Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING-SUBSTRUCTURE ACK ASV
CONTENTS
A Introduction 3
B Load calculations 12
C Software Model 32
E Design 165
G Annexure 643
1
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING-SUBSTRUCTURE ACK ASV
CONTENTS
A Introduction 3
B Load calculations 16
C Software Model 47
E Design 201
G Annexure 582
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
A. Design Criteria
A.1. Introduction:
The structure:
This document presents analysis and substructure design of Main Building of
132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION.
Main features of the building are summarized as below:
The plan size : 46 x 43 m
Floors : Basement, Ground floor ,& First floor (B+G+1).
Foundation level : Top of concrete (TOC) level for foundation is
-3.60 m lvl.
Height of the building : Top slab level +16.7 m lvl for substation.
Gate level is bench mark (0.00 lvl) for all other levels unless mentioned
otherwise.
Ground water level : +19.55 m DMD
: -11.1 m below the natural ground level.
Type of construction : cast in situ type
3
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
A.3. Material properties:
Note: for shear check strength of steel should not be more than 420 MPa.
4
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
Unit weight of walls is calculated as follows:
Hence,
270 mm thick Precast insulated wall = 0.22 x 25 = 5.5 kN/m2
150 thick Solid block internal wall =0.15x 21.0 = 3.2 kN/m2
150 mm thick precast wall. = 0.15 x 25 = 3.8 kN/m2
qna = Net allowable soil bearing capacity (Raft Fdn.) = 350 kPa
i) +19.55 m DMD = -11.1 m lvl w.r.t natural ground level. ( As per soil report)
As per ACI:
Primary Load Cases:
LC1 = DL = Dead Load
LC2 = LL = Live Load
LC3 = SDL = Super Imposed Dead Load
LC4 = SP = Soil Pressure
LC5 = EQX = Earthquake Load in X-direction
LC6 = EQY = Earthquake Load in Y-direction
LC7 = EQX+ecc = Earthquake Load in X-direction + eccentricity
LC8 = EQX-ecc = Earthquake Load in X-direction - eccentricity
LC9 = EQY+ecc = Earthquake Load in Y-direction + eccentricity
LC10 = EQY-ecc = Earthquake Load in Y-direction - eccentricity
5
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
LC11 = WL+X = Wind Load in X-direction
LC12 = WL+Y = Wind Load in Y-direction
LC13 = BL = Blast Load-1
LC13 = BL-1 = Blast Load-2
LC14 = BL-2 = Blast Load-3
LC15 = BL-3 = Blast Load-4
LC15 = BL-4 = Blast Load-5
LC16 = CR-1 = Crane Load
LC17= CR-2 = Crane Load
LC18 = SPS = Soil Pressure Surcharge
LC19 = LLR = Live load on roof
LC20= WP(Tank full) = Water Presure
LC21 = WP(Tank Half-1) = Water pressure Half Tank-1
LC22 = WP(Tank Half-2) = Water Pressure Half Tank-2
where, BL = Blast load applied on Power Transformer, ET Room and Shunt Reactor RC walls.
BL-1 = Blast load applied on Power Transformer and ET Room-3 RC walls.
BL-2 = Blast load applied on Power Transformer-2 and ET Room RC walls.
BL-3 = Blast load applied on Power Transformer-1 and ET Room RC walls.
BL-4 = Blast load applied on Shunt Reactor RC walls.
CR-1 & CR-2 = in Case-1 'CR-1' Crane Load applied considering when crane is near the
corbel support at one end and far from the other corbel support. Similarly Case-2 'CR-2' is applied
taking into consideration the vice versa of first case.
Note: Oil/Water load in Power Transformer oil / water collection area is included in LL (Live
Load) case.
Ultimate Load Combinations : ULS
1.4DL 500 Ref ACI318‐14 (CL:5.3.1)
1.2DL +1.6LL + 1.6SP+1.6SPS+ 0.5LLR 501 Ref ACI318‐14 (CL:5.3.1)
1.2DL +1.6LL + 1.6SP+1.6SPS+ 0.5LLR+1.6WP(FULL) 502 Ref ACI318‐14 (CL:5.3.1)
1.2DL +1.6LL + 1.6SP+1.6SPS+ 0.5LLR+1.6WP(HALF‐1) 503 Ref ACI318‐14 (CL:5.3.1)
1.2DL +1.6LL + 1.6SP+1.6SPS+ 0.5LLR+1.6WP(HALF‐2) 504 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:1 505 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:1+1.6WP(FULL) 506 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:1+1.6WP(HALF‐1) 507 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:1+1.6WP(HALF‐2) 508 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:2 509 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:2+1.6WP(FULL) 510 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:2+1.6WP(HALF‐1) 511 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6LL+1.6SP+0.5 LLR+1.6SPS+1.6CR:2+1.6WP(HALF‐2) 512 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL1 513 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL1+1.6WP(FULL) 514 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL1+1.6WP(HALF‐1) 515 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL1+1.6WP(HALF‐2) 516 Ref ACI318‐14 (CL:5.3.1)
6
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL2 517 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL2+1.6WP(FULL) 518 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL2+1.6WP(HALF‐1) 519 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL2+1.6WP(HALF‐2) 520 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL3 521 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL3+1.6WP(FULL) 522 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL3+1.6WP(HALF‐1) 523 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL3+1.6WP(HALF‐2) 524 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0CR‐1 525 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0CR‐1+1.0WP(FULL) 526 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0CR‐1+1.0WP(HALF‐1) 527 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0CR‐1+1.0WP(HALF‐2) 528 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0CR‐2 529 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0CR‐2+1.0WP(FULL) 530 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0CR‐2+1.0WP(HALF‐1) 531 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0CR‐2+1.0WP(HALF‐2) 532 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL1 533 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL1+1.0WP(FULL) 534 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL1+1.0WP(HALF‐1) 535 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL1+1.0WP(HALF‐2) 536 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL2 537 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL2+1.0WP(FULL) 538 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL2+1.0WP(HALF‐1) 539 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL2+1.0WP(HALF‐2) 540 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL3 541 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL3+1.0WP(FULL) 542 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL3+1.0WP(HALF‐1) 543 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL3+1.0WP(HALF‐2) 544 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ+Y 546 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ+Y+1.1WP(FULL) 547 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ+Y+1.1WP(HALF‐1) 548 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ+Y+1.1WP(HALF‐2) 549 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ‐Y 550 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ‐Y+1.1WP(FULL) 551 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ‐Y+1.1WP(HALF‐1) 552 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ‐Y+1.1WP(HALF‐2) 553 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ+X 554 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ+X+1.1WP(FULL) 555 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ+X+1.1WP(HALF‐1) 556 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ+Y+1.6SP+0.33EQ+X+1.1WP(HALF‐2) 557 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ‐Y+1.6SP+0.33EQ‐X 558 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ‐Y+1.6SP+0.33EQ‐X+1.1WP(FULL) 559 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ‐Y+1.6SP+0.33EQ‐X+1.1WP(HALF‐1) 560 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ‐Y+1.6SP+0.33EQ‐X+1.1WP(HALF‐2) 561 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ‐Y 562 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ‐Y+1.1WP(FULL) 563 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ‐Y+1.1WP(HALF‐1) 564 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ+X+1.6SP+0.33EQ‐Y+1.1WP(HALF‐2) 565 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ+Y 566 Ref ACI318‐14 (CL:5.3.1)
1.42DL+1.1(LL+LLR)+1.1EQ‐X+1.6SP+0.33EQ+Y+1.1WP(FULL) 567 Ref ACI318‐14 (CL:5.3.1)
7
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
8
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(+ecc)+1.6SP+0.33EQ‐X(+ecc) 618 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(FULL) 619 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(HALF‐1) 620 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(HALF‐2) 621 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ‐X(‐ecc) 622 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ‐X(‐ecc)+1.1WP(FULL) 623 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ‐X(‐ecc)+1.1WP(HALF‐1) 624 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ‐X(‐ecc)+1.1WP(HALF‐2) 625 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐X(+ecc)+1.6SP+0.33EQ+Y(+ecc 626 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐X(+ecc)+1.6SP+0.33EQ+Y(+ecc)+1.1WP(FULL) 627 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐X(+ecc)+1.6SP+0.33EQ+Y(+ecc)+1.1WP(HALF‐1) 628 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐X(+ecc)+1.6SP+0.33EQ+Y(+ecc)+1.1WP(HALF‐2) 629 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+0.33EQ+Y(‐ecc) 630 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+0.33EQ+Y(‐ecc)+1.1WP(FULL) 631 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+0.33EQ+Y(‐ecc)+1.1WP(HALF‐1) 632 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐X(‐ecc)+0.33EQ+Y(‐ecc)+1.1WP(HALF‐2) 633 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc) 634 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(FULL) 635 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(HALF‐1) 636 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc)+1.1WP(HALF‐2) 637 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ+X(‐ecc) 638 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ+X(‐ecc)+1.1WP(FULL) 639 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ+X(‐ecc)+1.1WP(HALF‐1) 640 UBC1997‐Cl‐1612.2.1
1.42DL+1.1(LL+LLR)+1.1EQ‐Y(‐ecc)+0.33EQ+X(‐ecc)+1.1WP(HALF‐2) 641 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ+X+1.6SP+0.33EQ+Y 642 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ‐X+1.6SP+0.33EQ‐Y 643 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ+Y+1.6SP+0.33EQ+X 644 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ‐Y+1.6SP+0.33EQ‐X 645 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ+X+1.6SP+0.33EQ‐Y 646 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ‐X+1.6SP+0.33EQ+Y 647 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ+Y+1.6SP+0.33EQ‐X 648 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ‐Y+1.6SP+0.33EQ+X 649 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ+X(+ecc)+1.6SP+1.1EQ+Y(+ecc) 650 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQX(‐‐ecc)+1.6SP+0.33EQY(‐‐ecc) 651 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQY(+ecc)+1.6SP+0.33EQX(+ecc) 652 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQY(‐ecc)+1.6SP+0.33EQX(‐ecc) 653 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ+X(+ecc)+1.6SP+1.1EQ‐Y(+ecc) 654 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ‐X(‐‐ecc)+1.6SP+0.33EQ+Y(‐‐ecc) 655 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc) 656 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ‐Y(‐ecc)+1.6SP+0.33EQ+X(‐ecc) 657 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ‐X(+ecc)+1.6SP+0.33EQ‐Y(+ecc) 658 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ‐X(‐ecc)+1.6SP+0.33EQ‐Y(‐ecc) 659 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ‐Y(+ecc)+1.6SP+0.33EQ‐X(+ecc) 660 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ‐Y(‐ecc)+1.6SP+0.33EQ‐X(‐ecc) 661 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ+X(+ecc)+1.6SP+0.33EQ‐Y(+ecc) 662 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ‐X(‐ecc)+1.6SP+0.33EQ+Y(‐ecc) 663 UBC1997‐Cl‐1612.2.1
31.09DL+1.1EQ+Y(+ecc)+1.6SP+0.33EQ‐X(+ecc) 664 UBC1997‐Cl‐1612.2.1
1.09DL+1.1EQ‐Y(‐ecc)+1.6SP+0.33EQ+X(‐ecc) 665 UBC1997‐Cl‐1612.2.1
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+X) 666 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+X)+1.0WP(FULL) 667 Ref 2.3.2 ASCE7‐05
9
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+X)+1.0WP(HALF‐1) 668 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+X)+1.0WP(HALF‐2) 669 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐X) 670 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐X)+1.0WP(FULL) 671 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐X)+1.0WP(HALF‐1) 672 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐X)+1.0WP(HALF‐2) 673 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+Y) 674 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+Y)‐1+1.0WP(FULL) 675 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+Y)‐1+1.0WP(HALF‐1) 676 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W+Y)‐1+1.0WP(HALF‐2) 677 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐Y) 678 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐Y)+1.0WP(FULL) 679 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐Y)+1.0WP(HALF‐1) 680 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 1.6 LLR + 0.8( W‐Y)+1.0WP(HALF‐2) 681 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+X) 682 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+X)+1.0WP(FULL) 683 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+X)+1.0WP(HALF‐1) 684 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+X)+1.0WP(HALF‐2) 685 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐X) 686 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐X)+1.0WP(FULL) 687 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐X)+1.0WP(HALF‐1) 688 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐X)+1.0WP(HALF‐2) 689 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+Y) 690 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+Y)+1.0WP(FULL) 691 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+Y)+1.0WP(HALF‐1) 692 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W+Y)+1.0WP(HALF‐2) 693 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐Y) 694 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐Y)+1.0WP(FULL) 695 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐Y)+1.0WP(HALF‐1) 696 Ref 2.3.2 ASCE7‐05
1.2 DL + 1.2 SP + 1.0 LL + 0.5 LLR + 1.6( W‐Y)+1.0WP(HALF‐2) 697 Ref 2.3.2 ASCE7‐05
0.9 DL + 1.6 SP + 1.6( W+X) 698 Ref 2.3.2 ASCE7‐05
0.9 DL + 1.6 SP + 1.6( W‐X) 699 Ref 2.3.2 ASCE7‐05
0.9 DL + 1.6 SP + 1.6( W+Y) 700 Ref 2.3.2 ASCE7‐05
0.9 DL + 1.6 SP + 1.6( W‐Y) 701 Ref 2.3.2 ASCE7‐05
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL 702 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL+1.6WP(FULL) 703 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL+1.6WP(HALF‐1) 704 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL+1.6WP(HALF‐2) 705 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL‐4 706 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL‐4+1.6WP(FULL) 707 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL‐4+1.6WP(HALF‐1) 708 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.6 LL+1.6SP+1.6SPS+0.5LLR+1.0 BL‐4+1.6WP(HALF‐2) 709 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL 710 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL+1.0WP(FULL) 711 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL+1.0WP(HALF‐1) 712 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL+1.0WP(HALF‐2) 713 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL‐4 714 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL‐4+1.0WP(FULL) 715 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL‐4+1.0WP(HALF‐1) 716 Ref ACI318‐14 (CL:5.3.1)
1.2DL+1.0 LL+1.6LLR+1.0BL‐4+1.0WP(HALF‐2) 717 Ref ACI318‐14 (CL:5.3.1)
10
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
11
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐X+0.75WP(FULL) 146 Ref ACI318-14 (CL:2.4.1)
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐X+0.75WP(HALF‐1) 147 Ref ACI318-14 (CL:2.4.1)
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐X+0.75WP(HALF‐2) 148 Ref ACI318-14 (CL:2.4.1)
1.0DL+1.0SP+0.75(LL+LLR)+0.75W+Y 149 Ref ACI318-14 (CL:2.4.1)
1.0DL+1.0SP+0.75(LL+LLR)+0.75W+Y+0.75WP(FULL) 150 Ref ACI318-14 (CL:2.4.1)
1.0DL+1.0SP+0.75(LL+LLR)+0.75W+Y+0.75WP(HALF‐1) 151 Ref ACI318-14 (CL:2.4.1)
1.0DL+1.0SP+0.75(LL+LLR)+0.75W+Y+0.75WP(HALF‐2) 152 Ref ACI318-14 (CL:2.4.1)
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐Y 153 Ref ACI318-14 (CL:2.4.1)
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐Y+0.75WP(FULL) 154 Ref ACI318-14 (CL:2.4.1)
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐Y+0.75WP(HALF‐1) 155 Ref ACI318-14 (CL:2.4.1)
1.0DL+1.0SP+0.75(LL+LLR)+0.75W‐Y+0.75WP(HALF‐2) 156 Ref ACI318-14 (CL:2.4.1)
0.6DL+1.0SP+1.0W+X 157 Ref ACI318-14 (CL:2.4.1)
0.6DL+1.0SP+1.0W‐X 158 Ref ACI318-14 (CL:2.4.1)
0.6DL+1.0SP+1.0W+Y 159 Ref ACI318-14 (CL:2.4.1)
0.6DL+1.0SP+1.0W‐Y 160 Ref ACI318-14 (CL:2.4.1)
1.0DL+0.72EQ+X+1.0SP+0.22EQ+Y 161 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ‐X+1.0SP+0.22EQ‐Y 162 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ+Y+1.0SP+0.22EQ+X 163 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ‐Y+1.0SP+0.22EQ‐X 164 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ+X+1.0SP+0.22EQ‐Y 165 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ‐X+1.0SP+0.22EQ+Y 166 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ+Y+1.0SP+0.22EQ‐X 167 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ‐Y+1.0SP+0.22EQ+X 168 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc) 169 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ‐X(+Ecc)+1.0SP+0.22EQ‐Y(+ecc) 170 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ+Y(+Ecc)+1.0SP+0.22EQ+X(+ecc) 171 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ‐X(+ecc) 172 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc) 173 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ‐X(+ecc)+1.0SP+0.22EQ+Y(+ecc) 174 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc) 175 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ+X(+ecc) 176 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ+X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc) 177 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ‐X(‐Ecc)+1.0SP+0.22EQ‐Y(‐Ecc) 178 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ+Y(‐Ecc)+1.0SP+0.22EQ+X(‐ecc) 179 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc) 180 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ+X(‐ecc)+1.0SP+0.22EQ‐Y(‐ecc) 181 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc) 182 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ+Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc) 183 UBC1997-Cl-1612.3.1
1.0DL+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc) 184 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ+Y 185 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ+Y+1.0WP(FULL) 186 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ+Y+1.0WP(HALF‐1) 187 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ+Y+1.0WP(HALF‐2) 188 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ‐Y 189 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ‐Y+1.0WP(FULL) 190 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ‐Y+1.0WP(TANK‐1) 191 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ‐Y+1.0WP(TANK‐2) 192 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ+X 193 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ+X+1.0WP(FULL) 194 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ+X+1.0WP(HALF‐1) 195 UBC1997-Cl-1612.3.1
12
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ+X+1.0WP(HALF‐2) 196 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ‐X 197 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ‐X+1.0WP(FULL) 198 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ‐X+1.0WP(HALF‐1) 199 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ‐X+1.0WP(HALF‐2) 200 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ‐Y 201 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ‐Y+1.0WP(FULL) 202 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ‐Y+1.0WP(HALF‐1) 203 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X+1.0SP+0.22EQ‐Y+1.0WP(HALF‐2) 204 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ+Y 205 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ+Y+1.0WP(FULL) 206 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ+Y+1.0WP(HALF‐1) 207 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X+1.0SP+0.22EQ+Y+1.0WP(HALF‐2) 208 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ‐X 209 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ‐X+1.0WP(FULL) 210 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ‐X+1.0WP(HALF‐1) 211 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y+1.0SP+0.72EQ‐X+1.0WP(HALF‐2) 212 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ+X 213 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ+X+1.0WP(FULL) 214 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ+X+1.0WP(HALF‐1) 215 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y+1.0SP+0.22EQ+X+1.0WP(HALF‐2) 216 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc) 217 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc)+1.0WP(FULL) 218 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc)+1.0WP(HALF‐1) 219 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ+Y(+ecc)+1.0WP(HALF‐2) 220 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc) 221 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(FULL) 222 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(HALF‐1) 223 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(HALF‐2) 224 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQY(+ecc)+1.0SP+0.22EQX(+ecc) 225 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQY(+ecc)+1.0SP+0.22EQX(+ecc)+1.0WP(FULL) 226 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQY(+ecc)+1.0SP+0.22EQX(+ecc)+1.0WP(HALF‐1) 227 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQY(+ecc)+1.0SP+0.22EQX(+ecc)+1.0WP(HALF‐2) 228 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQY(‐ecc)+1.0SP+0.22EQX(‐ecc) 229 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQY(‐ecc)+1.0SP+0.22EQX(‐ecc)+1.0WP(FULL) 230 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQY(‐ecc)+1.0SP+0.22EQX(‐ecc)+1.0WP(HALF‐1) 231 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQY(‐ecc)+1.0SP+0.22EQX(‐ecc)+1.0WP(HALF‐2) 232 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc) 233 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(FULL) 234 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(HALF‐1) 235 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(HALF‐2) 236 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc) 237 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(FULL) 238 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(HALF‐1) 239 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(HALF‐2) 240 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc) 241 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(FULL) 242 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(HALF‐1) 243 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(HALF‐2) 244 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc) 245 UBC1997-Cl-1612.3.1
13
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)+1.0WP(FULL) 246 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)+1.0WP(HALF‐1) 247 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)+1.0WP(HALF‐2) 248 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(+ecc)+1.0SP+0.22EQ‐Y(+ecc) 249 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(FULL) 250 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(HALF‐1) 251 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(HALF‐2) 252 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ‐Y(‐ecc) 253 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ‐Y(‐ecc)+1.0WP(FULL) 254 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ‐Y(‐ecc)+1.0WP(HALF‐1) 255 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ‐Y(‐ecc)+1.0WP(HALF‐2) 256 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ‐X(+ecc) 257 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(FULL) 258 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(HALF‐1) 259 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(HALF‐2) 260 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc) 261 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc)+1.0WP(FULL) 262 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc)+1.0WP(HALF‐1) 263 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc)+1.0WP(HALF‐2) 264 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc) 265 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(FULL) 266 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(HALF‐1) 267 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc)+1.0WP(HALF‐2) 268 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc) 269 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(FULL) 270 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(HALF‐1) 271 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc)+1.0WP(HALF‐2) 272 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc) 273 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(FULL) 274 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(HALF‐1) 275 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc)+1.0WP(HALF‐2) 276 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc) 277 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)+1.0WP(FULL) 278 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)+1.0WP(HALF‐1) 279 UBC1997-Cl-1612.3.1
1.0DL+1.0(LL+LLR)+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc)+1.0WP(HALF‐2) 280 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ+X+1.0SP+0.22EQ+Y 281 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ+Y+1.0SP+0.22EQ+X 282 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ+X+1.0SP+0.22EQ‐Y 283 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ+Y+1.0SP+0.22EQ‐X 284 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ‐X+1.0SP+0.72EQ‐Y 285 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ‐Y+1.0SP+0.22EQ‐X 286 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ+X+1.0SP+0.72EQ‐Y 287 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ+Y+1.0SP+0.22EQ‐X 288 UBC1997-Cl-1612.3.1
0.90DL+0.72EQX(+ecc)+1.0SP+0.22EQY(+ecc) 289 UBC1997-Cl-1612.3.1
0.90DL+0.72EQY(+ecc)+1.0SP+0.22EQX(+ecc) 290 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ+X(+ecc)+1.0SP+0.22EQ‐Y(+ecc) 291 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc) 292 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ‐X(+ecc)+1.0SP+0.72EQ‐Y(+ecc) 293 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ‐Y(+ecc)+1.0SP+0.22EQ‐X(+ecc) 294 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ+X(+ecc)+1.0SP+0.72EQ‐Y(+ecc) 295 UBC1997-Cl-1612.3.1
14
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
0.90DL+0.72EQ+Y(+ecc)+1.0SP+0.22EQ‐X(+ecc) 296 UBC1997-Cl-1612.3.1
0.90DL+0.72EQX(‐ecc)+1.0SP+0.22EQY(‐ecc) 297 UBC1997-Cl-1612.3.1
0.90DL+0.72EQY(‐ecc)+1.0SP+0.22EQX(‐ecc) 298 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc) 299 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ+X(‐ecc) 300 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ‐Y(‐ecc) 301 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ‐Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc) 302 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ‐X(‐ecc)+1.0SP+0.22EQ+Y(‐ecc) 303 UBC1997-Cl-1612.3.1
0.90DL+0.72EQ+Y(‐ecc)+1.0SP+0.22EQ‐X(‐ecc) 304 UBC1997-Cl-1612.3.1
0.6DL+0.7EQ+X+1.0SP+0.21EQ+Y 305 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ‐X+1.0SP+0.21EQ‐Y 306 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ+Y+1.0SP+0.21EQ+X 307 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ‐Y+1.0SP+0.21EQ‐X 308 Ref 2.4.1 ASCE7-05
.0.6DL+0.7EQ+X+1.0SP+0.21EQ‐Y 309 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ‐X+1.0SP+0.21EQ+Y 310 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ+Y+1.0SP+0.21EQ‐X 311 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ‐Y+1.0SP+0.21EQ+X 312 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ‐X(+ecc)+1.0SP+0.21EQ‐Y(+ecc) 313 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ‐X(‐ecc)+1.0SP+0.21EQ‐Y(‐ecc) 314 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ‐Y(+ecc)+1.0SP+0.21EQ‐X(+ecc) 315 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ‐Y(‐ecc)+1.0SP+0.21EQ‐X(‐ecc) 316 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ+X(+ecc)+1.0SP+0.21EQ‐Y(+ecc) 317 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ‐X(‐ecc)+1.0SP+0.21EQ+Y(‐ecc) 318 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ+Y(+ecc)+1.0SP+0.21EQ‐X(+ecc) 319 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ‐Y(‐ecc)+1.0SP+0.21EQ+X(‐ecc) 320 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ+X(+ecc)+1.0SP+0.21EQ+Y(+ecc) 321 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ+X(‐ecc)+1.0SP+0.21EQ+Y(‐ecc) 322 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ+Y(+ecc)+1.0SP+0.21EQ+X(+ecc) 323 Ref 2.4.1 ASCE7-05
0.6DL+0.7EQ+Y(‐ecc)+1.0SP+0.21EQ+X(‐ecc) 324 Ref 2.4.1 ASCE7-05
1.0(DL +SP+SPS+BL)+0.75(LL+LLR) 325 Ref ACI318-14 (CL:5.3.1)
1.0(DL +SP+SPS+BL)+0.75(LL+LLR)+0.75WP(FULL) 326 Ref ACI318-14 (CL:5.3.1)
1.0(DL +SP+SPS+BL)+0.75(LL+LLR)+0.75WP(HALF‐1) 327 Ref ACI318-14 (CL:5.3.1)
1.0(DL +SP+SPS+BL)+0.75(LL+LLR)+0.75WP(HALF‐2) 328 Ref ACI318-14 (CL:5.3.1)
1.0(DL +SP+SPS+BL‐4)+0.75(LL+LLR) 329 Ref ACI318-14 (CL:5.3.1)
1.0(DL +SP+SPS+BL‐4)+0.75(LL+LLR)+0.75WP(FULL) 330 Ref ACI318-14 (CL:5.3.1)
1.0(DL +SP+SPS+BL‐4)+0.75(LL+LLR)+0.75WP(HALF‐1) 331 Ref ACI318-14 (CL:5.3.1)
1.0(DL +SP+SPS+BL‐4)+0.75(LL+LLR)+0.75WP(HALF‐2) 332 Ref ACI318-14 (CL:5.3.1)
Load Envelopes:
15
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
Columns = 0.70 Ig
Beams = 0.35 Ig
Walls = 0.35 Ig
Slabs = 0.25 Ig
B. Load Calculations
Load values as applied in the software are calculated / explained as follows:
Roof = 200mm
16
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
Area Loads:
Concrete Platforms:
3 2
Between Grid B & C and 8 & 9 3.300-1.72 1.58 m 24 kN/m 37.9 kN/m
3 2
Between Grid K & L and 7 & 8 3.300-2.55 0.75 m 24 kN/m 18.0 kN/m
3 2
Between Grid B & C and 7 & 8 3.300-2.37 0.93 m 24 kN/m 22.3 kN/m
3 2
Between Grid H & K and 7 & 8 3.300-2.37 0.93 m 24 kN/m 22.3 kN/m
3 2
Between Grid B' & C and 4 & 4' 3.300-1.85 1.45 m 24 kN/m 34.8 kN/m
3 2
Between Grid H & K and 4 & 5 3.300-1.52 1.78 m 24 kN/m 42.7 kN/m
3 2
132kV Cable basement 3.300-2.30 1.00 m 24 kN/m 24.0 kN/m
3 2
In Stair case-1 Area 3.300-1.68 1.62 m 24 kN/m 38.9 kN/m
3 2
In Stair case-2 Area 3.300-2.475 0.83 m 24 kN/m 19.8 kN/m
3 2
In Stair case-3 Area 3.600-1.48 2.12 m 24 kN/m 50.9 kN/m
3 2
In Stair case-4 Area 3.600-1.81 1.79 m 24 kN/m 43.0 kN/m
3 2
Load due to screed in Sump pit-1 3.600-3.000 0.60 m 24 kN/m 14.4 kN/m
3 2
Load due to screed in Sump pit-2 3.600-3.5 0.10 m 24 kN/m 2.4 kN/m
3 2
Load due to screed in Cable pulpit -1 3.300-2.900 0.40 m 24 kN/m 9.6 kN/m
3 2
Load due to screed in OWMH-1 3.600-2.200 1.40 m 24 kN/m 33.6 kN/m
17
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
3 2
Load due to screed in OWMH-2 3.600-2.700 0.90 m 24 kN/m 21.6 kN/m
3 2
Load due to screed in OWMH-3 3.600-2.850 0.75 m 24 kN/m 18.0 kN/m
3 2
Load due to screed in OWMH-5 3.600-3.525 0.08 m 24 kN/m 1.8 kN/m
3 2
Load due to screed in OWMH-6 3.600-3.450 0.15 m 24 kN/m 3.6 kN/m
3 2
Load due to screed in OWMH-7 3.600-3.375 0.23 m 24 kN/m 5.4 kN/m
3 2
Load due to screed in OWMH-8 3.600-3.300 0.30 m 24 kN/m 7.2 kN/m
3 2
Load due to screed in 11 kV cable trench area 3.6-3.2 0.40 m 24 kN/m 9.6 kN/m
3 2
Load due to screed in 11 kV cable trench area (IDT-3) cable crosing location 3.6-1.85 1.75 m 24 kN/m 42.0 kN/m
3 2
Load due to screed in 132 kV cable trench area 3.6-3.0 0.60 m 24 kN/m 14.4 kN/m
3 2
Load due to screed in oil water collection area ( in areas-1, 2 & 3) -Shorter 3.60-3.15 0.45 m 24 kN/m 10.8 kN/m
3 2
Load due to screed in oil water collection area ( in areas-1,2&3) -Longer 3.6-3 0.60 m 24 kN/m 14.4 kN/m
3 2
Load due to screed in oil water collection area ( in areas-2) -Longer cable crosing l 3.6-1.45 2.15 m 24 kN/m 51.6 kN/m
3 2
Load due to screed in oil water collection area ( in areas-3) -Longer cable crosing l 3.6-1.85 1.75 m 24 kN/m 42.0 kN/m
3 2
Load due to screed in 15 MVR transformer (cable protection screed) 3.6-1.85 1.75 m 24 kN/m 42.0 kN/m
3 2
Load due to pedestal 3.60+0.4 4.000 m 25 kN/m 100.0 kN/m
2
Load due to 0.250m thk trench walls 3.6+0.4 4.000 m 6.25 kN/m 25.0 kN/m
3 2
Load due to 0.2 m thk slab over cable trench 0.2 m 25 kN/m 5.0 kN/m
(Considering Maximum value of
8.8 kN/m^2 UDL is applied at
3 2
Load due to 0.350 m (grating + cobble stone layer) @ water collection area 0.35 m 25 kN/m 8.8 kN/m +0.4 m lvl
Loads are applied as Distributed
frame loads under 'SDL' load
Load on shorter span,lx = 7.66 m (W lx)/3 = (8.8x 7.66)/3 22.5 kN/m case
18
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
Applied as uniform Shell loads
Dead load in ET transformer area (-3.600 m lvl) under "SDL" load case
3 2
Load due to screed in 11 kV cable trench area ET-1 (sleeves area) 3.600-0.87 2.73 m 24 kN/m 65.5 kN/m
3 2
Load due to screed in 11 kV cable trench area ET-1 3.600-2.47 1.13 m 24 kN/m 27.1 kN/m
3 2
Load due to screed in 11 kV cable trench area ET-2 (sleeves area) 3.600-1.12 2.48 m 24 kN/m 59.5 kN/m
3 2
Load due to screed in 11 kV cable trench area ET-2 3.600-2.97 0.63 m 24 kN/m 15.1 kN/m
3 2
Load due to screed in 11 kV cable trench area ET-3 (sleeves area) 3.600-2.375 1.225 m 24 kN/m 29.4 kN/m
3 2
Load due to screed in 11 kV cable trench area ET-3 3.600-2.925 0.675 m 24 kN/m 16.2 kN/m
3 2
Load due to screed in LV cable trench area ET-1 (sleeves area) 3.600-2.9 0.7 m 24 kN/m 16.8 kN/m
3 2
Load due to screed in LV cable trench area ET-2&3(sleeves area) 3.600-1.48 2.12 m 24 kN/m 50.9 kN/m
3 2
Load due to screed in oil water collection area ( in ET-1) 3.600-1.95 1.65 m 24 kN/m 39.6 kN/m
3 2
Load due to screed in oil water collection area ( in ET-2 & 3) 3.600-2.450 1.15 m 24 kN/m 27.6 kN/m
3 2
Load due to screed in oil water collection area ( in ET-2 & 3)(Sleeves area) 3.300-1.520 1.78 m 24 kN/m 42.7 kN/m
3 2
Load due to pedestal 3.600+0.4 4.000 m 25 kN/m 100.0 kN/m
2
Load due to 0.250m thk trench walls 4.000 m 6.25 kN/m 25.0 kN/m
3 2
Load due to 0.2 m thk slab over cable trench 0.2 m 25 kN/m 5.0 kN/m
(Considering Maximum value
Load due to 0.350 m (grating + cobble stone layer) @ water collection area 0.35 m 25 kN/m3 8.8 kN/m2 of 8.8 kN/m^2 UDL is applied
at +0.400 m lvl
Loads are applied as Distributed
Load on shorter span,lx = 4.57 m (W lx)/3 = (8.8x 4.570)/3 13.4 kN/m frame loads under 'SDL' load
case
Load on longer span, ly= 5.655 m ( W lx / 6) (3-(lx/ly)2) (8.8x4.57/6)(3-(4.57/5.655)2) 15.7 kN/m
3 2
Load due to screed in 132 kV cable trench area 3.600-3.000 0.6 m 24 kN/m 14.4 kN/m
3 2
Load due to screed in oil water collection area 3.600-3.0 0.6 m 24 kN/m 14.4 kN/m
3 2
Load due to screed in cable trench area 3.600-1.850 1.75 m 24 kN/m 42.0 kN/m
3 2
Load due to pedestal 3.600+0.4 4.000 m 25 kN/m 100.0 kN/m
19
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
2
Load due to 0.250m thk trench walls 3.994 m 6.25 kN/m 25.0 kN/m
3 2
Load due to 0.2 m thk slab over cable trench 0.2 m 25 kN/m 5.0 kN/m
(Considering Maximum value
of 8.8 kN/m^2 UDL is applied
3 2
Load due to 0.350 m (grating + cobble stone layer) @ water collection area 0.35 m 25 kN/m 8.8 kN/m at +0.4 m lvl
Loads are applied as Distributed
frame loads under 'SDL' load
Load on shorter span,lx = 8.090 m (W lx)/3 = (8.8x 8.09)/3 23.7 kN/m case
2 2
Load on longer span, ly= 9.25 m ( W lx / 6) (3-(lx/ly) ) (8.8x8.08/6)(3-(8.08/9.25) ) 26.5 kN/m
Wall Loads:
Loads are applied as Distributed
frame loads under 'SDL' load
Load due to 150 mm thick solid block work case
20
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
Loads are applied as Distributed
frame loads under 'SDL' load
Load due Removable Handrail case
Area Loads:
Self Wt. of slab, 0.20m Thk (Except 132 kV GIS Room & offloading platform)
21
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
3 2
Load due to screed 80 mm screed 1.50-1.42 0.080 m 24 kN/m 1.9 kN/m
Wall Loads:
Loads are applied as Distributed
frame loads under 'SDL' load
Load due to 270 thk (250 Thermal Block wall+20 mm outside plaster) Thermal Block wall @ +1.420 m lvl case
22
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
2
Density for 150 thk Hollow Block (0.15*16) 2.4 kN/m
2
Density for 270 thk RCC Screed supporting Upstand (0.27*25) 6.75 kN/m
2
Density for 150 thk RCC Screed supporting Upstand (0.15*25) 3.75 kN/m
Along Grid-7 from Grid-J to C' 7.5 -1.42-0.6 5.48 m 13.2 kN/m
Along Grid-8 from Grid-L to B 7.5 -1.42-0.6 5.48 13.2 kN/m
Along Grid-9 from Grid-L to B' 7.5 -1.42-0.6 5.48 m 13.2 kN/m
B/W Grids-H & K from Grid-9 to 11 7.5 -1.42 6.08 m 14.6 kN/m
Near Grid-F from Grid-9 to 11 7.5 -1.42-0.6 5.48 m 13.2 kN/m
Along Grid-D from Grid-9 to 11 6.7 -1.42-0.6 4.68 m 11.2 kN/m
Along Grid-B' from Grid-9 to 10 4-0.2-0.6 3.20 m 7.7 kN/m
Along Grid-B' from Grid 9 to 10(275 thk Screed Supporting RCC Upstand) 0.2+0.4 0.60 m 4.1 kN/m
Around Toilet in service room 4-0.19 3.81 m 9.1 kN/m
150 thk RCC Screed supporting Upstand Around Toilet in service room 0.19+0.4 0.59 m 2.2 kN/m
Along Grid-4 from Grid-H' to C' 13.3 -1.42-0.6 11.28 m 27.1 kN/m
Load due to 10 mm thk chequered plate on beam for 1,2,3 0.83*0.8/2 0.83 m 0.3 kN/m (Considered 1 kN/m in SDL)
Load due to 10 mm thk chequered plate on beam for 4&5 0.375*0.8/2 0.375 m 0.1 kN/m (Considered 1 kN/m in SDL)
23
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
Loads are applied as Distributed
Load due to Chain link Fence at capacitor bank rooms frame loads under 'SDL' load
case
At capacitor bank locations 5.0 kN/m
Loads in the First floor area (3.000, 4.000, 4.500, 4.900, 7.500 lvl)
Area Loads:
Load due to 800 mm screed in Off-loading platform area, HVAC Shaft &
3 2
Nitrogen Room 7.5-8.3 0.80 m 24 kN/m 19.2 kN/m
Load due to cable routing in Control, Protection & charger room, OT room,Few
Corridors, LVAC Room, CCTV Room and load due to services,raised floor. 1+1 kN/m
2
2.0 kN/m2
3 2
Load due to 900 mm screed in Battery Room-1 & 2 7.5-8.4 0.90 m 24 kN/m 21.6 kN/m
3 2
Load due to screed in Capacitor Room Roof 7.725-7.5 0.23 m 24 kN/m 5.4 kN/m
3 2
Load due to 400 mm screed on staircase-4 @ 3.00 m lvl 3.40-3.00 0.40 m 24 kN/m 9.6 kN/m
Load due to 600 Imperial Gallon tank weight (600*4.55) Liters 2730.00 liters
2
(Assuming 3000 kG total weight of the tank) 30 kN 1.365 2 30/(1.365*2)= 10.5 kN/m
3 2
Load due to 100 mm screed on Service room roof @ 4.00 m lvl 100mm 0.10 m 25 kN/m 2.5 kN/m
24
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
Load due to 1000 Imperial Gallon tank weight (1000*4.55) Liters 4550.00 liters
2
(Assuming 4700 kG total weight of the tank) 47 kN 1.52 2 47/(2)= 25.9 kN/m
2
(Assuming 200 kG total weight of transfer pumps) 2 kN 2.275 1.372 0.6 kN/m
3 2
Load due to 230 mm screed on Staircase-3 & ET room roof @ 4.90 m lvl 5.135-4.90 0.23 m 24 kN/m 5.6 kN/m
2
Density for 200 thk RCC Slab with tiles (0.20*25+0.02*20) 5.40 kN/m
Load around cable riser 1,2,3 on beams 0.83*5.4/2 0.83 m 4.5 kN/m
Load around cable riser 4,5 on beams 0.33*5.4/2 0.33 m 1.8 kN/m
Wall Loads:
Loads are applied as Distributed
Load due to 270 thk (250 Thermal Block wall+20 mm outside plaster) Thermal Block wall @ +4.500 m lvl frame loads under 'SDL' load
case
Height of the Thermal Block wall
2
Density for 250 thk Thermal Block wall + Plastering (0.25*17.5)+(0.02*20) 4.78 kN/m
25
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
Along Grid-4 from Grid-J to H' 13.30-5.135-1.2 6.97 m 33.3 kN/m
Along Grid-4 from Grid-J to H' 270 thk RCC Screed supporting Upstand 5.135-4.9 0.23 m 1.6 kN/m
Along Grid-7 from Grid-J to L 7.50-5.09-0.6 1.81 m 8.6 kN/m
Along Grid-7 from Grid-J to L 270 thk RCC Screed supporting Upstand 5.09-4.9 0.19 m 1.3 kN/m
Along Grid-B' from Grid-9 to 10 6.7-4-0.6-0.15 1.95 m 9.3 kN/m
Along Grid-B' from Grid-9 to 10 270 thk RCC Screed supporting Upstand 0.15 0.15 m 1.0 kN/m
Loads are applied as Distributed
frame loads under 'SDL' load
Load due to 270 thk (250 Thermal Block wall+20 mm outside plaster) Thermal Block wall @ +7.500 m lvl case
Height of the Thermal Block wall
2
Density for 250 thk Thermal Block wall + Plastering (0.25*17.5)+(0.02*20) 4.78 kN/m
2
Density for 270 thk RCC Screed supporting Upstand (0.27*25) 6.75 kN/m
26
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
2
Density for150 thk RCC Screed supporting Upstand (0.15*25) 3.75 kN/m
3
Load due to upstand at offloading platform 1.1 m 0.20 m 25 kN/m 5.50 kN/m
Load due removable hand rail at offloading platform 2.0 kN/m
Load due to removable chequered plate on Equipment lifting area (assume
0.01 m 3.00 m 78.5 kN/m3
thickness = 10 mm)
0.010*3.0*78.5/2 1.18 kN/m
Total dead load around opening in offloading area = 8.7 kN/m
27
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
Load due to parapet wall of 3.85 m height @+4.00 m lvl(Above Service Room)
Load due to 3.85 m RCC Precast wall
2
Load due to 200mm Thk RCC 3.85 m 5.00 kN/m 19.3 kN/m
Total 19.3 kN/m
Along Grid-A from Grid-9 to 10 19.3 kN/m
Along Grid-10 from Grid-A to B' 19.3 kN/m
Load due to parapet wall of 1.5 m height @+7.50 m lvl(Above Capacitor Room)
Load due to 1.5 m RCC Precast wall
2
Load due to 200mm Thk RCC 1.5 m 5.00 kN/m 7.5 kN/m
Total 7.5 kN/m
Along Grid-M from Grid-9 to 11 7.5 kN/m
Along Grid-11 from Grid-M to K 7.5 kN/m
Load due to roof shed on parapet wall over Staircase-4 & Service Room
28
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
2
Dead Load due to shed on beams 1.5 x 0.6 1.50 kN/m 0.90 kN/m
Loads in the Roof floor area +9.80 m (Power transformer Roof & Shunt Reactor-1)
[(13.7-13.3)+(13.45-
3
Load due to 275 mm screed (Average thick of screed) 13.3)]/2 0.275 m 24 kN/m 6.6 kN/m2
3
Load due to 0.04 m thk concrete tiles 0.04 m 24 kN/m 1.0 kN/m2
Load due to water proofing 0.5 kN/m2
Total 8.1 kN/m2
Load due to HVAC pedestals 0.4*0.6*25 6.0 kN/m
Wall Loads:
29
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
Along Grid-J from Grid-4 to 7 18.5 kN/m
Along Grid-7 from Grid-J to M 18.5 kN/m
Along Grid-M from Grid-7 to 8 18.5 kN/m
Along Grid-9 from Grid-L to K 18.5 kN/m
Along Grid-K from Grid-9 to 11 18.5 kN/m
Along Grid-11 from Grid-K to B' 18.5 kN/m
Along Grid-B' from Grid-9 to 11 18.5 kN/m
Along Grid-9 from Grid-B to B' 18.5 kN/m
Along Grid-A from Grid-7 to 8 18.5 kN/m
Along Grid-7 from Grid-A to C 18.5 kN/m
Along Grid-C from Grid-4 to 7 18.5 kN/m
Along Grid-4 from Grid-C to J 18.5 kN/m
30
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
Loads due to Staircase
Dead Load due to Staircase,
3 2
Self weight of waist slab 0.25 m 25 kN/m Total 6.25 kN/m
Self weight of steps 0.5*0.170*0.30*25*10 6.38 kN/m
2
Load due to Epoxy paint on staircase 0.5 kN/m
3 2
Load due to oil/water in Sump Pits & OWMH 1m 10 kN/m 10.0 kN/m
3 2
Load due to oil/water in Sump Pits & OWMH 1m 10 kN/m 10.0 kN/m
2
Live load at 0.4m level in transformer area 10.0 kN/m
Load on shorter span,lx = 7.66 m (W lx)/3 = (10x 7.66)/3 25.5 kN/m
31
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
2 2
Load on longer span, ly= 11.015 m ( W lx / 6) (3-(lx/ly) ) (10x7.66/6)(3-(7.66/11.015) ) 32.1 kN/m
2
Live load at 0.4m level in ET area 10.0 kN/m
Load on shorter span,lx = 4.57 m (W lx)/3 = (10x 4.57)/3 15.2 kN/m
2
Load on longer span, ly= 5.655 m ( W lx / 6) (3-(lx/ly) ) (10x4.57/6)(3-(4.57/5.655)2) 17.9 kN/m
2
Live load at 0.4m level in Shunt Reactor-1 area 10.0 kN/m
Load on shorter span,lx = 8.09 m (W lx)/3 = (10x 8.09)/3 27.0 kN/m
2 2
Load on longer span, ly= 9.25 m ( W lx / 6) (3-(lx/ly) ) (10x8.09/6)(3-(8.09/9.25) ) 30.1 kN/m
2
Live load due to roof truss on IDT transformer area @ +9.80 m lvl 1.00 kN/m
(Live load considered 0.75 kN/m2 Inaccessible roof)
Loads are applied as Distributed
Live Load due to Roof Truss above IDT walls(Along Grid D' & F') 7.66 m 1.0 kN/m2 7.7 kN/m frame loads under 'LL' load case
Live Load due to Roof Truss above IDT walls (Along Grid H') 3.8 kN/m
2
Live load due to roof truss on Shunt Reactor-1 area @ +9.800 m lvl 1.00 kN/m
(Live load considered 0.75 kN/m2 Inaccessible roof)
Live Load due to Roof Truss above Shunt reactor walls(Along Grid C') 8.09 m 1.0 kN/m2 8.1 kN/m
Live Load due to Roof Truss above Shunt reactor walls (Along Grid A') 4.0 kN/m
32
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
2
Live load due to roof truss on Staircase-3 & ET Room 1,2,3 area @ +4.900 m lvl 1.00 kN/m
(Live load considered 0.75 kN/m2 Inaccessible roof)
LLive oad due to Roof Truss above ET walls(Along Grid 5 & 6') 4.570 m 1.0 kN/m2 4.6 kN/m
Live Load due to Roof Truss above ET walls (Along Grid 4 & 7) 2.3 kN/m
Live load in 132 kV GIS room, Air lock room & Off loading platfom (including
2
cable tray load) 15.0 kN/m
2
Live load in 11 kV switch gear room 1 & 2 (including cable tray load) 11.0 kN/m
2
Live load in Capacitor rooms 10.0 kN/m
Live load due to staircase Along Grid E beside Grid 11 Live load = 10 kN/m2 2.1 m 10 kN/m
2
10.5 kN/m
2 2
Live load due to ramp (from Grid-K to L) & Grid 8 to 10 Live load = 10 kN/m 6.4 m 10 kN/m 32.0 kN/m
2
Live load in First floor area 10.0 kN/m
Loads are applied as Distributed
frame loads under 'SDL' load
Live Load on Cable riser-1,2,3,4 & 5 RCC Slab case
2
Live Load (0.20*25+0.02*20) 5.00 kN/m
2
Live load on chequered plate (Equipment lifting area) 5.0 kN/m
Live load on chequered plate as line load on upstand 5*3.0/2 7.5 kN/m
33
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
2
Live load on Service room & Staircase-4 roof 1.5 kN/m
Concentrated load due to hoist, trolly & lifted wt. (with impact factor) 55*1.25 69 kN
Bridge assembly (Excluding hoist and trolley) 50 kN
Span of crane bridge, Lc 12.75 m
UDL on crane girder (Selfweight), WG 50/12.75 3.92 kN/m
Minimum hook approach, Hm 0.65 m
69 kN WG = 4 10 kN/m
34
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
69 kN WG = 4.10 kN/m
12.750 m
Taking moment along A, ∑ MA = 0 => 0 = [69 x 0.65 + (3.92 x 12.75x 12.75/2) - (RB x 12.75)
35
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
46 kN
46 kN
5.71 m
36
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
When Crane is far from the Corbel:
5.71 m
Taking moment along A, ∑ MC = 0 => [15 x 2.855 + (1 x 5.71 x 5.71/2) - (RD x 5.71)]
37
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
Therefore, RD = 50.06/5.71 = 8.77 kN
2
Live load on the staircase head room roof floor area 1.5 kN/m
38
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
39
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
3 2
Load due to 0.600 m screed 0.40+0.2 0.6 m 24.00 kN/m 14.40 kN/m
3 2
Load due to 945 mm thick disel pump pedestal 0.945 m 25.00 kN/m 23.63 kN/m
3
Load due to 945 mm thick electrical pump pedestal 0.945 m 25.00 kN/m 23.63 kN/m2
3 2
Load due to 900 mm thick Jockey pump pedestal 0.9 m 25.00 kN/m 22.50 kN/m
2
Load due to 150 mm thk RC upstand around Cable trench 0.6 m 3.75 kN/m 2.25 kN/m
2
Load due to 150 mm thk RC bund wall fuel tank 1.4 m 3.75 kN/m 5.06 kN/m
2
Live load on Maintainance platform @ +6.1m lvl 1.50 kN/m
3
Load due to 0.075 m screed on Maintainance platform @+6.7m lvl 7.1-6.7 0.4 m 24.00 kN/m 9.60 kN/m2
3
Load due to 0.075 m screed on Maintainance platform @+6.1m lvl 6.175-6.1 0.075 m 24.00 kN/m 1.80 kN/m2
40
Project : 132/11 kV SHZBHST SUBSTATION.
