C'
C

200 THK 200 THK


B' B'
B B

A' 200 THK


200 THK A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m)

67
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L
200 THK L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A'
200 THK A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m)

68
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

Dummy
GB-400x600
Dummy

GB-400x600 GB-400x600
Dummy

C'
C C'
C

GB-400x600

Dummy
Dummy

Dummy

Dummy
Dummy

GB-300x700
B' B'
GB-300x500

GB-300x500
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FPR GF - Z = -0.4 (m)

69
ETABS 17.0.1

J
L

A
B
E
K

C
D
H

F'

A'
B'
M

C'
D'
H'

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB


1
1

2
2

2'
2'

3
3

Dummy Dummy Dummy Dummy Dummy


Dummy

4
4

GB-400x600 GB-400x600

GB-400x600

4'
4'

GB-300x500 GB-300x500 GB-300x500


Dummy

GB-300x600 GB-300x600

5
5

GB-300x500 GB-300x500 GB-300x500 GB-300x500

GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-400x700

GB-400x600 GB-400x600 GB-400x600 GB-400x600


GB-300x550
GB-300x550
GB-300x550

5'
5'

Dummy
GB-400x600 GB-400x600

GB-400x600
GB-400x600
Dummy

GB-300x500 GB-300x500 GB-300x500 GB-300x500

6 6'
6 6'

Dummy

70
GB-300x500 GB-300x500 GB-300x500 GB-300x500
GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-400x700

GB-400x600 GB-400x600 GB-400x600 GB-400x600


Dummy

GB-400x600 GB-400x600 Dummy Dummy Dummy


GB-300x700

GB-400x600 GB-400x600

Dummy
GB-400x600

7
7

GB-300x500 GB-300x500
GB-300x600

GB-300x500 GB-300x500 GB-300x500 GB-300x500 GB-300x500 GB-300x500 GB-300x500

Plan View - GF +1.420 m - Z = 1.42 (m)


GB-300x500 GB-300x500 GB-300x500 GB-300x500 GB-300x500 GB-300x500 GB-300x500
GB-300x600
Dummy
Dummy

GB-400x700
GB-300x700
GB-300x700
GB-300x700
GB-300x700
GB-300x700
GB-300x700
GB-400x700

GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-300x700 Dummy

8
8

GB-300x500 GB-300x500 GB-300x500 GB-300x500 GB-300x500 GB-300x500 GB-300x500

GB-300x500 GB-300x500 GB-300x500 GB-300x500 GB-300x500 GB-300x500 GB-300x500

Dummy Dummy
GB-300x700
GB-300x700
GB-300x700
GB-300x700
GB-300x700
GB-300x700
GB-400x700

Dummy Dummy GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x750 GB-300x700


9
9

9'
9'

Dummy
Dummy
Dummy

Dummy Dummy Dummy


10
10

Dummy Dummy Dummy Dummy Dummy


Dummy
Dummy

GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-300x700

Dummy Dummy Dummy Dummy GB-300x600


Dummy Dummy
11
11

GB-300x500 GB-300x500 GB-300x500 GB-300x500 Dummy


Dummy

GB-300x600
GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-300x600

J
L

A
B
E
K

C
D
H

F'

A'
B'
M

C'
D'
H'
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

Dummy
Dummy Dummy Dummy Dummy
L L

FB-400x600
Dummy

Dummy

Dummy
Dummy
K K

FB-400x600
FB-450x600 FB-450x600 FB-450x600
J J

Dummy
H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

Dummy FB-400x600 FB-400x600


C'
C C'
C
Dummy

Dummy

FB-300x600
B' B'

FB-300x600
Dummy
B B

Dummy
Dummy
A'
FB-300x600 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m)

71
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

FB-400x700 FB-400x700
M M

Dummy

Dummy

Dummy
FB-300x600

FB-300x600

FB-400x750
FB-300x700
L L

FB-300x700

FB-300x500

FB-300x750
Dummy
FB-400x700 FB-400x700 FB-400x700
K K

FB-400x600

FB-400x700

FB-300x500

FB-400x700

FB-400x700
FB-400x700
J J

FB-400x600
FB-400x700 FB-400x700 FB-400x700
H'
H H'
H

FB-400x600

FB-300x500

FB-400x600

FB-300x500

FB-450x800

FB-400x750
Dummy
FB-300x500
FB-300x700
FB-400x700 FB-400x700 FB-400x700
G G

FB-400x600

FB-400x600

FB-300x500

FB-400x700

FB-400x700
Dummy
FB-300x500

FB-400x700 FB-400x700 FB-400x700


F'
F F'
F

FB-400x600
FB-300x600

FB-400x600

FB-300x500

FB-450x800

FB-400x750
FB-300x700
FB-400x700 FB-400x700 FB-400x700
E E

FB-400x600
FB-300x600

FB-400x600

FB-300x500

FB-400x700

FB-400x700
D' D'

FB-400x700 FB-400x700 Dummy


FB-400x1200 FB-400x600

D D

FB-400x1650
FB-300x500

FB-300x500
FB-400x600

FB-400x600

FB-400X800
Dummy
FB-300x800

FB-400x600 FB-400x700 FB-400x700 FB-400X800 FB-400x600

C'
C C'
C
FB-300x800

FB-300x500

FB-400x1650

FB-300x500
FB-400X800
Dummy
FB-400x750

FB-400x750
FB-300x700 FB-300x700
FB-300x800
FB-400X800 FB-400X800 FB-400x600

B'
FB-400x700 B'
B B
FB-400x600

FB-300x500

FB-300x500

Dummy
A'
FB-400x700 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m)

72
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

Dummy
L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

Dummy
A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - RefPl Level 8.15 - Z = 8.15 (m)

73
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

Dummy
L L

K K

FB-400x600 FB-400x600

J J

Dummy FB-400x600 FB-400x600

H'
H H'
H
Dummy

FB-400x600 FB-400x600

G G

Dummy FB-400x600 FB-400x600

F'
F F'
F
Dummy

FB-400x600 FB-400x600

E E

Dummy
D' D'
Dummy

FB-400x600 FB-400x600

D D

Dummy Dummy Dummy FB-400x600 FB-400x600

C'
C C'
C
Dummy

Dummy

B' B'
B B

Dummy
Dummy
A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m)

74
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

RB-400x700
M M

Dummy
RB-400x700
L L

RB-300x700

RB-300x700
RB-400x1200 RB-400x700
K K

RB-400x600

RB-300x600

RB-400x600

RB-400x600
RB-400x1200 Dummy Dummy

J J
Dummy

RB-470x600

RB-300x500

RB-300x500

RB-400x600
Dummy

Dummy

Dummy

Dummy
Dummy

RB-400x1200 RB-400x1200 RB-400x700


H'
H
Dummy H'
H

RB-470x600

RB-400x600

RB-300x500

RB-400x600

RB-400x600
Dummy

Dummy

Dummy
RB-400x1200 RB-400x1200
Dummy

RB-400x700 Dummy RB-400x700

G G
Dummy

RB-470x600

RB-400x600

RB-400x600

RB-400x600
Dummy
Dummy
RB-400x1200 RB-400x1200 RB-400x700
F'
F Dummy F'
F

RB-470x600

RB-400x600

RB-400x600

RB-400x600
Dummy
Dummy
RB-400x1200 RB-400x1200 RB-400x700
E Dummy E
RB-470x600

RB-400x600

RB-400x600

RB-400x600
Dummy
D' D'

RB-400x1200 RB-400x1200 RB-400x700


D D
Dummy
RB-470x600

RB-400x600
RB-400x800

RB-400x800

RB-300x500

RB-400x600
RB-400x600
RB-300x600
Dummy

Dummy

Dummy
Dummy
RB-300x500
Dummy
Dummy

Dummy

RB-400x1200 RB-400x700
Dummy

Dummy

RB-450x600 RB-450x600 RB-450x600


C'
C Dummy
C'
C

RB-400x600
RB-400x750

RB-400x750
RB-300x700 Dummy

RB-400x600

RB-300x600
RB-400x700
B'
RB-400x700 B'
B B
RB-400x600

Dummy
A'
RB-400x700 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m)

75
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Dummy
M M

Dummy

Dummy
L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'

Dummy

Dummy
B B

A'
Dummy A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m)

76
ETABS 17.0.1

11 M

10 L

9'

H'
H

F'
F

6'
6
D'

5'

5
4'

C'C
4

B'

B
2'

A'
A

11
1

10
9'
M

9
K

8
'
HH

7
'
FF

6'
6
5'
E

5
D'

4'
D

4
3
'
C

2'
B'
B

2
A'

1
A

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View

77
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

1 1 1 1 11 1 1 1 11 1 11 1 1 1 1
C-1400X400
C-400x600

C-1400X400
C-400x600

C-1400X400-75mm
C-400x600-75mm

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 1

78
ETABS 17.0.1

2 2
A A'

2
2
B B'

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB


C

22
C'

2
D

C-400x600-75mm C-400x600-75mm C-400x600 C-400x600


2
D'

2
E

C-400x600-75mm C-400x600-75mm C-400x600 C-400x600


22
FF'

79
2
G

Elevation View - 2
C-400x600-75mm C-400x600-75mm C-400x600 C-400x600
22
HH'
J

2
2
K

2
L

2
M
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

2' 2' 2' 2' 2'


2' 2' 2' 2' 2'2' 2' 2'2' 2' 2' 2' 2'

C-400x600

C-400x600

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 2'

80
ETABS 17.0.1

C-400x600-75mm C-400x600 C-400x600

3 3
A A'

3
3
B B'

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB


C-400x600 C-400x600 C-400x600
C

33
C'

3
D

3
D'

3
E

33
FF'

81
3
G

Elevation View - 3
C-400x600-75mm C-400x600 C-400x600
33
HH'
J

3
3
K

C-400X600..75mm C-400X600..75mm C-400X600..


3
L

3
M
ETABS 17.0.1

C-400X600..75mm C-400X600..

4 4
A A'

4
4
B B'

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB


C-600x700 C-600x700 C-600x700
C

44
C'

Dummy
RB-470x600
C-600x600 C-600x600 C-600x600
4
D

4
D'

RB-470x600

C-600x600 C-600x600 C-600x600


4
E

Dummy
RB-470x600

C-600x600 C-600x600 C-600x600


44
FF'

Dummy
RB-470x600

C-600x600 C-600x600 C-600x600

82
4
G

Elevation View - 4
Dummy
RB-470x600

C-600x600 C-600x600 C-600x600


44
HH'

C-600x700 C-600x700 C-600x700 C-600x700


Dummy
RB-470x600
J

4
4
K

C-400x400-75mm C-400x400-75mm C-400x400


4
L

4
M
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

4' 4' 4' 4' 4'


4' 4' 4' 4' 4'4' 4' 4'4' 4' 4' 4' 4'

RB-400x800
C-600x700
C-600x700
C-600x700

GB-400x600 GB-400x600
C-600x700

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 4'

83
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

5 5 5 5 55 5 5 5 55 5 55 5 5 5 5

C-400x450

C-400x400
GB-300x600 GB-300x600 GB-300x500 GB-300x500 GB-300x500

C-400x400-75mm
C-400x450

C-400x400-75mm
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 5

84
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

5' 5' 5' 5' 5'


5' 5' 5' 5' 5'5' 5' 5'5' 5' 5' 5' 5'

GB-400x600 GB-400x600 GB-400x600 GB-400x600


C-400x600

C-400x600

C-400x600

C-400x600

C-400x600

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 5'

85
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

6 6 6 6 66 6 6 6 66 6 66 6 6 6 6

RB-400x800
C-600x700
C-600x700
C-600x700

GB-400x600 GB-400x600
C-600x700

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 6

86
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

6' 6' 6' 6' 6'


6' 6' 6' 6' 6'6' 6' 6'6' 6' 6' 6' 6'

C-400x450

C-400x400
GB-400x600

C-400x400-75mm
C-400x450

C-400x400-75mm
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 6'

87
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

7 7 7 7 77 7 7 7 77 7 77 7 7 7 7

RB-400x600 RB-400x750 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x700
C-600X500

C-600X500

C-600X500
C600X750
C-600x700

C-600x600

C-600x600

C-600x600

C-600x600

C-600x700

C-600x700
FB-400x600 FB-400x750 FB-400x600 FB-400x600 FB-400x600 FB-400x600 FB-400x600 FB-400x600 FB-400x600 Dummy Dummy

C-600x700
C-600x700
C-600X500

C-600X500

C-600X500
C-600x600

C-600x600

C600X750

C-600x600

C-600x600

C-600x700
FB-400x600 FB-400x600

C-600x700

C-400x400
C-600x700

GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 Dummy Dummy Dummy

C-400x400-75mm
C-600X500-75mm

C-600X500-75mm
C-600x700

C-600x600

C-600x600

C-600x600

C-600x600

C-600x700

C-600x700
C-600X500

C600X750

C-400x400-75mm
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 7

88
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

8 8 8 8 88 8 8 8 88 8 88 8 8 8 8

Dummy Dummy

RB-400x750 RB-300x700
C-450X600

C-450X600

C-450X600
FB-400x750 FB-400x600 FB-400x600 FB-400x600 FB-400x600 FB-400x600 FB-400x700 FB-300x700 Dummy
C-450X600

C-450X600

C-500X700

C-500X700

C-500X750

C-500X700

C-450X600
C-500x600

C-500x600

C-500x600
GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-300x700 Dummy
C-450X600-75mm

C-450X600-75mm
C-500x600

C-500x600

C-500x600
C-450X600

C-500X700

C-500X700

C-500X750

C-500X700

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 8

89
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

9 9 9 9 99 9 9 9 99 9 99 9 9 9 9

Dummy Dummy

RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-300x700

C-450X600
C-600x800

C-600x800

C-600x800

C-600x700

C-600x700

C-600x700

C-600x800

C-600x700
FB-400x1650 FB-400x1650 FB-400x700 FB-450x800 FB-400x700 FB-450x800 FB-400x700 FB-300x750

Dummy

C-450X600
C-600x800

C-600x800

C-600x800

C-600x700

C-600x700

C-600x700

C-600x800

C-600x700
Dummy
C-400X500

Dummy GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x750 GB-300x700


C-400X500-75mm

C-600x800

C-600x800

C-600x800

C-450X600-75mm
C-600x700

C-600x700

C-600x700

C-600x800

C-600x700
C-400X500-75mm

C-600x800

C-600x800

C-600x800

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 9

90
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

9' 9' 9' 9' 9'


9' 9' 9' 9' 9'9' 9' 9'9' 9' 9' 9' 9'

GB-400x600 GB-400x600
C-400x400

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 9'

91
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

10 10 10 10 10
10 10 10 10 10
10 10 10
10 10 10 10 10

FB-300x600
C-300X500

C-400X500

Dummy
C-300X500-75mm

C-400X500-75mm
C-300X500-75mm

C-400X500-75mm

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 10

92
ETABS 17.0.1

A A' B B' C
C' D D' E FF' G HH' J K L M

11 11 11 11 11
11 11 11 11 11
11 11 11
11 11 11 11 11

RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x600


C-550X800

C-600x800

C-600x800

C-500x600

C-500x600

C-500x600

C-500x600

C-500x600
FB-400x700 FB-400x750 FB-400x700 FB-400x750 FB-400x700 FB-400x750
FB-400X800 FB-400X800
C-600x800
C-550X800

C-450X600
C-600x800

C-500x600

C-500x600

C-500x600

C-500x600

C-500x600
C-600x800

Dummy Dummy Dummy


GB-300x600

Dummy
C-550X800-75mm

C-600x800

C-600x800

C-450X600-75mm
C-500x600-75mm

C-500x600-75mm

C-500x600-75mm

C-500x600-75mm
C-500x600
C-550X800-75mm

C-600x800-75mm

C-600x800-75mm

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 11

93
Project : 132/11 KV SHKZBHST S/S
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV

94
95
96
97
98
99
100
101
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

14.4
14.4
23.63
14.414.4
14.4
22.5
14.4
14.4
14.414.4
C'
C
14.4 C'
C

14.4
23.63
14.4
14.4
B'
14.4 B'
B B

A'
14.16 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FPR GF - Z = -0.4 (m) Uniform Loads Gravity (SDL)

102
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

10
10 10 10 10
10
1010
10
10 10 10 10
C'
C
10 C'
C

10 10 10
10
B'
10 B'
B B

A'
10 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FPR GF - Z = -0.4 (m) Uniform Loads Gravity (LL)

103
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L 10 10 10 L

K K

J J

H' H'
H H

G G

10
F'
F F'
F

E E

10
D' D'

D D

10
C'
C C'
C

B' B'
B10 10 B

10
A'
A
10 A'
A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m) Uniform Loads Gravity (SDL)

104
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

5
L L

5
K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A'
5 5 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m) Uniform Loads Gravity (LL)

105
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L 41.66 41.66 41.66 L

K K

J J

H' H'
H H

G G

41.66
F'
F F'
F

E E

41.66
D' D'

D D

41.66
C'
C C'
C

B' B'
41.66
B
41.66 B

41.66
A'
A
41.66 A'
A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m) Uniform Loads Gravity (SPS)

106
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

1.9
1.9 1.9
L 1.9 L

1.9 1.9
K K

1.9
J J

1.9
H'
H 1.9 H'
H

1.9
G 1.9 G
1.9 1.9
F'
F
1.9 F'
F

E E

1.9
D' D'

1.9
D D

1.9
1.9
C'
C C'
C

1.9 1.9 1.9


B' B'
B B

1.9
1.9
A'
A 1.9 A'
A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - GF +1.420 m - Z = 1.42 (m) Uniform Loads Gravity (SDL)

107
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

10
M
10 M

5
11 10
L 5 L

11 10
K K

10
J J

5 10
H'
H 5 10 H'
H

11
G 11 G
15 10
F'
F
10 F'
F

E E

10
D' D'

15
D D

11
11
C'
C C'
C

15 15 15
B' B'
B B

15 5
15
A'
A 15 5 A'
A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - GF +1.420 m - Z = 1.42 (m) Uniform Loads Gravity (LL)

108
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

5.6
5.6
J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B'
10.5 B'
B B

A'
26.5 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Uniform Loads Gravity (SDL)

109
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

5
L L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B'
9.6 B'
B B

A' 5 2.5 A'


A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Uniform Loads Gravity (LL)

110
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L
5.4 L

K
19.2 K

J
2 J

H'
H 21.6 H'
H

2
G G

2
2
F'
F
2 F'
F
21.6
19.2
E E

D'
19.2 D'

2
D D

9.6
9.6 9.6
C'
C 9.6 C'
C

9.6 1.8
9.6 9.6
B'
19.2 19.2 9.6 B'
B B

A' 19.2 19.2 A'


A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Uniform Loads Gravity (SDL)

111
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

5
L
10 L

K
10 K

J
10 J

H'
H 10 H'
H

10
G G

10
10
F'
F
10 F'
F
10
10
E E

D'
10 D'

10
D D

C'
C C'
C

1.5

B'
10 10 B'
B B

A' 10 10 5 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Uniform Loads Gravity (LL)

112
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

5
L L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' 5 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - RefPl Level 8.15 - Z = 8.15 (m) Uniform Loads Gravity (LL)

113
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

5
L L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' 5 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Uniform Loads Gravity (LL)

114
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L
8.1 L

K
8.1 K

J J

H' H'
H H

G G

F'
F
8.1 8.1 F'
F

8.1
E E

D' D'

D D

8.1 8.1
C'
C C'
C

8.1 8.1
B' B'
B B

A' 8.1 A'


A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Uniform Loads Gravity (SDL)

115
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

5
L
6 L

K
6 K

J J

H' H'
H H

G G

F'
F
6 6 F'
F

6
E E

D' D'

D D

6 5
C'
C C'
C

6 5
B' B'
B B

A' 6 5 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Uniform Loads Gravity (LL)

116
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L
3.6 L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A'
3.6 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Uniform Loads Gravity (SDL)

117
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

1.5
1.5
J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B'
1.5 B'
B B

A'
1.5 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Uniform Loads Gravity (LLR)

118
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L
1.5 L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A'
1.5 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Uniform Loads Gravity (LLR)

119
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D 2.25
25 D

2.25
.2

C'
C
2.25
2 C'
C

2.25
5.06 2.25
5.06
5.06
11.8
B'
B 11.3 B'
B

11.3
A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FPR GF - Z = -0.4 (m) Frame Span Loads (SDL)

120
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

31
M M

21.3 21.3 21.3


21.
L L

3115.7 31.4 31.4 15.7


K K

13.4 13.4 13.4


J J

28.3 28.3
H' H'
H H

40.1 22.5
G G

56.6 56.6
F'
F F'
F

40.1 22.5
E E

56.6 56.6
D' D'

D 40.1 22.5 D

32.3
26.5 54.8 28.3
C'
C C'
C

32.3
41.3 23.7
39.8
B' 31 B'
B
31 19.3 B

26.5 19.3
A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m) Frame Span Loads (SDL)

121
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

18.5
M M

15.2 15.2 15.2


15.
L L

18.5
17.9 35.8 35.8 17.9
K K

15.2 15.2 15.2


J J

32.1 32.1
H' H'
H H

25.5 25.5
G G

64.2 64.2
F'
F F'
F

25.5 25.5
E E

64.2 64.2
D' D'

D 25.5 25.5 D

30.1 62.2 32.1


C'
C C'
C

27 27
B' 18.5 B'
B
18.5 B

30.1
A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m) Frame Span Loads (LL)

122
ETABS 17.0.1

2
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 20.3 2
9' 10 11

26.2 26.2 20.3


27.2 1 31 5
M M

1 1 26.2
L
1 13.2 26.4 5 L

5
K 20.3 K

5
31 6.9 6.9 6.9 13.2 13.2 26.2 2
J
13.2 14.6
14. J

5
H' H'
H H

27.1 13.2 13.2 13.2 5 26.2 2


5
G G

27.1 13.2 13.2 13.2 5 26.2 2


13.2
13.
F'
F F'
F

27.1 13.2
1 13.2 13.2 5 26.2 2
7.5
E 5 E

27.1 13.2
1 13.2 13.2 5 26.2
D' D'

11.2
D D

27.1 13.2 13.2 13.2


11.8 11.8
C'
C C'
C

26.2 13.2 13.2


9.5 2
26.2
B'
2 B'
B
26.2 31 B

A'
2 2 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - GF +1.420 m - Z = 1.42 (m) Frame Span Loads (SDL)

123
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 32


11

32
18.5
M M

L L

K 32 K

18.5
J J

H' H'
H H

G G

F'
F F'
F

10.5
E E

D' D'

D D

C'
C C'
C

18
B' B'
B
18.5 B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - GF +1.420 m - Z = 1.42 (m) Frame Span Loads (LL)

124
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

31
M M

7.5 7.5 7.5 7.5


L
9.9 L

K
7.5 9.9 K

34.93 34.93 34.93


J
34.9 J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

1 39.2 39.2
C'
C C'
C

1 23.5
10.3
B' B'
B
31 1 20.3 B

23.5 20.3
A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Frame Span Loads (SDL)

125
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

18.5
M M

L L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B
18.5 B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Frame Span Loads (LL)

126
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

31.4 26.9 31.4 7.5


31.4
.4 4.5
4.5
4 31
M M

4.5 7.5
L
31.4
.4 26.9 L

4.5 0 4.5 26.9


K
26.9 K

15.25
14.05 26.9
J
14.05 J

14.05
H' H'
H H

14.05
05
14.05 15.25
15.25 14.05 26.9
11.5 15.25
14.05
4.05 14.0514.05
G 11.5 G

14.05 15.25
15.25
14.05 26.9
15.85 14.05 14.05
F'
F F'
F

15.85
1.8
85 15.25
14.05 26.9
15.25
1.8
.8
E E

15.85
1.8
85 15.25
14.05 26.9
D' D'

1.8
.8
D D

14.05 15.25
26.7
C'
C
15.25 C'
C

26.9 14.05 14.05

B'
8.7 8.7 B'
B
26.9
8.7 8.7 31 B

A'
26.935.6 26.9 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Frame Span Loads (SDL)

127
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

4.2 0 4.2
4.2
2 4.2
4 18.5
M M

4.2 4.2
L
4.2
2 4.2
4 L

4.2 0 4.2
K K

J J

H' H'
H H

G G

1.6
F'
F F'
F

1.6
1.6
6
1.6
.6
E E

1.6
1.6
6
D' D'

1.6
.6
D D

C'
C C'
C

B'
7.5 B'
B
7.5 7.5 18.5 B

A'
7.5 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Frame Span Loads (LL)

128
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

31
M M

L L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B
31 B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - RefPl Level 8.15 - Z = 8.15 (m) Frame Span Loads (SDL)

129
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

18.5
M M

L L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B
18.5 B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - RefPl Level 8.15 - Z = 8.15 (m) Frame Span Loads (LL)

130
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

31
M M

L L

K K

J J

13.2
H' H'
H H

7.5
G G

11.5
F'
F F'
F

7.5
E E

11.5
D' D'

D 7.5 D

13.2 11.5 13.2


C'
C C'
C

7.5 7.5
B' B'
B
31 B

13.2
A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Frame Span Loads (SDL)

131
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

18.5
M M

L L

K K

J J

3.8
H' H'
H H

G G

7.7
F'
F F'
F

E E

7.7
D' D'

D D

8.1 8.1 3.8


C'
C C'
C

B' B'
B
18.5 B

4
A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Frame Span Loads (LL)

132
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

18.5
31
M M

18.5
L
18.5 L

18.5
K
18.5 K

18.5 24.4 24.4 18.5


J
18.5 24.4
24.4
24.4 24.4
24.4 J
24.4
6
H'
H
24.4 H'
H

18.5 6 24.4
24.4 18.5
24.4
G
6 G

18.5 6 18.5
6
F'
F 6 F'
F

18.5 6 18.5
6
6
E 6 E

18.5 6 18.5
D' D'

24.4
D D

18.5 24.4
24.4
2.75
2.7 18.5
24.4
2.75
2.75
24.4
24.4
24.4 2.75
2.7
24.4
4.4
18.5
.5 18.5 18.5
C'
C
2.75
2.75
2.75
C'
C

2.75
2.7 18.5
18.5
18.5
B' B'
B
18.5 31 B

A'
18.5 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Frame Span Loads (SDL)

133
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

18.5
M M

L L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B
18.5 B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Frame Span Loads (LL)

134
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

1.5
M M

1.5 1.5
L L

K K

J J

H' H'
H H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B
1.5 1.5 B

A'
1.5 A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Frame Span Loads (SDL)

135
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

3.5
J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C
10.4

B' B'
B B

8.9
A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Frame Span Loads (WL +X)

136
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

3.5 3.5 3.5 3.5


K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

10.4 8.9

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Frame Span Loads (WL +Y)

137
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

2.6

2.6

2.6

2.6
L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B
23.4

17.1
A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Frame Span Moments (WL +Y)

138
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

3.5
L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Frame Span Loads (WL +X)

139
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L
2.6 L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Frame Span Moments (WL +X)

140
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

3.5
L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Frame Span Loads (WL +Y)

141
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

2.6
M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Frame Span Moments (WL +Y)

142
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H
3.5

G G

F'
F F'
F
3.5

E E

D' D'

D D
3.5

C'
C C'
C
3.5

3.5

B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Frame Span Loads (WL +X)

143
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

G
2.6 G

F'
F F'
F

2.6
E E

D' D'

D D
2.6

C'
C C'
C

2.6 2.6
B' B'
B B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Frame Span Moments (WL +X)

144
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

H'
H H'
H

3.5

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'
A
3.5 A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Frame Span Loads (WL +Y)

145
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K K

J J

2.6
H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B
2.6

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Frame Span Moments (WL +Y)

146
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

8.6
L L

8.6
K K

8.6

8.6
J J

8.6 8.6
H'
H H'
H

8.6
G G

8.6

8.6
F'
F F'
F
8.6

8.6
E E
8.6

8.6
D' D'

D D
8.6

8.6
8 6
C'
C C'
C

6
8.6
8.6

B' B'
B B
8.6

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Frame Span Loads (WL +X)

147
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

K 15.8 K

15.8
J J

15.8
H'
H
15.8 H'
H

15.8
G G

15.8 15.8
F'
F F'
F

15.8 15.8

E E
15.8 15.8
D' D'

D 15.8 15.8 D

15.8 15.8
C'
C C'
C

B'
B
15.8 15.8 B'
B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 15.8


7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Frame Span Moments (WL +X)

148
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

L L

8.6
K K

J J

8.6
H'
H H'
H

8.6
G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

8.6 8.6 8.6


B' B'
B B

A' A'
A
8.6 A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

8.6

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Frame Span Loads (WL +Y)

149
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

15.8
M M

L L

15.8
K K

15.8
J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D
15.8

15.8

15.8
C'
C C'
C

15.8
B' B'
B B

15.8
A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Frame Span Moments (WL +Y)

150
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

0.7

0.7
L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

0.7

0.7
A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Frame Span Loads (WL +X)

151
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M M

1 1
L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B
1 1 B

A' A'
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Frame Span Moments (WL +X)

152
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M
0.7 M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A'
A
0.7 A'
A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Frame Span Loads (WL +Y)

153
ETABS 17.0.1

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

1
M M

L L

K K

J J

H'
H H'
H

G G

F'
F F'
F

E E

D' D'

D D

C'
C C'
C

B' B'
B B

A' A'

1
A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Frame Span Moments (WL +Y)

154
ETABS 17.0.1

31

31.4
21.3 32.3
21.3
31.4 15.7
21.3 13.4
13.4 2.25
2.25
2.25
2.25
2.25

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Frame Span Loads (SDL)

155
ETABS 17.0.1

31
27.1 27.2 26.2
27.1
27.1 6.9
27.1
6.9 31
6.9
13.2 1 1 13.2
13.2 13.21
1

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Frame Span Loads (SDL)

156
ETABS 17.0.1

3232 32

18.5
35.8 35.8 18.5
10.5
15.2 17.9
15.2 15.2
15.2
17.9 15.2

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Frame Span Loads (LL)

157
ETABS 17.0.1

3232 32

18.5

10.5

18.5
18.5

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Frame Span Loads (LL)

158
-3 -3-3 ..7
7..4.7
-3 7
.7
-3
3 3
7
.
--3
.
73
-.
73
--
.
7.
3
-
7
7
.
4
7
--37
.
-
4
1
.
--3
-1 7
3
..7
4
.7
-7
7
-1-7
.
4
1- .4
-7
1
4
.
--1..7
4
.4
.1
-3
1
.7
7-1
.4
-7 .7
-3
-7
.4 -3
.4
-.7
--7
.47-3
3.4
.7
.7
.4
-7-3
.7
-7
.4.7
-3--7
.4
--1 3
.7
-3
7-1
.4
-7
.4.7
.7
-3
-7-3
-.7
-3
7.7
.4
.4
-7-3.7
-3
.7
--7.7
-3
3.7
-3.7
.7
--.7
-3 3
-3.7
.7
-3
-3 .7
--7.7
3.4
.7
-3
-3 .7
--.7
7
.
3-7
.
3-.
7
3-7
.
33
-7
.-
7
-7
.
4
.7
-4
..
7
--
44
7
.7
-.
41
--
1
. -1
1
.
- 1 1
.
-1.
14 -.
1
.84.
8
1
-.81
-1
8
.
1
481
.1 1
-
.1
.1
1
-1
.11
-1
1
.1
-.1
1-1
.11
.11.1
1-1
.1
- 1
.1.1
-1
1
-1.4
-7
-
.1.4
-.4 7
.4
.4
-7
-7 .4
-.4
77
.4
-7.4
.4
-7
-1.4 7
.4
-7
-7.4 3-3
7
.4.7
.4
-7.7-.7
-3 3-3
.7.7
-3.7
-3-3.7-.7
3-7
.7-3
-3 .7-.7
- 3
7
.3
-
7
. .
3
-
7 7
.
3
-- -4
.
7-4
.
7-4
.
7-.
4
7 .
1-.
11
-.1
--
1
.1
.
11
--
8
.
4 .
4
1
- 8
1
-1 8
.
4
1
- 8
.
48 1
-4 5
.
1
8
-1
.5-1
5
.
8
-14
.8
5-41
-
.8.8
41
-1
.84
-1
4-
.8.8
41
-4-1
.8
1 4
.8-
.8
41
-4
-
.811
4
-1
.8.8
4-1
4
-
.81
-
.1
1
.1 1
-1
-
.11
-
.1.1
1
- 1
-1
.1
1
-
.1
.1
1
- -1
.1.11
-.1
1
-1-
.11
.11-
.1 .4
- 7
-.4
7.4
-7-.4
7.4
-1-.1
7
.4
- 7-.4
7.4-.47-.43.7-.7
-3 3--.4
.73-3
.7.7
--7
3.4
.7
-3.7
--73
.7
-3
-7 .
3- 7
.
3 4
.
7 4
.
7
- 4
.
7
- .
1
--.
1- 4
18
.4
1
--
8
..
4
18 5 5
.
8
1 5
.
8 85
. 1 8
1-
.5.5
81
-8-1
.5
1 8
-
.5.5
81
-8
.5
1
-8-1
.5
1.5 11
4
-.8
.8 1
44
-
-1
.81
4
-
.8.8
1
4
- 4
-
.8
14
-1
.8
.8 1 11
-
.1 1
1
-1
.1.1
-1
.1
1
-1.1
11
-
.1 7-7
.4-.47 7-.47.4 .7
--3.7
-3.7
-3 .7
--3.7
--7
.7
3 - 1. - -2 .
- 2 1 . 8-.5
1 4
-14
-1
.8 -7 3.7
--7
- .
74 - -8
.
4
1 5 8
1
- - . 8-8
.5-
1 1 1.84
-.8 1
-1
.1 .4 3.4
-7
-.7
73
-. -. 7
3 4
.
7 - 4
.
7- 1
-.1
-. 4
1-
8
.8
.
4
1 8
1
--
5
..
8
1 1
22
. -21
. 2
-2
.12-.1
2
82
-2
.1
-2-
.1.1 8
-
.5.5
81
-8
-
.5
11
8
-
.5
.51
8
-8
-
.5 4
-1
4
.8
1
-4
.8 1.8
4
- 1-
.8
4 1
-
.8 1
-1
.1
11
-.1
1-
.1 11
-
.1 .4
- 7.4 7
.4 3.4
.7
-7 3.4
.7
-3 -.73.4
--.7
- - 8
15
. 2
2
-.1 11
8
-
.5.5 4 1
-
.84 1
-1
.1 -.1
3 1 7 73-.4
-
.7
3 -3
7
. - 7
. - 7
4
. -7
4
. - .
7
4 1
.
--1
.-. 1
-4
8
.1
-4
8
.4
1
-.
8 8
1.
5.
8
1
--
55
.
8
1- -
1
.-
2 1
.2
- .
-1 1
.
22
- 5 -28
.
5 8
.
2
-
5.88
.
52
-5
.8
2 22
-2-
.1
22-
.1.1
2-2
.1
2
-2-
.1
.1
22
-2
.1
2
--
2
.1 -
818
-
.5
18
-1
.5
.5
8
-18
-
.5
1.51
8
-.5
8
-1
8
.5
1
-8
.5 1.5 1
-
.84.8
1
-4
.8
1 4
-.8
1
-
4.81
-4
.8
1-
4.8 11
-
.1 1-
.1 11
-
.1 1-
.11-
.11-
.1 -
.4 7
.4 7
.4 .4 - - -.73-.4
-.73-.4
-.73-.4
-.73.4--.7 3.7
3
7
-
. -7.
3 .
7
4
- 4
-
.
7 . 1
-. .
-
1 1
8
.
-
4-1
8
.
4 -8
1
5
.8
1
-5
.- 1
.
22
-1
.2
- - 8 8
.
5
2 58
. .5 -5-
.8
.8
252
-.8
2
5
-5-
.8
252
-
.8.8
52
- 5
.8 -
2
.1
.12
-2
-
.1-
2
.1.1
-
2 2
-
.1-
2.1
.1 8
- .5
1-
8.5
1
-
8.5
1
-8
.5
1-
8.5 1-
4
.8 14
-
.81
-4
.814
-
.8 1-
4
.8 1-
.1 1
.1
- 1-1.1
- 7.4
- 7 7 7 -.4 3.7
-7 -3.1
7
.
-
3 3
7
-
. 7
4
.
- 7
4
-
. 1 1
.
- 1
- .
4
1
8
- 8
.
-
4
1 -1
5
.
81
-5
.
8 21
.2
--
.
1 8
.2
- 8
.
52
- .
-
52 -
2 92
-5
.
9 5
2
9
-. 9
.52
- -
9
.5
2.5
2 2
-5-
.8
2.8
52
-.8
5
-2
5-
.8
2-
52
.8.8
2 2 2
.1.12.1
-.1
2
- 2 1
-8
.5
1 -
8.5
1
-
8.5-
181
.5- 1
-4
.8 1
4-
.81
4
.8
- 4
.8 1-
.1 1
-
.1 1-
1
.1 1-
1.1 7 7 7 -7 -7.4
.7
3 3.7
-7
.7 3-.7
-7 3.43
-7.4
.7 .7 3.7
---7-.4
. .
- 4 - 25 5 9-.5 -
5.85 2 8 1
-
.58 1- .8 1 -
1.1 -3.1 -3
8
1 5 - . 2 - 2 1 .4
-.7
3
7
- -
.
7 .
- .
-
8
1 2
1
. 8
. 9 9- 9
.5
2 2 --
5
.8
.8
22 2 .1 .5 -
8
.5 1
4- 1-
1.1 3.7
-7
-.7
73
. 3
7
.
- .
-7
4 4 .1
- .
-
1 -8
1
.
4 -4
8
1
. 8 .
8
5
1
- 2-2
1
.- .
5
2
--
85
2 9
25
. 9
25
. -
9
.5.5
92
-9
.5
2
- 9
.5-
2.5
92
-.5 -
5.8
-
52-
5
.8
2-
52
.8
.8
525
.8 .1
- 2- 2
-2 1
-8
.51
-8
.5 1-
8
.5 1
8.5 1
4-
.8 1
-
4
.814
.8
- 4
.8 1-
1.1 1-
1.1 1-
1.1 1-
1 - - -3.4 -7
.7
3.43
-.4
.7 3.4
-7
.7 .7
- .1 ---3.1
3
.
-
7 3
7
.
- .
-
3
7 4
.7
- 4
.
-7 .
-
47 7
4
-. 1-
. .
-
1 -
1. -4
8
1
. -
8
.4
1 -
81
.
4 1
.
8
-
5 -5
1
.
88
.
-5
15
1
.
- 2
1
.
- .
1
2
- 1
.
-
2-1
.-8
2
.
5-2
8
.
55
2
-8
.5
2
-8
.9
2-
.
55
.
9
2-5
.
9
22
- .
9-
5 92
-9
.5
-2
9-
.5
2.5
92
-.5
-
92
.5-
9
2-2
9
.5
.5
2
-
99
.5
2
- -
9
.5
2.5
-
92
.5
2 .85.8
-.8
2
- 25 5 .8
.8- 2- 2-2.1
2
-
2.12
-.1
2-
2
.12
-2
.1 2
-2
.12
-2
.12
-.1 - 8
1.5
- .5
1
8- 1
8-
.5 1
8-
.5 18
.5
- 8
.5
1
- .5 1
- 1.8
-
4 1-
4
.8 1-
4
.81 -
4
.8 1-
4
.8 1-
4.8 1-
4.8 1
-.1 1
1
-.1 1
1
- .1
1
- 1-.1
1 1- -
.4 - -
.4 7
-
.4 - 7 .4 7.1.4 7
-
.4 - .7-3.4 3
-.4
.7 -3.4
.7 .7
-3.4-3.7
.7 -3.4.7-3.4
.7 -3.4
.7-3.4 -.7
.7
3
3
.
-
7 7
.-
3 7
4
.
- .
-
7
4 1
-
. .
1
- 1-
. 84
-
.
1 1
4
8
-
. .
1
4
-
8 .
1
8
-
5 8
5
.
1
- 8
-
5
1
. -2
1
.-.
2
11
.
-2 5
28
..
5
8
2
--8
.
5
2 5
2
.-9
5
2
.9
2
-5
.- -
9 -
9
.5
2.52
-
9.5
-
92
9
.5
2
-9
.5 2.5
-
9 .5
2
-
9 .5
2- 2
-52-5.8
2
-
5.8
2-
5.8
2-
5
.82
-
5.8 2 2
-2
.122-
.1 2.12
.1 .1 1
8- 1-
8
.5 1-
8
.5 1-
8
.51 -
8
.518.5 1-
4.8 1-
4.8 1-
4.8 1 -
4.8 1 4. 4
8 .8 -
1 1
.1
- 1-
.1 .1
-
1 .1
-
1 1
.1 -
1
.1 1- 7
- - 7 -7
.4 7
- 7
- -
7 7
- 7 -3.4
.7 -3.4
.7-3.4.7
3.4
.7 .7

84.4.1.414
--3---3 - -
3
. 37-.
-3. -
3
7
.
37 . 4-
7
. 7
3 -.
-
47 4-
7
. .
-
47 -
1
. 1
-
. 1
-
. 1
-
. 1
8
4
-
. -
.
1
4
8 4
8
-
.1 1
4
8
-
. 5
8
-
.1 1
8
5
-
. 8
-
.
1
5 1
8
5
-
. 1
-
.
2 2
1
-
. .
2
1
- 2
-
1
. -5
8
.
2-2
5
8
.-.
2
5
85
2
-8
.-
2
-9
5
.9
-5
.
29
-
2.
52
.
9
-59
- 9
.52
-
9.5
2
9-
.52
-9
.5
2-9.5
2
-
9.52
-
9.2
-9
5
.5
2-
9.5 -
2
-
95
.8
.52
-
2
-5
.8
92-
5.8 2
-
5.82-
5.825.85
.8 . 8 - 2- 2- 2 .1
-
2 2 -
.122-
.122-
-
.11
28
2.5
-
-1 -
8.51 -
8.5 1 -
8.51 -
8.51 -
8.51 -
8.5 1
- -
8.5
-1
- 8 1
-
.5 4
-1 .8 -
4
1 .8
-
41 .8
-
41 4
.8
1
- -
4
.8
1 .8
-
4 1 .8
1
-
4 4
.8
1
- 4
.81
--
1 1
.1
-
.8
1
- 1
.1- .1
1-.1
-
1 1.1 1 1 - .1
1 1
-.1 1
-11
.1 1
- 1
.1 1
-.1.4
1 -
1
- .1
1 -7
-
1 . 7
-
1
- -
7 7-.4 7
- 7
- -7 7 .4
4.
- . 3
7 . .
-
1 7 4
.
-
8 1 .
-
5 81 2 .
1
-2 2 8
-.
5 2 2-.
2
9
5 .5
2-
9.52 -
9.52 - 2- .1
2 -2.1
2 -2.12 1 - 1 1
-
8 .581 4 .8-
41. 4
1
-8 -
4
.8
1 .8 1 1 .1
1 1- 1
.1 1
-1
.1 .1 - 3-
- 1
.3.8.--.1
-

588157518-.71..817.1
.7 1- 7 8
4 1 5
8 1 1
.
- 8
-
.5 5
9
-
. 9.5 2 2 .1 - . 8 .5 4 - . - 1 - .
4787
.
- .- - 29
.5 5 - - 2.1 1 5 1
-
8 .5 1
-
4 8
.84 1 1 3--47
- 2 - 2 - 1 1 .1
-
..7
7- 7--7 .
-
1 8.4
-1 .
-
58 1 .
-
12 .
-
8 5
2 5
9
.
-
2 .5
2
-
9 2-
9 5.825
-. 2 .1
- 2 - -
8 8
.5
1
- -
8
.5
1 .1
- 4
.81
- .41 8
.8 1 1
.1 .1 3
.--7.3
7.--4
.1-3 -.1 85 2 8 - -
-3-3.---71 4
-.11 7.4 2 .
2 .52 2 -.8 . 2 5
.51
- 1 . -18 77
..7
3-----1 .74 -44.8 411..8-4
1 .85- 1.- 1 2 8
5
.
- 5
9
- 9
.5 . 1 2
2--5..1 -81 -8
.5 4-1 3
..8 --473
- 2--.5 -1.1 -1
8..-17
-1..-1 9 5 2-8 -852
31 -8 4-1 41
2 2 .5
-2 -.2-2 .2 .5 .8
.--7 .-1-1..4-1 .-41174 5-..-84
8.-1.-18 5.-8145.-815..8--1251-..821-1-.2.12-1.-825.2-.-12.8-52.8-528-.25.8552-9.-285-..-5292.5-925-9.2-.952-.59 .5
9-92
.-52
9-29
.5 -.5
29 -.5
5.8
29-.5
-5.2
28 -.5
-5.8 2-5
-2
9..2 8-.8
-5 2-5.2 -2 -1..1 -28.8
.5
--21 .-2
-8 -.-2
-2
1
.1 -1.-21 1
-.5 -112
-8 .5
-1
8-.1
.2
-1
8-.582
.5--1 8
.5
-..28-15.5
1 8-1.8-15 --1.54
.8-18..8
4 1.8
-.5
4--1
.8.8 -1
4-1-.8
8411
-.-487.8
4-.-7 .7..7

99.595..5.25.285.882.88.-18.148.114.514.51174.1-8
7 1-7 47 .1 -.5
29-.5
29 2 9 2 9 8-5.8 2 -.8
2 5
2 -5
2 2 2
.1
-.2 .1
2 2 .1 2 .8-1 8
5.5 8 5.58 -1 8-1
5 1 1 .4 .4 4
--41-.-.1
-1 7 1--4 4.18--1.1 4.8.8-1
4-8--14 .-1 .18.-214 5.18.--214 .18-21
5 .2-.1.2-1.12-218.5-28-.52.8-258.-5.2-29.5-925-9.2.529-.59-2 2 59 .2-.2
59 5-9.2
-9.-259-.25 .5 2 .52
.85
.8
25..5
2
-8
-5 .-5
-25-5
.8
.8
-25 1.1 -2
2 -21
.52 .1
-81
22
2 .5
-8.8
2-2
-2.1
.5 8.55 .2-85.8
1 5.5 1
.-511.-11.-11.-11.11
.4

--2-2--229-2-2-52-2--2121---11---1-1--
1 5 -5
..92
-5.9-258 2-2-81
2 .1 -2
---1-7-117--.-1 1 - 1
-14
4 11
-
-11
8 -
1
-1
1- .
11 - 85 .2 -
-1
5
48 5 .
1
-
. 1 18 . 41
8..-5.9.-228..55-8 .58.5--925.9-25.-92.-5925
295 -9
2.9
-5.9
2 -25
.5
-2.-9
9 25-9
2 9
2 .9 2 92 2 .8-5
2 .8
.9-25
-5
2 ..9
22
-5
-5 5
.8
.8
-2
2
9-5.9
.52
-2..9
-5 5
8 8
.8
2
--2 5
.92
5 -
2 .
-5.5 2
- .
5- .
52-2 .5
8
.2-2-2
1
8
.
522
.1--2
82-2
.5
.8 .2
-21
.
-5.9-25.9522
-2
-
-58
1.1
2
..9
5 2
-28---
.2 21
1
.1
.5.1
52 . 1
-
4
2
.
-8.51
- 1
1
.1.-5818
4
1
.--5
81
1
.--5
4 81
1
4
.-58
4
1
.5 ..5
88.4 1..1
8 8
1
--1--1 4-8 --1
-
4.
1 -
--.2-281
-
2 .
--4
1
2
.1.2
8 -12
-2--28
5
12
-
1
-52
4
2-
2..8
.
-2
2-
..5-288
.
.2 52
2
-
4
-
8 .
2
1 .
..5.2
-25 2
- 85 2 2
-
.
5
1
-192...2
.
8 .8
-
2
58
25 . 8 -
5
2 5
8
1..59-221.1.1
9-5
5.5 -
2 5 9-2.92
-5.9-25.9-2 5.9-2 5.9-25.92 -2.--.9
5 2 8
25- 8
.
2 1
8
8
. .
-
8 . .
8 8
-
. 8
1
.
295.95.-5.2.-512.-12.-12.-12. .5
152
1 - 1 - 8 -
9- 58 2 8 -2--2
25
--29
2-.-58
.5 .5.--582 .9..5
1..81

5
8 . 9- 5 8 2 2
--2--2 -5
2 2 2 2 58
--1-2 25 -
2 9
-21-2 2.5 -.952
- .2 1
-5 2
95 .2-89 5..29 1
5 . 9 5 .
. 8. 8 9 29 .5.--582
.5-.-582
2 2
.9.5
5 8 8

-29.
2 2 - .
2 .
2 9 1 8 . 8 5 . 5 9 9 .5
2-2-9 2 5
-29.59.5.5. 8 5
. - 8 2 . 9 . 8 5 9 . 5 . 5

