Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

6.

000

6.000

6.000

6.000
5.000

5.000

5.000

5.000
0.400

375.267
374.433
373.638

0.400
372.942

Note:
1.All dimensions are in m unless noted otherwise.
2.This drawing are used in Masonry Skin wall construction.

EMPLOYER: CONSULTANT: CONTRACTOR: PROJECT: SASEC Mugling–Pokhara Highway Improvement Phase-I Designed By : SCALE As shown
Government of Nepal Project – (SMPHIP)
Renardet S.A., Switzerland Checked By : DATE: May 2022
Ministry of Physical Infrastructure and Transport China Communication Construction Company Ltd. ADB Loan No. 3846 NEP
in association with Mugling – Anbukhaireni – Pokhara Road (Section-1)
Department of Roads Verified By : DRG NO :
Soil Test (P) Ltd., Nepal and
Project Directorate (ADB)
CEMAT Consultants (P) Ltd., Nepal
(C.C.C.C) Contract No: SMHIP/OCB/MAP/01
Bishalnagar, Kathmandu, Nepal (Km 8+250 to Km 49+700) Approved By : SHEET NO :

You might also like