Contractor : DANWAY
Enduser : DEWA DESIGNED CHECKED APPROVED
Title : Main Building Load Calculations RVK ASV VRP
Load Calculations
Height/ Unit
Thickness Weight Remarks
Loads on Fire water tank roof @ +13.300 m Lvl
2
Load due to 200 mm thk upstand around opening 0.55 5.00 kN/m 2.75 kN/m
Live load on roof 5.00 kN/m2
41
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
B.4 Wind Load:
Wind loads are calculated in accordance with ASCE7-05 of American Standards.
Topographic factor
Kzt = (1 + K1K2K3)2 CL.6.5.7.2 ASCE 7-05
= 1
Net Wind Load, p = qGCp– qi(GCpi)
Gf = gust-effect factor CL 6.5.8 ASCE 7-05
(For enclosed building)p = qGfCp– qi(GCpi)
External surface pressures, pe = qGCp
Internal surface pressures, pi = qi(GCpi)
Cp = external pressure coefficient
(Figs.6.6, 6.7 and 6.8 ASCE 7-05)
42
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
B.5: Seismic Loads:
Seismic forces are calculated in accordance with UBC-97, the following factors shall be applied.
Soil profile type SC (As per soil report)
W is total seismic dead load of the structure as defined in section 1630.1.1
Cv is the seismic coefficient.
Zone 2A: Z = 0.15
Seismic coefficients, Ca =0.18 & Cv = 0.25 (Ref. Soil Report)
Soil type & parameters (as per approved soil report)
I is the Importance Factor
I = 1.00 (Table 16K).
T is the Fundamental Period of Vibration, in Seconds, of the structure.
T = Ct x (h) ¾, with (Ref. UBC97:Cl:1630.2.2)
Ct = 0.0731 for Reinforced Moment Resisting Frames and Eccentrically
Braced Frames.
= 0.0853 for Structural Steel Frames.
h = Height to Top of Building from Base Level.
T = 0.0731 (h) ¾
R is Numerical Coefficient representative of the Inherent over Strength and Global Ductility
Capacity of Lateral-Force-Resisting Systems
R = 5.5 for Intermediate Moment Resisting Concrete Frames (Table 16-N)
. .
Design Base Shear, 𝑉 ,𝑉 (Ref. UBC97:Cl:1630.2.1, Eq.30-4)
.
.
𝑉
.
But, 𝑉 , (Ref. UBC97:Cl:1630.2.1, Eq.30-5)
. . .
𝑉
.
𝑉 0.08 𝑊
43
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
Also,
𝑉 0.11 𝑥𝐶 𝑥𝐼𝑥𝑊,𝑉 0.11 𝑥 0.18 𝑥 1.00 𝑥𝑊 (Ref. UBC97:Cl:1630.2.1, Eq.30-6)
𝑉 0.02 𝑊
The Earthquake Load E, on an element of the structure resulting from combination of the horizontal
component Eh, and Vertical Component Ev,
. .
𝐸 𝑥 (Ref. UBC97:Cl:1630.1.1)
.
0.045𝑥𝑊 1.1
𝐸 𝑥
𝑇 1.4
.
𝐸
Ev = The Load Effect resulting from the Vertical Component of the earthquake
Ground Motion.
.
𝐸 0.5 𝑥𝐶 𝑥𝐼𝑥𝐷𝑥 (Ref.UBC97:Cl:1630.1.1)
.
𝐸 0.0707𝐷
44
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
DOC NO:STRU‐C‐15‐317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
Base shear thus obtained will be distributed at different floor levels as lateral loads in mutually
perpendicular directions.
i. Lateral loads acting in global X- direction
ii.Lateral loads acting in global Y- direction
Note:
Seismic forces will be calculated by ETABS Program either by UBC or 0.07g whichever is
greater. The base shear for wind load and seismic load should be calculated and the design shall
be carried out for the governing load case. Considered orthogonal effect in combinations.
‐3.30 TOC
45
END USER: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY
1. Soil pressure
2. Surcharge
Soil pressure due to surcharge = ws x impact factor x K0
(Basement Walls) = 33.33 x 1.25 x 0.41
= 17.01 kN/m2
3.Surcharge
Surcharge load on manholes & sump pits = ws x impact factor
= 33.33 x 1.25
= 41.66 kN/m2
46
Project : 132/11 KV SHKZBHST S/S
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV
47
Project : 132/11 KV SHKZBHST S/S
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV
48
ETABS 17.0.1
49
ETABS 17.0.1
50
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FPR GF - Z = -0.4 (m)
51
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m)
52
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - GF +1.420 m - Z = 1.42 (m)
53
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m)
54
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m)
55
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - RefPl Level 8.15 - Z = 8.15 (m)
56
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m)
57
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m)
58
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m)
59
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
200 THK
OPEN
PE
200200
THK
200
THK
200
THKTHK
200
200
200
200THK
THK
THK
200
THK
200
THKOPEN
200PE
THKTHK
200 THK
C'
C
200 THK C'
C
200200
THKTHK
200 THK
200 THK
B'
200 THK B'
B B
A'
200 THK A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FPR GF - Z = -0.4 (m)
60
ETABS 17.0.1
M M
J J
H'
H H'
H
G G
250 THK
F'
F F'
F
E E
250 THK
D' D'
D D
200 THK
C'
C C'
C
B' B'
250 THK
B
250 THK B
250 THK
A'
250 thk Landing 250 THK 250 thk Landing A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m)
61
ETABS 17.0.1
200 THK
M
200 THK M
200 THK
200 THK 200 THK
L 200 THK L
200 THK
J J
200 THK
G 200 THK G
250 THK
200 THK
F'
F
200 THKF'
F
E E
200 THK
D' D'
250 THK
D D
200 THK
200 THK
C'
C C'
C
250 THK
250 THK250 THK
B' B'
B B
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - GF +1.420 m - Z = 1.42 (m)
62
ETABS 17.0.1
M M
200 THK
L L
K K
PC 200 THK
200 THK
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B'
PC 200 THK B'
B B
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m)
63
ETABS 17.0.1
M M
200 THK
L
200 THK L
K
200 THK K
J
200 THK J
H'
H 200 THK H'
H
200 THK
G G
200 THK
200 THK
F'
F
200 THK F'
F
200 THK
200 THK
E E
D'
200 THK D'
200 THK
D D
400 thk
400 thk
400
400
thkthk
C'
C 400 thk C'
C
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m)
64
ETABS 17.0.1
M M
200 THK
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - RefPl Level 8.15 - Z = 8.15 (m)
65
ETABS 17.0.1
M M
200 THK
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m)
66
ETABS 17.0.1
M M
200 THK
L
200 THK L
K
200 THK K
J J
H'
H H'
H
G G
F'
F
200 THK 200 THK F'
F
200 THK
E E
D' D'
D D
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m)
67
ETABS 17.0.1
M M
L
200 THK L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A'
200 THK A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m)
68
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
Dummy
GB-400x600
Dummy
GB-400x600 GB-400x600
Dummy
C'
C C'
C
GB-400x600
Dummy
Dummy
Dummy
Dummy
Dummy
GB-300x700
B' B'
GB-300x500
GB-300x500
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FPR GF - Z = -0.4 (m)
69
ETABS 17.0.1
J
L
A
B
E
K
C
D
H
F'
A'
B'
M
C'
D'
H'
2
2
2'
2'
3
3
4
4
GB-400x600 GB-400x600
GB-400x600
4'
4'
GB-300x600 GB-300x600
5
5
GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-400x700
5'
5'
Dummy
GB-400x600 GB-400x600
GB-400x600
GB-400x600
Dummy
6 6'
6 6'
Dummy
70
GB-300x500 GB-300x500 GB-300x500 GB-300x500
GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-400x600 GB-400x600
Dummy
GB-400x600
7
7
GB-300x500 GB-300x500
GB-300x600
GB-400x700
GB-300x700
GB-300x700
GB-300x700
GB-300x700
GB-300x700
GB-300x700
GB-400x700
8
8
Dummy Dummy
GB-300x700
GB-300x700
GB-300x700
GB-300x700
GB-300x700
GB-300x700
GB-400x700
9'
9'
Dummy
Dummy
Dummy
GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-300x700
GB-300x600
GB-400x700
GB-400x700
GB-400x700
GB-400x700
GB-300x600
J
L
A
B
E
K
C
D
H
F'
A'
B'
M
C'
D'
H'
ETABS 17.0.1
M M
Dummy
Dummy Dummy Dummy Dummy
L L
FB-400x600
Dummy
Dummy
Dummy
Dummy
K K
FB-400x600
FB-450x600 FB-450x600 FB-450x600
J J
Dummy
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
Dummy
FB-300x600
B' B'
FB-300x600
Dummy
B B
Dummy
Dummy
A'
FB-300x600 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m)
71
ETABS 17.0.1
FB-400x700 FB-400x700
M M
Dummy
Dummy
Dummy
FB-300x600
FB-300x600
FB-400x750
FB-300x700
L L
FB-300x700
FB-300x500
FB-300x750
Dummy
FB-400x700 FB-400x700 FB-400x700
K K
FB-400x600
FB-400x700
FB-300x500
FB-400x700
FB-400x700
FB-400x700
J J
FB-400x600
FB-400x700 FB-400x700 FB-400x700
H'
H H'
H
FB-400x600
FB-300x500
FB-400x600
FB-300x500
FB-450x800
FB-400x750
Dummy
FB-300x500
FB-300x700
FB-400x700 FB-400x700 FB-400x700
G G
FB-400x600
FB-400x600
FB-300x500
FB-400x700
FB-400x700
Dummy
FB-300x500
FB-400x600
FB-300x600
FB-400x600
FB-300x500
FB-450x800
FB-400x750
FB-300x700
FB-400x700 FB-400x700 FB-400x700
E E
FB-400x600
FB-300x600
FB-400x600
FB-300x500
FB-400x700
FB-400x700
D' D'
D D
FB-400x1650
FB-300x500
FB-300x500
FB-400x600
FB-400x600
FB-400X800
Dummy
FB-300x800
C'
C C'
C
FB-300x800
FB-300x500
FB-400x1650
FB-300x500
FB-400X800
Dummy
FB-400x750
FB-400x750
FB-300x700 FB-300x700
FB-300x800
FB-400X800 FB-400X800 FB-400x600
B'
FB-400x700 B'
B B
FB-400x600
FB-300x500
FB-300x500
Dummy
A'
FB-400x700 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m)
72
ETABS 17.0.1
M M
Dummy
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
Dummy
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - RefPl Level 8.15 - Z = 8.15 (m)
73
ETABS 17.0.1
M M
Dummy
L L
K K
FB-400x600 FB-400x600
J J
H'
H H'
H
Dummy
FB-400x600 FB-400x600
G G
F'
F F'
F
Dummy
FB-400x600 FB-400x600
E E
Dummy
D' D'
Dummy
FB-400x600 FB-400x600
D D
C'
C C'
C
Dummy
Dummy
B' B'
B B
Dummy
Dummy
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m)
74
ETABS 17.0.1
RB-400x700
M M
Dummy
RB-400x700
L L
RB-300x700
RB-300x700
RB-400x1200 RB-400x700
K K
RB-400x600
RB-300x600
RB-400x600
RB-400x600
RB-400x1200 Dummy Dummy
J J
Dummy
RB-470x600
RB-300x500
RB-300x500
RB-400x600
Dummy
Dummy
Dummy
Dummy
Dummy
RB-470x600
RB-400x600
RB-300x500
RB-400x600
RB-400x600
Dummy
Dummy
Dummy
RB-400x1200 RB-400x1200
Dummy
G G
Dummy
RB-470x600
RB-400x600
RB-400x600
RB-400x600
Dummy
Dummy
RB-400x1200 RB-400x1200 RB-400x700
F'
F Dummy F'
F
RB-470x600
RB-400x600
RB-400x600
RB-400x600
Dummy
Dummy
RB-400x1200 RB-400x1200 RB-400x700
E Dummy E
RB-470x600
RB-400x600
RB-400x600
RB-400x600
Dummy
D' D'
RB-400x600
RB-400x800
RB-400x800
RB-300x500
RB-400x600
RB-400x600
RB-300x600
Dummy
Dummy
Dummy
Dummy
RB-300x500
Dummy
Dummy
Dummy
RB-400x1200 RB-400x700
Dummy
Dummy
RB-400x600
RB-400x750
RB-400x750
RB-300x700 Dummy
RB-400x600
RB-300x600
RB-400x700
B'
RB-400x700 B'
B B
RB-400x600
Dummy
A'
RB-400x700 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m)
75
ETABS 17.0.1
Dummy
M M
Dummy
Dummy
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
Dummy
Dummy
B B
A'
Dummy A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m)
76
ETABS 17.0.1
11 M
10 L
9'
H'
H
F'
F
6'
6
D'
5'
5
4'
C'C
4
B'
B
2'
A'
A
11
1
10
9'
M
9
K
8
'
HH
7
'
FF
6'
6
5'
E
5
D'
4'
D
4
3
'
C
2'
B'
B
2
A'
1
A
77
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
1 1 1 1 11 1 1 1 11 1 11 1 1 1 1
C-1400X400
C-400x600
C-1400X400
C-400x600
C-1400X400-75mm
C-400x600-75mm
78
ETABS 17.0.1
2 2
A A'
2
2
B B'
22
C'
2
D
2
E
79
2
G
Elevation View - 2
C-400x600-75mm C-400x600-75mm C-400x600 C-400x600
22
HH'
J
2
2
K
2
L
2
M
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
C-400x600
C-400x600
80
ETABS 17.0.1
3 3
A A'
3
3
B B'
33
C'
3
D
3
D'
3
E
33
FF'
81
3
G
Elevation View - 3
C-400x600-75mm C-400x600 C-400x600
33
HH'
J
3
3
K
3
M
ETABS 17.0.1
C-400X600..75mm C-400X600..
4 4
A A'
4
4
B B'
44
C'
Dummy
RB-470x600
C-600x600 C-600x600 C-600x600
4
D
4
D'
RB-470x600
Dummy
RB-470x600
Dummy
RB-470x600
82
4
G
Elevation View - 4
Dummy
RB-470x600
4
4
K
4
M
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
RB-400x800
C-600x700
C-600x700
C-600x700
GB-400x600 GB-400x600
C-600x700
83
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
5 5 5 5 55 5 5 5 55 5 55 5 5 5 5
C-400x450
C-400x400
GB-300x600 GB-300x600 GB-300x500 GB-300x500 GB-300x500
C-400x400-75mm
C-400x450
C-400x400-75mm
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 5
84
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
C-400x600
C-400x600
C-400x600
C-400x600
85
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
6 6 6 6 66 6 6 6 66 6 66 6 6 6 6
RB-400x800
C-600x700
C-600x700
C-600x700
GB-400x600 GB-400x600
C-600x700
86
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
C-400x450
C-400x400
GB-400x600
C-400x400-75mm
C-400x450
C-400x400-75mm
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 6'
87
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
7 7 7 7 77 7 7 7 77 7 77 7 7 7 7
RB-400x600 RB-400x750 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x600 RB-400x700
C-600X500
C-600X500
C-600X500
C600X750
C-600x700
C-600x600
C-600x600
C-600x600
C-600x600
C-600x700
C-600x700
FB-400x600 FB-400x750 FB-400x600 FB-400x600 FB-400x600 FB-400x600 FB-400x600 FB-400x600 FB-400x600 Dummy Dummy
C-600x700
C-600x700
C-600X500
C-600X500
C-600X500
C-600x600
C-600x600
C600X750
C-600x600
C-600x600
C-600x700
FB-400x600 FB-400x600
C-600x700
C-400x400
C-600x700
GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 Dummy Dummy Dummy
C-400x400-75mm
C-600X500-75mm
C-600X500-75mm
C-600x700
C-600x600
C-600x600
C-600x600
C-600x600
C-600x700
C-600x700
C-600X500
C600X750
C-400x400-75mm
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - 7
88
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
8 8 8 8 88 8 8 8 88 8 88 8 8 8 8
Dummy Dummy
RB-400x750 RB-300x700
C-450X600
C-450X600
C-450X600
FB-400x750 FB-400x600 FB-400x600 FB-400x600 FB-400x600 FB-400x600 FB-400x700 FB-300x700 Dummy
C-450X600
C-450X600
C-500X700
C-500X700
C-500X750
C-500X700
C-450X600
C-500x600
C-500x600
C-500x600
GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-400x600 GB-300x700 Dummy
C-450X600-75mm
C-450X600-75mm
C-500x600
C-500x600
C-500x600
C-450X600
C-500X700
C-500X700
C-500X750
C-500X700
89
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
9 9 9 9 99 9 9 9 99 9 99 9 9 9 9
Dummy Dummy
C-450X600
C-600x800
C-600x800
C-600x800
C-600x700
C-600x700
C-600x700
C-600x800
C-600x700
FB-400x1650 FB-400x1650 FB-400x700 FB-450x800 FB-400x700 FB-450x800 FB-400x700 FB-300x750
Dummy
C-450X600
C-600x800
C-600x800
C-600x800
C-600x700
C-600x700
C-600x700
C-600x800
C-600x700
Dummy
C-400X500
C-600x800
C-600x800
C-600x800
C-450X600-75mm
C-600x700
C-600x700
C-600x700
C-600x800
C-600x700
C-400X500-75mm
C-600x800
C-600x800
C-600x800
90
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
GB-400x600 GB-400x600
C-400x400
91
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
10 10 10 10 10
10 10 10 10 10
10 10 10
10 10 10 10 10
FB-300x600
C-300X500
C-400X500
Dummy
C-300X500-75mm
C-400X500-75mm
C-300X500-75mm
C-400X500-75mm
92
ETABS 17.0.1
A A' B B' C
C' D D' E FF' G HH' J K L M
11 11 11 11 11
11 11 11 11 11
11 11 11
11 11 11 11 11
C-600x800
C-600x800
C-500x600
C-500x600
C-500x600
C-500x600
C-500x600
FB-400x700 FB-400x750 FB-400x700 FB-400x750 FB-400x700 FB-400x750
FB-400X800 FB-400X800
C-600x800
C-550X800
C-450X600
C-600x800
C-500x600
C-500x600
C-500x600
C-500x600
C-500x600
C-600x800
Dummy
C-550X800-75mm
C-600x800
C-600x800
C-450X600-75mm
C-500x600-75mm
C-500x600-75mm
C-500x600-75mm
C-500x600-75mm
C-500x600
C-550X800-75mm
C-600x800-75mm
C-600x800-75mm
93
Project : 132/11 KV SHKZBHST S/S
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV
94
95
96
97
98
99
100
101
ETABS 17.0.1
M M
L L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
14.4
14.4
23.63
14.414.4
14.4
22.5
14.4
14.4
14.414.4
C'
C
14.4 C'
C
14.4
23.63
14.4
14.4
B'
14.4 B'
B B
A'
14.16 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FPR GF - Z = -0.4 (m) Uniform Loads Gravity (SDL)
102
ETABS 17.0.1
M M
L L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
10
10 10 10 10
10
1010
10
10 10 10 10
C'
C
10 C'
C
10 10 10
10
B'
10 B'
B B
A'
10 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FPR GF - Z = -0.4 (m) Uniform Loads Gravity (LL)
103
ETABS 17.0.1
M M
L 10 10 10 L
K K
J J
H' H'
H H
G G
10
F'
F F'
F
E E
10
D' D'
D D
10
C'
C C'
C
B' B'
B10 10 B
10
A'
A
10 A'
A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m) Uniform Loads Gravity (SDL)
104
ETABS 17.0.1
M M
5
L L
5
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A'
5 5 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m) Uniform Loads Gravity (LL)
105
ETABS 17.0.1
M M
K K
J J
H' H'
H H
G G
41.66
F'
F F'
F
E E
41.66
D' D'
D D
41.66
C'
C C'
C
B' B'
41.66
B
41.66 B
41.66
A'
A
41.66 A'
A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m) Uniform Loads Gravity (SPS)
106
ETABS 17.0.1
M M
1.9
1.9 1.9
L 1.9 L
1.9 1.9
K K
1.9
J J
1.9
H'
H 1.9 H'
H
1.9
G 1.9 G
1.9 1.9
F'
F
1.9 F'
F
E E
1.9
D' D'
1.9
D D
1.9
1.9
C'
C C'
C
1.9
1.9
A'
A 1.9 A'
A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - GF +1.420 m - Z = 1.42 (m) Uniform Loads Gravity (SDL)
107
ETABS 17.0.1
10
M
10 M
5
11 10
L 5 L
11 10
K K
10
J J
5 10
H'
H 5 10 H'
H
11
G 11 G
15 10
F'
F
10 F'
F
E E
10
D' D'
15
D D
11
11
C'
C C'
C
15 15 15
B' B'
B B
15 5
15
A'
A 15 5 A'
A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - GF +1.420 m - Z = 1.42 (m) Uniform Loads Gravity (LL)
108
ETABS 17.0.1
M M
L L
K K
5.6
5.6
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B'
10.5 B'
B B
A'
26.5 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Uniform Loads Gravity (SDL)
109
ETABS 17.0.1
M M
5
L L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B'
9.6 B'
B B
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Uniform Loads Gravity (LL)
110
ETABS 17.0.1
M M
L
5.4 L
K
19.2 K
J
2 J
H'
H 21.6 H'
H
2
G G
2
2
F'
F
2 F'
F
21.6
19.2
E E
D'
19.2 D'
2
D D
9.6
9.6 9.6
C'
C 9.6 C'
C
9.6 1.8
9.6 9.6
B'
19.2 19.2 9.6 B'
B B
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Uniform Loads Gravity (SDL)
111
ETABS 17.0.1
M M
5
L
10 L
K
10 K
J
10 J
H'
H 10 H'
H
10
G G
10
10
F'
F
10 F'
F
10
10
E E
D'
10 D'
10
D D
C'
C C'
C
1.5
B'
10 10 B'
B B
A' 10 10 5 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Uniform Loads Gravity (LL)
112
ETABS 17.0.1
M M
5
L L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' 5 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - RefPl Level 8.15 - Z = 8.15 (m) Uniform Loads Gravity (LL)
113
ETABS 17.0.1
M M
5
L L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' 5 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Uniform Loads Gravity (LL)
114
ETABS 17.0.1
M M
L
8.1 L
K
8.1 K
J J
H' H'
H H
G G
F'
F
8.1 8.1 F'
F
8.1
E E
D' D'
D D
8.1 8.1
C'
C C'
C
8.1 8.1
B' B'
B B
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Uniform Loads Gravity (SDL)
115
ETABS 17.0.1
M M
5
L
6 L
K
6 K
J J
H' H'
H H
G G
F'
F
6 6 F'
F
6
E E
D' D'
D D
6 5
C'
C C'
C
6 5
B' B'
B B
A' 6 5 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Uniform Loads Gravity (LL)
116
ETABS 17.0.1
M M
L
3.6 L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A'
3.6 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Uniform Loads Gravity (SDL)
117
ETABS 17.0.1
M M
L L
K K
1.5
1.5
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B'
1.5 B'
B B
A'
1.5 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Uniform Loads Gravity (LLR)
118
ETABS 17.0.1
M M
L
1.5 L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A'
1.5 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Uniform Loads Gravity (LLR)
119
ETABS 17.0.1
M M
L L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D 2.25
25 D
2.25
.2
C'
C
2.25
2 C'
C
2.25
5.06 2.25
5.06
5.06
11.8
B'
B 11.3 B'
B
11.3
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FPR GF - Z = -0.4 (m) Frame Span Loads (SDL)
120
ETABS 17.0.1
31
M M
28.3 28.3
H' H'
H H
40.1 22.5
G G
56.6 56.6
F'
F F'
F
40.1 22.5
E E
56.6 56.6
D' D'
D 40.1 22.5 D
32.3
26.5 54.8 28.3
C'
C C'
C
32.3
41.3 23.7
39.8
B' 31 B'
B
31 19.3 B
26.5 19.3
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m) Frame Span Loads (SDL)
121
ETABS 17.0.1
18.5
M M
18.5
17.9 35.8 35.8 17.9
K K
32.1 32.1
H' H'
H H
25.5 25.5
G G
64.2 64.2
F'
F F'
F
25.5 25.5
E E
64.2 64.2
D' D'
D 25.5 25.5 D
27 27
B' 18.5 B'
B
18.5 B
30.1
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 0.4m lvl - Z = 0.4 (m) Frame Span Loads (LL)
122
ETABS 17.0.1
2
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 20.3 2
9' 10 11
1 1 26.2
L
1 13.2 26.4 5 L
5
K 20.3 K
5
31 6.9 6.9 6.9 13.2 13.2 26.2 2
J
13.2 14.6
14. J
5
H' H'
H H
27.1 13.2
1 13.2 13.2 5 26.2 2
7.5
E 5 E
27.1 13.2
1 13.2 13.2 5 26.2
D' D'
11.2
D D
A'
2 2 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - GF +1.420 m - Z = 1.42 (m) Frame Span Loads (SDL)
123
ETABS 17.0.1
32
18.5
M M
L L
K 32 K
18.5
J J
H' H'
H H
G G
F'
F F'
F
10.5
E E
D' D'
D D
C'
C C'
C
18
B' B'
B
18.5 B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - GF +1.420 m - Z = 1.42 (m) Frame Span Loads (LL)
124
ETABS 17.0.1
31
M M
K
7.5 9.9 K
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
1 39.2 39.2
C'
C C'
C
1 23.5
10.3
B' B'
B
31 1 20.3 B
23.5 20.3
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Frame Span Loads (SDL)
125
ETABS 17.0.1
18.5
M M
L L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B
18.5 B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Frame Span Loads (LL)
126
ETABS 17.0.1
4.5 7.5
L
31.4
.4 26.9 L
15.25
14.05 26.9
J
14.05 J
14.05
H' H'
H H
14.05
05
14.05 15.25
15.25 14.05 26.9
11.5 15.25
14.05
4.05 14.0514.05
G 11.5 G
14.05 15.25
15.25
14.05 26.9
15.85 14.05 14.05
F'
F F'
F
15.85
1.8
85 15.25
14.05 26.9
15.25
1.8
.8
E E
15.85
1.8
85 15.25
14.05 26.9
D' D'
1.8
.8
D D
14.05 15.25
26.7
C'
C
15.25 C'
C
B'
8.7 8.7 B'
B
26.9
8.7 8.7 31 B
A'
26.935.6 26.9 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Frame Span Loads (SDL)
127
ETABS 17.0.1
4.2 0 4.2
4.2
2 4.2
4 18.5
M M
4.2 4.2
L
4.2
2 4.2
4 L
4.2 0 4.2
K K
J J
H' H'
H H
G G
1.6
F'
F F'
F
1.6
1.6
6
1.6
.6
E E
1.6
1.6
6
D' D'
1.6
.6
D D
C'
C C'
C
B'
7.5 B'
B
7.5 7.5 18.5 B
A'
7.5 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Frame Span Loads (LL)
128
ETABS 17.0.1
31
M M
L L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B
31 B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - RefPl Level 8.15 - Z = 8.15 (m) Frame Span Loads (SDL)
129
ETABS 17.0.1
18.5
M M
L L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B
18.5 B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - RefPl Level 8.15 - Z = 8.15 (m) Frame Span Loads (LL)
130
ETABS 17.0.1
31
M M
L L
K K
J J
13.2
H' H'
H H
7.5
G G
11.5
F'
F F'
F
7.5
E E
11.5
D' D'
D 7.5 D
7.5 7.5
B' B'
B
31 B
13.2
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Frame Span Loads (SDL)
131
ETABS 17.0.1
18.5
M M
L L
K K
J J
3.8
H' H'
H H
G G
7.7
F'
F F'
F
E E
7.7
D' D'
D D
B' B'
B
18.5 B
4
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Frame Span Loads (LL)
132
ETABS 17.0.1
18.5
31
M M
18.5
L
18.5 L
18.5
K
18.5 K
18.5 6 24.4
24.4 18.5
24.4
G
6 G
18.5 6 18.5
6
F'
F 6 F'
F
18.5 6 18.5
6
6
E 6 E
18.5 6 18.5
D' D'
24.4
D D
18.5 24.4
24.4
2.75
2.7 18.5
24.4
2.75
2.75
24.4
24.4
24.4 2.75
2.7
24.4
4.4
18.5
.5 18.5 18.5
C'
C
2.75
2.75
2.75
C'
C
2.75
2.7 18.5
18.5
18.5
B' B'
B
18.5 31 B
A'
18.5 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Frame Span Loads (SDL)
133
ETABS 17.0.1
18.5
M M
L L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B
18.5 B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Frame Span Loads (LL)
134
ETABS 17.0.1
1.5
M M
1.5 1.5
L L
K K
J J
H' H'
H H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B
1.5 1.5 B
A'
1.5 A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Frame Span Loads (SDL)
135
ETABS 17.0.1
M M
L L
K K
3.5
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
10.4
B' B'
B B
8.9
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Frame Span Loads (WL +X)
136
ETABS 17.0.1
M M
L L
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
10.4 8.9
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Frame Span Loads (WL +Y)
137
ETABS 17.0.1
M M
2.6
2.6
2.6
2.6
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
23.4
17.1
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 4.9m lvl - Z = 4.9 (m) Frame Span Moments (WL +Y)
138
ETABS 17.0.1
M M
3.5
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Frame Span Loads (WL +X)
139
ETABS 17.0.1
M M
L
2.6 L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Frame Span Moments (WL +X)
140
ETABS 17.0.1
M M
3.5
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Frame Span Loads (WL +Y)
141
ETABS 17.0.1
2.6
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - FF @ 7.500 m lvl - Z = 7.5 (m) Frame Span Moments (WL +Y)
142
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
3.5
G G
F'
F F'
F
3.5
E E
D' D'
D D
3.5
C'
C C'
C
3.5
3.5
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Frame Span Loads (WL +X)
143
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
G
2.6 G
F'
F F'
F
2.6
E E
D' D'
D D
2.6
C'
C C'
C
2.6 2.6
B' B'
B B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Frame Span Moments (WL +X)
144
ETABS 17.0.1
M M
L L
K K
J J
H'
H H'
H
3.5
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
A
3.5 A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Frame Span Loads (WL +Y)
145
ETABS 17.0.1
M M
L L
K K
J J
2.6
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
2.6
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - 9.8m lvl - Z = 9.8 (m) Frame Span Moments (WL +Y)
146
ETABS 17.0.1
M M
8.6
L L
8.6
K K
8.6
8.6
J J
8.6 8.6
H'
H H'
H
8.6
G G
8.6
8.6
F'
F F'
F
8.6
8.6
E E
8.6
8.6
D' D'
D D
8.6
8.6
8 6
C'
C C'
C
6
8.6
8.6
B' B'
B B
8.6
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Frame Span Loads (WL +X)
147
ETABS 17.0.1
M M
L L
K 15.8 K
15.8
J J
15.8
H'
H
15.8 H'
H
15.8
G G
15.8 15.8
F'
F F'
F
15.8 15.8
E E
15.8 15.8
D' D'
D 15.8 15.8 D
15.8 15.8
C'
C C'
C
B'
B
15.8 15.8 B'
B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Frame Span Moments (WL +X)
148
ETABS 17.0.1
M M
L L
8.6
K K
J J
8.6
H'
H H'
H
8.6
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
A' A'
A
8.6 A
8.6
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Frame Span Loads (WL +Y)
149
ETABS 17.0.1
15.8
M M
L L
15.8
K K
15.8
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
15.8
15.8
15.8
C'
C C'
C
15.8
B' B'
B B
15.8
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - ROOF 13.300 - Z = 13.3 (m) Frame Span Moments (WL +Y)
150
ETABS 17.0.1
M M
0.7
0.7
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
0.7
0.7
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Frame Span Loads (WL +X)
151
ETABS 17.0.1
M M
1 1
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B
1 1 B
A' A'
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Frame Span Moments (WL +X)
152
ETABS 17.0.1
M
0.7 M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A'
A
0.7 A'
A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Frame Span Loads (WL +Y)
153
ETABS 17.0.1
1
M M
L L
K K
J J
H'
H H'
H
G G
F'
F F'
F
E E
D' D'
D D
C'
C C'
C
B' B'
B B
A' A'
1
A A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Plan View - Staircase Headroom +16.7 m - Z = 16.7 (m) Frame Span Moments (WL +Y)
154
ETABS 17.0.1
31
31.4
21.3 32.3
21.3
31.4 15.7
21.3 13.4
13.4 2.25
2.25
2.25
2.25
2.25
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Frame Span Loads (SDL)
155
ETABS 17.0.1
31
27.1 27.2 26.2
27.1
27.1 6.9
27.1
6.9 31
6.9
13.2 1 1 13.2
13.2 13.21
1
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Frame Span Loads (SDL)
156
ETABS 17.0.1
3232 32
18.5
35.8 35.8 18.5
10.5
15.2 17.9
15.2 15.2
15.2
17.9 15.2
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Frame Span Loads (LL)
157
ETABS 17.0.1
3232 32
18.5
10.5
18.5
18.5
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Frame Span Loads (LL)
158
-3 -3-3 ..7
7..4.7
-3 7
.7
-3
3 3
7
.
--3
.
73
-.
73
--
.
7.
3
-
7
7
.
4
7
--37
.
-
4
1
.
--3
-1 7
3
..7
4
.7
-7
7
-1-7
.
4
1- .4
-7
1
4
.
--1..7
4
.4
.1
-3
1
.7
7-1
.4
-7 .7
-3
-7
.4 -3
.4
-.7
--7
.47-3
3.4
.7
.7
.4
-7-3
.7
-7
.4.7
-3--7
.4
--1 3
.7
-3
7-1
.4
-7
.4.7
.7
-3
-7-3
-.7
-3
7.7
.4
.4
-7-3.7
-3
.7
--7.7
-3
3.7
-3.7
.7
--.7
-3 3
-3.7
.7
-3
-3 .7
--7.7
3.4
.7
-3
-3 .7
--.7
7
.
3-7
.
3-.
7
3-7
.
33
-7
.-
7
-7
.
4
.7
-4
..
7
--
44
7
.7
-.
41
--
1
. -1
1
.
- 1 1
.
-1.
14 -.
1
.84.
8
1
-.81
-1
8
.
1
481
.1 1
-
.1
.1
1
-1
.11
-1
1
.1
-.1
1-1
.11
.11.1
1-1
.1
- 1
.1.1
-1
1
-1.4
-7
-
.1.4
-.4 7
.4
.4
-7
-7 .4
-.4
77
.4
-7.4
.4
-7
-1.4 7
.4
-7
-7.4 3-3
7
.4.7
.4
-7.7-.7
-3 3-3
.7.7
-3.7
-3-3.7-.7
3-7
.7-3
-3 .7-.7
- 3
7
.3
-
7
. .
3
-
7 7
.
3
-- -4
.
7-4
.
7-4
.
7-.
4
7 .
1-.
11
-.1
--
1
.1
.
11
--
8
.
4 .
4
1
- 8
1
-1 8
.
4
1
- 8
.
48 1
-4 5
.
1
8
-1
.5-1
5
.
8
-14
.8
5-41
-
.8.8
41
-1
.84
-1
4-
.8.8
41
-4-1
.8
1 4
.8-
.8
41
-4
-
.811
4
-1
.8.8
4-1
4
-
.81
-
.1
1
.1 1
-1
-
.11
-
.1.1
1
- 1
-1
.1
1
-
.1
.1
1
- -1
.1.11
-.1
1
-1-
.11
.11-
.1 .4
- 7
-.4
7.4
-7-.4
7.4
-1-.1
7
.4
- 7-.4
7.4-.47-.43.7-.7
-3 3--.4
.73-3
.7.7
--7
3.4
.7
-3.7
--73
.7
-3
-7 .
3- 7
.
3 4
.
7 4
.
7
- 4
.
7
- .
1
--.
1- 4
18
.4
1
--
8
..
4
18 5 5
.
8
1 5
.
8 85
. 1 8
1-
.5.5
81
-8-1
.5
1 8
-
.5.5
81
-8
.5
1
-8-1
.5
1.5 11
4
-.8
.8 1
44
-
-1
.81
4
-
.8.8
1
4
- 4
-
.8
14
-1
.8
.8 1 11
-
.1 1
1
-1
.1.1
-1
.1
1
-1.1
11
-
.1 7-7
.4-.47 7-.47.4 .7
--3.7
-3.7
-3 .7
--3.7
--7
.7
3 - 1. - -2 .
- 2 1 . 8-.5
1 4
-14
-1
.8 -7 3.7
--7
- .
74 - -8
.
4
1 5 8
1
- - . 8-8
.5-
1 1 1.84
-.8 1
-1
.1 .4 3.4
-7
-.7
73
-. -. 7
3 4
.
7 - 4
.
7- 1
-.1
-. 4
1-
8
.8
.