159
-1
-1 -1 087
0
8.0878.0
-7
.
0
11
-
8-1
.
0
8
71
7
-.
0
80
-1
7
18
.7
-1 87
..0
8
7
7
7
8877-1
-1
.0
-1
.
0
0
-1 8
..-1
7
..08.0
7
.00
808
.0
-1 .0
-1
8
-1
78
-1
7
-
.08
87
7
8
1.0
7-1
-18.0
8.0
.07
-1 7-8.0
-1
87-8
.0 7
.0
7
8.0
1
-1
8
-17
-1
78
.07
.0.0
-1
8 7 8.0
--877
-1
8.0
178.0
-178.0
-17
--8.0
1
78
-1.0
-1
787
.0
-1
8.0
8.0
-77
--18.0
1
7.0
-1
8
778.0
-8
0
1
.
71
-8
0
7
.1
-8
7
0
.1
7
--
8
0
.7
1.
8
07
1
--
8
0
.-
.
0
1
71
7
-
81
-1
8
.
01
78
0
.7
-1 07
-
87
.08 71
-.8
0.0.
0
1
78
-18
0
7
.0-1
7
-
88
.0.0
1
8
7
- 7
-1
.0
187
.08.0
-178
-7-1
8
18
7
-1
.0
-1
.0 .0
7 .0
-1
81
78
.0
-1.0
78
-17
.081
7
-8
.0.0
1
78
-17
-1
.0
8 8
7
-1
.0.0
7 81
7
-1
.0
8-1
8
-1
.0 7
--1
.0
7 --18.0
8
7
.0 .0
71
8.0
-17-1
.0
87 8.0
--8
.0 .0
71
878.0
-1
.0 8.0
78
-1.0 8
7.0
--8.0
1-1
8 87
7.0
.0-1
8-78
.0 1-1
78
8
0
.
7
1-8
0
.
1
7 -8
0
1
.
77
1
-8
0
. - 1
-1
8
08
1
.
0
7
-17.
07- 7 - 1 0
.
.088
0 1
87
.08
.0
-1
7 8
- 7
.01
8
-78
.0.0
-1
1 8
7
-1- 8
7
.0 871
8
-77-1
1
87
.0 71
87
-.0 .0 78.0
-1
.0 -78.0
1-1
8.078
.0 78
- 7
1
8
0
.7
1
-
0
.8.
7
1
0
-80
.
7
8
1
- 0
.
7
8
1
-
8
0
.
7
1
-8
0
.
7
1
- 8
0
.
7
1
- 8
0
.
1
7
--8
.
0
1
7-8
0
1
.
7
8
0
.
7
1-8
0
.
7
11
-8
0
.
71
--
8
0
.
71
7
--
8
0
.
-
8
0
.
1
.
7
-
.
7
18
08
0
-1
.
1
71 78
0
.
7.
7
-08 7 0
.
1
-
.8
8
0
1
7
0
.
7
-
.08
17
.0
-10
7-1
8
17
8
-1
.0 -
.0
.0
7-
8
.0
81
8
7
-
7
- 7
-1
.01
87
.0 8
-1
.0
78
-7-
.0
1
871
8
-1
.0
.07 8
- 7
.0-
1
871
8
-
.0.0
1
8
7.0
7
7
-1-
.08
87
71
8
-
.0
1
8
-
.071
8
-1
.0
.0
7
-1
87
-1
.0
7
-187
-
.0
8.0
71
-87
-1
.0
187
.08
-1.0
7
-8
.07
-
18 1
8
-1
.0.0
78
-7
.0
1 -
871
8
.0-8
.0
781
7
-1
.0
1
-7
.0
81 7
7
8
- 1
8 78
--11-1
78
.0
-78
.0
1-78
.0
1
78
-1
.0-7 1 -
781--1
.0 7.0
81--7
.0 8
.0
1-1
7.0
81 78
-7.0 81-78
--77
.0 .0
178
-1
.07 81
--.078
-1
.07
8-8
.0 1
7
87--8
.0 1
7
81--8
.0 817
--8
. 0
7
1 -
8.07
1 - 0 1
8
.
7 - 1
8
0
.
7 .
7
1
-8
00
.
7
1
-88
0
.
7
1
- - 10
.
7
81
-8
0
.
77
1
-8
0
.7
1
--
8
0
. 8.
7
1
--
8
08
0
.
7
1-8
0
.
7
11
-7-
18
0
..
7
18
0
1
-1 78
0
.
77
-0.8 7 -
18
0 0
.
7
.08
1
-08
.08 .0
187
.01
8
-1
.0
7-87
.01
-88
7
-
.0
1.0
71
-1
8.0
7 -
8 7
.08
-
171
-
.08
.0
1
7
-1
8 7
-
.0 .0
1 88
7
-
.0.0
71
-87
-
.0
181
7
.08
-1.0
7
-8
.07
-
18 1
7
-
8
.0.0
71
8
-7
.0
1 -
878
.0.0 .0 .0
1
8 7.0
8 7
-8
.0
17
-8
.0
1 7
-1
8
.0
7
-8
.01
-78.0
17
-8
.0 .0
81 8
.0
1-78
.0
17
-8
.0
17
8 .0
178
-1
.07
8
.0
- .0 .0 1
7.0
81 7
--881
.081
-8 -.0
17 8
17-.0
7 8
17
-.0
.0
177
8
-.0
.0
7
8
1
0
-
. 8-
0.
7
1 -8 .
7 - 0
.
7
1
8 - 0
.
7
1
8 -.
7
1
8
0-0
.
7
1
8- 0
.
7
1
87
1
-0
.
87
1
-0
. 88
0
.
7
1-8
0
.
7
17
- 8
0
.
77 .8
0 . 71
-
87
.0
81
-87
-
.0
18
.0
71
-
8.0
7 1
8
-7
.0-8
11
7
-
8
.0.0 871
-
8
.0.0
7
-1
8-
7
.0
1 81
7
-
.08
.0
71
-87
-
.0
181
-
78 17
-8-
.0
17
81
.0 -
8
7 1
8
.0 -
781
.07
-.0
81
-7 1 7
-8
.0
1- 78
.0
1-78
.0
1 7
-8
.0
17
- 1 .0
7 17
.0 7.0 1
7
- 1-7
-7
8
.0
1-77
-8
8
.01-77
-8
8
.01-7
-7
8
.01-7
-7
88
.
-
81
0
7 0
8 7
1
.
- -8 7
1
0
. - 7
8
1
0
. - 8
1
0 -7
8
1
0
.-7
1
8
0
. -7
8
1
0
.-.
7
1
8
0- 7
10
.
87
1
--
0
.
8.
7
1-
0 8-
18
0
.
7.
7
18
0
1
- 7-
1 7 1
-
.8
0.0
78
0
.
1
-0
7
.0
1
-7-
8
.0.0 71
-
87
.01
-
8 7
.0-
8
1.0
71
-8
.0
1
-
787
-
.08
171
-
8
.0.0 .0 .0
1
7
-87
.0-
18 1
7
-
8
.0.0
71
-
87
.0
1 -
878
.0
1.0
-
78.0 .0
81 -
78
.0
1
7
-8
.01
-78
.017
-8
.0
1 7
-8 8
.0
17
-8
.0
17
8 -
.01
7
8-
.01
7
8-
.081
7- .0 -
7
.01
8-7.0
1
-7
7
8 1-7
8 1 8 .0
1-7
-7
8
.0
17
--7
8
.0
1
-77
8
.0 7
8.0
8 88
7
0
1
.
-
8 8-
7
1
0
. 1
.
-
8
7
0 -
7
1
0
.
8 1
.
-
8
7
0 1
0
.
-
7
8 .
8
7
1
0 0
-
8.
7
1 1
0
.
-
7
8 1
0
.
-
7 0 1
0
.
-
8
7-8
1
0
.
7 7
1
8
0
-
. -7
8
1
0
.-7
8
1
0
.-.
7
1
8
0- 1
-0
.
7
81
-0
.
7
8.
7
1
--
8
00
.
7
1-
-1
8
0
.7
1-
8
0
.
1 8
0
.
71
7
- .
78
0 7 -1 78
0
.
.0
1 8
08 11
7
-8
.0
71
-
87
.0-
8
17-
.01
8
.0
1
-
7
87
.0
1
-
8.07
-
8
1.0
71
-
8.0
71
-8-
7
.0
18 1 71
-
8-
7
.0
181
7
-
.08
.01
-
78-
7
.0
181
-
78
.0.0
1
787
.0 87
8
.0.0
-
8.0 1
-7
8.0
1 8
7
- 8
.0
1 -
78
.0
17
-8
.0
1
-78
.0
1 -
78
.0
1
7
-8
.0- .0
1 -
7 8
.0
1-78
.0
1 -
78
.0
1-
7 8
.0
17
-8
.0
1-
7
8 .0
1
78.0 .0 81
7
.0
- 87
1.0-8.0
1
7- 8 1
7
-
.081-
7
.01
8 -
.0 .0
1 .01 .01 8
.01 .0
1 8
.0
1 8
.0 8
.017
-1 17
-1-1
1 .0 8
18.0
-1
7 1.0
-1
7 8.0
-7
.01 1
-18
7 8.0
1
0
.
8
-
7 7
1
0
.
8
- - .
-
8
7
1 8
1
0
.
-
7 .
7
8
1 81
-7 8
0
. - -
7
.0
1.0
7 1
-
8
.0 7
-
.0 8
.0
71
-
87 -1 8 8
178 178
.01-
781-7 - 7
8
.0
1- 1
-
8 .0
1- 1 8 718
-1 -7
7
8.0
.018 1
-18
-7
.
-
01
7 87
0
.
-1-
7
0
1
.
8 1
.
8
-
7
0 1
.
8 -
7
0
1
8. -
7
0
.
811
.
8
-
7
0 .
81
-
7
0 .
81
-
7
0 7
0
.
8
-1 0
.
-
87
1 8
-0
1
.
7 8
-7
1
0
. 7
1
0
.
-8 .
8
7
1
0
- 1
.
-8
7
0.
1
0
-8
70
.
-
7
181
0
.
-
8
7 1
0
-
8
7.8
1
0
-
7.7
8
1
.
-07
8
1
0
.
--0
8
7
11
-.
8
7
0-0
.
7
8
1.
7
1
--
0
80
.
7
1-
88
0
.
7
17
10
.8 0
.
78 .
70 8 -
71
87
.0-
8
1 7
.01
-
8.0
7-1
87
.0
1
-
87-
8
.0
1.01
-
78
.01
-
7
87
.0
1
-8-
7
.0
18
.0
71
-8
.0
71
-
8.0
71
-
8
-
8
.0-
7
.0
18
.0
1
-
78
.01
-
78-
7
18
.01
-
78
.0.0
1
787
.0 87
8
.0.0
-
8.0
-1 8 8
1787 .0 .0 -81-
8 1
-7 1-7.0
1
-
7.01
-
7 8
.01-
7.0 81
.0 -
7 .0
81-
7 .0
81
- 78
.0
1-
7 8
.0
17
8
-.0
17
8
.0
- 1
78.0
- 8
1
7-8.0
1
7- 81
7-
.0 81
7-
.0 81
7
.0
- 8 7
.0
1
- 81.0
-
7 8
1-
7.08
1
- 8 .01 -
7 8
.0
1-
7 8
.0
1 -
7 8
.0
1 -
78.0
1 7-
8 .0
178
-.0
17
8
- -
.0
1 8-
.0 .0
--
7 .0
-
7 -
7
.0 78
1
- 7
.0
- -
7
.0 -1.0 8
.0 18
-1
7 7
8.0
.0
1
-8-1
7
8.0
18
.0.0
-18
7 8.0
.0
718
-18.07
-18
.0 7-18
.0 8.0 -1
7-1 .0
8.0
-1
71 78
8.0
.08.0
-1 -1
7-1
.0 8.0
.0
7-1.0
8 7
- -
7
0
1 1 -0
. 0
. 1 1 8
.0
1 .08 7.0 7 8 8
.0 8 .0

8
0
87
-
.
1 81
7
-
0
. -
.
87
0
11
-
0
.
870 01
7
-.
8
-
01
7.
8 7
0 -
.
87
0
1 -.
8
7
0 1 1
0
.
8
-
7 8
-7
1
0
. 0
1
-.
8
7-
10
.
8
7 8
1
-
70
.8
7
1
0
.
- 0
.
8
7
11
-0
.
8
77
1
- -
7
.08
.0
1
-
78 7
.0
1
-8-
7
18
.0.0
1
-
7 8
.0
1
-
787
.0-
1 81 7 .0 .0 -81-
8 1
-7 1 -7
8.0
1-78.0
1-
7 8
.0
1
-
7 8
.0
1
-7 .0
8 1
7-
.0 1
87
.0
- 87
.0
1- 8.0
1
7- 8 1-
7
8.0 1 -
78.0
1-
78.0
1 -
78.0
1 -
78.0 - 1
- 7-.0
11
-
78 .0
-1
7 87
.0 8 7 7--1
.0 -1
7 -
7 7
8
.0
1
- -
7 71
- 7-1.0
8 7
.08-1.0
7
.08 .0
-1.07-.0
8
1.07
8-1.0
.0
78-1.0 7
8

080808.088.80.008.08.088.08088
--1--1 1
7
-
. 7
0
.-
1 .
07
-1 7
0
.
81
- 7
0
-
8
.1 .
0
87
-
1 0
81
7
-
. 8.
1
7
-
0 7
-
.
1 1
7
-
0
8
..
81
7
0
- 0
87
-
1
. 8.
187
-
.
1
08
.7
-
01 81
.
7
-
0 1
.
8
-1 1
.
7
-
0
8 7
0
1
.
8
- 7
-
0
1
.
8 .
8
-
7
0 1
7
-
0
.
8 -1
.
8
7
0-7
0
1
.
80
-7
1
.
8
7-7
0
1
.
8-.
8
7
0
1-0
.
8
7
11
-
70
.
81
7
-0
.
87
1
-8
0
.8
7
1
.
--
0.
8
7
1
0- -
7
.0
8.0
71
-
87
.0
-1 878
.0
1
-.0
78.0
1
-
78.0
1- 8
7 8
.0
1 -
78
.0
1-
7
8
.01
-78
.0
1-
-7
7.0
1
-
7.0
1-
7 8
.0
1 -
78
.0
1-
78.0
1-78.0
1
-7 8
.0
1
-
7 .0
81
-78.1
1-
7
8
-
7
0.0
1
78
.0 78
.0 8
.08 8 - 1 - 1
7-
7
.081
7-
.01
-
7
8 .01
-
7
8.01
7
8
- .01 7
- .0
8 1
-
7 8
.01-
78.01-
78 1 -
78 .0
1-
78.0
1-
7
8 .0
1
7
- 8
.0
1
- 7 8
.0
1
- 7
1
-.0
8 -
7
1 81
-
.0
1
- -
7
.01
8.0
1
-
78.0
1
-
7 87
.0
- 18
7-
.0
1 .0
8
7 8 .0
1
-
7 87
.0
1
- 8
-
7
.0
1 8.0
1
-
7 8.0
7-1 8
8.0
77
.0
1
-1
-8 7
.0- 87-87-
1 7 8 78
1
- 78
1
- 78
-1 7
8-1 71
-
8 781
- 7 81 -1.0
7
8
.0.0
1.0
7.0
8.0
78.0
.0
8.0
888
1
-
-
1
-7-11 - 7
1
- .-
71
7
0.
1
-
7
.-
1 7
01
-
..810
.7-
1
0
7.
0
8
.1
7
-
8 7
0
8.
1
7
-8 -
0
7
8
. 1
0 .7
-
.
0
8
81 1
7
0
-
8
.
080
8
7
-
.
1
0
8 1
0
7
8
-
. .
7
0
8-
1 0
-
8
.71 87
0
-
.
-
.
1
0
7
8 1
7
0
-
8
.80
-
. 17 7
-
8
.
1
0 7
0
-
8
.
-
8.
01
7 0
-
8
.7
1 7
0
-
81
. 8
.
1
7
0
- 7
-
0
8
1
.
0
8-.
7 1 -
8
.7
0 1 1
7
0
-
.
8 .
1
8
7
-
0 0
1
.
8
-
8
.
1
7
0
- 7
0
8
.
1
--7
0
1
.
8-.
8
7
0
1-0
1
.
8
7 8.0
1
-
7
8.0
1-
7 .0
81-78
.0
1-
78.0
1-
7 8.0
1
-78.0
1
-
7 8
.0
1
-78.0
18
.0
7
.
8
- 1
7
7
0
1.0
8
.0
8
- 7
8
8.0
. .0
8 8 8 - 1 - 1
1
7-
- 1
1.0
-
7
-
7
.0 1
-
7 .08
1
-
7.01
-
7
8 .01 -
78 .01
-
7
8 .0
1 -
78.0
1 7
8
- .0
.11
0-
7
7
8
-8.
.0 1
-
7
08
..01
7-
.
8 1
7
0
8
- .0
-1 7
8-.
1 0
8
1
-
7.07
1
- 7
8
-
7
.0
1.0.0
1
-
7
1
-
7 8.
-
.0
1
-
77
187
0
7-
.0
18.0
1
-
7 8.
-
71 87
0
.0
1
- 8 -
7
.0
18.1
-
780
.0
-
71
8 7
.0
1
- 8.7-
1 8.0
071
-8 7
.0
.0
1
-
718 8
..0
7
7
1
-1
-
8
8
0 .0
7
71
-
8 7
.08
1
- 7
.08
1
-.7
80
1
- .0
78-
1 .0
78
1
- .0
7 81
-7
.081
- .781
--
0 .0
.0 7
87
8
-
-
11-
.0
7
87
8
1
11
.
8
77
8
-08
7
1
77-8.0
.
1
78
-0
18
-88881
7
- 7 -
1 7
- -1 1 8 01 0
7 1 0 7 1 1
7
0
-
8 1
7 -0 1
7.0 1
-
78 0 8.0
-18-
7 .0
1
-8.0
7 .0
8 .0 7.--0817

77.77.07.07.70.0871.17.0-.17.17.-17.177.-1717.77
1- 7 1 0
7
. 8
7
.
- 8
.7- 8
-. -
8
. . 8
1-
7
.08
1 - 17
8.0 8
1
-
7.0 8 .0
1 8.0
1
-
7 .
8 8
1
- .0
-
7 .0
.0
8
8 7..--0
-1 ..0
-7.-.17 7 1 1
.07--710 7 . 7 -
. 7 0
7
-
8
.
1 7. - 8 .0 1
7 . 1
-
7 0
87
.08 8
1 .0
8
1
-
7 .7 8 0
..0
-17
7 7
--7-1-1 7
.0
.-
1 7
.
0-
1.1
8 07
.
-0.
8 0
7 8 .
80-
1
7 0
8 1
0
7
.
-
8 0..071-180.-718
8- 1
7
0
8
.
- - 1 0 1
8008-.178.071-807.-187.0--171808-7.18-.7018-0.71-.0871 - 07
8.0
1-817.-081
7.08 1-
7 1-7 8
-8..018
-
7.01 -
7
8.01 - -0
1 7
8.-.0
178
-
1. 1
-
70 8
.0
1 8 1
-1 7
.0
8
1
-.7
-
7
180.0
71
-8 .0
71
-8.7 8 8
710
- 7
.08
1
- 7
.081
-.78
10
.0
- 7
8- . 1- 7 8
11
87 877
.08..0
8088
-1-17-7-1
-.10 1 .7
- 08. 8
0 -
187
-.
1 0 .8 8
-
17
.
-
0
81 7
.
-
01 - 7
.0
1-81.0
-
7 81
-
7 -
7
8.01 -
7
8. 1-
7
0
8.017 -
7 7
.01
- 7
.-
18.0
01
-
7 .0
81
-
7 7 -10 7
.0
1
-8 .0-
7
8
1.71
-
80
.08
1
-
7 7 1 78-1
0
. 8
71
07
.0
8 7
.
81 -
.0 .
1
-
7 0
17
.
-
--.1-1-1 1
..1-7-101 7
-
1
80
- 7.1-10
7
.0
-1.1 1
7
-0
07
. 8
11.7
7 .7 0
..-.71
.
0
8
87 8 8
80.0.870.180.7-18. .7-180.-71 .0-718.07-1 8.0-718.0
..-1.8 0..-778 0 8
..8 8 0.-10-77180.8-07.1-178078..01--71880-7.18.071-8.07-1087.-1
080-.718 .0 18
-
7
. 1-
7
0
8.01 7 17
0
8.0
-17 -8.017.1
-8
-.1
7 07
-8
.0 8
-.
18 -1.0 17
0
.0
8
- 1
- 8
7-1 0
78 18
-7
.-7 .7
1
-0
.0
188 1.0
7
-88 8
-18-7 -.71
8.0
-1 7 .1
-80 -
7
.0
18 .-
780
.1
-
780
.0
18 -80.71
-80
0 .0
.0771
-8.7-1
-1
8.7 80 8 8
.7-1 .0 8
1
-. 7
8
1
-
0.08
1
- . 70.
-178 -10.0
78
-1.781
-0.078-1.78.1-1
1
0 780.0 7-1.- 8017.0
08.0
878087
17
.0
-8088 81 87 08 .0 888
--1-17--7 1 7 1
-7 7--18
1 7
.1-0 0 --0 0.07.-0
10880.87--7117 80 8 8.8-.78
808..70-17-10 1 0-7
8.0
1-7
8.-107
-.0
81-7
18.7
-08
1 .0 0-7 .0
-1
-7 .-7
88 -18
8-7
.0
.0
1..0
8
-8 -1
-7.-7
8 -1.0
88.0
-1
-78 7
..7
-1
-10
8 .7
7 -1
8 0
.0
7 8
-1
.7
7 8
-10
.0
78-1
.778-1
0
.77 .0 -781 7
8 .880.7800 7
1.-08
0
81 .--8
7 08 7
1.008.7
. 0

080808
1
- . 7 0
.7 1 . 8.
0-0
7 1 . -1.7
7 -1
80
.-7
18 8
-8
.7-1
0 88
-1 .0
7
.0 .0
1
8
--1 - 8-1
07 8
-1.7 1
8 0. 1 - 1 7- 1 8. 8
0

--1--1-171-1--1-1-1-1-1--1---1--
1
- 1 - 0
- 0
- 78 1- 7 8.
1 7
- 7. 0 -
1 8 0
-
7 1 0. 8 -1
88 0 7-
8 1 8 0
.01 .7
1 .7
0 1 0
.0
7 1 1
7 0718
7
0
.01 7
1 0
8 1 0
.0 71
80
. 71
-80.0
8
-
71 . 8
-10
. 71
-
8 .0
0 1
-
8 .
781
- 0
. 81
- 0
. 8- 0
. - 0.0
78 .8
7 0
.0 . .
-
8081 .-8 1.
7- 1 7. 0 17
. 8 7

088
--1-1 7 1 7-7 -1 1 7 0
.0 7 1.1.8
--7 1 0..8 .
7-1
07-1.8 7 7 8
.710.7-1
-8 1 781
-0
. 781
-0. 781 1 - 17 - 1 0
8. 8
0
1 --1
7
-17 7
7--.1
.17 0
-0
1
--1- ..1
7 -11
--0
0
78
7-.7
1
8 1 ..7-18
-7
- 7
0.0
8 1
0-77 ..0..7.71
1-17 0
-80 8
7
8 ..0 . 18 0.00 8
-10
7 0 8
08.0.77-1-17
7080 8
18
.7-.8
-
7 188.00
8 0 . 8 0.-710 180.-718
80.7-8
88
80.78
-0.78
1 -10.78
-1
0.78
-10.78-1
0.78-1
0.78-1
0.78
-10.78 0
-.-78101
-10 .7
.178 0.0
7
8
-0.71
-8 7
1
8
0 .8
.--800.
1
7
.1
7.
8-
00
.-00
.8
1
8
81
7.- 0
8
7.-8808 1
7-
.
17.-080
11
87
.7
.--00
88
1
1.7.08
0
.7.08
87 08.0888

08
1- - 1 17- 1 -.
1 1 7 0 .1 - 7 -
7181 . -
1
7 8 7 7 888 7 .0
--1-17
1- ---1-7.1
.
1-10
-
-7.17
0 7
-7. -1-10
78
0 8
-.-1
7
1
7
.-..70
-
1
0
0
.
8
8 1-
07 7 1..0..1
-7 1-0
78
0
8
878
.0...8 1 7 0
0
7
00 8
8
..8 8 7 70 0 ..8
8
88
00 ..8 8 0 0 888 8 .--00
-1-17-17 .7.--0
1
17 08
81
.7.--08
1
7 08
.7
1
7
1-.-088
01
1
..0
7
7 087
8 7
..0
8..08
0
8 088

-17.
1
-
7 1 7
. 0 1.7 - 0 8 17
. . 0 7 . 0 8 . 088
-1-17-17.07.08.0 8
088 8

160
ETABS 17.0.1

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Joint Loads (CR 1)

161
ETABS 17.0.1

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Joint Loads (CR 2)

162
ETABS 17.0.1

Z
M
1

2
L

H' 2'
H

G 3

FF'
4

Y
E

4'
D'
5

22.2 9 5'

C
C'

9
2 . 2 2
9 2. 92
1 .612
2 96...82 92. 29
86.82986..26
6
6'

B' 22. .2922


6 2 . 2 92 .9.6862 .2 9
2 .
2
.
9
8
2 2
.
.81.4
6 64 8 .
6 81
1
.
6
.
64
8
161
. 4 1
.
616...44 61.464 8.26.892..2292.92
6 2 68 .2
B

.2 9 2 .2 9 8 .1 0 4 1.
921..2 9 2 2 .292.6.2824 6. . 6 050226 4 0 30126.3604116.304466..1104461.6.46.81.6829..62892.292.2
7

X 92..2 16.6.81861.6.4 868 .14 61 .64 421 .4


6 .0
A'

92..26 .64 60 3.5.022.262


A

2.2 .9 2 2
.9 2 .2 688 1 6 8 .6 1. 8 64 .1
9 6 .
2 1 1. 40 6
1
. 4
0 .10
6 4..1 6
3 0
.
2
2 36 .
0 6 6.
22.92.2.2 2.2 9 288.6. 2
9 88.6 88 .164.168 8 142..211 6 4
61 .4 1.64.1 6
61.40.6486 .14 60
92 6
.1.26 4
0 922 6 62 .6
0 30 .22 632 2
0 142395.2 1.29..77 1
9.5.2929712.8 9522136.0236..02613604.1640466..1164.164.68. .6892..292.92
.
0
2
1

1616.2 88.6 14.64


16 01406012...6 040 .3 8.2 0.63 0.23 9 5 15 .2 12 .32
5 9
2

8 . 6 4 . 0 6 .61 .
02 6 2 2. 2
1 .
2 7
9 9
. 7
86.68.2628 8
6 . 6
1 14 .16 1 0 .6
142 22362.5.62 0 236 04 .0
2 1.6 36 1 4 6 .1.2 5642 18 25
.
.6897
2
1 5 22
9 .927 94 9
.
2 9
7 2
9. 8344 .4
883.9 3 .3 3
8 .4383.46238397.5.2299712.5.221.5.022136.023640..0623104.6141064.912614.62
9
. 88.82.92
..9.8899
8

9.21 4..1
61
92...21 614.64 0.6 41 0.6 100
4 26..0 23236..950 .0263.2 5.0212346065 .211 402 .162 9 9
2 92
.687 9 83
3 4.9 3 .9 3 6 .912642
11.41 1
1 .664
.616.468...11 0
1 9
4
6
20
1 641 0 1 0
. 2
3 6 .06
2
3 .3 51
2 2 522 12 2.9 .5221
9 52. 1 2 29
. 7
9 9
.2
0 367
9 . 6.
1 2
9 04793
8 .6
43
4
. 3.
81 63
44
. 3
8 .
3
468 8.3
3
9
6
.2929
8
.
3 6 3
..
8
29 2 6 48. 6344
5
4 .83 9 8
.
3 . 4
3 83 9297 .92 . 5212
. 9 2 62
. .92
0236 . 2 .6
410 .64064.8
. 8 . 6 64.64 8
6

1612022 2 3 3 4 4 5
1 02.4602 8.6.80 .292.03 692..0
2 326.5 .51
2 .5217.92937.43927.34.72927 . 3 5283 2 1.53 4 8.023
3 .3669143
4 09 6
. 38
. 1643
.9
6 8..15 .4685 4 3
. 5
4 . .921 843 .345.3469.83692.43.2 8392.43.83792929.297.6.89.5221.6.5821.6.083266 4
6 64
2'

6.
1 36
2
.168.5.1 .
2 5 12 12 2 9
.2 4 38 8
3 3 .33
4 8 3
. 9 7 4
. 9 2 7 .2
8 1 29
6 3
8. .02 8.
3 6 1 4
03
. .5
4
6 4
3. 4 64 3
. .6
8
. 3
1 5 . 3 9 .8 4 1 2
9 2 4
5 2
. .8
3 6 8 . 9 . 4
6 . 0.
31
6 4
1
.0 40

6.10.16.206250.25.2292.59.2437.433838.3349.344858.4125.257
2 52.5264.5 1
2 2 2 . 9 9 2 7 .9 7 .438 .
4 4 8
.3 64 3
9 83 8
.3 9
6 .
93
2 . 52 12 5
4 4
3. 4
5
.0 2 4 1 40 8
. 1
3 4
8. .1 1
3 6
4 . 8 2 5 . 2
92
1 .8
4 3 3 4 45 .9
6 8 .
8 3 . 6 4 3 3
8 7 . 9 1
. 64 51
.
2 .
.6
3 0
4 .4
.962 7.29283
4.1.646982 2.29..24
7 383..483 83649.838 69
434 .3
8
9.35 .34345
.48315946..4 8..33184 3
3.897454 3
.893631..94234
.971
.833..952294
18
.72.13 68
52.134..102364
3 .61402 ..167 1.92 .27 188
8.257.6.258.1
1.688.3445.1364649.8136964.4.31864.421
17614.28451371.16
7 7640.51.61
.8431.84015.6341450.8631940.8.38640..498..0231 24036.33 63

046.14036.026321.52.19279.92.4383.4.388396.83.345.3.8413. .2517.
83299..4 02
9

53..448.13
3

292.92 7 83.166.4.8.4 3695..8 54 69..844 8 5215 .92 123265


.07 ...67 149 .64.04868.61 4.6 36..948..532 6..91.0
073 21.12 1
2 43.473.4 .48 .9 8639 34535 .23 48 3 9
5
2 1
.2.7 2

.6104.6.0236..5217.9273.438369.863945.3485431.84312517.2517
833 639 83
6
1 68.6.8 36 .
2 9
2
. 4
3 5 . 34 1 . 54
831 8
.4 3 8.4 3 4 45 3 5
2
. 9 2
7
1 .8 3 2
.
5 .9
7
1
4 2
3 82
5.
3 .7
19 297 . .86
.5 2
1 8 ..
0 6
2
388 . 6
1 4 40 6
. 6
1 4 .61.
42
507
1 .6143 .8 4 3 .
3. 4025
36 .6
30
296
3 . 8 2 2 1
2 .5
71
2 9
695..345.3465 85.68.84.3129.8431.84 17.9.5227.5 31.95 2 . 68 . 1 . 6
3

140.6140236.0.521..927..4383.8639.345.8431 .2157
41..46384 2. 8 1 7 3 4 69 . . 8 9 2 7 16 4
1 03 6 6
. 1
4 0 . . 02 36 3 4 . 9
5
2 1
2 . .99
7
4

383.83 9 .8 2 1 7 4 54
138..38168.345.39.4 8
. 6 8 4 38 4
1 .5 1 . 6..36 4 4 10 2362 2
0536
1
7 .8 4 3 5
2112.8.34.9 2
1 . 839
7 9'

.172.25 2.517.8.6 41841..4923.7461.2.6 431 0 36..0 212...9 1712.2.1955 1297..38344.9597.384..4


69
52
7..6.9
9 38
3.6.88

0.1640236.203521.252979.2.4383.43.8639..345..8431. .2517
5..3 41.8 1.8341..24.3 11 5 . 9127.25 258 7114.451 6
61.3813469...4
8336
.0 52.6 2 252
128 98
10

3 34.34 34345
8 157461.264178.46.2586.68.868 ..6
8414 31.3844315..4 901.8683.936 0.498237.4
1 .1 312
..0 610 326..0 5212..5 .2 79
7.21.4 2 4
3 3.83.8 38 3.4.84 96
6

16.4066.10.23612.205.2127.25.2979839.2.348833694..3863945.3485431.8431.2517.2517
484.84 1 .1
2 7 2
. 1
57 .6 1 4 1 6
. 2 1 7 2 .5 6 01 6 0 1 5 .3 4 . 0 2
6 0
3 2 9
6 7 . 1
5 2 5 2
1 2 9
2 7 9
2 97 2 97 . 4
3 83 5 3
7 83. 2 . 9 1
3 69
. 5 6
9 4
. 4
5 4
41.4601.4601417.2571.30.862431.834301562.34552.8639.5 1..2 92927.927.83.4383.4383.8
892377.894 91..3 5873 673
4'

1 53.3

04.1604630.236215.2197.92383.438.8369.83.345.34.8431.84.2517.2
4 .25 .2 157 161 1.1 483..5 69..8 36 45.21..8
44 5.13.8.3
14 13
11

525 7 439.8369.836933
5

13062.3062.3062.15 .22517..152.834.11 . 86 3 . 5 4 3
1

6.40. .0632..52179..973..48396..8695.34531.8315.17.217
6 1 . 60 3 45 . 9 2
79 .. 3
8 3 . 4 38 4 4
5 34 4 4 31 7 1
1 02.062. .152.152972.2519 77.215..79 7
2 .5..68 4396..86 369.83 6 45.3 445.43 1.8431..28 43 1 .2171.1
7 7
.83148 .34383

04436312197983.8696.454313.17
2 2.522.1522.9972.972..843.842 .32517..4 594.33 9..8 45..3 431.8431..28 51
5'

5 2 3.8 43
8
6 9 68 9
31..346 83
1 4 5 345..3 8 3
4 1 8 5 17 .2
5 1
7 517.2
292.972943.843.8493.6893.689 . 97 3 3.4 . . 4
3 5 31
41.847.2517.251 517
6

4..4 3211 5
47 8 7.2
L
6'

35 7411.3.8 3
2 43.43.8 893..6 893..68 3 4 .435 4..4 354.3 8 43
1 84..13 2 1 57.2 51 K

383.893.6 5443 4
5 14.381 4 5 4 .1 8
3 4
1
5.1 257 .21 5 7
334.354.433 814.38 5.1 27 527
4 84.814.814..31
J

5 . 1 275.1 27
7

4 .275.1275 27 HH'

525

1
G

FF'
8

D'

D
9

CC'
9'
10

B'
B
11

A'
A

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (WP(TANK FULL))

163
ETABS 17.0.1

Z
M
1

L 2

HH' 2'

G 3

FF'
4

Y
E

4'
D'
5

22.2 9 5'

CC'

2 .2 9
2 2. 92
1 .612
2 96.82 92. 9
86.6829862..6 2
6 6'

B'
22. .2922
6 2 . 2 2 . 9 2 .2 2
9
8
.9
2
6
. 8
26 .
2
.
9
8 .6 8
4
6
. 816
1
2. 6
.168.4
4 .
1 6 1.. 44 .
1 6
4 8..62829.2922.92
4
2
. . 6 402.66316.0431.6461.466..81.68..2629.292.2
1.
6
B

A'

2
11.6686.86 2 9
...26892.4 6.2894 6. 8 6 61 .641 46
.4.1 .1 .4
6 005226 .0 .0 0 4 .
1 7

X .64.1 14 60 421
A

1161.11 1. 8 2
1
. 6
.2 1 6
. 4
0 .
1
6 0
4 6
.
1 0.2 6 .
20 3
6 0. 36 .10.236.10240.610446.1648.68 92.292
220161.614 1.64.1 .686
.14 2
9
08..1 6.26 0
4 32
6 .6
0 352 0 3 925
.2 1.52.92.722 9.59.229172.8 9521236.0236..01266304.6140.6.11464.164.68. .68..6292.92
1

6 1. 0 .6 9
2 0
.
2 3
6 .
2
0 1 3
.
2
5 2
1
0 4
6 20 3 2 2
1 .
2 4 3 .43..37
2

25202.02 .
1
6001.664.0 1243 6 .62 2
9
22 .2922
5 12 .
2
5 .7 939 . 7
9 52.12 .02 0 164 88892.92
29222.55262.052634..2 62.1.2 82
1 5. 61 7
9 .
2
9 7
9 9
2 3
8 8
3 .
.43628397.4.923897.5.9229712.52136..0522163..06123460.2..962410.2..9162410614.2.91264..2
9 . .8899
8

25.0227 0 5
.
6 2
12407 1 5
64 .162
7
9 9
4.97 8 2
9
.6839
7 9
.923
8 .2929
.3
4 83
3 4
. 8
3 .
4
48 9
6 8 3.9 6.4 3 8
3 8
34322.972 2 . 12 .
2
9 36 9
. 0 9 .
6 .
1 9
20 4 34. 3
8.1 6 3
4
.
4 8 4
.
3
68 .
3 6 3
8
.
.2 6
9 4. 3 4 4.8 3 9 . 3 . 0 2
3 .64064..1 6 864.64
3382.3433 992.974 . 3523 21. 3
42 3638.023 .368
4 3 6
.1403 . 9.
6 1 3
8
. 1643
.9
6 ..19
8 6.4 8
3
.685 4 .
3925
4 . 4
.925 8 4 3 83
.345.34659.83962.43.2 3
892 .2
9 . 2 9 2
97292.9297..521.6.58216.6.083266 . 8 . 4
6 66
2'

4 .9 2 5 1 2 8
.
3 9
6 .02 8.326.5 4 0
..1 5
4 4
3
. 4
5 64 .6
8 1
3 5. 3
1 8
. 4 4 . 2 . 83 4 33
8 .6.89 4 . .
01
6.3640..360 4
0 034
44338.33
48433.48 94..33889368..3439 5
7..93
3
8
8
42.979
3
65.524
4 . 9 .91725
3 4.214 3 4
1
3023643
..3
4
8
61404
02
8
31404
..61
8 ..11 364..1..87
7
1 1522 911.2.84231348458.34.6968.8369.68.438.4217964.921
8 25.7.2658.84631.8445.136454.8316964.8.3380.4.38.67140 64..95..21 0
4 56.1
12 4..3446
3
9
3

354 4
38.3 . 4 3 83 31 2 4
8
. 1
3. 4 8
. . 5 2 1 36. .
07
1 52
.. 6 1
7402
. 64 . 6 1
6
2
7 . 0
1
.
2 6
3
5254
4..4528184.483.45341.483.41 69.84 8
3.2 1..84335 1.4923895
.68937 2.37.7
15 ..7
2 525
1 2236. .6406461.7114
0461.61017.614
.25.16 31.18440
31...86344134150.3.46 1942936.4380
0312536..3.84.3560 .8.36.5236.9..370236.9.51
2.8.93792 1.1291
.4841573.83.45 .59467 2 .4923897..9427..951227.5012236.036..341 .25017.6 05236.85 2912..48.685
21 .989
78
4

575 22.5175 2 4 . 3 4 5 .8 36 9 3 16 0
. 23 6 .22536
.
0 17 .
.2 .42 12. 8 1
2
2 .34 5 9 9
27
9 7 8
. 36
9'

.52712.531.8413..8345..383469.83689.483..927..9512.122302.026 .21712..25192 349197.834.9 237.34.4 ..6498 10

.521 2 .52 12 79 7 . . 2 . 1
4 8 5 38
3 . 3.66 9
17.2571431.84315.345.8639.483.487.972152.52.9 2 7 .
92 97 9
. 2 9
7 .43 8 3 2 514
. 7
3 8
3. 3 . 83
. 1
8
3 6
9 4 5
.
8 69 4 45 4
23.4383.43838369.8 75369.12.7344
921..8 5..3..83 53..3
4'

.2517.2.8431.345.83639.8693.823992.927 346 14 13
11
5

517.2517.8341.45.345.639843.43 3..4 38.8369.8 3 6 9 .4 5 . 4


3 5 3
4 45 8
4
. 31 1 7 1
3 1
.2157.8431.831.43 39.8 369445.3445.8 34431.8 43 1 .21
771.17
5468 3.8 345..83 1.431..8 517.251
5'

2517.21.314 34..8 345 1 . 4


8 3 1 4 31.843 2
. 5 1 7 25 7
1 .2
7.174384 4.2517.251 517
6

7.2
L
6'

5125.2 57 K

J
7

HH'

FF'
8

D'

D
9

CC'
9'
10

B'
B
11

A'
A

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (WP(TANK HALF-1))

164
ETABS 17.0.1

Z
M
1

L 2

HH' 2'

G 3

FF'
4

Y
E

4'
D'
5

5'

6 6'
CC'

-2-
-.2962-.2.9-2.2-299
B'
B

.22
9 - -1.-.68-86.-88..626
.1618
A'

X 2 9 2 -92.2-92
A

2.2 .9 292..2 2
9.6 .292 . -
.6886
22 . 29 2 . 88 .68 8 - -.1614-.61.16 -444 1.-644 -8.68-.2-92.292-
1

6 2
2. . 2 6
.8 8 6 8 1 6 4 .
14
6 1
.1 4 2- - 0 1.4.68- .2
2

2 868 . 1 - .62
4 0 0 0
8.6982.2628
116.6
.. 689.1.21
.8
68 . 614.64 .16 4
1 .6
1 4 10..0 61
40 .6140 2
-2362--.05236-.25-1 - 0
.
2 362.026-311.6--460.611.4460--.164.-68.-1.6892--..6292-.292-
6 .
61 0
- 4 3 8

.1411
1 492..21 614..1 10 .6410 .64 2
36 0
. 02 64 8- .29
46.166.4018.6..94 0.292.6
261 4 0
1.0 26..05 326..0 6.521.521
2
3 -
-292 2 -
2
3-..59492317--.29.-9 52.1-2..9 523261--..502236-.6.0210346--..6140--..6114604-.164.6-8.1-.682--..2692.92
16011

1612202 2 3 3 4 4 5
36
2 3
0 69.5
2 3 21 5 1
2 7 3 787 9.
2 8
2'

.0 6
2. 80 .2
.68..5 12
22.9227.927.927.43 2
9
. 7 9
. - - 8 3
.4. - 3
33-8.33-694.38-3.6 9
-7 9279-.9212-.5212-.0236-.0236-.6140-.64-.164892.8.9929

.160.60.2562..25922.923474.3833.834393.4845.84125.25
2 522.52146..5 162
1 6282
1 .89 89..4 -38944-..4 84834469 945.389-6.4 3 97 5 - 6 9 .4 .8888

140.610263.205.212.5.297..4338.8369.3454.84317.2517
2.29.24 83.83
4 7 . 3
4 -45-.3-1.48.1-31.435-48.33368-9-..843383--..49238937--.92.92229172--...52912-..5022136.9-2.20213460--..2
-
9

9 0...61468
3

292.92 . 9 7
2 .
.
16
4 .
6. 43
8 83 6 836 - 5 3.
4 - 5 6142 68.64.646

40.1640360.23621.5219297.9.249383.4.8369.8.345..8431. .2517
2 43.473.4 839..48 839
6 .164.186
3 .9 2992.9.283
68.6.83
6 .
69
4
35 .4
3 5 . 3 . 8
23
5 .
8 3.
4 . 99
26-
4.-3912.48145-.3454-.8369-.86.883-.438 .43 9 2 97 .6
8
-.8 6
8
0 3
286 4.0360.1 6.40.404

6.140..0263..5127.927383.483369.8633945.3485431.8431.2157.2517
63.3435.34651..4634 .129.8431.8431 -.9.522
85.68.843 68--.9217-.9562111 61
4

383.83 9 .8 . 7-1 7 3 8 8 4-.5 2


1. 1 9'

614061.420360.2.2515.2.927..483.8639.345.8341 .2157
3 34.34 5 .344 5.8 8
. 31
4 . 83
41
.1461.25 9
.178.25
12
7 . 2 . 2 . 2 7
1
517 .868.1-8768.528431-.6.1 .
2
5 1 - . 86 8 . 3 4 5 - .33
. 6
9
6
1 -
41
.8 3 6 . 6
.14 3 8 27-. .4
60
1. 5
1 2.64.036.363 10

341 4
84413-.84456-01.345.-4 9 - 60
1 9

06.10436.206312.25212979.2.934834.3.3883698.3.46353.4.48318.4.52172.5
4 84.841.831.2157.25 17 .2 5764.4686.681.6141.617-412.517-.6
1 .60831 69-.44 832-.4 27.0
3 .
2
6 9 7. 3.612.121
0
.3 . 6 3
8

.61046. 0.236. 5.2127.9279.43389.839645.345431.841317.2571


1.42050 1 1 - -. 8 30
083644325-.3.465
9-.8639.5 1..2
4'

4 .25 157 611..14 71-.25.137062.8431.-3 .483.5 9 79


.2 837..9
11

. 46 0 1 2

140.620630..521.5.2979..34834..8369..345.8431. .2517.
7
5

25 1 4
. 6 0
1
01 062.3062.3 .15-2.2517-.1521-.83417
6 62 . 12-.345.97 . 869.9 7
5 2 38

04.4036.6312.1297.983.38869..6345.831. 217.
161 2.0 2 . 3
6.1522.152 2.972.917-.2.158 .1 5 2 . 2 5 2 . 92
- .8431.843. 3
45.6. 8.
4 6
39.68696
5'

20 3 .

