INSPECTION REPORT OF RE PROJECTS

Date of inspection
Officers Present during inspection
Name

Representative of the Generator

Details of the plant

1 Name of the plant


2 Location of the plant
Capacity of the plant
Type of fuel

Capacity applied for accreditation


Date of Synchrinization
Date of COD
Generation Voltage
Pooling Station
Interconnecting point and Interconnecting Substation of TRANSCO/DISCOM
Interconnecting line details at generated end:
Volatge level of Inter
File No.EPCOR-17001(03)/8/2018-Solar Energy
INSPECTION REPORT OF RE PROJECTS

I Date of inspection 16.07.2021


II Officers present during inspection
Name Company Designation & Mobile No
1 N.KRISHNA MURTHY APEPDCL/Opn. E.E/OPE/VZM
2 P.TRINADHA RAO APEPDCL/MRT. E.E/M&P /VZM
3
4
III Representative of the generator
1 K.BHARGAV KUMAR SPRINT EXPORTS PVT LTD O&M ENGINEER
IV Details of the plant
1 Name of the plant M/S SPRINT EXPORTS PVT LTD
2 Location of the plant V.KRISHNAPURAM(vil) , Vizianagaram (dist)
3 Capacity of the plant MW AC: 2.0 MW DC: 2.13 MW
4 Type of the fuel SOLAR
5 Capacity applied for accreditation -
6 Date of synchronization 22.03.2019
7 Date of COD 22.03.2019
8 Generation voltage 33kv
9 Pooling station M/S SPRINT EXPORTS PVT LTD
Interconnecting point and interconnecting Substation
10 of TRANSCO/DISCOM 33/11 KV (Komati palli Substation)

11 Interconnecting line details at generator end:


a) Voltage leveel of Interconnection with grid SS 33kv
b) Dedicated or Mixed feeder Dedicated
12 Installation & commissioning of DAS YES (12.07.2019)
13 Installation & commissioning of AMRs -
14 Provision of Direction Relay NOT AVAILABLE
Harmonic content, DC injection & flicker of Solar plant:
(As per CEA (Technical standards for connectivity to the
grid)
Amendment Regulations, 2003 dated 15th October, 2013)
15 Harmonic content, DC injection & flicker of solar plant Inbuilt in Inverters (YES)
Installation of harmonic suppressing equipment at plant
side if voltage harmonic level is high.(in case of solar plants)

Date of Harmonics, DC current, flickeer Tests as per POWER QUALITY TEST NOT YET DONE.
16
TOO406 Dt 06.03.2017 DUE DATE 21.03.2020

Maintenance expenses for inter connection facilities


17 -
( Year wise raised & collected)
File No.EPCOR-17001(03)/8/2018-Solar Energy
INSPECTION REPORT OF RE PROJECTS
Maintenance expenses for inter connection facilities
17 -
( Year wise raised & collected)

X Energy Meter Check Readings:

S No Parameter Main Meter Check Meter Standby Meter

1 Date & Time 16.07.21 12:11:00 16.07.21 12:19:00 16.07.21 12:21:00


2 MW 1.35 0.58 1.67
3 MVA 1.06 0.58 1.67
4 MVAR 0.03 0 0.08
5 MF 1000 1000 1000
6 PF 0.999 0.999 0.999
7 MWH Import 6427.4 6427.6 6428.6
8 MVAH Import 6442.7 6442.8 6443.8
9 MVARH Lag Import 84.3 84.3 84.2
10 MVARH Lead Import 138 136.4 135.7
11 MWH Export 66.3 66.3 65.7
12 MVAH Export 67.4 67.4 66.7
13 MVARH Lag Export 2.7 2.7 2.6
14 MVARH Lead Export 110 109.8 109.6
15 MD Export 1.75, 3/7/21, 11:00 1.79, 3/7/21, 11:00 1.74, 3/7/21, 11:00
16 MD Import 0.01, 3/7/21, 19:00 0.01, 3/7/21, 19:00 0.01, 1/7/21, 08:45
17 CMD Export 46.78 46.94 46.69
18 CMD Import 3.21 2.93 3.96
19 Reset Count 31 31 31

Date of Periodical Testing as


20 24.06.2020 24.06.2020 24.06.2020
per TOO 537 Dt 23.03.2010

XI Generation : in MU FY 18-19: 0.0768 FY19-20 : 2.4899 FY20-21 : 2.9240

XII Remarks of the inspecting officers:

MAIN MRI : AH218486 CHECK MRI :AH218487 STAND BY MRI :AH218489

MD MAIN :AH219061 CHECK :AH219062 STAND BY:AH219064

BOX MAIN :AH218488 STAND BY:AH218490

Signed by Vijaya Lalitha


Vipparti
Date:
Reason:
File No.EPCOR-17001(03)/8/2018-Solar Energy
INSPECTION REPORT OF RE PROJECTS
Signed by Vijaya Lalitha
Vipparti
Date:
Reason:
File No.EPCOR-17001(03)/8/2018-Solar Energy
INSPECTION REPORT OF RE PROJECTS

V Metering check points:


1 Whether dedicated CTs & PTs available for
metering YES
2 Whether seals were provided for tanks &
secondary boxes of CTs & PTs YES
Whether earthing of Metering Equipment
3
is effective YES
Whether wiring from CTs & PTs to Energy
4 meters routed through concealed GI
conduit YES
5 Whether Meter Box is earthed effectively
YES
Whether TTB wiring is as per T.O.O. 394,
6 dt. 19.01.2012 YES
Whether seals were provided for TTBs,
7 Optical port, MD Reset, Meter terminal
cover and Meter box YES
8 Whether Standby meter is available
YES
Accuracy of CTs & PTs to which Standby
9
meter is connected Class : 0.2s , 0.2
10 HT service No. & Contracted MD (if any)
VZM 475 & 70 KVA/HP

Whether the Metering Arrangement and


VI Metering location is as per the YES
APTRANSCO/DISCOM/CEIG approved
single line diagram ?
Reference of approval
Whether the generator units to nbe
considered for accreditation are
VII YES
electrically isolated from the other units
or not ?

Whether the generator units to be


considered for accreditation are
VIII constructed as per the approved
drawing ?
If No, specify the deviation.
YES
Name plate details of the generator units

Details of Solar inverters


1MW : 2no = 2.0MW (AC)
IX
Modules : 6654
Details of Solar panels 1) s.no:
9180501104 2)9180501105 Capacity of each panel: 325Wp= 2156,
320WP= 4492

X Details of Energy meters SECURE PREMIER 300


File No.EPCOR-17001(03)/8/2018-Solar Energy
INSPECTION REPORT OF RE PROJECTS
X Details of Energy meters SECURE PREMIER 300