4
1 8
1
--
5
..
8
1 1
22
. -21
. 2
-2
.12-.1
2
82
-2
.1
-2-
.1.1 8
-
.5.5
81
-8
-
.5
11
8
-
.5
.51
8
-8
-
.5 4
-1
4
.8
1
-4
.8 1.8
4
- 1-
.8
4 1
-
.8 1
-1
.1
11
-.1
1-
.1 11
-
.1 .4
- 7.4 7
.4 3.4
.7
-7 3.4
.7
-3 -.73.4
--.7
- - 8
15
. 2
2
-.1 11
8
-
.5.5 4 1
-
.84 1
-1
.1 -.1
3 1 7 73-.4
-
.7
3 -3
7
. - 7
. - 7
4
. -7
4
. - .
7
4 1
.
--1
.-. 1
-4
8
.1
-4
8
.4
1
-.
8 8
1.
5.
8
1
--
55
.
8
1- -
1
.-
2 1
.2
- .
-1 1
.
22
- 5 -28
.
5 8
.
2
-
5.88
.
52
-5
.8
2 22
-2-
.1
22-
.1.1
2-2
.1
2
-2-
.1
.1
22
-2
.1
2
--
2
.1 -
818
-
.5
18
-1
.5
.5
8
-18
-
.5
1.51
8
-.5
8
-1
8
.5
1
-8
.5 1.5 1
-
.84.8
1
-4
.8
1 4
-.8
1
-
4.81
-4
.8
1-
4.8 11
-
.1 1-
.1 11
-
.1 1-
.11-
.11-
.1 -
.4 7
.4 7
.4 .4 - - -.73-.4
-.73-.4
-.73-.4
-.73.4--.7 3.7
3
7
-
. -7.
3 .
7
4
- 4
-
.
7 . 1
-. .
-
1 1
8
.
-
4-1
8
.
4 -8
1
5
.8
1
-5
.- 1
.
22
-1
.2
- - 8 8
.
5
2 58
. .5 -5-
.8
.8
252
-.8
2
5
-5-
.8
252
-
.8.8
52
- 5
.8 -
2
.1
.12
-2
-
.1-
2
.1.1
-
2 2
-
.1-
2.1
.1 8
- .5
1-
8.5
1
-
8.5
1
-8
.5
1-
8.5 1-
4
.8 14
-
.81
-4
.814
-
.8 1-
4
.8 1-
.1 1
.1
- 1-1.1
- 7.4
- 7 7 7 -.4 3.7
-7 -3.1
7
.
-
3 3
7
-
. 7
4
.
- 7
4
-
. 1 1
.
- 1
- .
4
1
8
- 8
.
-
4
1 -1
5
.
81
-5
.
8 21
.2
--
.
1 8
.2
- 8
.
52
- .
-
52 -
2 92
-5
.
9 5
2
9
-. 9
.52
- -
9
.5
2.5
2 2
-5-
.8
2.8
52
-.8
5
-2
5-
.8
2-
52
.8.8
2 2 2
.1.12.1
-.1
2
- 2 1
-8
.5
1 -
8.5
1
-
8.5-
181
.5- 1
-4
.8 1
4-
.81
4
.8
- 4
.8 1-
.1 1
-
.1 1-
1
.1 1-
1.1 7 7 7 -7 -7.4
.7
3 3.7
-7
.7 3-.7
-7 3.43
-7.4
.7 .7 3.7
---7-.4
. .
- 4 - 25 5 9-.5 -
5.85 2 8 1
-
.58 1- .8 1 -
1.1 -3.1 -3
8
1 5 - . 2 - 2 1 .4
-.7
3
7
- -
.
7 .
- .
-
8
1 2
1
. 8
. 9 9- 9
.5
2 2 --
5
.8
.8
22 2 .1 .5 -
8
.5 1
4- 1-
1.1 3.7
-7
-.7
73
. 3
7
.
- .
-7
4 4 .1
- .
-
1 -8
1
.
4 -4
8
1
. 8 .
8
5
1
- 2-2
1
.- .
5
2
--
85
2 9
25
. 9
25
. -
9
.5.5
92
-9
.5
2
- 9
.5-
2.5
92
-.5 -
5.8
-
52-
5
.8
2-
52
.8
.8
525
.8 .1
- 2- 2
-2 1
-8
.51
-8
.5 1-
8
.5 1
8.5 1
4-
.8 1
-
4
.814
.8
- 4
.8 1-
1.1 1-
1.1 1-
1.1 1-
1 - - -3.4 -7
.7
3.43
-.4
.7 3.4
-7
.7 .7
- .1 ---3.1
3
.
-
7 3
7
.
- .
-
3
7 4
.7
- 4
.
-7 .
-
47 7
4
-. 1-
. .
-
1 -
1. -4
8
1
. -
8
.4
1 -
81
.
4 1
.
8
-
5 -5
1
.
88
.
-5
15
1
.
- 2
1
.
- .
1
2
- 1
.
-
2-1
.-8
2
.
5-2
8
.
55
2
-8
.5
2
-8
.9
2-
.
55
.
9
2-5
.
9
22
- .
9-
5 92
-9
.5
-2
9-
.5
2.5
92
-.5
-
92
.5-
9
2-2
9
.5
.5
2
-
99
.5
2
- -
9
.5
2.5
-
92
.5
2 .85.8
-.8
2
- 25 5 .8
.8- 2- 2-2.1
2
-
2.12
-.1
2-
2
.12
-2
.1 2
-2
.12
-2
.12
-.1 - 8
1.5
- .5
1
8- 1
8-
.5 1
8-
.5 18
.5
- 8
.5
1
- .5 1
- 1.8
-
4 1-
4
.8 1-
4
.81 -
4
.8 1-
4
.8 1-
4.8 1-
4.8 1
-.1 1
1
-.1 1
1
- .1
1
- 1-.1
1 1- -
.4 - -
.4 7
-
.4 - 7 .4 7.1.4 7
-
.4 - .7-3.4 3
-.4
.7 -3.4
.7 .7
-3.4-3.7
.7 -3.4.7-3.4
.7 -3.4
.7-3.4 -.7
.7
3
3
.
-
7 7
.-
3 7
4
.
- .
-
7
4 1
-
. .
1
- 1-
. 84
-
.
1 1
4
8
-
. .
1
4
-
8 .
1
8
-
5 8
5
.
1
- 8
-
5
1
. -2
1
.-.
2
11
.
-2 5
28
..
5
8
2
--8
.
5
2 5
2
.-9
5
2
.9
2
-5
.- -
9 -
9
.5
2.52
-
9.5
-
92
9
.5
2
-9
.5 2.5
-
9 .5
2
-
9 .5
2- 2
-52-5.8
2
-
5.8
2-
5.8
2-
5
.82
-
5.8 2 2
-2
.122-
.1 2.12
.1 .1 1
8- 1-
8
.5 1-
8
.5 1-
8
.51 -
8
.518.5 1-
4.8 1-
4.8 1-
4.8 1 -
4.8 1 4. 4
8 .8 -
1 1
.1
- 1-
.1 .1
-
1 .1
-
1 1
.1 -
1
.1 1- 7
- - 7 -7
.4 7
- 7
- -
7 7
- 7 -3.4
.7 -3.4
.7-3.4.7
3.4
.7 .7
84.4.1.414
--3---3 - -
3
. 37-.
-3. -
3
7
.
37 . 4-
7
. 7
3 -.
-
47 4-
7
. .
-
47 -
1
. 1
-
. 1
-
. 1
-
. 1
8
4
-
. -
.
1
4
8 4
8
-
.1 1
4
8
-
. 5
8
-
.1 1
8
5
-
. 8
-
.
1
5 1
8
5
-
. 1
-
.
2 2
1
-
. .
2
1
- 2
-
1
. -5
8
.
2-2
5
8
.-.
2
5
85
2
-8
.-
2
-9
5
.9
-5
.
29
-
2.
52
.
9
-59
- 9
.52
-
9.5
2
9-
.52
-9
.5
2-9.5
2
-
9.52
-
9.2
-9
5
.5
2-
9.5 -
2
-
95
.8
.52
-
2
-5
.8
92-
5.8 2
-
5.82-
5.825.85
.8 . 8 - 2- 2- 2 .1
-
2 2 -
.122-
.122-
-
.11
28
2.5
-
-1 -
8.51 -
8.5 1 -
8.51 -
8.51 -
8.51 -
8.5 1
- -
8.5
-1
- 8 1
-
.5 4
-1 .8 -
4
1 .8
-
41 .8
-
41 4
.8
1
- -
4
.8
1 .8
-
4 1 .8
1
-
4 4
.8
1
- 4
.81
--
1 1
.1
-
.8
1
- 1
.1- .1
1-.1
-
1 1.1 1 1 - .1
1 1
-.1 1
-11
.1 1
- 1
.1 1
-.1.4
1 -
1
- .1
1 -7
-
1 . 7
-
1
- -
7 7-.4 7
- 7
- -7 7 .4
4.
- . 3
7 . .
-
1 7 4
.
-
8 1 .
-
5 81 2 .
1
-2 2 8
-.
5 2 2-.
2
9
5 .5
2-
9.52 -
9.52 - 2- .1
2 -2.1
2 -2.12 1 - 1 1
-
8 .581 4 .8-
41. 4
1
-8 -
4
.8
1 .8 1 1 .1
1 1- 1
.1 1
-1
.1 .1 - 3-
- 1
.3.8.--.1
-
588157518-.71..817.1
.7 1- 7 8
4 1 5
8 1 1
.
- 8
-
.5 5
9
-
. 9.5 2 2 .1 - . 8 .5 4 - . - 1 - .
4787
.
- .- - 29
.5 5 - - 2.1 1 5 1
-
8 .5 1
-
4 8
.84 1 1 3--47
- 2 - 2 - 1 1 .1
-
..7
7- 7--7 .
-
1 8.4
-1 .
-
58 1 .
-
12 .
-
8 5
2 5
9
.
-
2 .5
2
-
9 2-
9 5.825
-. 2 .1
- 2 - -
8 8
.5
1
- -
8
.5
1 .1
- 4
.81
- .41 8
.8 1 1
.1 .1 3
.--7.3
7.--4
.1-3 -.1 85 2 8 - -
-3-3.---71 4
-.11 7.4 2 .
2 .52 2 -.8 . 2 5
.51
- 1 . -18 77
..7
3-----1 .74 -44.8 411..8-4
1 .85- 1.- 1 2 8
5
.
- 5
9
- 9
.5 . 1 2
2--5..1 -81 -8
.5 4-1 3
..8 --473
- 2--.5 -1.1 -1
8..-17
-1..-1 9 5 2-8 -852
31 -8 4-1 41
2 2 .5
-2 -.2-2 .2 .5 .8
.--7 .-1-1..4-1 .-41174 5-..-84
8.-1.-18 5.-8145.-815..8--1251-..821-1-.2.12-1.-825.2-.-12.8-52.8-528-.25.8552-9.-285-..-5292.5-925-9.2-.952-.59 .5
9-92
.-52
9-29
.5 -.5
29 -.5
5.8
29-.5
-5.2
28 -.5
-5.8 2-5
-2
9..2 8-.8
-5 2-5.2 -2 -1..1 -28.8
.5
--21 .-2
-8 -.-2
-2
1
.1 -1.-21 1
-.5 -112
-8 .5
-1
8-.1
.2
-1
8-.582
.5--1 8
.5
-..28-15.5
1 8-1.8-15 --1.54
.8-18..8
4 1.8
-.5
4--1
.8.8 -1
4-1-.8
8411
-.-487.8
4-.-7 .7..7
99.595..5.25.285.882.88.-18.148.114.514.51174.1-8
7 1-7 47 .1 -.5
29-.5
29 2 9 2 9 8-5.8 2 -.8
2 5
2 -5
2 2 2
.1
-.2 .1
2 2 .1 2 .8-1 8
5.5 8 5.58 -1 8-1
5 1 1 .4 .4 4
--41-.-.1
-1 7 1--4 4.18--1.1 4.8.8-1
4-8--14 .-1 .18.-214 5.18.--214 .18-21
5 .2-.1.2-1.12-218.5-28-.52.8-258.-5.2-29.5-925-9.2.529-.59-2 2 59 .2-.2
59 5-9.2
-9.-259-.25 .5 2 .52
.85
.8
25..5
2
-8
-5 .-5
-25-5
.8
.8
-25 1.1 -2
2 -21
.52 .1
-81
22
2 .5
-8.8
2-2
-2.1
.5 8.55 .2-85.8
1 5.5 1
.-511.-11.-11.-11.11
.4
--2-2--229-2-2-52-2--2121---11---1-1--
1 5 -5
..92
-5.9-258 2-2-81
2 .1 -2
---1-7-117--.-1 1 - 1
-14
4 11
-
-11
8 -
1
-1
1- .
11 - 85 .2 -
-1
5
48 5 .
1
-
. 1 18 . 41
8..-5.9.-228..55-8 .58.5--925.9-25.-92.-5925
295 -9
2.9
-5.9
2 -25
.5
-2.-9
9 25-9
2 9
2 .9 2 92 2 .8-5
2 .8
.9-25
-5
2 ..9
22
-5
-5 5
.8
.8
-2
2
9-5.9
.52
-2..9
-5 5
8 8
.8
2
--2 5
.92
5 -
2 .
-5.5 2
- .
5- .
52-2 .5
8
.2-2-2
1
8
.
522
.1--2
82-2
.5
.8 .2
-21
.
-5.9-25.9522
-2
-
-58
1.1
2
..9
5 2
-28---
.2 21
1
.1
.5.1
52 . 1
-
4
2
.
-8.51
- 1
1
.1.-5818
4
1
.--5
81
1
.--5
4 81
1
4
.-58
4
1
.5 ..5
88.4 1..1
8 8
1
--1--1 4-8 --1
-
4.
1 -
--.2-281
-
2 .
--4
1
2
.1.2
8 -12
-2--28
5
12
-
1
-52
4
2-
2..8
.
-2
2-
..5-288
.
.2 52
2
-
4
-
8 .
2
1 .
..5.2
-25 2
- 85 2 2
-
.
5
1
-192...2
.
8 .8
-
2
58
25 . 8 -
5
2 5
8
1..59-221.1.1
9-5
5.5 -
2 5 9-2.92
-5.9-25.9-2 5.9-2 5.9-25.92 -2.--.9
5 2 8
25- 8
.
2 1
8
8
. .
-
8 . .
8 8
-
. 8
1
.
295.95.-5.2.-512.-12.-12.-12. .5
152
1 - 1 - 8 -
9- 58 2 8 -2--2
25
--29
2-.-58
.5 .5.--582 .9..5
1..81
5
8 . 9- 5 8 2 2
--2--2 -5
2 2 2 2 58
--1-2 25 -
2 9
-21-2 2.5 -.952
- .2 1
-5 2
95 .2-89 5..29 1
5 . 9 5 .
. 8. 8 9 29 .5.--582
.5-.-582
2 2
.9.5
5 8 8
-29.
2 2 - .
2 .
2 9 1 8 . 8 5 . 5 9 9 .5
2-2-9 2 5
-29.59.5.5. 8 5
. - 8 2 . 9 . 8 5 9 . 5 . 5
159
-1
-1 -1 087
0
8.0878.0
-7
.
0
11
-
8-1
.
0
8
71
7
-.
0
80
-1
7
18
.7
-1 87
..0
8
7
7
7
8877-1
-1
.0
-1
.
0
0
-1 8
..-1
7
..08.0
7
.00
808
.0
-1 .0
-1
8
-1
78
-1
7
-
.08
87
7
8
1.0
7-1
-18.0
8.0
.07
-1 7-8.0
-1
87-8
.0 7
.0
7
8.0
1
-1
8
-17
-1
78
.07
.0.0
-1
8 7 8.0
--877
-1
8.0
178.0
-178.0
-17
--8.0
1
78
-1.0
-1
787
.0
-1
8.0
8.0
-77
--18.0
1
7.0
-1
8
778.0
-8
0
1
.
71
-8
0
7
.1
-8
7
0
.1
7
--
8
0
.7
1.
8
07
1
--
8
0
.-
.
0
1
71
7
-
81
-1
8
.
01
78
0
.7
-1 07
-
87
.08 71
-.8
0.0.
0
1
78
-18
0
7
.0-1
7
-
88
.0.0
1
8
7
- 7
-1
.0
187
.08.0
-178
-7-1
8
18
7
-1
.0
-1
.0 .0
7 .0
-1
81
78
.0
-1.0
78
-17
.081
7
-8
.0.0
1
78
-17
-1
.0
8 8
7
-1
.0.0
7 81
7
-1
.0
8-1
8
-1
.0 7
--1
.0
7 --18.0
8
7
.0 .0
71
8.0
-17-1
.0
87 8.0
--8
.0 .0
71
878.0
-1
.0 8.0
78
-1.0 8
7.0
--8.0
1-1
8 87
7.0
.0-1
8-78
.0 1-1
78
8
0
.
7
1-8
0
.
1
7 -8
0
1
.
77
1
-8
0
. - 1
-1
8
08
1
.
0
7
-17.
07- 7 - 1 0
.
.088
0 1
87
.08
.0
-1
7 8
- 7
.01
8
-78
.0.0
-1
1 8
7
-1- 8
7
.0 871
8
-77-1
1
87
.0 71
87
-.0 .0 78.0
-1
.0 -78.0
1-1
8.078
.0 78
- 7
1
8
0
.7
1
-
0
.8.
7
1
0
-80
.
7
8
1
- 0
.
7
8
1
-
8
0
.
7
1
-8
0
.
7
1
- 8
0
.
7
1
- 8
0
.
1
7
--8
.
0
1
7-8
0
1
.
7
8
0
.
7
1-8
0
.
7
11
-8
0
.
71
--
8
0
.
71
7
--
8
0
.
-
8
0
.
1
.
7
-
.
7
18
08
0
-1
.
1
71 78
0
.
7.
7
-08 7 0
.
1
-
.8
8
0
1
7
0
.
7
-
.08
17
.0
-10
7-1
8
17
8
-1
.0 -
.0
.0
7-
8
.0
81
8
7
-
7
- 7
-1
.01
87
.0 8
-1
.0
78
-7-
.0
1
871
8
-1
.0
.07 8
- 7
.0-
1
871
8
-
.0.0
1
8
7.0
7
7
-1-
.08
87
71
8
-
.0
1
8
-
.071
8
-1
.0
.0
7
-1
87
-1
.0
7
-187
-
.0
8.0
71
-87
-1
.0
187
.08
-1.0
7
-8
.07
-
18 1
8
-1
.0.0
78
-7
.0
1 -
871
8
.0-8
.0
781
7
-1
.0
1
-7
.0
81 7
7
8
- 1
8 78
--11-1
78
.0
-78
.0
1-78
.0
1
78
-1
.0-7 1 -
781--1
.0 7.0
81--7
.0 8
.0
1-1
7.0
81 78
-7.0 81-78
--77
.0 .0
178
-1
.07 81
--.078
-1
.07
8-8
.0 1
7
87--8
.0 1
7
81--8
.0 817
--8
. 0
7
1 -
8.07
1 - 0 1
8
.
7 - 1
8
0
.
7 .
7
1
-8
00
.
7
1
-88
0
.
7
1
- - 10
.
7
81
-8
0
.
77
1
-8
0
.7
1
--
8
0
. 8.
7
1
--
8
08
0
.
7
1-8
0
.
7
11
-7-
18
0
..
7
18
0
1
-1 78
0
.
77
-0.8 7 -
18
0 0
.
7
.08
1
-08
.08 .0
187
.01
8
-1
.0
7-87
.01
-88
7
-
.0
1.0
71
-1
8.0
7 -
8 7
.08
-
171
-
.08
.0
1
7
-1
8 7
-
.0 .0
1 88
7
-
.0.0
71
-87
-
.0
181
7
.08
-1.0
7
-8
.07
-
18 1
7
-
8
.0.0
71
8
-7
.0
1 -
878
.0.0 .0 .0
1
8 7.0
8 7
-8
.0
17
-8
.0
1 7
-1
8
.0
7
-8
.01
-78.0
17
-8
.0 .0
81 8
.0
1-78
.0
17
-8
.0
17
8 .0
178
-1
.07
8
.0
- .0 .0 1
7.0
81 7
--881
.081
-8 -.0
17 8
17-.0
7 8
17
-.0
.0
177
8
-.0
.0
7
8
1
0
-
. 8-
0.
7
1 -8 .
7 - 0
.
7
1
8 - 0
.
7
1
8 -.
7
1
8
0-0
.
7
1
8- 0
.
7
1
87
1
-0
.
87
1
-0
. 88
0
.
7
1-8
0
.
7
17
- 8
0
.
77 .8
0 . 71
-
87
.0
81
-87
-
.0
18
.0
71
-
8.0
7 1
8
-7
.0-8
11
7
-
8
.0.0 871
-
8
.0.0
7
-1
8-
7
.0
1 81
7
-
.08
.0
71
-87
-
.0
181
-
78 17
-8-
.0
17
81
.0 -
8
7 1
8
.0 -
781
.07
-.0
81
-7 1 7
-8
.0
1- 78
.0
1-78
.0
1 7
-8
.0
17
- 1 .0
7 17
.0 7.0 1
7
- 1-7
-7
8
.0
1-77
-8
8
.01-77
-8
8
.01-7
-7
8
.01-7
-7
88
.
-
81
0
7 0
8 7
1
.
- -8 7
1
0
. - 7
8
1
0
. - 8
1
0 -7
8
1
0
.-7
1
8
0
. -7
8
1
0
.-.
7
1
8
0- 7
10
.
87
1
--
0
.
8.
7
1-
0 8-
18
0
.
7.
7
18
0
1
- 7-
1 7 1
-
.8
0.0
78
0
.
1
-0
7
.0
1
-7-
8
.0.0 71
-
87
.01
-
8 7
.0-
8
1.0
71
-8
.0
1
-
787
-
.08
171
-
8
.0.0 .0 .0
1
7
-87
.0-
18 1
7
-
8
.0.0
71
-
87
.0
1 -
878
.0
1.0
-
78.0 .0
81 -
78
.0
1
7
-8
.01
-78
.017
-8
.0
1 7
-8 8
.0
17
-8
.0
17
8 -
.01
7
8-
.01
7
8-
.081
7- .0 -
7
.01
8-7.0
1
-7
7
8 1-7
8 1 8 .0
1-7
-7
8
.0
17
--7
8
.0
1
-77
8
.0 7
8.0
8 88
7
0
1
.
-
8 8-
7
1
0
. 1
.
-
8
7
0 -
7
1
0
.
8 1
.
-
8
7
0 1
0
.
-
7
8 .
8
7
1
0 0
-
8.
7
1 1
0
.
-
7
8 1
0
.
-
7 0 1
0
.
-
8
7-8
1
0
.
7 7
1
8
0
-
. -7
8
1
0
.-7
8
1
0
.-.
7
1
8
0- 1
-0
.
7
81
-0
.
7
8.
7
1
--
8
00
.
7
1-
-1
8
0
.7
1-
8
0
.
1 8
0
.
71
7
- .
78
0 7 -1 78
0
.
.0
1 8
08 11
7
-8
.0
71
-
87
.0-
8
17-
.01
8
.0
1
-
7
87
.0
1
-
8.07
-
8
1.0
71
-
8.0
71
-8-
7
.0
18 1 71
-
8-
7
.0
181
7
-
.08
.01
-
78-
7
.0
181
-
78
.0.0
1
787
.0 87
8
.0.0
-
8.0 1
-7
8.0
1 8
7
- 8
.0
1 -
78
.0
17
-8
.0
1
-78
.0
1 -
78
.0
1
7
-8
.0- .0
1 -
7 8
.0
1-78
.0
1 -
78
.0
1-
7 8
.0
17
-8
.0
1-
7
8 .0
1
78.0 .0 81
7
.0
- 87
1.0-8.0
1
7- 8 1
7
-
.081-
7
.01
8 -
.0 .0
1 .01 .01 8
.01 .0
1 8
.0
1 8
.0 8
.017
-1 17
-1-1
1 .0 8
18.0
-1
7 1.0
-1
7 8.0
-7
.01 1
-18
7 8.0
1
0
.
8
-
7 7
1
0
.
8
- - .
-
8
7
1 8
1
0
.
-
7 .
7
8
1 81
-7 8
0
. - -
7
.0
1.0
7 1
-
8
.0 7
-
.0 8
.0
71
-
87 -1 8 8
178 178
.01-
781-7 - 7
8
.0
1- 1
-
8 .0
1- 1 8 718
-1 -7
7
8.0
.018 1
-18
-7
.
-
01
7 87
0
.
-1-
7
0
1
.
8 1
.
8
-
7
0 1
.
8 -
7
0
1
8. -
7
0
.
811
.
8
-
7
0 .
81
-
7
0 .
81
-
7
0 7
0
.
8
-1 0
.
-
87
1 8
-0
1
.
7 8
-7
1
0
. 7
1
0
.
-8 .
8
7
1
0
- 1
.
-8
7
0.
1
0
-8
70
.
-
7
181
0
.
-
8
7 1
0
-
8
7.8
1
0
-
7.7
8
1
.
-07
8
1
0
.
--0
8
7
11
-.
8
7
0-0
.
7
8
1.
7
1
--
0
80
.
7
1-
88
0
.
7
17
10
.8 0
.
78 .
70 8 -
71
87
.0-
8
1 7
.01
-
8.0
7-1
87
.0
1
-
87-
8
.0
1.01
-
78
.01
-
7
87
.0
1
-8-
7
.0
18
.0
71
-8
.0
71
-
8.0
71
-
8
-
8
.0-
7
.0
18
.0
1
-
78
.01
-
78-
7
18
.01
-
78
.0.0
1
787
.0 87
8
.0.0
-
8.0
-1 8 8
1787 .0 .0 -81-
8 1
-7 1-7.0
1
-
7.01
-
7 8
.01-
7.0 81
.0 -
7 .0
81-
7 .0
81
- 78
.0
1-
7 8
.0
17
8
-.0
17
8
.0
- 1
78.0
- 8
1
7-8.0
1
7- 81
7-
.0 81
7-
.0 81
7
.0
- 8 7
.0
1
- 81.0
-
7 8
1-
7.08
1
- 8 .01 -
7 8
.0
1-
7 8
.0
1 -
7 8
.0
1 -
78.0
1 7-
8 .0
178
-.0
17
8
- -
.0
1 8-
.0 .0
--
7 .0
-
7 -
7
.0 78
1
- 7
.0
- -
7
.0 -1.0 8
.0 18
-1
7 7
8.0
.0
1
-8-1
7
8.0
18
.0.0
-18
7 8.0
.0
718
-18.07
-18
.0 7-18
.0 8.0 -1
7-1 .0
8.0
-1
71 78
8.0
.08.0
-1 -1
7-1
.0 8.0
.0
7-1.0
8 7
- -
7
0
1 1 -0
. 0
. 1 1 8
.0
1 .08 7.0 7 8 8
.0 8 .0
8
0
87
-
.
1 81
7
-
0
. -
.
87
0
11
-
0
.
870 01
7
-.
8
-
01
7.
8 7
0 -
.
87
0
1 -.
8
7
0 1 1
0
.
8
-
7 8
-7
1
0
. 0
1
-.
8
7-
10
.
8
7 8
1
-
70
.8
7
1
0
.
- 0
.
8
7
11
-0
.
8
77
1
- -
7
.08
.0
1
-
78 7
.0
1
-8-
7
18
.0.0
1
-
7 8
.0
1
-
787
.0-
1 81 7 .0 .0 -81-
8 1
-7 1 -7
8.0
1-78.0
1-
7 8
.0
1
-
7 8
.0
1
-7 .0
8 1
7-
.0 1
87
.0
- 87
.0
1- 8.0
1
7- 8 1-
7
8.0 1 -
78.0
1-
78.0
1 -
78.0
1 -
78.0 - 1
- 7-.0
11
-
78 .0
-1
7 87
.0 8 7 7--1
.0 -1
7 -
7 7
8
.0
1
- -
7 71
- 7-1.0
8 7
.08-1.0
7
.08 .0
-1.07-.0
8
1.07
8-1.0
.0
78-1.0 7
8
080808.088.80.008.08.088.08088
--1--1 1
7
-
. 7
0
.-
1 .
07
-1 7
0
.
81
- 7
0
-
8
.1 .
0
87
-
1 0
81
7
-
. 8.
1
7
-
0 7
-
.
1 1
7
-
0
8
..
81
7
0
- 0
87
-
1
. 8.
187
-
.
1
08
.7
-
01 81
.
7
-
0 1
.
8
-1 1
.
7
-
0
8 7
0
1
.
8
- 7
-
0
1
.
8 .
8
-
7
0 1
7
-
0
.
8 -1
.
8
7
0-7
0
1
.
80
-7
1
.
8
7-7
0
1
.
8-.
8
7
0
1-0
.
8
7
11
-
70
.
81
7
-0
.
87
1
-8
0
.8
7
1
.
--
0.
8
7
1
0- -
7
.0
8.0
71
-
87
.0
-1 878
.0
1
-.0
78.0
1
-
78.0
1- 8
7 8
.0
1 -
78
.0
1-
7
8
.01
-78
.0
1-
-7
7.0
1
-
7.0
1-
7 8
.0
1 -
78
.0
1-
78.0
1-78.0
1
-7 8
.0
1
-
7 .0
81
-78.1
1-
7
8
-
7
0.0
1
78
.0 78
.0 8
.08 8 - 1 - 1
7-
7
.081
7-
.01
-
7
8 .01
-
7
8.01
7
8
- .01 7
- .0
8 1
-
7 8
.01-
78.01-
78 1 -
78 .0
1-
78.0
1-
7
8 .0
1
7
- 8
.0
1
- 7 8
.0
1
- 7
1
-.0
8 -
7
1 81
-
.0
1
- -
7
.01
8.0
1
-
78.0
1
-
7 87
.0
- 18
7-
.0
1 .0
8
7 8 .0
1
-
7 87
.0
1
- 8
-
7
.0
1 8.0
1
-
7 8.0
7-1 8
8.0
77
.0
1
-1
-8 7
.0- 87-87-
1 7 8 78
1
- 78
1
- 78
-1 7
8-1 71
-
8 781
- 7 81 -1.0
7
8
.0.0
1.0
7.0
8.0
78.0
.0
8.0
888
1
-
-
1
-7-11 - 7
1
- .-
71
7
0.
1
-
7
.-
1 7
01
-
..810
.7-
1
0
7.
0
8
.1
7
-
8 7
0
8.
1
7
-8 -
0
7
8
. 1
0 .7
-
.
0
8
81 1
7
0
-
8
.
080
8
7
-
.
1
0
8 1
0
7
8
-
. .
7
0
8-
1 0
-
8
.71 87
0
-
.
-
.
1
0
7
8 1
7
0
-
8
.80
-
. 17 7
-
8
.
1
0 7
0
-
8
.
-
8.
01
7 0
-
8
.7
1 7
0
-
81
. 8
.
1
7
0
- 7
-
0
8
1
.
0
8-.
7 1 -
8
.7
0 1 1
7
0
-
.
8 .
1
8
7
-
0 0
1
.
8
-
8
.
1
7
0
- 7
0
8
.
1
--7
0
1
.
8-.
8
7
0
1-0
1
.
8
7 8.0
1
-
7
8.0
1-
7 .0
81-78
.0
1-
78.0
1-
7 8.0
1
-78.0
1
-
7 8
.0
1
-78.0
18
.0
7
.
8
- 1
7
7
0
1.0
8
.0
8
- 7
8
8.0
. .0
8 8 8 - 1 - 1
1
7-
- 1
1.0
-
7
-
7
.0 1
-
7 .08
1
-
7.01
-
7
8 .01 -
78 .01
-
7
8 .0
1 -
78.0
1 7
8
- .0
.11
0-
7
7
8
-8.
.0 1
-
7
08
..01
7-
.
8 1
7
0
8
- .0
-1 7
8-.
1 0
8
1
-
7.07
1
- 7
8
-
7
.0
1.0.0
1
-
7
1
-
7 8.
-
.0
1
-
77
187
0
7-
.0
18.0
1
-
7 8.
-
71 87
0
.0
1
- 8 -
7
.0
18.1
-
780
.0
-
71
8 7
.0
1
- 8.7-
1 8.0
071
-8 7
.0
.0
1
-
718 8
..0
7
7
1
-1
-
8
8
0 .0
7
71
-
8 7
.08
1
- 7
.08
1
-.7
80
1
- .0
78-
1 .0
78
1
- .0
7 81
-7
.081
- .781
--
0 .0
.0 7
87
8
-
-
11-
.0
7
87
8
1
11
.
8
77
8
-08
7
1
77-8.0
.
1
78
-0
18
-88881
7
- 7 -
1 7
- -1 1 8 01 0
7 1 0 7 1 1
7
0
-
8 1
7 -0 1
7.0 1
-
78 0 8.0
-18-
7 .0
1
-8.0
7 .0
8 .0 7.--0817
77.77.07.07.70.0871.17.0-.17.17.-17.177.-1717.77
1- 7 1 0
7
. 8
7
.
- 8
.7- 8
-. -
8
. . 8
1-
7
.08
1 - 17
8.0 8
1
-
7.0 8 .0
1 8.0
1
-
7 .
8 8
1
- .0
-
7 .0
.0
8
8 7..--0
-1 ..0
-7.-.17 7 1 1
.07--710 7 . 7 -
. 7 0
7
-
8
.
1 7. - 8 .0 1
7 . 1
-
7 0
87
.08 8
1 .0
8
1
-
7 .7 8 0
..0
-17
7 7
--7-1-1 7
.0
.-
1 7
.
0-
1.1
8 07
.
-0.
8 0
7 8 .
80-
1
7 0
8 1
0
7
.
-
8 0..071-180.-718
8- 1
7
0
8
.
- - 1 0 1
8008-.178.071-807.-187.0--171808-7.18-.7018-0.71-.0871 - 07
8.0
1-817.-081
7.08 1-
7 1-7 8
-8..018
-
7.01 -
7
8.01 - -0
1 7
8.-.0
178
-
1. 1
-
70 8
.0
1 8 1
-1 7
.0
8
1
-.7
-
7
180.0
71
-8 .0
71
-8.7 8 8
710
- 7
.08
1
- 7
.081
-.78
10
.0
- 7
8- . 1- 7 8
11
87 877
.08..0
8088
-1-17-7-1
-.10 1 .7
- 08. 8
0 -
187
-.
1 0 .8 8
-
17
.
-
0
81 7
.
-
01 - 7
.0
1-81.0
-
7 81
-
7 -
7
8.01 -
7
8. 1-
7
0
8.017 -
7 7
.01
- 7
.-
18.0
01
-
7 .0
81
-
7 7 -10 7
.0
1
-8 .0-
7
8
1.71
-
80
.08
1
-
7 7 1 78-1
0
. 8
71
07
.0
8 7
.
81 -
.0 .
1
-
7 0
17
.
-
--.1-1-1 1
..1-7-101 7
-
1
80
- 7.1-10
7
.0
-1.1 1
7
-0
07
. 8
11.7
7 .7 0
..-.71
.
0
8
87 8 8
80.0.870.180.7-18. .7-180.-71 .0-718.07-1 8.0-718.0
..-1.8 0..-778 0 8
..8 8 0.-10-77180.8-07.1-178078..01--71880-7.18.071-8.07-1087.-1
080-.718 .0 18
-
7
. 1-
7
0
8.01 7 17
0
8.0
-17 -8.017.1
-8
-.1
7 07
-8
.0 8
-.
18 -1.0 17
0
.0
8
- 1
- 8
7-1 0
78 18
-7
.-7 .7
1
-0
.0
188 1.0
7
-88 8
-18-7 -.71
8.0
-1 7 .1
-80 -
7
.0
18 .-
780
.1
-
780
.0
18 -80.71
-80
0 .0
.0771
-8.7-1
-1
8.7 80 8 8
.7-1 .0 8
1
-. 7
8
1
-
0.08
1
- . 70.
-178 -10.0
78
-1.781
-0.078-1.78.1-1
1
0 780.0 7-1.- 8017.0
08.0
878087
17
.0
-8088 81 87 08 .0 888
--1-17--7 1 7 1
-7 7--18
1 7
.1-0 0 --0 0.07.-0
10880.87--7117 80 8 8.8-.78
808..70-17-10 1 0-7
8.0
1-7
8.-107
-.0
81-7
18.7
-08
1 .0 0-7 .0
-1
-7 .-7
88 -18
8-7
.0
.0
1..0
8
-8 -1
-7.-7
8 -1.0
88.0
-1
-78 7
..7
-1
-10
8 .7
7 -1
8 0
.0
7 8
-1
.7
7 8
-10
.0
78-1
.778-1
0
.77 .0 -781 7
8 .880.7800 7
1.-08
0
81 .--8
7 08 7
1.008.7
. 0
080808
1
- . 7 0
.7 1 . 8.
0-0
7 1 . -1.7
7 -1
80
.-7
18 8
-8
.7-1
0 88
-1 .0
7
.0 .0
1
8
--1 - 8-1
07 8
-1.7 1
8 0. 1 - 1 7- 1 8. 8
0
--1--1-171-1--1-1-1-1-1--1---1--
1
- 1 - 0
- 0
- 78 1- 7 8.
1 7
- 7. 0 -
1 8 0
-
7 1 0. 8 -1
88 0 7-
8 1 8 0
.01 .7
1 .7
0 1 0
.0
7 1 1
7 0718
7
0
.01 7
1 0
8 1 0
.0 71
80
. 71
-80.0
8
-
71 . 8
-10
. 71
-
8 .0
0 1
-
8 .
781
- 0
. 81
- 0
. 8- 0
. - 0.0
78 .8
7 0
.0 . .
-
8081 .-8 1.
7- 1 7. 0 17
. 8 7
088
--1-1 7 1 7-7 -1 1 7 0
.0 7 1.1.8
--7 1 0..8 .
7-1
07-1.8 7 7 8
.710.7-1
-8 1 781
-0
. 781
-0. 781 1 - 17 - 1 0
8. 8
0
1 --1
7
-17 7
7--.1
.17 0
-0
1
--1- ..1
7 -11
--0
0
78
7-.7
1
8 1 ..7-18
-7
- 7
0.0
8 1
0-77 ..0..7.71
1-17 0
-80 8
7
8 ..0 . 18 0.00 8
-10
7 0 8
08.0.77-1-17
7080 8
18
.7-.8
-
7 188.00
8 0 . 8 0.-710 180.-718
80.7-8
88
80.78
-0.78
1 -10.78
-1
0.78
-10.78-1
0.78-1
0.78-1
0.78
-10.78 0
-.-78101
-10 .7
.178 0.0
7
8
-0.71
-8 7
1
8
0 .8
.--800.
1
7
.1
7.
8-
00
.-00
.8
1
8
81
7.- 0
8
7.-8808 1
7-
.
17.-080
11
87
.7
.--00
88
1
1.7.08
0
.7.08
87 08.0888
08
1- - 1 17- 1 -.
1 1 7 0 .1 - 7 -
7181 . -
1
7 8 7 7 888 7 .0
--1-17
1- ---1-7.1
.
1-10
-
-7.17
0 7
-7. -1-10
78
0 8
-.-1
7
1
7
.-..70
-
1
0
0
.
8
8 1-
07 7 1..0..1
-7 1-0
78
0
8
878
.0...8 1 7 0
0
7
00 8
8
..8 8 7 70 0 ..8
8
88
00 ..8 8 0 0 888 8 .--00
-1-17-17 .7.--0
1
17 08
81
.7.--08
1
7 08
.7
1
7
1-.-088
01
1
..0
7
7 087
8 7
..0
8..08
0
8 088
-17.
1
-
7 1 7
. 0 1.7 - 0 8 17
. . 0 7 . 0 8 . 088
-1-17-17.07.08.0 8
088 8
160
ETABS 17.0.1
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Joint Loads (CR 1)
161
ETABS 17.0.1
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Joint Loads (CR 2)
162
ETABS 17.0.1
Z
M
1
2
L
H' 2'
H
G 3
FF'
4
Y
E
4'
D'
5
22.2 9 5'
C
C'
9
2 . 2 2
9 2. 92
1 .612
2 96...82 92. 29
86.82986..26
6
6'
.2 9 2 .2 9 8 .1 0 4 1.
921..2 9 2 2 .292.6.2824 6. . 6 050226 4 0 30126.3604116.304466..1104461.6.46.81.6829..62892.292.2
7
2.2 .9 2 2
.9 2 .2 688 1 6 8 .6 1. 8 64 .1
9 6 .
2 1 1. 40 6
1
. 4
0 .10
6 4..1 6
3 0
.
2
2 36 .
0 6 6.
22.92.2.2 2.2 9 288.6. 2
9 88.6 88 .164.168 8 142..211 6 4
61 .4 1.64.1 6
61.40.6486 .14 60
92 6
.1.26 4
0 922 6 62 .6
0 30 .22 632 2
0 142395.2 1.29..77 1
9.5.2929712.8 9522136.0236..02613604.1640466..1164.164.68. .6892..292.92
.
0
2
1
8 . 6 4 . 0 6 .61 .
02 6 2 2. 2
1 .
2 7
9 9
. 7
86.68.2628 8
6 . 6
1 14 .16 1 0 .6
142 22362.5.62 0 236 04 .0
2 1.6 36 1 4 6 .1.2 5642 18 25
.
.6897
2
1 5 22
9 .927 94 9
.
2 9
7 2
9. 8344 .4
883.9 3 .3 3
8 .4383.46238397.5.2299712.5.221.5.022136.023640..0623104.6141064.912614.62
9
. 88.82.92
..9.8899
8
9.21 4..1
61
92...21 614.64 0.6 41 0.6 100
4 26..0 23236..950 .0263.2 5.0212346065 .211 402 .162 9 9
2 92
.687 9 83
3 4.9 3 .9 3 6 .912642
11.41 1
1 .664
.616.468...11 0
1 9
4
6
20
1 641 0 1 0
. 2
3 6 .06
2
3 .3 51
2 2 522 12 2.9 .5221
9 52. 1 2 29
. 7
9 9
.2
0 367
9 . 6.
1 2
9 04793
8 .6
43
4
. 3.
81 63
44
. 3
8 .
3
468 8.3
3
9
6
.2929
8
.
3 6 3
..
8
29 2 6 48. 6344
5
4 .83 9 8
.
3 . 4
3 83 9297 .92 . 5212
. 9 2 62
. .92
0236 . 2 .6
410 .64064.8
. 8 . 6 64.64 8
6
1612022 2 3 3 4 4 5
1 02.4602 8.6.80 .292.03 692..0
2 326.5 .51
2 .5217.92937.43927.34.72927 . 3 5283 2 1.53 4 8.023
3 .3669143
4 09 6
. 38
. 1643
.9
6 8..15 .4685 4 3
. 5
4 . .921 843 .345.3469.83692.43.2 8392.43.83792929.297.6.89.5221.6.5821.6.083266 4
6 64
2'
6.
1 36
2
.168.5.1 .
2 5 12 12 2 9
.2 4 38 8
3 3 .33
4 8 3
. 9 7 4
. 9 2 7 .2
8 1 29
6 3
8. .02 8.
3 6 1 4
03
. .5
4
6 4
3. 4 64 3
. .6
8
. 3
1 5 . 3 9 .8 4 1 2
9 2 4
5 2
. .8
3 6 8 . 9 . 4
6 . 0.