4 3 179 896454313171
5 2 2 .9 7 .84 3 4
7- 8
6 .
3
98 1 8 4
95 54
25 2. 2.9972.997 243.843689 3..6 3.2517..4
89 4217...84351..34413
6

3..8 3.5
L

.5
29423..97
6'

8
. 4 3 . 8 4 6 8 9 3 .6893 3 4 3
44
5 3 1
1 3
383.4 3.6893.6893.4354.435 4..4 81 4.3 4.3
81 841 77.1171 K

334.8
93 354.4354.3814.381
354..438 1 4
43
7
5 . 1
25.1
7 257.21
4 84.814 .1275.127 14 . 3 8 5 .1275 . 1
2
J
7

4 .275.1275
HH'

525 G

FF'
8

D'

D
9

CC'
9'
10

B'
B
11

A'
A

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (WP(TANK HALF-2))

165
5
--5-5- 555555555
--5-5-5-55-5-5-5- 55555555555 55555555
--55---5-5-5 5-5-5-55-5-5-55 55555 55555555555
5 5- 5
- 5-5
- 5
- 5
-5
5 5
- 5-5
-
55
-55
- - 5 5 55 5555555555555
5 - 5
5555555-5-55-5-55-5-5-5-55-5-5-5-55-55--55--55555555555555555555555555555555555555555
5 5- 5
- -5 5
- 5
- 5
-5-5 5 5 5
5
555555555555 55-55-5-55-5-5-5-5-55555555555555555555555555
5 5555555555555555555555555-5-555--55--555555555555555555555555555555555555555555555555555555555
5555 55 55 55 5555555555555555555555555555555555555555555555555555555555555
5 55555555 55 55 55 555555555555555555555555555555555-5-5555555555
555 55 55 55 55 555555555555555555555555555555-5555-555-5-555555555555
5 5 5 5 5 5 5 5 55 5 555
555555555555 555555555555555555555555 5-5555-5555-55-5555--5555--555555--555-55-55--5555555555555555555555555
5 55 55555555555555555 55 -5 -55 -555-5555-5 5 5 555555 5 5
5 5555 5555 5 555 55555
55 5 5 555 5555 5555 5 - 5 -55--55-55--55-55--555--5555--555555--5555555---555--5555555555555555555555555555555555555555
5555 55 5555 5555555 -5- -5- -5- 5-5- 5-5-5- 5-555-55-555555555555555555 5 5
5 5 5 5 5 - 5 -55--55-55--55-55--55--55--55--555---55--555--555---55---55--55---5555555555555555555555555555555555555555555555555555
555 5 555 - - - 5- 5 - - 5- - 55- 555 5 5 5 5 5 5 5 5
55555 -5-5-5-5-5-55-5- 5-55--5--55-55-55--5--55-55--5- 555555555555555555555555555555555555555555555555555555555555
-55--55-55--55--55--555--55---55--555---55---55--555--555---55---55--55-5- 55555 5555555 5 5 5 5 5555555
- 5-5--5-55-5--5-55-55--5-55-55--5--5-5
- 5-5-5- 5-55-5--5- 5-55--5--5-5 5 5 55 555555555555555555555555555555555555555555555555555555555555
5 5 55 5 5555 55 5 5 5 5 5 5
--5-55-55--5--5-55-55--5--5-5
--55--55--55--555--55---55--5-5 5 555 5555 555555555555555555555555555555555555555555555555555555555555555
5 5 5
--55--55--55--5-5 5 5555555 5555555555555555555555555 55555555555555555555555555555555555555555
--55--5- 5
5 55 55 5 55 55555555555555555555 5 5 5 55555555555555555555555
5 5 55 5 5 55555 5 5555 5555555555555555555-5
55 55 5 5
55 5 55 5555555555555
5 5 5 55555555555-5555--5555--55--55555555
5 5 5 -5
5 5 55
5555555 55 5555555555
5 5 55-55555-55--555--55--55555--55---555555555555555
5 5 5-
-5-5 55-55- 5 55 55
5 - 5- 5 -
55 5555555 555 - 55--555--55555--5555555---555---55---55--55-5555555555555555555555
55 55 5 5 5
5-5-5-5-55-55-5-55 55 5555 5 5 5
5 - 5 --55---55---55---55---55---555--55555-55555555555555555555555555555555
5 5 5 5555 555555555555555 555 55
- 5 --55---55---55---55---55---55--5- 55555555555555555 55
5 - 55-55-55-55-55-55-5 5555555555555 555
- 55--55--55--55--55--55--5- 5555555555555555
5 - 5555555555555
--55---55---55---55---555---55--5 555 555555 5
--55 -55--55--55--55- 5 55555555555
--55 --55--55-5 55
--55 --5 5 555555555555555
5 5555
-5
5 55555555555555 5
55 5 5 5 5
55 555 55 555555 5
55 5 55 5 5
55 555 55 55 55 55 5
55 5 5 5 55 5
55 555 55 55 555 55
5 5
55 55 55 555 555 5
55 55 55 5
55 55 5
5

166
ETABS 17.0.1

555
5 5 55555555555
5 5 5 5 5 555555 5
5 5 55 5 55 5 55 5555555555555555555
5 5 5 5 55 5 5
5 5 55 5 55 5 55 5 55 5 5 5555555555555555555555555
5 5
5 5 5 5 5 5 5 5 5 5 555 5 5
55 5 5 5 555555 5 5
5 5 55 5 55 5 55 5 55 5 5 5 5 55 5 55 555555555555555555555555-555-55
5 55 5- -
5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 5 55 5 55555555555555-55-55-555-55-5
5 55 5 55 5 55 5 55 5 55 5 55 5 55 5 55 5 55 5 55 55555555555555555-55555-55555-555--55-5555--555-5
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 5 555555-5555-555-555-5555-55555-555-55-5
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 5 5 55-55-555-5555-5555-555-555-555-55-5555-5
5 5 5 5 5 5 5 5 5 5 5 5 55 5 55 55 5 -555-5555-55-55-55-5555-5555-5555-55-55-5555-55-5
5 5 5 5 5 5 5 5 5 5 55 5 5 55 5 5-55 -55-5-5- 5-5- 55-5555-5555-555-555-555-55-5
5 5 5 5 5 5 55 5 55 5 5 55 5-55-555-- 5-5-5-55-5- 5-5- 5-55-555-5555- 5555-5--555-55
5 5 5 5 55 5 5 55 5 55 55-5555-55-5-5-55-5- 5-5- 5-5- 5-5- 55-5555--55-55-55--5
5 5 55 5 5 55 5 5 555-5-55-55 -5-5-5- 5-5- 5-5- 5-5- 5-5- 5-55-55-5- 5-555-5
5 5 5 5 5 5 55-55- 5-5- 5-5-5-5-5- -5- -5- -5- 5-5--5- 5-5-5-555-55
5 5 5 5 5 5 555- -5- -5 5-5 5-5 5-5 5-5-5- 5-5-5- 5-5-5--5-5
5 5 5 5 5 5 - -5 5-5 5- 5- -5- -5- -5-5- 5-5-5- 5-5-5-5-
5 5 5 55 5 -5 5- -5- -5- -5 5-5 5-5-5-5- 5-5-5- 5-55-5
555 -5--5-55-5-55-5-55-5--5-55--5--55--55-55--5--55-55--5-
55
5 -5 -5- 5-5- 5-5--5-55-5--5-55-55-5--5-55-5-
-5 -5- 5-5--5-55-5--5-55-55--5--5-55-5-
-5 -5- 5-5-5--5-55-5--5--5-55-5-
-55-5--5-55-55-5--5-55-55-5-
- 5-5-5--5- 5-55-5--5-
- 5-55-5 -5--5- 5-5
- 5- 5-5-5-5-
- 5- 5-5-5
- 5- 5-5
- 5-
-

Y X
Z

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (BL-1)

167
ETABS 17.0.1

5
5 555555 5 5
5 55 5 5
5 5 55 5 55 555555555 555 5
5
5 5 55 5 55 5 55 5 55 555555 555 5 555 5
5 5 5 55 5 5
5 5 55 5 55 5 5 55 5 55 5 55555 5 555 5 555555555 5
5 5 5 5 5 5
5 5 55 5 55 5 5 55 5 55 5 55 5 55 55555555 555 55 5 55555 555555-5
5
5 5 5 5 5 5 5 5 5 5 5555 5 5 5 5 5 -5 -5 5
5 5 55 5 55 5 5 5 5 55 5 55 5 55 5 55 5 55 555555555555 555 555-5555-55--555-555-5
5 5 5 5 5 5 5 55 5 5 55 5 -55 -5 5
5 55 5 5 55 5 55 5 55 5 55 5 55 5 55 55 5 55 55 55 555555555555 55-55-5555--55-5555-55--555-55--5
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 55 5 5 55 5555-555-5-55555-555-555-55-55-55-5
5 5
5 5 5 5 5 5 5 5 5 5 5 5 55 5 5 5 55 5 -5-55-555-55-555-5-5555-5 55-55-5
5 5 5 5 5 5 5 5 5 5 5 55 55 5 5 55 5 5 5-5-5- 5-55-55-555- 5-5555-5-555-55-5
5 5 5 5 5 5 55 5 5 55 5 5 5 55 5 5 55-5- 5-5-5- 5-5-5-5555-55-555-555-555-5-5
5 5 5 5 55 5 5 55 5 5 55 55 5 5 5 -5- 5-5--5-55-5- 5-5 -5-5-5-55555-5--555-555-55
5 5 5 5 5 55 5 5 55 55 5 5 5 5-5 -5- 5-5 -5- 5-5- 5-5 -5-5-5-55-55-5555--5- 5
5 5 55 5 5 5 55 5 5 5 5 -5- 5-5 -5- 5-5-5- -5- 5-5-5-55-5--5--5-55555-5--5
5 5 5 55 5 5 5 55 5 5 -5 -5- 5-5 -5- 5-5 5-5-5- 5-5-5- 5-55-5-5--5-55-5
5 5 5 5 55 5 5 -5- 5-5 -5- 5-5 5- -5- 5-5 5- -5-5- 5- 5-5-5-5-5-5
5 5 5 5 55 - - - 5 - - 55 - - 55 -
5 555
555 -5 -5--55-5 -5-55-5--5-5 -5--55-55--55--5--55--55-55--55--5-5
55 -55-5 -5-5 -5- 5-5 -5-55-5-5--5- 5-55-55-5--5-
5 - -5 5-5 -5- 5-5 -5- 5-55-5-5--5--5- 5-5
-5 -5- 5-5 -5- 5-55-5--5--5--55-55-55-5-
-5 -5- 5-5 -5--5--5-55-55-55-5--5-
-5 -5--5-55-55-5-5--5--5- 5-5
-55-5 -5--5--5--55-55-55-5-
- 5-55-55-5 -5-5--5-
- 5- 5- -5-5 -5
- 5- 5-55-5 -5
- 5- 5- 5-5
- 5- 5-
- 5-
-

Y X
Z

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (BL-2)

168
ETABS 17.0.1

-5-5
-5-5-5-
-5-5-5-5-5-
-5-5-5-5-5-5-5
-5-5-5-5-5-5-5-5-5
-5--5-55--5-55-5--55-5--5-5 5
-5-55-5-5-5--5-5-5-5-5 5 5
-5-5-5-5-5-5-5-5 5 5
5-5-5-5-5-55-5 5 5
5-5--5-5-5 5 5
5-5--5 55 5
5 55

5
5 5555555 5
55 5
5 5 55 5 55555555 55 55
5 5 5 5 5 55 55555 55 5 55 5555 5
5 5 55 5 5 5 5 5
5 5 55 5 5 55 5 55 5 555555 55 55555555555 55
5 5 5 5 5 5 5 5 5 5 55 5555555 5 55555555 55 55
5
5 55 5 5 55 5 5 5 5 5 5
5 5 55 5 5 55 5 5 5 5 55 5 55 5 55555555 55555 555555555 5555 55 555 5
5 5 5
5 5 5 5 5 5 5 5 5 5 5 5 55 5 5 5555555555 55 55555555 555 55555-5--5
5
5
5 5 5 5 55 5 5 5 5 55 5 5 55 5 5 55 55 5555555555 55555555 5555-5--555-55-5
5 55 5 5 55 5 5 55 5 55 5 5 55 55 5 55 55 55 55 55555555555555555555555555-5555--5-555-555--5-55
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 5555555- -5555-5-5555-
5 5 5 5 5 5 5 5 5 5 55 5 5 5 55 55 5 5 5 5 5 5555-555-555-55-5555--5-55-555-5-5
5 5 5 5 5 5 5 5 5 5 5 55 5 5 5 5 55 5 5 - 55 5 -
5--5555-55-55555--55-555555- 55--5-555555-5--55
5 5 5 5 5 5 5 5 5 5 5 55 55 5 5 5 -
5 5 5 5 5 5 5 5 55 55 55 5 5 5 5 5- -5 5- -5555-55-5 555- 5-5 5
5 5 5 5 5 55 55 5 5 5 5 55 5 -5--5-55-5--5-55-5--5555-5555-55--5555-5555-55--55
5 - 5 - 5 - 5- -
5 5 55 5 5 5 5 55 55 5 5 5- -5-5 5- -5 5- -5 5-55-555-55-5-5
5 5 5 55 55 55 5 5 5 5 - 5--5-55-5-5--5-55-5--5-55-5--5--55--5555-5555-55--55
5 5 5 5 5 5 55 5 5 - 5 --
555555 - 5 --5-55-5-5--5-55-5--5-55-5--5--55--55--55--55-55-55--5
5 - 5 - - 5 5 --
55555
5555 - 5--5-55-55 -5--5-55-5-5-55-55-5--5--5--55--55--55--55-5
555 - - 5 5
-5 -5 -5 -5- 5-5 -5- 5-5-5-5--5--5-5-55-55-55-5
55
5 -5 -55 -55 -5 -5--5-55-5--5--55--55-55-55-55--55--55--5-
-5 --5 - 5 -5 -5 5- -5-5-5-5--5--5--5--5-
-5 5- -5 -5- 5-55-55-55-55-5-5-55-5
-5 - 5 -5 -5 -5--5--5- 5-5-5-55-55-
-5 - 5-5 -5 -5 -5-5--5--5--5--5-
-5 - 5-55-55-55-55-55-55-55-5
-5 --5--5--5--5--5--5--5-
-55 -5 -5 -5-5 -55-5
- 5 -5 -55-55 -55-
- 5 -55- 5- 5-
- 5 - 5 - 5-
- 5 - 5-
-5 -
-5
-

Y X
Z

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (BL-3)

169
ETABS 17.0.1

5
555555 5 5
5 5555 5 5
5 55 55 55555 5 55 5 55 5
5
5 5 5 5 55 5 5 5 5 5 5
5 5 55 5 5 55 55555 5 5 5 55 5 55 5 5 5
5 5 5 5
5 5 5 5 5 5 55 5 5 5 5 5 5 5 5
5 5 55 5 5 5 55 5 5 555555 55 5 5 5 5 55 5 55 5 5 55 5
5 5 5 5
5 5 5 5 5 5 5 5 55555 5 5 5 5 5 5 5 5 5 5 5
5 5 55 55 5 5 55 5 5 55 55 5 555555 55 55 55 5 55 5 5 55 5 55 5 5 55 5 5 5
5 5 5 5 55 5 5 5
5 5 55 55 5 5 55 5 5 5 55 55 55 5 55555 55 55 55 55 5 55 5 5 55 5 55 5 5 55 5 5 55
5 5 5 5
5 5 5 5 5 55 5 5 5 55 55 5 5 5 5 555555 555 55 55 5 5 55 55 5 5 5 5 55 5 5 55 55 55
5 55 5 5 5 5 5 5 5 5 55 55 55 55 5 5 5 5 5 55 55 5 5 5 5 5 5 5 5 555 5
5 5 5 5 55 55 5555 5 55 5 5 5 5 5 55 5 5 5 5 5 5 555 5
5 5 5 5 55 55 55 5 5 5 5 5 5 5 55 55 55 55 5 5 55 55 5 555 55 55 5 5
5 5 5 5 5 5 5 55 55 55 55 5 5 55 55 55 55 5 5 5 555 5 555 5 5
5 5 5 5 5 55555 5 55 55 55 55 555 5 5 55 5 5
5 55 55 55 55 55 55 55 5
5 555555 5 5 555 555 55 55 55 5555 55
5 5 55 5
5 55555
5 5555 5 5 5 55 55 5 555 55 55 555 55 55
5 555 555 5 555
5 55
5 5 5 5 5 5 55 55 5 5 5 55 55 55 55 55
5 555 5 5 5 5 555 5
5
5 5 5 5 5 5 55 55 5 5 5 5 55 55 55 55 5
55555 55 55
5 5 5 5 5 5 55 5 5 55 55 55 55 55 55 5
5 5 5 5 5 5 5 5 55 55 5 5 5 5 5
5 5 5 5 5 5 5 5 5 5 5 5 55 5
5 5 5 5 5 5 5 5 5 5 55 55
5 5 5 5 5 5 5 5 55 55 5
5 5 5 5 5 5 5 55 5 5
5 5 5 5 5 55 55 5 5
5 5 5 55 55 5 5 5
5 5 55 5 5 55 5
5 55 5 5 5
Y 55555 X
Z555 55 55 5
55
5

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (BL-4)

170
Project : 132/11 KV SHKZBHST S/S
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV

171
CLIENT: PROJECT:
132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: Consultant:
DANWAY
DOC NO:STRU-C-15-317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP

C.3. Used parameters in software


Zero level of model is equal to the zero level of substation gate level. All walls and floors
are modeled as shell element.
C.3.1. Parameters For Raft
Raft is modeled in SAFE as shell members. Mesh size is kept in the range of 500 mm.

172
CLIENT: PROJECT:
132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: Consultant:
DANWAY
DOC NO:STRU-C-15-317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP

C.3.2. Parameters For Walls


Wall is modeled as shell members. Mesh size is maintained within the size of 500
mm.Walls mainly consist of basement walls, stair case walls and fire walls.

TABLE:  Shell Sections ‐ Wall 
Element 
Name  Material  Type  Thickness 
         mm 
Shell‐
RW‐250‐C40  C‐40/32  Thin  250 
Shell‐
RW‐300‐C40  C‐40/32  Thin  300 

C.3.3. Parameters For Slabs

TABLE:  Shell Sections ‐ Slab 
Slab  Element  Slab 
Name  Material  Type  Type  Thickness 
            mm 
200 THK  C‐40/32  Uniform  Shell‐Thin  200 
250 THK  C‐40/32  Uniform  Shell‐Thin  250 
250 thk 
Landing  C‐40/32  Uniform  Shell‐Thin  250 
400 thk  C‐40/32  Uniform  Shell‐Thin  400 
PC 200 THK  C‐40/32  Uniform  Shell‐Thin  200 

173
CLIENT: PROJECT:
132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: Consultant:
DANWAY
DOC NO:STRU-C-15-317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP

C.3.4. Parameters For Beams :


Beam sections are attached here for reference. Clear cover in beams 75 mm
(Considered in etabs)

TABLE:  Concrete Beam Rebar Data 
Frame Property  Long. Rebar Material  Tran. Rebar Material  Top Cover  Bottom Cover 
mm  mm 
FB‐300x500  Fy‐460  Fy‐420  75  75 
FB‐300x600  Fy‐460  Fy‐420  75  75 
FB‐300x700  Fy‐460  Fy‐420  75  75 
FB‐300x750  Fy‐460  Fy‐420  75  75 
FB‐300x800  Fy‐460  Fy‐420  75  75 
FB‐400x1200  Fy‐460  Fy‐420  75  75 
FB‐400x1650  Fy‐460  Fy‐420  75  75 
FB‐400x600  Fy‐460  Fy‐420  75  75 
FB‐400x700  Fy‐460  Fy‐420  75  75 
FB‐400x750  Fy‐460  Fy‐420  75  75 
FB‐400X800  Fy‐460  Fy‐420  75  75 
FB‐450x600  Fy‐460  Fy‐420  75  75 
FB‐450x800  Fy‐460  Fy‐420  75  75 
GB‐300x500  Fy‐460  Fy‐420  75  75 
GB‐300x550  Fy‐460  Fy‐420  75  75 
GB‐300x600  Fy‐460  Fy‐420  75  75 
GB‐300x700  Fy‐460  Fy‐420  75  75 
GB‐400x600  Fy‐460  Fy‐420  75  75 
GB‐400x700  Fy‐460  Fy‐420  75  75 
GB‐400x750  Fy‐460  Fy‐420  75  75 
RB‐300x500  Fy‐460  Fy‐420  75  75 
RB‐300x600  Fy‐460  Fy‐420  75  75 
RB‐300x700  Fy‐460  Fy‐420  75  75 
RB‐400x1200  Fy‐460  Fy‐420  75  75 
RB‐400x600  Fy‐460  Fy‐420  75  75 
RB‐400x700  Fy‐460  Fy‐420  75  75 
RB‐400x750  Fy‐460  Fy‐420  75  75 
RB‐400x800  Fy‐460  Fy‐420  75  75 
RB‐450x600  Fy‐460  Fy‐420  75  75 
RB‐470x600  Fy‐460  Fy‐420  75  75 

174
CLIENT: PROJECT:
132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: Consultant:
DANWAY
DOC NO:STRU-C-15-317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP

.3.4. 5 Parameters For Columns :


Column sections are attached here for reference. Clear cover in columns75 and 50 mm
(Considered in etabs).

TABLE:  Concrete Column Rebar Data 
Frame Property  Long. Rebar Material  Tran. Rebar Material  Cover 
         mm 
C‐1400X400  Fy‐460  Fy‐420  50 
C‐1400X400‐75mm  Fy‐460  Fy‐420  75 
C‐300X500  Fy‐460  Fy‐420  50 
C‐300X500‐75mm  Fy‐460  Fy‐420  75 
C‐400x400  Fy‐460  Fy‐420  50 
C‐400x400‐75mm  Fy‐460  Fy‐420  75 
C‐400x450  Fy‐460  Fy‐420  50 
C‐400X500  Fy‐460  Fy‐420  50 
C‐400X500‐75mm  Fy‐460  Fy‐420  75 
C‐400x600  Fy‐460  Fy‐420  50 
C‐400x600‐75mm  Fy‐460  Fy‐420  75 
C‐400X600..  Fy‐460  Fy‐420  50 
C‐400X600..75mm  Fy‐460  Fy‐420  75 
C‐450X600  Fy‐460  Fy‐420  50 
C‐450X600‐75mm  Fy‐460  Fy‐420  75 
C‐500x600  Fy‐460  Fy‐420  50 
C‐500x600‐75mm  Fy‐460  Fy‐420  75 
C‐500X700  Fy‐460  Fy‐420  50 
C‐500X750  Fy‐460  Fy‐420  50 
C‐550X800  Fy‐460  Fy‐420  50 
C‐550X800‐75mm  Fy‐460  Fy‐420  75 
C‐600X500  Fy‐460  Fy‐420  50 
C‐600X500‐75mm  Fy‐460  Fy‐420  75 
C‐600x600  Fy‐460  Fy‐420  50 
C‐600x700  Fy‐460  Fy‐420  50 
C‐600x800  Fy‐460  Fy‐420  50 
C‐600x800‐75mm  Fy‐460  Fy‐420  75 
C600X750  Fy‐460  Fy‐420  50 

175
Project : 132/11 KV SHKZBHST S/S
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV

176
END USER:  PROJECT: 132/11 kV  SHEIK ZAYED BIN HAMDAN  STREET SUBSTATION 

Contractor:  DANWAY  Consultant:  EPE 
 
 
DOC NO: STRU‐C‐15‐317  Prepared by  Checked by  Approved by     
Date: 13/06/2022  SRI  ASV  VRP         
 
TABLE:  Base Reactions 
Load 
Case/Comb FX  FY  FZ  MX  MY  MZ  X  Y  Z 

   kN  kN  kN  kN‐m  kN‐m  kN‐m  m  m  m 
1316922.46
DL  0  0  64755.8665  ‐1747850  0  0  0  ‐3.8 

768653.417
LL  ‐517.1519  ‐469.2762  36458.0432  ‐1011150  10821.3851  0  0  ‐3.8 

912066.897
SDL  0  0  44194.2094  ‐1294287  0  0  0  ‐3.8 

SP  ‐185.8048  184.0706  0  ‐289.6465  ‐288.1526  9940.6782  0  0  ‐3.8 
BL‐1  ‐327.239  78.822  0  ‐548.6011  ‐3079.319  10945.512  0  0  ‐3.8 

‐ 232439.623
EQX  0  0  0  138668.916 0  0  ‐3.8 
11170.3601  5 


‐ 138668.916
EQY  0  0  0  331642.186 0  0  ‐3.8 
11170.3601  4 


WL +X  ‐1765.587  0  0  0  32546.8806  0  0  ‐3.8 
25268.1683 

WL +Y  0  ‐1958.8042  0  24791.7026  0  0  0  ‐3.8 
39114.7134 
BL‐2  ‐314.4671  80.214  0  ‐558.2894  ‐2959.8542  7849.8441  0  0  ‐3.8 
BL‐3  ‐321.1561  126.833  0  ‐1000.811  ‐3021.3598  5186.737  0  0  ‐3.8 
CR‐1  ‐77  ‐77  770  18451.9485  ‐17763.2  68.8748  0  0  ‐3.8 
CR‐2  77  ‐77  770  18451.9485  ‐11797.1  ‐3024.9048  0  0  ‐3.8 

SPS  ‐142.8251  150.5845  1643.8799  22803.2898  7791.859  0  0  ‐3.8 
20988.9399 

‐ 250658.391
EQX(+ecc)  0  0  0  138668.916 0  0  ‐3.8 
11170.3601  8 


‐ 214220.855
EQX(‐ecc)  0  0  0  138668.916 0  0  ‐3.8 
11170.3601  1 


‐ 138668.916
EQY(+ecc)  0  0  0  344742.683 0  0  ‐3.8 
11170.3601  4 


‐ 138668.916
EQY(‐ecc)  0  0  0  318541.689 0  0  ‐3.8 
11170.3601  4 

LLR  0  0  320.3483  7657.1685  ‐8194.8297  0  0  0  ‐3.8 

WP(TANK 
‐0.3293  1272.4511  4030.0991  18332.2045  173020.944 54617.1196  0  0  ‐3.8 
FULL) 

WP(TANK  ‐
‐0.3301  ‐0.1689  1956.4241  21624.4104  ‐3.7169  0  0  ‐3.8 
HALF‐1)  83996.1427 
WP(TANK 
0.0008  0.3366  2073.675  12651.7363  ‐89024.802  14.2296  0  0  ‐3.8 
HALF‐2) 
BL‐4  ‐338.971  0  0  0  ‐3189.7171  1560.9601  0  0  ‐3.8 

BL  ‐1301.8332  673.444  0  ‐5754.7824  27335.5887  0  0  ‐3.8 
12250.2501 

177
Loads

ASCE 7-05 Auto Wind Load Calculation


This calculation presents the automatically generated lateral wind loads for load pattern WL +X according to
ASCE 7-05, as calculated by ETABS.

Exposure Parameters

Exposure From = Diaphragms


Exposure Category = C
Wind Direction = 0 degrees

Basic Wind Speed, V [ASCE 6.5.4] V = 100 mph


Windward Coefficient, C p,wind [ASCE
Cp,wind =0.8
6.5.11.2.1]
Leeward Coefficient, C p,lee [ASCE
Cp,lee =0.5
6.5.11.2.1]
Wind Case = Case 1
Top Story = Staircase Headroom +16.7 m
Bottom Story = Base
Include Parapet = No
Factors and Coefficients

Gradient Height, z g [ASCE Table 6-2] z g = 900


Emperical Exponent, α [ASCE Table 6-2] α = 9.5
2

Velocity Pressure Exposure Coefficient, z α

K z = 2.01 for 15ft ≤ z ≤ z g


K z; [ASCE Table 6-3] zg 2

15 α

K z = 2.01 for z ≤ 15ft


zg
Topographical Factor, Kzt [ASCE 6.5.7.2] K zt = 1
Directionality Factor, K d [ASCE 6.5.4.4] K d = 0.85
Importance Factor, I [ASCE 6.5.5] I = 1.15
Gust Effect Factor, G [ASCE 6.5.8] G = 0.85
Lateral Loading
Velocity Pressure, q z [ASCE 6.5.10 Eq.
q z = 0.00256 K z K zt K d V 2 I
6-15]
Design Wind Pressure, p [ASCE 6.5.12.2.1
p = qG Cp,wind + q h ( G Cp,lee )
Eq. 6-17]

Applied Story Forces

178
Loads

Lateral Load t

19.3769kN
Staircase Headroom +16.7 m

221.7037kN
ROOF 13.300

9.8m lvl

183.9939kN
FF @ 7.500 m lvl

82.627kN
4.9m lvl

127.2852kN
GF +1.420 m
0.4m lvl36.3068kN
FPR GF

Base

0 80 160 240
Force, kN

Story Elevation X-Dir Y-Dir


m kN kN

Staircase
Headroom 16.7 19.3769 0
+16.7 m

ROOF
13.3 221.7037 0
13.300
9.8m lvl 9.8 0 0
FF @
7.500 m 7.5 183.9939 0
lvl
4.9m lvl 4.9 82.627 0
GF
1.42 127.2852 0
+1.420 m
0.4m lvl 0.4 0 0
FPR GF -0.4 36.3068 0
Base -3.8 0 0

179
Loads

ASCE 7-05 Auto Wind Load Calculation


This calculation presents the automatically generated lateral wind loads for load pattern WL +Y according to
ASCE 7-05, as calculated by ETABS.

Exposure Parameters

Exposure From = Diaphragms


Exposure Category = C
Wind Direction = 90 degrees

Basic Wind Speed, V [ASCE 6.5.4] V = 100 mph


Windward Coefficient, C p,wind [ASCE
Cp,wind =0.8
6.5.11.2.1]
Leeward Coefficient, C p,lee [ASCE
Cp,lee =0.5
6.5.11.2.1]
Wind Case = Case 1
Top Story = Staircase Headroom +16.7 m
Bottom Story = Base
Include Parapet = No
Factors and Coefficients

Gradient Height, z g [ASCE Table 6-2] z g = 900


Emperical Exponent, α [ASCE Table 6-2] α = 9.5
2

Velocity Pressure Exposure Coefficient, z α

K z = 2.01 for 15ft ≤ z ≤ z g


K z; [ASCE Table 6-3] zg 2

15 α

K z = 2.01 for z ≤ 15ft


zg
Topographical Factor, Kzt [ASCE 6.5.7.2] K zt = 1
Directionality Factor, K d [ASCE 6.5.4.4] K d = 0.85
Importance Factor, I [ASCE 6.5.5] I = 1.15
Gust Effect Factor, G [ASCE 6.5.8] G = 0.85
Lateral Loading
Velocity Pressure, q z [ASCE 6.5.10 Eq.
q z = 0.00256 K z K zt K d V 2 I
6-15]
Design Wind Pressure, p [ASCE 6.5.12.2.1
p = qG Cp,wind + q h ( G Cp,lee )
Eq. 6-17]

Applied Story Forces

180
Loads

Lateral Load t

Staircase Headroom +16.7 m


33.4998kN

ROOF 13.300
177.7264kN

9.8m lvl

FF @ 7.500 m lvl
105.2343kN

4.9m lvl
102.5613kN

GF +1.420 m
107.1043kN
0.4m lvl
FPR GF
19.8258kN

Base

0 60 120 180
Force, kN

Story Elevation X-Dir Y-Dir


m kN kN

Staircase
Headroom 16.7 0 33.4998
+16.7 m

ROOF
13.3 0 177.7264
13.300
9.8m lvl 9.8 0 0
FF @
7.500 m 7.5 0 105.2343
lvl

4.9m lvl 4.9 0 102.5613

GF
1.42 0 107.1043
+1.420 m
0.4m lvl 0.4 0 0
FPR GF -0.4 0 19.8258
Base -3.8 0 0

181
Loads

UBC 97 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern EQX according to
UBC 97, as calculated by ETABS.

Direction and Eccentricity

Direction = X
Eccentricity Ratio = 0% for all diaphragms
Structural Period

Period Calculation Method = Program Calculated

Coefficient, C t [UBC 1630.2.2] Ct = 0.03ft


Structure Height Above Base, h n h n = 67.26 ft
3
Approximate Fundamental Period, T a
T a = Ct (h) 4
T a = 0.705 sec
[UBC 1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
T ≤ 1.4 T a
1630.2.2.2]
Factors and Coefficients
Response Modification Factor, R [UBC
R = 5.5
Table 16-N]
Importance Factor, I [UBC Table 16-K] I=1
Seismic Zone Factor, Z [UBC Table 16-I] Z = 0.15
Soil Profile [UBC Table 16-J] = SC
Site Coefficient, C a [UBC Table 16-Q] Ca = 0.18
Site Coefficient, C v [UBC Table 16-R] Cv = 0.25
Equivalent Lateral Forces

Base Shear Coefficient [UBC 1630.2.1, Eq. Cv I


=
30-4] RT
2.5 Ca I
maximum [UBC 1630.2.1, Eq. 30-5] = = 0.081818
R
minimum [UBC 1630.2.1, Eq. 30-6] = 0.11 Ca I = 0.0198
min ≤ Vcoeff ≤ max
Calculated Base Shear
Period
W V Ft
Direction Used V coeff
(kN) (kN) (kN)
(sec)
X 0.349 0 136687.4539 11183.519 0

Applied Story Forces

182
Loads

Lateral Load t

167.8767kN
Staircase Headroom +16.7 m

4443.4649kN
ROOF 13.300

670.9kN
9.8m lvl

3075.9974kN
FF @ 7.500 m lvl

535.0046kN
4.9m lvl

1630.8055kN
GF +1.420 m
538.4034kN
0.4m121.0663kN
lvl
FPR GF

Base

0.00 1.50 3.00 4.50 E+3


Force, kN

Story Elevation X-Dir Y-Dir


m kN kN

Staircase
Headroom 16.7 167.8767 0
+16.7 m

ROOF
13.3 4443.4649 0
13.300
9.8m lvl 9.8 670.9 0
FF @
7.500 m 7.5 3075.9974 0
lvl

4.9m lvl 4.9 535.0046 0

GF
1.42 1630.8055 0
+1.420 m

0.4m lvl 0.4 538.4034 0

FPR GF -0.4 121.0663 0

Base -3.8 0 0

183
Loads

UBC 97 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern EQY according to
UBC 97, as calculated by ETABS.

Direction and Eccentricity

Direction = Y
Eccentricity Ratio = 0% for all diaphragms
Structural Period

Period Calculation Method = Program Calculated

Coefficient, C t [UBC 1630.2.2] Ct = 0.03ft


Structure Height Above Base, h n h n = 67.26 ft
3
Approximate Fundamental Period, T a
T a = Ct (h) 4
T a = 0.705 sec
[UBC 1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
T ≤ 1.4 T a
1630.2.2.2]
Factors and Coefficients
Response Modification Factor, R [UBC
R = 5.5
Table 16-N]
Importance Factor, I [UBC Table 16-K] I=1
Seismic Zone Factor, Z [UBC Table 16-I] Z = 0.15
Soil Profile [UBC Table 16-J] = SC
Site Coefficient, C a [UBC Table 16-Q] Ca = 0.18
Site Coefficient, C v [UBC Table 16-R] Cv = 0.25
Equivalent Lateral Forces

Base Shear Coefficient [UBC 1630.2.1, Eq. Cv I


=
30-4] RT
2.5 Ca I
maximum [UBC 1630.2.1, Eq. 30-5] = = 0.081818
R
minimum [UBC 1630.2.1, Eq. 30-6] = 0.11 Ca I = 0.0198
min ≤ Vcoeff ≤ max
Calculated Base Shear
Period
W V Ft
Direction Used V coeff
(kN) (kN) (kN)
(sec)
Y 0.296 0 136687.4539 11183.519 0

Applied Story Forces

184
Loads

Lateral Load t

Staircase Headroom +16.7 m


167.8767kN

ROOF 13.300
4443.4649kN

9.8m lvl
670.9kN

FF @ 7.500 m lvl
3075.9974kN

4.9m lvl
535.0046kN

GF +1.420 m
1630.8055kN
0.4m lvl
538.4034kN
FPR GF
121.0663kN

Base

0.00 1.50 3.00 4.50 E+3


Force, kN

Story Elevation X-Dir Y-Dir


m kN kN

Staircase
Headroom 16.7 0 167.8767
+16.7 m

ROOF
13.3 0 4443.4649
13.300
9.8m lvl 9.8 0 670.9
FF @
7.500 m 7.5 0 3075.9974
lvl

4.9m lvl 4.9 0 535.0046

GF
1.42 0 1630.8055
+1.420 m

0.4m lvl 0.4 0 538.4034

FPR GF -0.4 0 121.0663

Base -3.8 0 0

185
Loads

UBC 97 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern EQX(+ecc)
according to UBC 97, as calculated by ETABS.

Direction and Eccentricity

Direction = X + Eccentricity Y
Eccentricity Ratio = 5% for all diaphragms
Structural Period

Period Calculation Method = Program Calculated

Coefficient, C t [UBC 1630.2.2] Ct = 0.03ft


Structure Height Above Base, h n h n = 67.26 ft
3
Approximate Fundamental Period, T a
T a = Ct (h) 4
T a = 0.705 sec
[UBC 1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
T ≤ 1.4 T a
1630.2.2.2]
Factors and Coefficients
Response Modification Factor, R [UBC
R = 5.5
Table 16-N]
Importance Factor, I [UBC Table 16-K] I=1
Seismic Zone Factor, Z [UBC Table 16-I] Z = 0.15
Soil Profile [UBC Table 16-J] = SC
Site Coefficient, C a [UBC Table 16-Q] Ca = 0.18
Site Coefficient, C v [UBC Table 16-R] Cv = 0.25
Equivalent Lateral Forces

Base Shear Coefficient [UBC 1630.2.1, Eq. Cv I


=
30-4] RT
2.5 Ca I
maximum [UBC 1630.2.1, Eq. 30-5] = = 0.081818
R
minimum [UBC 1630.2.1, Eq. 30-6] = 0.11 Ca I = 0.0198
min ≤ Vcoeff ≤ max
Calculated Base Shear
Period
W V Ft
Direction Used V coeff
(kN) (kN) (kN)
(sec)
X + Ecc. Y 0.349 0 136687.4539 11183.519 0

Applied Story Forces

186
Loads

Lateral Load t

167.8767kN
Staircase Headroom +16.7 m

4443.4649kN
ROOF 13.300

670.9kN
9.8m lvl

3075.9974kN
FF @ 7.500 m lvl

535.0046kN
4.9m lvl

1630.8055kN
GF +1.420 m
538.4034kN
0.4m121.0663kN
lvl
FPR GF

Base

0.00 1.50 3.00 4.50 E+3


Force, kN

Story Elevation X-Dir Y-Dir


m kN kN

Staircase
Headroom 16.7 167.8767 0
+16.7 m

ROOF
13.3 4443.4649 0
13.300
9.8m lvl 9.8 670.9 0
FF @
7.500 m 7.5 3075.9974 0
lvl

4.9m lvl 4.9 535.0046 0

GF
1.42 1630.8055 0
+1.420 m

0.4m lvl 0.4 538.4034 0

FPR GF -0.4 121.0663 0

Base -3.8 0 0

187
Loads

UBC 97 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern EQX(-ecc)
according to UBC 97, as calculated by ETABS.

Direction and Eccentricity

Direction = X - Eccentricity Y
Eccentricity Ratio = 5% for all diaphragms
Structural Period

Period Calculation Method = Program Calculated

Coefficient, C t [UBC 1630.2.2] Ct = 0.03ft


Structure Height Above Base, h n h n = 67.26 ft
3
Approximate Fundamental Period, T a
T a = Ct (h) 4
T a = 0.705 sec
[UBC 1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
T ≤ 1.4 T a
1630.2.2.2]
Factors and Coefficients
Response Modification Factor, R [UBC
R = 5.5
Table 16-N]
Importance Factor, I [UBC Table 16-K] I=1
Seismic Zone Factor, Z [UBC Table 16-I] Z = 0.15
Soil Profile [UBC Table 16-J] = SC
Site Coefficient, C a [UBC Table 16-Q] Ca = 0.18
Site Coefficient, C v [UBC Table 16-R] Cv = 0.25
Equivalent Lateral Forces

Base Shear Coefficient [UBC 1630.2.1, Eq. Cv I


=
30-4] RT
2.5 Ca I
maximum [UBC 1630.2.1, Eq. 30-5] = = 0.081818
R
minimum [UBC 1630.2.1, Eq. 30-6] = 0.11 Ca I = 0.0198
min ≤ Vcoeff ≤ max
Calculated Base Shear
Period
W V Ft
Direction Used V coeff
(kN) (kN) (kN)
(sec)
X - Ecc. Y 0.349 0 136687.4539 11183.519 0

Applied Story Forces

188
Loads

Lateral Load t

167.8767kN
Staircase Headroom +16.7 m

4443.4649kN
ROOF 13.300

670.9kN
9.8m lvl

3075.9974kN
FF @ 7.500 m lvl

535.0046kN
4.9m lvl

1630.8055kN
GF +1.420 m
538.4034kN
0.4m121.0663kN
lvl
FPR GF

Base

0.00 1.50 3.00 4.50 E+3


Force, kN

Story Elevation X-Dir Y-Dir


m kN kN

Staircase
Headroom 16.7 167.8767 0
+16.7 m

ROOF
13.3 4443.4649 0
13.300
9.8m lvl 9.8 670.9 0
FF @
7.500 m 7.5 3075.9974 0
lvl

4.9m lvl 4.9 535.0046 0

GF
1.42 1630.8055 0
+1.420 m

0.4m lvl 0.4 538.4034 0

FPR GF -0.4 121.0663 0

Base -3.8 0 0

189
Loads

UBC 97 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern EQY(+ecc)
according to UBC 97, as calculated by ETABS.

Direction and Eccentricity

Direction = Y + Eccentricity X
Eccentricity Ratio = 5% for all diaphragms
Structural Period

Period Calculation Method = Program Calculated

Coefficient, C t [UBC 1630.2.2] Ct = 0.03ft


Structure Height Above Base, h n h n = 67.26 ft
3
Approximate Fundamental Period, T a
T a = Ct (h) 4
T a = 0.705 sec
[UBC 1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
T ≤ 1.4 T a
1630.2.2.2]
Factors and Coefficients
Response Modification Factor, R [UBC
R = 5.5
Table 16-N]
Importance Factor, I [UBC Table 16-K] I=1
Seismic Zone Factor, Z [UBC Table 16-I] Z = 0.15
Soil Profile [UBC Table 16-J] = SC
Site Coefficient, C a [UBC Table 16-Q] Ca = 0.18
Site Coefficient, C v [UBC Table 16-R] Cv = 0.25
Equivalent Lateral Forces

Base Shear Coefficient [UBC 1630.2.1, Eq. Cv I


=
30-4] RT
2.5 Ca I
maximum [UBC 1630.2.1, Eq. 30-5] = = 0.081818
R
minimum [UBC 1630.2.1, Eq. 30-6] = 0.11 Ca I = 0.0198
min ≤ Vcoeff ≤ max
Calculated Base Shear
Period
W V Ft
Direction Used V coeff
(kN) (kN) (kN)
(sec)
Y + Ecc. X 0.296 0 136687.4539 11183.519 0

Applied Story Forces

190
Loads

Lateral Load t

Staircase Headroom +16.7 m


167.8767kN

ROOF 13.300
4443.4649kN

9.8m lvl
670.9kN

FF @ 7.500 m lvl
3075.9974kN

4.9m lvl
535.0046kN

GF +1.420 m
1630.8055kN
0.4m lvl
538.4034kN
FPR GF
121.0663kN

Base

0.00 1.50 3.00 4.50 E+3


Force, kN

Story Elevation X-Dir Y-Dir


m kN kN

Staircase
Headroom 16.7 0 167.8767
+16.7 m

ROOF
13.3 0 4443.4649
13.300
9.8m lvl 9.8 0 670.9
FF @
7.500 m 7.5 0 3075.9974
lvl

4.9m lvl 4.9 0 535.0046

GF
1.42 0 1630.8055
+1.420 m

0.4m lvl 0.4 0 538.4034

FPR GF -0.4 0 121.0663

Base -3.8 0 0

191
Loads

UBC 97 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern EQY(-ecc)
according to UBC 97, as calculated by ETABS.

Direction and Eccentricity

Direction = Y - Eccentricity X
Eccentricity Ratio = 5% for all diaphragms
Structural Period

Period Calculation Method = Program Calculated

Coefficient, C t [UBC 1630.2.2] Ct = 0.03ft


Structure Height Above Base, h n h n = 67.26 ft
3
Approximate Fundamental Period, T a
T a = Ct (h) 4
T a = 0.705 sec
[UBC 1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
T ≤ 1.4 T a
1630.2.2.2]
Factors and Coefficients
Response Modification Factor, R [UBC
R = 5.5
Table 16-N]
Importance Factor, I [UBC Table 16-K] I=1
Seismic Zone Factor, Z [UBC Table 16-I] Z = 0.15
Soil Profile [UBC Table 16-J] = SC
Site Coefficient, C a [UBC Table 16-Q] Ca = 0.18
Site Coefficient, C v [UBC Table 16-R] Cv = 0.25
Equivalent Lateral Forces

Base Shear Coefficient [UBC 1630.2.1, Eq. Cv I


=
30-4] RT
2.5 Ca I
maximum [UBC 1630.2.1, Eq. 30-5] = = 0.081818
R
minimum [UBC 1630.2.1, Eq. 30-6] = 0.11 Ca I = 0.0198
min ≤ Vcoeff ≤ max
Calculated Base Shear
Period
W V Ft
Direction Used V coeff
(kN) (kN) (kN)
(sec)
Y - Ecc. X 0.296 0 136687.4539 11183.519 0

Applied Story Forces

192
Loads

Lateral Load t

Staircase Headroom +16.7 m


167.8767kN

ROOF 13.300
4443.4649kN

9.8m lvl
670.9kN

FF @ 7.500 m lvl
3075.9974kN

4.9m lvl
535.0046kN

GF +1.420 m
1630.8055kN
0.4m lvl
538.4034kN
FPR GF
121.0663kN

Base

0.00 1.50 3.00 4.50 E+3


Force, kN

Story Elevation X-Dir Y-Dir


m kN kN

Staircase
Headroom 16.7 0 167.8767
+16.7 m

ROOF
13.3 0 4443.4649
13.300
9.8m lvl 9.8 0 670.9
FF @
7.500 m 7.5 0 3075.9974
lvl

4.9m lvl 4.9 0 535.0046

GF
1.42 0 1630.8055
+1.420 m

0.4m lvl 0.4 0 538.4034

FPR GF -0.4 0 121.0663

Base -3.8 0 0

193
Analysis Results 13-06-2022

1 Analysis Results
This chapter provides analysis results.
1.1 Structure Results
Table 1.1 - Diaphragm Center of Mass Displacements

Load UX UY RZ X Y Z
Story Diaphragm Point
Case/Combo mm mm rad m m m
Staircase Headroom +16.7 m D1 ULS(SESIMIC) Max 7.292 5.115 9.2E-05 17070 36.0603 41.064 16.7
Staircase Headroom +16.7 m D1 ULS(SESIMIC) Min -5.992 -4.727 -6.1E-05 17070 36.0603 41.064 16.7
Staircase Headroom +16.7 m D2 ULS(SESIMIC) Max 5.161 5.585 0.000102 17071 36.0568 1.6206 16.7
Staircase Headroom +16.7 m D2 ULS(SESIMIC) Min -3.613 -3.57 -0.000112 17071 36.0568 1.6206 16.7
ROOF 13.300 D3 ULS(SESIMIC) Max 5.845 4.303 0.000219 17072 30.4178 20.9528 13.3
ROOF 13.300 D3 ULS(SESIMIC) Min -4.281 -3.157 -0.000184 17072 30.4178 20.9528 13.3
FF @ 7.500 m lvl D3 ULS(SESIMIC) Max 4.534 2.97 8.9E-05 17073 36.5108 22.6997 7.5
FF @ 7.500 m lvl D3 ULS(SESIMIC) Min -2.894 -3.076 -6.3E-05 17073 36.5108 22.6997 7.5
FF @ 7.500 m lvl D4 ULS(SESIMIC) Max 4.2 3.328 7.5E-05 17074 43.7248 8.2402 6.7
FF @ 7.500 m lvl D4 ULS(SESIMIC) Min -2.653 -3.98 -9.3E-05 17074 43.7248 8.2402 6.7
4.9m lvl D5 ULS(SESIMIC) Max 0.297 0.132 1.3E-05 17075 17.1537 35.8048 4.9
4.9m lvl D5 ULS(SESIMIC) Min -0.232 -0.28 -2.5E-05 17075 17.1537 35.8048 4.9
4.9m lvl D6 ULS(SESIMIC) Max -0.027 0.222 0.000101 17076 10.5436 4.6039 3
4.9m lvl D6 ULS(SESIMIC) Min -0.441 -0.062 6E-06 17076 10.5436 4.6039 3
4.9m lvl D7 ULS(SESIMIC) Max 1.773 1.517 0.000208 17077 41.545 1.775 4
4.9m lvl D7 ULS(SESIMIC) Min -1.292 -2.014 -0.000226 17077 41.545 1.775 4
GF +1.420 m D8 ULS(SESIMIC) Max 0.27 0.322 7E-06 17078 29.3746 21.7888 1.42
GF +1.420 m D8 ULS(SESIMIC) Min -0.346 -0.343 -8E-06 17078 29.3746 21.7888 1.42
FPR GF D9 ULS(SESIMIC) Max 0.175 0.136 7E-06 17079 42.8895 6.8236 -0.4
FPR GF D9 ULS(SESIMIC) Min -0.172 -0.141 -2.1E-05 17079 42.8895 6.8236 -0.4

194
Analysis Results 13-06-2022

1 Analysis Results
This chapter provides analysis results.
1.1 Story Results
Table 1.1 - Story Drifts

Load X Y Z
Story Direction Drift Label
Case/Combo m m m
Staircase Headroom +16.7 m ULS(SESIMIC) Max X 0.000435 7249 38.7496 42.7 16.7
Staircase Headroom +16.7 m ULS(SESIMIC) Max Y 0.000378 7806 34.2912 2.95 16.7
Staircase Headroom +16.7 m ULS(SESIMIC) Min X 0.000392 384 39.245 42.7 16.7
Staircase Headroom +16.7 m ULS(SESIMIC) Min Y 0.000353 300 34.655 42.7 16.7
ROOF 13.300 ULS(SESIMIC) Max X 0.002735 4848 12.365 19.7994 13.3
ROOF 13.300 ULS(SESIMIC) Max Y 0.001674 4451 42.92 8.65 13.3
ROOF 13.300 ULS(SESIMIC) Min X 0.001229 77 12.365 31.63 13.3
ROOF 13.300 ULS(SESIMIC) Min Y 0.001255 4451 42.92 8.65 13.3
9.8m lvl ULS(SESIMIC) Max X 0.000856 4806 46.595 6.1 9.8
9.8m lvl ULS(SESIMIC) Max Y 0.004566 359 2.845E-06 0.56 9.8
9.8m lvl ULS(SESIMIC) Min X 0.00181 378 12.365 19.225 9.8
9.8m lvl ULS(SESIMIC) Min Y 0.004491 376 1.15 31.63 9.8
FF @ 7.500 m lvl ULS(SESIMIC) Max X 0.001403 393 26.025 34.065 7.5
FF @ 7.500 m lvl ULS(SESIMIC) Max Y 0.003809 361 2.845E-06 8.65 7.5
FF @ 7.500 m lvl ULS(SESIMIC) Min X 0.001703 380 12.365 34.065 7.5
FF @ 7.500 m lvl ULS(SESIMIC) Min Y 0.003801 359 2.845E-06 0.56 7.5
4.9m lvl ULS(SESIMIC) Max X 0.000586 370 39.245 3.55 4.9
4.9m lvl ULS(SESIMIC) Max Y 0.002756 376 1.15 31.63 4.9
4.9m lvl ULS(SESIMIC) Min X 0.000396 370 39.245 3.55 4.9
4.9m lvl ULS(SESIMIC) Min Y 0.002925 359 2.845E-06 0.56 4.9
GF +1.420 m ULS(SESIMIC) Max X 0.000861 1558 46.595 35.5423 1.42
GF +1.420 m ULS(SESIMIC) Max Y 0.001184 3285 3.6813 31.63 1.42
GF +1.420 m ULS(SESIMIC) Min X 0.000713 4143 9.25 35.0363 1.42
GF +1.420 m ULS(SESIMIC) Min Y 0.001288 3990 2.9211 0.56 1.42
0.4m lvl ULS(SESIMIC) Max X 0.000713 8 39.245 2.95 0.4
0.4m lvl ULS(SESIMIC) Max Y 0.000632 416 6.655 16.31 0.4
0.4m lvl ULS(SESIMIC) Min X 0.000316 8 39.245 2.95 0.4
0.4m lvl ULS(SESIMIC) Min Y 0.000758 7017 42.675 13.46 0.4
FPR GF ULS(SESIMIC) Max X 5.9E-05 368 46.595 8.65 -0.4
FPR GF ULS(SESIMIC) Max Y 6.6E-05 6687 39.245 4.23 -0.4
FPR GF ULS(SESIMIC) Min X 9.9E-05 7656 46.595 6.95 -0.4
FPR GF ULS(SESIMIC) Min Y 0.000101 373 39.245 -4.09E-06 -0.4

Drift at 9.8m lvl =0.004566


Drift at 0.4m lvl = 0.000632
storey height =9.8-0.4=9.4m
Storey Drift Limitation =0.025*9.4=0.235 >0.003935(0.004566-000632)
Hence Safe

195
132 kV SHEIK ZAYED BINHAMDAN STREET Base Pressure Check For SLS Sesimic 07-03-2018 08:25

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11

-20
K

-40
J

-59
H'
H

-79

G
-98

-118
F'
F

-137

E -157

D' -176

D -196

-215

C'
C
-235

-254

B'
Y
B -274

A'
X A

SAFE 2016 16.0.2 Soil Pressure Diagram - (SLS(GRAVITY)) Min [kN/m2] kN - m

196
132 kV SHEIK ZAYED BINHAMDAN STREET
Base Pressure Check For SLS Gravity 07-03-2018 08:23

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11

-50
K

-73
J

-96
H'
H

-119

G
-142

-165
F'
F

-188

E -212

D' -235

D -258

-281

C'
C
-304

-327

B'
Y
B -350

A'
X A

SAFE 2016 16.0.2 Soil Pressure Diagram - (SLS) Min [kN/m2] kN - m

197
Base Pressure Check For Up Lift
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 08:27

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11

M MInimum Bearing Pressure

-15
K

-22
J

-28
H'
H

-35

G
-41

-48
F'
F

-54

E -61

D' -67

D -74

-80

C'
C
-87

-93

B'
Y
B -100

A'
X A

SAFE 2016 16.0.2 Soil Pressure Diagram - (SLS) Max [kN/m2] kN - m

198
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 08:20

Settelement check 1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11

-1.5
K

-2.9
J

-4.3
H'
H

-5.8

G
-7.2

-8.6
F'
F

-10.0

E -11.5

D' -12.9

D -14.3

-15.7

C'
C
-17.2

-18.6

B'
Y
B -20.0

A'
X A

199
Project : 132/11 KV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Title : MAIN BUILDING-SUBSTRUCTURE ASV MMN 14-06-2022

BEARING PRESSURE , SETTLEMENT & DRIFT CHECKS

Check for Support Settlement :

Maximum support settlement : = 20 mm down


(Please refer attached contour) < 25 mm

Check for Lateral Drift : (siesmic ULS load combinations)

In the Y -direction Actual Drift at SS Bldg roof level Δs = 5.585 mm


Δm = 0.7 R Δs (R=5.5)
Δm = 21.502 mm
Fundamental time period Tay = 0.296 seconds
< 0.7 seconds
Clause Allowale Drift for a height H = 16.7 m = Height/50
1630.10.2m, UBC 1997
Allowable Drift for this height = 334 mm
> Δm Hence Safe

In the X -direction Actual Drift at SS Bldg roof level Δs = 7.292 mm


Δm = 0.7 R Δs
Δm = 28.074 mm
Fundamental time period Tax = 0.272 seconds
< 0.7 seconds
Clause Allowale Drift for a height H = 16.7 m = Height/50
1630.10.2m, UBC 1997
Allowable Drift for this height = 334 mm
> Δm Hence Safe

Check for Safe Bearing Pressure:

For Gravity Load Combinations:

Maximum actual bearing pressure observed from the analysis model = 274 kN/m2

Allowable Net Bearing Pressure as per soil investigation report = 350 kN/m2

> Actual, Hence Safe

For Seismic Load Combinations:

Maximum actual bearing pressure observed from the analysis model = 350 kN/m2

Allowable Gross Bearing Pressure for Seismic load cases 1.25*350 = 438 kN/m2
> Actual, Hence Safe

200
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : Main Building Substructure SRI ASV

201
Project : 132/11 KV SHKZBHST S/S
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : Main Building Substructure SRI ASV

202
Project : 13211 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE ASV KSM

RAFT DESIGN

Raft is used as foundation for this substation. 700 mm thick is provided beneath main building
and 400 mm thk provided beneath transformer area respectively. Main building raft comprises of 132kV basement,
11 kV-1 & 2 & capacitor basements. Transformer area consists of power transformer-1,2 & 3

The raft is designed for all ultimate load combinations defined in this document and checked
for 0.2 mm crackwidh for service loads. The contours are taken for envelope of all ultimate load combinations.
and service load combinations.

