Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

250mm Thick

Filter Material

5.0
8.5 1.0 8.5

300mmX300mm Geotextile
Attached to Wall at Wephole

3.3 10.3
13.5

CH:46+740to CH:46+750

90mm PVC weep holes


@ 1000mm c/c Horizontal and Vertical

5
0.10m PCC
10
250mm Thick
Filter Material ELEVATION OF MASONRY BREAST WALL
5.0

8.5 1.0 8.5

300mmX300mm Geotextile
Attached to Wall at Wephole

3.3 10.3
13.5

NOTE:
1.ALL DIMENSIONS ARE IN M UNLESS NOTED OTHERWISE.
2.THIS DRAWING ARE USED IN MASONRY WALL CONSTRUCTION.

EMPLOYER: CONSULTANT: CONTRACTOR: PROJECT: SASEC Mugling–Pokhara Highway Improvement Phase-I Designed By : SCALE As shown
Government of Nepal Project – (SMPHIP) MASONRY BREAST WALL DETAILS
Renardet S.A., Switzerland Checked By : DATE: Mar.2022
Ministry of Physical Infrastructure and Transport China Communications Construction Company Ltd. ADB Loan No. 3846 NEP KM46+720 TO KM46+760
in association with Mugling – Anbukhaireni – Pokhara Road (Section-1)
Department of Roads Verified By : DRG NO :
Soil Test (P) Ltd., Nepal and
Project Directorate (ADB)
CEMAT Consultants (P) Ltd., Nepal
(C.C.C.C) Contract No: SMHIP/OCB/MAP/01
Bishalnagar, Kathmandu, Nepal (Km 8+250 to Km 49+700) Approved By : SHEET NO :

You might also like