31
6 4
1
.0 40
6.10.16.206250.25.2292.59.2437.433838.3349.344858.4125.257
2 52.5264.5 1
2 2 2 . 9 9 2 7 .9 7 .438 .
4 4 8
.3 64 3
9 83 8
.3 9
6 .
93
2 . 52 12 5
4 4
3. 4
5
.0 2 4 1 40 8
. 1
3 4
8. .1 1
3 6
4 . 8 2 5 . 2
92
1 .8
4 3 3 4 45 .9
6 8 .
8 3 . 6 4 3 3
8 7 . 9 1
. 64 51
.
2 .
.6
3 0
4 .4
.962 7.29283
4.1.646982 2.29..24
7 383..483 83649.838 69
434 .3
8
9.35 .34345
.48315946..4 8..33184 3
3.897454 3
.893631..94234
.971
.833..952294
18
.72.13 68
52.134..102364
3 .61402 ..167 1.92 .27 188
8.257.6.258.1
1.688.3445.1364649.8136964.4.31864.421
17614.28451371.16
7 7640.51.61
.8431.84015.6341450.8631940.8.38640..498..0231 24036.33 63
046.14036.026321.52.19279.92.4383.4.388396.83.345.3.8413. .2517.
83299..4 02
9
53..448.13
3
.6104.6.0236..5217.9273.438369.863945.3485431.84312517.2517
833 639 83
6
1 68.6.8 36 .
2 9
2
. 4
3 5 . 34 1 . 54
831 8
.4 3 8.4 3 4 45 3 5
2
. 9 2
7
1 .8 3 2
.
5 .9
7
1
4 2
3 82
5.
3 .7
19 297 . .86
.5 2
1 8 ..
0 6
2
388 . 6
1 4 40 6
. 6
1 4 .61.
42
507
1 .6143 .8 4 3 .
3. 4025
36 .6
30
296
3 . 8 2 2 1
2 .5
71
2 9
695..345.3465 85.68.84.3129.8431.84 17.9.5227.5 31.95 2 . 68 . 1 . 6
3
140.6140236.0.521..927..4383.8639.345.8431 .2157
41..46384 2. 8 1 7 3 4 69 . . 8 9 2 7 16 4
1 03 6 6
. 1
4 0 . . 02 36 3 4 . 9
5
2 1
2 . .99
7
4
383.83 9 .8 2 1 7 4 54
138..38168.345.39.4 8
. 6 8 4 38 4
1 .5 1 . 6..36 4 4 10 2362 2
0536
1
7 .8 4 3 5
2112.8.34.9 2
1 . 839
7 9'
0.1640236.203521.252979.2.4383.43.8639..345..8431. .2517
5..3 41.8 1.8341..24.3 11 5 . 9127.25 258 7114.451 6
61.3813469...4
8336
.0 52.6 2 252
128 98
10
3 34.34 34345
8 157461.264178.46.2586.68.868 ..6
8414 31.3844315..4 901.8683.936 0.498237.4
1 .1 312
..0 610 326..0 5212..5 .2 79
7.21.4 2 4
3 3.83.8 38 3.4.84 96
6
16.4066.10.23612.205.2127.25.2979839.2.348833694..3863945.3485431.8431.2517.2517
484.84 1 .1
2 7 2
. 1
57 .6 1 4 1 6
. 2 1 7 2 .5 6 01 6 0 1 5 .3 4 . 0 2
6 0
3 2 9
6 7 . 1
5 2 5 2
1 2 9
2 7 9
2 97 2 97 . 4
3 83 5 3
7 83. 2 . 9 1
3 69
. 5 6
9 4
. 4
5 4
41.4601.4601417.2571.30.862431.834301562.34552.8639.5 1..2 92927.927.83.4383.4383.8
892377.894 91..3 5873 673
4'
1 53.3
04.1604630.236215.2197.92383.438.8369.83.345.34.8431.84.2517.2
4 .25 .2 157 161 1.1 483..5 69..8 36 45.21..8
44 5.13.8.3
14 13
11
525 7 439.8369.836933
5
13062.3062.3062.15 .22517..152.834.11 . 86 3 . 5 4 3
1
6.40. .0632..52179..973..48396..8695.34531.8315.17.217
6 1 . 60 3 45 . 9 2
79 .. 3
8 3 . 4 38 4 4
5 34 4 4 31 7 1
1 02.062. .152.152972.2519 77.215..79 7
2 .5..68 4396..86 369.83 6 45.3 445.43 1.8431..28 43 1 .2171.1
7 7
.83148 .34383
04436312197983.8696.454313.17
2 2.522.1522.9972.972..843.842 .32517..4 594.33 9..8 45..3 431.8431..28 51
5'
5 2 3.8 43
8
6 9 68 9
31..346 83
1 4 5 345..3 8 3
4 1 8 5 17 .2
5 1
7 517.2
292.972943.843.8493.6893.689 . 97 3 3.4 . . 4
3 5 31
41.847.2517.251 517
6
4..4 3211 5
47 8 7.2
L
6'
35 7411.3.8 3
2 43.43.8 893..6 893..68 3 4 .435 4..4 354.3 8 43
1 84..13 2 1 57.2 51 K
383.893.6 5443 4
5 14.381 4 5 4 .1 8
3 4
1
5.1 257 .21 5 7
334.354.433 814.38 5.1 27 527
4 84.814.814..31
J
5 . 1 275.1 27
7
4 .275.1275 27 HH'
525
1
G
FF'
8
D'
D
9
CC'
9'
10
B'
B
11
A'
A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (WP(TANK FULL))
163
ETABS 17.0.1
Z
M
1
L 2
HH' 2'
G 3
FF'
4
Y
E
4'
D'
5
22.2 9 5'
CC'
2 .2 9
2 2. 92
1 .612
2 96.82 92. 9
86.6829862..6 2
6 6'
B'
22. .2922
6 2 . 2 2 . 9 2 .2 2
9
8
.9
2
6
. 8
26 .
2
.
9
8 .6 8
4
6
. 816
1
2. 6
.168.4
4 .
1 6 1.. 44 .
1 6
4 8..62829.2922.92
4
2
. . 6 402.66316.0431.6461.466..81.68..2629.292.2
1.
6
B
A'
2
11.6686.86 2 9
...26892.4 6.2894 6. 8 6 61 .641 46
.4.1 .1 .4
6 005226 .0 .0 0 4 .
1 7
X .64.1 14 60 421
A
1161.11 1. 8 2
1
. 6
.2 1 6
. 4
0 .
1
6 0
4 6
.
1 0.2 6 .
20 3
6 0. 36 .10.236.10240.610446.1648.68 92.292
220161.614 1.64.1 .686
.14 2
9
08..1 6.26 0
4 32
6 .6
0 352 0 3 925
.2 1.52.92.722 9.59.229172.8 9521236.0236..01266304.6140.6.11464.164.68. .68..6292.92
1
6 1. 0 .6 9
2 0
.
2 3
6 .
2
0 1 3
.
2
5 2
1
0 4
6 20 3 2 2
1 .
2 4 3 .43..37
2
25202.02 .
1
6001.664.0 1243 6 .62 2
9
22 .2922
5 12 .
2
5 .7 939 . 7
9 52.12 .02 0 164 88892.92
29222.55262.052634..2 62.1.2 82
1 5. 61 7
9 .
2
9 7
9 9
2 3
8 8
3 .
.43628397.4.923897.5.9229712.52136..0522163..06123460.2..962410.2..9162410614.2.91264..2
9 . .8899
8
25.0227 0 5
.
6 2
12407 1 5
64 .162
7
9 9
4.97 8 2
9
.6839
7 9
.923
8 .2929
.3
4 83
3 4
. 8
3 .
4
48 9
6 8 3.9 6.4 3 8
3 8
34322.972 2 . 12 .
2
9 36 9
. 0 9 .
6 .
1 9
20 4 34. 3
8.1 6 3
4
.
4 8 4
.
3
68 .
3 6 3
8
.
.2 6
9 4. 3 4 4.8 3 9 . 3 . 0 2
3 .64064..1 6 864.64
3382.3433 992.974 . 3523 21. 3
42 3638.023 .368
4 3 6
.1403 . 9.
6 1 3
8
. 1643
.9
6 ..19
8 6.4 8
3
.685 4 .
3925
4 . 4
.925 8 4 3 83
.345.34659.83962.43.2 3
892 .2
9 . 2 9 2
97292.9297..521.6.58216.6.083266 . 8 . 4
6 66
2'
4 .9 2 5 1 2 8
.
3 9
6 .02 8.326.5 4 0
..1 5
4 4
3
. 4
5 64 .6
8 1
3 5. 3
1 8
. 4 4 . 2 . 83 4 33
8 .6.89 4 . .
01
6.3640..360 4
0 034
44338.33
48433.48 94..33889368..3439 5
7..93
3
8
8
42.979
3
65.524
4 . 9 .91725
3 4.214 3 4
1
3023643
..3
4
8
61404
02
8
31404
..61
8 ..11 364..1..87
7
1 1522 911.2.84231348458.34.6968.8369.68.438.4217964.921
8 25.7.2658.84631.8445.136454.8316964.8.3380.4.38.67140 64..95..21 0
4 56.1
12 4..3446
3
9
3
354 4
38.3 . 4 3 83 31 2 4
8
. 1
3. 4 8
. . 5 2 1 36. .
07
1 52
.. 6 1
7402
. 64 . 6 1
6
2
7 . 0
1
.
2 6
3
5254
4..4528184.483.45341.483.41 69.84 8
3.2 1..84335 1.4923895
.68937 2.37.7
15 ..7
2 525
1 2236. .6406461.7114
0461.61017.614
.25.16 31.18440
31...86344134150.3.46 1942936.4380
0312536..3.84.3560 .8.36.5236.9..370236.9.51
2.8.93792 1.1291
.4841573.83.45 .59467 2 .4923897..9427..951227.5012236.036..341 .25017.6 05236.85 2912..48.685
21 .989
78
4
575 22.5175 2 4 . 3 4 5 .8 36 9 3 16 0
. 23 6 .22536
.
0 17 .
.2 .42 12. 8 1
2
2 .34 5 9 9
27
9 7 8
. 36
9'
.521 2 .52 12 79 7 . . 2 . 1
4 8 5 38
3 . 3.66 9
17.2571431.84315.345.8639.483.487.972152.52.9 2 7 .
92 97 9
. 2 9
7 .43 8 3 2 514
. 7
3 8
3. 3 . 83
. 1
8
3 6
9 4 5
.
8 69 4 45 4
23.4383.43838369.8 75369.12.7344
921..8 5..3..83 53..3
4'
.2517.2.8431.345.83639.8693.823992.927 346 14 13
11
5
7.2
L
6'
5125.2 57 K
J
7
HH'
FF'
8
D'
D
9
CC'
9'
10
B'
B
11
A'
A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (WP(TANK HALF-1))
164
ETABS 17.0.1
Z
M
1
L 2
HH' 2'
G 3
FF'
4
Y
E
4'
D'
5
5'
6 6'
CC'
-2-
-.2962-.2.9-2.2-299
B'
B
.22
9 - -1.-.68-86.-88..626
.1618
A'
X 2 9 2 -92.2-92
A
2.2 .9 292..2 2
9.6 .292 . -
.6886
22 . 29 2 . 88 .68 8 - -.1614-.61.16 -444 1.-644 -8.68-.2-92.292-
1
6 2
2. . 2 6
.8 8 6 8 1 6 4 .
14
6 1
.1 4 2- - 0 1.4.68- .2
2
2 868 . 1 - .62
4 0 0 0
8.6982.2628
116.6
.. 689.1.21
.8
68 . 614.64 .16 4
1 .6
1 4 10..0 61
40 .6140 2
-2362--.05236-.25-1 - 0
.
2 362.026-311.6--460.611.4460--.164.-68.-1.6892--..6292-.292-
6 .
61 0
- 4 3 8
.1411
1 492..21 614..1 10 .6410 .64 2
36 0
. 02 64 8- .29
46.166.4018.6..94 0.292.6
261 4 0
1.0 26..05 326..0 6.521.521
2
3 -
-292 2 -
2
3-..59492317--.29.-9 52.1-2..9 523261--..502236-.6.0210346--..6140--..6114604-.164.6-8.1-.682--..2692.92
16011
1612202 2 3 3 4 4 5
36
2 3
0 69.5
2 3 21 5 1
2 7 3 787 9.
2 8
2'
.0 6
2. 80 .2
.68..5 12
22.9227.927.927.43 2
9
. 7 9
. - - 8 3
.4. - 3
33-8.33-694.38-3.6 9
-7 9279-.9212-.5212-.0236-.0236-.6140-.64-.164892.8.9929
.160.60.2562..25922.923474.3833.834393.4845.84125.25
2 522.52146..5 162
1 6282
1 .89 89..4 -38944-..4 84834469 945.389-6.4 3 97 5 - 6 9 .4 .8888
140.610263.205.212.5.297..4338.8369.3454.84317.2517
2.29.24 83.83
4 7 . 3
4 -45-.3-1.48.1-31.435-48.33368-9-..843383--..49238937--.92.92229172--...52912-..5022136.9-2.20213460--..2
-
9
9 0...61468
3
292.92 . 9 7
2 .
.
16
4 .
6. 43
8 83 6 836 - 5 3.
4 - 5 6142 68.64.646
40.1640360.23621.5219297.9.249383.4.8369.8.345..8431. .2517
2 43.473.4 839..48 839
6 .164.186
3 .9 2992.9.283
68.6.83
6 .
69
4
35 .4
3 5 . 3 . 8
23
5 .
8 3.
4 . 99
26-
4.-3912.48145-.3454-.8369-.86.883-.438 .43 9 2 97 .6
8
-.8 6
8
0 3
286 4.0360.1 6.40.404
6.140..0263..5127.927383.483369.8633945.3485431.8431.2157.2517
63.3435.34651..4634 .129.8431.8431 -.9.522
85.68.843 68--.9217-.9562111 61
4
614061.420360.2.2515.2.927..483.8639.345.8341 .2157
3 34.34 5 .344 5.8 8
. 31
4 . 83
41
.1461.25 9
.178.25
12
7 . 2 . 2 . 2 7
1
517 .868.1-8768.528431-.6.1 .
2
5 1 - . 86 8 . 3 4 5 - .33
. 6
9
6
1 -
41
.8 3 6 . 6
.14 3 8 27-. .4
60
1. 5
1 2.64.036.363 10
341 4
84413-.84456-01.345.-4 9 - 60
1 9
06.10436.206312.25212979.2.934834.3.3883698.3.46353.4.48318.4.52172.5
4 84.841.831.2157.25 17 .2 5764.4686.681.6141.617-412.517-.6
1 .60831 69-.44 832-.4 27.0
3 .
2
6 9 7. 3.612.121
0
.3 . 6 3
8
. 46 0 1 2
140.620630..521.5.2979..34834..8369..345.8431. .2517.
7
5
25 1 4
. 6 0
1
01 062.3062.3 .15-2.2517-.1521-.83417
6 62 . 12-.345.97 . 869.9 7
5 2 38
04.4036.6312.1297.983.38869..6345.831. 217.
161 2.0 2 . 3
6.1522.152 2.972.917-.2.158 .1 5 2 . 2 5 2 . 92
- .8431.843. 3
45.6. 8.
4 6
39.68696
5'
20 3 .
4 3 179 896454313171
5 2 2 .9 7 .84 3 4
7- 8
6 .
3
98 1 8 4
95 54
25 2. 2.9972.997 243.843689 3..6 3.2517..4
89 4217...84351..34413
6
3..8 3.5
L
.5
29423..97
6'
8
. 4 3 . 8 4 6 8 9 3 .6893 3 4 3
44
5 3 1
1 3
383.4 3.6893.6893.4354.435 4..4 81 4.3 4.3
81 841 77.1171 K
334.8
93 354.4354.3814.381
354..438 1 4
43
7
5 . 1
25.1
7 257.21
4 84.814 .1275.127 14 . 3 8 5 .1275 . 1
2
J
7
4 .275.1275
HH'
525 G
FF'
8
D'
D
9
CC'
9'
10
B'
B
11
A'
A
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (WP(TANK HALF-2))
165
5
--5-5- 555555555
--5-5-5-55-5-5-5- 55555555555 55555555
--55---5-5-5 5-5-5-55-5-5-55 55555 55555555555
5 5- 5
- 5-5
- 5
- 5
-5
5 5
- 5-5
-
55
-55
- - 5 5 55 5555555555555
5 - 5
5555555-5-55-5-55-5-5-5-55-5-5-5-55-55--55--55555555555555555555555555555555555555555
5 5- 5
- -5 5
- 5
- 5
-5-5 5 5 5
5
555555555555 55-55-5-55-5-5-5-5-55555555555555555555555555
5 5555555555555555555555555-5-555--55--555555555555555555555555555555555555555555555555555555555
5555 55 55 55 5555555555555555555555555555555555555555555555555555555555555
5 55555555 55 55 55 555555555555555555555555555555555-5-5555555555
555 55 55 55 55 555555555555555555555555555555-5555-555-5-555555555555
5 5 5 5 5 5 5 5 55 5 555
555555555555 555555555555555555555555 5-5555-5555-55-5555--5555--555555--555-55-55--5555555555555555555555555
5 55 55555555555555555 55 -5 -55 -555-5555-5 5 5 555555 5 5
5 5555 5555 5 555 55555
55 5 5 555 5555 5555 5 - 5 -55--55-55--55-55--555--5555--555555--5555555---555--5555555555555555555555555555555555555555
5555 55 5555 5555555 -5- -5- -5- 5-5- 5-5-5- 5-555-55-555555555555555555 5 5
5 5 5 5 5 - 5 -55--55-55--55-55--55--55--55--555---55--555--555---55---55--55---5555555555555555555555555555555555555555555555555555
555 5 555 - - - 5- 5 - - 5- - 55- 555 5 5 5 5 5 5 5 5
55555 -5-5-5-5-5-55-5- 5-55--5--55-55-55--5--55-55--5- 555555555555555555555555555555555555555555555555555555555555
-55--55-55--55--55--555--55---55--555---55---55--555--555---55---55--55-5- 55555 5555555 5 5 5 5 5555555
- 5-5--5-55-5--5-55-55--5-55-55--5--5-5
- 5-5-5- 5-55-5--5- 5-55--5--5-5 5 5 55 555555555555555555555555555555555555555555555555555555555555
5 5 55 5 5555 55 5 5 5 5 5 5
--5-55-55--5--5-55-55--5--5-5
--55--55--55--555--55---55--5-5 5 555 5555 555555555555555555555555555555555555555555555555555555555555555
5 5 5
--55--55--55--5-5 5 5555555 5555555555555555555555555 55555555555555555555555555555555555555555
--55--5- 5
5 55 55 5 55 55555555555555555555 5 5 5 55555555555555555555555
5 5 55 5 5 55555 5 5555 5555555555555555555-5
55 55 5 5
55 5 55 5555555555555
5 5 5 55555555555-5555--5555--55--55555555
5 5 5 -5
5 5 55
5555555 55 5555555555
5 5 55-55555-55--555--55--55555--55---555555555555555
5 5 5-
-5-5 55-55- 5 55 55
5 - 5- 5 -
55 5555555 555 - 55--555--55555--5555555---555---55---55--55-5555555555555555555555
55 55 5 5 5
5-5-5-5-55-55-5-55 55 5555 5 5 5
5 - 5 --55---55---55---55---55---555--55555-55555555555555555555555555555555
5 5 5 5555 555555555555555 555 55
- 5 --55---55---55---55---55---55--5- 55555555555555555 55
5 - 55-55-55-55-55-55-5 5555555555555 555
- 55--55--55--55--55--55--5- 5555555555555555
5 - 5555555555555
--55---55---55---55---555---55--5 555 555555 5
--55 -55--55--55--55- 5 55555555555
--55 --55--55-5 55
--55 --5 5 555555555555555
5 5555
-5
5 55555555555555 5
55 5 5 5 5
55 555 55 555555 5
55 5 55 5 5
55 555 55 55 55 55 5
55 5 5 5 55 5
55 555 55 55 555 55
5 5
55 55 55 555 555 5
55 55 55 5
55 55 5
5
166
ETABS 17.0.1
555
5 5 55555555555
5 5 5 5 5 555555 5
5 5 55 5 55 5 55 5555555555555555555
5 5 5 5 55 5 5
5 5 55 5 55 5 55 5 55 5 5 5555555555555555555555555
5 5
5 5 5 5 5 5 5 5 5 5 555 5 5
55 5 5 5 555555 5 5
5 5 55 5 55 5 55 5 55 5 5 5 5 55 5 55 555555555555555555555555-555-55
5 55 5- -
5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 5 55 5 55555555555555-55-55-555-55-5
5 55 5 55 5 55 5 55 5 55 5 55 5 55 5 55 5 55 5 55 55555555555555555-55555-55555-555--55-5555--555-5
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 5 555555-5555-555-555-5555-55555-555-55-5
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 5 5 55-55-555-5555-5555-555-555-555-55-5555-5
5 5 5 5 5 5 5 5 5 5 5 5 55 5 55 55 5 -555-5555-55-55-55-5555-5555-5555-55-55-5555-55-5
5 5 5 5 5 5 5 5 5 5 55 5 5 55 5 5-55 -55-5-5- 5-5- 55-5555-5555-555-555-555-55-5
5 5 5 5 5 5 55 5 55 5 5 55 5-55-555-- 5-5-5-55-5- 5-5- 5-55-555-5555- 5555-5--555-55
5 5 5 5 55 5 5 55 5 55 55-5555-55-5-5-55-5- 5-5- 5-5- 5-5- 55-5555--55-55-55--5
5 5 55 5 5 55 5 5 555-5-55-55 -5-5-5- 5-5- 5-5- 5-5- 5-5- 5-55-55-5- 5-555-5
5 5 5 5 5 5 55-55- 5-5- 5-5-5-5-5- -5- -5- -5- 5-5--5- 5-5-5-555-55
5 5 5 5 5 5 555- -5- -5 5-5 5-5 5-5 5-5-5- 5-5-5- 5-5-5--5-5
5 5 5 5 5 5 - -5 5-5 5- 5- -5- -5- -5-5- 5-5-5- 5-5-5-5-
5 5 5 55 5 -5 5- -5- -5- -5 5-5 5-5-5-5- 5-5-5- 5-55-5
555 -5--5-55-5-55-5-55-5--5-55--5--55--55-55--5--55-55--5-
55
5 -5 -5- 5-5- 5-5--5-55-5--5-55-55-5--5-55-5-
-5 -5- 5-5--5-55-5--5-55-55--5--5-55-5-
-5 -5- 5-5-5--5-55-5--5--5-55-5-
-55-5--5-55-55-5--5-55-55-5-
- 5-5-5--5- 5-55-5--5-
- 5-55-5 -5--5- 5-5
- 5- 5-5-5-5-
- 5- 5-5-5
- 5- 5-5
- 5-
-
Y X
Z
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (BL-1)
167
ETABS 17.0.1
5
5 555555 5 5
5 55 5 5
5 5 55 5 55 555555555 555 5
5
5 5 55 5 55 5 55 5 55 555555 555 5 555 5
5 5 5 55 5 5
5 5 55 5 55 5 5 55 5 55 5 55555 5 555 5 555555555 5
5 5 5 5 5 5
5 5 55 5 55 5 5 55 5 55 5 55 5 55 55555555 555 55 5 55555 555555-5
5
5 5 5 5 5 5 5 5 5 5 5555 5 5 5 5 5 -5 -5 5
5 5 55 5 55 5 5 5 5 55 5 55 5 55 5 55 5 55 555555555555 555 555-5555-55--555-555-5
5 5 5 5 5 5 5 55 5 5 55 5 -55 -5 5
5 55 5 5 55 5 55 5 55 5 55 5 55 5 55 55 5 55 55 55 555555555555 55-55-5555--55-5555-55--555-55--5
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 55 5 5 55 5555-555-5-55555-555-555-55-55-55-5
5 5
5 5 5 5 5 5 5 5 5 5 5 5 55 5 5 5 55 5 -5-55-555-55-555-5-5555-5 55-55-5
5 5 5 5 5 5 5 5 5 5 5 55 55 5 5 55 5 5 5-5-5- 5-55-55-555- 5-5555-5-555-55-5
5 5 5 5 5 5 55 5 5 55 5 5 5 55 5 5 55-5- 5-5-5- 5-5-5-5555-55-555-555-555-5-5
5 5 5 5 55 5 5 55 5 5 55 55 5 5 5 -5- 5-5--5-55-5- 5-5 -5-5-5-55555-5--555-555-55
5 5 5 5 5 55 5 5 55 55 5 5 5 5-5 -5- 5-5 -5- 5-5- 5-5 -5-5-5-55-55-5555--5- 5
5 5 55 5 5 5 55 5 5 5 5 -5- 5-5 -5- 5-5-5- -5- 5-5-5-55-5--5--5-55555-5--5
5 5 5 55 5 5 5 55 5 5 -5 -5- 5-5 -5- 5-5 5-5-5- 5-5-5- 5-55-5-5--5-55-5
5 5 5 5 55 5 5 -5- 5-5 -5- 5-5 5- -5- 5-5 5- -5-5- 5- 5-5-5-5-5-5
5 5 5 5 55 - - - 5 - - 55 - - 55 -
5 555
555 -5 -5--55-5 -5-55-5--5-5 -5--55-55--55--5--55--55-55--55--5-5
55 -55-5 -5-5 -5- 5-5 -5-55-5-5--5- 5-55-55-5--5-
5 - -5 5-5 -5- 5-5 -5- 5-55-5-5--5--5- 5-5
-5 -5- 5-5 -5- 5-55-5--5--5--55-55-55-5-
-5 -5- 5-5 -5--5--5-55-55-55-5--5-
-5 -5--5-55-55-5-5--5--5- 5-5
-55-5 -5--5--5--55-55-55-5-
- 5-55-55-5 -5-5--5-
- 5- 5- -5-5 -5
- 5- 5-55-5 -5
- 5- 5- 5-5
- 5- 5-
- 5-
-
Y X
Z
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (BL-2)
168
ETABS 17.0.1
-5-5
-5-5-5-
-5-5-5-5-5-
-5-5-5-5-5-5-5
-5-5-5-5-5-5-5-5-5
-5--5-55--5-55-5--55-5--5-5 5
-5-55-5-5-5--5-5-5-5-5 5 5
-5-5-5-5-5-5-5-5 5 5
5-5-5-5-5-55-5 5 5
5-5--5-5-5 5 5
5-5--5 55 5
5 55
5
5 5555555 5
55 5
5 5 55 5 55555555 55 55
5 5 5 5 5 55 55555 55 5 55 5555 5
5 5 55 5 5 5 5 5
5 5 55 5 5 55 5 55 5 555555 55 55555555555 55
5 5 5 5 5 5 5 5 5 5 55 5555555 5 55555555 55 55
5
5 55 5 5 55 5 5 5 5 5 5
5 5 55 5 5 55 5 5 5 5 55 5 55 5 55555555 55555 555555555 5555 55 555 5
5 5 5
5 5 5 5 5 5 5 5 5 5 5 5 55 5 5 5555555555 55 55555555 555 55555-5--5
5
5
5 5 5 5 55 5 5 5 5 55 5 5 55 5 5 55 55 5555555555 55555555 5555-5--555-55-5
5 55 5 5 55 5 5 55 5 55 5 5 55 55 5 55 55 55 55 55555555555555555555555555-5555--5-555-555--5-55
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 5555555- -5555-5-5555-
5 5 5 5 5 5 5 5 5 5 55 5 5 5 55 55 5 5 5 5 5 5555-555-555-55-5555--5-55-555-5-5
5 5 5 5 5 5 5 5 5 5 5 55 5 5 5 5 55 5 5 - 55 5 -
5--5555-55-55555--55-555555- 55--5-555555-5--55
5 5 5 5 5 5 5 5 5 5 5 55 55 5 5 5 -
5 5 5 5 5 5 5 5 55 55 55 5 5 5 5 5- -5 5- -5555-55-5 555- 5-5 5
5 5 5 5 5 55 55 5 5 5 5 55 5 -5--5-55-5--5-55-5--5555-5555-55--5555-5555-55--55
5 - 5 - 5 - 5- -
5 5 55 5 5 5 5 55 55 5 5 5- -5-5 5- -5 5- -5 5-55-555-55-5-5
5 5 5 55 55 55 5 5 5 5 - 5--5-55-5-5--5-55-5--5-55-5--5--55--5555-5555-55--55
5 5 5 5 5 5 55 5 5 - 5 --
555555 - 5 --5-55-5-5--5-55-5--5-55-5--5--55--55--55--55-55-55--5
5 - 5 - - 5 5 --
55555
5555 - 5--5-55-55 -5--5-55-5-5-55-55-5--5--5--55--55--55--55-5
555 - - 5 5
-5 -5 -5 -5- 5-5 -5- 5-5-5-5--5--5-5-55-55-55-5
55
5 -5 -55 -55 -5 -5--5-55-5--5--55--55-55-55-55--55--55--5-
-5 --5 - 5 -5 -5 5- -5-5-5-5--5--5--5--5-
-5 5- -5 -5- 5-55-55-55-55-5-5-55-5
-5 - 5 -5 -5 -5--5--5- 5-5-5-55-55-
-5 - 5-5 -5 -5 -5-5--5--5--5--5-
-5 - 5-55-55-55-55-55-55-55-5
-5 --5--5--5--5--5--5--5-
-55 -5 -5 -5-5 -55-5
- 5 -5 -55-55 -55-
- 5 -55- 5- 5-
- 5 - 5 - 5-
- 5 - 5-
-5 -
-5
-
Y X
Z
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (BL-3)
169
ETABS 17.0.1
5
555555 5 5
5 5555 5 5
5 55 55 55555 5 55 5 55 5
5
5 5 5 5 55 5 5 5 5 5 5
5 5 55 5 5 55 55555 5 5 5 55 5 55 5 5 5
5 5 5 5
5 5 5 5 5 5 55 5 5 5 5 5 5 5 5
5 5 55 5 5 5 55 5 5 555555 55 5 5 5 5 55 5 55 5 5 55 5
5 5 5 5
5 5 5 5 5 5 5 5 55555 5 5 5 5 5 5 5 5 5 5 5
5 5 55 55 5 5 55 5 5 55 55 5 555555 55 55 55 5 55 5 5 55 5 55 5 5 55 5 5 5
5 5 5 5 55 5 5 5
5 5 55 55 5 5 55 5 5 5 55 55 55 5 55555 55 55 55 55 5 55 5 5 55 5 55 5 5 55 5 5 55
5 5 5 5
5 5 5 5 5 55 5 5 5 55 55 5 5 5 5 555555 555 55 55 5 5 55 55 5 5 5 5 55 5 5 55 55 55
5 55 5 5 5 5 5 5 5 5 55 55 55 55 5 5 5 5 5 55 55 5 5 5 5 5 5 5 5 555 5
5 5 5 5 55 55 5555 5 55 5 5 5 5 5 55 5 5 5 5 5 5 555 5
5 5 5 5 55 55 55 5 5 5 5 5 5 5 55 55 55 55 5 5 55 55 5 555 55 55 5 5
5 5 5 5 5 5 5 55 55 55 55 5 5 55 55 55 55 5 5 5 555 5 555 5 5
5 5 5 5 5 55555 5 55 55 55 55 555 5 5 55 5 5
5 55 55 55 55 55 55 55 5
5 555555 5 5 555 555 55 55 55 5555 55
5 5 55 5
5 55555
5 5555 5 5 5 55 55 5 555 55 55 555 55 55
5 555 555 5 555
5 55
5 5 5 5 5 5 55 55 5 5 5 55 55 55 55 55
5 555 5 5 5 5 555 5
5
5 5 5 5 5 5 55 55 5 5 5 5 55 55 55 55 5
55555 55 55
5 5 5 5 5 5 55 5 5 55 55 55 55 55 55 5
5 5 5 5 5 5 5 5 55 55 5 5 5 5 5
5 5 5 5 5 5 5 5 5 5 5 5 55 5
5 5 5 5 5 5 5 5 5 5 55 55
5 5 5 5 5 5 5 5 55 55 5
5 5 5 5 5 5 5 55 5 5
5 5 5 5 5 55 55 5 5
5 5 5 55 55 5 5 5
5 5 55 5 5 55 5
5 55 5 5 5
Y 55555 X
Z555 55 55 5
55
5
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Uniform Loads Local-3 (BL-4)
170
Project : 132/11 KV SHKZBHST S/S
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV
171
CLIENT: PROJECT:
132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: Consultant:
DANWAY
DOC NO:STRU-C-15-317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
172
CLIENT: PROJECT:
132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: Consultant:
DANWAY
DOC NO:STRU-C-15-317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
TABLE: Shell Sections ‐ Wall
Element
Name Material Type Thickness
mm
Shell‐
RW‐250‐C40 C‐40/32 Thin 250
Shell‐
RW‐300‐C40 C‐40/32 Thin 300
TABLE: Shell Sections ‐ Slab
Slab Element Slab
Name Material Type Type Thickness
mm
200 THK C‐40/32 Uniform Shell‐Thin 200
250 THK C‐40/32 Uniform Shell‐Thin 250
250 thk
Landing C‐40/32 Uniform Shell‐Thin 250
400 thk C‐40/32 Uniform Shell‐Thin 400
PC 200 THK C‐40/32 Uniform Shell‐Thin 200
173
CLIENT: PROJECT:
132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: Consultant:
DANWAY
DOC NO:STRU-C-15-317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
TABLE: Concrete Beam Rebar Data
Frame Property Long. Rebar Material Tran. Rebar Material Top Cover Bottom Cover
mm mm
FB‐300x500 Fy‐460 Fy‐420 75 75
FB‐300x600 Fy‐460 Fy‐420 75 75
FB‐300x700 Fy‐460 Fy‐420 75 75
FB‐300x750 Fy‐460 Fy‐420 75 75
FB‐300x800 Fy‐460 Fy‐420 75 75
FB‐400x1200 Fy‐460 Fy‐420 75 75
FB‐400x1650 Fy‐460 Fy‐420 75 75
FB‐400x600 Fy‐460 Fy‐420 75 75
FB‐400x700 Fy‐460 Fy‐420 75 75
FB‐400x750 Fy‐460 Fy‐420 75 75
FB‐400X800 Fy‐460 Fy‐420 75 75
FB‐450x600 Fy‐460 Fy‐420 75 75
FB‐450x800 Fy‐460 Fy‐420 75 75
GB‐300x500 Fy‐460 Fy‐420 75 75
GB‐300x550 Fy‐460 Fy‐420 75 75
GB‐300x600 Fy‐460 Fy‐420 75 75
GB‐300x700 Fy‐460 Fy‐420 75 75
GB‐400x600 Fy‐460 Fy‐420 75 75
GB‐400x700 Fy‐460 Fy‐420 75 75
GB‐400x750 Fy‐460 Fy‐420 75 75
RB‐300x500 Fy‐460 Fy‐420 75 75
RB‐300x600 Fy‐460 Fy‐420 75 75
RB‐300x700 Fy‐460 Fy‐420 75 75
RB‐400x1200 Fy‐460 Fy‐420 75 75
RB‐400x600 Fy‐460 Fy‐420 75 75
RB‐400x700 Fy‐460 Fy‐420 75 75
RB‐400x750 Fy‐460 Fy‐420 75 75
RB‐400x800 Fy‐460 Fy‐420 75 75
RB‐450x600 Fy‐460 Fy‐420 75 75
RB‐470x600 Fy‐460 Fy‐420 75 75
174
CLIENT: PROJECT:
132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: Consultant:
DANWAY
DOC NO:STRU-C-15-317 Prepared by Checked by Approved by
Date:11/06/2022 SRI ASV VRP
TABLE: Concrete Column Rebar Data
Frame Property Long. Rebar Material Tran. Rebar Material Cover
mm
C‐1400X400 Fy‐460 Fy‐420 50
C‐1400X400‐75mm Fy‐460 Fy‐420 75
C‐300X500 Fy‐460 Fy‐420 50
C‐300X500‐75mm Fy‐460 Fy‐420 75
C‐400x400 Fy‐460 Fy‐420 50
C‐400x400‐75mm Fy‐460 Fy‐420 75
C‐400x450 Fy‐460 Fy‐420 50
C‐400X500 Fy‐460 Fy‐420 50
C‐400X500‐75mm Fy‐460 Fy‐420 75
C‐400x600 Fy‐460 Fy‐420 50
C‐400x600‐75mm Fy‐460 Fy‐420 75
C‐400X600.. Fy‐460 Fy‐420 50
C‐400X600..75mm Fy‐460 Fy‐420 75
C‐450X600 Fy‐460 Fy‐420 50
C‐450X600‐75mm Fy‐460 Fy‐420 75
C‐500x600 Fy‐460 Fy‐420 50
C‐500x600‐75mm Fy‐460 Fy‐420 75
C‐500X700 Fy‐460 Fy‐420 50
C‐500X750 Fy‐460 Fy‐420 50
C‐550X800 Fy‐460 Fy‐420 50
C‐550X800‐75mm Fy‐460 Fy‐420 75
C‐600X500 Fy‐460 Fy‐420 50
C‐600X500‐75mm Fy‐460 Fy‐420 75
C‐600x600 Fy‐460 Fy‐420 50
C‐600x700 Fy‐460 Fy‐420 50
C‐600x800 Fy‐460 Fy‐420 50
C‐600x800‐75mm Fy‐460 Fy‐420 75
C600X750 Fy‐460 Fy‐420 50
175
Project : 132/11 KV SHKZBHST S/S
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV
176
END USER: PROJECT: 132/11 kV SHEIK ZAYED BIN HAMDAN STREET SUBSTATION
Contractor: DANWAY Consultant: EPE
DOC NO: STRU‐C‐15‐317 Prepared by Checked by Approved by
Date: 13/06/2022 SRI ASV VRP
TABLE: Base Reactions
Load
Case/Comb FX FY FZ MX MY MZ X Y Z
o
kN kN kN kN‐m kN‐m kN‐m m m m
1316922.46
DL 0 0 64755.8665 ‐1747850 0 0 0 ‐3.8
9
768653.417
LL ‐517.1519 ‐469.2762 36458.0432 ‐1011150 10821.3851 0 0 ‐3.8
3
912066.897
SDL 0 0 44194.2094 ‐1294287 0 0 0 ‐3.8
5
SP ‐185.8048 184.0706 0 ‐289.6465 ‐288.1526 9940.6782 0 0 ‐3.8
BL‐1 ‐327.239 78.822 0 ‐548.6011 ‐3079.319 10945.512 0 0 ‐3.8
‐
‐ 232439.623
EQX 0 0 0 138668.916 0 0 ‐3.8
11170.3601 5
4
‐
‐ 138668.916
EQY 0 0 0 331642.186 0 0 ‐3.8
11170.3601 4
7
‐
WL +X ‐1765.587 0 0 0 32546.8806 0 0 ‐3.8
25268.1683
‐
WL +Y 0 ‐1958.8042 0 24791.7026 0 0 0 ‐3.8
39114.7134
BL‐2 ‐314.4671 80.214 0 ‐558.2894 ‐2959.8542 7849.8441 0 0 ‐3.8
BL‐3 ‐321.1561 126.833 0 ‐1000.811 ‐3021.3598 5186.737 0 0 ‐3.8
CR‐1 ‐77 ‐77 770 18451.9485 ‐17763.2 68.8748 0 0 ‐3.8
CR‐2 77 ‐77 770 18451.9485 ‐11797.1 ‐3024.9048 0 0 ‐3.8
‐
SPS ‐142.8251 150.5845 1643.8799 22803.2898 7791.859 0 0 ‐3.8
20988.9399
‐
‐ 250658.391
EQX(+ecc) 0 0 0 138668.916 0 0 ‐3.8
11170.3601 8
4
‐
‐ 214220.855
EQX(‐ecc) 0 0 0 138668.916 0 0 ‐3.8
11170.3601 1
4
‐
‐ 138668.916
EQY(+ecc) 0 0 0 344742.683 0 0 ‐3.8
11170.3601 4
7
‐
‐ 138668.916
EQY(‐ecc) 0 0 0 318541.689 0 0 ‐3.8
11170.3601 4
6
LLR 0 0 320.3483 7657.1685 ‐8194.8297 0 0 0 ‐3.8
‐
WP(TANK
‐0.3293 1272.4511 4030.0991 18332.2045 173020.944 54617.1196 0 0 ‐3.8
FULL)
8
WP(TANK ‐
‐0.3301 ‐0.1689 1956.4241 21624.4104 ‐3.7169 0 0 ‐3.8
HALF‐1) 83996.1427
WP(TANK
0.0008 0.3366 2073.675 12651.7363 ‐89024.802 14.2296 0 0 ‐3.8
HALF‐2)
BL‐4 ‐338.971 0 0 0 ‐3189.7171 1560.9601 0 0 ‐3.8
‐
BL ‐1301.8332 673.444 0 ‐5754.7824 27335.5887 0 0 ‐3.8
12250.2501
177
Loads
Exposure Parameters
15 α
178
Loads
Lateral Load t
19.3769kN
Staircase Headroom +16.7 m
221.7037kN
ROOF 13.300
9.8m lvl
183.9939kN
FF @ 7.500 m lvl
82.627kN
4.9m lvl
127.2852kN
GF +1.420 m
0.4m lvl36.3068kN
FPR GF
Base
0 80 160 240
Force, kN
Staircase
Headroom 16.7 19.3769 0
+16.7 m
ROOF
13.3 221.7037 0
13.300
9.8m lvl 9.8 0 0
FF @
7.500 m 7.5 183.9939 0
lvl
4.9m lvl 4.9 82.627 0
GF
1.42 127.2852 0
+1.420 m
0.4m lvl 0.4 0 0
FPR GF -0.4 36.3068 0
Base -3.8 0 0
179
Loads
Exposure Parameters
15 α
180
Loads
Lateral Load t
ROOF 13.300
177.7264kN
9.8m lvl
FF @ 7.500 m lvl
105.2343kN
4.9m lvl
102.5613kN
GF +1.420 m
107.1043kN
0.4m lvl
FPR GF
19.8258kN
Base
0 60 120 180
Force, kN
Staircase
Headroom 16.7 0 33.4998
+16.7 m
ROOF
13.3 0 177.7264
13.300
9.8m lvl 9.8 0 0
FF @
7.500 m 7.5 0 105.2343
lvl
GF
1.42 0 107.1043
+1.420 m
0.4m lvl 0.4 0 0
FPR GF -0.4 0 19.8258
Base -3.8 0 0
181
Loads
Direction = X
Eccentricity Ratio = 0% for all diaphragms
Structural Period
182
Loads
Lateral Load t
167.8767kN
Staircase Headroom +16.7 m
4443.4649kN
ROOF 13.300
670.9kN
9.8m lvl
3075.9974kN
FF @ 7.500 m lvl
535.0046kN
4.9m lvl
1630.8055kN
GF +1.420 m
538.4034kN
0.4m121.0663kN
lvl
FPR GF
Base
Staircase
Headroom 16.7 167.8767 0
+16.7 m
ROOF
13.3 4443.4649 0
13.300
9.8m lvl 9.8 670.9 0
FF @
7.500 m 7.5 3075.9974 0
lvl
GF
1.42 1630.8055 0
+1.420 m
Base -3.8 0 0
183
Loads
Direction = Y
Eccentricity Ratio = 0% for all diaphragms
Structural Period
184
Loads
Lateral Load t
ROOF 13.300
4443.4649kN
9.8m lvl
670.9kN
FF @ 7.500 m lvl
3075.9974kN
4.9m lvl
535.0046kN
GF +1.420 m
1630.8055kN
0.4m lvl
538.4034kN
FPR GF
121.0663kN
Base
Staircase
Headroom 16.7 0 167.8767
+16.7 m
ROOF
13.3 0 4443.4649
13.300
9.8m lvl 9.8 0 670.9
FF @
7.500 m 7.5 0 3075.9974
lvl
GF
1.42 0 1630.8055
+1.420 m
Base -3.8 0 0
185
Loads
Direction = X + Eccentricity Y
Eccentricity Ratio = 5% for all diaphragms
Structural Period
186
Loads
Lateral Load t
167.8767kN
Staircase Headroom +16.7 m
4443.4649kN
ROOF 13.300
670.9kN
9.8m lvl
3075.9974kN
FF @ 7.500 m lvl
535.0046kN
4.9m lvl
1630.8055kN
GF +1.420 m
538.4034kN
0.4m121.0663kN
lvl
FPR GF
Base
Staircase
Headroom 16.7 167.8767 0
+16.7 m
ROOF
13.3 4443.4649 0
13.300
9.8m lvl 9.8 670.9 0
FF @
7.500 m 7.5 3075.9974 0
lvl
GF
1.42 1630.8055 0
+1.420 m
Base -3.8 0 0
187
Loads
Direction = X - Eccentricity Y
Eccentricity Ratio = 5% for all diaphragms
Structural Period
188
Loads
Lateral Load t
167.8767kN
Staircase Headroom +16.7 m
4443.4649kN
ROOF 13.300
670.9kN
9.8m lvl
3075.9974kN
FF @ 7.500 m lvl
535.0046kN
4.9m lvl
1630.8055kN
GF +1.420 m
538.4034kN
0.4m121.0663kN
lvl
FPR GF
Base
Staircase
Headroom 16.7 167.8767 0
+16.7 m
ROOF
13.3 4443.4649 0
13.300
9.8m lvl 9.8 670.9 0
FF @
7.500 m 7.5 3075.9974 0
lvl
GF
1.42 1630.8055 0
+1.420 m
Base -3.8 0 0
189
Loads
Direction = Y + Eccentricity X
Eccentricity Ratio = 5% for all diaphragms
Structural Period
190
Loads
Lateral Load t
ROOF 13.300
4443.4649kN
9.8m lvl
670.9kN
FF @ 7.500 m lvl
3075.9974kN
4.9m lvl
535.0046kN
GF +1.420 m
1630.8055kN
0.4m lvl
538.4034kN
FPR GF
121.0663kN
Base
Staircase
Headroom 16.7 0 167.8767
+16.7 m
ROOF
13.3 0 4443.4649
13.300
9.8m lvl 9.8 0 670.9
FF @
7.500 m 7.5 0 3075.9974
lvl
GF
1.42 0 1630.8055
+1.420 m
Base -3.8 0 0
191
Loads
Direction = Y - Eccentricity X
Eccentricity Ratio = 5% for all diaphragms
Structural Period
192
Loads
Lateral Load t
ROOF 13.300
4443.4649kN
9.8m lvl
670.9kN
FF @ 7.500 m lvl
3075.9974kN
4.9m lvl
535.0046kN
GF +1.420 m
1630.8055kN
0.4m lvl
538.4034kN
FPR GF
121.0663kN
Base
Staircase
Headroom 16.7 0 167.8767
+16.7 m
ROOF
13.3 0 4443.4649
13.300
9.8m lvl 9.8 0 670.9
FF @
7.500 m 7.5 0 3075.9974
lvl
GF
1.42 0 1630.8055
+1.420 m
Base -3.8 0 0
193
Analysis Results 13-06-2022
1 Analysis Results
This chapter provides analysis results.