Internal Forces and ETABS/SAFE local axes convention

Raft is designed for moments and shear in two orthogonal directions, i.e. along Global X.& Y axes of ETABS.
The local-1,2 & 3 axes are consistent throughout the model so as to use results from contours for raft
design with ease. The local axes for all raft shells is as follows:

a) Local-1: This axis is in the plane of the area object. The positive local-1 axis is in the same direction as
the positive global X-axis This axis is red in color.

b) Local-2: This axis is in the plane of the area object. The positive local-2 axis is in the same direction as
the positive global Y-axis This axis is green in color.

c) Local-3: This axis is perpendicular to the plane of the area object. The positive local-3 axis is in the
same direction as the positive global Z-axis, This axis is blue in color.

The shell elements for raft design are designed for moments and shear forces in two orthogonal directions,
those are as follows:

a) M11 : Moment per unit length acting at mid-surface of the element on the positive and negative 1-faces
about local-2 axis.

b) M22 : Moment per unit length acting at mid-surface of the element on the positive and negative 2-faces
about local-1 axis.

c) V13 : Out of plane shear per unit length acting at mid-surface of the element on the positive and
negative 1-faces in the direction of local-3 axis.

d) V23 : Out of plane shear per unit length acting at mid-surface of the element on the positive and
negative 2-faces in the direction of local-3 axis.

A positive face is one whose outward normal (pointing away from element) is in the positive local-1
,local-2 or local-3 direction.

Sign convention for Bending Moment

As mentioned earlier raft is designed for M11 moment and M22 moment, reinforcement for M11 is parallel to
Global-X axis and reinforcement for M22 is parallel to Global-Y axis. The positive moment value indicates
tension in bottom face of raft i.e. negative-3 face of ETABS raft shell. Whereas negative moment indicates
tension in top face of raft i.e. positive-3 face of Etabs raft shell.

203
Project : 13211 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE ASV KSM

Reinforcement Calculations

Reinforcement calculations for RCC elements is done as per ACI 318 with following design parameters:

a) Grade of Concrete : C40


b) Grade of Steel : Fy460
c) Clear cover (Bottom): 75 mm
d) Clear cover (Top): 50 mm

Main reinforcement is designed for -- M11 moment


Secondary reinforcement is designed for -- M22 moment

Main building raft thickness -- 700 mm


Transformer bay raft thickness -- 400 mm

Reinforcement (General mesh)


Main Reinforcement (Top & Bottom) -- 16 @ 150 mm c/c ( 1340 mm2/m )
Secondary Reinforcement (Top & Bottom) -- 16 @ 150 mm c/c ( 1340 mm2/m )

Minimum reinforcement in slabs as per ACI318-14 = 0.18% of concrete area*(420/460) (ref TB:7.6.1.1)
For 700 thick raft = 1150 mm2/m
For 400 thick raft = 657 mm2/m

204
Project : 13211 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE ASV KSM

16 @ 150 is used as general mesh for top and bottom faces of raft. As per provided reinforcement moment
capacities are calculated for various reinforcement combinations. Extra bar locations are identified with the help of
calculated capacities and moment contours. Moment capacities are tabulated in the next section

Moment capacity tables

Moment capacities for 700 mm thick Raft satisfying Ultimate limit state criteria for bottom mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. (mm2/m)
Capacity
Description Type
(kN-m/m)
0.20 mm Crackwidth

1 16 @ 150 Main 1340 330 146


2 16 @ 150 Secondary 1340 310 125
5 16@150 + 20@150(Extra) Main 3435 820 487
6 16@150 + 20@150(Extra) Secondary 3435 800 380
7 16@150 + 25@150(Extra) Main 4613 1050 600
8 16@150 + 25@150(Extra) Secondary 4613 1000 483
9 16@150 + 32@150(Extra) Main 6702 1500 800
11 16@150 + 32@150(Extra) Secondary 6702 1450 730

Moment capacities for 700 mm thick Raft satisfying Ultimate limit state criteria for top mesh
Reinforcement Reinforcement Area of reinforcement Moment Capacity
S.No.
Description Type (mm2/m) (kN-m/m)
1 16 @ 150 Main 1340 330
2 16 @ 150 Secondary 1340 300

3 16@150 + 16@150(Extra) Main 2681 680

4 16@150 + 16@150(Extra) Secondary 2681 650

5 16@150 + 25@150(Extra) Secondary 4613 1050

Moment capacities for 400 mm thick Raft satisfying Ultimate limit state criteria & servicebility for bottom mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. (mm2/m)
Capacity
Description Type
(kN-m/m)
0.2 mm Crackwidth

1 16 @ 150 Main 1340 150 65


2 16 @ 150 Secondary 1340 140 53
3 16@150 + 16@150(Extra) Main 2681 320 169
4 16@150 + 25@150(Extra) Secondary 4613 480 183

Moment capacities for 400 mm thick Raft satisfying Ultimate limit state & Servicebility criteria for top mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. (mm2/m)
Capacity
Description Type
(kN-m/m)
0.15mm Crackwidth

1 16 @ 150 Main 1340 160 57


2 16 @ 150 Secondary 1340 150 46
3 16@150 + 16@150(Extra) Main 2681 320 149
4 16@150 + 16@150(Extra) Secondary 2681 300 111

205
Project : 132/11 KV SHKZBHST S/S DOC. NO.

Contractor SUBSTATION : DANWAY


Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity calculations for ULS of 700 mm thick raft

Bottom mesh capacity calculations

Moment capacity of main bottom reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1340.4 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 617 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 0.96

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1316 mm

Moment Capacity = 330 kN-m

Moment capacity of secondary bottom reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1340.4 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 601 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 0.95

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1269 mm

Moment Capacity = 310 kN-m

206
Project : 132/11 KV SHKZBHST S/S DOC. NO.

Contractor SUBSTATION : DANWAY


Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity calculations for ULS of 700 mm thick raft :

Bottom mesh capacity calculations

Moment capacity of main bottom reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 20 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 3434.8 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 20 mm


Local-1
Effective depth d = 615 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 2.41

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 3377 mm

Moment Capacity = 820 kN-m

Moment capacity of secondary bottom reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 20 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 3434.8 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 20 mm


Local-1
Effective depth d = 595 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 2.51

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 3413 mm

Moment Capacity = 800 kN-m

207
Project : 132/11 KV SHKZBHST S/S DOC. NO.

Contractor SUBSTATION : DANWAY


Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity calculations for ULS of 700 mm thick raft :

Bottom mesh capacity calculations

Moment capacity of main bottom reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 25 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 4612.9 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 25 mm


Local-1
Effective depth d = 612.5 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 3.11

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 4409 mm

Moment Capacity = 1050 kN-m

Moment capacity of secondary bottom reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 25 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 4612.9 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 25 mm


Local-1
Effective depth d = 587.5 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 3.22

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 4389 mm

Moment Capacity = 1000 kN-m

208
Project : 132/11 KV SHKZBHST S/S DOC. NO.

Contractor SUBSTATION : DANWAY


Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity calculations for ULS of 700 mm thick raft :

Bottom mesh capacity calculations

Moment capacity of main bottom reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 32 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 6702.1 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 32 mm


Local-1
Effective depth d = 609 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 4.49

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 6544 mm

Moment Capacity = 1500 kN-m

Moment capacity of secondary bottom reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 32 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 6702.1 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 32 mm


Local-1
Effective depth d = 593 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 4.58

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 6511 mm

Moment Capacity = 1450 kN-m

209
Project : 132/11 KV SHKZBHST S/S DOC. NO.

Contractor SUBSTATION : DANWAY


Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity calculations for ULS of 700 mm thick raft

Top mesh capacity calculations

Moment capacity of main top reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1340.4 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 642 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 0.89

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1263 mm

Moment Capacity = 330 kN-m

Moment capacity of secondary top reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1340.4 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 626 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 0.85

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1176 mm

Moment Capacity = 300 kN-m

210
Project : 132/11 KV SHKZBHST S/S DOC. NO.

Contractor SUBSTATION : DANWAY


Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity calculations for ULS of 700 mm thick raft :

Top mesh capacity calculations

Moment capacity of main top reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 2680.8 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 642 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 1.83

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 2651 mm

Moment Capacity = 680 kN-m

Moment capacity of secondary top reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 2680.8 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 626 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 1.84

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 2599 mm

Moment Capacity = 650 kN-m

211
Project : 13211 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE ASV KSM

Moment capacity calculations for ULS of 700 mm thick raft :

Top mesh capacity calculations

Moment capacity of secondary top reinforcement of 700 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 25 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 4613 mm2

Thickness of the raft = 700 mm


Local-2
Clear cover = 66 mm

Diameter of the reinforcement = 25 mm


Local-1
Effective depth d = 621.5 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 3.02

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 4337 mm

Moment Capacity = 1050 kN-m

212
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of bottom main reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 0@ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 1340.4 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 146 kN-m
Thickness of the Raft (h) = 700 mm
Diameter of main bar ( Ø ) = 16 mm
Spacing of main bars (s) = 150 mm
Clear cover to reinforcement (Cmin) = 75 mm
Cover-Tension face to center of closest bar (dc) = 58 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST = 1340.4 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 27.598 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 617 mm

z = Lever arm ( d - a/2) = 605.67 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 179.85 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.1408 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 94.81 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

213
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of bottom secondary reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 0@ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 1340.4 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 125 kN-m
Thickness of the Raft (h) = 700 mm
Diameter of main bar ( Ø ) = 16 mm
Spacing of main bars (s) = 150 mm
Clear cover to reinforcement (Cmin) = 91 mm
Cover-Tension face to center of closest bar (dc) = 74 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST = 1340.4 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 27.598 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 601 mm

z = Lever arm ( d - a/2) = 589.67 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 157.63 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.1727 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 105.36 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

214
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of bottom main reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 20 @ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 3434.8 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 487 kN-m
Thickness of the Raft (h) = 700 mm
Diameter of main bar ( Ø ) = 18 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 75 mm
Cover-Tension face to center of closest bar (dc) = 59 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST +20 @ 150 EXTRA = 3434.8 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 58.09 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 70.718 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 616 mm

z = Lever arm ( d - a/2) = 586.96 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 241.67 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.154 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 69.909 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

215
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of bottom secondary reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 20 @ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 3434.8 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 380 kN-m
Thickness of the Raft (h) = 700 mm
Diameter of main bar ( Ø ) = 18 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 93 mm
Cover-Tension face to center of closest bar (dc) = 75 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST +20 @ 150 EXTRA = 3434.8 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 58.09 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 70.718 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 598 mm

z = Lever arm ( d - a/2) = 568.96 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 194.45 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.1934 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 83.853 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

216
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of bottom main reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 25 @ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 4612.9 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 600 kN-m
Thickness of the Raft (h) = 700 mm
Diameter of main bar ( Ø ) = 21 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 75 mm
Cover-Tension face to center of closest bar (dc) = 60 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST +25 @ 150 EXTRA = 4612.9 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 78.02 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 94.981 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 615 mm

z = Lever arm ( d - a/2) = 575.74 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 225.92 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.164 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 70.967 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.187 mm Eqn 1-2 ACI 224.1-R-8
SAFE

217
Project : 132/11 kV SHKZBHST SUBSTATION
DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of bottom secondary reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 25 @ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 4612.9 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 483 kN-m
Thickness of the Raft (h) = 700 mm
Diameter of main bar ( Ø ) = 21 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 96 mm
Cover-Tension face to center of closest bar (dc) = 76 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST +25 @ 150 EXTRA = 4612.9 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 78.02 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 94.981 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 594 mm

z = Lever arm ( d - a/2) = 555.24 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 188.72 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.2118 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 84.972 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

218
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of bottom main reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 32 @ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 6702.1 mm2

h
cmin

Concrete & Steel :

Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)


Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :

Maximum working moment in section = 800 kN-m


Thickness of the Raft (h) = 700 mm
Diameter of main bar ( Ø ) = 24 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 75 mm
Cover-Tension face to center of closest bar (dc) = 62 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST +32 @ 150 EXTRA = 6702.1 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 113.35 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 137.99 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 599 mm (Considered avg.Effective depth )

z = Lever arm ( d - a/2) = 542.33 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 220.16 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.2191 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 72.459 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

219
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of bottom secondary reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 32 @ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 6702.1 mm2

h
cmin

Concrete & Steel :

Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)


Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :

Maximum working moment in section = 730 kN-m


Thickness of the Raft (h) = 700 mm
Diameter of main bar ( Ø ) = 24 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 99 mm
Cover-Tension face to center of closest bar (dc) = 62 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST +32 @ 150 EXTRA = 6702.1 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 113.35 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 137.99 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 578 mm (Considered avg.Effective depth )

z = Lever arm ( d - a/2) = 521.33 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 208.93 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.2773 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 72.459 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.194 mm Eqn 1-2 ACI 224.1-R-8
SAFE

220
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity calculations for ULS of 400 mm thick raft

Bottom mesh capacity calculations

Moment capacity of main bottom reinforcement of 400 mm thick raft --

Provided reinforcement T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1340.4 mm2

Thickness of the raft = 400 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 317 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 1.66

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1180 mm

Moment Capacity = 150 kN-m

Moment capacity of secondary bottom reinforcement of 400 mm thick raft --

Provided reinforcement T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1340.4 mm2

Thickness of the raft = 400 mm


Local-2
Clear cover = 91 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 285 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 1.92

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1232 mm

Moment Capacity = 140 kN-m

221
Project : 13211 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE ASV KSM

Moment capacity calculations for ULS of 400 mm thick raft :

Bottom mesh capacity calculations

Moment capacity of main bottom reinforcement of 400 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 2681 mm2

Thickness of the raft = 400 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 317 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 3.54

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 2622 mm

Moment Capacity = 320 kN-m

Moment capacity of secondary bottom reinforcement of 400 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 25 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 4613 mm2

Thickness of the raft = 400 mm


Local-2
Clear cover = 91 mm

Diameter of the reinforcement = 25 mm


Local-1
Effective depth d = 296.5 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 6.07

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 4484 mm

Moment Capacity = 480 kN-m

222
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity calculations for ULS of 400 mm thick raft

Top mesh capacity calculations

Moment capacity of main top reinforcement of 400 mm thick raft --

Provided reinforcement T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1340.4 mm2

Thickness of the raft = 400 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 342 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 1.52

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1164 mm

Moment Capacity = 160 kN-m

Moment capacity of secondary top reinforcement of 400 mm thick raft --

Provided reinforcement T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1340.4 mm2

Thickness of the raft = 400 mm


Local-2
Clear cover = 66 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 310 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 1.73

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1209 mm

Moment Capacity = 150 kN-m

223
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity calculations for ULS of 400 mm thick raft :

Top mesh capacity calculations

Moment capacity of main top reinforcement of 400 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 2680.8 mm2

Thickness of the raft = 400 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 342 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 3.04

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 2403 mm

Moment Capacity = 320 kN-m

Moment capacity of secondary top reinforcement of 400 mm thick raft --

Provided reinforcement T 16 @ 150 mm + T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 2680.8 mm2

Thickness of the raft = 400 mm


Local-2
Clear cover = 66 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 310 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 3.47

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 2509 mm

Moment Capacity = 300 kN-m

224
Project : 132/11 kV SHKZBHST SUBSTATION
DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of bottom main reinforcement of 400 mm thick Raft satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 0@ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 1340.4 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 65 kN-m
Thickness of the Raft (h) = 400 mm
Diameter of main bar ( Ø ) = 16 mm
Spacing of main bars (s) = 150 mm
Clear cover to reinforcement (Cmin) = 75 mm
Cover-Tension face to center of closest bar (dc) = 58 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST = 1340.4 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 27.598 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 317 mm

z = Lever arm ( d - a/2) = 305.67 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 159.04 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.2868 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 94.81 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

225
Project : 132/11 kV SHKZBHST SUBSTATION
DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of bottom secondary reinforcement of 400 mm thick Raft satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 0@ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 1340.4 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 53 kN-m
Thickness of the Raft (h) = 400 mm
Diameter of main bar ( Ø ) = 16 mm
Spacing of main bars (s) = 150 mm
Clear cover to reinforcement (Cmin) = 91 mm
Cover-Tension face to center of closest bar (dc) = 74 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST = 1340.4 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 27.598 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 301 mm

z = Lever arm ( d - a/2) = 289.67 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 135.61 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.3621 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 105.36 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

226
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of bottom main reinforcement of 400 mm thick Raft satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 16 @ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 2680.8 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 169 kN-m
Thickness of the Raft (h) = 400 mm
Diameter of main bar ( Ø ) = 16 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 75 mm
Cover-Tension face to center of closest bar (dc) = 58 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST +16 @ 150 EXTRA = 2680.8 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 45.34 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 55.197 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 317 mm

z = Lever arm ( d - a/2) = 294.33 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 214.06 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.317 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 69.067 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

227
Project : 13211 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE ASV KSM

Moment capacity of bottom secondary reinforcement of 400 mm thick Raft satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 25 @ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 4613 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-11: Cl : 8.5.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 183 kN-m
Thickness of the Raft (h) = 400 mm
Diameter of main bar ( Ø ) = 21 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 96 mm
Cover-Tension face to center of closest bar (dc) = 76 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST +25 @ 150 EXTRA = 4613 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.821 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 78.02 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 94.98 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 299 mm

z = Lever arm ( d - a/2) = 259.7 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 152.6 N/mm


2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.497 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 84.97 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

228
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of top main reinforcement of 400 mm thick Raft satisfying 0.15 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 0@ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 1340.4 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 57 kN-m
Thickness of the Raft (h) = 400 mm
Diameter of main bar ( Ø ) = 16 mm
Spacing of main bars (s) = 150 mm
Clear cover to reinforcement (Cmin) = 50 mm
Cover-Tension face to center of closest bar (dc) = 58 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST = 1340.4 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 27.598 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 342 mm

z = Lever arm ( d - a/2) = 330.67 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 128.96 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.1845 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 94.81 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE

229
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of top secondary reinforcement of 400 mm thick Raft satisfying 0.15 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 0@ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 1340.4 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 46 kN-m
Thickness of the Raft (h) = 400 mm
Diameter of main bar ( Ø ) = 16 mm
Spacing of main bars (s) = 150 mm
Clear cover to reinforcement (Cmin) = 66 mm
Cover-Tension face to center of closest bar (dc) = 74 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST = 1340.4 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 27.598 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 326 mm

z = Lever arm ( d - a/2) = 314.67 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 110.11 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.248 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 105.36 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE

230
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of top main reinforcement of 400 mm thick Raft satisfying 0.15 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 16 @ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 2680.8 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 149 kN-m
Thickness of the Raft (h) = 400 mm
Diameter of main bar ( Ø ) = 16 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 50 mm
Cover-Tension face to center of closest bar (dc) = 58 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST +16 @ 150 EXTRA = 2680.8 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 45.34 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 55.197 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 342 mm

z = Lever arm ( d - a/2) = 319.33 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 174.44 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.2022 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 69.067 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE

231
Project : 132/11 kV SHKZBHST SUBSTATION
DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE SSP ASV

Moment capacity of top secondary reinforcement of 400 mm thick Raft satisfying 0.15 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 16 @ 150 mm (Extra) fy = 460 Mpa


f c' = 32 Mpa
Provided Ast = 2680.8 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 111 kN-m
Thickness of the Raft (h) = 400 mm
Diameter of main bar ( Ø ) = 16 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 66 mm
Cover-Tension face to center of closest bar (dc) = 74 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST +16 @ 150 EXTRA = 2680.8 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the Raft = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 45.34 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 55.197 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 326 mm

z = Lever arm ( d - a/2) = 303.33 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 136.86 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.2733 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 82.959 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE

232
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE ASV KSM

233
132 kV SHEIK ZAYED BINHAMDAN STREET

Bottom Main Reinforcement :(ULS)

E+3

1.65
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 1.50

1.35

1.20
J

H'
H
1.05

G
0.90

F'
F
0.75

0.60
E

D'
0.45

0.30

C'
C
0.15

0.00
B'
B
Y

A' -0.15
X A

-0.30

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m

234
132 kV SHEIK ZAYED BINHAMDAN STREET

820
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 782

745

707
J

H'
H
669

G
632

F'
F
594

556
E

D'
518

481

C'
C
443

405
B'
B
Y

A' 368
X A

330

T20 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for ULS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m

235
132 kV SHEIK ZAYED BINHAMDAN STREET

E+3

1.05
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 1.03

1.01

1.00
J

H'
H
0.98

G
0.96

F'
F
0.94

0.93
E

D'
0.91

0.89

C'
C
0.87

0.86
B'
B
Y

A' 0.84
X A

0.82

T25 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for ULS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m

236
132 kV SHEIK ZAYED BINHAMDAN STREET

E+3

1.50
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 1.47

1.43

1.40
J

H'
H
1.36

G
1.33

F'
F
1.29

1.26
E

D'
1.22

1.19

C'
C
1.15

1.12
B'
B
Y

A' 1.08
X A

1.05

T32 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for ULS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m

237
132 kV SHEIK ZAYED BINHAMDAN STREET

E+3

1.60
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 1.59

1.58

1.58
J

H'
H
1.57

G
1.56

F'
F
1.55

1.55
E

D'
1.54

1.53

C'
C
1.52

1.52
B'
B
Y

A' 1.51
X A

1.50

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m

238
132 kV SHEIK ZAYED BINHAMDAN STREET

Bottom Secondary Reinforcement :(ULS)

E+3

2.20
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 2.00

1.80

1.60
J

H'
H
1.40

G
1.20

F'
F
1.00

0.80
E

D'
0.60

0.40

C'
C
0.20

0.00
B'
B
Y

A' -0.20
X A

-0.40

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m

239
132 kV SHEIK ZAYED BINHAMDAN STREET

800
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 762

725

687
J

H'
H
649

G
612

F'
F
574

536
E

D'
498

461

C'
C
423

385
B'
B
Y

A' 348
X A

310

T20 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for ULS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m

240
132 kV SHEIK ZAYED BINHAMDAN STREET

E+3

1.00
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 0.98

0.97

0.95
J

H'
H
0.94

G
0.92

F'
F
0.91

0.89
E

D'
0.88

0.86

C'
C
0.85

0.83
B'
B
Y

A' 0.82
X A

0.80

T25@ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for ULS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m

241
132 kV SHEIK ZAYED BINHAMDAN STREET

E+3

1.45
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 1.42

1.38

1.35
J

H'
H
1.31

G
1.28

F'
F
1.24

1.21
E

D'
1.17

1.14

C'
C
1.10

1.07
B'
B
Y

A' 1.03
X A

1.00

T32 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for ULS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m

242
132 kV SHEIK ZAYED BINHAMDAN STREET

E+3

1.50
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 1.50

1.49

1.49
J

H'
H
1.48

G
1.48

F'
F
1.48

1.47
E

D'
1.47

1.47

C'
C
1.46

1.46
B'
B
Y

A' 1.45
X A

1.45

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m

243
132 kV SHEIK ZAYED BINHAMDAN STREET

Top Main Reinforcement :(ULS)

E+3

1.05
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 0.90

0.75

0.60
J

H'
H
0.45

G
0.30

F'
F
0.15

0.00
E

D'
-0.15

-0.30

C'
C
-0.45

-0.60
B'
B
Y

A' -0.75
X A

-0.90

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Min [kN-m/m] kN - m

244
132 kV SHEIK ZAYED BINHAMDAN STREET

-330
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M -357

-384

-411
J

H'
H
-438

G
-465

F'
F
-492

-518
E

D'
-545

-572

C'
C
-599

-626
B'
B
Y

A' -653
X A

-680

T16 @ 150 mm c/c(Top main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for ULS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Min [kN-m/m] kN - m

245
132 kV SHEIK ZAYED BINHAMDAN STREET

-680
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M -685

-691

-696
J

H'
H
-702

G
-707

F'
F
-712

-718
E

D'
-723

-728

C'
C
-734

-739
B'
B
Y

A' -745
X A

-750

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Min [kN-m/m] kN - m

246
132 kV SHEIK ZAYED BINHAMDAN STREET

Top Secondary Reinforcement :(ULS)

E+3

1.00
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 0.80

0.60

0.40
J

H'
H
0.20

G
0.00

F'
F
-0.20

-0.40
E

D'
-0.60

-0.80

C'
C
-1.00

-1.20
B'
B
Y

A' -1.40
X A

-1.60

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Min [kN-m/m] kN - m

247
132 kV SHEIK ZAYED BINHAMDAN STREET

-300
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M -327

-354

-381
J

H'
H
-408

G
-435

F'
F
-462

-488
E

D'
-515

-542

C'
C
-569

-596
B'
B
Y

A' -623
X A

-650

T16 @ 150 mm c/c(Top secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for ULS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Min [kN-m/m] kN - m

248
132 kV SHEIK ZAYED BINHAMDAN STREET

E+3

-0.65
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M -0.68

-0.71

-0.74
J

H'
H
-0.77

G
-0.80

F'
F
-0.83

-0.87
E

D'
-0.90

-0.93

C'
C
-0.96

-0.99
B'
B
Y

A' -1.02
X A

-1.05

T25 @ 150 mm c/c(Top secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for ULS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Min [kN-m/m] kN - m

249
132 kV SHEIK ZAYED BINHAMDAN STREET

E+3

-1.05
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M -1.05

-1.06

-1.06
J

H'
H
-1.07

G
-1.07

F'
F
-1.07

-1.08
E

D'
-1.08

-1.08

C'
C
-1.09

-1.09
B'
B
Y

A' -1.10
X A

-1.10

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Min [kN-m/m] kN - m

250
132 kV SHEIK ZAYED BINHAMDAN STREET

Bottom Main Reinforcement :(SLS)

E+3

1.10
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 1.00

0.90

0.80
J

H'
H
0.70

G
0.60

F'
F
0.50

0.40
E

D'
0.30

0.20

C'
C
0.10

0.00
B'
B
Y

A' -0.10
X A

-0.20

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m

251
132 kV SHEIK ZAYED BINHAMDAN STREET

487
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 461

435

408
J

H'
H
382

G
356

F'
F
330

303
E

D'
277

251

C'
C
225

198
B'
B
Y

A' 172
X A

146

T20 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for SLS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m

252
132 kV SHEIK ZAYED BINHAMDAN STREET

600
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 591

583

574
J

H'
H
565

G
557

F'
F
548

539
E

D'
530

522

C'
C
513

504
B'
B
Y

A' 496
X A

487

T25 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for SLS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m

253
132 kV SHEIK ZAYED BINHAMDAN STREET

800
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 785

769

754
J

H'
H
738

G
723

F'
F
708

692
E

D'
677

662

C'
C
646

631
B'
B
Y

A' 615
X A

600

T32 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for SLS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m

254
132 kV SHEIK ZAYED BINHAMDAN STREET

E+3

1.05
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 1.03

1.01

0.99
J

H'
H
0.97

G
0.95

F'
F
0.93

E
0.92

D'
0.90

0.88

C'
C
0.86

0.84
B'
B
Y

A' 0.82
X A

0.80

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m

255
132 kV SHEIK ZAYED BINHAMDAN STREET

Bottom Secondary Reinforcement :(SLS)

E+3

1.65
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 1.50

1.35

1.20
J

H'
H
1.05

G
0.90

F'
F
0.75

0.60
E

D'
0.45

0.30

C'
C
0.15

0.00
B'
B
Y

A' -0.15
X A

-0.30

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m

256
132 kV SHEIK ZAYED BINHAMDAN STREET

380
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 360

341

321
J

H'
H
302

G
282

F'
F
262

E
243

D'
223

203

C'
C
184

164
B'
B
Y

A' 145
X A

125

T20 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for SLS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m

257
132 kV SHEIK ZAYED BINHAMDAN STREET

483
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 475

467

459
J

H'
H
451

G
443

F'
F
435

E
428

D'
420

412

C'
C
404

396
B'
B
Y

A' 388
X A

380

T25 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for SLS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m

258
132 kV SHEIK ZAYED BINHAMDAN STREET

730
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 711

692

673
J

H'
H
654

G
635

F'
F
616

E
597

D'
578

559

C'
C
540

521
B'
B
Y

A' 502
X A

483

T32 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for SLS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m

259
132 kV SHEIK ZAYED BINHAMDAN STREET

850
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

M 841

832

822
J

H'
H
813

G
804

F'
F
795

E
785

D'
776

767

C'
C
758

748
B'
B
Y

A' 739
X A

730

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m

260
Project : 13211 kV HAITJARI SUBSTATION DOC. NO.

Contractor : DANWAY
Client DESIGNED CHECKED DATE
: DEWA
Title : MAIN BUILDING-SUBSTRUCTURE ASV KSM

261
132 kV SHEIK ZAYED BINHAMDAN STREET

Bottom Main Reinforcement :(ULS)

E+3

1.65

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
1.50

1.35
L

K
1.20

1.05
H'
H

0.90
G

F'
F
0.75

0.60
E

D'
0.45

0.30

C''
C

0.15

B'
B 0.00
Y

A'
X A

-0.15

-0.30

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m

262
132 kV SHEIK ZAYED BINHAMDAN STREET

320

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
307

294
L

K
281

268
H'
H

255
G

F'
F
242

228
E

D'
215

202

C''
C

189

B'
B 176
Y

A'
X A

163

150

T16 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c straight
for ULS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m

263
132 kV SHEIK ZAYED BINHAMDAN STREET

400

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
394

388
L

K
382

375
H'
H

369
G

F'
F
363

357
E

D'
351

345

C''
C

338

B'
B 332
Y

A'
X A

326

320

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m

264
132 kV SHEIK ZAYED BINHAMDAN STREET

Bottom Secondary Reinforcement :(ULS)

E+3

2.20

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
2.00

1.80
L

K
1.60

1.40
H'
H

1.20
G

F'
F
1.00

0.80
E

D'
0.60

0.40

C''
C

0.20

B'
B 0.00
Y

A'
X A

-0.20

-0.40

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m

265
132 kV SHEIK ZAYED BINHAMDAN STREET

600

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
565

529
L

K
494

458
H'
H

423
G

F'
F
388

352
E

D'
317

282

C''
C

246

B'
B 211
Y

A'
X A

175

140

T25 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm c/c
straight for ULS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m

266
132 kV SHEIK ZAYED BINHAMDAN STREET

700

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
692

685
L

K
677

669
H'
H

662
G

F'
F
654

646
E

D'
638

631

C''
C

623

B'
B 615
Y

A'
X A

608

600

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m

267
132 kV SHEIK ZAYED BINHAMDAN STREET

Top Main Reinforcement :(ULS)


E+3

1.05

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
0.90

0.75
L

K
0.60

0.45
H'
H

0.30
G

F'
F
0.15

0.00
E

D'
-0.15

-0.30

C''
C

-0.45

B'
B -0.60
Y

A'
X A

-0.75

-0.90

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Min [kN-m/m] kN - m

268
132 kV SHEIK ZAYED BINHAMDAN STREET

-160

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
-172

-185
L

K
-197

-209
H'
H

-222
G

F'
F
-234

-246
E

D'
-258

-271

C''
C

-283

B'
B -295
Y

A'
X A

-308

-320

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m

269
132 kV SHEIK ZAYED BINHAMDAN STREET

Top Secondary Reinforcement :(ULS)


E+3

1.00

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
0.80

0.60
L

K
0.40

0.20
H'
H

0.00
G

F'
F
-0.20

-0.40
E

D'
-0.60

-0.80

C''
C

-1.00

B'
B -1.20
Y

A'
X A

-1.40

-1.60

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Min [kN-m/m] kN - m

270
132 kV SHEIK ZAYED BINHAMDAN STREET

-150

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
-162

-173
L

K
-185

-196
H'
H

-208
G

F'
F
-219

-231
E

D'
-242

-254

C''
C

-265

B'
B -277
Y

A'
X A

-288

-300

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m

271
132 kV SHEIK ZAYED BINHAMDAN STREET

Bottom Main Reinforcement :(SLS)

E+3

1.10

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
1.00

0.90
L

K
0.80

0.70
H'
H

0.60
G

F'
F
0.50

0.40
E

D'
0.30

0.20

C''
C

0.10

B'
B 0.00
Y

A'
X A

-0.10

-0.20

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m

272
132 kV SHEIK ZAYED BINHAMDAN STREET

169

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
161

153
L

K
145

137
H'
H

129
G

F'
F
121

113
E

D'
105

97

C''
C

89

B'
B 81
Y

A'
X A

73

65

T16 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c straight
for SLS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m

273
132 kV SHEIK ZAYED BINHAMDAN STREET

180

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
179

178
L

K
177

177
H'
H

176
G

F'
F
175

174
E

D'
173

172

C''
C

172

B'
B 171
Y

A'
X A

170

169

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m

274
132 kV SHEIK ZAYED BINHAMDAN STREET

Bottom Secondary Reinforcement :(SLS)


E+3

1.65

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
1.50

1.35
L

K
1.20

1.05
H'
H

0.90
G

F'
F
0.75

0.60
E

D'
0.45

0.30

C''
C

0.15

B'
B 0.00
Y

A'
X A

-0.15

-0.30

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m

275
132 kV SHEIK ZAYED BINHAMDAN STREET

183

173
1 2 2' 3 4 4' 5 5' 66'
6 6' 7 8 9 9' 10 11

M
163

153
K

J 143

H'
H

133

123

F'
F

113

103
D'

D
93

C''
C
83

73
B'
B
Y

A' 63
X A

53

T25 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm c/c
straight for SLS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m

276
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:00

200

199
1 2 2' 3 4 4' 5 5' 66'
6 6' 7 8 9 9' 10 11

M
197

196
K

J 195

H'
H

193

192

F'
F

191

190
D'

D
188

C''
C
187

186
B'
B
Y

A' 184
X A

183

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m

277
132 kV SHEIK ZAYED BINHAMDAN STREET

Top Main Reinforcement :(SLS)

600

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
500

400
L

K
300

200
H'
H

100
G

F'
F
0

-100
E

D'
-200

-300

C''
C

-400

B'
B -500
Y

A'
X A

-600

-700

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Min [kN-m/m] kN - m

278
132 kV SHEIK ZAYED BINHAMDAN STREET

-57

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
-64

-71
L

K
-78

-85
H'
H

-92
G

F'
F
-99

-107
E

D'
-114

-121

C''
C

-128

B'
B -135
Y

A'
X A

-142

-149

T16 @ 150 mm c/c(Top main extra) shall be provided in addition to T16 @ 150 mm c/c straight for
SLS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Min [kN-m/m] kN - m

279
132 kV SHEIK ZAYED BINHAMDAN STREET

-149

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
-150

-151
L

K
-152

-152
H'
H

-153
G

F'
F
-154

-155
E

D'
-156

-157

C''
C

-157

B'
B -158
Y

A'
X A

-159

-160

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Min [kN-m/m] kN - m

280
132 kV SHEIK ZAYED BINHAMDAN STREET

Top Secondary Reinforcement :(SLS)

E+3

0.75

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
0.60

0.45
L

K
0.30

0.15
H'
H

0.00
G

F'
F
-0.15

-0.30
E

D'
-0.45

-0.60

C''
C

-0.75

B'
B -0.90
Y

A'
X A

-1.05

-1.20

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Min [kN-m/m] kN - m

281
132 kV SHEIK ZAYED BINHAMDAN STREET

-46

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
-51

-56
L

K
-61

-66
H'
H

-71
G

F'
F
-76

-81
E

D'
-86

-91

C''
C

-96

B'
B -101
Y

A'
X A

-106

-111

T16 @ 150 mm c/c(Top main extra) shall be provided in addition to T16 @ 150 mm c/c straight for
SLS design. Governing reinforcement from SLS & ULS provided in design

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Min [kN-m/m] kN - m

282
132 kV SHEIK ZAYED BINHAMDAN STREET

-111

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11
-112

-112
L

K
-113

-114
H'
H

-114
G

F'
F
-115

-116
E

D'
-117

-117

C''
C

-118

B'
B -119
Y

A'
X A

-119

-120

No Extra Reinforcement required as per contour diagram.

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Min [kN-m/m] kN - m

283
Provided shear links at this grid location
calculations attached below pages

Utilization Ratio < 1


All internal columns passing for 700thk raft . Governing column
location calculations from SAFE provided below of this document

SAFE 2016 16.0.2 Punching Shear Capacity Ratios/Shear Reinforcement kN - m

284
ACI318-14 Punching Shear Check & Design
At grid E-9
Geometric Properties

Combination = 575:1.42DL+1.1(LL+LLR)+1.1EQ-Y+1.6SP+0.33EQ+X+1.1WP(FULL)
Point Label = 7401
Column Shape = Rectangular
Column Location = Interior
Global X-Coordinate = 39.245 m
Global Y-Coordinate = 19.225 m

Load Punching Check

Avg. Eff. Slab Thickness = 609 mm


Eff. Punching Perimeter = 5036 mm
Cover = 66 mm
Conc. Comp. Strength = 32 N/mm2
Reinforcement Ratio = 0.0000
Section Inertia I22 = 9.077E+011 mm4
Section Inertia I33 = 8.075E+011 mm4
Section Inertia I23 = 0 mm4 Column Punching Perimeter
Gamma_v2 = 0.409573
Gamma_v3 = 0.390503
Moment Mu2 = -23.4538 kN-m
Moment Mu3= -22.348 kN-m
Shear Force = -4456.502 kN
Unbalanced Moment Mu2 = -9.6061 kN-m
Unbalanced Moment Mu3= -8.7269 kN-m
Max Design Shear Stress = 1.466545 N/mm2
Conc. Shear Stress Capacity = 1.409145 N/mm2
Punching Shear Ratio = 1.04

Punching Reinforcement Design

Rebar Yield Strength = 460 N/mm2


Rebar Diameter = 10 mm
Number of Rebar Sets = 43
Number of Single Leg Stirrups per Set = 5
Typical Rebar Spacing = 300 mm

Page 1
285
ACI318-14 Punching Shear Check & Design
At grid H-9

Geometric Properties

Combination = 604:1.44DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ-X(+ecc)+1.1WP(HALF-1)
Point Label = 7402
Column Shape = Rectangular
Column Location = Interior
Global X-Coordinate = 39.245 m
Global Y-Coordinate = 31.63 m

Load Punching Check

Avg. Eff. Slab Thickness = 609 mm


Eff. Punching Perimeter = 5236 mm
Cover = 66 mm
Conc. Comp. Strength = 32 N/mm2
Reinforcement Ratio = 0.0000
Section Inertia I22 = 1.068E+012 mm4
Section Inertia I33 = 8.52E+011 mm4
Section Inertia I23 = 0 mm4 Column Punching Perimeter
Gamma_v2 = 0.418503
Gamma_v3 = 0.381778
Moment Mu2 = 41.6831 kN-m
Moment Mu3= -7.8633 kN-m
Shear Force = -4369.451 kN
Unbalanced Moment Mu2 = 17.4445 kN-m
Unbalanced Moment Mu3= -3.002 kN-m
Max Design Shear Stress = 1.383921 N/mm2
Conc. Shear Stress Capacity = 1.409145 N/mm2
Punching Shear Ratio = 0.98

Punching Reinforcement Design

Rebar Yield Strength = 460 N/mm2


Rebar Diameter = 10 mm
Number of Rebar Sets = 0
Number of Single Leg Stirrups per Set = 0
Typical Rebar Spacing = 300 mm

Page 1
286
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE ASV KSM

SHEAR CHECK (As per ACI 318M-14) -700 mm thk slab


( Refer shear contours )

Capacity of the Foundation Slab against shear stress at distance "d" from Face of Column/Wall

Avg. Factored moment for mesh (Refer moment contour) Mu = 800 kNm
(At d distance)
Thickness of Slab D = 700 mm

Clear cover = 75 mm

Strength reduction factor Φv = 0.75

Effective depth d = 617 mm

Compressive strength, f'c = 32 N/mm2

Diameter of reinforcement = 16 mm

Diameter of Extra reinforcement = 0 mm

Spacing of reinforcement = 150 mm

Area of steel provided = 1340 mm2

Factored Shear force Vu = 493.6 kN


(Avg. Shear stress at d distance from face of the column = 0.8 N/mm2)
Shear strength of concrete, Vc shall be minimum of

(Cl. 22.5.5.1 ACI 318M-14) 1, Vc1 = 0.16 λ SQRT ( fc' ) + 17p w ( Vu d / Mu )

2, Vc2 = 0.29 λ SQRT ( fc' )

Vud/Mu = 0.38 ( Maximum of 1)

Steel Ratio pw = 0.002

2
Vc1 = 0.919 N/mm

2
Vc2 = 1.64 N/mm

2
Shear strength provided by Vc = 0.919 N/mm
concrete
2
ΦvVc = 0.689 N/mm

(As per shear contours shear reinforcement is not required )

287
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.

Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE ASV KSM

SHEAR CHECK (As per ACI 318M-14)-400 thk slab


( Refer shear contours )

Capacity of the wall against shear stress at distance "d" from Face of Column/Wall

Avg. Factored moment for mesh (Refer moment contour) Mu = 500 kNm (Max moment)
(At d distance)
Thickness of the Raft D = 400 mm

Clear cover = 75 mm

Strength reduction factor Φv = 0.75

Effective depth d = 317 mm

Compressive strength, f'c = 32 N/mm2

Diameter of reinforcement = 16 mm

Diameter of Extra reinforcement = 0 mm

Spacing of reinforcement = 150 mm

Area of steel provided = 1340 mm2

Factored Shear force Vu = 285.3 kN


(Avg. Shear stress at d distance from face of the column = 0.9 N/mm2)
Shear strength of concrete, Vc shall be minimum of

(Cl. 22.5.5.1 ACI 318-14) 1, Vc1 = 0.16 λ SQRT ( fc' ) + 17p w ( Vu d / Mu )

2, Vc2 = 0.29 λ SQRT ( fc' )

Vud/Mu = 0.18 ( Maximum of 1)

Steel Ratio pw = 0.004

2
Vc1 = 0.918 N/mm

2
Vc2 = 1.64 N/mm

2
Shear strength provided by Vc = 0.918 N/mm
concrete
2
ΦvVc = 0.689 N/mm

(As per shear contours shear reinforcement is not required )

288
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:42

2.68

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11 2.42

2.15
L

K 1.89

1.62
H'
H

1.36
G

F'
F
1.09

0.83
E

D'
0.56

0.30

C''
C

0.03

B'
B
-0.23
Y

A'
X A
-0.50

-0.76

SAFE 2016 16.0.2 Slab Stress S13 Diagram - Bot Face - (ULS) Max [N/mm2] kN - m

289
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:49

2.00

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11 1.90

1.80
L

K 1.70

1.59
H'
H

1.49
G

F'
F
1.39

1.29
E

D'
1.19

1.09

C''
C

0.98

B'
B
0.88
Y

A'
X A
0.78

Provided shear links in highlighted area. Other locations shear stress


0.68
with in the limit from "d" distance of the support face

SAFE 2016 16.0.2 Slab Stress S13 Diagram - Bot Face - (ULS) Max [N/mm2] kN - m

290
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:43

1.10

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11 0.78

0.45
L

K 0.13

-0.19
H'
H

-0.52
G

F'
F
-0.84

-1.16
E

D'
-1.48

-1.81

C''
C

-2.13

B'
B
-2.45
Y

A'
X A
-2.78

-3.10

SAFE 2016 16.0.2 Slab Stress S13 Diagram - Bot Face - (ULS) Min [N/mm2] kN - m

291
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:53

-0.68

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11 -0.78

-0.88
L

K -0.98

-1.09
H'
H

-1.19
G

F'
F
-1.29

-1.39
E

D'
-1.49

-1.59

C''
C

-1.70

B'
B
-1.80
Y

A'
X A
-1.90

-2.00
Provided shear links in highlighted area. Other locations shear stress
with in the limit from "d" distance of the support face

SAFE 2016 16.0.2 Slab Stress S13 Diagram - Bot Face - (ULS) Min [N/mm2] kN - m

292
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:46

1.90

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11 1.69

1.48
L

K 1.26

1.05
H'
H

0.84
G

F'
F
0.63

0.41
E

D'
0.20

-0.01

C''
C

-0.22

B'
B
-0.44
Y

A'
X A
-0.65

-0.86

SAFE 2016 16.0.2 Slab Stress S23 Diagram - Bot Face - (ULS) Max [N/mm2] kN - m

293
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:51

2.00

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11 1.90

1.80
L

K 1.70

1.59
H'
H

1.49
G

F'
F
1.39

1.29
E

D'
1.19

1.09

C''
C

0.98

B'
B
0.88
Y

A'
X A
0.78

0.68

Provided shear links in highlighted area. Other locations shear stress


with in the limit from "d" distance of the support face

SAFE 2016 16.0.2 Slab Stress S23 Diagram - Bot Face - (ULS) Max [N/mm2] kN - m

294
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:48

0.90

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11 0.56

0.22
L

K -0.12

-0.45
H'
H

-0.79
G

F'
F
-1.13

-1.47
E

D'
-1.81

-2.15

C''
C

-2.48

B'
B
-2.82
Y

A'
X A
-3.16

-3.50

SAFE 2016 16.0.2 Slab Stress S23 Diagram - Bot Face - (ULS) Min [N/mm2] kN - m

295
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:54

-0.68

1 2 2' 3 4 4' 5 5' 66'


6 6' 7 8 9 9' 10 11 -0.78

-0.88
L

K -0.98

-1.09
H'
H

-1.19
G

F'
F
-1.29

-1.39
E

D'
-1.49

-1.59

C''
C

-1.70

B'
B
-1.80
Y

A'
X A
-1.90

Provided shear links in highlighted area. Other locations shear stress


with in the limit from "d" distance of the support face -2.00

SAFE 2016 16.0.2 Slab Stress S23 Diagram - Bot Face - (ULS) Min [N/mm2] kN - m

296
Project 132/11 kV SHKZBHST SUBSTATION. Ref. No.
LEAD/ Contractor DANWAY Designed By RVK Checked By ASV
DEWA Title SHEAR LINK CALCULATIONS Date Approved By VRP
Doc No.:

CHECK FOR RAFT:-


RAFT Data :-
Characterstic Strength of Concrete ƒcu = 32 N/mm2 Breadth of raft b = 1000 mm
2
Yeild Strength of Steel ƒy = 460 N/mm Depth of Raft D = 700 mm
Effective Depth to bott. steel d1 = D-Ct-Øs-Øt/2 Dia of stirrups Øs = 12 mm
= 700-75-12-16/2 Concrete Top cover Ct = 50 mm
= 605.0 mm Concrete Bot cover Cb = 75 mm
Spacer dia (Top) St = 25 mm
Spacer dia (Bot) S St = 25 mm

Shear Stress :- ɸfor shear =0.75


ƛ             = 1
Maximm shear stress from analysis = 1.2 N/mm2 (At distance "d" from face of support)
Maximum Shear Force Vu = 726 kN (1.2*1000*607/1000)
Shear resistance of conc. Vc = 0.17ƛ sqrt(f'c) bw d
= 0.17 x1× sqrt (32)×1000×605 Since Tu>Tcr , Torsion Reinforcement is required
= 581.9 kN
Maximum shear force Vmax = Vc + (0.66 sqrt(f'c)) bwd
= 581.9 + (0.66 x sqrt(32)) 1000 x 605
= 2840.7 kN Torsional Reinforcement not Required
Vc/2 = 290.95 kN
Since Vu >Vc/2, shear reinforcement is required
Minimum shear Reinforcement = Min ((0.062 sqrt(f'c) bwS )/fys , (0.35bwS)/fys)
Min ((0.062x sqrt( 32) x 1000x300)/460) ,(0.35 x1000x3 =228.26 mm

Assign -
4 L-T 12 Bars @ 300 mm c/c. (Asv Provided = 452.39 mm² )

Area of Shear Reinforcement Reqd. Asv = (Vu - ɸVc)/ɸfysd)xS


(((726- (0.75x581.9))x1000/(0.75x460x605)) x300 =
= 416.21 mm²

Total Area of Shear Reinforcement Reqd. Asv = 416.21 mm², < Asv Provided, OK

297
Project : 132/11 Kv SHKZBHST
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV

298
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING-SUBSTRUCTURE LPK ASV

COLUMN DESIGN

RC columns are modelled as line elements and these columns are designed for major and minor axis
moments. The design results are presented in the form of pictures captured from ETABS.

Internal Forces and ETABS local axes convention

Columns are designed for moments and shear in two orthogonal directions, i.e. along Global X.& Y axes
of ETABS. The local-1,2 & 3 axes are consistent throughout the model so as to use results for design
with ease. The local axes for columns is as follows:
a) Local-1: This axis is in the parallel to global Z-axis, this axis is red in color.
b) Local-2: This axis is always axis of minor bending and green in color.
c) Local-3: This axis is always axis of major bending and blue in color.
M33 moment corresponds to Major axis bending and M22 corresponds to minor axis bending

Minimum & maximum % of steel in columns

Minimum % of steel in columns as per ACI = 1.0 % (Ref :ACI 318-14: Cl 10.6.1.1)
Maximum % of steel in columns as per ACI = 8.0 % (Ref :ACI 318-14: Cl 10.6.1.1)
Minimum % of steel in columns as per UBC = 1.0 % (Ref : UBC-97: Cl 1910.9.1 )
Maximum % of steel in columns as per UBC = 8.0 % (Ref : UBC-97: Cl 1910.9.1 )

Column Reinforcement Schedule :


Column Column Size Required Required Provided Provided Provided
Group (mm) Ast , mm2 % of Ast Ast , mm2 % of Ast Reinforcement
C1 400 400 1600 1.0 2061 1.3 4 T20 + 4 T16
C2 600 400 3267 1.4 4398 1.8 14 T20

C3 600 400 2400 1.0 2815 1.2 14 T16

C4 1400 400 5600 1.0 6132 1.10 8 T20 + 18 T16

C5 600 700 4200 1.0 5027 1.2 16 T20


C6 600 600 6202 1.7 7854 2.2 16 T25
C7 700 600 4200 1.0 4298 1.02 6 T20 + 12 T16
C8 600 500 3000 1.0 4398 1.5 14 T20
C9 450 600 3952 1.5 4398 1.6 14 T20
C10 450 600 2700 1.0 2815 1.04 14 T16
C11 500 600 3000 1.0 3267 1.1 4 T20 + 10 T16
C12 500 700 3500 1.0 4072 1.16 4 T20 + 14 T16
C13 500 750 3750 1.0 5027 1.34 16 T20
C14 600 700 4200 1.0 5027 1.2 16 T20
C15 600 800 4800 1.0 5655 1.2 18 T20
C16 600 800 4800 1.0 8836 1.8 18 T25
C17 550 800 4400 1.0 8836 2.0 18 T25
C18 500 600 4877 1.6 5105 1.70 4 T25 + 10 T20
C19 400 500 2000 1.0 2413 1.21 12 T16
C20 300 500 1500 1.0 1608 1.1 8 T16
C21 400 400 1600 1.0 2513 1.6 8 T20
C22 400 600 2400 1.0 2815 1.2 14 T16
C23 400 450 1800 1.0 2061 1.1 4 T20 + 4 T16
C24 400 600 2400 1.0 2815 1.2 14 T16
C25 600 750 4500 1.0 5655 1.3 18 T20
C26 600 600 3600 1.0 5733 1.6 4 T25 + 12 T20
C27 600 400 2400 1.0 2815 1.2 14 T16
C28 450 600 5020 1.9 5733 2.1 4 T25 + 12 T20

299
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING-SUBSTRUCTURE LPK ASV

Column Shear Reinforcement Schedule :

Required spacing
Required Required Provided Provided
Column Column Size
M33 Shear Ast , M22 Shear M33 Shear M22 Shear S0 (mm)
Group (mm) S1 (mm)
mm2 Ast , mm2 Ast , mm2 Ast , mm2 (UBC-97)

C1 400 400 0 0 2513 2513 125 175


C2 600 400 511 0 2094 2094 150 200
C3 600 400 0 0 2513 2513 125 175

C4 1400 400 1192 0 2513 2513 125 175


C5 600 700 511 596 2094 2094 150 200
C6 600 600 0 1748 2094 2094 150 200

C7 700 600 0 0 2513 2513 125 175


C8 600 500 0 0 2094 2094 150 200
C9 450 600 383 734 2094 2094 150 200
C10 450 600 383 511 2513 2513 125 175
C11 500 600 0 0 2513 2513 125 175
C12 500 700 0 0 2513 2513 125 175
C13 500 750 0 0 2094 2094 150 200
C14 600 700 0 0 2094 2094 150 200
C15 600 800 0 0 2094 2094 150 200
C16 600 800 511 681 2094 2094 150 200
C17 550 800 0 0 2094 2094 150 200
C18 500 600 0 511 2094 2094 150 200
C19 400 500 0 426 2513 2513 125 175
C20 300 500 0 0 1257 1257 125 175
C21 400 400 0 0 2094 2094 150 200
C22 400 600 0 0 2513 2513 125 175
C23 400 450 341 0 2513 2513 125 175
C24 400 600 0 0 2513 2513 125 175
C25 600 750 0 0 2094 2094 150 200
C26 600 600 0 0 2094 2094 150 200
C27 600 400 0 0 2513 2513 125 175
C28 450 600 1900 3094 3619 3619 125 125

1) 16 times of the least longitudinal bar diameter


2) 48 times of tie diameter
3) Least dimension of column but not more than 457 mm

300
ETABS 17.0.1 12-Jun-22

M M M M M M M M MM M M M M M M

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

3000

2700

2700
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl

3000

3952

2700

2700
Z

GF +1.420 m
0.4m lvl
X 3000 FPR GF

2700

2700

2700
Base

C8 C9 C9 C10

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - M Longitudinal Reinforcing (ACI 318-14)
301
ETABS 17.0.1 12-Jun-22

M M M M M M M M MM M M M M M M

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

734

511
0
0

0
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl

511
383

511
0
0

0
0
Z

GF +1.420 m
0.4m lvl
X FPR GF

511
383

511
383
0
0

0
0
Base

C8 C9 C9 C10

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - M Shear Reinforcing (ACI 318-14)
302
ETABS 17.0.1 14-06-2022

M M M M M M M M MM M M M M M M

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

0.627

0.552

0.449
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl

4.9m lvl

0.294

0.808

0.479

0.627
Z

GF +1.420 m
0.4m lvl
X 0.186 FPR GF

0.485

0.340

0.456
Base

C9 C10
C8 C9

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - M Column P-M-M Interaction Ratios (ACI 318-14)
303
ETABS 17.0.1 13-Jun-22

L L L L L L L L L L L L L L L L

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
Z
2400

1600

1600

1600

1600
GF +1.420 m
2400

1600

1600

1600

1600
0.4m lvl
X FPR GF
2400

1600

1600

1600

1600

Base

C22 C1 C1 C1 C1

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - L Longitudinal Reinforcing (ACI 318-14)
304
ETABS 17.0.1 13-Jun-22

L L L L L L L L L L L L L L L L

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
Z
0
0

0
0

0
0

0
0

0
0
GF +1.420 m

341
0
0

0
0

0
0

0
0

0
0.4m lvl
X FPR GF
0
0

0
0

0
0

0
0

0
0

Base

C1 C1 C1 C1
C22

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - L Shear Reinforcing (ACI 318-14)
305
ETABS 17.0.1 14-06-2022

L L L L L L L L L L L L L L L L

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl

4.9m lvl
Z
0.023

0.038

0.040

0.040

0.121
GF +1.420 m
0.4m lvl
0.030

0.033

0.074

0.072

0.178
X FPR GF
0.061

0.055

0.043

0.047

0.083

Base

C1 C1 C1 C1
C22

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - L Column P-M-M Interaction Ratios (ACI 318-14)
306
ETABS 17.0.1 12-Jun-22

K K K K K K K K KK K K K K K K

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

4200

4200

4754
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl

4200

3000

4200

3000
Z

GF +1.420 m
0.4m lvl
X 4200 FPR GF

3000

4200

3000
Base

C5 C11 C14
C18

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - K Longitudinal Reinforcing (ACI 318-14)
307
ETABS 17.0.1 12-Jun-22

K K K K K K K K KK K K K K K K

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

596

511
0

0
0

0
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl

511
0

0
0

0
0

0
0
Z

GF +1.420 m
0.4m lvl
X FPR GF

511
0
0

0
0

0
0

0
Base

C5 C11 C14 C18

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - K Shear Reinforcing (ACI 318-14)
308
ETABS 17.0.1 14-06-2022

K K K K K K K K KK K K K K K K

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

0.732

0.519

0.883
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl

4.9m lvl

0.545

0.348

0.498

0.652
Z

GF +1.420 m
0.4m lvl
X 0.200 FPR GF

0.388

0.537

0.533
Base

C5 C11 C14 C18

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - K Column P-M-M Interaction Ratios (ACI 318-14)
309
ETABS 17.0.1 12-Jun-22

J J J J J J J J J J J J J J J J

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

4200 ROOF 13.300

4200
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl
4200

4200
4.9m lvl
Z
4200

1800

1800

4200
GF +1.420 m
0.4m lvl
X FPR GF
4200

1800

1800

4200

Base

C5 C23 C23 C5

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - J Longitudinal Reinforcing (ACI 318-14)
310
ETABS 17.0.1 12-Jun-22

J J J J J J J J J J J J J J J J

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

0 ROOF 13.300
0

0
0
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

596
511
0
0

4.9m lvl
Z
341
0
0

0
0

0
0
GF +1.420 m
0.4m lvl
X FPR GF
341
0
0

0
0

0
0

Base

C23 C5
C5 C23

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - J Shear Reinforcing (ACI 318-14)
311
ETABS 17.0.1 14-06-2022

J J J J J J J J J J J J J J J J

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

0.743 ROOF 13.300

0.550
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl
0.463

0.547
4.9m lvl
Z
0.091

0.139

0.181

0.141
GF +1.420 m
0.4m lvl
X FPR GF
0.076

0.077

0.096

0.151

Base

C23 C5
C5 C23

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - J Column P-M-M Interaction Ratios (ACI 318-14)
312
ETABS 17.0.1 12-Jun-22

H' H' H' H' H' H' H' H' H' H' H' H' H' H' H' H'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

4838 ROOF 13.300

3600

4800

4877
9.8m lvl
2400

2400

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
2400

2400

3600

3600

3000

4800

3000
Z

GF +1.420 m
0.4m lvl
2400

X FPR GF
2400

3600

2400

3600

3000

4800

3000
2400

Base

C2 C2 C6 C4 C26 C15
C11 C18

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - H' Longitudinal Reinforcing (ACI 318-14)
313
ETABS 17.0.1 12-Jun-22

H' H' H' H' H' H' H' H' H' H' H' H' H' H' H' H'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

1475 ROOF 13.300

511
0

0
0

0
0

0
9.8m lvl
0
0

0
0

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
511

511
0
0

0
0

0
0

0
0

0
0
Z

GF +1.420 m
0.4m lvl
511
0

X FPR GF

511
0
0

0
0

0
0

0
0

0
0

0
0

0
0
0

Base

C4 C26 C15 C18


C2 C2 C6 C11

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - H' Shear Reinforcing (ACI 318-14)
314
ETABS 17.0.1 14-06-2022

H' H' H' H' H' H' H' H' H' H' H' H' H' H' H' H'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

0.617 ROOF 13.300

0.393

0.562

0.913
9.8m lvl
0.208

0.039

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
0.319

0.438

0.136

0.360

0.268

0.491

0.664
Z

GF +1.420 m
0.4m lvl
0.557

X FPR GF
0.064

0.088

0.201

0.467

0.410

0.581

0.498
0.065

Base

C4 C26 C15 C18


C2 C2 C6 C11

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - H' Column P-M-M Interaction Ratios (ACI 318-14)
315
ETABS 17.0.1 12-Jun-22

G G G G G G G G GG G G G G G G

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

4966 ROOF 13.300

3600

4200

4444
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
3600

3600

3500

4200

3000
Z

GF +1.420 m
0.4m lvl
X FPR GF
3600

2400

3600

3500

4200

3000
Base

C6 C26 C12 C14 C18


C4

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - G Longitudinal Reinforcing (ACI 318-14)
316
ETABS 17.0.1 12-Jun-22

G G G G G G G G GG G G G G G G

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

511 ROOF 13.300

511
0

0
0

0
0

0
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
0
0

0
0

0
0

0
0

0
0
Z

GF +1.420 m
0.4m lvl
X FPR GF

511
0
0

0
0

0
0

0
0

0
0

0
Base

C26 C12
C6 C4 C14 C18

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - G Shear Reinforcing (ACI 318-14)
317
ETABS 17.0.1 14-06-2022

G G G G G G G G GG G G G G G G

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

0.620 ROOF 13.300

0.409

0.460

0.834
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl

4.9m lvl
0.195

0.396

0.195

0.453

0.563
Z

GF +1.420 m
0.4m lvl
X FPR GF
0.177

0.252

0.529

0.302

0.515

0.518
Base

C6 C4 C12 C14 C18

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - G Column P-M-M Interaction Ratios (ACI 318-14)
318
ETABS 17.0.1 12-Jun-22

F F F F F F F F FF F F F F F F

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

5604 ROOF 13.300

4500

4200

4230
9.8m lvl
2400

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
2400

3600

4500

3750

4200

3000
Z

GF +1.420 m
0.4m lvl
3267

X FPR GF
3600

2400

4500

3750

4200

3000
2400
2400

Base

C3 C6 C4 C25 C14 C18


C2 C13

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - F Longitudinal Reinforcing (ACI 318-14)
319
ETABS 17.0.1 12-Jun-22

F F F F F F F F FF F F F F F F

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

1748 ROOF 13.300

511
0

0
0

0
0

0
9.8m lvl
0
0

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
511
0
0

0
0

0
0

0
0

0
0
Z

GF +1.420 m
0.4m lvl
511
0

X FPR GF

511
0
0

0
0

0
0

0
0

0
0

0
0
0
0
0

Base

C6 C13 C14 C18


C2 C3 C27 C25

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - F Shear Reinforcing (ACI 318-14)
320
ETABS 17.0.1 14-06-2022

F F F F F F F F FF F F F F F F

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

0.703 ROOF 13.300

0.357

0.419

0.789
9.8m lvl
0.174

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
0.350

0.194

0.355

0.180

0.475

0.616
Z

GF +1.420 m
0.4m lvl
0.760

X FPR GF
0.093

0.262

0.465

0.289

0.563

0.551
0.361
0.070

Base

C6 C13 C14 C18


C2 C3 C27 C25

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - F Column P-M-M Interaction Ratios (ACI 318-14)
321
ETABS 17.0.1 12-Jun-22

E E E E E E E E EE E E E E E E

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

6202 ROOF 13.300

3600

4200

4430
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
3600

3600

3500

4200

3000
Z

GF +1.420 m
0.4m lvl
X FPR GF
3600

2400

3600

3500

4200

3000
Base

C4 C26 C12 C14 C18


C6

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - E Longitudinal Reinforcing (ACI 318-14)
322
ETABS 17.0.1 12-Jun-22

E E E E E E E E EE E E E E E E

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

511 ROOF 13.300

511
0

0
0

0
0

0
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
0
0

0
0

0
0

0
0

0
0
Z

GF +1.420 m
0.4m lvl
X FPR GF

511
0
0

0
0

0
0

0
0

0
0

0
Base

C4 C26 C12 C14 C18


C6

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - E Shear Reinforcing (ACI 318-14)
323
ETABS 17.0.1 14-06-2022

E E E E E E E E EE E E E E E E

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

0.799 ROOF 13.300

0.478

0.508

0.834
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl

4.9m lvl
0.206

0.488

0.233

0.568

0.693
Z

GF +1.420 m
0.4m lvl
X FPR GF
0.223

0.338

0.662

0.378

0.671

0.523
Base

C4 C26 C12 C14 C18


C6

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - E Column P-M-M Interaction Ratios (ACI 318-14)
324
ETABS 17.0.1 12-Jun-22

D' D' D' D' D' D' D' D' D' D' D' D' D' D' D' D'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

9.8m lvl
2400

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
2400

GF +1.420 m
0.4m lvl
3194

X FPR GF
2400
2400

Base

C2 C3

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - D' Longitudinal Reinforcing (ACI 318-14)
325
ETABS 17.0.1 12-Jun-22

D' D' D' D' D' D' D' D' D' D' D' D' D' D' D' D'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

9.8m lvl
0
0

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
0
0

GF +1.420 m
0.4m lvl
511
0

X FPR GF
0
0
0
0

Base

C2 C3

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - D' Shear Reinforcing (ACI 318-14)
326
ETABS 17.0.1 14-06-2022

D' D' D' D' D' D' D' D' D' D' D' D' D' D' D' D'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

9.8m lvl
0.202

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
0.350

GF +1.420 m
0.4m lvl
0.743

X FPR GF
0.382
0.059

Base

C2 C3

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - D' Column P-M-M Interaction Ratios (ACI 318-14)
327
ETABS 17.0.1 12-Jun-22

D D D D D D D D DD D D D D D D

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

5569 ROOF 13.300

3600

4800

4800
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
3600

3600

3000

4800

4800
Z

GF +1.420 m

4800

4800
0.4m lvl
X FPR GF
3600

2400

3600

3000

4800

4800
Base

C6 C4 C26 C11 C16 C16

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - D Longitudinal Reinforcing (ACI 318-14)
328
ETABS 17.0.1 12-Jun-22

D D D D D D D D DD D D D D D D

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

511 ROOF 13.300

681

511
0

0
0

0
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
0
0

0
0

0
0

0
0

0
0
Z

GF +1.420 m

681
0.4m lvl

0
0
X FPR GF
0
0

0
0

0
0

0
0

0
0

0
0
Base

C6 C4 C26 C11 C16 C16

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - D Shear Reinforcing (ACI 318-14)
329
ETABS 17.0.1 14-06-2022

D D D D D D D D DD D D D D D D

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

0.696 ROOF 13.300

0.461

0.176

0.312
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl

4.9m lvl
0.208

0.471

0.267

0.592

0.524
Z

GF +1.420 m
0.4m lvl

0.391

0.380
X FPR GF
0.188

0.366

0.653

0.447

0.277

0.180
Base

C6 C4 C26 C11 C16 C16

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - D Column P-M-M Interaction Ratios (ACI 318-14)
330
ETABS 17.0.1 12-Jun-22

C' C' C' C' C' C' C' C' C' C' C' C' C' C' C' C'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

4200 ROOF 13.300

4200

4800

4800
4200

4200
9.8m lvl
5600

2400

RefPl Level 8.15


FF @ 7.500 m lvl

4800
4200
4200

4200
4.9m lvl
5600

2400

4200

3500

4800

4800
Z
4200

4200

4200
GF +1.420 m

4800

4800
0.4m lvl
X FPR GF
5600

2400

4200

4200

4200

4200

3500

4800

1600

4800
Base

C4 C2 C5 C7 C12 C16 C21 C16


C7 C5

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - C' Longitudinal Reinforcing (ACI 318-14)
331
ETABS 17.0.1 12-Jun-22

C' C' C' C' C' C' C' C' C' C' C' C' C' C' C' C'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

596 ROOF 13.300

596

681
0

0
0
0 9.8m lvl

0
0
0
0

0
0

RefPl Level 8.15


FF @ 7.500 m lvl

0
0
0
0
0
0

0
0
4.9m lvl
0
0

0
0

0
0

0
0

0
0
Z

0
0
0
0

0
0

0
0
GF +1.420 m
0.4m lvl

0
0

0
0
X FPR GF
1192
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0
Base

C4 C2 C5 C7 C7 C5 C16 C21 C16


C12

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - C' Shear Reinforcing (ACI 318-14)
332
ETABS 17.0.1 14-06-2022

C' C' C' C' C' C' C' C' C' C' C' C' C' C' C' C'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

0.371 ROOF 13.300

0.652

0.240

0.118
0.667

0.748
9.8m lvl
0.121

0.014

RefPl Level 8.15


FF @ 7.500 m lvl

0.177
0.327
0.268

0.159
4.9m lvl
0.359

0.040

0.106

0.373

0.466

0.421
Z
0.353

0.352

0.358
GF +1.420 m
0.4m lvl

0.275

0.426
X FPR GF
0.632

0.069

0.092

0.262

0.265

0.507

0.400

0.180

0.277

0.177
Base

C4 C2 C5 C7 C7 C12 C16 C21 C16

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - C' Column P-M-M Interaction Ratios (ACI 318-14)
333
ETABS 17.0.1 12-Jun-22

B' B' B' B' B' B' B' B' B' B' B' B' B' B' B' B'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

4800

4400
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl

4800

4400
Z

2000
GF +1.420 m

4800

2000

4400
0.4m lvl
X FPR GF

4800

2000

4400
Base

C16 C19 C17

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - B' Longitudinal Reinforcing (ACI 318-14)
334
ETABS 17.0.1 12-Jun-22

B' B' B' B' B' B' B' B' B' B' B' B' B' B' B' B'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

681
0

0
0
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl

681
511

0
0
Z

0
0
GF +1.420 m

426
0.4m lvl

0
0

0
0
0
X FPR GF

0
0

0
0
0
0
Base

C19 C17
C16

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - B' Shear Reinforcing (ACI 318-14)
335
ETABS 17.0.1 14-06-2022

B' B' B' B' B' B' B' B' B' B' B' B' B' B' B' B'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

0.181

0.129
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl

4.9m lvl

0.344

0.337
Z

0.543
GF +1.420 m
0.4m lvl

0.276

0.449

0.345
X FPR GF

0.207

0.120

0.223
Base

C19 C17
C16

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - B' Column P-M-M Interaction Ratios (ACI 318-14)
336
ETABS 17.0.1 12-Jun-22

B B B B B B B B BB B B B B B B

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

3000

4667
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl

3000

5020
Z

GF +1.420 m
0.4m lvl
X 3000 FPR GF

2700
Base

C8 C28

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - B Longitudinal Reinforcing (ACI 318-14)
337
ETABS 17.0.1 12-Jun-22

B B B B B B B B BB B B B B B B

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

1334
1900
426
0
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl

3094
838
0
0
Z

GF +1.420 m
0.4m lvl
X FPR GF

511
0
0

0
Base

C8 C28

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - B Shear Reinforcing (ACI 318-14)
338
ETABS 17.0.1 14-06-2022

B B B B B B B B BB B B B B B B

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

0.637

0.849
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl

4.9m lvl

0.545

0.880
Z

GF +1.420 m
0.4m lvl
X 0.477 FPR GF

0.268
Base

C8 C28

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - B Column P-M-M Interaction Ratios (ACI 318-14)
339
ETABS 17.0.1 12-Jun-22

A' A' A' A' A' A' A' A' A' A' A' A' A' A' A' A'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

9.8m lvl
2400

2400

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
2400

2400

Z
2400

GF +1.420 m
0.4m lvl
X FPR GF
2809

2400

2400

Base

C2 C2 C24

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - A' Longitudinal Reinforcing (ACI 318-14)
340
ETABS 17.0.1 12-Jun-22

A' A' A' A' A' A' A' A' A' A' A' A' A' A' A' A'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

9.8m lvl
0
0

0
0

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
0
0

0
0

Z
0
0

GF +1.420 m
0.4m lvl
X FPR GF
511
0

0
0

0
0

Base

C2 C2 C24

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - A' Shear Reinforcing (ACI 318-14)
341
ETABS 17.0.1 14-06-2022

A' A' A' A' A' A' A' A' A' A' A' A' A' A' A' A'

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

9.8m lvl
0.210

0.008

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl
0.365

0.032

Z
0.044

GF +1.420 m
0.4m lvl
X FPR GF
0.687

0.051

0.042

Base

C2 C2 C24

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - A' Column P-M-M Interaction Ratios (ACI 318-14)
342
ETABS 17.0.1 12-Jun-22

A A A A A A A A AA A A A A A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

3000

2700
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl

3000

2700
Z

2000

1500
GF +1.420 m

2000

1500
0.4m lvl
X 3000 FPR GF

2700

2000

1500
Base

C8 C9 C19 C20

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - A Longitudinal Reinforcing (ACI 318-14)
343
ETABS 17.0.1 12-Jun-22

A A A A A A A A AA A A A A A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

511
0
0

0
9.8m lvl

RefPl Level 8.15


FF @ 7.500 m lvl

4.9m lvl

511
0
0

0
Z

426
0

0
0
GF +1.420 m
0.4m lvl

0
0

0
0
X FPR GF
511
0

0
0

0
0

0
0
Base

C8 C9 C19 C20

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - A Shear Reinforcing (ACI 318-14)
344
ETABS 17.0.1 14-06-2022

A A A A A A A A AA A A A A A A

1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11

Staircase Headroom +16.7 m

ROOF 13.300

0.380

0.423
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl

4.9m lvl

0.222

0.485
Z

0.320

0.753
GF +1.420 m
0.4m lvl

0.446

0.652
X 0.602 FPR GF

0.318

0.306

0.124
Base

C8 C9 C19 C20

0.00 0.50 0.70 0.90 1.00


132 kV SHEIK ZAYED BINHAMDAN STREET CHECKED 14.06.22.EDB Elevation View - A Column P-M-M Interaction Ratios (ACI 318-14)
345
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE

Title : Substructure JNS ASV

346
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE

Title : Substructure JNS ASV

WALL DESIGN

Reinforced concrete walls are used as basement walls to retain soil below ground and as firewalls between
main building and transformer area. Staircase walls are also made in RCC as per DEWA specifications

The walls are designed for all ultimate load combinations and checked for 0.2mm crackwidth for outer mesh &
0.15mm crackwidth for inner mesh of service loads. The contours are taken for envelope of all ultimate load combinations
and service load combinations.

Internal Forces and ETABS local axes convention

Walls are designed for moments and shear in two orthogonal directions, i.e. along Local-1 & 2 axes of ETABS.
The local-1,2 & 3 axes are consistent throughout the model so as to use results from contours for wall
design with ease. The local axes for all wall shells is as follows:

a) Local-1: This axis is in the plane of the area object, this axis is red in color.

b) Local-2: This axis is in the plane of the area object. The positive local-2 axis is in the same direction as
the positive global Z-axis This axis is green in color.

c) Local-3: This axis is perpendicular to the plane of the area object, this axis is blue in color.

Walls are modelled and made sure to be their local-3 axis outside the building and design to be performed
according to the output of local axis

The shell elements for wall design are designed for moments and shear forces in two orthogonal directions,
those are as follows:

a) M11 : Moment per unit length acting at mid-surface of the element on the positive and negative 1-faces
about local-2 axis.

b) M22 : Moment per unit length acting at mid-surface of the element on the positive and negative 2-faces
about local-1 axis.

c) V13 : Out of plane shear per unit length acting at mid-surface of the element on the positive and
negative 1-faces in the direction of local-3 axis.

c) V23 : Out of plane shear per unit length acting at mid-surface of the element on the positive and
negative 2-faces in the direction of local-3 axis.

A positive face is one whose outward normal pointing (pointing away from element) is in the positive local-1
,local-2 or local-3 direction.

Sign convention for Bending Moment

As mentioned earlier walls are designed for M11 moment and M22 moment, reinforcement for M11 is horizontal
in elevation and reinforcement for M22 is in direction of Global-Z axis i.e. vertical in elevation. The positive moment
value indicates tension in negative-3 face of ETABS wall shell. Whereas negative moment indicates tension
in positive-3 face of ETABS wall shell.

347
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE

Title : Substructure JNS ASV

Reinforcement Calculations

Reinforcement calculations for RCC elements is done as per ACI 318 with following design parameters:

a) Grade of Concrete : C40


b) Grade of Steel : Fy460
c) Clear cover (Face in contact with soil): 75 mm
d) Clear cover (Face not in contact with soil): 50 mm

Main reinforcement is designed for -- M22 moment


Secondary reinforcement is designed for -- M11 moment

Wall thickness -- 300 mm

Reinforcement (General mesh)

Main Reinforcement (Outer & inner face ) -- 16 @ 150 mm c/c ( 1340 mm2/m )
Secondary Reinforcement (Outer face) -- 12 @ 200 mm c/c ( 565 mm2/m )

Main Reinforcement (Inner face ) -- 12 @ 150 mm c/c ( 754 mm2/m )


Secondary Reinforcement (Inner face) -- 12 @ 200 mm c/c ( 565 mm2/m )

Minimum reinforcement in slabs as per ACI318 = 0.18% of concrete area*(420/460) (ref TB:7.6.1.1)
2
For 300 thick wall = 493.043 mm /m

348
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Above mentioned rebar is used as general mesh for walls. As per provided reinforcement moment capacities are
calculated for various reinforcement combinations. Extra bar locations are identified with the help of calculated
capacities and moment contours. Moment capacities are tabulated in the next section

Moment capacity tables

Moment capacities for 300 mm thick wall satisfying Ultimate limit state criteria & servicebility for outer mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. Type (mm2/m)
Capacity
0.20 mm Crackwidth
Description (kN-m/m)
1 16 @ 150 Main 1340 110 39
2 12 @ 200 Secondary 565 40 12
3 16@150 + 16@150(Extra) Main 2681 210 97
4 12@200 + 12@200(Extra) Secondary 1131 85 31
5 12@200 + 16@200(Extra) Secondary 1571 100 41

Moment capacities for 300 mm thick wall satisfying Ultimate limit state criteria & servicebility for inner mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. Type (mm2/m)
Capacity
0.15 mm Crackwidth
Description (kN-m/m)
1 12 @ 150 Main 754 65 22
2 16 @ 150 Main 1340 120 38
3 12 @ 200 Secondary 565 45 12
4 12@150 + 12@150(Extra) Main 1508 135 59
5 16@150 + 12@150(Extra) Main 2094 190 78
6 12@200 + 12@200(Extra) Secondary 1131 100 32
7 12@200 + 16@200(Extra) Secondary 1571 130 42

349
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity calculations for ULS of 300 mm thick wall

Outer mesh capacity calculations

Moment capacity of main outer reinforcement of 300 mm thick wall --

Provided reinforcement T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1340.4 mm2

Thickness of the wall = 300 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 217 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 2.60

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1289 mm

Moment Capacity = 110 kN-m

Moment capacity of secondary outer reinforcement of 300 mm thick wall --

Provided reinforcement T 12 @ 200 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 565.49 mm2

Thickness of the wall = 300 mm


Local-2
Clear cover = 91 mm

Diameter of the reinforcement = 12 mm


Local-1
Effective depth d = 203 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 1.08

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 485.8 mm

Moment Capacity = 40 kN-m

350
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity calculations for ULS of 300 mm thick wall :

Outer mesh capacity calculations

Moment capacity of main outer reinforcement of 300 mm thick wall --

Provided reinforcement T 16 @ 150 mm + T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 2680.8 mm2

Thickness of the wall = 300 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 217 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 4.96

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 2601 mm

Moment Capacity = 210 kN-m

Moment capacity of secondary outer reinforcement of 300 mm thick wall --

Provided reinforcement T 12 @ 200 mm + T 12 @ 200 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1131 mm2

Thickness of the wall = 300 mm


Local-2
Clear cover = 91 mm

Diameter of the reinforcement = 12 mm


Local-1
Effective depth d = 203 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 2.29

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1058 mm

Moment Capacity = 85 kN-m

351
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of secondary outer reinforcement of 300 mm thick wall --

Provided reinforcement T 12 @ 200 mm + T 16 @ 200 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1570.8 mm2

Thickness of the wall = 300 mm


Local-2
Clear cover = 91 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 181 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 3.39

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1430 mm

Moment Capacity = 100 kN-m

352
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity calculations for ULS of 300 mm thick wall

Inner mesh capacity calculations

Moment capacity of main inner reinforcement of 300 mm thick wall --

Provided reinforcement T 12 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 753.98 mm2

Thickness of the wall = 300 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 12 mm


Local-1
Effective depth d = 244 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 1.21

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 658.5 mm

Moment Capacity = 65 kN-m

Moment capacity of secondary inner reinforcement of 300 mm thick wall --

Provided reinforcement T 12 @ 200 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 565.49 mm2

Thickness of the wall = 300 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 12 mm


Local-1
Effective depth d = 232 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 0.93

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 476.8 mm

Moment Capacity = 45 kN-m

353
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity calculations for ULS of 300 mm thick wall :

Inner mesh capacity calculations

Moment capacity of main inner reinforcement of 300 mm thick wall --

Provided reinforcement T 12 @ 150 mm + T 12 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1508 mm2

Thickness of the wall = 300 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 12 mm


Local-1
Effective depth d = 244 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 2.52

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1405 mm

Moment Capacity = 135 kN-m

Moment capacity of secondary inner reinforcement of 300 mm thick wall --

Provided reinforcement T 12 @ 200 mm + T 12 @ 200 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1131 mm2

Thickness of the wall = 300 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 12 mm


Local-1
Effective depth d = 232 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 2.06

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1084 mm

Moment Capacity = 100 kN-m

354
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity calculations for ULS of 300 mm thick wall :

Moment capacity of secondary inner reinforcement of 300 mm thick wall --

Provided reinforcement T 12 @ 200 mm + T 16 @ 200 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1570.8 mm2

Thickness of the wall = 300 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 230 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 2.73

Bending steel required


2 2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1442 mm

Moment Capacity = 130 kN-m

355
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity calculations for ULS of 300 mm thick wall

Inner mesh capacity calculations

Moment capacity of main inner reinforcement of 300 mm thick wall --

Provided reinforcement T 16 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1340.4 mm2

Thickness of the wall = 300 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 16 mm


Local-1
Effective depth d = 242 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / ((Ø b d2) = 2.28

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1253 mm

Moment Capacity = 120 kN-m

356
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity calculations for ULS of 300 mm thick wall :

Inner mesh capacity calculations

Moment capacity of main inner reinforcement of 300 mm thick wall --

Provided reinforcement T 16 @ 150 mm + T 12 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 2094.4 mm2

Thickness of the wall = 300 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 14 mm


Local-1
Effective depth d = 243 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 3.58

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 2032 mm

Moment Capacity = 190 kN-m

357
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of outer main reinforcement of 300 mm thick wall satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 0@ 150 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 1340.4 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 39 kN-m
Thickness of the Wall (h) = 300 mm
Diameter of main bar ( Ø ) = 16 mm
Spacing of main bars (s) = 150 mm
Clear cover to reinforcement (Cmin)
i ) = 75 mm
Cover-Tension face to center of closest bar (dc) = 58 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST = 1340.4 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b) = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 27.598 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 217 mm

z = Lever arm ( d - a/2) = 205.67 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 142.6 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.4382 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 94.81 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

358
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of outer secondary reinforcement of 300 mm thick wall satisfying 0.20 mm crackwidth --

Provided reinforcement T 12 @ 200 + T 0@ 200 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 565.49 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 12 kN-m
Thickness of the wall (h) = 300 mm
Diameter of main bar ( Ø ) = 12 mm
Spacing of main bars (s) = 200 mm
Clear cover to reinforcement (Cmin)
i ) = 91 mm
Cover-Tension face to center of closest bar (dc) = 72 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 200 ST = 565.49 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 9.57 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 11.65 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 203 mm

z = Lever arm ( d - a/2) = 198.22 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 104.99 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.5069 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 123.22 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

359
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of outer main reinforcement of 300 mm thick wall satisfying 0.20 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 16 @ 150 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 2680.8 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 97 kN-m
Thickness of the wall (h) = 300 mm
Diameter of main bar ( Ø ) = 16 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 75 mm
Cover-Tension face to center of closest bar (dc) = 58 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST +16 @ 150 EXTRA = 2680.8 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 45.34 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 55.197 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 217 mm

z = Lever arm ( d - a/2) = 194.33 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 186.06 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.513 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 69.067 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

360
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of outer secondary reinforcement of 300 mm thick wall satisfying 0.20 mm crackwidth --

Provided reinforcement T 12 @ 200 + T 12 @ 200 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 1131 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 31 kN-m
Thickness of the wall (h) = 300 mm
Diameter of main bar ( Ø ) = 12 mm
Spacing of main bars (s) = 100 mm
Clear cover to reinforcement (Cmin) = 91 mm
Cover-Tension face to center of closest bar (dc) = 72 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 200 ST +12 @ 200 EXTRA = 1131 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 19.13 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 23.289 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 203 mm

z = Lever arm ( d - a/2) = 193.44 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 143.73 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.5398 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 87.658 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

361
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of outer secondary reinforcement of 300 mm thick wall satisfying 0.20 mm crackwidth --

Provided reinforcement T 12 @ 200 + T 16 @ 200 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 1570.8 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 41 kN-m
Thickness of the wall (h) = 300 mm
Diameter of main bar ( Ø ) = 14 mm
Spacing of main bars (s) = 100 mm
Clear cover to reinforcement (Cmin)
i ) = 91 mm
Cover-Tension face to center of closest bar (dc) = 73 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 200 ST +16 @ 200 EXTRA = 1570.8 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 26.57 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 32.346 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 202 mm

z = Lever arm ( d - a/2) = 188.72 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 139.49 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.5776 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 88.482 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

362
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of inner main reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --

Provided reinforcement T 12 @ 150 + T 0@ 150 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 753.98 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 22 kN-m
Thickness of the wall (h) = 300 mm
Diameter of main bar ( Ø ) = 12 mm
Spacing of main bars (s) = 150 mm
Clear cover to reinforcement (Cmin)
i ) = 50 mm
Cover-Tension face to center of closest bar (dc) = 56 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 150 ST = 753.98 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b) = 12.76 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 15.534 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 244 mm

z = Lever arm ( d - a/2) = 237.62 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 123.56 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.2451 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 93.6 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE

363
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of inner secondary reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --

Provided reinforcement T 12 @ 200 + T 0@ 200 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 565.49 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 12 kN-m
Thickness of the wall (h) = 300 mm
Diameter of main bar ( Ø ) = 12 mm
Spacing of main bars (s) = 200 mm
Clear cover to reinforcement (Cmin)
i ) = 62 mm
Cover-Tension face to center of closest bar (dc) = 68 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 200 ST = 565.49 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 9.57 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 11.65 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 232 mm

z = Lever arm ( d - a/2) = 227.22 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 91.56 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.3086 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 120.93 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE

364
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of inner main reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --

Provided reinforcement T 12 @ 150 + T 12 @ 150 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 1508 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 59 kN-m
Thickness of the wall (h) = 300 mm
Diameter of main bar ( Ø ) = 12 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 50 mm
Cover-Tension face to center of closest bar (dc) = 56 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 150 ST +12 @ 150 EXTRA = 1508 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 25.51 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 31.056 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 244 mm

z = Lever arm ( d - a/2) = 231.25 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 169.94 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.263 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 67.396 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE

365
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of inner secondary reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --

Provided reinforcement T 12 @ 200 + T 12 @ 200 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 1131 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 32 kN-m
Thickness of the wall (h) = 300 mm
Diameter of main bar ( Ø ) = 12 mm
Spacing of main bars (s) = 100 mm
Clear cover to reinforcement (Cmin) = 62 mm
Cover-Tension face to center of closest bar (dc) = 68 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 200 ST +12 @ 200 EXTRA = 1131 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 19.13 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 23.289 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 232 mm

z = Lever arm ( d - a/2) = 222.44 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 129.19 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.3258 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 84.404 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE

366
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of inner secondary reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --

Provided reinforcement T 12 @ 200 + T 16 @ 200 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 1570.8 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 42 kN-m
Thickness of the wall (h) = 300 mm
Diameter of main bar ( Ø ) = 14 mm
Spacing of main bars (s) = 100 mm
Clear cover to reinforcement (Cmin) = 64 mm
Cover-Tension face to center of closest bar (dc) = 69 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 200 ST +16 @ 200 EXTRA = 1570.8 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 26.57 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 32.346 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 229 mm

z = Lever arm ( d - a/2) = 215.72 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 124.77 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.361 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 85.212 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE

367
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of inner main reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 0@ 150 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 1340.4 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 38 kN-m
Thickness of the wall (h) = 300 mm
Diameter of main bar ( Ø ) = 16 mm
Spacing of main bars (s) = 150 mm
Clear cover to reinforcement (Cmin)
i ) = 50 mm
Cover-Tension face to center of closest bar (dc) = 58 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST = 1340.4 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b) = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 27.598 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 242 mm

z = Lever arm ( d - a/2) = 230.67 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 122.9 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.2705 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 94.81 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.149 mm Eqn 1-2 ACI 224.1-R-8
SAFE

368
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED

Title : Substructure RVK ASV

Moment capacity of inner main reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --

Provided reinforcement T 16 @ 150 + T 12 @ 150 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 2094.4 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-14: Cl : 19.2.2.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 78 kN-m
Thickness of the wall (h) = 300 mm
Diameter of main bar ( Ø ) = 14 mm
Spacing of main bars (s) = 75 mm
Clear cover to reinforcement (Cmin) = 50 mm
Cover-Tension face to center of closest bar (dc) = 57 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 16 @ 150 ST +12 @ 150 EXTRA = 2094.4 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 35.42 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 43.12 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 243 mm

z = Lever arm ( d - a/2) = 225.29 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 164.53 N/mm


2
ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.2852 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 68.229 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE

369
ETABS 17.0.1

OUTER VERTICAL REINFORCEMENT - ULS CASE


General mesh T16@150 mm c/c

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

-350 -315 -280 -245 -210 -175 -140 -105 -70 -35 0 35 70 105
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

370
ETABS 17.0.1

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

T16@150 mm c/c outer vertical extra is provided in addition to T16@150 straight for ULS case.

-210 -202 -195 -187 -179 -172 -164 -156 -148 -141 -133 -125 -118 -110
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

371
ETABS 17.0.1

Neglected at Beam
locations

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

No moment is found above 210 kN-m. Hence provided reinforcement is satisfactory.

-210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

372
ETABS 17.0.1

OUTER SECONDARY REINFORCEMENT - ULS CASE


General mesh T12@200 mm c/c

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

-71.5 -65.0 -58.5 -52.0 -45.5 -39.0 -32.5 -26.0 -19.5 -13.0 -6.5 0.0 6.5 13.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

373
ETABS 17.0.1

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

T12@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for ULS case.

-85.0 -81.5 -78.1 -74.6 -71.2 -67.7 -64.2 -60.8 -57.3 -53.8 -50.4 -46.9 -43.5 -40.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

374
ETABS 17.0.1

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

T16@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for ULS case.

-100 -99 -98 -97 -95 -94 -93 -92 -91 -90 -88 -87 -86 -85
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

375
ETABS 17.0.1

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

No moment is found above 100 kN-m. Hence provided reinforcement is satisfactory.

-100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

376
ETABS 17.0.1

INNER VERTICAL REINFORCEMENT - ULS CASE


General mesh T12@150 mm c/c

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

-150 -120 -90 -60 -30 0 30 60 90 120 150 180 210 240
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

377
ETABS 17.0.1

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

T12@150 mm c/c inner vertical extra is provided in addition to T12@150 straight for ULS case.

65 70 76 81 87 92 97 103 108 113 119 124 130 135


132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

378
ETABS 17.0.1

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

No moment is found above 135 kN-m. Hence provided reinforcement is satisfactory.

135 135 135 135 135 135 135 135 135 135 135 135 135 135
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

379
ETABS 17.0.1

INNER SECONDARY REINFORCEMENT - ULS CASE


General mesh T12@200 mm c/c

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

-20.0 -15.0 -10.0 -5.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

380
ETABS 17.0.1

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

No moment is found above 45kN-m. Hence provided reinforcement is satisfactory.

45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

381
ETABS 17.0.1 Crackwidth Check

OUTER VERTICAL REINFORCEMENT - SLS CASE


General mesh T16@150 mm c/c

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

-264 -240 -216 -192 -168 -144 -120 -96 -72 -48 -24 0 24 48
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

382
ETABS 17.0.1

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

T16@150 mm c/c outer vertical extra is provided in addition to T16@150 straight for SLS case.

-97.0 -92.5 -88.1 -83.6 -79.2 -74.7 -70.2 -65.8 -61.3 -56.8 -52.4 -47.9 -43.5 -39.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

383
ETABS 17.0.1

Neglected at Beam
locations

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

No moment is found above 97 kN-m. Hence provided reinforcement is satisfactory.

-97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

384
ETABS 17.0.1

OUTER SECONDARY REINFORCEMENT - SLS CASE


General mesh T12@200 mm c/c

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

-48.0 -44.0 -40.0 -36.0 -32.0 -28.0 -24.0 -20.0 -16.0 -12.0 -8.0 -4.0 0.0 4.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

385
ETABS 17.0.1

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

T12@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for SLS case.

-31.0 -29.5 -28.1 -26.6 -25.2 -23.7 -22.2 -20.8 -19.3 -17.8 -16.4 -14.9 -13.5 -12.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

386
ETABS 17.0.1

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

T16@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for SLS case.

-41.0 -40.2 -39.5 -38.7 -37.9 -37.2 -36.4 -35.6 -34.8 -34.1 -33.3 -32.5 -31.8 -31.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

387
ETABS 17.0.1

RW03

RW65

RW01 RW63

RW66

RW61
RW02
RW64

RW62
RW50

No moment is found above 41kN-m. Hence provided reinforcement is satisfactory.

-41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

388
SHEAR CHECK

Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK


Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 16 @ 150 mm + T 0@ 150 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 1340.4 mm

Thickness of the Wall = 300 mm

Clear cover = 75 mm Local-2

Diameter of the reinforcement = 16 mm

Effective depth d = 217 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 2.55 N/mm2

Factored moment at critical shear section,


section Mu = 374.0
374 0 kN m
kN-m

Factored shear force, Vu = 765 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.45 (maximum 1)

Percentage of steel provided þW = 0.0062

Vc1 = 0.95 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.95 N/mm

ɸ v Vc = 0.71 N/mm2

389
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 12 @ 200 mm + T 0@ 200 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 565.49 mm

Thickness of the Wall = 300 mm

Clear cover = 91 mm Local-2

Diameter of the reinforcement = 12 mm

Effective depth d = 203 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 2.55 N/mm2

Factored moment at critical shear section,


section Mu = 374.0
374 0 kN m
kN-m

Factored shear force, Vu = 765 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.42 (maximum 1)

Percentage of steel provided þW = 0.0028

Vc1 = 0.92 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.92 N/mm

ɸ v Vc = 0.69 N/mm2

390
ETABS 17.0.1

Main Reinforcement

-1.75 -1.40 -1.05 -0.70 -0.35 0.00 0.35 0.70 1.05 1.40 1.75 2.10 2.45 2.80
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
391
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.69 N/mm2
Shear stress at a distance 'd' from face of support is within limit
Hence SAFE

690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
392
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.69 N/mm2
Shear stress at a distance 'd' from face of support is within limit
Hence SAFE

-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
393
ETABS 17.0.1

Secondary Reinforcement

-0.90 -0.75 -0.60 -0.45 -0.30 -0.15 0.00 0.15 0.30 0.45 0.60 0.75 0.90 1.05
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
394
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.69 N/mm2
Shear stress at a distance 'd' from face of support is within limit
Hence SAFE

690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
395
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.69 N/mm2
Shear stress at a distance 'd' from face of support is within limit
Hence SAFE

-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
396
ETABS 17.0.1

RW04
OUTER VERTICAL REINFORCEMENT - ULS CASE
General mesh T16@150 mm c/c

RW35

RW21

RW47

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-121 -110 -99 -88 -77 -66 -55 -44 -33 -22 -11 0 11 22
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

397
ETABS 17.0.1

RW04

RW35

RW21

RW47

No moment is found above 110 kN-m. Hence provided reinforcement is satisfactory.

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-110 -110 -110 -110 -110 -110 -110 -110 -110 -110 -110 -110 -110 -110
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

398
ETABS 17.0.1

RW04
OUTER SECONDARY REINFORCEMENT - ULS CASE
General mesh T12@200 mm c/c

RW35
Z

RW21

RW47

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-84.5 -78.0 -71.5 -65.0 -58.5 -52.0 -45.5 -39.0 -32.5 -26.0 -19.5 -13.0 -6.5 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

399
ETABS 17.0.1

RW04

RW35
Z

RW21

T12@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for ULS case.
RW47

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-85.0 -81.5 -78.1 -74.6 -71.2 -67.7 -64.2 -60.8 -57.3 -53.8 -50.4 -46.9 -43.5 -40.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

400
ETABS 17.0.1

RW04

RW35

RW21

No moment is found above 85kN-m. Hence provided reinforcement is satisfactory.


RW47

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

401
ETABS 17.0.1

RW04
INNER VERTICAL REINFORCEMENT - ULS CASE
General mesh T12@150 mm c/c

RW35

RW21

RW47

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-52 -39 -26 -13 0 13 26 39 52 65 78 91 104 117


132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

402
ETABS 17.0.1

RW04

RW35

RW21

RW47

No moment is found above 65 kN-m. Hence provided reinforcement is satisfactory.

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

403
ETABS 17.0.1

INNER SECONDARY REINFORCEMENT - ULS CASE RW04


General mesh T12@200 mm c/c

RW35

RW21

RW47

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-10.0 -5.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

404
ETABS 17.0.1

RW04

RW35
Z

RW21

RW47 T12@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for ULS case.

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

45 49 53 58 62 66 70 75 79 83 87 92 96 100
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

405
ETABS 17.0.1

RW04

RW35
Z

RW21

No moment is found above 100kN-m. Hence provided reinforcement is satisfactory.


RW47

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

100 100 100 100 100 100 100 100 100 100 100 100 100 100
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

406
ETABS 17.0.1 Crackwidth Check
RW04
OUTER VERTICAL REINFORCEMENT - SLS CASE
General mesh T16@150 mm c/c

RW35

RW21

RW47

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-82.5 -75.0 -67.5 -60.0 -52.5 -45.0 -37.5 -30.0 -22.5 -15.0 -7.5 0.0 7.5 15.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

407
ETABS 17.0.1

RW04

RW35

RW21

RW47
T16@150 mm c/c outer vertical extra is provided in addition to T16@150 straight for SLS case.

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-97.0 -92.5 -88.1 -83.6 -79.2 -74.7 -70.2 -65.8 -61.3 -56.8 -52.4 -47.9 -43.5 -39.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

408
ETABS 17.0.1

RW04

RW35

RW21

RW47
No moment is found above 97 kN-m. Hence provided reinforcement is satisfactory.

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

409
ETABS 17.0.1

RW04
OUTER SECONDARY REINFORCEMENT - SLS CASE
General mesh T12@200 mm c/c

RW35

RW21

RW47

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-52.0 -48.0 -44.0 -40.0 -36.0 -32.0 -28.0 -24.0 -20.0 -16.0 -12.0 -8.0 -4.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

410
ETABS 17.0.1

RW04

RW35

RW21

RW47
T12@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for SLS case.

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-31.0 -29.5 -28.1 -26.6 -25.2 -23.7 -22.2 -20.8 -19.3 -17.8 -16.4 -14.9 -13.5 -12.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

411
ETABS 17.0.1

RW04

RW35

RW21

RW47

No moment is found above 31kN-m. Hence provided reinforcement is satisfactory.