1.1 Structure Results
Table 1.1 - Diaphragm Center of Mass Displacements
Load UX UY RZ X Y Z
Story Diaphragm Point
Case/Combo mm mm rad m m m
Staircase Headroom +16.7 m D1 ULS(SESIMIC) Max 7.292 5.115 9.2E-05 17070 36.0603 41.064 16.7
Staircase Headroom +16.7 m D1 ULS(SESIMIC) Min -5.992 -4.727 -6.1E-05 17070 36.0603 41.064 16.7
Staircase Headroom +16.7 m D2 ULS(SESIMIC) Max 5.161 5.585 0.000102 17071 36.0568 1.6206 16.7
Staircase Headroom +16.7 m D2 ULS(SESIMIC) Min -3.613 -3.57 -0.000112 17071 36.0568 1.6206 16.7
ROOF 13.300 D3 ULS(SESIMIC) Max 5.845 4.303 0.000219 17072 30.4178 20.9528 13.3
ROOF 13.300 D3 ULS(SESIMIC) Min -4.281 -3.157 -0.000184 17072 30.4178 20.9528 13.3
FF @ 7.500 m lvl D3 ULS(SESIMIC) Max 4.534 2.97 8.9E-05 17073 36.5108 22.6997 7.5
FF @ 7.500 m lvl D3 ULS(SESIMIC) Min -2.894 -3.076 -6.3E-05 17073 36.5108 22.6997 7.5
FF @ 7.500 m lvl D4 ULS(SESIMIC) Max 4.2 3.328 7.5E-05 17074 43.7248 8.2402 6.7
FF @ 7.500 m lvl D4 ULS(SESIMIC) Min -2.653 -3.98 -9.3E-05 17074 43.7248 8.2402 6.7
4.9m lvl D5 ULS(SESIMIC) Max 0.297 0.132 1.3E-05 17075 17.1537 35.8048 4.9
4.9m lvl D5 ULS(SESIMIC) Min -0.232 -0.28 -2.5E-05 17075 17.1537 35.8048 4.9
4.9m lvl D6 ULS(SESIMIC) Max -0.027 0.222 0.000101 17076 10.5436 4.6039 3
4.9m lvl D6 ULS(SESIMIC) Min -0.441 -0.062 6E-06 17076 10.5436 4.6039 3
4.9m lvl D7 ULS(SESIMIC) Max 1.773 1.517 0.000208 17077 41.545 1.775 4
4.9m lvl D7 ULS(SESIMIC) Min -1.292 -2.014 -0.000226 17077 41.545 1.775 4
GF +1.420 m D8 ULS(SESIMIC) Max 0.27 0.322 7E-06 17078 29.3746 21.7888 1.42
GF +1.420 m D8 ULS(SESIMIC) Min -0.346 -0.343 -8E-06 17078 29.3746 21.7888 1.42
FPR GF D9 ULS(SESIMIC) Max 0.175 0.136 7E-06 17079 42.8895 6.8236 -0.4
FPR GF D9 ULS(SESIMIC) Min -0.172 -0.141 -2.1E-05 17079 42.8895 6.8236 -0.4
194
Analysis Results 13-06-2022
1 Analysis Results
This chapter provides analysis results.
1.1 Story Results
Table 1.1 - Story Drifts
Load X Y Z
Story Direction Drift Label
Case/Combo m m m
Staircase Headroom +16.7 m ULS(SESIMIC) Max X 0.000435 7249 38.7496 42.7 16.7
Staircase Headroom +16.7 m ULS(SESIMIC) Max Y 0.000378 7806 34.2912 2.95 16.7
Staircase Headroom +16.7 m ULS(SESIMIC) Min X 0.000392 384 39.245 42.7 16.7
Staircase Headroom +16.7 m ULS(SESIMIC) Min Y 0.000353 300 34.655 42.7 16.7
ROOF 13.300 ULS(SESIMIC) Max X 0.002735 4848 12.365 19.7994 13.3
ROOF 13.300 ULS(SESIMIC) Max Y 0.001674 4451 42.92 8.65 13.3
ROOF 13.300 ULS(SESIMIC) Min X 0.001229 77 12.365 31.63 13.3
ROOF 13.300 ULS(SESIMIC) Min Y 0.001255 4451 42.92 8.65 13.3
9.8m lvl ULS(SESIMIC) Max X 0.000856 4806 46.595 6.1 9.8
9.8m lvl ULS(SESIMIC) Max Y 0.004566 359 2.845E-06 0.56 9.8
9.8m lvl ULS(SESIMIC) Min X 0.00181 378 12.365 19.225 9.8
9.8m lvl ULS(SESIMIC) Min Y 0.004491 376 1.15 31.63 9.8
FF @ 7.500 m lvl ULS(SESIMIC) Max X 0.001403 393 26.025 34.065 7.5
FF @ 7.500 m lvl ULS(SESIMIC) Max Y 0.003809 361 2.845E-06 8.65 7.5
FF @ 7.500 m lvl ULS(SESIMIC) Min X 0.001703 380 12.365 34.065 7.5
FF @ 7.500 m lvl ULS(SESIMIC) Min Y 0.003801 359 2.845E-06 0.56 7.5
4.9m lvl ULS(SESIMIC) Max X 0.000586 370 39.245 3.55 4.9
4.9m lvl ULS(SESIMIC) Max Y 0.002756 376 1.15 31.63 4.9
4.9m lvl ULS(SESIMIC) Min X 0.000396 370 39.245 3.55 4.9
4.9m lvl ULS(SESIMIC) Min Y 0.002925 359 2.845E-06 0.56 4.9
GF +1.420 m ULS(SESIMIC) Max X 0.000861 1558 46.595 35.5423 1.42
GF +1.420 m ULS(SESIMIC) Max Y 0.001184 3285 3.6813 31.63 1.42
GF +1.420 m ULS(SESIMIC) Min X 0.000713 4143 9.25 35.0363 1.42
GF +1.420 m ULS(SESIMIC) Min Y 0.001288 3990 2.9211 0.56 1.42
0.4m lvl ULS(SESIMIC) Max X 0.000713 8 39.245 2.95 0.4
0.4m lvl ULS(SESIMIC) Max Y 0.000632 416 6.655 16.31 0.4
0.4m lvl ULS(SESIMIC) Min X 0.000316 8 39.245 2.95 0.4
0.4m lvl ULS(SESIMIC) Min Y 0.000758 7017 42.675 13.46 0.4
FPR GF ULS(SESIMIC) Max X 5.9E-05 368 46.595 8.65 -0.4
FPR GF ULS(SESIMIC) Max Y 6.6E-05 6687 39.245 4.23 -0.4
FPR GF ULS(SESIMIC) Min X 9.9E-05 7656 46.595 6.95 -0.4
FPR GF ULS(SESIMIC) Min Y 0.000101 373 39.245 -4.09E-06 -0.4
195
132 kV SHEIK ZAYED BINHAMDAN STREET Base Pressure Check For SLS Sesimic 07-03-2018 08:25
-20
K
-40
J
-59
H'
H
-79
G
-98
-118
F'
F
-137
E -157
D' -176
D -196
-215
C'
C
-235
-254
B'
Y
B -274
A'
X A
196
132 kV SHEIK ZAYED BINHAMDAN STREET
Base Pressure Check For SLS Gravity 07-03-2018 08:23
-50
K
-73
J
-96
H'
H
-119
G
-142
-165
F'
F
-188
E -212
D' -235
D -258
-281
C'
C
-304
-327
B'
Y
B -350
A'
X A
197
Base Pressure Check For Up Lift
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 08:27
-15
K
-22
J
-28
H'
H
-35
G
-41
-48
F'
F
-54
E -61
D' -67
D -74
-80
C'
C
-87
-93
B'
Y
B -100
A'
X A
198
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 08:20
-1.5
K
-2.9
J
-4.3
H'
H
-5.8
G
-7.2
-8.6
F'
F
-10.0
E -11.5
D' -12.9
D -14.3
-15.7
C'
C
-17.2
-18.6
B'
Y
B -20.0
A'
X A
199
Project : 132/11 KV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Title : MAIN BUILDING-SUBSTRUCTURE ASV MMN 14-06-2022
Maximum actual bearing pressure observed from the analysis model = 274 kN/m2
Allowable Net Bearing Pressure as per soil investigation report = 350 kN/m2
Maximum actual bearing pressure observed from the analysis model = 350 kN/m2
Allowable Gross Bearing Pressure for Seismic load cases 1.25*350 = 438 kN/m2
> Actual, Hence Safe
200
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : Main Building Substructure SRI ASV
201
Project : 132/11 KV SHKZBHST S/S
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : Main Building Substructure SRI ASV
202
Project : 13211 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
RAFT DESIGN
Raft is used as foundation for this substation. 700 mm thick is provided beneath main building
and 400 mm thk provided beneath transformer area respectively. Main building raft comprises of 132kV basement,
11 kV-1 & 2 & capacitor basements. Transformer area consists of power transformer-1,2 & 3
The raft is designed for all ultimate load combinations defined in this document and checked
for 0.2 mm crackwidh for service loads. The contours are taken for envelope of all ultimate load combinations.
and service load combinations.
Raft is designed for moments and shear in two orthogonal directions, i.e. along Global X.& Y axes of ETABS.
The local-1,2 & 3 axes are consistent throughout the model so as to use results from contours for raft
design with ease. The local axes for all raft shells is as follows:
a) Local-1: This axis is in the plane of the area object. The positive local-1 axis is in the same direction as
the positive global X-axis This axis is red in color.
b) Local-2: This axis is in the plane of the area object. The positive local-2 axis is in the same direction as
the positive global Y-axis This axis is green in color.
c) Local-3: This axis is perpendicular to the plane of the area object. The positive local-3 axis is in the
same direction as the positive global Z-axis, This axis is blue in color.
The shell elements for raft design are designed for moments and shear forces in two orthogonal directions,
those are as follows:
a) M11 : Moment per unit length acting at mid-surface of the element on the positive and negative 1-faces
about local-2 axis.
b) M22 : Moment per unit length acting at mid-surface of the element on the positive and negative 2-faces
about local-1 axis.
c) V13 : Out of plane shear per unit length acting at mid-surface of the element on the positive and
negative 1-faces in the direction of local-3 axis.
d) V23 : Out of plane shear per unit length acting at mid-surface of the element on the positive and
negative 2-faces in the direction of local-3 axis.
A positive face is one whose outward normal (pointing away from element) is in the positive local-1
,local-2 or local-3 direction.
As mentioned earlier raft is designed for M11 moment and M22 moment, reinforcement for M11 is parallel to
Global-X axis and reinforcement for M22 is parallel to Global-Y axis. The positive moment value indicates
tension in bottom face of raft i.e. negative-3 face of ETABS raft shell. Whereas negative moment indicates
tension in top face of raft i.e. positive-3 face of Etabs raft shell.
203
Project : 13211 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Reinforcement Calculations
Reinforcement calculations for RCC elements is done as per ACI 318 with following design parameters:
Minimum reinforcement in slabs as per ACI318-14 = 0.18% of concrete area*(420/460) (ref TB:7.6.1.1)
For 700 thick raft = 1150 mm2/m
For 400 thick raft = 657 mm2/m
204
Project : 13211 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
16 @ 150 is used as general mesh for top and bottom faces of raft. As per provided reinforcement moment
capacities are calculated for various reinforcement combinations. Extra bar locations are identified with the help of
calculated capacities and moment contours. Moment capacities are tabulated in the next section
Moment capacities for 700 mm thick Raft satisfying Ultimate limit state criteria for bottom mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. (mm2/m)
Capacity
Description Type
(kN-m/m)
0.20 mm Crackwidth
Moment capacities for 700 mm thick Raft satisfying Ultimate limit state criteria for top mesh
Reinforcement Reinforcement Area of reinforcement Moment Capacity
S.No.
Description Type (mm2/m) (kN-m/m)
1 16 @ 150 Main 1340 330
2 16 @ 150 Secondary 1340 300
Moment capacities for 400 mm thick Raft satisfying Ultimate limit state criteria & servicebility for bottom mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. (mm2/m)
Capacity
Description Type
(kN-m/m)
0.2 mm Crackwidth
Moment capacities for 400 mm thick Raft satisfying Ultimate limit state & Servicebility criteria for top mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. (mm2/m)
Capacity
Description Type
(kN-m/m)
0.15mm Crackwidth
205
Project : 132/11 KV SHKZBHST S/S DOC. NO.
Rn = Mu / (Ø b d2) = 0.96
Rn = Mu / (Ø b d2) = 0.95
206
Project : 132/11 KV SHKZBHST S/S DOC. NO.
Rn = Mu / (Ø b d2) = 2.41
Rn = Mu / (Ø b d2) = 2.51
207
Project : 132/11 KV SHKZBHST S/S DOC. NO.
Rn = Mu / (Ø b d2) = 3.11
Rn = Mu / (Ø b d2) = 3.22
208
Project : 132/11 KV SHKZBHST S/S DOC. NO.
Rn = Mu / (Ø b d2) = 4.49
Rn = Mu / (Ø b d2) = 4.58
209
Project : 132/11 KV SHKZBHST S/S DOC. NO.
Rn = Mu / (Ø b d2) = 0.89
Rn = Mu / (Ø b d2) = 0.85
210
Project : 132/11 KV SHKZBHST S/S DOC. NO.
Rn = Mu / (Ø b d2) = 1.83
Rn = Mu / (Ø b d2) = 1.84
211
Project : 13211 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Rn = Mu / (Ø b d2) = 3.02
212
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of bottom main reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 179.85 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 94.81 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
213
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of bottom secondary reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 157.63 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 105.36 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
214
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of bottom main reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 58.09 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 241.67 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 69.909 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
215
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of bottom secondary reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 58.09 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 194.45 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 83.853 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
216
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of bottom main reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 78.02 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 225.92 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 70.967 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.187 mm Eqn 1-2 ACI 224.1-R-8
SAFE
217
Project : 132/11 kV SHKZBHST SUBSTATION
DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of bottom secondary reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 78.02 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 188.72 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 84.972 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
218
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of bottom main reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --
h
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 113.35 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 220.16 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 72.459 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
219
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of bottom secondary reinforcement of 700 mm thick Raft satisfying 0.20 mm crackwidth --
h
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 113.35 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 208.93 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 72.459 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.194 mm Eqn 1-2 ACI 224.1-R-8
SAFE
220
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Rn = Mu / (Ø b d2) = 1.66
Rn = Mu / (Ø b d2) = 1.92
221
Project : 13211 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Rn = Mu / (Ø b d2) = 3.54
Rn = Mu / (Ø b d2) = 6.07
222
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Rn = Mu / (Ø b d2) = 1.52
Rn = Mu / (Ø b d2) = 1.73
223
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Rn = Mu / (Ø b d2) = 3.04
Rn = Mu / (Ø b d2) = 3.47
224
Project : 132/11 kV SHKZBHST SUBSTATION
DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of bottom main reinforcement of 400 mm thick Raft satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 159.04 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 94.81 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
225
Project : 132/11 kV SHKZBHST SUBSTATION
DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of bottom secondary reinforcement of 400 mm thick Raft satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 135.61 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 105.36 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
226
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of bottom main reinforcement of 400 mm thick Raft satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 45.34 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 214.06 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 69.067 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
227
Project : 13211 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of bottom secondary reinforcement of 400 mm thick Raft satisfying 0.20 mm crackwidth --
cmin
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 78.02 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
sqrt[dc2+(s/2)2] = 84.97 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
228
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of top main reinforcement of 400 mm thick Raft satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 128.96 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 94.81 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE
229
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of top secondary reinforcement of 400 mm thick Raft satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 110.11 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 105.36 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE
230
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of top main reinforcement of 400 mm thick Raft satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 45.34 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 174.44 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 69.067 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE
231
Project : 132/11 kV SHKZBHST SUBSTATION
DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Moment capacity of top secondary reinforcement of 400 mm thick Raft satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 45.34 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress Mu/ Ast ∗z = 136.86 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 82.959 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE
232
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
233
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.65
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 1.50
1.35
1.20
J
H'
H
1.05
G
0.90
F'
F
0.75
0.60
E
D'
0.45
0.30
C'
C
0.15
0.00
B'
B
Y
A' -0.15
X A
-0.30
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m
234
132 kV SHEIK ZAYED BINHAMDAN STREET
820
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 782
745
707
J
H'
H
669
G
632
F'
F
594
556
E
D'
518
481
C'
C
443
405
B'
B
Y
A' 368
X A
330
T20 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for ULS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m
235
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.05
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 1.03
1.01
1.00
J
H'
H
0.98
G
0.96
F'
F
0.94
0.93
E
D'
0.91
0.89
C'
C
0.87
0.86
B'
B
Y
A' 0.84
X A
0.82
T25 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for ULS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m
236
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.50
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 1.47
1.43
1.40
J
H'
H
1.36
G
1.33
F'
F
1.29
1.26
E
D'
1.22
1.19
C'
C
1.15
1.12
B'
B
Y
A' 1.08
X A
1.05
T32 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for ULS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m
237
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.60
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 1.59
1.58
1.58
J
H'
H
1.57
G
1.56
F'
F
1.55
1.55
E
D'
1.54
1.53
C'
C
1.52
1.52
B'
B
Y
A' 1.51
X A
1.50
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m
238
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
2.20
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 2.00
1.80
1.60
J
H'
H
1.40
G
1.20
F'
F
1.00
0.80
E
D'
0.60
0.40
C'
C
0.20
0.00
B'
B
Y
A' -0.20
X A
-0.40
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m
239
132 kV SHEIK ZAYED BINHAMDAN STREET
800
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 762
725
687
J
H'
H
649
G
612
F'
F
574
536
E
D'
498
461
C'
C
423
385
B'
B
Y
A' 348
X A
310
T20 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for ULS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m
240
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.00
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 0.98
0.97
0.95
J
H'
H
0.94
G
0.92
F'
F
0.91
0.89
E
D'
0.88
0.86
C'
C
0.85
0.83
B'
B
Y
A' 0.82
X A
0.80
T25@ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for ULS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m
241
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.45
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 1.42
1.38
1.35
J
H'
H
1.31
G
1.28
F'
F
1.24
1.21
E
D'
1.17
1.14
C'
C
1.10
1.07
B'
B
Y
A' 1.03
X A
1.00
T32 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for ULS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m
242
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.50
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 1.50
1.49
1.49
J
H'
H
1.48
G
1.48
F'
F
1.48
1.47
E
D'
1.47
1.47
C'
C
1.46
1.46
B'
B
Y
A' 1.45
X A
1.45
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m
243
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.05
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 0.90
0.75
0.60
J
H'
H
0.45
G
0.30
F'
F
0.15
0.00
E
D'
-0.15
-0.30
C'
C
-0.45
-0.60
B'
B
Y
A' -0.75
X A
-0.90
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Min [kN-m/m] kN - m
244
132 kV SHEIK ZAYED BINHAMDAN STREET
-330
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M -357
-384
-411
J
H'
H
-438
G
-465
F'
F
-492
-518
E
D'
-545
-572
C'
C
-599
-626
B'
B
Y
A' -653
X A
-680
T16 @ 150 mm c/c(Top main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for ULS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Min [kN-m/m] kN - m
245
132 kV SHEIK ZAYED BINHAMDAN STREET
-680
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M -685
-691
-696
J
H'
H
-702
G
-707
F'
F
-712
-718
E
D'
-723
-728
C'
C
-734
-739
B'
B
Y
A' -745
X A
-750
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Min [kN-m/m] kN - m
246
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.00
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 0.80
0.60
0.40
J
H'
H
0.20
G
0.00
F'
F
-0.20
-0.40
E
D'
-0.60
-0.80
C'
C
-1.00
-1.20
B'
B
Y
A' -1.40
X A
-1.60
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Min [kN-m/m] kN - m
247
132 kV SHEIK ZAYED BINHAMDAN STREET
-300
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M -327
-354
-381
J
H'
H
-408
G
-435
F'
F
-462
-488
E
D'
-515
-542
C'
C
-569
-596
B'
B
Y
A' -623
X A
-650
T16 @ 150 mm c/c(Top secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for ULS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Min [kN-m/m] kN - m
248
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
-0.65
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M -0.68
-0.71
-0.74
J
H'
H
-0.77
G
-0.80
F'
F
-0.83
-0.87
E
D'
-0.90
-0.93
C'
C
-0.96
-0.99
B'
B
Y
A' -1.02
X A
-1.05
T25 @ 150 mm c/c(Top secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for ULS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Min [kN-m/m] kN - m
249
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
-1.05
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M -1.05
-1.06
-1.06
J
H'
H
-1.07
G
-1.07
F'
F
-1.07
-1.08
E
D'
-1.08
-1.08
C'
C
-1.09
-1.09
B'
B
Y
A' -1.10
X A
-1.10
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Min [kN-m/m] kN - m
250
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.10
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 1.00
0.90
0.80
J
H'
H
0.70
G
0.60
F'
F
0.50
0.40
E
D'
0.30
0.20
C'
C
0.10
0.00
B'
B
Y
A' -0.10
X A
-0.20
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m
251
132 kV SHEIK ZAYED BINHAMDAN STREET
487
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 461
435
408
J
H'
H
382
G
356
F'
F
330
303
E
D'
277
251
C'
C
225
198
B'
B
Y
A' 172
X A
146
T20 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for SLS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m
252
132 kV SHEIK ZAYED BINHAMDAN STREET
600
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 591
583
574
J
H'
H
565
G
557
F'
F
548
539
E
D'
530
522
C'
C
513
504
B'
B
Y
A' 496
X A
487
T25 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for SLS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m
253
132 kV SHEIK ZAYED BINHAMDAN STREET
800
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 785
769
754
J
H'
H
738
G
723
F'
F
708
692
E
D'
677
662
C'
C
646
631
B'
B
Y
A' 615
X A
600
T32 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c
straight for SLS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m
254
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.05
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 1.03
1.01
0.99
J
H'
H
0.97
G
0.95
F'
F
0.93
E
0.92
D'
0.90
0.88
C'
C
0.86
0.84
B'
B
Y
A' 0.82
X A
0.80
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m
255
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.65
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 1.50
1.35
1.20
J
H'
H
1.05
G
0.90
F'
F
0.75
0.60
E
D'
0.45
0.30
C'
C
0.15
0.00
B'
B
Y
A' -0.15
X A
-0.30
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m
256
132 kV SHEIK ZAYED BINHAMDAN STREET
380
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 360
341
321
J
H'
H
302
G
282
F'
F
262
E
243
D'
223
203
C'
C
184
164
B'
B
Y
A' 145
X A
125
T20 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for SLS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m
257
132 kV SHEIK ZAYED BINHAMDAN STREET
483
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 475
467
459
J
H'
H
451
G
443
F'
F
435
E
428
D'
420
412
C'
C
404
396
B'
B
Y
A' 388
X A
380
T25 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for SLS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m
258
132 kV SHEIK ZAYED BINHAMDAN STREET
730
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 711
692
673
J
H'
H
654
G
635
F'
F
616
E
597
D'
578
559
C'
C
540
521
B'
B
Y
A' 502
X A
483
T32 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm
c/c straight for SLS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m
259
132 kV SHEIK ZAYED BINHAMDAN STREET
850
1 2 2' 3 4 4' 5 5' 6 6' 7 8 9 9' 10 11
M 841
832
822
J
H'
H
813
G
804
F'
F
795
E
785
D'
776
767
C'
C
758
748
B'
B
Y
A' 739
X A
730
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m
260
Project : 13211 kV HAITJARI SUBSTATION DOC. NO.
Contractor : DANWAY
Client DESIGNED CHECKED DATE
: DEWA
Title : MAIN BUILDING-SUBSTRUCTURE ASV KSM
261
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.65
1.35
L
K
1.20
1.05
H'
H
0.90
G
F'
F
0.75
0.60
E
D'
0.45
0.30
C''
C
0.15
B'
B 0.00
Y
A'
X A
-0.15
-0.30
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m
262
132 kV SHEIK ZAYED BINHAMDAN STREET
320
294
L
K
281
268
H'
H
255
G
F'
F
242
228
E
D'
215
202
C''
C
189
B'
B 176
Y
A'
X A
163
150
T16 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c straight
for ULS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m
263
132 kV SHEIK ZAYED BINHAMDAN STREET
400
388
L
K
382
375
H'
H
369
G
F'
F
363
357
E
D'
351
345
C''
C
338
B'
B 332
Y
A'
X A
326
320
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m
264
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
2.20
1.80
L
K
1.60
1.40
H'
H
1.20
G
F'
F
1.00
0.80
E
D'
0.60
0.40
C''
C
0.20
B'
B 0.00
Y
A'
X A
-0.20
-0.40
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m
265
132 kV SHEIK ZAYED BINHAMDAN STREET
600
529
L
K
494
458
H'
H
423
G
F'
F
388
352
E
D'
317
282
C''
C
246
B'
B 211
Y
A'
X A
175
140
T25 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm c/c
straight for ULS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m
266
132 kV SHEIK ZAYED BINHAMDAN STREET
700
685
L
K
677
669
H'
H
662
G
F'
F
654
646
E
D'
638
631
C''
C
623
B'
B 615
Y
A'
X A
608
600
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m
267
132 kV SHEIK ZAYED BINHAMDAN STREET
1.05
0.75
L
K
0.60
0.45
H'
H
0.30
G
F'
F
0.15
0.00
E
D'
-0.15
-0.30
C''
C
-0.45
B'
B -0.60
Y
A'
X A
-0.75
-0.90
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Min [kN-m/m] kN - m
268
132 kV SHEIK ZAYED BINHAMDAN STREET
-160
-185
L
K
-197
-209
H'
H
-222
G
F'
F
-234
-246
E
D'
-258
-271
C''
C
-283
B'
B -295
Y
A'
X A
-308
-320
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ULS) Max [kN-m/m] kN - m
269
132 kV SHEIK ZAYED BINHAMDAN STREET
1.00
0.60
L
K
0.40
0.20
H'
H
0.00
G
F'
F
-0.20
-0.40
E
D'
-0.60
-0.80
C''
C
-1.00
B'
B -1.20
Y
A'
X A
-1.40
-1.60
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Min [kN-m/m] kN - m
270
132 kV SHEIK ZAYED BINHAMDAN STREET
-150
-173
L
K
-185
-196
H'
H
-208
G
F'
F
-219
-231
E
D'
-242
-254
C''
C
-265
B'
B -277
Y
A'
X A
-288
-300
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ULS) Max [kN-m/m] kN - m
271
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
1.10
0.90
L
K
0.80
0.70
H'
H
0.60
G
F'
F
0.50
0.40
E
D'
0.30
0.20
C''
C
0.10
B'
B 0.00
Y
A'
X A
-0.10
-0.20
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m
272
132 kV SHEIK ZAYED BINHAMDAN STREET
169
153
L
K
145
137
H'
H
129
G
F'
F
121
113
E
D'
105
97
C''
C
89
B'
B 81
Y
A'
X A
73
65
T16 @ 150 mm c/c(Bottom main extra) shall be provided in addition to T16 @ 150 mm c/c straight
for SLS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m
273
132 kV SHEIK ZAYED BINHAMDAN STREET
180
178
L
K
177
177
H'
H
176
G
F'
F
175
174
E
D'
173
172
C''
C
172
B'
B 171
Y
A'
X A
170
169
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Max [kN-m/m] kN - m
274
132 kV SHEIK ZAYED BINHAMDAN STREET
1.65
1.35
L
K
1.20
1.05
H'
H
0.90
G
F'
F
0.75
0.60
E
D'
0.45
0.30
C''
C
0.15
B'
B 0.00
Y
A'
X A
-0.15
-0.30
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m
275
132 kV SHEIK ZAYED BINHAMDAN STREET
183
173
1 2 2' 3 4 4' 5 5' 66'
6 6' 7 8 9 9' 10 11
M
163
153
K
J 143
H'
H
133
123
F'
F
113
103
D'
D
93
C''
C
83
73
B'
B
Y
A' 63
X A
53
T25 @ 150 mm c/c(Bottom secondary extra) shall be provided in addition to T16 @ 150 mm c/c
straight for SLS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m
276
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:00
200
199
1 2 2' 3 4 4' 5 5' 66'
6 6' 7 8 9 9' 10 11
M
197
196
K
J 195
H'
H
193
192
F'
F
191
190
D'
D
188
C''
C
187
186
B'
B
Y
A' 184
X A
183
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Max [kN-m/m] kN - m
277
132 kV SHEIK ZAYED BINHAMDAN STREET
600
400
L
K
300
200
H'
H
100
G
F'
F
0
-100
E
D'
-200
-300
C''
C
-400
B'
B -500
Y
A'
X A
-600
-700
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Min [kN-m/m] kN - m
278
132 kV SHEIK ZAYED BINHAMDAN STREET
-57
-71
L
K
-78
-85
H'
H
-92
G
F'
F
-99
-107
E
D'
-114
-121
C''
C
-128
B'
B -135
Y
A'
X A
-142
-149
T16 @ 150 mm c/c(Top main extra) shall be provided in addition to T16 @ 150 mm c/c straight for
SLS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Min [kN-m/m] kN - m
279
132 kV SHEIK ZAYED BINHAMDAN STREET
-149
-151
L
K
-152
-152
H'
H
-153
G
F'
F
-154
-155
E
D'
-156
-157
C''
C
-157
B'
B -158
Y
A'
X A
-159
-160
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (SLS) Min [kN-m/m] kN - m
280
132 kV SHEIK ZAYED BINHAMDAN STREET
E+3
0.75
0.45
L
K
0.30
0.15
H'
H
0.00
G
F'
F
-0.15
-0.30
E
D'
-0.45
-0.60
C''
C
-0.75
B'
B -0.90
Y
A'
X A
-1.05
-1.20
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Min [kN-m/m] kN - m
281
132 kV SHEIK ZAYED BINHAMDAN STREET
-46
-56
L
K
-61
-66
H'
H
-71
G
F'
F
-76
-81
E
D'
-86
-91
C''
C
-96
B'
B -101
Y
A'
X A
-106
-111
T16 @ 150 mm c/c(Top main extra) shall be provided in addition to T16 @ 150 mm c/c straight for
SLS design. Governing reinforcement from SLS & ULS provided in design
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Min [kN-m/m] kN - m
282
132 kV SHEIK ZAYED BINHAMDAN STREET
-111
-112
L
K
-113
-114
H'
H
-114
G
F'
F
-115
-116
E
D'
-117
-117
C''
C
-118
B'
B -119
Y
A'
X A
-119
-120
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (SLS) Min [kN-m/m] kN - m
283
Provided shear links at this grid location
calculations attached below pages
284
ACI318-14 Punching Shear Check & Design
At grid E-9
Geometric Properties
Combination = 575:1.42DL+1.1(LL+LLR)+1.1EQ-Y+1.6SP+0.33EQ+X+1.1WP(FULL)
Point Label = 7401
Column Shape = Rectangular
Column Location = Interior
Global X-Coordinate = 39.245 m
Global Y-Coordinate = 19.225 m
Page 1
285
ACI318-14 Punching Shear Check & Design
At grid H-9
Geometric Properties
Combination = 604:1.44DL+1.1(LL+LLR)+1.1EQ+Y(+ecc)+1.6SP+0.33EQ-X(+ecc)+1.1WP(HALF-1)
Point Label = 7402
Column Shape = Rectangular
Column Location = Interior
Global X-Coordinate = 39.245 m
Global Y-Coordinate = 31.63 m
Page 1
286
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Capacity of the Foundation Slab against shear stress at distance "d" from Face of Column/Wall
Avg. Factored moment for mesh (Refer moment contour) Mu = 800 kNm
(At d distance)
Thickness of Slab D = 700 mm
Clear cover = 75 mm
Diameter of reinforcement = 16 mm
2
Vc1 = 0.919 N/mm
2
Vc2 = 1.64 N/mm
2
Shear strength provided by Vc = 0.919 N/mm
concrete
2
ΦvVc = 0.689 N/mm
287
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
Client : DEWA DESIGNED CHECKED DATE
Capacity of the wall against shear stress at distance "d" from Face of Column/Wall
Avg. Factored moment for mesh (Refer moment contour) Mu = 500 kNm (Max moment)
(At d distance)
Thickness of the Raft D = 400 mm
Clear cover = 75 mm
Diameter of reinforcement = 16 mm
2
Vc1 = 0.918 N/mm
2
Vc2 = 1.64 N/mm
2
Shear strength provided by Vc = 0.918 N/mm
concrete
2
ΦvVc = 0.689 N/mm
288
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:42
2.68
2.15
L
K 1.89
1.62
H'
H
1.36
G
F'
F
1.09
0.83
E
D'
0.56
0.30
C''
C
0.03
B'
B
-0.23
Y
A'
X A
-0.50
-0.76
SAFE 2016 16.0.2 Slab Stress S13 Diagram - Bot Face - (ULS) Max [N/mm2] kN - m
289
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:49
2.00
1.80
L
K 1.70
1.59
H'
H
1.49
G
F'
F
1.39
1.29
E
D'
1.19
1.09
C''
C
0.98
B'
B
0.88
Y
A'
X A
0.78
SAFE 2016 16.0.2 Slab Stress S13 Diagram - Bot Face - (ULS) Max [N/mm2] kN - m
290
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:43
1.10
0.45
L
K 0.13
-0.19
H'
H
-0.52
G
F'
F
-0.84
-1.16
E
D'
-1.48
-1.81
C''
C
-2.13
B'
B
-2.45
Y
A'
X A
-2.78
-3.10
SAFE 2016 16.0.2 Slab Stress S13 Diagram - Bot Face - (ULS) Min [N/mm2] kN - m
291
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:53
-0.68
-0.88
L
K -0.98
-1.09
H'
H
-1.19
G
F'
F
-1.29
-1.39
E
D'
-1.49
-1.59
C''
C
-1.70
B'
B
-1.80
Y
A'
X A
-1.90
-2.00
Provided shear links in highlighted area. Other locations shear stress
with in the limit from "d" distance of the support face
SAFE 2016 16.0.2 Slab Stress S13 Diagram - Bot Face - (ULS) Min [N/mm2] kN - m
292
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:46
1.90
1.48
L
K 1.26
1.05
H'
H
0.84
G
F'
F
0.63
0.41
E
D'
0.20
-0.01
C''
C
-0.22
B'
B
-0.44
Y
A'
X A
-0.65
-0.86
SAFE 2016 16.0.2 Slab Stress S23 Diagram - Bot Face - (ULS) Max [N/mm2] kN - m
293
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:51
2.00
1.80
L
K 1.70
1.59
H'
H
1.49
G
F'
F
1.39
1.29
E
D'
1.19
1.09
C''
C
0.98
B'
B
0.88
Y
A'
X A
0.78
0.68
SAFE 2016 16.0.2 Slab Stress S23 Diagram - Bot Face - (ULS) Max [N/mm2] kN - m
294
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:48
0.90
0.22
L
K -0.12
-0.45
H'
H
-0.79
G
F'
F
-1.13
-1.47
E
D'
-1.81
-2.15
C''
C
-2.48
B'
B
-2.82
Y
A'
X A
-3.16
-3.50
SAFE 2016 16.0.2 Slab Stress S23 Diagram - Bot Face - (ULS) Min [N/mm2] kN - m
295
132 kV SHEIK ZAYED BINHAMDAN STREET 07-03-2018 09:54
-0.68
-0.88
L
K -0.98
-1.09
H'
H
-1.19
G
F'
F
-1.29
-1.39
E
D'
-1.49
-1.59
C''
C
-1.70
B'
B
-1.80
Y
A'
X A
-1.90
SAFE 2016 16.0.2 Slab Stress S23 Diagram - Bot Face - (ULS) Min [N/mm2] kN - m
296
Project 132/11 kV SHKZBHST SUBSTATION. Ref. No.
LEAD/ Contractor DANWAY Designed By RVK Checked By ASV
DEWA Title SHEAR LINK CALCULATIONS Date Approved By VRP
Doc No.:
Assign -
4 L-T 12 Bars @ 300 mm c/c. (Asv Provided = 452.39 mm² )
Total Area of Shear Reinforcement Reqd. Asv = 416.21 mm², < Asv Provided, OK
297
Project : 132/11 Kv SHKZBHST
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV
298
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING-SUBSTRUCTURE LPK ASV
COLUMN DESIGN
RC columns are modelled as line elements and these columns are designed for major and minor axis
moments. The design results are presented in the form of pictures captured from ETABS.
Columns are designed for moments and shear in two orthogonal directions, i.e. along Global X.& Y axes
of ETABS. The local-1,2 & 3 axes are consistent throughout the model so as to use results for design
with ease. The local axes for columns is as follows:
a) Local-1: This axis is in the parallel to global Z-axis, this axis is red in color.
b) Local-2: This axis is always axis of minor bending and green in color.
c) Local-3: This axis is always axis of major bending and blue in color.