RW26

RW60
RW27

RW58 RW23
RW28

RW59
RW29

-31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

412
SHEAR CHECK
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 16 @ 150 mm + T 0@ 150 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 1340.4 mm

Thickness of the Wall = 300 mm

Clear cover = 75 mm Local-2

Diameter of the reinforcement = 16 mm

Effective depth d = 217 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 0.92 N/mm2

Factored moment at critical shear section,


section Mu = 123.0
123 0 kN m
kN-m

Factored shear force, Vu = 276 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.49 (maximum 1)

Percentage of steel provided þW = 0.0062

Vc1 = 0.96 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.96 N/mm

ɸ v Vc = 0.72 N/mm2

413
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 12 @ 200 mm + T 0@ 200 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 565.49 mm

Thickness of the Wall = 300 mm

Clear cover = 91 mm Local-2

Diameter of the reinforcement = 12 mm

Effective depth d = 203 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 0.92 N/mm2

Factored moment at critical shear section,


section Mu = 123.0
123 0 kN m
kN-m

Factored shear force, Vu = 276 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.46 (maximum 1)

Percentage of steel provided þW = 0.0028

Vc1 = 0.93 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.93 N/mm

ɸ v Vc = 0.70 N/mm2

414
ETABS 17.0.1

Main Reinforcement

-720 -600 -480 -360 -240 -120 0 120 240 360 480 600 720 840 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
415
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


X

mesh T12@200mm c/c is 0.7 N/mm2


Shear stress at a distance 'd' from face of support is within limit
Hence SAFE

700 700 700 700 700 700 700 700 700 700 700 700 700 700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
416
ETABS 17.0.1

X Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.7 N/mm2
Shear stress at a distance 'd' from face of support is within limit
Hence SAFE

-700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
417
ETABS 17.0.1

Secondary Reinforcement

-490 -420 -350 -280 -210 -140 -70 0 70 140 210 280 350 420 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
418
ETABS 17.0.1

X
Shear stress capacity of 300 mm thick wall with general
mesh T12@200mm c/c is 0.7 N/mm2
Shear stress at a distance 'd' from face of support is within limit
Hence SAFE

700 700 700 700 700 700 700 700 700 700 700 700 700 700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
419
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


X

mesh T12@200mm c/c is 0.7 N/mm2


Shear stress at a distance 'd' from face of support is within limit
Hence SAFE

-700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
420
ETABS 17.0.1

RW07 OUTER VERTICAL REINFORCEMENT - ULS CASE


General mesh T16@150 mm c/c

RW05

RW06

RW12

RW32

RW33

RW31

Z X
RW24
Y

RW30

-169 -156 -143 -130 -117 -104 -91 -78 -65 -52 -39 -26 -13 0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

421
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y RW24

RW30

T16@150 mm c/c outer vertical extra is provided in addition to T16@150 straight for ULS case.

-210 -202 -195 -187 -179 -172 -164 -156 -148 -141 -133 -125 -118 -110
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

422
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y RW24

RW30

No moment is found above 210 kN-m. Hence provided reinforcement is satisfactory.

-210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

423
ETABS 17.0.1

RW07 OUTER SECONDARY REINFORCEMENT - ULS CASE


General mesh T12@200 mm c/c

RW05

RW06

RW12

RW32

RW33

RW31

X
Y
Z RW24

RW30

-104 -96 -88 -80 -72 -64 -56 -48 -40 -32 -24 -16 -8 0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

424
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

X
Y
Z
RW24

RW30

T16@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for ULS case.

-100 -95 -91 -86 -82 -77 -72 -68 -63 -58 -54 -49 -45 -40
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

425
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y RW24

RW30

No moment is found above 100 kN-m. Hence provided reinforcement is satisfactory.

-100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

426
ETABS 17.0.1

RW07 INNER VERTICAL REINFORCEMENT - ULS CASE


General mesh T16@150 mm c/c

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y RW24

RW30

0.0 6.5 13.0 19.5 26.0 32.5 39.0 45.5 52.0 58.5 65.0 71.5 78.0 84.5
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

427
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

Z X RW24
Y

RW30

No moment is found above 120 kN-m. Hence provided reinforcement is satisfactory.

120 120 120 120 120 120 120 120 120 120 120 120 120 120
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

428
ETABS 17.0.1

RW07 INNER SECONDARY REINFORCEMENT - ULS CASE


General mesh T12@200 mm c/c

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y RW24

RW30

0.0 4.5 9.0 13.5 18.0 22.5 27.0 31.5 36.0 40.5 45.0 49.5 54.0 58.5
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

429
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y RW24

RW30

No moment is found above 45kN-m. Hence provided reinforcement is satisfactory.

45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

430
ETABS 17.0.1 Crackwidth Check

RW07 OUTER VERTICAL REINFORCEMENT - SLS CASE


General mesh T16@150 mm c/c

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y RW24

RW30

-104 -96 -88 -80 -72 -64 -56 -48 -40 -32 -24 -16 -8 0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

431
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y
RW24

RW30

T16@150 mm c/c outer vertical extra is provided in addition to T16@150 straight for SLS case.

-97.0 -92.5 -88.1 -83.6 -79.2 -74.7 -70.2 -65.8 -61.3 -56.8 -52.4 -47.9 -43.5 -39.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

432
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y
RW24

RW30

No moment is found above 97 kN-m. Hence provided reinforcement is satisfactory.

-97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

433
ETABS 17.0.1

RW07 OUTER SECONDARY REINFORCEMENT - SLS CASE


General mesh T12@200 mm c/c

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y RW24

RW30

-78.0 -72.0 -66.0 -60.0 -54.0 -48.0 -42.0 -36.0 -30.0 -24.0 -18.0 -12.0 -6.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

434
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

X
Y
Z
RW24

RW30

T12@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for SLS case.

-31.0 -29.5 -28.1 -26.6 -25.2 -23.7 -22.2 -20.8 -19.3 -17.8 -16.4 -14.9 -13.5 -12.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

435
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y RW24

RW30

T16@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for SLS case.

-41.0 -40.2 -39.5 -38.7 -37.9 -37.2 -36.4 -35.6 -34.8 -34.1 -33.3 -32.5 -31.8 -31.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

436
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

X
Y
Z
RW24

RW30

No moment is found above 41kN-m. Hence provided reinforcement is satisfactory.

-41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

437
ETABS 17.0.1

INNER VERTICAL REINFORCEMENT - SLS CASE


RW07 General mesh T16@150 mm c/c

RW05

RW06

RW12

RW32

RW33

RW31

X
Y
Z
RW24

RW30

0.0 5.5 11.0 16.5 22.0 27.5 33.0 38.5 44.0 49.5 55.0 60.5 66.0 71.5
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

438
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

Y
Z X
RW24

RW30

T12@150 mm c/c inner vertical extra is provided in addition to T16@150 straight for SLS case.

38.0 41.1 44.2 47.2 50.3 53.4 56.5 59.5 62.6 65.7 68.8 71.8 74.9 78.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

439
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y
RW24

RW30

No moment is found above 78 kN-m. Hence provided reinforcement is satisfactory.

78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

440
ETABS 17.0.1

RW07 INNER SECONDARY REINFORCEMENT - SLS CASE


General mesh T12@200 mm c/c

RW05

RW06

RW12

RW32

RW33

RW31

Z X
Y
RW24

RW30

0.0 4.0 8.0 12.0 16.0 20.0 24.0 28.0 32.0 36.0 40.0 44.0 48.0 52.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

441
ETABS 17.0.1

RW07

RW05

RW06

RW12

T12@200 mm c/c inner horizontal extra is provided in addition to T12@200 straight for SLS case.

RW32

RW33

RW31

Z X
Y
RW24

RW30

12.0 13.5 15.1 16.6 18.2 19.7 21.2 22.8 24.3 25.8 27.4 28.9 30.5 32.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

442
ETABS 17.0.1

RW07

RW05

RW06

RW12

RW32

RW33

RW31

X
Y
Z RW24

RW30

No moment is found above 32 kN-m. Hence provided reinforcement is satisfactory.

32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

443
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 16 @ 150 mm + T 0@ 150 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 1340.4 mm

Thickness of the Wall = 300 mm

Clear cover = 75 mm Local-2

Diameter of the reinforcement = 16 mm

Effective depth d = 217 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 1.01 N/mm2

Factored moment at critical shear section,


section Mu = 175.0
175 0 kN m
kN-m

Factored shear force, Vu = 303 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.38 (maximum 1)

Percentage of steel provided þW = 0.0062

Vc1 = 0.95 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.95 N/mm

ɸ v Vc = 0.71 N/mm2

444
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 12 @ 200 mm + T 0@ 200 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 565.49 mm

Thickness of the Wall = 300 mm

Clear cover = 91 mm Local-2

Diameter of the reinforcement = 12 mm

Effective depth d = 203 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 1.01 N/mm2

Factored moment at critical shear section,


section Mu = 175.0
175 0 kN m
kN-m

Factored shear force, Vu = 303 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.36 (maximum 1)

Percentage of steel provided þW = 0.0028

Vc1 = 0.92 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.92 N/mm

ɸ v Vc = 0.69 N/mm2

445
ETABS 17.0.1

Main Reinforcement

Z X
Y

-520 -455 -390 -325 -260 -195 -130 -65 0 65 130 195 260 325 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
446
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE

Z X
Y

690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
447
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE

Z X
Y

-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
448
ETABS 17.0.1

Secondary Reinforcement

Z X
Y

-960 -840 -720 -600 -480 -360 -240 -120 0 120 240 360 480 600 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
449
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE

Z X
Y

690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
450
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE

Z X
Y

-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
451
ETABS 17.0.1

VERTICAL REINFORCEMENT (POSITIVE SIDE) - ULS CASE


General mesh T12@150 mm c/c

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

0.0 6.5 13.0 19.5 26.0 32.5 39.0 45.5 52.0 58.5 65.0 71.5 78.0 84.5
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

452
ETABS 17.0.1

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

No moment is found above 65 kN-m. Hence provided reinforcement is satisfactory. Y


Z
X

65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

453
ETABS 17.0.1

SECONDARY REINFORCEMENT (POSITIVE SIDE) - ULS CASE


General mesh T12@200 mm c/c

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

454
ETABS 17.0.1

RW46

RW45

RW15

RW14

RW17

RW16 RW20

neglected wall
locations
RW19

Z
X
No moment is found above 45 kN-m. Hence provided reinforcement is satisfactory. Y

45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

455
ETABS 17.0.1

VERTICAL REINFORCEMENT (NEGATIVE SIDE) - ULS CASE


General mesh T12@150 mm c/c
RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

-78.0 -72.0 -66.0 -60.0 -54.0 -48.0 -42.0 -36.0 -30.0 -24.0 -18.0 -12.0 -6.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

456
ETABS 17.0.1

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

No moment is found above 65 kN-m. Hence provided reinforcement is satisfactory.

-65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

457
ETABS 17.0.1

SECONDARY REINFORCEMENT (NEGATIVE SIDE) - ULS CASE


General mesh T12@200 mm c/c
RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

-52.0 -48.0 -44.0 -40.0 -36.0 -32.0 -28.0 -24.0 -20.0 -16.0 -12.0 -8.0 -4.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

458
ETABS 17.0.1

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

No moment is found above 45 kN-m. Hence provided reinforcement is satisfactory.

-45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

459
ETABS 17.0.1
Crackwidth Check
VERTICAL REINFORCEMENT (POSITIVE SIDE) - SLS CASE
General mesh T12@150 mm c/c

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

0.0 5.5 11.0 16.5 22.0 27.5 33.0 38.5 44.0 49.5 55.0 60.5 66.0 71.5
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

460
ETABS 17.0.1

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

T12@150 mm c/c vertical extra both sides is provided in addition to T12@150 straight for SLS case.
22.0 24.8 27.7 30.5 33.4 36.2 39.1 41.9 44.8 47.6 50.5 53.3 56.2 59.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

461
ETABS 17.0.1

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

No moment is found above 59 kN-m. Hence provided reinforcement is satisfactory.

59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

462
ETABS 17.0.1

SECONDARY REINFORCEMENT (POSITIVE SIDE) - SLS CASE


General mesh T12@200 mm c/c

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

0.0 4.5 9.0 13.5 18.0 22.5 27.0 31.5 36.0 40.5 45.0 49.5 54.0 58.5
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

463
ETABS 17.0.1

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

T12@200 mm c/c horizontal extra both sides is provided in addition to T12@200 straight for SLS case.

12.0 13.5 15.1 16.6 18.2 19.7 21.2 22.8 24.3 25.8 27.4 28.9 30.5 32.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

464
ETABS 17.0.1

RW46

RW45

RW15

RW14

RW17

RW16 RW20

neglected at wall
locations

RW19

Z
X
Y

No moment is found above 32 kN-m. Hence provided reinforcement is satisfactory.

32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

465
ETABS 17.0.1

VERTICAL REINFORCEMENT (NEGATIVE SIDE) - SLS CASE


General mesh T12@150 mm c/c

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

-78.0 -72.0 -66.0 -60.0 -54.0 -48.0 -42.0 -36.0 -30.0 -24.0 -18.0 -12.0 -6.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

466
ETABS 17.0.1

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y
T12@150 mm c/c vertical extra both sides is provided in addition to T12@150 straight for SLS case.

-59.0 -56.2 -53.3 -50.5 -47.6 -44.8 -41.9 -39.1 -36.2 -33.4 -30.5 -27.7 -24.8 -22.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

467
ETABS 17.0.1

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

No moment is found above 59 kN-m. Hence provided reinforcement is satisfactory. Y


Z
X

-59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

468
ETABS 17.0.1

SECONDARY REINFORCEMENT (NEGATIVE SIDE) - SLS CASE


General mesh T12@200 mm c/c

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

-52.0 -48.0 -44.0 -40.0 -36.0 -32.0 -28.0 -24.0 -20.0 -16.0 -12.0 -8.0 -4.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

469
ETABS 17.0.1

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y

T12@200 mm c/c horizontal extra both sides is provided in addition to T12@200 straight for SLS case.

-32.0 -30.5 -28.9 -27.4 -25.8 -24.3 -22.8 -21.2 -19.7 -18.2 -16.6 -15.1 -13.5 -12.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

470
ETABS 17.0.1

RW46

RW45

RW15

RW14

RW17

RW16 RW20

RW19

Z
X
Y
No moment is found above 32 kN-m. Hence provided reinforcement is satisfactory.

-32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

471
SHEAR CHECK
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 12 @ 150 mm + T 0@ 150 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 753.98 mm

Thickness of the Wall = 300 mm

Clear cover = 50 mm Local-2

Diameter of the reinforcement = 12 mm

Effective depth d = 244 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 0.44 N/mm2

Factored moment at critical shear section,


section Mu = 90.0
90 0 kN m
kN-m

Factored shear force, Vu = 132 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.36 (maximum 1)

Percentage of steel provided þW = 0.0031

Vc1 = 0.92 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.92 N/mm

ɸ v Vc = 0.69 N/mm2

472
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 12 @ 200 mm + T 0@ 200 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 565.49 mm

Thickness of the Wall = 300 mm

Clear cover = 62 mm Local-2

Diameter of the reinforcement = 12 mm

Effective depth d = 232 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 0.44 N/mm2

Factored moment at critical shear section,


section Mu = 90.0
90 0 kN m
kN-m

Factored shear force, Vu = 132 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.35 (maximum 1)

Percentage of steel provided þW = 0.0024

Vc1 = 0.92 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.92 N/mm

ɸ v Vc = 0.69 N/mm2

473
ETABS 17.0.1

Main Reinforcement

-360 -300 -240 -180 -120 -60 0 60 120 180 240 300 360 420 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa] Y
Z
X

474
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE

690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa] Y
Z
X

475
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE

-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa] Y
Z
X

476
ETABS 17.0.1

Secondary Reinforcement

-350 -300 -250 -200 -150 -100 -50 0 50 100 150 200 250 300 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa] Y
Z
X

477
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE

690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa] Y
Z
X

478
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE

-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa] Y
Z
X

479
ETABS 17.0.1

VERTICAL REINFORCEMENT (POSITIVE SIDE) - ULS CASE


General mesh T12@150 mm c/c
RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

-22.5 -15.0 -7.5 0.0 7.5 15.0 22.5 30.0 37.5 45.0 52.5 60.0 67.5 75.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

480
ETABS 17.0.1

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

No moment is found above 65 kN-m. Hence provided reinforcement is satisfactory.

65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

481
ETABS 17.0.1

SECONDARY REINFORCEMENT (POSITIVE SIDE) - ULS CASE


General mesh T12@200 mm c/c
RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

-4.8 -2.4 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 26.4
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

482
ETABS 17.0.1

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

No moment is found above 45 kN-m. Hence provided reinforcement is satisfactory.

45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

483
ETABS 17.0.1

VERTICAL REINFORCEMENT (NEGATIVE SIDE) - ULS CASE


General mesh T12@150 mm c/c
RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

-70.0 -63.0 -56.0 -49.0 -42.0 -35.0 -28.0 -21.0 -14.0 -7.0 0.0 7.0 14.0 21.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

484
ETABS 17.0.1

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

No moment is found above 65 kN-m. Hence provided reinforcement is satisfactory.

-65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]

485
ETABS 17.0.1

SECONDARY REINFORCEMENT (NEGATIVE SIDE) - ULS CASE


General mesh T12@200 mm c/c
RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

-44.0 -40.0 -36.0 -32.0 -28.0 -24.0 -20.0 -16.0 -12.0 -8.0 -4.0 0.0 4.0 8.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

486
ETABS 17.0.1

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

No moment is found above 45 kN-m. Hence provided reinforcement is satisfactory.

-45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]

487
ETABS 17.0.1
Crackwidth Check
VERTICAL REINFORCEMENT (POSITIVE SIDE) - SLS CASE
General mesh T12@150 mm c/c

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

-15.0 -10.0 -5.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

488
ETABS 17.0.1

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

T12@150 mm c/c vertical extra both sides is provided in addition to T12@150 straight for SLS case.

22.0 24.8 27.7 30.5 33.4 36.2 39.1 41.9 44.8 47.6 50.5 53.3 56.2 59.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

489
ETABS 17.0.1

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

No moment is found above 59 kN-m. Hence provided reinforcement is satisfactory.

59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

490
ETABS 17.0.1

SECONDARY REINFORCEMENT (POSITIVE SIDE) - SLS CASE


General mesh T12@200 mm c/c

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

-2.2 0.0 2.2 4.4 6.6 8.8 11.0 13.2 15.4 17.6 19.8 22.0 24.2 26.4
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

491
ETABS 17.0.1

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

T12@200 mm c/c horizontal extra both sides is provided in addition to T12@200 straight for SLS case.

12.0 13.5 15.1 16.6 18.2 19.7 21.2 22.8 24.3 25.8 27.4 28.9 30.5 32.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

492
ETABS 17.0.1

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37 No moment is found above 32 kN-m. Hence provided reinforcement is satisfactory.

32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

493
ETABS 17.0.1

VERTICAL REINFORCEMENT (NEGATIVE SIDE) - SLS CASE


General mesh T12@150 mm c/c
RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

-50.0 -45.0 -40.0 -35.0 -30.0 -25.0 -20.0 -15.0 -10.0 -5.0 0.0 5.0 10.0 15.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

494
ETABS 17.0.1

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

T12@150 mm c/c vertical extra both sides is provided in addition to T12@150 straight for SLS case.

-59.0 -56.2 -53.3 -50.5 -47.6 -44.8 -41.9 -39.1 -36.2 -33.4 -30.5 -27.7 -24.8 -22.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

495
ETABS 17.0.1

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

No moment is found above 59 kN-m. Hence provided reinforcement is satisfactory.

-59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]

496
ETABS 17.0.1

SECONDARY REINFORCEMENT (NEGATIVE SIDE) - SLS CASE


General mesh T12@200 mm c/c
RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

-2.2 0.0 2.2 4.4 6.6 8.8 11.0 13.2 15.4 17.6 19.8 22.0 24.2 26.4
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

497
ETABS 17.0.1

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

T12@200 mm c/c horizontal extra both sides is provided in addition to T12@200 straight for SLS case.

-32.0 -30.5 -28.9 -27.4 -25.8 -24.3 -22.8 -21.2 -19.7 -18.2 -16.6 -15.1 -13.5 -12.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

498
ETABS 17.0.1

RW44

RW43
RW13

RW10

RW09
RW40
RW42
RW49

RW41
RW11 RW48

RW38

RW39

RW36

RW37

No moment is found above 32 kN-m. Hence provided reinforcement is satisfactory.

-32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]

499
SHEAR CHECK
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 12 @ 150 mm + T 0@ 150 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 753.98 mm

Thickness of the Wall = 300 mm

Clear cover = 50 mm Local-2

Diameter of the reinforcement = 12 mm

Effective depth d = 244 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 0.68 N/mm2

Factored moment at critical shear section,


section Mu = 75.0
75 0 kN m
kN-m

Factored shear force, Vu = 204 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.67 (maximum 1)

Percentage of steel provided þW = 0.0031

Vc1 = 0.94 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.94 N/mm

ɸ v Vc = 0.71 N/mm2

500
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 12 @ 200 mm + T 0@ 200 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 565.49 mm

Thickness of the Wall = 300 mm

Clear cover = 50 mm Local-2

Diameter of the reinforcement = 12 mm

Effective depth d = 244 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 0.68 N/mm2

Factored moment at critical shear section,


section Mu = 75.0
75 0 kN m
kN-m

Factored shear force, Vu = 204 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.67 (maximum 1)

Percentage of steel provided þW = 0.0023

Vc1 = 0.93 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.93 N/mm

ɸ v Vc = 0.70 N/mm2

501
ETABS 17.0.1

Main Reinforcement

Z Y

-375 -300 -225 -150 -75 0 75 150 225 300 375 450 525 600 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
502
ETABS 17.0.1

Z Y

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.7 N/mm2
From above contour no shear stress is found above 0.7 N/mm2.
Hence SAFE

700 700 700 700 700 700 700 700 700 700 700 700 700 700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
503
ETABS 17.0.1

Z Y

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.7 N/mm2
From above contour no shear stress is found above 0.7 N/mm2.
Hence SAFE

-700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
504
ETABS 17.0.1

Secondary Reinforcement

Z Y

-385 -330 -275 -220 -165 -110 -55 0 55 110 165 220 275 330 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
505
ETABS 17.0.1

Z Y

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.7 N/mm2
From above contour no shear stress is found above 0.7 N/mm2.
Hence SAFE

700 700 700 700 700 700 700 700 700 700 700 700 700 700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
506
ETABS 17.0.1

Z Y

Shear stress capacity of 300 mm thick wall with general


mesh T12@200mm c/c is 0.7 N/mm2
From above contour no shear stress is found above 0.7 N/mm2.
Hence SAFE

-700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
507
ETABS 17.0.1

VERTICAL REINFORCEMENT (POSITIVE SIDE) - ULS CASE RW52


General mesh T12@150 mm c/c

RW08
RW57

RW18
RW51

RW22
RW55

RW56

RW54

RW53

-38 -19 0 19 38 57 76 95 114 133 152 171 190 209


132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
508
ETABS 17.0.1

RW52

T12@150mm c/c vertical extra is provided in addition to T12@150 straight for ULS case. RW08
RW57

RW18
RW51

RW22
RW55

RW56

RW54

RW53

65 70 76 81 87 92 97 103 108 113 119 124 130 135


132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
509
ETABS 17.0.1

RW52

No moment is found above 135 kN-m. Hence provided reinforcement is satisfactory. RW08
RW57

RW18
RW51

RW22
RW55

RW56

RW54

RW53

135 135 135 135 135 135 135 135 135 135 135 135 135 135
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
510
ETABS 17.0.1

SECONDARY REINFORCEMENT (POSITIVE SIDE) - ULS CASE


General mesh T12@200 mm c/c
RW52

RW08
RW57

RW18
RW51

RW22
RW55

RW56

RW54

RW53

-5.5 0.0 5.5 11.0 16.5 22.0 27.5 33.0 38.5 44.0 49.5 55.0 60.5 66.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
511
ETABS 17.0.1

RW52

No moment is found above 45 kN-m. Hence provided reinforcement is satisfactory.

RW08
RW57

RW18
RW51

RW22
RW55

RW56

RW54

RW53

45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
512
ETABS 17.0.1

VERTICAL REINFORCEMENT (NEGATIVE SIDE) - ULS CASE


General mesh T12@150 mm c/c RW52

RW08
RW57

RW18
RW51

RW22
RW55

RW56

RW54

RW53

-77.0 -66.0 -55.0 -44.0 -33.0 -22.0 -11.0 0.0 11.0 22.0 33.0 44.0 55.0 66.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
513
ETABS 17.0.1

RW52

RW08
No moment is found above 65 kN-m. Hence provided reinforcement is satisfactory. RW57

RW51 RW18

RW22
RW55

RW56

RW54

RW53

-65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
514
ETABS 17.0.1

SECONDARY REINFORCEMENT (NEGATIVE SIDE) - ULS CASE


General mesh T12@200 mm c/c RW52

RW08
RW57

RW18
RW51

RW22
RW55

RW56

RW54

RW53

-55.0 -50.0 -45.0 -40.0 -35.0 -30.0 -25.0 -20.0 -15.0 -10.0 -5.0 0.0 5.0 10.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
515
ETABS 17.0.1

RW52

No moment is found above 45 kN-m. Hence provided reinforcement is satisfactory.


RW08
RW57

RW18
RW51

RW22
RW55

RW56

RW54

RW53

-45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
516
SHEAR CHECK
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 12 @ 150 mm + T 0@ 150 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 753.98 mm

Thickness of the Wall = 300 mm

Clear cover = 50 mm Local-2

Diameter of the reinforcement = 12 mm

Effective depth d = 244 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 1.67 N/mm2

Factored moment at critical shear section,


section Mu = 223.0
223 0 kN m
kN-m

Factored shear force, Vu = 501 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.55 (maximum 1)

Percentage of steel provided þW = 0.0031

Vc1 = 0.93 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.93 N/mm

ɸ v Vc = 0.70 N/mm2

517
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 12 @ 200 mm + T 0@ 200 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 565.49 mm

Thickness of the Wall = 300 mm

Clear cover = 62 mm Local-2

Diameter of the reinforcement = 12 mm

Effective depth d = 232 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 1.67 N/mm2

Factored moment at critical shear section,


section Mu = 223.0
223 0 kN m
kN-m

Factored shear force, Vu = 501 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.53 (maximum 1)

Percentage of steel provided þW = 0.0024

Vc1 = 0.93 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.93 N/mm

ɸ v Vc = 0.70 N/mm2

518
ETABS 17.0.1

Main Reinforcement

-715 -650 -585 -520 -455 -390 -325 -260 -195 -130 -65 0 65 130 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Min (ULS) [MPa]
519
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@150mm c/c is 0.7 N/mm2
From above contour no shear stress is found above 0.7 N/mm2.
Hence SAFE

700 700 700 700 700 700 700 700 700 700 700 700 700 700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
520
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@150mm c/c is 0.7 N/mm2
From above contour no shear stress is found above 0.7 N/mm2.
Hence SAFE

-700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
521
ETABS 17.0.1

Secondary Reinforcement

-700 -600 -500 -400 -300 -200 -100 0 100 200 300 400 500 600 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
522
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@150mm c/c is 0.7 N/mm2
From above contour no shear stress is found above 0.7 N/mm2.
Hence SAFE

700 700 700 700 700 700 700 700 700 700 700 700 700 700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
523
ETABS 17.0.1

Shear stress capacity of 300 mm thick wall with general


mesh T12@150mm c/c is 0.7 N/mm2
From above contour no shear stress is found above 0.7 N/mm2.
Hence SAFE

-700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
524
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE

Title : Substructure RVK ASV

526
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE

Title : Substructure RVK ASV

WALL DESIGN

Reinforced concrete walls are used as basement walls to retain soil below ground and as firewalls between
main building and transformer area. Staircase walls are also made in RCC as per DEWA specifications

The walls are designed for all ultimate load combinations and checked for 0.2mm crackwidth for outer mesh &
0.15mm crackwidth for inner mesh of service loads. The contours are taken for envelope of all ultimate load combinations
and service load combinations.

Internal Forces and ETABS local axes convention

Walls are designed for moments and shear in two orthogonal directions, i.e. along Local-1 & 2 axes of ETABS.
The local-1,2 & 3 axes are consistent throughout the model so as to use results from contours for wall
design with ease. The local axes for all wall shells is as follows:

a) Local-1: This axis is in the plane of the area object, this axis is red in color.

b) Local-2: This axis is in the plane of the area object. The positive local-2 axis is in the same direction as
the positive global Z-axis This axis is green in color.

c) Local-3: This axis is perpendicular to the plane of the area object, this axis is blue in color.

Walls are modelled and made sure to be their local-3 axis outside the building and design to be performed
according to the output of local axis

The shell elements for wall design are designed for moments and shear forces in two orthogonal directions,
those are as follows:

a) M11 : Moment per unit length acting at mid-surface of the element on the positive and negative 1-faces
about local-2 axis.

b) M22 : Moment per unit length acting at mid-surface of the element on the positive and negative 2-faces
about local-1 axis.

c) V13 : Out of plane shear per unit length acting at mid-surface of the element on the positive and
negative 1-faces in the direction of local-3 axis.

c) V23 : Out of plane shear per unit length acting at mid-surface of the element on the positive and
negative 2-faces in the direction of local-3 axis.

A positive face is one whose outward normal pointing (pointing away from element) is in the positive local-1
,local-2 or local-3 direction.

Sign convention for Bending Moment

As mentioned earlier walls are designed for M11 moment and M22 moment, reinforcement for M11 is horizontal
in elevation and reinforcement for M22 is in direction of Global-Z axis i.e. vertical in elevation. The positive moment
value indicates tension in negative-3 face of ETABS wall shell. Whereas negative moment indicates tension
in positive-3 face of ETABS wall shell.

527
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE

Title : Substructure RVK ASV

Reinforcement Calculations

Reinforcement calculations for RCC elements is done as per ACI 318 with following design parameters:

a) Grade of Concrete : C40


b) Grade of Steel : Fy460
c) Clear cover (Face in contact with soil): 75 mm
d) Clear cover (Face not in contact with soil): 50 mm

Main reinforcement is designed for -- M22 moment


Secondary reinforcement is designed for -- M11 moment

Wall thickness -- 250 mm

Reinforcement (General mesh)

Main Reinforcement (Both faces ) -- 12 @ 150 mm c/c ( 754 mm2/m )


Secondary Reinforcement (Both faces) -- 12 @ 100 mm c/c ( 1131 mm2/m )

Minimum reinforcement in slabs as per ACI318 = 0.18% of concrete area*(420/460) (ref TB:7.6.1.1)
For 250 thick wall = 410.87 mm2/m

528
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE

Title : Substructure RVK ASV

Above mentioned rebar is used as general mesh for walls. As per provided reinforcement moment capacities are
calculated for various reinforcement combinations. Extra bar locations are identified with the help of calculated
capacities and moment contours. Moment capacities are tabulated in the next section

Moment capacity tables

Moment capacities for 250 mm thick wall satisfying Ultimate limit state criteria & servicebility for outer mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. Type (mm2/m)
Capacity
0.20 mm Crackwidth
Description (kN-m/m)
1 12 @ 150 Main 754 45 17
2 12 @ 100 Secondary 1131 65 23

Moment capacities for 250 mm thick wall satisfying Ultimate limit state criteria & servicebility for inner mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. Type (mm2/m)
Capacity
0.15 mm Crackwidth
Description
(kN-m/m)
1 12 @ 150 Main 754 50 17
2 12 @ 100 Secondary 1131 75 23

529
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE

Title : Substructure RVK ASV

Moment capacity calculations for ULS of 250 mm thick wall

Outer mesh capacity calculations

Moment capacity of main outer reinforcement of 250 mm thick wall --

Provided reinforcement T 12 @ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 753.98 mm2

Thickness of the wall = 250 mm


Local-2
Clear cover = 75 mm

Diameter of the reinforcement = 12 mm


Local-1
Effective depth d = 169 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 1.75

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 665.3 mm

Moment Capacity = 45 kN-m

Moment capacity of secondary outer reinforcement of 250 mm thick wall --

Provided reinforcement T 12 @ 100 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1131 mm2

Thickness of the wall = 250 mm


Local-2
Clear cover = 87 mm

Diameter of the reinforcement = 12 mm


Local-1
Effective depth d = 157 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 2.93

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1061 mm

Moment Capacity = 65 kN-m

530
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE

Title : Substructure RVK ASV

Moment capacity calculations for ULS of 250 mm thick wall :

Inner mesh capacity calculations

Moment capacity of main inner reinforcement of 250 mm thick wall --

Provided reinforcement T 12 @ 150 mm + T 0@ 150 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 753.98 mm2

Thickness of the wall = 250 mm


Local-2
Clear cover = 50 mm

Diameter of the reinforcement = 12 mm


Local-1
Effective depth d = 194 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 1.48

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 640.4 mm

Moment Capacity = 50 kN-m

Moment capacity of secondary inner reinforcement of 250 mm thick wall --

Provided reinforcement T 12 @ 100 mm + T 0@ 100 mm fc' = 32 mpa


fy = 460 mpa
Provided Area = 1131 mm2

Thickness of the wall = 250 mm


Local-2
Clear cover = 62 mm

Diameter of the reinforcement = 12 mm


Local-1
Effective depth d = 182 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 2.52

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 1046 mm

Moment Capacity = 75 kN-m

531
Project :: 132/11 kV SHKZBHST SUBSTATION
Contractor :: DANWAY
End User DESIGNED CHECKED DATE
:: DEWA
Title RVK ASV
:: Substructure

Moment capacity of outer face main reinforcement of 250 mm thick wall satisfying 0.20 mm crackwidth --

Provided reinforcement T 12 @ 150 + T 0@ 150 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 753.98 mm2

cmin

s
Concrete & Steel :
Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-11: Cl : 8.5.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 17 kN-m
Thickness of the Wall (h) = 250
Diameter of main bar ( Ø ) = 12 mm
Spacing of main bars (s) = 150 mm
Clear cover to reinforcement (Cmin)
i ) = 75 mm
Cover-Tension face to center of closest bar (dc) = 56 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 150 ST = 753.98 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth = 12.76 mm ACI:318-14, R20.2.2 & Sec. 22.2.2


=(As∗fy)/(0.85∗fc^′∗b)
c = Neutral axis depth = a / β1 = 15.534 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 169 mm

z = Lever arm ( d - a/2) = 162.62 mm

fs = reinforcing steel stress = 136.21 N/mm2 ACI:318-14, Table R24.5.2.1


=Mu/(Ast ∗z)
β = (h-c)/(d-c) = 1.5278 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 93.6 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE

532
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE

Title : Substructure RVK ASV

Moment capacity of outer face secondary reinforcement of 250 mm thick wall satisfying 0.20 mm crackwidth --

Provided reinforcement T 12 @ 100 + T 0@ 200 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 1131 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-11: Cl : 8.5.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 23 kN-m
Thickness of the wall (h) = 250 mm
Diameter of main bar ( Ø ) = 12 mm
Spacing of main bars (s) = 100 mm
Clear cover to reinforcement (Cmin)
i ) = 87 mm
Cover-Tension face to center of closest bar (dc) = 68 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.20 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 100 ST = 1131 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 19.13 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 23.289 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 157 mm

z = Lever arm ( d - a/2) = 147.44 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 137.94 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.6955 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 84.404 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.198 mm Eqn 1-2 ACI 224.1-R-8
SAFE

533
Project :: 132/11 kV SHKZBHST SUBSTATION
Contractor :: DANWAY
End User :: DEWA DESIGNED CHECKED DATE

Title :: Substructure RVK ASV

Moment capacity of inner face main reinforcement of 250 mm thick wall satisfying 0.15 mm crackwidth --

Provided reinforcement T 12 @ 150 + T 0@ 150 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 753.98 mm2

cmin

s
Concrete & Steel :
Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-11: Cl : 8.5.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 17 kN-m
Thickness of the Wall (h) = 250
Diameter of main bar ( Ø ) = 12 mm
Spacing of main bars (s) = 150 mm
Clear cover to reinforcement (Cmin)
i ) = 50 mm
Cover-Tension face to center of closest bar (dc) = 56 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 150 ST = 753.98 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth = 12.76 mm ACI:318-14, R20.2.2 & Sec. 22.2.2


=(As∗fy)/(0.85∗fc^′∗b)
c = Neutral axis depth = a / β1 = 15.534 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 194 mm

z = Lever arm ( d - a/2) = 187.62 mm

fs = reinforcing steel stress = 117.22 N/mm2 ACI:318-14, Table R24.5.2.1


=Mu/(Ast ∗z)
β = (h-c)/(d-c) = 1.3138 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 93.6 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE

534
Project :: 132/11 kV SHKZBHST SUBSTATION
Contractor :: DANWAY
End User :: DESIGNED CHECKED DATE
DEWA
Title :: RVK ASV
Substructure

Moment capacity of inner face secondary reinforcement of 250 mm thick wall satisfying 0.15 mm crackwidth --

Provided reinforcement T 12 @ 100 + T 0@ 200 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 1131 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-11: Cl : 8.5.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 23 kN-m
Thickness of the wall (h) = 250 mm
Diameter of main bar ( Ø ) = 12 mm
Spacing of main bars (s) = 100 mm
Clear cover to reinforcement (Cmin)
i ) = 62 mm
Cover-Tension face to center of closest bar (dc) = 68 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 100 ST = 1131 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 19.13 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 23.289 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 182 mm

z = Lever arm ( d - a/2) = 172.44 mm

fs = reinforcing steel stress =Mu/(Ast ∗z) = 117.94 N/mm2 ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.4285 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 84.404 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.143 mm Eqn 1-2 ACI 224.1-R-8
SAFE

535
ETABS 17.0.1

OUTER VERTICAL REINFORCEMENT - ULS CASE


General mesh T12@150 mm c/c

Z Y

-1.80 -1.35 -0.90 -0.45 0.00 0.45 0.90 1.35 1.80 2.25 2.70 3.15 3.60 4.05
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
536
ETABS 17.0.1

Z Y

No moment is found above 45 kN-m. Hence provided reinforcement is satisfactory.

45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
537
ETABS 17.0.1

OUTER SECONDARY REINFORCEMENT - ULS CASE


General mesh T12@100 mm c/c

Z Y

0.00 0.70 1.40 2.10 2.80 3.50 4.20 4.90 5.60 6.30 7.00 7.70 8.40 9.10
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
538
ETABS 17.0.1

Z Y

No moment is found above 65 kN-m. Hence provided reinforcement is satisfactory.

65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
539
ETABS 17.0.1

INNER VERTICAL REINFORCEMENT - ULS CASE


General mesh T12@150 mm c/c

Z Y

-13.0 -12.0 -11.0 -10.0 -9.0 -8.0 -7.0 -6.0 -5.0 -4.0 -3.0 -2.0 -1.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
540
ETABS 17.0.1

Z Y

No moment is found above 50 kN-m. Hence provided reinforcement is satisfactory.

-50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
541
ETABS 17.0.1

INNER SECONDARY REINFORCEMENT - ULS CASE


General mesh T12@200 mm c/c

Z Y

-24.7 -22.8 -20.9 -19.0 -17.1 -15.2 -13.3 -11.4 -9.5 -7.6 -5.7 -3.8 -1.9 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
542
ETABS 17.0.1

Z Y

No moment is found above 75 kN-m. Hence provided reinforcement is satisfactory.

-75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
543
ETABS 17.0.1 Crackwidth check

OUTER VERTICAL REINFORCEMENT - SLS CASE


General mesh T12@150 mm c/c

Z Y

-1.12 -0.84 -0.56 -0.28 0.00 0.28 0.56 0.84 1.12 1.40 1.68 1.96 2.24 2.52
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
544
ETABS 17.0.1

Z Y

No moment is found above 17 kN-m. Hence provided reinforcement is satisfactory.

17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
545
ETABS 17.0.1

OUTER SECONDARY REINFORCEMENT - SLS CASE


General mesh T12@100 mm c/c

Z Y

0.00 0.45 0.90 1.35 1.80 2.25 2.70 3.15 3.60 4.05 4.50 4.95 5.40 5.85
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
546
ETABS 17.0.1

Z Y

No moment is found above 23 kN-m. Hence provided reinforcement is satisfactory.

23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
547
ETABS 17.0.1

INNER VERTICAL REINFORCEMENT - SLS CASE


General mesh T12@150 mm c/c

Z Y

-7.80 -7.15 -6.50 -5.85 -5.20 -4.55 -3.90 -3.25 -2.60 -1.95 -1.30 -0.65 0.00 0.65
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
548
ETABS 17.0.1

Z Y

No moment is found above 17 kN-m. Hence provided reinforcement is satisfactory.

-17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
549
ETABS 17.0.1

INNER SECONDARY REINFORCEMENT - SLS CASE


General mesh T12@100 mm c/c

Z Y

-15.6 -14.4 -13.2 -12.0 -10.8 -9.6 -8.4 -7.2 -6.0 -4.8 -3.6 -2.4 -1.2 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
550
ETABS 17.0.1

Z Y

No moment is found above 23 kN-m. Hence provided reinforcement is satisfactory.

-23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
551
Shear Check

Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK


Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 12 @ 150 mm + T 0@ 150 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 753.98 mm

Thickness of the Wall = 250 mm

Clear cover = 75 mm Local-2

Diameter of the reinforcement = 12 mm

Effective depth d = 169 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 0.18 N/mm2

Factored moment at critical shear section,


section Mu = 28.0
28 0 kN m
kN-m

Factored shear force, Vu = 45 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.28 (maximum 1)

Percentage of steel provided þW = 0.0045

Vc1 = 0.93 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.93 N/mm

ɸ v Vc = 0.69 N/mm2

552
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN

Shear Check calculations for ULS of 300 mm thick Wall

Provided reinforcement T 12 @ 200 mm + T 0@ 200 mm f c' = 32 MPa


fy = 460 MPa
2
Provided Area = 565.49 mm

Thickness of the Wall = 250 mm

Clear cover = 87 mm Local-2

Diameter of the reinforcement = 12 mm

Effective depth d = 157 mm Local-1

Strength reduction factor (ɸ ) for Shear = 0.75

Max Shear Stress from ETABS Contour = 0.18 N/mm2

Factored moment at critical shear section,


section Mu = 28.0
28 0 kN m
kN-m

Factored shear force, Vu = 45 kN

Shear strength of the Wall, Vc shall be minimum of ( Vc1, Vc2)

Vc1 = 0.16ƛ SQRT(fc' )+ 17 w (V ud / M u )


As per Cl. 22.5.5.1, ACI318-14
Vc2 = 0.29 ƛ SQRT(fc')

Vud/Mu = 0.26 (maximum 1)

Percentage of steel provided þW = 0.0036

Vc1 = 0.92 N/mm2

2
Vc2 = 1.64 N/mm

2
Shear strength provide by concrete Vc = 0.92 N/mm

ɸ v Vc = 0.69 N/mm2

553
ETABS 17.0.1

VERTICAL REINFORCEMENT - ULS CASE

Z Y

-108 -90 -72 -54 -36 -18 0 18 36 54 72 90 108 126 E-3


132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
554
ETABS 17.0.1

Z Y

X
Shear stress capacity of 250 mm thick wall with general
mesh T12@150mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE

690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
555
ETABS 17.0.1

Z Y

X
Shear stress capacity of 250 mm thick wall with general
mesh T12@150mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE

-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
556
ETABS 17.0.1

SECONDARY REINFORCEMENT - ULS CASE

Z Y

-168 -144 -120 -96 -72 -48 -24 0 24 48 72 96 120 144 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
557
ETABS 17.0.1

Z Y

X
Shear stress capacity of 250 mm thick wall with general
mesh T12@150mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE

690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
558
ETABS 17.0.1

Z Y

Shear stress capacity of 250 mm thick wall with general


mesh T12@150mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE

-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
559
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Title : MAIN BUILDING-SUBSTRUCTURE ASV MMN 14-06-2022

560
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Title : MAIN BUILDING-SUBSTRUCTURE ASV MMN 14-06-2022

SHEAR WALL DESIGN

Staircase RC walls are designed as core walls by using uniform reinforcing pier section in ETABS.
ETABS designs the walls labeled as piers for in plane and out of plane moments and reports the steel
required for bending and shear requirements as longitudinal reinforcement and shear reinforcement.
Shear wall design summary sheets from ETABS are attached for each core wall for reference

Internal Forces and ETABS local axes convention

Shear wall is designed for moments and shear in two orthogonal directions, i.e. along Global X.& Y axes
of ETABS. The local-1,2 & 3 axes are consistent throughout the model so as to use results for design
with ease. The local axes for piers is as follows:

a) Local-1: This axis is in the parallel to global Z-axis, this axis is red in color.

b) Local-2: This axis is always axis of minor bending and green in color.

c) Local-3: This axis is always axis of major bending and blue in color.

M33 moment corresponds to Major axis bending and M22 corresponds to minor axis bending

Reinforcement

Longitudinal steel of T12@150 is provided for all walls in two layers, boundary elements of same thickness
as that of wall are found to be safe, on the conservative side T16 bars are provided for boundary elements.
Transverse reinforcement T12@200 in two layers

Reinforcement calculations of core walls are attached before respective design summaries

561
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Title : MAIN BUILDING-SUBSTRUCTURE ASV MMN 14-06-2022

a) Staircase-1 core wall reinforcement details

Pier ID's : P1,P2,P3

Core wall structural geometry

Length of Leg
Leg ID
(mm)
1 2950
2 6440
3 2950
4 6440

Thickness of wall : 300 mm

Minimum % of reinforcement in vertical direction : 0.25% = 750 mm2

Minimum % of reinforcement in horizontal direction : 0.25% = 750 mm2

Minimum vertical reinforcement on each wall face : = 375 mm2

Minimum horizontal reinforcement on each wall face : = 375 mm2

Longitudinal Steel provided : T 12 @ 150 = 754 mm2 > 375 mm2

Transverse Steel provided : T 12 @ 200 = 565 mm2 > 375 mm2

Maximum required longitudinal steel in mm2 : 14085 (Summary sheet and picture attached for reference)

Total length of core wall : 18.8 m

Total Steel provided : 28319 mm2 > 14085, SAFE

Core wall Reqd. Shear Prov. Shear


Leg ID
Reference Reinforcement, mm2/m Reinforcement, mm2/m
(T16 @ 200 Extra is provided from
Leg-1 Staircase-1 750 1131 7.5 lvl to 16.7m lvl)
Leg-2 Staircase-1 750 1131
Leg-3 Staircase-1 750 1131
Leg-4 Staircase-1 750 1131

SAFE

Core wall Reqd. Shear Prov. Shear


Leg ID
Reference Reinforcement, mm2/m Reinforcement, mm2/m
Leg-1 Staircase-1 2421 3141 (T16 @ 200 Extra is provided from
Leg-2 Staircase-1 2421 3141 BASEMENT lvl to 7.5m lvl)
Leg-3 Staircase-1 2421 3141
Leg-4 Staircase-1 2421 3141

SAFE

562
ETABS 17.0.1 14-06-2022

85
1408 5
13
1 31
3
1319195
13195
5
13195
1319 5
14085
14085
14085
12599

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Pier Longitudinal Reinforcing Areas (mm²) (ACI 318-14)

563
ETABS 17.0.1 14-06-2022

750
750
750
2223
222
2421
1906 3

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Pier Shear Reinforcing (mm²/m) (ACI 318-14)

564
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Title : MAIN BUILDING-SUBSTRUCTURE ASV MMN 14-06-2022

b) Staircase-2 core wall reinforcement details

Pier ID's : P4, P5, P6

Core wall structural geometry

Length of Leg
Leg ID
(mm)
1 2980
2 6440
3 2980
4 6440

Thickness of wall : 300 mm

Minimum % of reinforcement in vertical direction : 0.25% = 750 mm2

Minimum % of reinforcement in horizontal direction : 0.25% = 750 mm2

Minimum vertical reinforcement on each wall face : = 375 mm2

Minimum horizontal reinforcement on each wall face : = 375 mm2

Longitudinal Steel provided : T 12 @ 150 = 754 mm2 > 375 mm2

Transverse Steel provided : T 12 @ 200 = 565 mm2 > 375 mm2

Maximum required longitudinal steel in mm2 : 14130 (Summary sheet and picture attached for reference)

Total length of core wall : 18.8 m

Total Steel provided : 28410 mm2 > 14130, Safe

Core wall Reqd. Shear Prov. Shear


Leg ID
Reference Reinforcement, mm2/m Reinforcement, mm2/m
Leg-1 Staircase-2 878 1131
Leg-2 Staircase-2 878 1131
Leg-3 Staircase-2 878 1131
Leg-4 Staircase-2 878 1131

SAFE

565
ETABS 17.0.1 14-06-2022

14130
13387
14130
13387
13387
13387
14130
14130
14130
13676

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Pier Longitudinal Reinforcing Areas (mm²) (ACI 318-14)

566
ETABS 17.0.1 14-06-2022

750
750
750
750
750
750
750
750
750
878

132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Pier Shear Reinforcing (mm²/m) (ACI 318-14)

567
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : Main Building Substructure SRI ASV

568
Job No Sheet No Rev
1
Part
Software licensed to Microsoft
Job Title Ref

By Date

Client File Trench wall.std Date/Time

3.200m

4.150m

Y
X
Z Load 202

Whole Structure

Print Time/Date: 13/07/2021 17:43 STAAD.Pro V8i (SELECTseries 5) 20.07.10.65 Print Run 1 of 1

569
CLIENT: DESIGN CONSULTANT:
DUBAI ELECTRICITY & WATER LAKSHMI ENGINEERS ARCHITECTS PROJECT: 132/11kV SHZBHST SUBSTATION
AUTHORITY(DEWA) & DESIGNERS
MAIN CONTRACTOR: DESIGN TITLE:
DANWAY TRENCH WALL DESIGN

STAAD SPACE
START JOB INFORMATION
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 0.533333 0 0; 3 1.06667 0 0; 4 1.6 0 0; 5 2.13333 0 0;
6 2.66667 0 0; 7 3.2 0 0; 8 0 0.51875 0; 9 0.533333 0.51875 0;
10 1.06667 0.51875 0; 11 1.6 0.51875 0; 12 2.13333 0.51875 0;
13 2.66667 0.51875 0; 14 3.2 0.51875 0; 15 0 1.0375 0; 16 0.533333 1.0375 0;
17 1.06667 1.0375 0; 18 1.6 1.0375 0; 19 2.13333 1.0375 0; 20 2.66667 1.0375 0;
21 3.2 1.0375 0; 22 0 1.55625 0; 23 0.533333 1.55625 0; 24 1.06667 1.55625 0;
25 1.6 1.55625 0; 26 2.13333 1.55625 0; 27 2.66667 1.55625 0; 28 3.2 1.55625 0;
29 0 2.075 0; 30 0.533333 2.075 0; 31 1.06667 2.075 0; 32 1.6 2.075 0;
33 2.13333 2.075 0; 34 2.66667 2.075 0; 35 3.2 2.075 0; 36 0 2.59375 0;
37 0.533333 2.59375 0; 38 1.06667 2.59375 0; 39 1.6 2.59375 0;
40 2.13333 2.59375 0; 41 2.66667 2.59375 0; 42 3.2 2.59375 0; 43 0 3.1125 0;
44 0.533333 3.1125 0; 45 1.06667 3.1125 0; 46 1.6 3.1125 0;
47 2.13333 3.1125 0; 48 2.66667 3.1125 0; 49 3.2 3.1125 0; 50 0 3.63125 0;
51 0.533333 3.63125 0; 52 1.06667 3.63125 0; 53 1.6 3.63125 0;
54 2.13333 3.63125 0; 55 2.66667 3.63125 0; 56 3.2 3.63125 0; 57 0 4.15 0;
58 0.533333 4.15 0; 59 1.06667 4.15 0; 60 1.6 4.15 0; 61 2.13333 4.15 0;
62 2.66667 4.15 0; 63 3.2 4.15 0;
MEMBER INCIDENCES
49 57 63;
ELEMENT INCIDENCES SHELL
1 1 2 9 8; 2 2 3 10 9; 3 3 4 11 10; 4 4 5 12 11; 5 5 6 13 12; 6 6 7 14 13;
7 8 9 16 15; 8 9 10 17 16; 9 10 11 18 17; 10 11 12 19 18; 11 12 13 20 19;
12 13 14 21 20; 13 15 16 23 22; 14 16 17 24 23; 15 17 18 25 24; 16 18 19 26 25;
17 19 20 27 26; 18 20 21 28 27; 19 22 23 30 29; 20 23 24 31 30; 21 24 25 32 31;
22 25 26 33 32; 23 26 27 34 33; 24 27 28 35 34; 25 29 30 37 36; 26 30 31 38 37;
27 31 32 39 38; 28 32 33 40 39; 29 33 34 41 40; 30 34 35 42 41; 31 36 37 44 43;
32 37 38 45 44; 33 38 39 46 45; 34 39 40 47 46; 35 40 41 48 47; 36 41 42 49 48;
37 43 44 51 50; 38 44 45 52 51; 39 45 46 53 52; 40 46 47 54 53; 41 47 48 55 54;
42 48 49 56 55; 43 50 51 58 57; 44 51 52 59 58; 45 52 53 60 59; 46 53 54 61 60;
47 54 55 62 61; 48 55 56 63 62;
ELEMENT PROPERTY
1 TO 48 THICKNESS 0.25
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
TYPE CONCRETE
STRENGTH FCU 27579
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
49 PRIS YD 0.05 ZD 0.05
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
1 TO 8 14 15 21 22 28 29 35 36 42 43 49 50 56 57 63 FIXED
LOAD 1 LOADTYPE Dead TITLE DEAD
SELFWEIGHT Y -1 LIST ALL
MEMBER LOAD

570
CLIENT: DESIGN CONSULTANT:
DUBAI ELECTRICITY & WATER LAKSHMI ENGINEERS ARCHITECTS PROJECT: 132/11kV SHZBHST SUBSTATION
AUTHORITY(DEWA) & DESIGNERS
MAIN CONTRACTOR: DESIGN TITLE:
DANWAY TRENCH WALL DESIGN

49 UNI GY -10
LOAD 2 LOADTYPE Live REDUCIBLE TITLE LL
MEMBER LOAD
49 UNI GY -10
LOAD 3 LOADTYPE Live REDUCIBLE TITLE OIL/WATER PRESSURE (FULL)
ELEMENT LOAD
1 TO 6 TRAP JT -25 -25 -20 -20
7 TO 12 TRAP JT -20 -20 -15 -15
13 TO 18 TRAP JT -15 -15 -10 -10
19 TO 24 TRAP JT -10 -10 -5 -5
25 TO 30 TRAP JT -5 -5 0 0
LOAD 4 LOADTYPE Live REDUCIBLE TITLE OIL/WATER PRESSURE (HALF)
ELEMENT LOAD
1 TO 6 TRAP JT -13 -13 -8.66667 -8.66667
7 TO 12 TRAP JT -8.66667 -8.66667 -4.33333 -4.33333
13 TO 18 TRAP JT -4.33333 -4.33333 0 0
LOAD COMB 100 1.4DL + 1.6 LL
1 1.4 2 1.6
LOAD COMB 101 1.4DL + 1.6 LL + 1.4OW (F)
1 1.4 2 1.6 3 1.4
LOAD COMB 102 1.4DL + 1.6LL - 1.4OW(F)
1 1.4 2 1.6 3 -1.4
LOAD COMB 103 1.4DL + 1.6LL + 1.4OW(H)
1 1.4 2 1.6 4 1.4
LOAD COMB 104 1.4DL + 1.6LL - 1.4OW(H)
1 1.4 2 1.6 4 -1.4
LOAD COMB 200 1.0DL + 1.0LL
1 1.0 2 1.0
LOAD COMB 201 1.0DL + 1.0LL + 1.0OW(F)
1 1.0 2 1.0 3 1.0
LOAD COMB 202 1.0DL + 1.0LL - 1.0OW(F)
1 1.0 2 1.0 3 -1.0
LOAD COMB 203 1.0DL + 1.0LL + 1.0OW(H)
1 1.0 2 1.0 4 1.0
LOAD COMB 204 1.0DL + 1.0LL - 1.0OW(H)
1 1.0 2 1.0 4 -1.0
PERFORM ANALYSIS
FINISH

571
Job No Sheet No Rev
1
Part
Software licensed to Microsoft
Job Title Ref

By Date Chd

Client File Trench wall.std Date/Time

Plate Center Stress Summary -For Trench Wall ULS


Shear Membrane Bending
Plate L/C Qx Qy Sx Sy Sxy Mx My Mxy
(N/mm2) (N/mm2) (N/mm2) (N/mm2) (N/mm2) (kNm/m) (kNm/m) (kNm/m)
Max Qx 18 101:1.4DL + 1.6 0.065 0.006 -0.009 -0.010 0.028 4 0 -0
Min Qx 18 102:1.4DL + 1.6 -0.065 -0.006 -0.009 -0.010 0.028 -4 -0 0
Max Qy 4 102:1.4DL + 1.6 0.006 0.087 -0.006 -0.054 0.002 -0 -4 0
Min Qy 4 101:1.4DL + 1.6 -0.006 -0.087 -0.006 -0.054 0.002 0 4 -0
Max Sx 48 100:1.4DL + 1.6 0.000 0.000 0.026 0.009 0.031 0 0 0
Min Sx 46 100:1.4DL + 1.6 0.000 0.000 -0.020 -0.007 0.003 0 0 0
Max Sy 48 100:1.4DL + 1.6 0.000 0.000 0.026 0.009 0.031 0 0 0
Min Sy 4 100:1.4DL + 1.6 0.000 0.000 -0.006 -0.054 0.002 0 0 0
Max Sxy 36 100:1.4DL + 1.6 0.000 0.000 -0.003 -0.003 0.040 0 0 0
Min Sxy 31 100:1.4DL + 1.6 0.000 0.000 -0.003 -0.003 -0.040 0 0 0
Max Mx 18 101:1.4DL + 1.6 0.065 0.006 -0.009 -0.010 0.028 4 0 -0
Min Mx 18 102:1.4DL + 1.6 -0.065 -0.006 -0.009 -0.010 0.028 -4 -0 0
Max My 4 101:1.4DL + 1.6 -0.006 -0.087 -0.006 -0.054 0.002 0 4 -0
Min My 4 102:1.4DL + 1.6 0.006 0.087 -0.006 -0.054 0.002 -0 -4 0
Max Mxy 8 101:1.4DL + 1.6 -0.020 -0.016 -0.003 -0.031 -0.009 -1 -1 1
Min Mxy 8 102:1.4DL + 1.6 0.020 0.016 -0.003 -0.031 -0.009 1 1 -1

Print Time/Date: 13/07/2021 17:30 STAAD.Pro V8i (SELECTseries 5) 20.07.10.65 Print Run 1 of 1

572
Job No Sheet No Rev
1
Part
Software licensed to Microsoft
Job Title Ref

By Date Chd

Client File Trench wall.std Date/Time

MY (local)
kNm/m
<= -4.05
-3.6
-3.16
-2.72
-2.28
-1.83
-1.39
-0.949
-0.507
-0.065
0.378
0.82
1.26
1.7
2.15
2.59
>= 3.03

Y
Z X
Load 102

WALL My MOMENT

MX (local)
kNm/m
<= -3.57
-3.16
-2.75
-2.34
-1.93
-1.52
-1.11
-0.7
-0.290
0.120
0.53
0.94
1.35
1.76
2.17
2.58
>= 2.99

Y
Z X
Load 102

WALL Mx MOMENT

Print Time/Date: 13/07/2021 17:35 STAAD.Pro V8i (SELECTseries 5) 20.07.10.65 Print Run 1 of 1

573
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : Main Building substructure SRI ASV

Both face Main Reinforcement design of 250 mm thick Wall

Design Moment = 4 kN-m

f c' = 32 mpa

fy = 460 mpa

Thickness of the wall = 250 mm

Clear cover = 50 mm
Y
Diameter of the reinforcement = 12 mm
X
Spacing of Reinforcement = 150 mm

Effective depth d = 194 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 0.12

Bending steel required


As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 50 mm2

Provide T 12 @ 150 mm c/c

2
Provided Area = 753.98 mm SAFE

Both face Secondary Reinforcement design of 250 mm thick Wall

Design Moment = 4 kN-m

f c' = 32 mpa

fy = 460 mpa

Thickness of the wall = 250 mm

Clear cover = 62 mm
Y
Diameter of the reinforcement = 12 mm
X
Spacing of Reinforcement = 200 mm

Effective depth d = 182 mm

Strength reduction factor ( Ø ) for flexure = 0.90

Rn = Mu / (Ø b d2) = 0.13

Bending steel required


2
As = 0.85 fc' (1-sqrt((1-(2Rn/0.85 fc'))) × bd / fy = 53.219 mm

Provide T 12 @ 200 mm c/c

2
Provided Area = 565.49 mm SAFE

574
Job No Sheet No Rev
1
Part
Software licensed to Microsoft
Job Title Ref

By Date Chd

Client File Trench wall.std Date/Time

Plate Center Stress Summary -For Trench Wall SLS


Shear Membrane Bending
Plate L/C Qx Qy Sx Sy Sxy Mx My Mxy
(N/mm2) (N/mm2) (N/mm2) (N/mm2) (N/mm2) (kNm/m) (kNm/m) (kNm/m)
Max Qx 18 201:1.0DL + 1.0 0.046 0.004 -0.006 -0.007 0.020 3 0 -0
Min Qx 18 202:1.0DL + 1.0 -0.046 -0.004 -0.006 -0.007 0.020 -3 -0 0
Max Qy 4 202:1.0DL + 1.0 0.004 0.062 -0.004 -0.039 0.002 -0 -3 0
Min Qy 4 201:1.0DL + 1.0 -0.004 -0.062 -0.004 -0.039 0.002 0 3 -0
Max Sx 48 200:1.0DL + 1.0 0.000 0.000 0.019 0.007 0.022 0 0 0
Min Sx 46 200:1.0DL + 1.0 0.000 0.000 -0.014 -0.005 0.002 0 0 0
Max Sy 48 200:1.0DL + 1.0 0.000 0.000 0.019 0.007 0.022 0 0 0
Min Sy 4 200:1.0DL + 1.0 0.000 0.000 -0.004 -0.039 0.002 0 0 0
Max Sxy 36 200:1.0DL + 1.0 0.000 0.000 -0.002 -0.002 0.029 0 0 0
Min Sxy 31 200:1.0DL + 1.0 0.000 0.000 -0.002 -0.002 -0.029 0 0 0
Max Mx 18 201:1.0DL + 1.0 0.046 0.004 -0.006 -0.007 0.020 3 0 -0
Min Mx 18 202:1.0DL + 1.0 -0.046 -0.004 -0.006 -0.007 0.020 -3 -0 0
Max My 4 201:1.0DL + 1.0 -0.004 -0.062 -0.004 -0.039 0.002 0 3 -0
Min My 4 202:1.0DL + 1.0 0.004 0.062 -0.004 -0.039 0.002 -0 -3 0
Max Mxy 8 201:1.0DL + 1.0 -0.014 -0.011 -0.002 -0.022 -0.006 -1 -1 1
Min Mxy 8 202:1.0DL + 1.0 0.014 0.011 -0.002 -0.022 -0.006 1 1 -1

Print Time/Date: 13/07/2021 17:34 STAAD.Pro V8i (SELECTseries 5) 20.07.10.65 Print Run 1 of 1

575
Job No Sheet No Rev
1
Part
Software licensed to Microsoft
Job Title Ref

By Date Chd

Client File Trench wall.std Date/Time

MY (local)
kNm/m
<= -2.89
-2.57
-2.26
-1.94
-1.63
-1.31
-0.994
-0.678
-0.362
-0.046
0.270
0.586
0.902
1.22
1.53
1.85
>= 2.17

Y
Z X
Load 202

WALL My MOMENT

MX (local)
kNm/m
<= -2.55
-2.26
-1.97
-1.67
-1.38
-1.09
-0.793
-0.5
-0.207
0.086
0.378
0.671
0.964
1.26
1.55
1.84
>= 2.14

Y
Z X
Load 202

WALL Mx MOMENT

Print Time/Date: 13/07/2021 17:40 STAAD.Pro V8i (SELECTseries 5) 20.07.10.65 Print Run 1 of 1

576
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE

Title : MAIN BUILDING-SUBSTRUCTURE RVK ASV 27.07.2021

Moment capacity of both face main reinforcement of 250 mm thick wall satisfying 0.15 mm crackwidth --

Provided reinforcement T 12 @ 150 + T 0@ 150 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 753.98 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-11: Cl : 8.5.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 3 kN-m
Thickness of the Wall (h) = 250
Diameter of main bar ( Ø ) = 12 mm
Spacing of main bars (s) = 150 mm
Clear cover to reinforcement (Cmin) = 50 mm
Cover-Tension face to center of closest bar (dc) = 56 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 150 ST = 753.98 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 12.76 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 15.534 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 194 mm

z = Lever arm ( d - a/2) = 187.62 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 21.207 N/mm


2
ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.3138 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 93.6 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.027 mm Eqn 1-2 ACI 224.1-R-8
SAFE

577
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User DESIGNED CHECKED DATE
: DEWA
Title RVK ASV 12.07.2021
: MAIN BUILDING-SUBSTRUCTURE

Moment capacity of both face secondary reinforcement of 250 mm thick wall satisfying 0.15 mm crackwidth --

Provided reinforcement T 12 @ 200 + T 0@ 200 mm (Extra) fy = 460 Mpa


fc ' = 32 Mpa
Provided Ast = 565.49 mm2

cmin

Concrete & Steel :


Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-11: Cl : 8.5.1)
Modulus of elasticity of steel ES = 200000 N/mm2

Force and reinforcement data :


Maximum working moment in section = 3 kN-m
Thickness of the wall (h) = 250 mm
Diameter of main bar ( Ø ) = 12 mm
Spacing of main bars (s) = 200 mm
Clear cover to reinforcement (Cmin) = 62 mm
Cover-Tension face to center of closest bar (dc) = 68 mm Max cover 50mm - R10.6.4 ACI350-01
Limiting crackwidth = 0.15 mm

Calculation : 0.85fc'
a/2
a
C=0.85fc'ba

z = (d-a/2)
T = Asfy

Stress distribution

As = 12 @ 200 ST = 565.49 mm2/m

β1 = 0.65 < (0.85-(0.05(fc'-28)/7)) < 0.85 = 0.8214 ACI:318-14,Table 22.2.2.4.3

b = width of the wall = 1000 mm

a = Compression block depth As∗fy / 0.85∗fc^′∗b = 9.57 mm ACI:318-14, R20.2.2 & Sec. 22.2.2

c = Neutral axis depth = a / β1 = 11.65 mm ACI:318-14, Eqn: 22.2.2.4.1

d = h -cl cover - Ø/2 = 182 mm

z = Lever arm ( d - a/2) = 177.22 mm

fs = reinforcing steel stress Mu/ Ast ∗z = 29.936 N/mm


2
ACI:318-14, Table R24.5.2.1

β = (h-c)/(d-c) = 1.3992 mm ACI:224.1.R-8, Eqn1-2

sqrt[dc2+(s/2)2] = 120.93 mm

Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.051 mm Eqn 1-2 ACI 224.1-R-8
SAFE

578
Project : 132/11 Kv SHKZBHST
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV

579
Project: 132/11 kV SHEIK ZAYED BIN HAMDAN SUBSTATION DESIGNED ACK
Contractor:DANWAY CHECKED ASV
Client:DEWA APPROVED VRP
Title: POWER TRANSFORMER
Design of Plinth :
Data:
2
Compressive Strength of concrete = 32 N/mm
Length of Pedestal = 8.515 m
Width of Pedestal = 2.45 m
Height o pedestal = 4m
weight of Equipment Load = 900.0 kN
Weight of pedestal = 2086.18 kN

Design Calculations:
Total Compression Load = 900+2,086.18 kN
2986.18 kN
Maximum Stress developed on the section = (2,986.18*1000) N/mm2
( Load /Area) (8.515*1000*2.45*1000)
= 0.14 N/mm2
2
Max design stress = ɸ*0.85*fc' (clause R16.3.5.2 ) = 17.68 N/mm
(ACI 318-14) 0.14 N/mm2 < 17.68 N/mm2
HENCE SAFE
Reinforcement:
Stresse is within acceptable limit, so no rebar is required from structural point of view.
Hence minimum temperature and shrinkage reinforcement is provided (clause 24.4.1 ) (ACI 318-14)

Height of the pedestal is more than 600mm therefore H = 300mm


Minimum temperature and shrinkage reinforcement = 0.0035*B*H
= 1050 sqmm / m

Provide T16@150mm c/c in bothways = 1340 sqmm / m

HENCE SAFE

580
Project: 132/11 kV SHEIK ZAYED BIN HAMDAN SUBSTATION DESIGNED ACK
Contractor:DANWAY CHECKED ASV
Client:DEWA APPROVED VRP
Title: Shunt Reactor
Design of Plinth :
Data:
2
Compressive Strength of concrete = 32 N/mm
Length of Pedestal = 6.85 m
Width of Pedestal = 2.366 m
Height o pedestal = 4m
weight of Equipment Load = 540.0 kN
Weight of pedestal = 1620.71 kN

Design Calculations:
Total Compression Load = 540+1,620.71 kN
2160.71 kN
Maximum Stress developed on the section = (2,160.71*1000) N/mm2
( Load /Area) (6.85*1000*2.366*1000)
= 0.13 N/mm2
2
Max design stress = ɸ*0.85*fc' (clause R16.3.5.2 ) = 17.68 N/mm
(ACI 318-14) 0.13 N/mm2 < 17.68 N/mm2
HENCE SAFE
Reinforcement:
Stresse is within acceptable limit, so no rebar is required from structural point of view.
Hence minimum temperature and shrinkage reinforcement is provided (clause 24.4.1 ) (ACI 318-14)

Height of the pedestal is more than 600mm therefore H = 300mm


Minimum temperature and shrinkage reinforcement = 0.0035*B*H
= 1050 sqmm / m

Provide T16@150mm c/c in bothways = 1340 sqmm / m

HENCE SAFE

581
Project: 132/11 kV SHEIK ZAYED BIN HAMDAN SUBSTATION DESIGNED ACK
Contractor:DANWAY CHECKED ASV
Client:DEWA APPROVED VRP
Title: ET-1,2,3 area
Design of Plinth :
Data:
2
Compressive Strength of concrete = 32 N/mm
Length of Pedestal = 3.885 m
Width of Pedestal = 1.1 m
Height o pedestal = 4m
weight of Equipment Load = 50.0 kN
Weight of pedestal = 427.35 kN

Design Calculations:
Total Compression Load = 50+427.35 kN
477.35 kN
Maximum Stress developed on the section = (477.35*1000) N/mm2
( Load /Area) (3.885*1000*1.1*1000)
= 0.11 N/mm2
2
Max design stress = ɸ*0.85*fc' (clause R16.3.5.2 ) = 17.68 N/mm
(ACI 318-14) 0.11 N/mm2 < 17.68 N/mm2
HENCE SAFE
Reinforcement:
Stresse is within acceptable limit, so no rebar is required from structural point of view.
Hence minimum temperature and shrinkage reinforcement is provided (clause 24.4.1 ) (ACI 318-14)

Height of the pedestal is more than 600mm therefore H = 300mm


Minimum temperature and shrinkage reinforcement = 0.0035*B*H
= 1050 sqmm / m

Provide T16@150mm c/c in bothways = 1340 sqmm / m

HENCE SAFE

582
Project : 132/11 Kv SHKZBHST
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV

583
Project : 132/11 Kv SHKZBHST
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV

584
585
586
587
ACES Confidentiality & Proprietary Rights

Arab Center for Engineering Studies (ACES) is the sole owner of all intellectual
property rights in this document including but not limited to original materials,
tests, results, analysis, processes, schematics, drawings, photographs,
designs, conclusions, recommendations and generated information. Those
works are protected by copyright laws and treaties around the world.
The fees paid by the client to obtain the services of ACES are not considered
by any means a work made for hire, the fees is against the utilization of the
information specified in this document and for the purpose for which it was
prepared only.
The client doesn’t have the right to commercially, or otherwise, utilize the
information herein without the prior written consent of ACES. The information
of this document should not be modified and should not be reproduced except
in full.
ACES status as the authors / owners of the information of this report must
always be acknowledged. All materials and information contained in this
document are considered strictly confidential. All rights reserved. No part of
this document may be reproduced, or transmitted in any form or by any means,
electronic or mechanical, including photocopying, recording, or any information
storage and retrieval system, or translated into a machine language or
otherwise without the prior permission in writing from ACES.

***

588
TABLE OF CONTENTS
1.0 INTRODUCTION ..................................................................................................... 1
1.1 PURPOSE OF STUDY ............................................................................................................... 1
1.2 SCOPE OF WORKS .................................................................................................................. 1
1.3 STANDARDS AND CODES OF PRACTICE.................................................................................... 1
2.0 SITE AND PROJECT DESCRIPTION ..................................................................... 2
3.0 PREVAILING WEATHER CONDITIONS ................................................................ 5
4.0 REGIONAL GEOLOGY ........................................................................................... 5
5.0 FIELD WORK .......................................................................................................... 6
5.1 DRILLING ................................................................................................................................ 7
5.2 SAMPLING .............................................................................................................................. 8
5.3 FIELD TESTING IN BOREHOLES ................................................................................................ 8
5.4 EXCAVATION OF TRIAL PITS .................................................................................................. 10
5.5 INSTALLATION OF STANDPIPE PIEZOMETERS ......................................................................... 10
5.6 SITE SAFETY ......................................................................................................................... 10
6.0 LABORATORY TESTING ......................................................................................10
6.1 LABORATORY TESTS CARRIED OUT ON SAMPLES FROM BOREHOLES ....................................... 11
7.0 GROUND CONDITIONS ........................................................................................13
7.1 SITE GEOLOGY ..................................................................................................................... 13
7.2 SUB-SURFACE CONDITION .................................................................................................... 13
7.3 GROUND-WATER AND CAVITIES ............................................................................................ 16
7.4 CORE SAMPLE PHOTOGRAPHS............................................................................................... 16
7.5 LIQUEFACTION POTENTIAL .................................................................................................... 16
8.0 GEOTECHNICAL DESIGN PARAMETER MODEL ...............................................16
8.1 ENGINEERING PARAMETERS: ................................................................................................ 16
8.2 UPPER SAND ........................................................................................................................ 17
8.3 UNDERLYING BEDROCK ........................................................................................................ 18
8.3.1 Shear Strength Parameters ............................................................................... 18
8.3.2 Deformation Modulus of Rock Mass ................................................................ 19
9.0 FOUNDATION RECOMMENDATIONS .................................................................20
9.1 FOUNDATION TYPE & DEPTH ................................................................................................. 20
9.1.1 Foundation Ground Preparation ....................................................................... 21
9.2 GEOTECHNICAL ANALYSIS..................................................................................................... 22
9.2.1 Bearing Capacity Foundation Settlement ........................................................ 22
9.2.2 Allowable Bearing Pressure .............................................................................. 24
9.3 GROUND IMPROVEMENT BY ROAD BASE: ............................................................................... 25
9.4 GROUND IMPROVEMENT BY STONE COLUMNS: ...................................................................... 26
9.5 SEISMIC DESIGN PARAMETERS ............................................................................................. 27
9.6 SOIL PARAMETERS FOR DESIGN OF RETAINING STRUCTURES ............................................... 27
10.0 FOUNDATION CONSTRUCTION ..........................................................................29
10.1 EXCAVATION METHODS ........................................................................................................ 29
10.2 EXCAVATION SIDE SLOPES ................................................................................................... 29
10.3 BACKFILL MATERIAL AND COMPACTION CRITERIA ................................................................ 29
10.4 SURFACE DRAINAGE ............................................................................................................. 29
10.5 SUBSURFACE DRAINAGE SYSTEM (DEWATERING) .................................................................. 29
11.0 FOUNDATION CONCRETE ...................................................................................30
11.1 INTRODUCTION ..................................................................................................................... 30
11.2 ANALYSIS & GUIDELINES ....................................................................................................... 30

589
11.3 CLASSIFICATION OF GROUND CONDITIONS ............................................................................. 31
11.4 CONCRETE QUALITY FOR RESISTING CHEMICAL ATTACK ........................................................ 31
11.5 CONCRETE MIX .................................................................................................................... 32
11.6 CHLORIDE INFLUENCES .................................................................................................. 33
11.7 CONCLUSION ........................................................................................................................ 34
12.0 INTERACTION WITH ADJACENT PROPERTY ....................................................34
12.1 EXCAVATION INSPECTION ..................................................................................................... 35
13.0 IMPORTANT NOTES .............................................................................................35
14.0 SOFT COPY ...........................................................................................................35
List of Tables:

Table 1: Details of proposed substation ........................................................................................... 2


Table 2: Details of Field Testing and Test Methods ......................................................................... 7
Table 3: Summary of Borehole Information ...................................................................................... 7
Table 4: Summary of Trial Pit Information ...................................................................................... 10
Table 5: Summary of all Conducted Laboratory Tests ................................................................... 11
Table 6: Summary of Ground Material Properties and Classification ............................................ 13
Table 7 : Material constant for the common rock type .................................................................... 18
Table 8: Modulus ratio for common rock types ............................................................................... 19
Table 9: Geotechnical Design Parameter Model ............................................................................ 20
Table 10: Summary of foundation details ....................................................................................... 20
Table 11: Recommended Factors for Creep effects ....................................................................... 24
Table 12: Recommended Allowable Bearing Pressure without any improvement ......................... 24
Table 13: Recommended Allowable Bearing Pressures for Raft Foundations after 6 layers of Road
base ................................................................................................................................................ 26
Table 14: Recommended Allowable Bearing Pressures for Raft Foundations after stone columns
installation ....................................................................................................................................... 26
Table 15: Coefficients of Lateral Earth pressure ............................................................................ 28
Table 16: Classification of Ground Conditions................................................................................ 31
Table 17: Concrete Quality & number of Additional Protective Measures ...................................... 31
Table 18: Intended working life and number of APMs for concrete elements ................................ 32
Table 19: Concrete Qualities to resist chemical attack for the general use of in-situ and precast
concrete .......................................................................................................................................... 32
Table 20: Cement and Combination types for Concrete Qualities.................................................. 32
Table 21: Classification of exposure conditions in the Arabian Peninsula (Table 5.1 CS277-2002)
........................................................................................................................................................ 33
Table 22: Typical concrete mix criteria and cover requirements for exposure conditions in the
Arabian Peninsula from above table ............................................................................................... 33
Table 23: Methods of reducing Chloride Penetration ..................................................................... 34
List of Figures:

Figure 1: Google Image showing site location .................................................................................. 2


Figure 2: General Affection Plan....................................................................................................... 3
Figure 3: General Borehole Location Plan........................................................................................ 4
Figure 4: General Site Photographs ................................................................................................. 5
Figure 5: General Site Photographs during drilling activities ............................................................ 8
Figure 6: Graphical presentation of SPT-N value versus Elevations ................................................ 9
Figure 7: Graphical Presentation of UCS versus Elevations .......................................................... 12
Figure 8: Generalized Subsurface Profile ....................................................................................... 15
Figure 9: Approximate correlation to determine the effective angle φ° for cohesion less (Non-plastic)
soil and dry unit weight. .................................................................................................................. 17
Figure 10: Normalized Modulus Versus GSI .................................................................................. 19
Figure 11: Schematic Diagram for Limiting Depth Consideration ................................................... 23
Figure 12: Effective Peak Ground Acceleration, 10% Exceedance Probability for 50 Years Exposure
Time ................................................................................................................................................ 27

590
List of Appendices

Appendix No. Appendix Details


Appendix A : Site Plan
Appendix B : Logs of Boring and Geological Cross Section Profiles
Appendix B1 : Logs of Boring
Appendix B2 : Geological Cross Section Profiles
Appendix B3 : Trial Pit Logs
Appendix C : Field Test Results
Appendix C1 Installation of Standpipe Piezometer Test Results
Appendix D : Laboratory Test Results from Boreholes
Appendix D1 : Physical / Mechanical & Index Properties Results
Appendix D2 : Chemical Testing
Appendix D3 : Shear Strength Test Results
Appendix D3-1 : UCS Test Results
Appendix D3-2 : Point Load Test Results
Appendix D3-3 : Direct Shear Test Results
Appendix E : Photographs of Core Samples
Appendix F : Trial Pit Photographs
Recommendation for Foundation Concrete
Appendix G :
(Extract of BS 8500 – 1 : 2006 & BRE Special Digest 1 : 2005)
Appendix H : Typical calculation output for bearing capacity

591
1.0 INTRODUCTION
This revised final interpretative report presents the results of the geotechnical investigation works
carried out for the Proposed Project Emaar 132/11 kV Substation on plot no. 6482150,
SHKZBHST, Arabian Ranches III, Dubai-U.A.E.

1.1 Purpose of Study

The purpose of this geotechnical investigation was to determine the character and distribution of
geologic materials and ground water within the project site for use in foundation and excavation
design. The main objectives of the study are:

1. Assess the stability of the site in general and the influence of the construction works, to provide
the design engineers with the required measures to enhance the stability and safety of the site
and design of foundations.
2. Define and describe the subsurface materials within the site in order to assist in evaluating its
suitability to be used as backfill materials.

1.2 Scope of Works

The geotechnical investigation consisted of field studies and laboratory analysis. The field portion of
the investigation employed test borings with in-situ tests such as Nspt (standard penetration test) as
primary investigative techniques. Additionally, a standpipe piezometer was installed for the
groundwater monitoring. Laboratory studies included tests to determine soil and rock properties
including physical and mechanical properties. Additionally, chemical analyses on selected samples
of soil, rock and ground water were also included.

The project scope of works consists of the following:

1. Collecting information and maps particular to the project site.


2. Making inspection visits to the site to collect information about the present land use, surface
topography, geological features and surface drainage.
3. Drilling of five (05 Nos) boreholes upto a depth of 25.0m each and collecting disturbed (soil) and
undisturbed (rock) samples.
4. Excavating of five (05 Nos) trial pits upto a depth of 2.0m each below existing ground surface
near borehole locations.
5. Installation of one (01) of standpipe piezometer in the drilled borehole BH-01.
6. Performing engineering analysis based on field and laboratory findings.
7. Developing recommendations for foundation design and construction based on the above
findings.

1.3 Standards and Codes of Practice

Unless otherwise specified in this document, all equipments, materials and procedures associated
with this work comply with current editions of following relevant Standards and Codes of Practice.

1. BS 1377:1990 Part 9 AMD 8264-95, “Method of Test for Soils for Civil Engineering Purposes”.
2. BS 5930: 1999+A2:2015, “Code of Practice for Site Investigations”.
3. Other technical references including software used are cited in the report as appropriate.

592
2.0 SITE AND PROJECT DESCRIPTION
The project is the construction of Proposed D618 EMAAR 132/11 kV Arabian Ranches on plot no.
6482150 SHKZBHST, Dubai-U.A.E. The Google map showing the location of the site is shown
below:

For this project, it includes two (02) reports:

• SD22000015-01 - Interpretative Report for Geotechnical Investigation.


• SD22000015-02 – Slope Stability Analysis Report.

Figure 1: Google Image showing site location

The current site level is approximately ranging from +30.68m to +30.74 m DMD. However as
informed by the Engineer the gate level is +31.65m DMD and shall be considered in the foundation
depth for further recommendations as detailed below in table 1.

The provided details of the proposed substation are as given in the following Table 1:

Table 1: Details of proposed substation


Foundation
Tentative Footing
Foundation Depth below Foundation level
Structure Size
Type Gate Level* (m, DMD)
(m)
(m)
132/11kV Main Building (IDT,
SR, ET, Fire Pump Room with
RAFT -4.00 27.65 L= 42.5 x B= 39.25
Fire Water Tank & Security
Room)
Under Ground Oil Water Tank RAFT -5.70 25.95 L= 13.0 x B= 6.7
-2.15 29.5 B=1.80
Boundary wall Strip Footing -2.90 28.75 B=2.40
-3.60 28.05 B=3.00
-0.95 30.70 B=1.10
Fire Pipe Trench Strip footing
-1.65 30.00 B=2.00
-1.75 29.90 B=1.50

593
Foundation
Tentative Footing
Foundation Depth below Foundation level
Structure Size
Type Gate Level* (m, DMD)
(m)
(m)
-2.25 29.40 B=1.50
Strom water Pits & Foul Water Isolated
-2.75 28.90 B=2.50
manholes footing
-3.90 27.75 B=3.00
Outdoor Miscellaneous -1.50 30.15 B=1.50
Isolated
Structures (Manholes & Soak
footing -2.90 28.75 B=2.00
pits)
-2.50 29.15
Duct Bank Strip footing -3.00 28.65 B=3.50
-3.40 28.25
Isolated -3.50 +28.15
Holding Tank L=4.0 x B=3.0
Footing -4.00 +27.65
*Gate Level +31.65m DMD as provided.

The Ground levels are related to Dubai Municipality Datum (DMD). General affection plan and site
layout, are presented below in Figure 2 and 3 respectively.

Figure 2: General Affection Plan

594
Figure 3: General Borehole Location Plan

595
A general site plan showing the project layout and the locations of the boreholes is enclosed in
Appendix A.

General site photographs are also presented below showing the general nature of the site and
ground conditions:

Figure 4: General Site Photographs

3.0 PREVAILING WEATHER CONDITIONS


The site is situated in Dubai where a hot arid climate prevails. A hot arid climate is one where
evaporation exceeds precipitation – such as rain, snow and dewfall. This climate regime produces
characteristic hot desert terrains. Average annual rainfall may only be a few centimeters (even only
a few millimeters in some parts) which usually occurs seasonally and sometimes only from a single
cloudburst. Summer shade temperatures are frequently in excess 40°C and humidity may be around
100% near the coast. The contrast between maximum night and day temperatures and between
night and day humidity is often great. Strong persistent winds are normal in many areas.

This unfavorable climate imposes adverse conditions on the concrete structures, such as:

1. High temperature and high seasonal changes.


2. High humidity and high change in relative humidity.
3. Strong drying winds.
4. Condensation at night.
5. Windborne salt-laden dust.
6. High solar radiation.

4.0 REGIONAL GEOLOGY

The write-up is based on the available literature and the site investigation data.

Geology of Dubai

The ancient shallow sea, ‘The Tethys’, once covering the whole region of UAE, rose and fell,
influenced by major world climatic changes, and deposited sediments for at least 500 million years
(from Cambrian age onwards). The layers of rocks, at places several kilometers thick, were thus
formed in pockets of this ancient sea-bed. In general, in UAE the Palaeozoic basement rocks are
overlain by the Mesozoic to tertiary sedimentary rocks, and later overlain by the volcanics and the
continental shelf sediments. Cutting deep into the sedimentary series, erosion has exposed the

596
deformed and thrusted ancient and volcanic rocks which are well exposed with in the NNE – SSW
trending Hajar Mountains of Eastern UAE and the Musandam peninsula of northern Oman.
The dubai area is mostly occupied by the Tertiary rocks which were deposited in a shallow shelf
platform environment.

The processes of decomposition created hydrocarbon (oil and gas) reserves in the Tertiary
sediments, which provide the means for the present day man to transform the modern landscape.
Earth movements folded and tilted these once horizontal layers during the mid-Tertiary, creating in
the process scenic mountains such as Jebel Hafeet.

During late Cretaceous period Great pressures were clearly involved in the process of obduction of
the ophiolites (dated 90 – 95 Ma), which thrusted over the Permean to Cretaceous sedimentary
sequences. Thus was formed the fore land depositional basin called the Aruma basin in which the
the rocks of mid to upper Tertiary and Quaternary age were deposited, which are seen as the weakly
consolidated/ lithified and weathered arenites- sandstones, argillites- siltstones and rudites-
conglomerate group of rocks in the main land Dubai area. The provenance/ source area for the
conglomerates are the Hajar Mountains.

Deep seated evaporates / Palaeo evaporites are geologically older deposits noticed at different
depths as interbeds (0.5 – 5 m thickness). The upsurges of the Cambrian salt deposits from beneath
(as deep as 6000 m) the Permian limestone layers: under extreme pressure, caused by overlying
rocks, squeezed them up towards the surface through weakness planes or cracks, dragging with
them rocks from deep within the crust, sometimes from 6,000 meters down. When the salt rock
pierces the surface, it is quite rapidly eroded, depositing the boulders and debris it has brought up
with it. Current examples of this phenomenon are seen at Jebel Dhanna, Sir Bani Yas, Das, Zirku
and on several other islands in the Arabian Gulf.

Recent sabkahs are evaporates deposited in geologically recent times (< 1 Ma) which are being
identified on the surface or at shallow depths. These are noticed in the main land and coastal belts
of Dubai also.

The recent deposits consisting of silty, fine sand and clays in local pockets noticed in Dubai area
are mostly related to the deposits of the sea migrations/ eustatic changes, deserts and the
weathered products of the weak tertiary rocks. These vary in thickness from about 6 to 13 m in the
main land and coastal areas respectively. The bed rock in Dubai area is marked by deeply
weathered/ destructured sandstones and gravelly beds close to the eastern hill ranges.

5.0 FIELD WORK


The field works in the investigation campaign consisted of drilling of boreholes and performing
standard penetration testing (SPT) at selected intervals, followed by rotary coring upon reaching
rock head. Additionally, a standpipe piezometer was installed for groundwater monitoring in drilled
borehole. Soil and rock sampling; besides, ground water measurement and sampling were also
carried out. The details of test methods employed for each above stated field testing are provided
in below Table 2.

597
Table 2: Details of Field Testing and Test Methods
Type of Test Note Test Name
BS 5930:1999 Clause 25.2 with x-ref. of BS 1377 Part 9 : 1990 Section
Standard Penetration
(1) 3.3 (amd1 & 2)
Test
BS EN ISO 22476 Part 3 : 2005 + A1 2011
BS 5930:1999 Clause 22
Soil Sampling (1)
BS 5930:2015 Clause 25.0
Rock quality BS 5930:1999 section 6 Clause 44.4.4
(1)
designation BS 5930:2015 section 6 Clause 36.4.4
BS 5930:1999 section 6 Clause 44.4.4
Core recovery (1)
BS 5930:2015 section 6 Clause 36.4.4
Description of rock Description of rock cores
(1)
cores BS 5930 Clause 44 & Clark & Walker
Rotary core drilling
Rotary core drilling (1)
BS 5930 Clause 20.7.3
Soil description
Soil description (1) BS 5930:1999 section 6 Clause 41 & Clark and Walker
BS 5930:2015 Section 6.0 Clause 33 & Clark and Walker
Field Investigation Method of determining ground water pressure
Ground water Level
(1) BS 5930:1999 Clause 23.2, Clause 27.5 & Clause 47.2.7
measurement
BS 5930:2015 Clause 52.0
Piezometer Installation
Piezometer Installation (1) ACES- MS-016
BS 5930:1999 section 3 Clause 23.2.3, BS 5930:2015 Clause 52
NB: AC* - Relevant Accreditation
(1) EIAC accredited test method (Certificate No. LB-006)

5.1 Drilling

During the period from 19th to 30th April 2022, five (05) boreholes were drilled to the specified depth
wihtin the site. The borings were advanced by using rotary drilling method with polymer/bentonite
circulation. The following Table 3 summarizes the borehole information:

Table 3: Summary of Borehole Information


Ground As built Co-ordinates Drilling Date
Depth
BH No. Elevation Rig Used
(m)
(m DMD) Easting Northing Started Finished

BH-01 25.0 30.68 499204.27 2773914.35 23/04/2022 26/04/2022 RD-14

BH-02 25.0 30.70 499184.25 2773914.55 27/04/2022 29/04/2022 RD-14

BH-03 25.0 30.74 499186.42 2773931.79 28/04/2022 30/04/2022 RD-10

BH-04 25.0 30.68 499196.72 2773944.82 25/04/2022 28/04/2022 RD-10

BH-05 25.0 30.70 499215.53 2773931.45 19/04/2022 22/04/2022 RD-10

The locations of the boreholes were set-out by ACES at locations provided by the client. The site
plan showing the test locations is presented in Appendix A and borehole logs are presented in
Appendix B1.

598
Figure 5: General Site Photographs during drilling activities
5.2 Sampling

Disturbed and undisturbed samples from the retrieved cores/ materials were obtained from different
selected depths. Split spoon samples were obtained at selected intervals from specified soil
materials, in all boreholes. Wherever cemented soil and rock materials are encountered, undisturbed
core samples are obtained using double tube core barrel.

The recovered samples were placed in moisture proof plastic bags in proper sequence in wooden
core boxes. The moist samples were placed in airtight plastic bags before being placed in wooden
core boxes and transported to our laboratory. They were then examined, described and classified
by our geologist. Representative samples were selected for further required testing.

Moreover, groundwater samples were collected from the boreholes after flushing using bailer
sampler. Then after, filled in a plastic bottle and transported to our laboratory for further testing.

5.3 Field Testing in Boreholes

Standard Penetration Tests (SPT) were performed at various depths in the boreholes to assess the
relative densities of the ground materials. The tests were performed in accordance with
BS1377:1990 Part 9 AMD8264-95, “Determination of Penetration Resistance Using Split-Barrel
Sampler (SPT)”.

The SPT consists of driving a Standard 50mm outside diameter split spoon sampler into soil at the
bottom of a borehole, using repeated blows of a 63.5kg hammer falling through 760mm. The SPT
N value is the number of blows required to achieve a penetration of 300mm, after an initial seating
drive of 150mm.
Graphical presentation of SPT-N values versus elevation was prepared and is presented in Figure
6.

599
Graphical Presentation
SPT N Values
1 10 100
32.0

Very dense
Medium dense
Very loose

Loose

Dense
31.0

30.0

29.0

28.0
Elevation, (m, DMD)

27.0

26.0

25.0

24.0

BH-01 BH-02 BH-03

23.0

BH-04 BH-05

22.0

Figure 6: Graphical presentation of SPT-N value versus Elevations

The test results are shown on the boring logs at the respective test depths. Interpretation of the SPT
test results can be found in the Legend to Boring Logs (Appendix B1).

600
5.4 Excavation of Trial Pits

As per project requirement five (05 Nos.) of trial pits were excavated mechanically at specified
locations up to the specified depths. These trial pits were excavated on 16th April 2022. The summary
of trial pits is given in table below.
Table 4: Summary of Trial Pit Information
Ground Coordinates
Test pit Excavation Excavation
Elevation
No. Depth (m) BGL Easting Northing Date
(m DMD)
TP-01 2.00 30.68 499204.27 2773914.35 16/04/22
TP-02 2.00 30.70 499184.25 2773914.55 16/04/22
TP-03 2.00 30.74 499186.42 2773931.79 16/04/22
TP-04 2.00 30.68 499196.72 2773944.82 16/04/22
TP-05 2.00 30.70 499215.53 2773931.45 16/04/22
*BGL = Below Existing Ground Level,

The locations of the trial pits were set-out by ACES at locations provided by the client adjacent to
each borehole locations. The strata’s encountered were visually described by ACES representative.
Bulk samples were carefully collected from the sides and bottom of the pits. Sampling was carried
out in accordance with BS 5930:2015.
A site plan showing the locations of the trial pits are attached in Appendix A. whereas the logs of
the test pits are presented in Appendix B3.

5.5 Installation of Standpipe Piezometers

As per the project requirement one (01 No.) of 50mm standpipe piezometer was installed to monitor
the ground water table. The monitoring well was composed of slotted pipes (continuous slots) 50mm
diameter PVC screen 1.0m above ground water table followed with PVC solid stand pipe up to
ground level.
Groundwater levels were measured from the installed piezometer using dip meter after the
installation. The ground water readings are presented in Appendix C1.

5.6 Site safety

ACES were fully committed for implementing the Health and Safety measures for all personnel who
were working at this project. Effective methods were adopted to ensure the policies and procedures
are communicated to, and properly understood by all crew personnel and followed throughout the
operations, controlled by inspection visits of the safety representative.

It is concluded that no accidents/incidents occurred during the period of site investigation works for
this project.

6.0 LABORATORY TESTING


In order to determine the chemical properties and other parameters of the ground materials (Soil
rock and water), laboratory tests were performed on selected samples recovered from drilled
boreholes.

601
6.1 Laboratory Tests carried out on samples from Boreholes

The details of test performed on samples collected from boreholes and the test methods followed
for each testings are presented in Table 5.
Table 5: Summary of all Conducted Laboratory Tests
Test Type Note Test Name
Determination of Particle Size Distribution (Wet Sieving Method),
(1)
BS 1377: Part 2: 1990, Cl.9.2. (Amd. 9027/96)
Physical & Index Determination of Particle Density of Soil
(1)
Properties BS 1377: 1990 Part 2 CI.8.3 / 8.4(Amd. 9027/96)
Determination of Natural Moisture Content for soil and rock,
(1)
BS1377: Part2 :1990 (Amd.9027/96) Cl. 3.2.3.2

Determination of Sulphate for Soil & Water


(1)
BS 1377: Part 3 : 1990, Cl.5 (Amd. 9028/96)
Determination of Chloride for Soil & Water
(1)
BS 1377: Part 3 : 1990, Cl.7 (Amd. 9028/96)
Chemical Testing
Determination of pH for Soil & Water
(1)
BS1377: Part 3 : 1990, Cl.9 (Amd. 9028/96)
Determination of the Carbonate Content,
(1)
BS 1377: Part 3: 1990, Cl.6 (Amd. 9028/96)

Standard Test Method for Unconfined Compressive Strength of Intact Rock


(1)
Cores Spec. ASTM D 7012-07 / ASTM D 4543-08
Shear Strength Determination of Point Load Strength Index of Rock
Tests (1)
ASTM D 5731-08 & Moisture Content (ASTM D 2216-05)
(2) Standard Test Method for Small Shear Box Test for soil and Rock
Note:
(1) DAC accredited test method (Certificate No. LB-006)
(2) Non-accredited tests

1. Sieve Analysis Tests Results were presented on standard PSD graphical presentations in
Appendix D1. The BS 5930 classification and summary of gradation results and indices are also
indicated on the graphs*.
2. Physical/Mechanical & Index property tests (particle density, moisture content, etc results)
are presented in separate tables in Appendix D1.
3. Chemical Test Results are presented in Appendix D2 in separate tables.
4. UCS Test Results are presented in a standard test sheet in Appendix D3-1. Graphical
presentation of the axial strain (%) versus average compressive stress (MPa) is included for
each sample and schematic diagram of failure plane(s) is also shown. * Moreover, results are
presented graphically along with strength classification limits as shown below in Figure 7.
5. Point Load Test Results are presented in a separate table in Appendix D3-2
6. Direct Shear Test Results are presented in a separate table in Appendix D3-3

602
Graphical Presentation
Unconfined Compressive Strength (MPa)
0.0 0.1 1.0 10.0 100.0 1000.0
28.0

Ext. Strong
V. Strong
M. Strong
V. Weak
Ext. Weak

Strong
Weak
27.0

26.0

25.0

24.0

23.0

22.0

21.0

20.0

19.0

18.0

17.0

16.0
ELEVATION (m, DMD)

15.0

14.0

13.0

12.0

11.0

10.0

9.0

8.0

7.0

6.0
BH-01 BH-02 BH-03

5.0

4.0 BH-04 BH-05

3.0

Figure 7: Graphical Presentation of UCS versus Elevations

603
7.0 GROUND CONDITIONS
7.1 Site Geology

The present site is explored with five (05) boreholes (5BH x25m). The interpretation of the
subsurface geological condition is based on the available information from the 25 m deep boreholes.
The exploration reveals 5.0 m to 6.0 m thick layer of overburden material consisting of dense, slightly
silty to silty, slightly gravelly to gravelly, fine to medium SAND with gravel sized sandstone fragments
and basic rock fragments, underlain by very dense sand of 0.41 m to 1.23 m thick very dense Sand
(Class D calcarenite/sandstone). It is followed by partially weathered extremely weak to weak, fine
to medium grained CALCARENITE / SANDSTONE. After upper layers, a 0.40m to 1.92 m thick
partially weathered to un weathered (B/A) layer of CONGLOMERATE encountered. Furthermore,
very weak to weak, fine to medium grained, Sandstone supposed to be locally gravelly sandstone,
interbedded with thin to medium beds of conglomerate, partially weathered to unweathered (B/A) is
continued up to maximum drilling depth of the borehole. The bedrock is encountered at a depth of
5.49 m to 7.23 m from EGL.

The boreholes drilled have indicated general similarities and continuities of the subsurface materials,
in spite of some local variations.

A generalized subsurface profile was constructed and is attached to Appendix B2. The below profile
is an illustrative of the general subsurface ground conditions:

7.2 Sub-surface Condition

The geologic description of the subsurface materials, encountered in the borehole, and the average
approximate elevations at which they are encountered are presented in table 8. Classification of the
soils and rocks has been conducted according to BS 5930: 1999+A2: 2010. The tables given in the
legend to boring logs in Appendix B1 were used to describe the relative density/consistency of the
respective coarse/ fine grained-soils and strength of rocks.