M33 moment corresponds to Major axis bending and M22 corresponds to minor axis bending
Minimum % of steel in columns as per ACI = 1.0 % (Ref :ACI 318-14: Cl 10.6.1.1)
Maximum % of steel in columns as per ACI = 8.0 % (Ref :ACI 318-14: Cl 10.6.1.1)
Minimum % of steel in columns as per UBC = 1.0 % (Ref : UBC-97: Cl 1910.9.1 )
Maximum % of steel in columns as per UBC = 8.0 % (Ref : UBC-97: Cl 1910.9.1 )
299
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING-SUBSTRUCTURE LPK ASV
Required spacing
Required Required Provided Provided
Column Column Size
M33 Shear Ast , M22 Shear M33 Shear M22 Shear S0 (mm)
Group (mm) S1 (mm)
mm2 Ast , mm2 Ast , mm2 Ast , mm2 (UBC-97)
300
ETABS 17.0.1 12-Jun-22
M M M M M M M M MM M M M M M M
ROOF 13.300
3000
2700
2700
9.8m lvl
4.9m lvl
3000
3952
2700
2700
Z
GF +1.420 m
0.4m lvl
X 3000 FPR GF
2700
2700
2700
Base
C8 C9 C9 C10
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - M Longitudinal Reinforcing (ACI 318-14)
301
ETABS 17.0.1 12-Jun-22
M M M M M M M M MM M M M M M M
ROOF 13.300
734
511
0
0
0
9.8m lvl
4.9m lvl
511
383
511
0
0
0
0
Z
GF +1.420 m
0.4m lvl
X FPR GF
511
383
511
383
0
0
0
0
Base
C8 C9 C9 C10
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - M Shear Reinforcing (ACI 318-14)
302
ETABS 17.0.1 14-06-2022
M M M M M M M M MM M M M M M M
ROOF 13.300
0.627
0.552
0.449
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl
4.9m lvl
0.294
0.808
0.479
0.627
Z
GF +1.420 m
0.4m lvl
X 0.186 FPR GF
0.485
0.340
0.456
Base
C9 C10
C8 C9
L L L L L L L L L L L L L L L L
ROOF 13.300
9.8m lvl
4.9m lvl
Z
2400
1600
1600
1600
1600
GF +1.420 m
2400
1600
1600
1600
1600
0.4m lvl
X FPR GF
2400
1600
1600
1600
1600
Base
C22 C1 C1 C1 C1
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - L Longitudinal Reinforcing (ACI 318-14)
304
ETABS 17.0.1 13-Jun-22
L L L L L L L L L L L L L L L L
ROOF 13.300
9.8m lvl
4.9m lvl
Z
0
0
0
0
0
0
0
0
0
0
GF +1.420 m
341
0
0
0
0
0
0
0
0
0
0.4m lvl
X FPR GF
0
0
0
0
0
0
0
0
0
0
Base
C1 C1 C1 C1
C22
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - L Shear Reinforcing (ACI 318-14)
305
ETABS 17.0.1 14-06-2022
L L L L L L L L L L L L L L L L
ROOF 13.300
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl
4.9m lvl
Z
0.023
0.038
0.040
0.040
0.121
GF +1.420 m
0.4m lvl
0.030
0.033
0.074
0.072
0.178
X FPR GF
0.061
0.055
0.043
0.047
0.083
Base
C1 C1 C1 C1
C22
K K K K K K K K KK K K K K K K
ROOF 13.300
4200
4200
4754
9.8m lvl
4.9m lvl
4200
3000
4200
3000
Z
GF +1.420 m
0.4m lvl
X 4200 FPR GF
3000
4200
3000
Base
C5 C11 C14
C18
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - K Longitudinal Reinforcing (ACI 318-14)
307
ETABS 17.0.1 12-Jun-22
K K K K K K K K KK K K K K K K
ROOF 13.300
596
511
0
0
0
0
9.8m lvl
4.9m lvl
511
0
0
0
0
0
0
0
Z
GF +1.420 m
0.4m lvl
X FPR GF
511
0
0
0
0
0
0
0
Base
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - K Shear Reinforcing (ACI 318-14)
308
ETABS 17.0.1 14-06-2022
K K K K K K K K KK K K K K K K
ROOF 13.300
0.732
0.519
0.883
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl
4.9m lvl
0.545
0.348
0.498
0.652
Z
GF +1.420 m
0.4m lvl
X 0.200 FPR GF
0.388
0.537
0.533
Base
J J J J J J J J J J J J J J J J
4200
9.8m lvl
4200
4.9m lvl
Z
4200
1800
1800
4200
GF +1.420 m
0.4m lvl
X FPR GF
4200
1800
1800
4200
Base
C5 C23 C23 C5
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - J Longitudinal Reinforcing (ACI 318-14)
310
ETABS 17.0.1 12-Jun-22
J J J J J J J J J J J J J J J J
0 ROOF 13.300
0
0
0
9.8m lvl
596
511
0
0
4.9m lvl
Z
341
0
0
0
0
0
0
GF +1.420 m
0.4m lvl
X FPR GF
341
0
0
0
0
0
0
Base
C23 C5
C5 C23
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - J Shear Reinforcing (ACI 318-14)
311
ETABS 17.0.1 14-06-2022
J J J J J J J J J J J J J J J J
0.550
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl
0.463
0.547
4.9m lvl
Z
0.091
0.139
0.181
0.141
GF +1.420 m
0.4m lvl
X FPR GF
0.076
0.077
0.096
0.151
Base
C23 C5
C5 C23
H' H' H' H' H' H' H' H' H' H' H' H' H' H' H' H'
3600
4800
4877
9.8m lvl
2400
2400
4.9m lvl
2400
2400
3600
3600
3000
4800
3000
Z
GF +1.420 m
0.4m lvl
2400
X FPR GF
2400
3600
2400
3600
3000
4800
3000
2400
Base
C2 C2 C6 C4 C26 C15
C11 C18
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - H' Longitudinal Reinforcing (ACI 318-14)
313
ETABS 17.0.1 12-Jun-22
H' H' H' H' H' H' H' H' H' H' H' H' H' H' H' H'
511
0
0
0
0
0
0
9.8m lvl
0
0
0
0
4.9m lvl
511
511
0
0
0
0
0
0
0
0
0
0
Z
GF +1.420 m
0.4m lvl
511
0
X FPR GF
511
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Base
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - H' Shear Reinforcing (ACI 318-14)
314
ETABS 17.0.1 14-06-2022
H' H' H' H' H' H' H' H' H' H' H' H' H' H' H' H'
0.393
0.562
0.913
9.8m lvl
0.208
0.039
4.9m lvl
0.319
0.438
0.136
0.360
0.268
0.491
0.664
Z
GF +1.420 m
0.4m lvl
0.557
X FPR GF
0.064
0.088
0.201
0.467
0.410
0.581
0.498
0.065
Base
G G G G G G G G GG G G G G G G
3600
4200
4444
9.8m lvl
4.9m lvl
3600
3600
3500
4200
3000
Z
GF +1.420 m
0.4m lvl
X FPR GF
3600
2400
3600
3500
4200
3000
Base
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - G Longitudinal Reinforcing (ACI 318-14)
316
ETABS 17.0.1 12-Jun-22
G G G G G G G G GG G G G G G G
511
0
0
0
0
0
0
9.8m lvl
4.9m lvl
0
0
0
0
0
0
0
0
0
0
Z
GF +1.420 m
0.4m lvl
X FPR GF
511
0
0
0
0
0
0
0
0
0
0
0
Base
C26 C12
C6 C4 C14 C18
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - G Shear Reinforcing (ACI 318-14)
317
ETABS 17.0.1 14-06-2022
G G G G G G G G GG G G G G G G
0.409
0.460
0.834
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl
4.9m lvl
0.195
0.396
0.195
0.453
0.563
Z
GF +1.420 m
0.4m lvl
X FPR GF
0.177
0.252
0.529
0.302
0.515
0.518
Base
F F F F F F F F FF F F F F F F
4500
4200
4230
9.8m lvl
2400
4.9m lvl
2400
3600
4500
3750
4200
3000
Z
GF +1.420 m
0.4m lvl
3267
X FPR GF
3600
2400
4500
3750
4200
3000
2400
2400
Base
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - F Longitudinal Reinforcing (ACI 318-14)
319
ETABS 17.0.1 12-Jun-22
F F F F F F F F FF F F F F F F
511
0
0
0
0
0
0
9.8m lvl
0
0
4.9m lvl
511
0
0
0
0
0
0
0
0
0
0
Z
GF +1.420 m
0.4m lvl
511
0
X FPR GF
511
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Base
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - F Shear Reinforcing (ACI 318-14)
320
ETABS 17.0.1 14-06-2022
F F F F F F F F FF F F F F F F
0.357
0.419
0.789
9.8m lvl
0.174
4.9m lvl
0.350
0.194
0.355
0.180
0.475
0.616
Z
GF +1.420 m
0.4m lvl
0.760
X FPR GF
0.093
0.262
0.465
0.289
0.563
0.551
0.361
0.070
Base
E E E E E E E E EE E E E E E E
3600
4200
4430
9.8m lvl
4.9m lvl
3600
3600
3500
4200
3000
Z
GF +1.420 m
0.4m lvl
X FPR GF
3600
2400
3600
3500
4200
3000
Base
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - E Longitudinal Reinforcing (ACI 318-14)
322
ETABS 17.0.1 12-Jun-22
E E E E E E E E EE E E E E E E
511
0
0
0
0
0
0
9.8m lvl
4.9m lvl
0
0
0
0
0
0
0
0
0
0
Z
GF +1.420 m
0.4m lvl
X FPR GF
511
0
0
0
0
0
0
0
0
0
0
0
Base
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - E Shear Reinforcing (ACI 318-14)
323
ETABS 17.0.1 14-06-2022
E E E E E E E E EE E E E E E E
0.478
0.508
0.834
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl
4.9m lvl
0.206
0.488
0.233
0.568
0.693
Z
GF +1.420 m
0.4m lvl
X FPR GF
0.223
0.338
0.662
0.378
0.671
0.523
Base
D' D' D' D' D' D' D' D' D' D' D' D' D' D' D' D'
ROOF 13.300
9.8m lvl
2400
4.9m lvl
2400
GF +1.420 m
0.4m lvl
3194
X FPR GF
2400
2400
Base
C2 C3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - D' Longitudinal Reinforcing (ACI 318-14)
325
ETABS 17.0.1 12-Jun-22
D' D' D' D' D' D' D' D' D' D' D' D' D' D' D' D'
ROOF 13.300
9.8m lvl
0
0
4.9m lvl
0
0
GF +1.420 m
0.4m lvl
511
0
X FPR GF
0
0
0
0
Base
C2 C3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - D' Shear Reinforcing (ACI 318-14)
326
ETABS 17.0.1 14-06-2022
D' D' D' D' D' D' D' D' D' D' D' D' D' D' D' D'
ROOF 13.300
9.8m lvl
0.202
4.9m lvl
0.350
GF +1.420 m
0.4m lvl
0.743
X FPR GF
0.382
0.059
Base
C2 C3
D D D D D D D D DD D D D D D D
3600
4800
4800
9.8m lvl
4.9m lvl
3600
3600
3000
4800
4800
Z
GF +1.420 m
4800
4800
0.4m lvl
X FPR GF
3600
2400
3600
3000
4800
4800
Base
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - D Longitudinal Reinforcing (ACI 318-14)
328
ETABS 17.0.1 12-Jun-22
D D D D D D D D DD D D D D D D
681
511
0
0
0
0
9.8m lvl
4.9m lvl
0
0
0
0
0
0
0
0
0
0
Z
GF +1.420 m
681
0.4m lvl
0
0
X FPR GF
0
0
0
0
0
0
0
0
0
0
0
0
Base
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - D Shear Reinforcing (ACI 318-14)
329
ETABS 17.0.1 14-06-2022
D D D D D D D D DD D D D D D D
0.461
0.176
0.312
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl
4.9m lvl
0.208
0.471
0.267
0.592
0.524
Z
GF +1.420 m
0.4m lvl
0.391
0.380
X FPR GF
0.188
0.366
0.653
0.447
0.277
0.180
Base
C' C' C' C' C' C' C' C' C' C' C' C' C' C' C' C'
4200
4800
4800
4200
4200
9.8m lvl
5600
2400
4800
4200
4200
4200
4.9m lvl
5600
2400
4200
3500
4800
4800
Z
4200
4200
4200
GF +1.420 m
4800
4800
0.4m lvl
X FPR GF
5600
2400
4200
4200
4200
4200
3500
4800
1600
4800
Base
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - C' Longitudinal Reinforcing (ACI 318-14)
331
ETABS 17.0.1 12-Jun-22
C' C' C' C' C' C' C' C' C' C' C' C' C' C' C' C'
596
681
0
0
0
0 9.8m lvl
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4.9m lvl
0
0
0
0
0
0
0
0
0
0
Z
0
0
0
0
0
0
0
0
GF +1.420 m
0.4m lvl
0
0
0
0
X FPR GF
1192
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Base
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - C' Shear Reinforcing (ACI 318-14)
332
ETABS 17.0.1 14-06-2022
C' C' C' C' C' C' C' C' C' C' C' C' C' C' C' C'
0.652
0.240
0.118
0.667
0.748
9.8m lvl
0.121
0.014
0.177
0.327
0.268
0.159
4.9m lvl
0.359
0.040
0.106
0.373
0.466
0.421
Z
0.353
0.352
0.358
GF +1.420 m
0.4m lvl
0.275
0.426
X FPR GF
0.632
0.069
0.092
0.262
0.265
0.507
0.400
0.180
0.277
0.177
Base
B' B' B' B' B' B' B' B' B' B' B' B' B' B' B' B'
ROOF 13.300
4800
4400
9.8m lvl
4.9m lvl
4800
4400
Z
2000
GF +1.420 m
4800
2000
4400
0.4m lvl
X FPR GF
4800
2000
4400
Base
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - B' Longitudinal Reinforcing (ACI 318-14)
334
ETABS 17.0.1 12-Jun-22
B' B' B' B' B' B' B' B' B' B' B' B' B' B' B' B'
ROOF 13.300
681
0
0
0
9.8m lvl
4.9m lvl
681
511
0
0
Z
0
0
GF +1.420 m
426
0.4m lvl
0
0
0
0
0
X FPR GF
0
0
0
0
0
0
Base
C19 C17
C16
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - B' Shear Reinforcing (ACI 318-14)
335
ETABS 17.0.1 14-06-2022
B' B' B' B' B' B' B' B' B' B' B' B' B' B' B' B'
ROOF 13.300
0.181
0.129
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl
4.9m lvl
0.344
0.337
Z
0.543
GF +1.420 m
0.4m lvl
0.276
0.449
0.345
X FPR GF
0.207
0.120
0.223
Base
C19 C17
C16
B B B B B B B B BB B B B B B B
ROOF 13.300
3000
4667
9.8m lvl
4.9m lvl
3000
5020
Z
GF +1.420 m
0.4m lvl
X 3000 FPR GF
2700
Base
C8 C28
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - B Longitudinal Reinforcing (ACI 318-14)
337
ETABS 17.0.1 12-Jun-22
B B B B B B B B BB B B B B B B
ROOF 13.300
1334
1900
426
0
9.8m lvl
4.9m lvl
3094
838
0
0
Z
GF +1.420 m
0.4m lvl
X FPR GF
511
0
0
0
Base
C8 C28
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - B Shear Reinforcing (ACI 318-14)
338
ETABS 17.0.1 14-06-2022
B B B B B B B B BB B B B B B B
ROOF 13.300
0.637
0.849
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl
4.9m lvl
0.545
0.880
Z
GF +1.420 m
0.4m lvl
X 0.477 FPR GF
0.268
Base
C8 C28
A' A' A' A' A' A' A' A' A' A' A' A' A' A' A' A'
ROOF 13.300
9.8m lvl
2400
2400
4.9m lvl
2400
2400
Z
2400
GF +1.420 m
0.4m lvl
X FPR GF
2809
2400
2400
Base
C2 C2 C24
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - A' Longitudinal Reinforcing (ACI 318-14)
340
ETABS 17.0.1 12-Jun-22
A' A' A' A' A' A' A' A' A' A' A' A' A' A' A' A'
ROOF 13.300
9.8m lvl
0
0
0
0
4.9m lvl
0
0
0
0
Z
0
0
GF +1.420 m
0.4m lvl
X FPR GF
511
0
0
0
0
0
Base
C2 C2 C24
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - A' Shear Reinforcing (ACI 318-14)
341
ETABS 17.0.1 14-06-2022
A' A' A' A' A' A' A' A' A' A' A' A' A' A' A' A'
ROOF 13.300
9.8m lvl
0.210
0.008
4.9m lvl
0.365
0.032
Z
0.044
GF +1.420 m
0.4m lvl
X FPR GF
0.687
0.051
0.042
Base
C2 C2 C24
A A A A A A A A AA A A A A A A
ROOF 13.300
3000
2700
9.8m lvl
4.9m lvl
3000
2700
Z
2000
1500
GF +1.420 m
2000
1500
0.4m lvl
X 3000 FPR GF
2700
2000
1500
Base
C8 C9 C19 C20
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - A Longitudinal Reinforcing (ACI 318-14)
343
ETABS 17.0.1 12-Jun-22
A A A A A A A A AA A A A A A A
ROOF 13.300
511
0
0
0
9.8m lvl
4.9m lvl
511
0
0
0
Z
426
0
0
0
GF +1.420 m
0.4m lvl
0
0
0
0
X FPR GF
511
0
0
0
0
0
0
0
Base
C8 C9 C19 C20
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB Elevation View - A Shear Reinforcing (ACI 318-14)
344
ETABS 17.0.1 14-06-2022
A A A A A A A A AA A A A A A A
ROOF 13.300
0.380
0.423
9.8m lvl
RefPl Level 8.15
FF @ 7.500 m lvl
4.9m lvl
0.222
0.485
Z
0.320
0.753
GF +1.420 m
0.4m lvl
0.446
0.652
X 0.602 FPR GF
0.318
0.306
0.124
Base
C8 C9 C19 C20
346
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
WALL DESIGN
Reinforced concrete walls are used as basement walls to retain soil below ground and as firewalls between
main building and transformer area. Staircase walls are also made in RCC as per DEWA specifications
The walls are designed for all ultimate load combinations and checked for 0.2mm crackwidth for outer mesh &
0.15mm crackwidth for inner mesh of service loads. The contours are taken for envelope of all ultimate load combinations
and service load combinations.
Walls are designed for moments and shear in two orthogonal directions, i.e. along Local-1 & 2 axes of ETABS.
The local-1,2 & 3 axes are consistent throughout the model so as to use results from contours for wall
design with ease. The local axes for all wall shells is as follows:
a) Local-1: This axis is in the plane of the area object, this axis is red in color.
b) Local-2: This axis is in the plane of the area object. The positive local-2 axis is in the same direction as
the positive global Z-axis This axis is green in color.
c) Local-3: This axis is perpendicular to the plane of the area object, this axis is blue in color.
Walls are modelled and made sure to be their local-3 axis outside the building and design to be performed
according to the output of local axis
The shell elements for wall design are designed for moments and shear forces in two orthogonal directions,
those are as follows:
a) M11 : Moment per unit length acting at mid-surface of the element on the positive and negative 1-faces
about local-2 axis.
b) M22 : Moment per unit length acting at mid-surface of the element on the positive and negative 2-faces
about local-1 axis.
c) V13 : Out of plane shear per unit length acting at mid-surface of the element on the positive and
negative 1-faces in the direction of local-3 axis.
c) V23 : Out of plane shear per unit length acting at mid-surface of the element on the positive and
negative 2-faces in the direction of local-3 axis.
A positive face is one whose outward normal pointing (pointing away from element) is in the positive local-1
,local-2 or local-3 direction.
As mentioned earlier walls are designed for M11 moment and M22 moment, reinforcement for M11 is horizontal
in elevation and reinforcement for M22 is in direction of Global-Z axis i.e. vertical in elevation. The positive moment
value indicates tension in negative-3 face of ETABS wall shell. Whereas negative moment indicates tension
in positive-3 face of ETABS wall shell.
347
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Reinforcement Calculations
Reinforcement calculations for RCC elements is done as per ACI 318 with following design parameters:
Main Reinforcement (Outer & inner face ) -- 16 @ 150 mm c/c ( 1340 mm2/m )
Secondary Reinforcement (Outer face) -- 12 @ 200 mm c/c ( 565 mm2/m )
Minimum reinforcement in slabs as per ACI318 = 0.18% of concrete area*(420/460) (ref TB:7.6.1.1)
2
For 300 thick wall = 493.043 mm /m
348
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Above mentioned rebar is used as general mesh for walls. As per provided reinforcement moment capacities are
calculated for various reinforcement combinations. Extra bar locations are identified with the help of calculated
capacities and moment contours. Moment capacities are tabulated in the next section
Moment capacities for 300 mm thick wall satisfying Ultimate limit state criteria & servicebility for outer mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. Type (mm2/m)
Capacity
0.20 mm Crackwidth
Description (kN-m/m)
1 16 @ 150 Main 1340 110 39
2 12 @ 200 Secondary 565 40 12
3 16@150 + 16@150(Extra) Main 2681 210 97
4 12@200 + 12@200(Extra) Secondary 1131 85 31
5 12@200 + 16@200(Extra) Secondary 1571 100 41
Moment capacities for 300 mm thick wall satisfying Ultimate limit state criteria & servicebility for inner mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. Type (mm2/m)
Capacity
0.15 mm Crackwidth
Description (kN-m/m)
1 12 @ 150 Main 754 65 22
2 16 @ 150 Main 1340 120 38
3 12 @ 200 Secondary 565 45 12
4 12@150 + 12@150(Extra) Main 1508 135 59
5 16@150 + 12@150(Extra) Main 2094 190 78
6 12@200 + 12@200(Extra) Secondary 1131 100 32
7 12@200 + 16@200(Extra) Secondary 1571 130 42
349
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Rn = Mu / (Ø b d2) = 2.60
Rn = Mu / (Ø b d2) = 1.08
350
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Rn = Mu / (Ø b d2) = 4.96
Rn = Mu / (Ø b d2) = 2.29
351
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Rn = Mu / (Ø b d2) = 3.39
352
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Rn = Mu / (Ø b d2) = 1.21
Rn = Mu / (Ø b d2) = 0.93
353
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Rn = Mu / (Ø b d2) = 2.52
Rn = Mu / (Ø b d2) = 2.06
354
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Rn = Mu / (Ø b d2) = 2.73
355
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
356
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Rn = Mu / (Ø b d2) = 3.58
357
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Moment capacity of outer main reinforcement of 300 mm thick wall satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b) = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 142.6 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 94.81 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
358
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Moment capacity of outer secondary reinforcement of 300 mm thick wall satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 9.57 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 104.99 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 123.22 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
359
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Moment capacity of outer main reinforcement of 300 mm thick wall satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 45.34 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 186.06 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 69.067 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
360
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Moment capacity of outer secondary reinforcement of 300 mm thick wall satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 19.13 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 143.73 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 87.658 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
361
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Moment capacity of outer secondary reinforcement of 300 mm thick wall satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 26.57 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 139.49 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 88.482 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
362
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Moment capacity of inner main reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b) = 12.76 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 123.56 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 93.6 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE
363
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Moment capacity of inner secondary reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 9.57 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 91.56 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 120.93 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE
364
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Moment capacity of inner main reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 25.51 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 169.94 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 67.396 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE
365
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Moment capacity of inner secondary reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 19.13 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 129.19 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 84.404 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE
366
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Moment capacity of inner secondary reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 26.57 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 124.77 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 85.212 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE
367
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Moment capacity of inner main reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b) = 22.67 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 122.9 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 94.81 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.149 mm Eqn 1-2 ACI 224.1-R-8
SAFE
368
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Moment capacity of inner main reinforcement of 300 mm thick wall satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 35.42 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
sqrt[dc2+(s/2)2] = 68.229 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE
369
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
-350 -315 -280 -245 -210 -175 -140 -105 -70 -35 0 35 70 105
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
370
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
T16@150 mm c/c outer vertical extra is provided in addition to T16@150 straight for ULS case.
-210 -202 -195 -187 -179 -172 -164 -156 -148 -141 -133 -125 -118 -110
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
371
ETABS 17.0.1
Neglected at Beam
locations
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
-210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
372
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
-71.5 -65.0 -58.5 -52.0 -45.5 -39.0 -32.5 -26.0 -19.5 -13.0 -6.5 0.0 6.5 13.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
373
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
T12@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for ULS case.
-85.0 -81.5 -78.1 -74.6 -71.2 -67.7 -64.2 -60.8 -57.3 -53.8 -50.4 -46.9 -43.5 -40.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
374
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
T16@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for ULS case.
-100 -99 -98 -97 -95 -94 -93 -92 -91 -90 -88 -87 -86 -85
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
375
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
-100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
376
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
-150 -120 -90 -60 -30 0 30 60 90 120 150 180 210 240
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
377
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
T12@150 mm c/c inner vertical extra is provided in addition to T12@150 straight for ULS case.
378
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
135 135 135 135 135 135 135 135 135 135 135 135 135 135
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
379
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
-20.0 -15.0 -10.0 -5.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
380
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
381
ETABS 17.0.1 Crackwidth Check
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
-264 -240 -216 -192 -168 -144 -120 -96 -72 -48 -24 0 24 48
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
382
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
T16@150 mm c/c outer vertical extra is provided in addition to T16@150 straight for SLS case.
-97.0 -92.5 -88.1 -83.6 -79.2 -74.7 -70.2 -65.8 -61.3 -56.8 -52.4 -47.9 -43.5 -39.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
383
ETABS 17.0.1
Neglected at Beam
locations
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
-97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
384
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
-48.0 -44.0 -40.0 -36.0 -32.0 -28.0 -24.0 -20.0 -16.0 -12.0 -8.0 -4.0 0.0 4.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
385
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
T12@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for SLS case.
-31.0 -29.5 -28.1 -26.6 -25.2 -23.7 -22.2 -20.8 -19.3 -17.8 -16.4 -14.9 -13.5 -12.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
386
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
T16@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for SLS case.
-41.0 -40.2 -39.5 -38.7 -37.9 -37.2 -36.4 -35.6 -34.8 -34.1 -33.3 -32.5 -31.8 -31.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
387
ETABS 17.0.1
RW03
RW65
RW01 RW63
RW66
RW61
RW02
RW64
RW62
RW50
-41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
388
SHEAR CHECK
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.95 N/mm
ɸ v Vc = 0.71 N/mm2
389
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.92 N/mm
ɸ v Vc = 0.69 N/mm2
390
ETABS 17.0.1
Main Reinforcement
-1.75 -1.40 -1.05 -0.70 -0.35 0.00 0.35 0.70 1.05 1.40 1.75 2.10 2.45 2.80
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
391
ETABS 17.0.1
690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
392
ETABS 17.0.1
-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
393
ETABS 17.0.1
Secondary Reinforcement
-0.90 -0.75 -0.60 -0.45 -0.30 -0.15 0.00 0.15 0.30 0.45 0.60 0.75 0.90 1.05
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
394
ETABS 17.0.1
690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
395
ETABS 17.0.1
-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
396
ETABS 17.0.1
RW04
OUTER VERTICAL REINFORCEMENT - ULS CASE
General mesh T16@150 mm c/c
RW35
RW21
RW47
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
-121 -110 -99 -88 -77 -66 -55 -44 -33 -22 -11 0 11 22
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
397
ETABS 17.0.1
RW04
RW35
RW21
RW47
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
-110 -110 -110 -110 -110 -110 -110 -110 -110 -110 -110 -110 -110 -110
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
398
ETABS 17.0.1
RW04
OUTER SECONDARY REINFORCEMENT - ULS CASE
General mesh T12@200 mm c/c
RW35
Z
RW21
RW47
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
-84.5 -78.0 -71.5 -65.0 -58.5 -52.0 -45.5 -39.0 -32.5 -26.0 -19.5 -13.0 -6.5 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
399
ETABS 17.0.1
RW04
RW35
Z
RW21
T12@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for ULS case.
RW47
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
-85.0 -81.5 -78.1 -74.6 -71.2 -67.7 -64.2 -60.8 -57.3 -53.8 -50.4 -46.9 -43.5 -40.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
400
ETABS 17.0.1
RW04
RW35
RW21
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
-85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0 -85.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
401
ETABS 17.0.1
RW04
INNER VERTICAL REINFORCEMENT - ULS CASE
General mesh T12@150 mm c/c
RW35
RW21
RW47
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
402
ETABS 17.0.1
RW04
RW35
RW21
RW47
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
403
ETABS 17.0.1
RW35
RW21
RW47
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
-10.0 -5.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
404
ETABS 17.0.1
RW04
RW35
Z
RW21
RW47 T12@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for ULS case.
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
45 49 53 58 62 66 70 75 79 83 87 92 96 100
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
405
ETABS 17.0.1
RW04
RW35
Z
RW21
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
100 100 100 100 100 100 100 100 100 100 100 100 100 100
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
406
ETABS 17.0.1 Crackwidth Check
RW04
OUTER VERTICAL REINFORCEMENT - SLS CASE
General mesh T16@150 mm c/c
RW35
RW21
RW47
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
-82.5 -75.0 -67.5 -60.0 -52.5 -45.0 -37.5 -30.0 -22.5 -15.0 -7.5 0.0 7.5 15.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
407
ETABS 17.0.1
RW04
RW35
RW21
RW47
T16@150 mm c/c outer vertical extra is provided in addition to T16@150 straight for SLS case.
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
-97.0 -92.5 -88.1 -83.6 -79.2 -74.7 -70.2 -65.8 -61.3 -56.8 -52.4 -47.9 -43.5 -39.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
408
ETABS 17.0.1
RW04
RW35
RW21
RW47
No moment is found above 97 kN-m. Hence provided reinforcement is satisfactory.
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
-97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
409
ETABS 17.0.1
RW04
OUTER SECONDARY REINFORCEMENT - SLS CASE
General mesh T12@200 mm c/c
RW35
RW21
RW47
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
-52.0 -48.0 -44.0 -40.0 -36.0 -32.0 -28.0 -24.0 -20.0 -16.0 -12.0 -8.0 -4.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
410
ETABS 17.0.1
RW04
RW35
RW21
RW47
T12@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for SLS case.
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
-31.0 -29.5 -28.1 -26.6 -25.2 -23.7 -22.2 -20.8 -19.3 -17.8 -16.4 -14.9 -13.5 -12.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
411
ETABS 17.0.1
RW04
RW35
RW21
RW47
RW26
RW60
RW27
RW58 RW23
RW28
RW59
RW29
-31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
412
SHEAR CHECK
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.96 N/mm
ɸ v Vc = 0.72 N/mm2
413
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.93 N/mm
ɸ v Vc = 0.70 N/mm2
414
ETABS 17.0.1
Main Reinforcement
-720 -600 -480 -360 -240 -120 0 120 240 360 480 600 720 840 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
415
ETABS 17.0.1
700 700 700 700 700 700 700 700 700 700 700 700 700 700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
416
ETABS 17.0.1
-700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
417
ETABS 17.0.1
Secondary Reinforcement
-490 -420 -350 -280 -210 -140 -70 0 70 140 210 280 350 420 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
418
ETABS 17.0.1
X
Shear stress capacity of 300 mm thick wall with general
mesh T12@200mm c/c is 0.7 N/mm2
Shear stress at a distance 'd' from face of support is within limit
Hence SAFE
700 700 700 700 700 700 700 700 700 700 700 700 700 700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
419
ETABS 17.0.1
-700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
420
ETABS 17.0.1
RW05
RW06
RW12
RW32
RW33
RW31
Z X
RW24
Y
RW30
-169 -156 -143 -130 -117 -104 -91 -78 -65 -52 -39 -26 -13 0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
421
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y RW24
RW30
T16@150 mm c/c outer vertical extra is provided in addition to T16@150 straight for ULS case.
-210 -202 -195 -187 -179 -172 -164 -156 -148 -141 -133 -125 -118 -110
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
422
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y RW24
RW30
-210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210 -210
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
423
ETABS 17.0.1
RW05
RW06
RW12
RW32
RW33
RW31
X
Y
Z RW24
RW30
-104 -96 -88 -80 -72 -64 -56 -48 -40 -32 -24 -16 -8 0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
424
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
X
Y
Z
RW24
RW30
T16@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for ULS case.
-100 -95 -91 -86 -82 -77 -72 -68 -63 -58 -54 -49 -45 -40
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
425
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y RW24
RW30
-100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100 -100
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
426
ETABS 17.0.1
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y RW24
RW30
0.0 6.5 13.0 19.5 26.0 32.5 39.0 45.5 52.0 58.5 65.0 71.5 78.0 84.5
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
427
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
Z X RW24
Y
RW30
120 120 120 120 120 120 120 120 120 120 120 120 120 120
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
428
ETABS 17.0.1
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y RW24
RW30
0.0 4.5 9.0 13.5 18.0 22.5 27.0 31.5 36.0 40.5 45.0 49.5 54.0 58.5
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
429
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y RW24
RW30
45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
430
ETABS 17.0.1 Crackwidth Check
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y RW24
RW30
-104 -96 -88 -80 -72 -64 -56 -48 -40 -32 -24 -16 -8 0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
431
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y
RW24
RW30
T16@150 mm c/c outer vertical extra is provided in addition to T16@150 straight for SLS case.
-97.0 -92.5 -88.1 -83.6 -79.2 -74.7 -70.2 -65.8 -61.3 -56.8 -52.4 -47.9 -43.5 -39.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
432
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y
RW24
RW30
-97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0 -97.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
433
ETABS 17.0.1
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y RW24
RW30
-78.0 -72.0 -66.0 -60.0 -54.0 -48.0 -42.0 -36.0 -30.0 -24.0 -18.0 -12.0 -6.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
434
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
X
Y
Z
RW24
RW30
T12@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for SLS case.
-31.0 -29.5 -28.1 -26.6 -25.2 -23.7 -22.2 -20.8 -19.3 -17.8 -16.4 -14.9 -13.5 -12.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
435
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y RW24
RW30
T16@200 mm c/c outer horizontal extra is provided in addition to T12@200 straight for SLS case.
-41.0 -40.2 -39.5 -38.7 -37.9 -37.2 -36.4 -35.6 -34.8 -34.1 -33.3 -32.5 -31.8 -31.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
436
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
X
Y
Z
RW24
RW30
-41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0 -41.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
437
ETABS 17.0.1
RW05
RW06
RW12
RW32
RW33
RW31
X
Y
Z
RW24
RW30
0.0 5.5 11.0 16.5 22.0 27.5 33.0 38.5 44.0 49.5 55.0 60.5 66.0 71.5
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
438
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
Y
Z X
RW24
RW30
T12@150 mm c/c inner vertical extra is provided in addition to T16@150 straight for SLS case.
38.0 41.1 44.2 47.2 50.3 53.4 56.5 59.5 62.6 65.7 68.8 71.8 74.9 78.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
439
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y
RW24
RW30
78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0 78.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
440
ETABS 17.0.1
RW05
RW06
RW12
RW32
RW33
RW31
Z X
Y
RW24
RW30
0.0 4.0 8.0 12.0 16.0 20.0 24.0 28.0 32.0 36.0 40.0 44.0 48.0 52.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
441
ETABS 17.0.1
RW07
RW05
RW06
RW12
T12@200 mm c/c inner horizontal extra is provided in addition to T12@200 straight for SLS case.
RW32
RW33
RW31
Z X
Y
RW24
RW30
12.0 13.5 15.1 16.6 18.2 19.7 21.2 22.8 24.3 25.8 27.4 28.9 30.5 32.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
442
ETABS 17.0.1
RW07
RW05
RW06
RW12
RW32
RW33
RW31
X
Y
Z RW24
RW30
32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
132 kV SHEIK ZAYED BINHAMDAN STREET REstrains..EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
443
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.95 N/mm
ɸ v Vc = 0.71 N/mm2
444
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.92 N/mm
ɸ v Vc = 0.69 N/mm2
445
ETABS 17.0.1
Main Reinforcement
Z X
Y
-520 -455 -390 -325 -260 -195 -130 -65 0 65 130 195 260 325 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
446
ETABS 17.0.1
Z X
Y
690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
447
ETABS 17.0.1
Z X
Y
-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
448
ETABS 17.0.1
Secondary Reinforcement
Z X
Y
-960 -840 -720 -600 -480 -360 -240 -120 0 120 240 360 480 600 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
449
ETABS 17.0.1
Z X
Y
690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
450
ETABS 17.0.1
Z X
Y
-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
451
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
0.0 6.5 13.0 19.5 26.0 32.5 39.0 45.5 52.0 58.5 65.0 71.5 78.0 84.5
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
452
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
453
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
454
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
neglected wall
locations
RW19
Z
X
No moment is found above 45 kN-m. Hence provided reinforcement is satisfactory. Y
45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
455
ETABS 17.0.1
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
-78.0 -72.0 -66.0 -60.0 -54.0 -48.0 -42.0 -36.0 -30.0 -24.0 -18.0 -12.0 -6.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
456
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
-65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
457
ETABS 17.0.1
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
-52.0 -48.0 -44.0 -40.0 -36.0 -32.0 -28.0 -24.0 -20.0 -16.0 -12.0 -8.0 -4.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
458
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
-45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
459
ETABS 17.0.1
Crackwidth Check
VERTICAL REINFORCEMENT (POSITIVE SIDE) - SLS CASE
General mesh T12@150 mm c/c
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
0.0 5.5 11.0 16.5 22.0 27.5 33.0 38.5 44.0 49.5 55.0 60.5 66.0 71.5
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
460
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
T12@150 mm c/c vertical extra both sides is provided in addition to T12@150 straight for SLS case.
22.0 24.8 27.7 30.5 33.4 36.2 39.1 41.9 44.8 47.6 50.5 53.3 56.2 59.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
461
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
462
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
0.0 4.5 9.0 13.5 18.0 22.5 27.0 31.5 36.0 40.5 45.0 49.5 54.0 58.5
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
463
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
T12@200 mm c/c horizontal extra both sides is provided in addition to T12@200 straight for SLS case.
12.0 13.5 15.1 16.6 18.2 19.7 21.2 22.8 24.3 25.8 27.4 28.9 30.5 32.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
464
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
neglected at wall
locations
RW19
Z
X
Y
32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
465
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
-78.0 -72.0 -66.0 -60.0 -54.0 -48.0 -42.0 -36.0 -30.0 -24.0 -18.0 -12.0 -6.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
466
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
T12@150 mm c/c vertical extra both sides is provided in addition to T12@150 straight for SLS case.
-59.0 -56.2 -53.3 -50.5 -47.6 -44.8 -41.9 -39.1 -36.2 -33.4 -30.5 -27.7 -24.8 -22.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
467
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
-59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
468
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
-52.0 -48.0 -44.0 -40.0 -36.0 -32.0 -28.0 -24.0 -20.0 -16.0 -12.0 -8.0 -4.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
469
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
T12@200 mm c/c horizontal extra both sides is provided in addition to T12@200 straight for SLS case.
-32.0 -30.5 -28.9 -27.4 -25.8 -24.3 -22.8 -21.2 -19.7 -18.2 -16.6 -15.1 -13.5 -12.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
470
ETABS 17.0.1
RW46
RW45
RW15
RW14
RW17
RW16 RW20
RW19
Z
X
Y
No moment is found above 32 kN-m. Hence provided reinforcement is satisfactory.
-32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
471
SHEAR CHECK
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.92 N/mm
ɸ v Vc = 0.69 N/mm2
472
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.92 N/mm
ɸ v Vc = 0.69 N/mm2
473
ETABS 17.0.1
Main Reinforcement
-360 -300 -240 -180 -120 -60 0 60 120 180 240 300 360 420 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa] Y
Z
X
474
ETABS 17.0.1
690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa] Y
Z
X
475
ETABS 17.0.1
-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa] Y
Z
X
476
ETABS 17.0.1
Secondary Reinforcement
-350 -300 -250 -200 -150 -100 -50 0 50 100 150 200 250 300 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa] Y
Z
X
477
ETABS 17.0.1
690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa] Y
Z
X
478
ETABS 17.0.1
-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa] Y
Z
X
479
ETABS 17.0.1
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
-22.5 -15.0 -7.5 0.0 7.5 15.0 22.5 30.0 37.5 45.0 52.5 60.0 67.5 75.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
480
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
481
ETABS 17.0.1
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
-4.8 -2.4 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 26.4
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
482
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
483
ETABS 17.0.1
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
-70.0 -63.0 -56.0 -49.0 -42.0 -35.0 -28.0 -21.0 -14.0 -7.0 0.0 7.0 14.0 21.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
484
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
-65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
485
ETABS 17.0.1
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
-44.0 -40.0 -36.0 -32.0 -28.0 -24.0 -20.0 -16.0 -12.0 -8.0 -4.0 0.0 4.0 8.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
486
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
-45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
487
ETABS 17.0.1
Crackwidth Check
VERTICAL REINFORCEMENT (POSITIVE SIDE) - SLS CASE
General mesh T12@150 mm c/c
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
-15.0 -10.0 -5.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
488
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
T12@150 mm c/c vertical extra both sides is provided in addition to T12@150 straight for SLS case.
22.0 24.8 27.7 30.5 33.4 36.2 39.1 41.9 44.8 47.6 50.5 53.3 56.2 59.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
489
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0 59.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
490
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
-2.2 0.0 2.2 4.4 6.6 8.8 11.0 13.2 15.4 17.6 19.8 22.0 24.2 26.4
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
491
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
T12@200 mm c/c horizontal extra both sides is provided in addition to T12@200 straight for SLS case.
12.0 13.5 15.1 16.6 18.2 19.7 21.2 22.8 24.3 25.8 27.4 28.9 30.5 32.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
492
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0 32.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
493
ETABS 17.0.1
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
-50.0 -45.0 -40.0 -35.0 -30.0 -25.0 -20.0 -15.0 -10.0 -5.0 0.0 5.0 10.0 15.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
494
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
T12@150 mm c/c vertical extra both sides is provided in addition to T12@150 straight for SLS case.
-59.0 -56.2 -53.3 -50.5 -47.6 -44.8 -41.9 -39.1 -36.2 -33.4 -30.5 -27.7 -24.8 -22.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
495
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
-59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0 -59.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
496
ETABS 17.0.1
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
-2.2 0.0 2.2 4.4 6.6 8.8 11.0 13.2 15.4 17.6 19.8 22.0 24.2 26.4
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
497
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
T12@200 mm c/c horizontal extra both sides is provided in addition to T12@200 straight for SLS case.
-32.0 -30.5 -28.9 -27.4 -25.8 -24.3 -22.8 -21.2 -19.7 -18.2 -16.6 -15.1 -13.5 -12.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
498
ETABS 17.0.1
RW44
RW43
RW13
RW10
RW09
RW40
RW42
RW49
RW41
RW11 RW48
RW38
RW39
RW36
RW37
-32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0 -32.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
499
SHEAR CHECK
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.94 N/mm
ɸ v Vc = 0.71 N/mm2
500
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.93 N/mm
ɸ v Vc = 0.70 N/mm2
501
ETABS 17.0.1
Main Reinforcement
Z Y
-375 -300 -225 -150 -75 0 75 150 225 300 375 450 525 600 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
502
ETABS 17.0.1
Z Y
700 700 700 700 700 700 700 700 700 700 700 700 700 700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
503
ETABS 17.0.1
Z Y
-700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
504
ETABS 17.0.1
Secondary Reinforcement
Z Y
-385 -330 -275 -220 -165 -110 -55 0 55 110 165 220 275 330 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
505
ETABS 17.0.1
Z Y
700 700 700 700 700 700 700 700 700 700 700 700 700 700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
506
ETABS 17.0.1
Z Y
-700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
507
ETABS 17.0.1
RW08
RW57
RW18
RW51
RW22
RW55
RW56
RW54
RW53
RW52
T12@150mm c/c vertical extra is provided in addition to T12@150 straight for ULS case. RW08
RW57
RW18
RW51
RW22
RW55
RW56
RW54
RW53
RW52
No moment is found above 135 kN-m. Hence provided reinforcement is satisfactory. RW08
RW57
RW18
RW51
RW22
RW55
RW56
RW54
RW53
135 135 135 135 135 135 135 135 135 135 135 135 135 135
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
510
ETABS 17.0.1
RW08
RW57
RW18
RW51
RW22
RW55
RW56
RW54
RW53
-5.5 0.0 5.5 11.0 16.5 22.0 27.5 33.0 38.5 44.0 49.5 55.0 60.5 66.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
511
ETABS 17.0.1
RW52
RW08
RW57
RW18
RW51
RW22
RW55
RW56
RW54
RW53
45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
512
ETABS 17.0.1
RW08
RW57
RW18
RW51
RW22
RW55
RW56
RW54
RW53
-77.0 -66.0 -55.0 -44.0 -33.0 -22.0 -11.0 0.0 11.0 22.0 33.0 44.0 55.0 66.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
513
ETABS 17.0.1
RW52
RW08
No moment is found above 65 kN-m. Hence provided reinforcement is satisfactory. RW57
RW51 RW18
RW22
RW55
RW56
RW54
RW53
-65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0 -65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
514
ETABS 17.0.1
RW08
RW57
RW18
RW51
RW22
RW55
RW56
RW54
RW53
-55.0 -50.0 -45.0 -40.0 -35.0 -30.0 -25.0 -20.0 -15.0 -10.0 -5.0 0.0 5.0 10.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
515
ETABS 17.0.1
RW52
RW18
RW51
RW22
RW55
RW56
RW54
RW53
-45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0 -45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
516
SHEAR CHECK
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.93 N/mm
ɸ v Vc = 0.70 N/mm2
517
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.93 N/mm
ɸ v Vc = 0.70 N/mm2
518
ETABS 17.0.1
Main Reinforcement
-715 -650 -585 -520 -455 -390 -325 -260 -195 -130 -65 0 65 130 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Min (ULS) [MPa]
519
ETABS 17.0.1
700 700 700 700 700 700 700 700 700 700 700 700 700 700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
520
ETABS 17.0.1
-700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
521
ETABS 17.0.1
Secondary Reinforcement
-700 -600 -500 -400 -300 -200 -100 0 100 200 300 400 500 600 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
522
ETABS 17.0.1
700 700 700 700 700 700 700 700 700 700 700 700 700 700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
523
ETABS 17.0.1
-700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 -700 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
524
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
526
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
WALL DESIGN
Reinforced concrete walls are used as basement walls to retain soil below ground and as firewalls between
main building and transformer area. Staircase walls are also made in RCC as per DEWA specifications
The walls are designed for all ultimate load combinations and checked for 0.2mm crackwidth for outer mesh &
0.15mm crackwidth for inner mesh of service loads. The contours are taken for envelope of all ultimate load combinations
and service load combinations.
Walls are designed for moments and shear in two orthogonal directions, i.e. along Local-1 & 2 axes of ETABS.
The local-1,2 & 3 axes are consistent throughout the model so as to use results from contours for wall
design with ease. The local axes for all wall shells is as follows:
a) Local-1: This axis is in the plane of the area object, this axis is red in color.
b) Local-2: This axis is in the plane of the area object. The positive local-2 axis is in the same direction as
the positive global Z-axis This axis is green in color.
c) Local-3: This axis is perpendicular to the plane of the area object, this axis is blue in color.
Walls are modelled and made sure to be their local-3 axis outside the building and design to be performed
according to the output of local axis
The shell elements for wall design are designed for moments and shear forces in two orthogonal directions,
those are as follows:
a) M11 : Moment per unit length acting at mid-surface of the element on the positive and negative 1-faces
about local-2 axis.
b) M22 : Moment per unit length acting at mid-surface of the element on the positive and negative 2-faces
about local-1 axis.
c) V13 : Out of plane shear per unit length acting at mid-surface of the element on the positive and
negative 1-faces in the direction of local-3 axis.
c) V23 : Out of plane shear per unit length acting at mid-surface of the element on the positive and
negative 2-faces in the direction of local-3 axis.
A positive face is one whose outward normal pointing (pointing away from element) is in the positive local-1
,local-2 or local-3 direction.
As mentioned earlier walls are designed for M11 moment and M22 moment, reinforcement for M11 is horizontal
in elevation and reinforcement for M22 is in direction of Global-Z axis i.e. vertical in elevation. The positive moment
value indicates tension in negative-3 face of ETABS wall shell. Whereas negative moment indicates tension
in positive-3 face of ETABS wall shell.
527
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Reinforcement Calculations
Reinforcement calculations for RCC elements is done as per ACI 318 with following design parameters:
Minimum reinforcement in slabs as per ACI318 = 0.18% of concrete area*(420/460) (ref TB:7.6.1.1)
For 250 thick wall = 410.87 mm2/m
528
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Above mentioned rebar is used as general mesh for walls. As per provided reinforcement moment capacities are
calculated for various reinforcement combinations. Extra bar locations are identified with the help of calculated
capacities and moment contours. Moment capacities are tabulated in the next section
Moment capacities for 250 mm thick wall satisfying Ultimate limit state criteria & servicebility for outer mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. Type (mm2/m)
Capacity
0.20 mm Crackwidth
Description (kN-m/m)
1 12 @ 150 Main 754 45 17
2 12 @ 100 Secondary 1131 65 23
Moment capacities for 250 mm thick wall satisfying Ultimate limit state criteria & servicebility for inner mesh
ULS Moment
Reinforcement Reinforcement Area of reinforcement SLS Moment Capacity for
S.No. Type (mm2/m)
Capacity
0.15 mm Crackwidth
Description
(kN-m/m)
1 12 @ 150 Main 754 50 17
2 12 @ 100 Secondary 1131 75 23
529
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Rn = Mu / (Ø b d2) = 1.75
Rn = Mu / (Ø b d2) = 2.93
530
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Rn = Mu / (Ø b d2) = 1.48
Rn = Mu / (Ø b d2) = 2.52
531
Project :: 132/11 kV SHKZBHST SUBSTATION
Contractor :: DANWAY
End User DESIGNED CHECKED DATE
:: DEWA
Title RVK ASV
:: Substructure
Moment capacity of outer face main reinforcement of 250 mm thick wall satisfying 0.20 mm crackwidth --
cmin
s
Concrete & Steel :
Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-11: Cl : 8.5.1)
Modulus of elasticity of steel ES = 200000 N/mm2
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
sqrt[dc2+(s/2)2] = 93.6 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.195 mm Eqn 1-2 ACI 224.1-R-8
SAFE
532
Project : 132/11 kV SHKZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Moment capacity of outer face secondary reinforcement of 250 mm thick wall satisfying 0.20 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 19.13 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 137.94 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 84.404 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.198 mm Eqn 1-2 ACI 224.1-R-8
SAFE
533
Project :: 132/11 kV SHKZBHST SUBSTATION
Contractor :: DANWAY
End User :: DEWA DESIGNED CHECKED DATE
Moment capacity of inner face main reinforcement of 250 mm thick wall satisfying 0.15 mm crackwidth --
cmin
s
Concrete & Steel :
Modulus of elasticity of concrete (Long term ) EC = 13294 N/mm2 (ACI318-11: Cl : 8.5.1)
Modulus of elasticity of steel ES = 200000 N/mm2
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
sqrt[dc2+(s/2)2] = 93.6 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.145 mm Eqn 1-2 ACI 224.1-R-8
SAFE
534
Project :: 132/11 kV SHKZBHST SUBSTATION
Contractor :: DANWAY
End User :: DESIGNED CHECKED DATE
DEWA
Title :: RVK ASV
Substructure
Moment capacity of inner face secondary reinforcement of 250 mm thick wall satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth =(As∗fy)/(0.85∗fc^′∗b)= 19.13 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
fs = reinforcing steel stress =Mu/(Ast ∗z) = 117.94 N/mm2 ACI:318-14, Table R24.5.2.1
sqrt[dc2+(s/2)2] = 84.404 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.143 mm Eqn 1-2 ACI 224.1-R-8
SAFE
535
ETABS 17.0.1
Z Y
-1.80 -1.35 -0.90 -0.45 0.00 0.45 0.90 1.35 1.80 2.25 2.70 3.15 3.60 4.05
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
536
ETABS 17.0.1
Z Y
45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
537
ETABS 17.0.1
Z Y
0.00 0.70 1.40 2.10 2.80 3.50 4.20 4.90 5.60 6.30 7.00 7.70 8.40 9.10
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
538
ETABS 17.0.1
Z Y
65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0 65.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
539
ETABS 17.0.1
Z Y
-13.0 -12.0 -11.0 -10.0 -9.0 -8.0 -7.0 -6.0 -5.0 -4.0 -3.0 -2.0 -1.0 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
540
ETABS 17.0.1
Z Y
-50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (ULS) [kN-m/m]
541
ETABS 17.0.1
Z Y
-24.7 -22.8 -20.9 -19.0 -17.1 -15.2 -13.3 -11.4 -9.5 -7.6 -5.7 -3.8 -1.9 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
542
ETABS 17.0.1
Z Y
-75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0 -75.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (ULS) [kN-m/m]
543
ETABS 17.0.1 Crackwidth check
Z Y
-1.12 -0.84 -0.56 -0.28 0.00 0.28 0.56 0.84 1.12 1.40 1.68 1.96 2.24 2.52
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
544
ETABS 17.0.1
Z Y
17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
545
ETABS 17.0.1
Z Y
0.00 0.45 0.90 1.35 1.80 2.25 2.70 3.15 3.60 4.05 4.50 4.95 5.40 5.85
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
546
ETABS 17.0.1
Z Y
23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
547
ETABS 17.0.1
Z Y
-7.80 -7.15 -6.50 -5.85 -5.20 -4.55 -3.90 -3.25 -2.60 -1.95 -1.30 -0.65 0.00 0.65
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
548
ETABS 17.0.1
Z Y
-17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0 -17.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M22 Diagram (SLS) [kN-m/m]
549
ETABS 17.0.1
Z Y
-15.6 -14.4 -13.2 -12.0 -10.8 -9.6 -8.4 -7.2 -6.0 -4.8 -3.6 -2.4 -1.2 0.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
550
ETABS 17.0.1
Z Y
-23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Resultant M11 Diagram (SLS) [kN-m/m]
551
Shear Check
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.93 N/mm
ɸ v Vc = 0.69 N/mm2
552
Project : 132/11 kV SHKZBHST SUBSTATION DESIGNED ACK
Contractor : DANWAY CHECKED ASV
Client : DEWA APPROVED VRP
Title : MAIN BUILDING - WALL DESIGN
2
Vc2 = 1.64 N/mm
2
Shear strength provide by concrete Vc = 0.92 N/mm
ɸ v Vc = 0.69 N/mm2
553
ETABS 17.0.1
Z Y
Z Y
X
Shear stress capacity of 250 mm thick wall with general
mesh T12@150mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE
690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
555
ETABS 17.0.1
Z Y
X
Shear stress capacity of 250 mm thick wall with general
mesh T12@150mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE
-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S23 Diagram Abs Max (ULS) [MPa]
556
ETABS 17.0.1
Z Y
-168 -144 -120 -96 -72 -48 -24 0 24 48 72 96 120 144 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
557
ETABS 17.0.1
Z Y
X
Shear stress capacity of 250 mm thick wall with general
mesh T12@150mm c/c is 0.69 N/mm2
From above contour no shear stress is found above 0.69 N/mm2.
Hence SAFE
690 690 690 690 690 690 690 690 690 690 690 690 690 690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
558
ETABS 17.0.1
Z Y
-690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 -690 E-3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Stress S13 Diagram Abs Max (ULS) [MPa]
559
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Title : MAIN BUILDING-SUBSTRUCTURE ASV MMN 14-06-2022
560
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Title : MAIN BUILDING-SUBSTRUCTURE ASV MMN 14-06-2022
Staircase RC walls are designed as core walls by using uniform reinforcing pier section in ETABS.
ETABS designs the walls labeled as piers for in plane and out of plane moments and reports the steel
required for bending and shear requirements as longitudinal reinforcement and shear reinforcement.
Shear wall design summary sheets from ETABS are attached for each core wall for reference
Shear wall is designed for moments and shear in two orthogonal directions, i.e. along Global X.& Y axes
of ETABS. The local-1,2 & 3 axes are consistent throughout the model so as to use results for design
with ease. The local axes for piers is as follows:
a) Local-1: This axis is in the parallel to global Z-axis, this axis is red in color.
b) Local-2: This axis is always axis of minor bending and green in color.
c) Local-3: This axis is always axis of major bending and blue in color.
M33 moment corresponds to Major axis bending and M22 corresponds to minor axis bending
Reinforcement
Longitudinal steel of T12@150 is provided for all walls in two layers, boundary elements of same thickness
as that of wall are found to be safe, on the conservative side T16 bars are provided for boundary elements.
Transverse reinforcement T12@200 in two layers
Reinforcement calculations of core walls are attached before respective design summaries
561
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Title : MAIN BUILDING-SUBSTRUCTURE ASV MMN 14-06-2022
Length of Leg
Leg ID
(mm)
1 2950
2 6440
3 2950
4 6440
Maximum required longitudinal steel in mm2 : 14085 (Summary sheet and picture attached for reference)
SAFE
SAFE
562
ETABS 17.0.1 14-06-2022
85
1408 5
13
1 31
3
1319195
13195
5
13195
1319 5
14085
14085
14085
12599
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Pier Longitudinal Reinforcing Areas (mm²) (ACI 318-14)
563
ETABS 17.0.1 14-06-2022
750
750
750
2223
222
2421
1906 3
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Pier Shear Reinforcing (mm²/m) (ACI 318-14)
564
Project : 132/11 kV SHKZBHST SUBSTATION DOC. NO.
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Title : MAIN BUILDING-SUBSTRUCTURE ASV MMN 14-06-2022
Length of Leg
Leg ID
(mm)
1 2980
2 6440
3 2980
4 6440
Maximum required longitudinal steel in mm2 : 14130 (Summary sheet and picture attached for reference)
SAFE
565
ETABS 17.0.1 14-06-2022
14130
13387
14130
13387
13387
13387
14130
14130
14130
13676
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Pier Longitudinal Reinforcing Areas (mm²) (ACI 318-14)
566
ETABS 17.0.1 14-06-2022
750
750
750
750
750
750
750
750
750
878
132 kV SHEIK ZAYED BINHAMDAN STREET.EDB 3-D View Pier Shear Reinforcing (mm²/m) (ACI 318-14)
567
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : Main Building Substructure SRI ASV
568
Job No Sheet No Rev
1
Part
Software licensed to Microsoft
Job Title Ref
By Date
3.200m
4.150m
Y
X
Z Load 202
Whole Structure
Print Time/Date: 13/07/2021 17:43 STAAD.Pro V8i (SELECTseries 5) 20.07.10.65 Print Run 1 of 1
569
CLIENT: DESIGN CONSULTANT:
DUBAI ELECTRICITY & WATER LAKSHMI ENGINEERS ARCHITECTS PROJECT: 132/11kV SHZBHST SUBSTATION
AUTHORITY(DEWA) & DESIGNERS
MAIN CONTRACTOR: DESIGN TITLE:
DANWAY TRENCH WALL DESIGN
STAAD SPACE
START JOB INFORMATION
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 0.533333 0 0; 3 1.06667 0 0; 4 1.6 0 0; 5 2.13333 0 0;
6 2.66667 0 0; 7 3.2 0 0; 8 0 0.51875 0; 9 0.533333 0.51875 0;
10 1.06667 0.51875 0; 11 1.6 0.51875 0; 12 2.13333 0.51875 0;
13 2.66667 0.51875 0; 14 3.2 0.51875 0; 15 0 1.0375 0; 16 0.533333 1.0375 0;
17 1.06667 1.0375 0; 18 1.6 1.0375 0; 19 2.13333 1.0375 0; 20 2.66667 1.0375 0;
21 3.2 1.0375 0; 22 0 1.55625 0; 23 0.533333 1.55625 0; 24 1.06667 1.55625 0;
25 1.6 1.55625 0; 26 2.13333 1.55625 0; 27 2.66667 1.55625 0; 28 3.2 1.55625 0;
29 0 2.075 0; 30 0.533333 2.075 0; 31 1.06667 2.075 0; 32 1.6 2.075 0;
33 2.13333 2.075 0; 34 2.66667 2.075 0; 35 3.2 2.075 0; 36 0 2.59375 0;
37 0.533333 2.59375 0; 38 1.06667 2.59375 0; 39 1.6 2.59375 0;
40 2.13333 2.59375 0; 41 2.66667 2.59375 0; 42 3.2 2.59375 0; 43 0 3.1125 0;
44 0.533333 3.1125 0; 45 1.06667 3.1125 0; 46 1.6 3.1125 0;
47 2.13333 3.1125 0; 48 2.66667 3.1125 0; 49 3.2 3.1125 0; 50 0 3.63125 0;
51 0.533333 3.63125 0; 52 1.06667 3.63125 0; 53 1.6 3.63125 0;
54 2.13333 3.63125 0; 55 2.66667 3.63125 0; 56 3.2 3.63125 0; 57 0 4.15 0;
58 0.533333 4.15 0; 59 1.06667 4.15 0; 60 1.6 4.15 0; 61 2.13333 4.15 0;
62 2.66667 4.15 0; 63 3.2 4.15 0;
MEMBER INCIDENCES
49 57 63;
ELEMENT INCIDENCES SHELL
1 1 2 9 8; 2 2 3 10 9; 3 3 4 11 10; 4 4 5 12 11; 5 5 6 13 12; 6 6 7 14 13;
7 8 9 16 15; 8 9 10 17 16; 9 10 11 18 17; 10 11 12 19 18; 11 12 13 20 19;
12 13 14 21 20; 13 15 16 23 22; 14 16 17 24 23; 15 17 18 25 24; 16 18 19 26 25;
17 19 20 27 26; 18 20 21 28 27; 19 22 23 30 29; 20 23 24 31 30; 21 24 25 32 31;
22 25 26 33 32; 23 26 27 34 33; 24 27 28 35 34; 25 29 30 37 36; 26 30 31 38 37;
27 31 32 39 38; 28 32 33 40 39; 29 33 34 41 40; 30 34 35 42 41; 31 36 37 44 43;
32 37 38 45 44; 33 38 39 46 45; 34 39 40 47 46; 35 40 41 48 47; 36 41 42 49 48;
37 43 44 51 50; 38 44 45 52 51; 39 45 46 53 52; 40 46 47 54 53; 41 47 48 55 54;
42 48 49 56 55; 43 50 51 58 57; 44 51 52 59 58; 45 52 53 60 59; 46 53 54 61 60;
47 54 55 62 61; 48 55 56 63 62;
ELEMENT PROPERTY
1 TO 48 THICKNESS 0.25
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
TYPE CONCRETE
STRENGTH FCU 27579
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
49 PRIS YD 0.05 ZD 0.05
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
1 TO 8 14 15 21 22 28 29 35 36 42 43 49 50 56 57 63 FIXED
LOAD 1 LOADTYPE Dead TITLE DEAD
SELFWEIGHT Y -1 LIST ALL
MEMBER LOAD
570
CLIENT: DESIGN CONSULTANT:
DUBAI ELECTRICITY & WATER LAKSHMI ENGINEERS ARCHITECTS PROJECT: 132/11kV SHZBHST SUBSTATION
AUTHORITY(DEWA) & DESIGNERS
MAIN CONTRACTOR: DESIGN TITLE:
DANWAY TRENCH WALL DESIGN
49 UNI GY -10
LOAD 2 LOADTYPE Live REDUCIBLE TITLE LL
MEMBER LOAD
49 UNI GY -10
LOAD 3 LOADTYPE Live REDUCIBLE TITLE OIL/WATER PRESSURE (FULL)
ELEMENT LOAD
1 TO 6 TRAP JT -25 -25 -20 -20
7 TO 12 TRAP JT -20 -20 -15 -15
13 TO 18 TRAP JT -15 -15 -10 -10
19 TO 24 TRAP JT -10 -10 -5 -5
25 TO 30 TRAP JT -5 -5 0 0
LOAD 4 LOADTYPE Live REDUCIBLE TITLE OIL/WATER PRESSURE (HALF)
ELEMENT LOAD
1 TO 6 TRAP JT -13 -13 -8.66667 -8.66667
7 TO 12 TRAP JT -8.66667 -8.66667 -4.33333 -4.33333
13 TO 18 TRAP JT -4.33333 -4.33333 0 0
LOAD COMB 100 1.4DL + 1.6 LL
1 1.4 2 1.6
LOAD COMB 101 1.4DL + 1.6 LL + 1.4OW (F)
1 1.4 2 1.6 3 1.4
LOAD COMB 102 1.4DL + 1.6LL - 1.4OW(F)
1 1.4 2 1.6 3 -1.4
LOAD COMB 103 1.4DL + 1.6LL + 1.4OW(H)
1 1.4 2 1.6 4 1.4
LOAD COMB 104 1.4DL + 1.6LL - 1.4OW(H)
1 1.4 2 1.6 4 -1.4
LOAD COMB 200 1.0DL + 1.0LL
1 1.0 2 1.0
LOAD COMB 201 1.0DL + 1.0LL + 1.0OW(F)
1 1.0 2 1.0 3 1.0
LOAD COMB 202 1.0DL + 1.0LL - 1.0OW(F)
1 1.0 2 1.0 3 -1.0
LOAD COMB 203 1.0DL + 1.0LL + 1.0OW(H)
1 1.0 2 1.0 4 1.0
LOAD COMB 204 1.0DL + 1.0LL - 1.0OW(H)
1 1.0 2 1.0 4 -1.0
PERFORM ANALYSIS
FINISH
571
Job No Sheet No Rev
1
Part
Software licensed to Microsoft
Job Title Ref
By Date Chd
Print Time/Date: 13/07/2021 17:30 STAAD.Pro V8i (SELECTseries 5) 20.07.10.65 Print Run 1 of 1
572
Job No Sheet No Rev
1
Part
Software licensed to Microsoft
Job Title Ref
By Date Chd
MY (local)
kNm/m
<= -4.05
-3.6
-3.16
-2.72
-2.28
-1.83
-1.39
-0.949
-0.507
-0.065
0.378
0.82
1.26
1.7
2.15
2.59
>= 3.03
Y
Z X
Load 102
WALL My MOMENT
MX (local)
kNm/m
<= -3.57
-3.16
-2.75
-2.34
-1.93
-1.52
-1.11
-0.7
-0.290
0.120
0.53
0.94
1.35
1.76
2.17
2.58
>= 2.99
Y
Z X
Load 102
WALL Mx MOMENT
Print Time/Date: 13/07/2021 17:35 STAAD.Pro V8i (SELECTseries 5) 20.07.10.65 Print Run 1 of 1
573
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : Main Building substructure SRI ASV
f c' = 32 mpa
fy = 460 mpa
Clear cover = 50 mm
Y
Diameter of the reinforcement = 12 mm
X
Spacing of Reinforcement = 150 mm
Rn = Mu / (Ø b d2) = 0.12
2
Provided Area = 753.98 mm SAFE
f c' = 32 mpa
fy = 460 mpa
Clear cover = 62 mm
Y
Diameter of the reinforcement = 12 mm
X
Spacing of Reinforcement = 200 mm
Rn = Mu / (Ø b d2) = 0.13
2
Provided Area = 565.49 mm SAFE
574
Job No Sheet No Rev
1
Part
Software licensed to Microsoft
Job Title Ref
By Date Chd
Print Time/Date: 13/07/2021 17:34 STAAD.Pro V8i (SELECTseries 5) 20.07.10.65 Print Run 1 of 1
575
Job No Sheet No Rev
1
Part
Software licensed to Microsoft
Job Title Ref
By Date Chd
MY (local)
kNm/m
<= -2.89
-2.57
-2.26
-1.94
-1.63
-1.31
-0.994
-0.678
-0.362
-0.046
0.270
0.586
0.902
1.22
1.53
1.85
>= 2.17
Y
Z X
Load 202
WALL My MOMENT
MX (local)
kNm/m
<= -2.55
-2.26
-1.97
-1.67
-1.38
-1.09
-0.793
-0.5
-0.207
0.086
0.378
0.671
0.964
1.26
1.55
1.84
>= 2.14
Y
Z X
Load 202
WALL Mx MOMENT
Print Time/Date: 13/07/2021 17:40 STAAD.Pro V8i (SELECTseries 5) 20.07.10.65 Print Run 1 of 1
576
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED DATE
Moment capacity of both face main reinforcement of 250 mm thick wall satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 12.76 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
sqrt[dc2+(s/2)2] = 93.6 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.027 mm Eqn 1-2 ACI 224.1-R-8
SAFE
577
Project : 132/11 kV SHZBHST SUBSTATION
Contractor : DANWAY
End User DESIGNED CHECKED DATE
: DEWA
Title RVK ASV 12.07.2021
: MAIN BUILDING-SUBSTRUCTURE
Moment capacity of both face secondary reinforcement of 250 mm thick wall satisfying 0.15 mm crackwidth --
cmin
Calculation : 0.85fc'
a/2
a
C=0.85fc'ba
z = (d-a/2)
T = Asfy
Stress distribution
a = Compression block depth As∗fy / 0.85∗fc^′∗b = 9.57 mm ACI:318-14, R20.2.2 & Sec. 22.2.2
sqrt[dc2+(s/2)2] = 120.93 mm
Surface crack width W cr =2(fs/Es)β √[dc2+(s/2)2] = 0.051 mm Eqn 1-2 ACI 224.1-R-8
SAFE
578
Project : 132/11 Kv SHKZBHST
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV
579
Project: 132/11 kV SHEIK ZAYED BIN HAMDAN SUBSTATION DESIGNED ACK
Contractor:DANWAY CHECKED ASV
Client:DEWA APPROVED VRP
Title: POWER TRANSFORMER
Design of Plinth :
Data:
2
Compressive Strength of concrete = 32 N/mm
Length of Pedestal = 8.515 m
Width of Pedestal = 2.45 m
Height o pedestal = 4m
weight of Equipment Load = 900.0 kN
Weight of pedestal = 2086.18 kN
Design Calculations:
Total Compression Load = 900+2,086.18 kN
2986.18 kN
Maximum Stress developed on the section = (2,986.18*1000) N/mm2
( Load /Area) (8.515*1000*2.45*1000)
= 0.14 N/mm2
2
Max design stress = ɸ*0.85*fc' (clause R16.3.5.2 ) = 17.68 N/mm
(ACI 318-14) 0.14 N/mm2 < 17.68 N/mm2
HENCE SAFE
Reinforcement:
Stresse is within acceptable limit, so no rebar is required from structural point of view.
Hence minimum temperature and shrinkage reinforcement is provided (clause 24.4.1 ) (ACI 318-14)
HENCE SAFE
580
Project: 132/11 kV SHEIK ZAYED BIN HAMDAN SUBSTATION DESIGNED ACK
Contractor:DANWAY CHECKED ASV
Client:DEWA APPROVED VRP
Title: Shunt Reactor
Design of Plinth :
Data:
2
Compressive Strength of concrete = 32 N/mm
Length of Pedestal = 6.85 m
Width of Pedestal = 2.366 m
Height o pedestal = 4m
weight of Equipment Load = 540.0 kN
Weight of pedestal = 1620.71 kN
Design Calculations:
Total Compression Load = 540+1,620.71 kN
2160.71 kN
Maximum Stress developed on the section = (2,160.71*1000) N/mm2
( Load /Area) (6.85*1000*2.366*1000)
= 0.13 N/mm2
2
Max design stress = ɸ*0.85*fc' (clause R16.3.5.2 ) = 17.68 N/mm
(ACI 318-14) 0.13 N/mm2 < 17.68 N/mm2
HENCE SAFE
Reinforcement:
Stresse is within acceptable limit, so no rebar is required from structural point of view.
Hence minimum temperature and shrinkage reinforcement is provided (clause 24.4.1 ) (ACI 318-14)
HENCE SAFE
581
Project: 132/11 kV SHEIK ZAYED BIN HAMDAN SUBSTATION DESIGNED ACK
Contractor:DANWAY CHECKED ASV
Client:DEWA APPROVED VRP
Title: ET-1,2,3 area
Design of Plinth :
Data:
2
Compressive Strength of concrete = 32 N/mm
Length of Pedestal = 3.885 m
Width of Pedestal = 1.1 m
Height o pedestal = 4m
weight of Equipment Load = 50.0 kN
Weight of pedestal = 427.35 kN
Design Calculations:
Total Compression Load = 50+427.35 kN
477.35 kN
Maximum Stress developed on the section = (477.35*1000) N/mm2
( Load /Area) (3.885*1000*1.1*1000)
= 0.11 N/mm2
2
Max design stress = ɸ*0.85*fc' (clause R16.3.5.2 ) = 17.68 N/mm
(ACI 318-14) 0.11 N/mm2 < 17.68 N/mm2
HENCE SAFE
Reinforcement:
Stresse is within acceptable limit, so no rebar is required from structural point of view.
Hence minimum temperature and shrinkage reinforcement is provided (clause 24.4.1 ) (ACI 318-14)
HENCE SAFE
582
Project : 132/11 Kv SHKZBHST
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV
583
Project : 132/11 Kv SHKZBHST
Contractor : DANWAY
End User : DEWA DESIGNED CHECKED
Title : MAIN BUILDING STRUCTURE SRI ASV
584
585
586
587
ACES Confidentiality & Proprietary Rights
Arab Center for Engineering Studies (ACES) is the sole owner of all intellectual
property rights in this document including but not limited to original materials,
tests, results, analysis, processes, schematics, drawings, photographs,
designs, conclusions, recommendations and generated information. Those
works are protected by copyright laws and treaties around the world.
The fees paid by the client to obtain the services of ACES are not considered
by any means a work made for hire, the fees is against the utilization of the
information specified in this document and for the purpose for which it was
prepared only.
The client doesn’t have the right to commercially, or otherwise, utilize the
information herein without the prior written consent of ACES. The information
of this document should not be modified and should not be reproduced except
in full.
ACES status as the authors / owners of the information of this report must
always be acknowledged. All materials and information contained in this
document are considered strictly confidential. All rights reserved. No part of
this document may be reproduced, or transmitted in any form or by any means,
electronic or mechanical, including photocopying, recording, or any information
storage and retrieval system, or translated into a machine language or
otherwise without the prior permission in writing from ACES.
***
588
TABLE OF CONTENTS
1.0 INTRODUCTION ..................................................................................................... 1
1.1 PURPOSE OF STUDY ............................................................................................................... 1
1.2 SCOPE OF WORKS .................................................................................................................. 1
1.3 STANDARDS AND CODES OF PRACTICE.................................................................................... 1
2.0 SITE AND PROJECT DESCRIPTION ..................................................................... 2
3.0 PREVAILING WEATHER CONDITIONS ................................................................ 5
4.0 REGIONAL GEOLOGY ........................................................................................... 5
5.0 FIELD WORK .......................................................................................................... 6
5.1 DRILLING ................................................................................................................................ 7
5.2 SAMPLING .............................................................................................................................. 8
5.3 FIELD TESTING IN BOREHOLES ................................................................................................ 8
5.4 EXCAVATION OF TRIAL PITS .................................................................................................. 10
5.5 INSTALLATION OF STANDPIPE PIEZOMETERS ......................................................................... 10
5.6 SITE SAFETY ......................................................................................................................... 10
6.0 LABORATORY TESTING ......................................................................................10
6.1 LABORATORY TESTS CARRIED OUT ON SAMPLES FROM BOREHOLES ....................................... 11
7.0 GROUND CONDITIONS ........................................................................................13
7.1 SITE GEOLOGY ..................................................................................................................... 13
7.2 SUB-SURFACE CONDITION .................................................................................................... 13
7.3 GROUND-WATER AND CAVITIES ............................................................................................ 16
7.4 CORE SAMPLE PHOTOGRAPHS............................................................................................... 16
7.5 LIQUEFACTION POTENTIAL .................................................................................................... 16
8.0 GEOTECHNICAL DESIGN PARAMETER MODEL ...............................................16
8.1 ENGINEERING PARAMETERS: ................................................................................................ 16
8.2 UPPER SAND ........................................................................................................................ 17
8.3 UNDERLYING BEDROCK ........................................................................................................ 18
8.3.1 Shear Strength Parameters ............................................................................... 18
8.3.2 Deformation Modulus of Rock Mass ................................................................ 19
9.0 FOUNDATION RECOMMENDATIONS .................................................................20
9.1 FOUNDATION TYPE & DEPTH ................................................................................................. 20
9.1.1 Foundation Ground Preparation ....................................................................... 21
9.2 GEOTECHNICAL ANALYSIS..................................................................................................... 22
9.2.1 Bearing Capacity Foundation Settlement ........................................................ 22
9.2.2 Allowable Bearing Pressure .............................................................................. 24
9.3 GROUND IMPROVEMENT BY ROAD BASE: ............................................................................... 25
9.4 GROUND IMPROVEMENT BY STONE COLUMNS: ...................................................................... 26
9.5 SEISMIC DESIGN PARAMETERS ............................................................................................. 27
9.6 SOIL PARAMETERS FOR DESIGN OF RETAINING STRUCTURES ............................................... 27
10.0 FOUNDATION CONSTRUCTION ..........................................................................29
10.1 EXCAVATION METHODS ........................................................................................................ 29
10.2 EXCAVATION SIDE SLOPES ................................................................................................... 29
10.3 BACKFILL MATERIAL AND COMPACTION CRITERIA ................................................................ 29
10.4 SURFACE DRAINAGE ............................................................................................................. 29
10.5 SUBSURFACE DRAINAGE SYSTEM (DEWATERING) .................................................................. 29
11.0 FOUNDATION CONCRETE ...................................................................................30
11.1 INTRODUCTION ..................................................................................................................... 30
11.2 ANALYSIS & GUIDELINES ....................................................................................................... 30
589
11.3 CLASSIFICATION OF GROUND CONDITIONS ............................................................................. 31
11.4 CONCRETE QUALITY FOR RESISTING CHEMICAL ATTACK ........................................................ 31
11.5 CONCRETE MIX .................................................................................................................... 32
11.6 CHLORIDE INFLUENCES .................................................................................................. 33
11.7 CONCLUSION ........................................................................................................................ 34
12.0 INTERACTION WITH ADJACENT PROPERTY ....................................................34
12.1 EXCAVATION INSPECTION ..................................................................................................... 35
13.0 IMPORTANT NOTES .............................................................................................35
14.0 SOFT COPY ...........................................................................................................35
List of Tables:
590
List of Appendices
591
1.0 INTRODUCTION
This revised final interpretative report presents the results of the geotechnical investigation works
carried out for the Proposed Project Emaar 132/11 kV Substation on plot no. 6482150,
SHKZBHST, Arabian Ranches III, Dubai-U.A.E.
The purpose of this geotechnical investigation was to determine the character and distribution of
geologic materials and ground water within the project site for use in foundation and excavation
design. The main objectives of the study are:
1. Assess the stability of the site in general and the influence of the construction works, to provide
the design engineers with the required measures to enhance the stability and safety of the site
and design of foundations.
2. Define and describe the subsurface materials within the site in order to assist in evaluating its
suitability to be used as backfill materials.
The geotechnical investigation consisted of field studies and laboratory analysis. The field portion of
the investigation employed test borings with in-situ tests such as Nspt (standard penetration test) as
primary investigative techniques. Additionally, a standpipe piezometer was installed for the
groundwater monitoring. Laboratory studies included tests to determine soil and rock properties
including physical and mechanical properties. Additionally, chemical analyses on selected samples
of soil, rock and ground water were also included.
Unless otherwise specified in this document, all equipments, materials and procedures associated
with this work comply with current editions of following relevant Standards and Codes of Practice.
1. BS 1377:1990 Part 9 AMD 8264-95, “Method of Test for Soils for Civil Engineering Purposes”.
2. BS 5930: 1999+A2:2015, “Code of Practice for Site Investigations”.
3. Other technical references including software used are cited in the report as appropriate.
592
2.0 SITE AND PROJECT DESCRIPTION
The project is the construction of Proposed D618 EMAAR 132/11 kV Arabian Ranches on plot no.
6482150 SHKZBHST, Dubai-U.A.E. The Google map showing the location of the site is shown
below:
The current site level is approximately ranging from +30.68m to +30.74 m DMD. However as
informed by the Engineer the gate level is +31.65m DMD and shall be considered in the foundation
depth for further recommendations as detailed below in table 1.
The provided details of the proposed substation are as given in the following Table 1:
593
Foundation
Tentative Footing
Foundation Depth below Foundation level
Structure Size
Type Gate Level* (m, DMD)
(m)
(m)
-2.25 29.40 B=1.50
Strom water Pits & Foul Water Isolated
-2.75 28.90 B=2.50
manholes footing
-3.90 27.75 B=3.00
Outdoor Miscellaneous -1.50 30.15 B=1.50
Isolated
Structures (Manholes & Soak
footing -2.90 28.75 B=2.00
pits)
-2.50 29.15
Duct Bank Strip footing -3.00 28.65 B=3.50
-3.40 28.25
Isolated -3.50 +28.15
Holding Tank L=4.0 x B=3.0
Footing -4.00 +27.65
*Gate Level +31.65m DMD as provided.
The Ground levels are related to Dubai Municipality Datum (DMD). General affection plan and site
layout, are presented below in Figure 2 and 3 respectively.
594
Figure 3: General Borehole Location Plan
595
A general site plan showing the project layout and the locations of the boreholes is enclosed in
Appendix A.
General site photographs are also presented below showing the general nature of the site and
ground conditions:
This unfavorable climate imposes adverse conditions on the concrete structures, such as:
The write-up is based on the available literature and the site investigation data.
Geology of Dubai
The ancient shallow sea, ‘The Tethys’, once covering the whole region of UAE, rose and fell,
influenced by major world climatic changes, and deposited sediments for at least 500 million years
(from Cambrian age onwards). The layers of rocks, at places several kilometers thick, were thus
formed in pockets of this ancient sea-bed. In general, in UAE the Palaeozoic basement rocks are
overlain by the Mesozoic to tertiary sedimentary rocks, and later overlain by the volcanics and the
continental shelf sediments. Cutting deep into the sedimentary series, erosion has exposed the
596
deformed and thrusted ancient and volcanic rocks which are well exposed with in the NNE – SSW
trending Hajar Mountains of Eastern UAE and the Musandam peninsula of northern Oman.
The dubai area is mostly occupied by the Tertiary rocks which were deposited in a shallow shelf
platform environment.
The processes of decomposition created hydrocarbon (oil and gas) reserves in the Tertiary
sediments, which provide the means for the present day man to transform the modern landscape.
Earth movements folded and tilted these once horizontal layers during the mid-Tertiary, creating in
the process scenic mountains such as Jebel Hafeet.
During late Cretaceous period Great pressures were clearly involved in the process of obduction of
the ophiolites (dated 90 – 95 Ma), which thrusted over the Permean to Cretaceous sedimentary
sequences. Thus was formed the fore land depositional basin called the Aruma basin in which the
the rocks of mid to upper Tertiary and Quaternary age were deposited, which are seen as the weakly
consolidated/ lithified and weathered arenites- sandstones, argillites- siltstones and rudites-
conglomerate group of rocks in the main land Dubai area. The provenance/ source area for the
conglomerates are the Hajar Mountains.
Deep seated evaporates / Palaeo evaporites are geologically older deposits noticed at different
depths as interbeds (0.5 – 5 m thickness). The upsurges of the Cambrian salt deposits from beneath
(as deep as 6000 m) the Permian limestone layers: under extreme pressure, caused by overlying
rocks, squeezed them up towards the surface through weakness planes or cracks, dragging with
them rocks from deep within the crust, sometimes from 6,000 meters down. When the salt rock
pierces the surface, it is quite rapidly eroded, depositing the boulders and debris it has brought up
with it. Current examples of this phenomenon are seen at Jebel Dhanna, Sir Bani Yas, Das, Zirku
and on several other islands in the Arabian Gulf.
Recent sabkahs are evaporates deposited in geologically recent times (< 1 Ma) which are being
identified on the surface or at shallow depths. These are noticed in the main land and coastal belts
of Dubai also.
The recent deposits consisting of silty, fine sand and clays in local pockets noticed in Dubai area
are mostly related to the deposits of the sea migrations/ eustatic changes, deserts and the
weathered products of the weak tertiary rocks. These vary in thickness from about 6 to 13 m in the
main land and coastal areas respectively. The bed rock in Dubai area is marked by deeply
weathered/ destructured sandstones and gravelly beds close to the eastern hill ranges.
597
Table 2: Details of Field Testing and Test Methods
Type of Test Note Test Name
BS 5930:1999 Clause 25.2 with x-ref. of BS 1377 Part 9 : 1990 Section
Standard Penetration
(1) 3.3 (amd1 & 2)
Test
BS EN ISO 22476 Part 3 : 2005 + A1 2011
BS 5930:1999 Clause 22
Soil Sampling (1)
BS 5930:2015 Clause 25.0
Rock quality BS 5930:1999 section 6 Clause 44.4.4
(1)
designation BS 5930:2015 section 6 Clause 36.4.4
BS 5930:1999 section 6 Clause 44.4.4
Core recovery (1)
BS 5930:2015 section 6 Clause 36.4.4
Description of rock Description of rock cores
(1)
cores BS 5930 Clause 44 & Clark & Walker
Rotary core drilling
Rotary core drilling (1)
BS 5930 Clause 20.7.3
Soil description
Soil description (1) BS 5930:1999 section 6 Clause 41 & Clark and Walker
BS 5930:2015 Section 6.0 Clause 33 & Clark and Walker
Field Investigation Method of determining ground water pressure
Ground water Level
(1) BS 5930:1999 Clause 23.2, Clause 27.5 & Clause 47.2.7
measurement
BS 5930:2015 Clause 52.0
Piezometer Installation
Piezometer Installation (1) ACES- MS-016
BS 5930:1999 section 3 Clause 23.2.3, BS 5930:2015 Clause 52
NB: AC* - Relevant Accreditation
(1) EIAC accredited test method (Certificate No. LB-006)
5.1 Drilling
During the period from 19th to 30th April 2022, five (05) boreholes were drilled to the specified depth
wihtin the site. The borings were advanced by using rotary drilling method with polymer/bentonite
circulation. The following Table 3 summarizes the borehole information:
The locations of the boreholes were set-out by ACES at locations provided by the client. The site
plan showing the test locations is presented in Appendix A and borehole logs are presented in
Appendix B1.
598
Figure 5: General Site Photographs during drilling activities
5.2 Sampling
Disturbed and undisturbed samples from the retrieved cores/ materials were obtained from different
selected depths. Split spoon samples were obtained at selected intervals from specified soil
materials, in all boreholes. Wherever cemented soil and rock materials are encountered, undisturbed
core samples are obtained using double tube core barrel.
The recovered samples were placed in moisture proof plastic bags in proper sequence in wooden
core boxes. The moist samples were placed in airtight plastic bags before being placed in wooden
core boxes and transported to our laboratory. They were then examined, described and classified
by our geologist. Representative samples were selected for further required testing.
Moreover, groundwater samples were collected from the boreholes after flushing using bailer
sampler. Then after, filled in a plastic bottle and transported to our laboratory for further testing.
Standard Penetration Tests (SPT) were performed at various depths in the boreholes to assess the
relative densities of the ground materials. The tests were performed in accordance with
BS1377:1990 Part 9 AMD8264-95, “Determination of Penetration Resistance Using Split-Barrel
Sampler (SPT)”.
The SPT consists of driving a Standard 50mm outside diameter split spoon sampler into soil at the
bottom of a borehole, using repeated blows of a 63.5kg hammer falling through 760mm. The SPT
N value is the number of blows required to achieve a penetration of 300mm, after an initial seating
drive of 150mm.
Graphical presentation of SPT-N values versus elevation was prepared and is presented in Figure
6.
599
Graphical Presentation
SPT N Values
1 10 100
32.0
Very dense
Medium dense
Very loose
Loose
Dense
31.0
30.0
29.0
28.0
Elevation, (m, DMD)
27.0
26.0
25.0
24.0
23.0
BH-04 BH-05
22.0
The test results are shown on the boring logs at the respective test depths. Interpretation of the SPT
test results can be found in the Legend to Boring Logs (Appendix B1).
600
5.4 Excavation of Trial Pits
As per project requirement five (05 Nos.) of trial pits were excavated mechanically at specified
locations up to the specified depths. These trial pits were excavated on 16th April 2022. The summary
of trial pits is given in table below.
Table 4: Summary of Trial Pit Information
Ground Coordinates
Test pit Excavation Excavation
Elevation
No. Depth (m) BGL Easting Northing Date
(m DMD)
TP-01 2.00 30.68 499204.27 2773914.35 16/04/22
TP-02 2.00 30.70 499184.25 2773914.55 16/04/22
TP-03 2.00 30.74 499186.42 2773931.79 16/04/22
TP-04 2.00 30.68 499196.72 2773944.82 16/04/22
TP-05 2.00 30.70 499215.53 2773931.45 16/04/22
*BGL = Below Existing Ground Level,
The locations of the trial pits were set-out by ACES at locations provided by the client adjacent to
each borehole locations. The strata’s encountered were visually described by ACES representative.