Table 6: Summary of Ground Material Properties and Classification


Elevation
Summary
(m DMD) Thickness Material
BH No. Geologic Description of Tests
(m) Classification
From To Results

Layer –I

+30.68 +24.68 6.00 BH-01


Brown, silty, slightly gravelly to
+30.70 +25.70 5.00 BH-02 gravelly, fine to medium SAND
RD:
with gravelly sized sandstone SPT-N:
+30.74 +25.74 5.00 BH-03 Dense
fragments and basic igneous 33-49
rock fragments.
+30.68 +24.68 6.00 BH-04

+30.70 +24.89 5.81 BH-05


Layer –II

+24.68 +24.23 0.45 BH-01 Brown, silty, slightly gravelly to


gravelly fine to medium SAND.
+25.70 +25.12 0.58 BH-02 RD:
Gravel sized Sandstone SPT-N:
Very dense
fragments. (Class D >50
+25.74 +25.25 0.49 BH-03 Calcarenite)
+24.68 +23.45 1.23 BH-04

604
Elevation
Summary
(m DMD) Thickness Material
BH No. Geologic Description of Tests
(m) Classification
From To Results

+24.89 +24.48 0.41 BH-05

Layer -III Brown / greyish brown / reddish


+24.23 +7.28 16.95 BH-01 brown, fine to medium grained, RQD%: STR:
CALCARNITE / SANDSTONE, 0-100 Extremely
+25.12 +7.04 18.08 BH-02 locally interlayered with weak to very
conglomerate, un weathered to UCS weak,
+25.25 +7.92 17.33 BH-03 partially weathered (A/B). locally (MPa): locally weak
distinctly weathered (C), 0.72- to medium
+23.45 +7.26 16.19 BH-04
fractures medium to closely 23.19 strong
spaced, locally very closely,
+24.48 +7.39 17.09 BH-05 locally widely spaced.
Layer -IV

+7.28 +5.68 1.60 BH-01


Reddish brown, RQD%:
CONGLOMERATE, clast to 0-95
+7.04 +5.70 1.34 BH-02 matrix ratio 60:40%, matrix silty STR:
sand, clast subangular to UCS Very weak to
+7.92 +5.74 2.18 BH-03 subrounded, Partially weathered (MPa): Weak
to unweathered (B/A), fractures 2.43-
close to medium spaced, locally 10.50
+7.26 +5.68 1.58 BH-04
widely spaced.

+7.39 +5.70 1.69 BH-05

SPT: Standard Penetration Tests RD: Relative Density


RQD: Rock Quality Designation EOB: End of Boring
STR: Strength of Rock UCS: Unconfined Compressive Strength

605
Figure 8: Generalized Subsurface Profile

606
7.3 Ground-Water and Cavities

At the time of the investigation, ground water table was encountered in all five drilled boreholes at
depth varies between 11.10m to 11.15m below existing ground level (i.e. at R. L. of +19.55m to
+19.61m DMD). However, ground water table is subjected to weather seasonal variations or by
artificial induced effects. Therefore, reconfirmation is recommended prior to any works related to
ground water regime.

No cavities were encountered in any of the boreholes up to the drilled depths. However, in boreholes
BH-02 and BH-04, partial to complete drilling fluid loss was encountered as indicated on boreholes log
presented in Appendix B1.

7.4 Core sample photographs

Standard photographs of all the core samples are attached as Appendix E.

7.5 Liquefaction Potential

Liquefaction is used to describe a situation of significant loss of strength due to buildup of pore water
pressure and subsequent deformation of loose, fine, saturated sands under the cyclic loading of
earthquakes.

Based on the “Recommended procedures for Implementation of DMG, Special Publication - 117 the
guidelines for analyzing and mitigating liquefaction hazards in California, Implementation Committee,
March 1999“, Preliminary screening for liquefaction can be judged as ‘unlikely’ based on the SPT- N
results, GWT conditions & Shallow rock.

8.0 GEOTECHNICAL DESIGN PARAMETER MODEL


The design geotechnical analytical model was established following a step by step procedure of
validation of the quality of the data, proper interpretation of in-situ and laboratory tests, establish
geological model of stratigraphy of the site, selection of representative parameters for each layer / unit,
and selection of representative deign value / Engineering parameters.

The generalized subsurface model that represents the site was presented above indicating the main
soil / rock layers and GW conditions with ranges main tests results and classifications. The site
subsurface geology has indicated almost uniform and homogeneous geological features, with no
appreciable discontinuities. However due to difference in rock level, single geotechnical analytical
models have been established based on the results of in-situ and laboratory tests.

The selected geotechnical analytical model of the site is presented below with shear strength and
stiffness parameters for each layer.

8.1 Engineering Parameters:

The Shear Strength and Stiffness Parameters of different soil layers are necessary for any geotechnical
analysis.

The following Engineering parameters were assessed

Shear Strength Parameters: the commonly used elasto-plastic Mohr / Coulomb parameters c & φ were
adopted.

Stiffness or modulus of deformation for the upper soil ‘Es’ and underlying rock mass ‘Em’.

607
These are typically established using empirical correlations based on the above selected design
parameters. The following description is given regarding selection of engineering parameters for soil
and rock mass.

8.2 Upper Sand

The Engineering shear strength and modulus parameters of the upper sand were assessed based on
the results of in-situ Nspt tests results, and soil classification and descriptions obtained for different
layers. Software Novo-Spt (NOVO-SPT, of NOVO TECH, USA) provides numerous Nspt-Based
correlations of different desired Engineering parameters of the soil (Shear strength and modulus of
deformation, were checked and evaluated. Further, the program includes a filter to indicate the
applicability of correlations to the specified soil type.

In addition, the following simple, commonly used correlation was used to select shear strength
parameters of the upper sand layers for use in the geotechnical analysis. The friction angle and dry
density can readily be obtained for soil class type and assessed relative density as expressed by the
in-situ SPT results. Conservative estimates were made.

Figure 9: Approximate correlation to determine the effective angle φ° for cohesion less (Non-plastic)
soil and dry unit weight.

Reference is also made to CIRIA report 143, 1995 “The Standard Penetration Test (SPT): Methods
and Use, by C.R.I. Clayton Msc DIC PhD CEng MICE C Geol FGS, which describes the main
advantages and limitations if the SPT, controlling factors, accuracy, and gives numerous correlations
with Engineering parameters for different types of soils, including stiffness and shear strength.

On the other hand, recent methods advise to estimate the soil stiffness (Es) at a selected range of
shear strain that matches the expected geotechnical consideration / problem (large strains for stability
problems and smaller and limited strains for deformation analysis, typically <1% which would result in
higher modulus). Such techniques include Marchetti Flat Plate Dilatometer (DMT) which is an in-situ
testing tool, and others based on CPT – based empirical correlations.

The following correlations with in-situ Nspt tests and DMT-based ‘Es’ are given in recent literature:
• Schmertmann (1988): Nspt = MDMT (MPa) / 3
• Tanaka & Tanaka (1998): Nspt = ED (MPa) / 2.5

608
Note M is the constrained modulus and E is the modulus of deformation / Elastic modulus. They are
related as:

E’ = M (1+ν)(1-2ν) / (1-ν)

For ν = 0.25-0.30, then E’ = 0.80 M.

Therefore, E is about 2.5*N; which is much


larger than the above Ciria recommended
correlation (E’=N60). This relationship is only
used if actual tests such as DMT as minimum
are conducted at the site, or if instructed by
the consultant Engineer. For this project Es
was estimated as E’=N.

8.3 Underlying Bedrock

The shear strength parameters and rock


mass modulus for the underlying rock were
established following the procedure
recommended by Hoek & Brown, as briefed
in the following:

8.3.1 Shear Strength Parameters

Hoek and Brown (1980a, 1980b) proposed a method for obtaining estimates of the strength of jointed
rock masses, based upon an assessment of the interlocking of rock blocks and the condition of the
surfaces between these blocks. The application of the method to very poor-quality rock masses
required further changes (Hoek, Wood and Shah 1992) and, eventually, the development of a new
classification called the Geological Strength Index (Hoek, Kaiser and Bawden 1995, Hoek 1995, Hoek
and Brown 1997).

The rock mass presented by core data is indicated on the generalized subsurface profiles and boring
logs.

In order to use the Hoek-Brown criterion, three ‘properties’ of the rock mass have to be estimated.
These are typical published material constant (mi) for common rock types are as follows:

1. Uniaxial compressive strength `ci of the intact rock.


2. Value of the Hoek-Brown constant mi for intact rock.
3. Value of Geological Strength Index GSI for rock mass.

Table 7 : Material constant for the common rock type


Rock Type mi
Sandstone 17 + 4
Conglomerate 21 + 3
Siltstone 7+2
Claystone / Mudstone 4+2
Limestone 8+3
The Geological Strength Index (GSI), Introduced by Hoek (1995) and Hoek, Kaiser and Bawden (1995) provide
a system for estimating the reduction in rock mass strength for different geological conditions as illustrated in the
below schematic chart.

GSI for various rock layers were established by ACES senior geologist.

609
8.3.2 Deformation Modulus of Rock Mass

i. Hoek - Diederichs Formula

The following modification to Serafim and Pereira’s equation is proposed "E. Brown, M.S Diederichs -
Empirical Estimation of Rock Mass Modulus, International Journal of Rock Mechanics & Mining
Sciences 43 (2006) 203 - 215"

Erm = Ei { (0.02 + (1 - D/2) / (1 + e^((60+15D-GSI)/11) }

In which D is disturbance factor (taken = 0.0 for foundation settlement analysis).

Note that GSI has been substituted for RMR in this equation and that the rock mass modulus Erm is
directly dependent on Ei (Intact Rock Modulus). Ei is typically input by the user, however, if no direct
measurement of Ei is available due to highly fractured rock or other reasons, then it is estimated as Ei
- MR x ci in which, MR = Modulus Ratio and ci is the Compressive Strength of Intact Rock.

Typical published MR (Modulus Ratio) for common rock types are as follows:

Table 8: Modulus ratio for common rock types


Rock Type MR
Sandstone 275 + 75
Conglomerate 350 + 50
Siltstone 375 + 25
Claystone / Mudstone 250 + 50
Limestone 900 + 100
The following relation illustrates the effect of GSI and Intact strength (Ei):

Plot of Normalized in Situ Rock Mass


Deformation Modulus from China and Taiwan
Against Hoek and Diederichs Equation.
Each Data Point Represents the Average of
Multiple Tests at Same Site in Same Rock
Mass.
It shows that the deformation of better quality
rock masses is controlled by the
discontinuities (GSI), while, for poorer quality
rock masses (Low GSI), the deformation of the
intact rock pieces contributes to the overall
deformation process.
Figure 10: Normalized Modulus Versus GSI
Therefore, the conservative estimate of Ei would result in a conservative estimate of Erm for the same
GSI. The above paper recognizes this fact and recommends Ei to be established by direct
measurement as much as possible, however, careful attention should be given to sample disturbance
effects, likely micro cracks, in addition to considering the method of interpretation of Ei from test curves
(Shear strain consideration). Such effects would be much important for Ei than UCS, therefore, the
estimate of Ei = MR x UCS is suggested if reliable measurements or estimates of Ei are not available.

Special software (rock lab of Rock Science, USA) was used to carry out the above calculations for
Rock-Mass Parameters.

The selected geotechnical parameter model of the site is presented below with shear strength and
stiffness parameters for each layer.

610
Table 9: Geotechnical Design Parameter Model
Elevation of Engineering Parameters
(RD* /
each layer (m
Geological Material Unit Wt,
DMD) N- UCS Poisons C,
Strength Description Ed,
KN/m^3, °
From To Classification) SPT (MPa) MPa ratio,  kPa
b

+31.65 +30.74 - Engineered Fill# - - 18 30# 0.35 0 32

+30.74 +28.00 D* Silty SAND 40 - 18 40 0.35 0 39

+28.00 +26.00 D to VD* Silty SAND 45 - 18 45 0.35 0 40


Class ‘D’
+26.00 +24.23 VD* >50 - 19 75 0.35 0 42
Calcarenite
CALCARENITE /
SANDSTONE
+24.23** +14.00 VW locally W - 2.50 22 174 0.30 146 35
interlayered with
conglomerate
+14.00 +5.68 W locally VW CONGLOMERATE - 7.00 22 291 0.30 436 36
*. D: Dense, VD: Very Dense, VW: Very weak, W= Weak, Ed- Deformation Modulus, RD -Relative density
** Deepest rock has been considered as rock level
#: subject to verification by field density and plate load tests of 60cm diameter.

9.0 FOUNDATION RECOMMENDATIONS

Based on the examinations of the site materials, the field and laboratory test results,
engineering analysis and previous practical experience in the area with the soil materials
encountered in the investigation, it is our opinion that the proposed structure(s) can be
satisfactorily supported by the ground materials subject to the following recommendations:

9.1 Foundation Type & Depth

Based on the information provided by the client, the proposed structures are to be supported on
isolated/strip footing and raft foundations. The foundation levels as provided by The Engineer are
shown below in Table 10.
Table 10: Summary of foundation details
Foundation Tentative Footing
Foundation Foundation level
Structure Depth below Size
Type (m, DMD)
Gate Level* (m) (m)
132/11kV Main Building (IDT,
SR, ET, Fire Pump Room with
RAFT -4.00 27.65 L= 42.5 x B= 39.25
Fire Water Tank & Security
Room)
Under Ground Oil Water Tank RAFT -5.7 25.95 L= 13.0 x B= 6.7
-2.15 29.5 B=1.80
Boundary wall Strip Footing -2.90 28.75 B=2.40
-3.60 28.05 B=3.00
-0.95 30.70 B=1.10
Fire Pipe Trench Strip footing
-1.65 30.00 B=2.00
-1.75 29.90 B=1.50
Strom water Pits & Foul Water -2.25 29.40 B=1.50
Isolated footing
manholes -2.75 28.90 B=2.50
-3.90 27.75 B=3.00
Outdoor Miscellaneous -1.50 30.15 B=1.50
Structures (Manholes & Soak Isolated footing
pits) -2.90 28.75 B=2.00

611
Foundation Tentative Footing
Foundation Foundation level
Structure Depth below Size
Type (m, DMD)
Gate Level* (m) (m)
-2.50 29.15
Duct Bank Strip footing -3.00 28.65 B=3.50
-3.40 28.25
Holding Tank Isolated -3.50 +28.15
L=4.0 x B=3.0
Footing -4.00 +27.65
*Gate Level +31.65m DMD as provided.

9.1.1 Foundation Ground Preparation

The existing ground shall be excavated to specified level as mentioned in Table 10 above and shall
be inspected by a qualified engineer to confirm that the required depth has been reached and that any
undesirable materials are removed. Moreover, the exposed foundation ground shall be proof rolled in
soil with heavy vibratory rollers to ensure that any loose soil is densified to not less than 95% of the
max. dry density as determined by ASTM D 1557 (Modified Proctor) or equivalent BS Procedure.
Uneven localities or over excavations in rock shall be re-filled and leveled with mass concrete, if
required.

It is recommended that a layer of well compacted selected granular road base material of 200 mm
thickness be furnished directly below the foundation. The layer is recommended to be well compacted
to not less than 98% of the max. dry density as determined by Modified Proctor Test (ASTM D 1557)
or BS 1377: 1990 Part 4 Cl. 3.5.

This layer shall be extending to not less than 2.50 m surrounding the foundation area/ foot print of the
structures. The natural ground shall be protected against potential scour effects by suitable means (as
tiling, grouted pitching, etc.).

Guide lines for construction of (Engineered Fill)

Placement

Fill material shall not be placed until the required excavation and foundation preparation have been
completed and the foundation has been inspected and approved by the Engineer.

Fill shall be placed in approximately horizontal layers. The thickness of each layer before compaction
shall not exceed 25cm or as may be otherwise approved by the engineer. Materials placed by dumping
in piles or windrows shall be spread uniformly to not more than the specified thickness before being
compacted.

If the surface of any layer becomes too hard and smooth for proper bond with the succeeding layer, it
shall be scarified parallel to the axis of the fill to a depth of not less than 2 inches before the next layer
is placed.

Control of Moisture Content

During placement and compaction of fill, the moisture content of the materials being placed shall be
maintained close to the point of optimum, as determined by the procedures of ASTM D 1557 (Modified
Proctor), or BS 1377: 1990 Part 4 Cl 3.5.

612
Compaction

Earth fill shall be compacted according to the following requirements: Each layer of engineered fill shall
be compacted, so that the, density is not less than 95% degree of compaction for engineer fill layer
(ASTM D 1557 (Modified Proctor), or BS 1377: 1990 Part 4 Cl 3) or as shown on the design drawings.

Testing

During the course of the work, the Engineer will perform such tests as are required to identify materials,
to determine compaction characteristics, to determine moisture content, and to determine density of
fill in place. These tests performed by the Engineer will be used to verify that the fills conform to the
requirements of the specifications. Such tests are not intended to provide the Contractor with the
information required by him for the proper execution of the work and their performance shall not relieve
the Contractor of the necessity to perform tests for the purpose.

In-situ plate loading tests (Cyclic with 60cm plate) are advised for each 50cm thick layer of compacted
engineered fill, to confirm the assumed in-situ modulus of deformation of 30 Mpa (The number and
location of tests shall be advised by the Engineer depending on construction progress, etc..), in
addition to in-situ density tests.

9.2 Geotechnical Analysis

Load – deformation analysis was carried out to assess the foundation settlement and confirm the
allowable bearing pressure using specialized computer software as described below.

An idealized subsurface profile indicating the bedrock level and thickness of different soil layers and
their interpreted engineering parameters has been established.

9.2.1 Bearing Capacity Foundation Settlement

Geotechnical analysis was carried out using specialist software (GGU footing) that considers both
allowable bearing capacity (qab) and settlement (qas).
A: analysis for qab: qab was assessed using the conventional bearing capacity equations with
specialized software GGU-Footing. The program considers the layered system of soil and rock and
GW table representing the site, in addition to the foundation shape and average specified loading. The
safety factor against BC failure is calculated using the conventional bearing capacity equation which
has the general form of: qult = c.Nc scdcicbcqc + ½  B N sdibq + q Nq sqdqiqbqqq , the program adopts
solution based on Terzaghi / Meyerhoff / Hansen / Vesic and the DIN 4017 formulation. A safety factor
against general shear failure of 3 was adopted.

B: Analysis for qas: the program performs settlement analysis adopting the elastic theory. Each layer
is divided into thin sub layers, and the foundation pressure distribution in the subsoil layers is calculated
using the elastic theory. The settlement for each sub layer is then calculated as ∆s=∆σv.∆z/Ed. The
final settlement is the sum of the settlement of each of the significant sub layers. The settlement
analysis was made for selected range of foundation pressure to select the most appropriate value for
qas and considering the effect of long term settlement as discussed below.

Limiting Depth Consideration: The limiting depth for settlement calculation is typically much less
than the theoretical depth of influence. Typically, for normal conditions, the calculations for settlement
are truncated below the depth at which the total vertical stress exceeds the overburden stress by x %
(As a rule 20%).

613
This is recommended by DIN 4019
(German Standard) as shown in the
below schematic diagram.

Several published commercial specialist


software include an option to truncate the
calculations below the 20 % limiting
depth.

Therefore, the depth of the analytical


model used for geotechnical analysis
shall be sufficiently deep to a greater
depth than the above 20% limiting depth
as a guideline.

Figure 11: Schematic Diagram for Limiting Depth


Consideration

Long Term Settlement: Long term settlement may come from consolidation of clay soil and creep
effects of cohesion less soil and rocks, in general.

Clay soils were not encountered within the foundation soils in this site, therefore consolidation
settlement is unlikely.

The creep of rock depends on the rock joints, width of joints, joint filling soils, where clause of joints
with time produces creep movements. The encountered rock mass is characterized with closely to
moderately spaced joint system, with narrow to tight joints devoid of any compressible infilling
materials. Therefore, the long term creep settlement of bedrock would be in-significant and negligible.
Long term settlement for foundations on cohesion less soil is typically assessed as a fraction of the
initial / short term settlement calculated as below.
Creep of foundation on cohesion less soil was assessed using the following two methods presented
in “Engineering and Design-Settlement Analysis”, US Army Corps of Engineers, Engineering Manual
1110-1-1904.

1) Schmertmann Approximation: This procedure provides an estimate of the time-dependent


increase in the estimated “Immediate” settlement using a correction factor:
Ct = 1 + 0.2 · log10 (t/0.1)

Where, t = time in years

According to this procedure, Ct represents the time-dependent increase in settlement, related with
creep and secondary compression as observed in clays.

2) Burland and Burbidge Approximation: According to this procedure, the settlement after time t
at least 3 years following construction from creep and secondary effects may be estimated by:
t = ft · i
Where:
ft : 1 + R3 + R2 · Log t/3
R3 : time-dependent settlement ratio as a proportion of the immediate settlement i during first 3
years following construction, ~ 0.3

614
R2 : time-dependent settlement ratio as a proportion of the immediate settlement i for each log
cycle of time after 3 years, ~ 0.2
Values of R3 and R2 are conservative.
Using the above relations, the followings were obtained:

Table 11: Recommended Factors for Creep effects


T (yr) Ct ft Recommended

3 1.30 1.30 1.30


5 1.34 1.34 1.34
10 1.40 1.37 1.40
20 1.46 1.38 1.46
50 1.54 1.54 1.54

The creep of rock depends on the rock joints, width of joints, joint filling soils, where clause of joints
with time produces creep movements. The encountered rock mass is characterized with closely to
moderately spaced joint system, with narrow to tight joints devoid of any compressible infilling
materials. Therefore, the long-term creep settlement of bedrock would be in-significant and negligible.

In this project, the maximum allowable settlement (long term settlement) is considered as 25mm and
differential settlement as 10mm for the spread/strip footing and raft foundations as per the DEWA
specifications. It should also be noted that most of the expected settlements will take place during
construction period.

9.2.2 Allowable Bearing Pressure

The allowable bearing pressure is the maximum bearing pressure of the foundation that satisfies the
following two conditions:
1. The bearing capacity of the foundation soil / rock is greater than the maximum bearing pressure
with adequate safety factor, typically 3.
2. Settlement of the foundation which will result from both elastic and inelastic strain of the soil / rock,
and possibly long term creep effects to be below tolerable limits under maximum bearing pressure.

The bearing capacity of wide foundations on bedrock materials would be very high and hence condition
1 above is already satisfied. This was confirmed with geotechnical analysis results of bearing capacity.
Accordingly, the following allowable bearing pressures are summarized in below Table 13

Table 12: Recommended Allowable Bearing Pressure without any improvement


Modulus
Excavation of
Foundation Tentative Gross Allowable
Depth Foundation Recommended Subgrade
Foundation Depth Footing Bearing max.
Structure below level net allowable Reaction
Type below Gate Size Capacity settlement
Gate (m, DMD) pressure (Kpa) Ks based
Level* (m) (m) (Kpa) (mm)
Level* (m) on shear
(MN/m3)*
132/11kV Main
Building (IDT,
SR, ET, Fire L= 42.5
Pump Room RAFT -4.00 -4.33 27.65 x 180 252 25 21.6
with Fire Water B=39.25
Tank & Security
Room)
Under Ground L= 13.0
RAFT -5.70 -6.03 25.95 350 483 25 42.0
Oil Water Tank x B= 6.7
Boundary wall -2.15 -2.48 29.5 B=1.80 210 248 25 25.2

615
Modulus
Excavation of
Foundation Tentative Gross Allowable
Depth Foundation Recommended Subgrade
Foundation Depth Footing Bearing max.
Structure below level net allowable Reaction
Type below Gate Size Capacity settlement
Gate (m, DMD) pressure (Kpa) Ks based
Level* (m) (m) (Kpa) (mm)
Level* (m) on shear
(MN/m3)*
Strip -2.90 -3.23 28.75 B=2.40 250 302 25 30.0
Footing -3.50 -3.83 28.15 B=3.00 270 333 25 32.4
Fire Pipe Strip -0.95 -1.28 30.70 B=1.10 180 197 25 21.6
Trench footing -1.65 -1.98 30.00 B=2.00 200 229 25 24.0
Strom water -1.75 -2.08 29.90 B=1.50 200 231 25 24.0
Pits & Foul Isolated -2.25 -2.58 29.40 B=1.50 210 250 25 25.2
Water Footing -2.75 -3.08 28.90 B=2.50 220 269 25 26.4
manholes -3.90 -4.23 27.75 B=3.00 250 320 25 30.0
Outdoor
Miscellaneous -1.50 -1.83 30.15 B=1.50 200 227 25 24.0
Isolated
Structures
Footing
(Manholes & -2.90 -3.23 28.75 B=2.00 225 277 25 27.0
Soak pits)
-2.50 -2.83 29.15 230 275 25 27.6
Strip
Duct Bank -3.00 -3.33 28.65 B=3.50 250 304 25 30.0
footing
-3.40 -3.73 28.25 270 331 25 32.4
Isolated -3.50 -3.83 28.15 L=4.0 x 230 293 25 27.6
Holding Tank
footing -4.00 -4.33 27.65 B-3.0 250 322 25 30.0
*Note: The calculation was estimated based on the equation Ks= 40(FS)qa

The typical calculation output for the bearing capacity is given in Appendix H.

It is recommended that a layer of well compacted selected granular road base material of 200 mm
thickness be furnished directly below the foundation. The layer is recommended to be well compacted
to not less than 98% of the max. dry density as determined by Modified Proctor Test (ASTM D 1557)
or BS 1377: 1990 Part 4 Cl. 3.5. Additionally, as advised by client an addition of 130mm is consider
for excavation below foundation.

The modulus of sub-grade reaction is a foundation-soil interaction parameter and not a geotechnical
property of the soil. The modulus of subgrade reaction based on shear is calculated as 40(FS)qa
(where qa is the allowable pressure).

9.3 Ground Improvement by Road base:

The following main targets shall be considered and satisfied:

- Target Stiffness (M) would be > 100 MPa.


- Any other criteria specified by the Engineer.

The ground improvement shall be verified with adequate testing to ensure that effective improvement
to the soil stiffness has been achieved as anticipated. Tests such as field density, PLT test etc… is
typically employed in such verification programs. However, specialist can be contacted for suitable
methods.
The information given in this investigation may be used for selection and design of the most appropriate
ground improvement method and scheme; however, the specialist contractor may also conduct any
additional testing if required on his own.
Accordingly, the following allowable bearing pressures can be used for design after successful
implementation and verification of six layers of well compacted road base.

616
Table 13: Recommended Allowable Bearing Pressures for Raft Foundations after 6 layers of Road base
Estimated total Modulus of
Foundation Recommended Subgrade
(Max.) foundation
Structure Foundation Type level Allowable Bearing Reaction
Settlement
(m, DMD) Pressure, (kPa) Ks based on
mm
shear (MN/m3)*
132/11kV Main
Building (IDT, SR,
RAFT
ET, Fire Pump
L= 42.5 x +27.65 275* <25 33.0
Room with Fire
B= 39.25
Water Tank &
Security Room)
* Verification of in – situ modulus of deformation for road base replacement should be confirmed by field density and cyclic
plate load test.

It is to be noted from the above table that the specified bearing capacity requirement of 350
kPa for main the building cannot be achieved on existing ground conditions, accordingly to
meet this requirement ground improvement with installation of stone column can be
considered as discussed below.

9.4 Ground Improvement by Stone Columns:

The following main targets shall be considered and satisfied:


- Depth of ground improvement: The ground improvement shall include to level of +24.23m DMD at
main building area i.e. stone columns should extend up to Very dense strata.

- Target Stiffness (M) would be > 150 MPa.


- Any other criteria specified by the Engineer.

The ground improvement shall be verified with adequate testing to ensure that effective improvement
to the soil stiffness has been achieved as anticipated. Tests such as Zone Loading Tests etc… is
typically employed in such verification programs. However, specialist can be contacted for suitable
methods.
The information given in this investigation may be used for selection and design of the most appropriate
ground improvement method and scheme; however, the specialist contractor may also conduct any
additional testing if required on his own.

Accordingly, the following allowable bearing pressures can be used for design after successful
implementation and verification of ground improvement by stone column.
Table 14: Recommended Allowable Bearing Pressures for Raft Foundations after stone columns
installation
Modulus of
Recommended Estimated total Subgrade
Foundation Length of Stone Allowable (Max.) foundation Reaction
Foundation Column
Structure level
Type Bearing Settlement Ks based on
(m, DMD) (m)
Pressure, (kPa) mm shear
(MN/m3)*
132/11kV Main
Building (IDT,
RAFT
SR, ET, Fire
L= 42.5 x +27.65 3.42 350* 25 42.0
Pump Room with
B= 39.25
Fire Water Tank
& Security Room)
* After successful ground improvement, verification of in – situ modulus of deformation for stone columns should be confirmed
by zone load tests and cyclic plate load test.

617
9.5 Seismic Design Parameters

A. Soil Profile Type: According to uniform building code, UBC 1997 / International Building Code IBC
2006 / ASCE/ISE 7-05 (American Society of Civil Engineers, the statistical average shear wave velocity
vs of the upper 100ft (30m) below the foundation is used to select the soil profile type as follows;

Hard Rock Rock Soft Rock Stiff Soil Soft Soil


Soil Profile Type
SA SB SC SD SE
Shear Wave 760  Vs  360  Vs  180  Vs 
Vs > 1500 Vs  180
Velocity, Vs (m/s) 1500 760 360
Standard
Not Applicable Not Applicable N > 50 15  N  50 N < 15
Penetration
Soil Undrained
Not Applicable Not Applicable Su > 100 50  Su  100 Su < 50
Strength, Su
Statistical; average Vs is calculated as Vs =  Vsi x Zi /  Zi

Since direct in-situ measurement of shear wave velocity was not done and based on the boreholes the
below site classification is done.

Based on the encountered subsurface materials, site class as ‘SC’ (representing Soft Rock) can
be considered. However, it is further recommended to verify the same by direct in-situ
measurement of shear wave velocity by down-hole or other appropriate methods.

B. Very limited studies are available that describe seismic activity and zoning in the area. The report
“Earthquakes and Seismic Zones in the Middle east”, by J D Mortimer-Lloyd, BRE – Building Research
Establishment, Report No. Cl/SfB 1976 (H16), published 1983, provides an evaluation of seismic
history from previous records available and instruments data, and suggests zoning classification and
ground motion activity.

Accordingly, the site area is classified within UBC Seismic Zone 2A, with Seismic Zone Factor Z
equals 0.15. Below is schematic of UBC seismic zoning scale.

Figure 12: Effective Peak Ground Acceleration, 10% Exceedance Probability for 50 Years Exposure
Time
The above assessments are subject to the approval of The Engineer.

9.6 Soil Parameters for Design of Retaining Structures

The retaining walls, if any, drained and backfilled, shall be designed for an equivalent earth lateral
pressure, plus a uniform lateral pressure which corresponds to the maximum expected surface loads.
For a general estimate of earth pressures on shallow sub-grade walls, the following parameters are
recommended:

618
Table 15: Coefficients of Lateral Earth pressure
Elevation Range (m DMD)
Soil Parameters
+31.65 to +28.0 +28.00 to 26.00
Dense to Very Dense
Ground Material Type Very dense SAND
SAND

Angle of Shearing Resistance, deg 36 40

Cohesion (kPa) 0 0

Unit Weight of Soil (above water table) (kN/m3) 18 18

Unit Weight of Soil (below water table) (kN/m3) 8 8

Recommended Earth Pressure Coefficients

Active earth pressure coefficient (ka) 0.25 0.21

Passive earth pressure coefficient (kp) 3.85 4.59

Earth pressure at rest (k0) 0.41 0.35

Notes:
1. Lateral earth pressure parameters were estimated without considering the wall / soil friction, the
wall is vertical and ground surface is horizontal. Moreover, likely over consolidation, aging or
cementation effects were not estimated. Deviations from these conditions, if encountered, shall be
considered by the foundation engineer. The data included in this report can be used for more
specific parameter estimates, if required.
2. Representative shear strength parameters shown above represent average estimates based on
soil classification index properties, in-situ and laboratory tests results as discussed above.
3. ACES would be pleased to provide further detailed recommendations, if required, for specific
design situations, at separate fees.
Lateral pressure is calculated using:
σ' a = σ’v Ka – 2c’ √(Ka), in which Ka = Tan2 (45- Φ’/2)
σ‘p = σ’v Kp + 2c’ √ (Kp), in which Kp = Tan2(45+ Φ’/2)
Lateral pressure at rest: σ‘0 = σ’v K0

Water pressure shall be added to calculate the total lateral pressure.

* Estimate of Lateral Pressure Coefficient (At Rest) for Rock:


In-situ horizontal stresses for a gravitationally loaded rock mass in which no strain is permitted (K o
condition), where estimated by Terzaghi and Richart (1952) as:

σ'o = ko . σ’v = ko .  . z
ko = /(1-), where  is poisons ratio.
For  = 0.3, then ko = 0.43
However, measurements of horizontal stresses have shown that the ratio ko tends to be high at shallow
depths and it decreases at depth (Hoek and Brown 1978, Herget, 1988). Accordingly, the above
estimate is recommended. These are generally supported by PMT interpreted Ko.

619
10.0 FOUNDATION CONSTRUCTION

10.1 Excavation Methods

The excavation works are to be carried out in accordance with good construction practice, as per BS
6031: 1990, “Code of Practice for Earthworks” or a similar recognized standard. The proposed shallow
excavations are expected to be through dense to very dense SAND formation. Therefore, conventional
excavation equipment such as loaders and dozers will be needed for the excavation works for upper
sandy materials.

10.2 Excavation Side Slopes

Where space permits and above the water table, the side slopes in temporary excavations should not
be steeper than (3H: 2V) in the upper sandy soil, as recommended by the CIRIA Report No. 97
“Trenching Practice”.
If the above recommended side slopes cannot be achieved for insufficient lateral space or any other
reason, a temporary lateral support (shoring) system will be needed and shall be installed.

10.3 Backfill Material and Compaction Criteria

The following general backfilling and compaction criteria are recommended, unless otherwise stated
in the project specifications:

Materials to be used for backfilling purposes against sub-grade walls and around foundations are
described as backfill. Because water penetration is not desired, the material to be used for this purpose
(unless otherwise stated by the project specifications) shall be a soil or soil-rock mixture of low
permeability, which is free of organic matter or other deleterious substances. It shall not contain rocks
or lumps over 15 cm in greatest dimension, and not more than 15 percent larger than 7 cm. The
percentage of the fine materials (passing sieve no. 200 shall not exceed 20%). The plasticity index for
the backfill material shall not be more than 10 percent. It shall be spread in lifts not exceeding 25 cm
in compacted thickness, moisture conditioned to its optimum moisture content, and compacted to a
dry density not less than 95 percent of the maximum dry density as determined by the procedures of
ASTM D 1557 (Modified Proctor), or BS 1377: 1990 Part 4 Cl 3.5.
Suitability test shall be performed on the encountered materials to satisfy the above stated backfilling
criteria to be used as backfill material.

10.4 Surface Drainage

It is recommended that proper and efficient surface drainage be provided at the location of the project
both during and after construction. Surface water should be diverted away from the edges of the
excavation.

10.5 Subsurface Drainage System (Dewatering)

If the excavation has to be carried out below the ground water table, dewatering is necessary.
However, the water table level is approximately at 11m below the gate level, hence dewatering might
not be required. In any case, if the excavation has to be carried out below water table, then a minimum
depth 1m should be maintained from the excavation level and monitoring to be performed to assure
the same.

In all cases, specialist contractors should be consulted in this regard. Care should be taken during
dewatering to ensure that fines are not removed during pumping since this could result in unpredictable
settlements of the surrounding ground and associated structures.

620
Different methods for site dewatering exist; ranging from shallow trenches and sumps, well point
dewatering system or deep wells depending on the depth of dewatering and site particulars. Shallow
trenches and pumping are only suitable for very shallow dewatering requirements, whereas well points
are more convenient for larger dewatering depth.

The effective depth of a well point system below the header pipe is about 5-6m only; therefore, a single,
double or even multiple systems may be used depending on the required depth of dewatering.
Specialist contractors, with sufficient previous experience, must be consulted for the selection and
design of the shoring and dewatering systems

11.0 FOUNDATION CONCRETE

11.1 Introduction

The primary cause of serious deterioration in reinforced concrete is corrosion of the reinforcement,
due to attack by chlorides, present in concrete either within concrete aggregate and mixing water, or
through penetration from surrounding environment. Since chloride induced reinforcement corrosion
can only occur in the presence of oxygen and water, the risk of corrosion can be reduced by control of
chloride in concreting materials and by ensuring adequacy, integrity and impermeability of the concrete
cover.

Sulphate attack to concrete is caused by the presence of a high sulphate content either by the ingress
from the sulphate of the surrounding environment such as foundations soils or groundwater, or by the
presence of sulphate in the concrete ingredients. The attack results in a considerable internal
expansion which may lead to crack and disintegration of the concrete. This effect can be reduced by
use of selected cements or by suitable protection of the concrete.

Where sulphate and chloride occur together in high concentrations, sulphate resisting cement provides
less protection against the reinforcement corrosion. In such cases the test exposure conditions should
be studied in conjunction with modified recommendations for concrete mix design, based on local
experience in the Gulf Region and CIRIA Special Publication 31(1984).

It may be noted that as per CIRIA Special Publication 31, there is no widely accepted view on the
concentration at which chlorides become significant in soil or ground water, but limited experience in
the Gulf Region suggests it may be as low as 0.05% particularly in situations where wetting and drying
or capillary rise effect the concrete.

11.2 Analysis & Guidelines

The results of chemical analysis for soil and ground water in the site are given in Appendix D2. The
methodology of assessment of ground for chemical agents aggressive for concrete has been based
on the latest publications concerning assessment of exposure conditions and specification of concrete
to resist chemical attack:
1. BS 8500-1:2006
2. BRE Special Digest 1, 2005, 3rd ed, “Concrete in Aggressive Ground”.
3. CIRIA Publication C577, 2002, Guide to the construction of reinforced concrete in the Arabian
Peninsula.
Appendix G: includes selected extracts from the above referenced documents.
Notes:

a. SD 1: 2005 includes some key changes over SD 1:2003 version. Direct reference to this document
is recommended for appreciation of these changes. SD 1 refers to conditions in UK, however, the

621
document is widely in use in the area and it includes very useful information that is also in close
matching with other references (e.g. CIRIA C577, and BS 8500); therefore, reference to SD 1 was
made in this report.
b. The analysis conducted below is mainly intended to highlight the general procedure and main steps
and factors affecting the selection of durable concrete within the existing aggressive environmental
and site conditions. It presents a range of solutions and therefore, it is the designer who must make
the most appropriate selection. Further, other references may be used as may be applicable to
reach the optimum selection. It is our advice that the strictest requirements be followed from the
different resources.
c. In addition, several mix characteristics and aggregate property ranges from local experiences to
produce concrete of high durability and strength and other high quality engineering parameters are
included to demonstrate the typical concrete proportions and constituents that can be achieved
locally.

11.3 Classification of Ground conditions

Classification of the severity of chemical attack in the investigated site was based on the foundation
soil / GW sulphate content and PH value (Natural Soil and mobile GW conditions were adopted),
location of foundation, as well as the type of exposure conditions. Accordingly, the following
classification was obtained:
Table 16: Classification of Ground Conditions
Aggressive Chemical
Design DS based on Water
Environment
Location of Sulphate Class Soluble sulphates in
for Concrete Class Reference
Foundations
2:1 water / soil extract
(DS-Class) (ACEC-Class)
or GW
Table A.2 of BS
DS-3 Soil / Water AC-3
Soil 8500-1:2006
DS-3 Soil / Water AC-3 SD 1:2005, Table C1

11.4 Concrete Quality for Resisting Chemical attack

The concrete quality and number of additional protective measures are outlined in Tables A.9 of BS
8500-1:2006. The Design Chemical class (DC) is obtained for a specified Structural performance level
(SPL) and concrete section thickness.

The following preliminary design chemical classification may be proposed, subject to the following
provisions: Cast in-situ concrete for general use, well compacted with no face exposed to air, high
structural performance, and concrete section thickness >450mm,
Table 17: Concrete Quality & number of Additional Protective Measures
Design Chemical Class Additional Protective Measures
ACEC-Class
(DC Class) (APM)
DC-3 + one APM of choice+ one APM of
AC-3 DC-3 (FND3)
choice, DC-4 or FND4

Description of the options for the required additional protective measures for buried concrete is given
in the above referenced document.
However, adoption of the appropriate APMs, for particular application shall be carefully considered.
BS 8500-1: 2006 refers to SD 1: 2005, which provides full guidance and a series of design guides that
aid the selection of DC class and the relevant APMs. Design guides for specifying concrete for common
applications such as: Non-Domestic buildings including residential buildings …, Low Rise Domestic
Buildings, and Transport structures, are given in design guides No: (1a … 1h, 2a … 2c, 3a … 3g) for
the three categories, respectively in BRE Special Digest 1, 2005. These design guides provide
recommended DC (Design chemical class) according to the ACEC class selected previously, and then

622
recommends the appropriate APM number most suitable for the particular foundation element. These
design guides shall be referenced by the specifier.
BRE SD 1: 2005 has replaced the SPL by “Intended working life”. Table D1 provides selection of the
DC Class and the number of APMs for concrete elements where the hydraulic gradient due to
groundwater is 5 or less: for general in-situ use of concrete, using the ACEC class selected above.
Accordingly:

Table 18: Intended working life and number of APMs for concrete elements
Intended Working Life
ACEC – Class Reference
At Least 50 Years At Least 100 Years
AC-3 DC- 3 DC- 3+one APM of choice SD 1: 2005, Table D1

11.5 Concrete Mix

Table A.11 of BS 8500-1:2006, specifies Limiting values of composition and properties of concrete
where a DC class is specified, and recommend minimum cement or combination content for max.
aggregate sizes, maximum water cement ratio, Cement or Combination group. The selected
parameters apply to this site are (Please note that this assessment is based on preliminary estimate of
DC for general use. Consideration of changed DC class for particular application shall be made):

Table 19: Concrete Qualities to resist chemical attack for the general use of in-situ and precast concrete
Max free w/c Minimum cement or
or combination content Recommended cement and Reference
DC Class combination Kg/m3 combination group
ratio
For max. aggr size 20mm *
0.50 340 IIIB+SR BS 8500-
1:2006
DC-3 0.45 360 IVB-V Table A.11
0.40 380 IIB-V+SR,IIIA+SR,SRPC
BS 8500-1:2006 Table A.6 gives descriptions of cement and combination types.
*Note: for mixes with different max. aggregate size, please refer to above document.
SD 1: 2005, Table D2 and D3 provide Cement and Combination types for Concrete Qualities to resist
chemical attack for the general use of in-situ concrete. The followings are obtained:

Table 20: Cement and Combination types for Concrete Qualities


Minimum cement or
Recommended
Max free w/c or combination content Kg/m3
DC Class cement and Reference
combination ratio
For max. aggr size 20mm * combination group

0.50 340 F
SD 1: 2005,
DC-3 0.45 360 E
Table D2
0.40 380 D,G
SD 1: 2005, Table D2 & D3 gives descriptions of cement and combination types.

*Note: for mixes with different max. aggregate size, please refer to above document.

Comparison between cements specified in British standards which are still current or are to be
withdrawn and common cements specified in BS EN 197-1: 2011 adopted in SD-1:2005,Table D2
referred above is attached. For further details, it is advised that BS EN 197-1:2011 CEMENT-
(Composition, specification and conformity criteria for common Cements) be referred.

623
11.6 CHLORIDE INFLUENCES

The above classification does not reflect the significance of chloride ions in concrete surrounding. It
may be noted that as per CIRIA Special Publication 31, there is no widely accepted view on the
concentration at which chlorides become significant in soil or ground water, but limited experience in
the Gulf Region suggests it may be as low as 0.05% particularly in situations where wetting and drying
or capillary rise effect the concrete.

For this site Chloride Content in Concrete Surrounding is significant.

In such cases the site exposure conditions should be studied in conjunction with modified
recommendations for concrete mix design, based on local experience in the Gulf Region, CIRIA
Publication C577, 2002, “Guide to the construction of reinforced concrete in the Arabian Peninsula”.

For reinforced concrete in the ground the need for protection from chlorides must be balanced against
the need of protection from sulphates and where necessary a cement resistant to both sulphates and
chlorides should be used.
The usual procedure is to use cement giving best protection against chlorides and to prevent sulphates
ingress by tanking (coating with an impervious material), the surface of the concrete. Also in coastal
regions or in locations where high levels of ground salts are present all foundation concrete should be
protected by tanking to minimize salt and water ingress. In every case the need for good quality
concrete with low permeability is desirable.

The following tables give information on typical exposure conditions and recommended concrete mix
and cover criteria.

Table 21: Classification of exposure conditions in the Arabian Peninsula (Table 5.1 CS277-2002)
Exposure
Locations
condition
A Superstructures inland with no risk of windborne salts
B Superstructures in areas of salt flats, inland or near the coast, exposed to windborne salts
Parts of structures in contact with the soil, well above capillary rise zone, with no risk of water
C
introduced at the surface by irrigation, faulty drainage systems, washing down etc.
Parts of structures in contract with the soil, within the capillary rise zone, below ground water level
or where water may be introduced at the surface by irrigation, discharge of wastes, washing down
etc. The situations all lead to a potential for the concentration of aggressive salts by evaporation.
D
(i)Significant sulphate contamination only
(ii) Significant chloride contamination only.
(iii) Significant contamination with both sulphates and chlorides.
E Marine structures (splash zone)
F Water retaining structures (including sewerage treatment plants)

Table 22: Typical concrete mix criteria and cover requirements for exposure conditions in the Arabian
Peninsula from above table
Minimum Maximum Minimum
Exposure Cementitious cementitious free- Additional cover to
Conditions material (s) content for 20mm water/cement requirements reinforcement
aggregates (kg/m3 ) ratio ** (mm)
A 300-320 0.52 None 30
B 320 0.50 None 40
Portland cement
c* or additions 320-350 0.45 None 40-50
d(i), (ii) or
320-400 0.42 Tanking 40-50
(iii)

624
Portland
e and f Cement blends 370-400 0.40 None 100-150
with additions
*When concrete is cast directly in contact with soil the minimum cover should be increased to 75mm.
** On well supervised projects free-water /cement ratios down to 0.35 have successfully achieved using the latest generation
of super-plasticizers.

In general, Portland cement with a high C3A content is more resistant to chloride penetration than
Portland cement with a low C3A content.

Concrete containing pulverized fuel ash, ground granulated blast furnace slag and silica fume are
highly resistant to penetration by chlorides, due to their increased binding capacity and refined pore
structure.

The following are the main methods of reducing the penetration chlorides. (Table 6.1 CS277-2002)

Table 23: Methods of reducing Chloride Penetration


Approach Method
Selection of cement type.
Water/cement ratio
Use of conditions: -
Concrete mix design
Pulverized fuel ash.
Ground granulated blast furnace slag
Silica fume
Controlled Permeability
Formwork
Other measures
Coatings
Hydrophobic treatment of the concrete

Normal concrete containing silica fume will reduce the chloride penetration when used in conjunction
with a very low water /Cement ratio, the potential increase in resistance to chloride penetration is
considerable.

For further information, refer Guide to the construction of reinforced concrete in the Arabian Peninsula
(CIRIA Publication C577:2002.)

11.7 Conclusion

Modified or confirmed design recommendations shall be the responsibility of the designer, who shall
finalize the concrete specification considering the designed structural performance level, section
thickness, hydrostatic pressure, local availability of aggregate.

12.0 INTERACTION WITH ADJACENT PROPERTY

The following important points should be taken into consideration at the design stage and during
construction.

1. Lateral support (shoring system) if required, then should be considered.


2. Supporting the adjacent buildings and roads should be considered, if required, and the method
and sequence of support should be studied and ensured prior to commencement of excavation.
3. Thorough inspection of the adjacent buildings and roads and documentation of any existing
distortions, cracks, etc. Should be carried out prior to any commencement of work on the site.

625
4. Methods for protection from surface water from the adjacent roads, buildings and areas must be
studied. Any water, sewer or service pipes or manholes must be diverted from the plot.
Dewatering during excavation and construction must be studied and a provisional system shall
be designed.
5. Accurate type and level of foundations at the adjacent buildings must be determined at the design
stage and the stress interaction between the two foundations must be studied. Methods for
supporting the existing foundations must be studied if the excavations reach the existing
foundations.
6. The type of foundation, retaining walls and its method of construction should be carefully studied
if all area of project site is intended for utilization as built area.
7. Extreme care must be ensured during excavation which should be carried out under close
supervision. Over excavation of the sides should be totally avoided and the effect of vibration or
impact during excavation should be avoided.
8. The scheduling of excavation and construction should be studied to provide maximum safety.
9. The design of support and all other measures and requirements mentioned above should be
studied by competent structural engineers.

All the above notes are outside the scope of this investigation but should be taken into consideration
at the design stage and prior to any excavation.

In addition to the above, all municipal and local requirements regarding site excavations adjacent to
existing structures, services and roads shall be fully satisfied.

12.1 Excavation Inspection

The recommendations given in this report are based on the assumption that the subsurface materials
and conditions do not deviate appreciably from those disclosed in the borings.

Our office should be notified, in writing, immediately after site excavations to inspect the excavations
and confirm that the existing materials and conditions are similar to those encountered during the
investigation.

13.0 IMPORTANT NOTES

1. The groundwater levels indicated on the logs of borings represent the measured levels at the time
of investigation. It should be noted however, that groundwater levels are subject to variations
caused by tidal and weather seasonal variations and by changes of local drainage and or pumping
conditions.
2. Conclusions and recommendations given in this report are based on the findings from the drilled
boreholes, and obtained tests results.
3. All information in this report is considered confidential and should not be copied or used without
the permission of "Arab Center For Engineering Studies". No part of this report may be reproduced,
photocopied, translated, published, recorded, stored in a retrieval system or transmitted in any
form or by any means without the prior written permission of ACES.
4. The content of this report are not to be used for advertising, publication or promotional purposes.
Citation of any trade name does not constitute promotion or approval of the use of such product.

14.0 SOFT COPY

Electronic copy of the contents of this report & appendices is attached to this report.