Bulk samples were carefully collected from the sides and bottom of the pits. Sampling was carried
out in accordance with BS 5930:2015.
A site plan showing the locations of the trial pits are attached in Appendix A. whereas the logs of
the test pits are presented in Appendix B3.
As per the project requirement one (01 No.) of 50mm standpipe piezometer was installed to monitor
the ground water table. The monitoring well was composed of slotted pipes (continuous slots) 50mm
diameter PVC screen 1.0m above ground water table followed with PVC solid stand pipe up to
ground level.
Groundwater levels were measured from the installed piezometer using dip meter after the
installation. The ground water readings are presented in Appendix C1.
ACES were fully committed for implementing the Health and Safety measures for all personnel who
were working at this project. Effective methods were adopted to ensure the policies and procedures
are communicated to, and properly understood by all crew personnel and followed throughout the
operations, controlled by inspection visits of the safety representative.
It is concluded that no accidents/incidents occurred during the period of site investigation works for
this project.
601
6.1 Laboratory Tests carried out on samples from Boreholes
The details of test performed on samples collected from boreholes and the test methods followed
for each testings are presented in Table 5.
Table 5: Summary of all Conducted Laboratory Tests
Test Type Note Test Name
Determination of Particle Size Distribution (Wet Sieving Method),
(1)
BS 1377: Part 2: 1990, Cl.9.2. (Amd. 9027/96)
Physical & Index Determination of Particle Density of Soil
(1)
Properties BS 1377: 1990 Part 2 CI.8.3 / 8.4(Amd. 9027/96)
Determination of Natural Moisture Content for soil and rock,
(1)
BS1377: Part2 :1990 (Amd.9027/96) Cl. 3.2.3.2
1. Sieve Analysis Tests Results were presented on standard PSD graphical presentations in
Appendix D1. The BS 5930 classification and summary of gradation results and indices are also
indicated on the graphs*.
2. Physical/Mechanical & Index property tests (particle density, moisture content, etc results)
are presented in separate tables in Appendix D1.
3. Chemical Test Results are presented in Appendix D2 in separate tables.
4. UCS Test Results are presented in a standard test sheet in Appendix D3-1. Graphical
presentation of the axial strain (%) versus average compressive stress (MPa) is included for
each sample and schematic diagram of failure plane(s) is also shown. * Moreover, results are
presented graphically along with strength classification limits as shown below in Figure 7.
5. Point Load Test Results are presented in a separate table in Appendix D3-2
6. Direct Shear Test Results are presented in a separate table in Appendix D3-3
602
Graphical Presentation
Unconfined Compressive Strength (MPa)
0.0 0.1 1.0 10.0 100.0 1000.0
28.0
Ext. Strong
V. Strong
M. Strong
V. Weak
Ext. Weak
Strong
Weak
27.0
26.0
25.0
24.0
23.0
22.0
21.0
20.0
19.0
18.0
17.0
16.0
ELEVATION (m, DMD)
15.0
14.0
13.0
12.0
11.0
10.0
9.0
8.0
7.0
6.0
BH-01 BH-02 BH-03
5.0
3.0
603
7.0 GROUND CONDITIONS
7.1 Site Geology
The present site is explored with five (05) boreholes (5BH x25m). The interpretation of the
subsurface geological condition is based on the available information from the 25 m deep boreholes.
The exploration reveals 5.0 m to 6.0 m thick layer of overburden material consisting of dense, slightly
silty to silty, slightly gravelly to gravelly, fine to medium SAND with gravel sized sandstone fragments
and basic rock fragments, underlain by very dense sand of 0.41 m to 1.23 m thick very dense Sand
(Class D calcarenite/sandstone). It is followed by partially weathered extremely weak to weak, fine
to medium grained CALCARENITE / SANDSTONE. After upper layers, a 0.40m to 1.92 m thick
partially weathered to un weathered (B/A) layer of CONGLOMERATE encountered. Furthermore,
very weak to weak, fine to medium grained, Sandstone supposed to be locally gravelly sandstone,
interbedded with thin to medium beds of conglomerate, partially weathered to unweathered (B/A) is
continued up to maximum drilling depth of the borehole. The bedrock is encountered at a depth of
5.49 m to 7.23 m from EGL.
The boreholes drilled have indicated general similarities and continuities of the subsurface materials,
in spite of some local variations.
A generalized subsurface profile was constructed and is attached to Appendix B2. The below profile
is an illustrative of the general subsurface ground conditions:
The geologic description of the subsurface materials, encountered in the borehole, and the average
approximate elevations at which they are encountered are presented in table 8. Classification of the
soils and rocks has been conducted according to BS 5930: 1999+A2: 2010. The tables given in the
legend to boring logs in Appendix B1 were used to describe the relative density/consistency of the
respective coarse/ fine grained-soils and strength of rocks.
Layer –I
604
Elevation
Summary
(m DMD) Thickness Material
BH No. Geologic Description of Tests
(m) Classification
From To Results
605
Figure 8: Generalized Subsurface Profile
606
7.3 Ground-Water and Cavities
At the time of the investigation, ground water table was encountered in all five drilled boreholes at
depth varies between 11.10m to 11.15m below existing ground level (i.e. at R. L. of +19.55m to
+19.61m DMD). However, ground water table is subjected to weather seasonal variations or by
artificial induced effects. Therefore, reconfirmation is recommended prior to any works related to
ground water regime.
No cavities were encountered in any of the boreholes up to the drilled depths. However, in boreholes
BH-02 and BH-04, partial to complete drilling fluid loss was encountered as indicated on boreholes log
presented in Appendix B1.
Liquefaction is used to describe a situation of significant loss of strength due to buildup of pore water
pressure and subsequent deformation of loose, fine, saturated sands under the cyclic loading of
earthquakes.
Based on the “Recommended procedures for Implementation of DMG, Special Publication - 117 the
guidelines for analyzing and mitigating liquefaction hazards in California, Implementation Committee,
March 1999“, Preliminary screening for liquefaction can be judged as ‘unlikely’ based on the SPT- N
results, GWT conditions & Shallow rock.
The generalized subsurface model that represents the site was presented above indicating the main
soil / rock layers and GW conditions with ranges main tests results and classifications. The site
subsurface geology has indicated almost uniform and homogeneous geological features, with no
appreciable discontinuities. However due to difference in rock level, single geotechnical analytical
models have been established based on the results of in-situ and laboratory tests.
The selected geotechnical analytical model of the site is presented below with shear strength and
stiffness parameters for each layer.
The Shear Strength and Stiffness Parameters of different soil layers are necessary for any geotechnical
analysis.
Shear Strength Parameters: the commonly used elasto-plastic Mohr / Coulomb parameters c & φ were
adopted.
Stiffness or modulus of deformation for the upper soil ‘Es’ and underlying rock mass ‘Em’.
607
These are typically established using empirical correlations based on the above selected design
parameters. The following description is given regarding selection of engineering parameters for soil
and rock mass.
The Engineering shear strength and modulus parameters of the upper sand were assessed based on
the results of in-situ Nspt tests results, and soil classification and descriptions obtained for different
layers. Software Novo-Spt (NOVO-SPT, of NOVO TECH, USA) provides numerous Nspt-Based
correlations of different desired Engineering parameters of the soil (Shear strength and modulus of
deformation, were checked and evaluated. Further, the program includes a filter to indicate the
applicability of correlations to the specified soil type.
In addition, the following simple, commonly used correlation was used to select shear strength
parameters of the upper sand layers for use in the geotechnical analysis. The friction angle and dry
density can readily be obtained for soil class type and assessed relative density as expressed by the
in-situ SPT results. Conservative estimates were made.
Figure 9: Approximate correlation to determine the effective angle φ° for cohesion less (Non-plastic)
soil and dry unit weight.
Reference is also made to CIRIA report 143, 1995 “The Standard Penetration Test (SPT): Methods
and Use, by C.R.I. Clayton Msc DIC PhD CEng MICE C Geol FGS, which describes the main
advantages and limitations if the SPT, controlling factors, accuracy, and gives numerous correlations
with Engineering parameters for different types of soils, including stiffness and shear strength.
On the other hand, recent methods advise to estimate the soil stiffness (Es) at a selected range of
shear strain that matches the expected geotechnical consideration / problem (large strains for stability
problems and smaller and limited strains for deformation analysis, typically <1% which would result in
higher modulus). Such techniques include Marchetti Flat Plate Dilatometer (DMT) which is an in-situ
testing tool, and others based on CPT – based empirical correlations.
The following correlations with in-situ Nspt tests and DMT-based ‘Es’ are given in recent literature:
• Schmertmann (1988): Nspt = MDMT (MPa) / 3
• Tanaka & Tanaka (1998): Nspt = ED (MPa) / 2.5
608
Note M is the constrained modulus and E is the modulus of deformation / Elastic modulus. They are
related as:
E’ = M (1+ν)(1-2ν) / (1-ν)
Hoek and Brown (1980a, 1980b) proposed a method for obtaining estimates of the strength of jointed
rock masses, based upon an assessment of the interlocking of rock blocks and the condition of the
surfaces between these blocks. The application of the method to very poor-quality rock masses
required further changes (Hoek, Wood and Shah 1992) and, eventually, the development of a new
classification called the Geological Strength Index (Hoek, Kaiser and Bawden 1995, Hoek 1995, Hoek
and Brown 1997).
The rock mass presented by core data is indicated on the generalized subsurface profiles and boring
logs.
In order to use the Hoek-Brown criterion, three ‘properties’ of the rock mass have to be estimated.
These are typical published material constant (mi) for common rock types are as follows:
GSI for various rock layers were established by ACES senior geologist.
609
8.3.2 Deformation Modulus of Rock Mass
The following modification to Serafim and Pereira’s equation is proposed "E. Brown, M.S Diederichs -
Empirical Estimation of Rock Mass Modulus, International Journal of Rock Mechanics & Mining
Sciences 43 (2006) 203 - 215"
Note that GSI has been substituted for RMR in this equation and that the rock mass modulus Erm is
directly dependent on Ei (Intact Rock Modulus). Ei is typically input by the user, however, if no direct
measurement of Ei is available due to highly fractured rock or other reasons, then it is estimated as Ei
- MR x ci in which, MR = Modulus Ratio and ci is the Compressive Strength of Intact Rock.
Typical published MR (Modulus Ratio) for common rock types are as follows:
Special software (rock lab of Rock Science, USA) was used to carry out the above calculations for
Rock-Mass Parameters.
The selected geotechnical parameter model of the site is presented below with shear strength and
stiffness parameters for each layer.
610
Table 9: Geotechnical Design Parameter Model
Elevation of Engineering Parameters
(RD* /
each layer (m
Geological Material Unit Wt,
DMD) N- UCS Poisons C,
Strength Description Ed,
KN/m^3, °
From To Classification) SPT (MPa) MPa ratio, kPa
b
Based on the examinations of the site materials, the field and laboratory test results,
engineering analysis and previous practical experience in the area with the soil materials
encountered in the investigation, it is our opinion that the proposed structure(s) can be
satisfactorily supported by the ground materials subject to the following recommendations:
Based on the information provided by the client, the proposed structures are to be supported on
isolated/strip footing and raft foundations. The foundation levels as provided by The Engineer are
shown below in Table 10.
Table 10: Summary of foundation details
Foundation Tentative Footing
Foundation Foundation level
Structure Depth below Size
Type (m, DMD)
Gate Level* (m) (m)
132/11kV Main Building (IDT,
SR, ET, Fire Pump Room with
RAFT -4.00 27.65 L= 42.5 x B= 39.25
Fire Water Tank & Security
Room)
Under Ground Oil Water Tank RAFT -5.7 25.95 L= 13.0 x B= 6.7
-2.15 29.5 B=1.80
Boundary wall Strip Footing -2.90 28.75 B=2.40
-3.60 28.05 B=3.00
-0.95 30.70 B=1.10
Fire Pipe Trench Strip footing
-1.65 30.00 B=2.00
-1.75 29.90 B=1.50
Strom water Pits & Foul Water -2.25 29.40 B=1.50
Isolated footing
manholes -2.75 28.90 B=2.50
-3.90 27.75 B=3.00
Outdoor Miscellaneous -1.50 30.15 B=1.50
Structures (Manholes & Soak Isolated footing
pits) -2.90 28.75 B=2.00
611
Foundation Tentative Footing
Foundation Foundation level
Structure Depth below Size
Type (m, DMD)
Gate Level* (m) (m)
-2.50 29.15
Duct Bank Strip footing -3.00 28.65 B=3.50
-3.40 28.25
Holding Tank Isolated -3.50 +28.15
L=4.0 x B=3.0
Footing -4.00 +27.65
*Gate Level +31.65m DMD as provided.
The existing ground shall be excavated to specified level as mentioned in Table 10 above and shall
be inspected by a qualified engineer to confirm that the required depth has been reached and that any
undesirable materials are removed. Moreover, the exposed foundation ground shall be proof rolled in
soil with heavy vibratory rollers to ensure that any loose soil is densified to not less than 95% of the
max. dry density as determined by ASTM D 1557 (Modified Proctor) or equivalent BS Procedure.
Uneven localities or over excavations in rock shall be re-filled and leveled with mass concrete, if
required.
It is recommended that a layer of well compacted selected granular road base material of 200 mm
thickness be furnished directly below the foundation. The layer is recommended to be well compacted
to not less than 98% of the max. dry density as determined by Modified Proctor Test (ASTM D 1557)
or BS 1377: 1990 Part 4 Cl. 3.5.
This layer shall be extending to not less than 2.50 m surrounding the foundation area/ foot print of the
structures. The natural ground shall be protected against potential scour effects by suitable means (as
tiling, grouted pitching, etc.).
Placement
Fill material shall not be placed until the required excavation and foundation preparation have been
completed and the foundation has been inspected and approved by the Engineer.
Fill shall be placed in approximately horizontal layers. The thickness of each layer before compaction
shall not exceed 25cm or as may be otherwise approved by the engineer. Materials placed by dumping
in piles or windrows shall be spread uniformly to not more than the specified thickness before being
compacted.
If the surface of any layer becomes too hard and smooth for proper bond with the succeeding layer, it
shall be scarified parallel to the axis of the fill to a depth of not less than 2 inches before the next layer
is placed.
During placement and compaction of fill, the moisture content of the materials being placed shall be
maintained close to the point of optimum, as determined by the procedures of ASTM D 1557 (Modified
Proctor), or BS 1377: 1990 Part 4 Cl 3.5.
612
Compaction
Earth fill shall be compacted according to the following requirements: Each layer of engineered fill shall
be compacted, so that the, density is not less than 95% degree of compaction for engineer fill layer
(ASTM D 1557 (Modified Proctor), or BS 1377: 1990 Part 4 Cl 3) or as shown on the design drawings.
Testing
During the course of the work, the Engineer will perform such tests as are required to identify materials,
to determine compaction characteristics, to determine moisture content, and to determine density of
fill in place. These tests performed by the Engineer will be used to verify that the fills conform to the
requirements of the specifications. Such tests are not intended to provide the Contractor with the
information required by him for the proper execution of the work and their performance shall not relieve
the Contractor of the necessity to perform tests for the purpose.
In-situ plate loading tests (Cyclic with 60cm plate) are advised for each 50cm thick layer of compacted
engineered fill, to confirm the assumed in-situ modulus of deformation of 30 Mpa (The number and
location of tests shall be advised by the Engineer depending on construction progress, etc..), in
addition to in-situ density tests.
Load – deformation analysis was carried out to assess the foundation settlement and confirm the
allowable bearing pressure using specialized computer software as described below.
An idealized subsurface profile indicating the bedrock level and thickness of different soil layers and
their interpreted engineering parameters has been established.
Geotechnical analysis was carried out using specialist software (GGU footing) that considers both
allowable bearing capacity (qab) and settlement (qas).
A: analysis for qab: qab was assessed using the conventional bearing capacity equations with
specialized software GGU-Footing. The program considers the layered system of soil and rock and
GW table representing the site, in addition to the foundation shape and average specified loading. The
safety factor against BC failure is calculated using the conventional bearing capacity equation which
has the general form of: qult = c.Nc scdcicbcqc + ½ B N sdibq + q Nq sqdqiqbqqq , the program adopts
solution based on Terzaghi / Meyerhoff / Hansen / Vesic and the DIN 4017 formulation. A safety factor
against general shear failure of 3 was adopted.
B: Analysis for qas: the program performs settlement analysis adopting the elastic theory. Each layer
is divided into thin sub layers, and the foundation pressure distribution in the subsoil layers is calculated
using the elastic theory. The settlement for each sub layer is then calculated as ∆s=∆σv.∆z/Ed. The
final settlement is the sum of the settlement of each of the significant sub layers. The settlement
analysis was made for selected range of foundation pressure to select the most appropriate value for
qas and considering the effect of long term settlement as discussed below.
Limiting Depth Consideration: The limiting depth for settlement calculation is typically much less
than the theoretical depth of influence. Typically, for normal conditions, the calculations for settlement
are truncated below the depth at which the total vertical stress exceeds the overburden stress by x %
(As a rule 20%).
613
This is recommended by DIN 4019
(German Standard) as shown in the
below schematic diagram.
Long Term Settlement: Long term settlement may come from consolidation of clay soil and creep
effects of cohesion less soil and rocks, in general.
Clay soils were not encountered within the foundation soils in this site, therefore consolidation
settlement is unlikely.
The creep of rock depends on the rock joints, width of joints, joint filling soils, where clause of joints
with time produces creep movements. The encountered rock mass is characterized with closely to
moderately spaced joint system, with narrow to tight joints devoid of any compressible infilling
materials. Therefore, the long term creep settlement of bedrock would be in-significant and negligible.
Long term settlement for foundations on cohesion less soil is typically assessed as a fraction of the
initial / short term settlement calculated as below.
Creep of foundation on cohesion less soil was assessed using the following two methods presented
in “Engineering and Design-Settlement Analysis”, US Army Corps of Engineers, Engineering Manual
1110-1-1904.
According to this procedure, Ct represents the time-dependent increase in settlement, related with
creep and secondary compression as observed in clays.
2) Burland and Burbidge Approximation: According to this procedure, the settlement after time t
at least 3 years following construction from creep and secondary effects may be estimated by:
t = ft · i
Where:
ft : 1 + R3 + R2 · Log t/3
R3 : time-dependent settlement ratio as a proportion of the immediate settlement i during first 3
years following construction, ~ 0.3
614
R2 : time-dependent settlement ratio as a proportion of the immediate settlement i for each log
cycle of time after 3 years, ~ 0.2
Values of R3 and R2 are conservative.
Using the above relations, the followings were obtained:
The creep of rock depends on the rock joints, width of joints, joint filling soils, where clause of joints
with time produces creep movements. The encountered rock mass is characterized with closely to
moderately spaced joint system, with narrow to tight joints devoid of any compressible infilling
materials. Therefore, the long-term creep settlement of bedrock would be in-significant and negligible.
In this project, the maximum allowable settlement (long term settlement) is considered as 25mm and
differential settlement as 10mm for the spread/strip footing and raft foundations as per the DEWA
specifications. It should also be noted that most of the expected settlements will take place during
construction period.
The allowable bearing pressure is the maximum bearing pressure of the foundation that satisfies the
following two conditions:
1. The bearing capacity of the foundation soil / rock is greater than the maximum bearing pressure
with adequate safety factor, typically 3.
2. Settlement of the foundation which will result from both elastic and inelastic strain of the soil / rock,
and possibly long term creep effects to be below tolerable limits under maximum bearing pressure.
The bearing capacity of wide foundations on bedrock materials would be very high and hence condition
1 above is already satisfied. This was confirmed with geotechnical analysis results of bearing capacity.
Accordingly, the following allowable bearing pressures are summarized in below Table 13
615
Modulus
Excavation of
Foundation Tentative Gross Allowable
Depth Foundation Recommended Subgrade
Foundation Depth Footing Bearing max.
Structure below level net allowable Reaction
Type below Gate Size Capacity settlement
Gate (m, DMD) pressure (Kpa) Ks based
Level* (m) (m) (Kpa) (mm)
Level* (m) on shear
(MN/m3)*
Strip -2.90 -3.23 28.75 B=2.40 250 302 25 30.0
Footing -3.50 -3.83 28.15 B=3.00 270 333 25 32.4
Fire Pipe Strip -0.95 -1.28 30.70 B=1.10 180 197 25 21.6
Trench footing -1.65 -1.98 30.00 B=2.00 200 229 25 24.0
Strom water -1.75 -2.08 29.90 B=1.50 200 231 25 24.0
Pits & Foul Isolated -2.25 -2.58 29.40 B=1.50 210 250 25 25.2
Water Footing -2.75 -3.08 28.90 B=2.50 220 269 25 26.4
manholes -3.90 -4.23 27.75 B=3.00 250 320 25 30.0
Outdoor
Miscellaneous -1.50 -1.83 30.15 B=1.50 200 227 25 24.0
Isolated
Structures
Footing
(Manholes & -2.90 -3.23 28.75 B=2.00 225 277 25 27.0
Soak pits)
-2.50 -2.83 29.15 230 275 25 27.6
Strip
Duct Bank -3.00 -3.33 28.65 B=3.50 250 304 25 30.0
footing
-3.40 -3.73 28.25 270 331 25 32.4
Isolated -3.50 -3.83 28.15 L=4.0 x 230 293 25 27.6
Holding Tank
footing -4.00 -4.33 27.65 B-3.0 250 322 25 30.0
*Note: The calculation was estimated based on the equation Ks= 40(FS)qa
The typical calculation output for the bearing capacity is given in Appendix H.
It is recommended that a layer of well compacted selected granular road base material of 200 mm
thickness be furnished directly below the foundation. The layer is recommended to be well compacted
to not less than 98% of the max. dry density as determined by Modified Proctor Test (ASTM D 1557)
or BS 1377: 1990 Part 4 Cl. 3.5. Additionally, as advised by client an addition of 130mm is consider
for excavation below foundation.
The modulus of sub-grade reaction is a foundation-soil interaction parameter and not a geotechnical
property of the soil. The modulus of subgrade reaction based on shear is calculated as 40(FS)qa
(where qa is the allowable pressure).
The ground improvement shall be verified with adequate testing to ensure that effective improvement
to the soil stiffness has been achieved as anticipated. Tests such as field density, PLT test etc… is
typically employed in such verification programs. However, specialist can be contacted for suitable
methods.
The information given in this investigation may be used for selection and design of the most appropriate
ground improvement method and scheme; however, the specialist contractor may also conduct any
additional testing if required on his own.
Accordingly, the following allowable bearing pressures can be used for design after successful
implementation and verification of six layers of well compacted road base.
616
Table 13: Recommended Allowable Bearing Pressures for Raft Foundations after 6 layers of Road base
Estimated total Modulus of
Foundation Recommended Subgrade
(Max.) foundation
Structure Foundation Type level Allowable Bearing Reaction
Settlement
(m, DMD) Pressure, (kPa) Ks based on
mm
shear (MN/m3)*
132/11kV Main
Building (IDT, SR,
RAFT
ET, Fire Pump
L= 42.5 x +27.65 275* <25 33.0
Room with Fire
B= 39.25
Water Tank &
Security Room)
* Verification of in – situ modulus of deformation for road base replacement should be confirmed by field density and cyclic
plate load test.
It is to be noted from the above table that the specified bearing capacity requirement of 350
kPa for main the building cannot be achieved on existing ground conditions, accordingly to
meet this requirement ground improvement with installation of stone column can be
considered as discussed below.
The ground improvement shall be verified with adequate testing to ensure that effective improvement
to the soil stiffness has been achieved as anticipated. Tests such as Zone Loading Tests etc… is
typically employed in such verification programs. However, specialist can be contacted for suitable
methods.
The information given in this investigation may be used for selection and design of the most appropriate
ground improvement method and scheme; however, the specialist contractor may also conduct any
additional testing if required on his own.
Accordingly, the following allowable bearing pressures can be used for design after successful
implementation and verification of ground improvement by stone column.
Table 14: Recommended Allowable Bearing Pressures for Raft Foundations after stone columns
installation
Modulus of
Recommended Estimated total Subgrade
Foundation Length of Stone Allowable (Max.) foundation Reaction
Foundation Column
Structure level
Type Bearing Settlement Ks based on
(m, DMD) (m)
Pressure, (kPa) mm shear
(MN/m3)*
132/11kV Main
Building (IDT,
RAFT
SR, ET, Fire
L= 42.5 x +27.65 3.42 350* 25 42.0
Pump Room with
B= 39.25
Fire Water Tank
& Security Room)
* After successful ground improvement, verification of in – situ modulus of deformation for stone columns should be confirmed
by zone load tests and cyclic plate load test.
617
9.5 Seismic Design Parameters
A. Soil Profile Type: According to uniform building code, UBC 1997 / International Building Code IBC
2006 / ASCE/ISE 7-05 (American Society of Civil Engineers, the statistical average shear wave velocity
vs of the upper 100ft (30m) below the foundation is used to select the soil profile type as follows;
Since direct in-situ measurement of shear wave velocity was not done and based on the boreholes the
below site classification is done.
Based on the encountered subsurface materials, site class as ‘SC’ (representing Soft Rock) can
be considered. However, it is further recommended to verify the same by direct in-situ
measurement of shear wave velocity by down-hole or other appropriate methods.
B. Very limited studies are available that describe seismic activity and zoning in the area. The report
“Earthquakes and Seismic Zones in the Middle east”, by J D Mortimer-Lloyd, BRE – Building Research
Establishment, Report No. Cl/SfB 1976 (H16), published 1983, provides an evaluation of seismic
history from previous records available and instruments data, and suggests zoning classification and
ground motion activity.
Accordingly, the site area is classified within UBC Seismic Zone 2A, with Seismic Zone Factor Z
equals 0.15. Below is schematic of UBC seismic zoning scale.
Figure 12: Effective Peak Ground Acceleration, 10% Exceedance Probability for 50 Years Exposure
Time
The above assessments are subject to the approval of The Engineer.
The retaining walls, if any, drained and backfilled, shall be designed for an equivalent earth lateral
pressure, plus a uniform lateral pressure which corresponds to the maximum expected surface loads.
For a general estimate of earth pressures on shallow sub-grade walls, the following parameters are
recommended:
618
Table 15: Coefficients of Lateral Earth pressure
Elevation Range (m DMD)
Soil Parameters
+31.65 to +28.0 +28.00 to 26.00
Dense to Very Dense
Ground Material Type Very dense SAND
SAND
Cohesion (kPa) 0 0
Notes:
1. Lateral earth pressure parameters were estimated without considering the wall / soil friction, the
wall is vertical and ground surface is horizontal. Moreover, likely over consolidation, aging or
cementation effects were not estimated. Deviations from these conditions, if encountered, shall be
considered by the foundation engineer. The data included in this report can be used for more
specific parameter estimates, if required.
2. Representative shear strength parameters shown above represent average estimates based on
soil classification index properties, in-situ and laboratory tests results as discussed above.
3. ACES would be pleased to provide further detailed recommendations, if required, for specific
design situations, at separate fees.
Lateral pressure is calculated using:
σ' a = σ’v Ka – 2c’ √(Ka), in which Ka = Tan2 (45- Φ’/2)
σ‘p = σ’v Kp + 2c’ √ (Kp), in which Kp = Tan2(45+ Φ’/2)
Lateral pressure at rest: σ‘0 = σ’v K0
σ'o = ko . σ’v = ko . . z
ko = /(1-), where is poisons ratio.
For = 0.3, then ko = 0.43
However, measurements of horizontal stresses have shown that the ratio ko tends to be high at shallow
depths and it decreases at depth (Hoek and Brown 1978, Herget, 1988). Accordingly, the above
estimate is recommended. These are generally supported by PMT interpreted Ko.
619
10.0 FOUNDATION CONSTRUCTION
The excavation works are to be carried out in accordance with good construction practice, as per BS
6031: 1990, “Code of Practice for Earthworks” or a similar recognized standard. The proposed shallow
excavations are expected to be through dense to very dense SAND formation. Therefore, conventional
excavation equipment such as loaders and dozers will be needed for the excavation works for upper
sandy materials.
Where space permits and above the water table, the side slopes in temporary excavations should not
be steeper than (3H: 2V) in the upper sandy soil, as recommended by the CIRIA Report No. 97
“Trenching Practice”.
If the above recommended side slopes cannot be achieved for insufficient lateral space or any other
reason, a temporary lateral support (shoring) system will be needed and shall be installed.
The following general backfilling and compaction criteria are recommended, unless otherwise stated
in the project specifications:
Materials to be used for backfilling purposes against sub-grade walls and around foundations are
described as backfill. Because water penetration is not desired, the material to be used for this purpose
(unless otherwise stated by the project specifications) shall be a soil or soil-rock mixture of low
permeability, which is free of organic matter or other deleterious substances. It shall not contain rocks
or lumps over 15 cm in greatest dimension, and not more than 15 percent larger than 7 cm. The
percentage of the fine materials (passing sieve no. 200 shall not exceed 20%). The plasticity index for
the backfill material shall not be more than 10 percent. It shall be spread in lifts not exceeding 25 cm
in compacted thickness, moisture conditioned to its optimum moisture content, and compacted to a
dry density not less than 95 percent of the maximum dry density as determined by the procedures of
ASTM D 1557 (Modified Proctor), or BS 1377: 1990 Part 4 Cl 3.5.
Suitability test shall be performed on the encountered materials to satisfy the above stated backfilling
criteria to be used as backfill material.
It is recommended that proper and efficient surface drainage be provided at the location of the project
both during and after construction. Surface water should be diverted away from the edges of the
excavation.
If the excavation has to be carried out below the ground water table, dewatering is necessary.
However, the water table level is approximately at 11m below the gate level, hence dewatering might
not be required. In any case, if the excavation has to be carried out below water table, then a minimum
depth 1m should be maintained from the excavation level and monitoring to be performed to assure
the same.
In all cases, specialist contractors should be consulted in this regard. Care should be taken during
dewatering to ensure that fines are not removed during pumping since this could result in unpredictable
settlements of the surrounding ground and associated structures.
620
Different methods for site dewatering exist; ranging from shallow trenches and sumps, well point
dewatering system or deep wells depending on the depth of dewatering and site particulars. Shallow
trenches and pumping are only suitable for very shallow dewatering requirements, whereas well points
are more convenient for larger dewatering depth.
The effective depth of a well point system below the header pipe is about 5-6m only; therefore, a single,
double or even multiple systems may be used depending on the required depth of dewatering.
Specialist contractors, with sufficient previous experience, must be consulted for the selection and
design of the shoring and dewatering systems
11.1 Introduction
The primary cause of serious deterioration in reinforced concrete is corrosion of the reinforcement,
due to attack by chlorides, present in concrete either within concrete aggregate and mixing water, or
through penetration from surrounding environment. Since chloride induced reinforcement corrosion
can only occur in the presence of oxygen and water, the risk of corrosion can be reduced by control of
chloride in concreting materials and by ensuring adequacy, integrity and impermeability of the concrete
cover.
Sulphate attack to concrete is caused by the presence of a high sulphate content either by the ingress
from the sulphate of the surrounding environment such as foundations soils or groundwater, or by the
presence of sulphate in the concrete ingredients. The attack results in a considerable internal
expansion which may lead to crack and disintegration of the concrete. This effect can be reduced by
use of selected cements or by suitable protection of the concrete.
Where sulphate and chloride occur together in high concentrations, sulphate resisting cement provides
less protection against the reinforcement corrosion. In such cases the test exposure conditions should
be studied in conjunction with modified recommendations for concrete mix design, based on local
experience in the Gulf Region and CIRIA Special Publication 31(1984).
It may be noted that as per CIRIA Special Publication 31, there is no widely accepted view on the
concentration at which chlorides become significant in soil or ground water, but limited experience in
the Gulf Region suggests it may be as low as 0.05% particularly in situations where wetting and drying
or capillary rise effect the concrete.
The results of chemical analysis for soil and ground water in the site are given in Appendix D2. The
methodology of assessment of ground for chemical agents aggressive for concrete has been based
on the latest publications concerning assessment of exposure conditions and specification of concrete
to resist chemical attack:
1. BS 8500-1:2006
2. BRE Special Digest 1, 2005, 3rd ed, “Concrete in Aggressive Ground”.
3. CIRIA Publication C577, 2002, Guide to the construction of reinforced concrete in the Arabian
Peninsula.
Appendix G: includes selected extracts from the above referenced documents.
Notes:
a. SD 1: 2005 includes some key changes over SD 1:2003 version. Direct reference to this document
is recommended for appreciation of these changes. SD 1 refers to conditions in UK, however, the
621
document is widely in use in the area and it includes very useful information that is also in close
matching with other references (e.g. CIRIA C577, and BS 8500); therefore, reference to SD 1 was
made in this report.
b. The analysis conducted below is mainly intended to highlight the general procedure and main steps
and factors affecting the selection of durable concrete within the existing aggressive environmental
and site conditions. It presents a range of solutions and therefore, it is the designer who must make
the most appropriate selection. Further, other references may be used as may be applicable to
reach the optimum selection. It is our advice that the strictest requirements be followed from the
different resources.
c. In addition, several mix characteristics and aggregate property ranges from local experiences to
produce concrete of high durability and strength and other high quality engineering parameters are
included to demonstrate the typical concrete proportions and constituents that can be achieved
locally.
Classification of the severity of chemical attack in the investigated site was based on the foundation
soil / GW sulphate content and PH value (Natural Soil and mobile GW conditions were adopted),
location of foundation, as well as the type of exposure conditions. Accordingly, the following
classification was obtained:
Table 16: Classification of Ground Conditions
Aggressive Chemical
Design DS based on Water
Environment
Location of Sulphate Class Soluble sulphates in
for Concrete Class Reference
Foundations
2:1 water / soil extract
(DS-Class) (ACEC-Class)
or GW
Table A.2 of BS
DS-3 Soil / Water AC-3
Soil 8500-1:2006
DS-3 Soil / Water AC-3 SD 1:2005, Table C1
The concrete quality and number of additional protective measures are outlined in Tables A.9 of BS
8500-1:2006. The Design Chemical class (DC) is obtained for a specified Structural performance level
(SPL) and concrete section thickness.
The following preliminary design chemical classification may be proposed, subject to the following
provisions: Cast in-situ concrete for general use, well compacted with no face exposed to air, high
structural performance, and concrete section thickness >450mm,
Table 17: Concrete Quality & number of Additional Protective Measures
Design Chemical Class Additional Protective Measures
ACEC-Class
(DC Class) (APM)
DC-3 + one APM of choice+ one APM of
AC-3 DC-3 (FND3)
choice, DC-4 or FND4
Description of the options for the required additional protective measures for buried concrete is given
in the above referenced document.
However, adoption of the appropriate APMs, for particular application shall be carefully considered.
BS 8500-1: 2006 refers to SD 1: 2005, which provides full guidance and a series of design guides that
aid the selection of DC class and the relevant APMs. Design guides for specifying concrete for common
applications such as: Non-Domestic buildings including residential buildings …, Low Rise Domestic
Buildings, and Transport structures, are given in design guides No: (1a … 1h, 2a … 2c, 3a … 3g) for
the three categories, respectively in BRE Special Digest 1, 2005. These design guides provide
recommended DC (Design chemical class) according to the ACEC class selected previously, and then
622
recommends the appropriate APM number most suitable for the particular foundation element. These
design guides shall be referenced by the specifier.
BRE SD 1: 2005 has replaced the SPL by “Intended working life”. Table D1 provides selection of the
DC Class and the number of APMs for concrete elements where the hydraulic gradient due to
groundwater is 5 or less: for general in-situ use of concrete, using the ACEC class selected above.
Accordingly:
Table 18: Intended working life and number of APMs for concrete elements
Intended Working Life
ACEC – Class Reference
At Least 50 Years At Least 100 Years
AC-3 DC- 3 DC- 3+one APM of choice SD 1: 2005, Table D1
Table A.11 of BS 8500-1:2006, specifies Limiting values of composition and properties of concrete
where a DC class is specified, and recommend minimum cement or combination content for max.
aggregate sizes, maximum water cement ratio, Cement or Combination group. The selected
parameters apply to this site are (Please note that this assessment is based on preliminary estimate of
DC for general use. Consideration of changed DC class for particular application shall be made):
Table 19: Concrete Qualities to resist chemical attack for the general use of in-situ and precast concrete
Max free w/c Minimum cement or
or combination content Recommended cement and Reference
DC Class combination Kg/m3 combination group
ratio
For max. aggr size 20mm *
0.50 340 IIIB+SR BS 8500-
1:2006
DC-3 0.45 360 IVB-V Table A.11
0.40 380 IIB-V+SR,IIIA+SR,SRPC
BS 8500-1:2006 Table A.6 gives descriptions of cement and combination types.
*Note: for mixes with different max. aggregate size, please refer to above document.
SD 1: 2005, Table D2 and D3 provide Cement and Combination types for Concrete Qualities to resist
chemical attack for the general use of in-situ concrete. The followings are obtained:
0.50 340 F
SD 1: 2005,
DC-3 0.45 360 E
Table D2
0.40 380 D,G
SD 1: 2005, Table D2 & D3 gives descriptions of cement and combination types.
*Note: for mixes with different max. aggregate size, please refer to above document.
Comparison between cements specified in British standards which are still current or are to be
withdrawn and common cements specified in BS EN 197-1: 2011 adopted in SD-1:2005,Table D2
referred above is attached. For further details, it is advised that BS EN 197-1:2011 CEMENT-
(Composition, specification and conformity criteria for common Cements) be referred.
623
11.6 CHLORIDE INFLUENCES
The above classification does not reflect the significance of chloride ions in concrete surrounding. It
may be noted that as per CIRIA Special Publication 31, there is no widely accepted view on the
concentration at which chlorides become significant in soil or ground water, but limited experience in
the Gulf Region suggests it may be as low as 0.05% particularly in situations where wetting and drying
or capillary rise effect the concrete.
In such cases the site exposure conditions should be studied in conjunction with modified
recommendations for concrete mix design, based on local experience in the Gulf Region, CIRIA
Publication C577, 2002, “Guide to the construction of reinforced concrete in the Arabian Peninsula”.
For reinforced concrete in the ground the need for protection from chlorides must be balanced against
the need of protection from sulphates and where necessary a cement resistant to both sulphates and
chlorides should be used.
The usual procedure is to use cement giving best protection against chlorides and to prevent sulphates
ingress by tanking (coating with an impervious material), the surface of the concrete. Also in coastal
regions or in locations where high levels of ground salts are present all foundation concrete should be
protected by tanking to minimize salt and water ingress. In every case the need for good quality
concrete with low permeability is desirable.
The following tables give information on typical exposure conditions and recommended concrete mix
and cover criteria.
Table 21: Classification of exposure conditions in the Arabian Peninsula (Table 5.1 CS277-2002)
Exposure
Locations
condition
A Superstructures inland with no risk of windborne salts
B Superstructures in areas of salt flats, inland or near the coast, exposed to windborne salts
Parts of structures in contact with the soil, well above capillary rise zone, with no risk of water
C
introduced at the surface by irrigation, faulty drainage systems, washing down etc.
Parts of structures in contract with the soil, within the capillary rise zone, below ground water level
or where water may be introduced at the surface by irrigation, discharge of wastes, washing down
etc. The situations all lead to a potential for the concentration of aggressive salts by evaporation.
D
(i)Significant sulphate contamination only
(ii) Significant chloride contamination only.
(iii) Significant contamination with both sulphates and chlorides.
E Marine structures (splash zone)
F Water retaining structures (including sewerage treatment plants)
Table 22: Typical concrete mix criteria and cover requirements for exposure conditions in the Arabian
Peninsula from above table
Minimum Maximum Minimum
Exposure Cementitious cementitious free- Additional cover to
Conditions material (s) content for 20mm water/cement requirements reinforcement
aggregates (kg/m3 ) ratio ** (mm)
A 300-320 0.52 None 30
B 320 0.50 None 40
Portland cement
c* or additions 320-350 0.45 None 40-50
d(i), (ii) or
320-400 0.42 Tanking 40-50
(iii)
624
Portland
e and f Cement blends 370-400 0.40 None 100-150
with additions
*When concrete is cast directly in contact with soil the minimum cover should be increased to 75mm.
** On well supervised projects free-water /cement ratios down to 0.35 have successfully achieved using the latest generation
of super-plasticizers.
In general, Portland cement with a high C3A content is more resistant to chloride penetration than
Portland cement with a low C3A content.
Concrete containing pulverized fuel ash, ground granulated blast furnace slag and silica fume are
highly resistant to penetration by chlorides, due to their increased binding capacity and refined pore
structure.
The following are the main methods of reducing the penetration chlorides. (Table 6.1 CS277-2002)
Normal concrete containing silica fume will reduce the chloride penetration when used in conjunction
with a very low water /Cement ratio, the potential increase in resistance to chloride penetration is
considerable.
For further information, refer Guide to the construction of reinforced concrete in the Arabian Peninsula
(CIRIA Publication C577:2002.)
11.7 Conclusion
Modified or confirmed design recommendations shall be the responsibility of the designer, who shall
finalize the concrete specification considering the designed structural performance level, section
thickness, hydrostatic pressure, local availability of aggregate.
The following important points should be taken into consideration at the design stage and during
construction.
625
4. Methods for protection from surface water from the adjacent roads, buildings and areas must be
studied. Any water, sewer or service pipes or manholes must be diverted from the plot.
Dewatering during excavation and construction must be studied and a provisional system shall
be designed.
5. Accurate type and level of foundations at the adjacent buildings must be determined at the design
stage and the stress interaction between the two foundations must be studied. Methods for
supporting the existing foundations must be studied if the excavations reach the existing
foundations.
6. The type of foundation, retaining walls and its method of construction should be carefully studied
if all area of project site is intended for utilization as built area.
7. Extreme care must be ensured during excavation which should be carried out under close
supervision. Over excavation of the sides should be totally avoided and the effect of vibration or
impact during excavation should be avoided.
8. The scheduling of excavation and construction should be studied to provide maximum safety.
9. The design of support and all other measures and requirements mentioned above should be
studied by competent structural engineers.
All the above notes are outside the scope of this investigation but should be taken into consideration
at the design stage and prior to any excavation.
In addition to the above, all municipal and local requirements regarding site excavations adjacent to
existing structures, services and roads shall be fully satisfied.
The recommendations given in this report are based on the assumption that the subsurface materials
and conditions do not deviate appreciably from those disclosed in the borings.
Our office should be notified, in writing, immediately after site excavations to inspect the excavations
and confirm that the existing materials and conditions are similar to those encountered during the
investigation.
1. The groundwater levels indicated on the logs of borings represent the measured levels at the time
of investigation. It should be noted however, that groundwater levels are subject to variations
caused by tidal and weather seasonal variations and by changes of local drainage and or pumping
conditions.
2. Conclusions and recommendations given in this report are based on the findings from the drilled
boreholes, and obtained tests results.
3. All information in this report is considered confidential and should not be copied or used without
the permission of "Arab Center For Engineering Studies". No part of this report may be reproduced,
photocopied, translated, published, recorded, stored in a retrieval system or transmitted in any
form or by any means without the prior written permission of ACES.
4. The content of this report are not to be used for advertising, publication or promotional purposes.
Citation of any trade name does not constitute promotion or approval of the use of such product.
Electronic copy of the contents of this report & appendices is attached to this report.
626