Professional Documents
Culture Documents
Asset Facility Man Maintenance Management
Asset Facility Man Maintenance Management
Asset
Maintenance Management
Simplified services
Pronto Software, Pronto Xi, the Pronto interrobang logo
and the P interrobang logo are all registered trademarks of
Pronto Software Limited. All other marks are the property of
their respective owners.
Disclaimer
This document contains statements related to our current
and future developments that may constitute forward-looking
statements, or be subject to change. Features described may
be added or removed in future releases of Pronto Xi and may
not be available in all regions.
39 Completely customisable 57 Contract invoicing
39 How Service Scheduler works 57 One-off invoices
39 Directions and maps 57 Billing cycle
57 Payment reminders
40 Pronto Xi Mobile Service 57 Tracking
40 Fast in the field, fast in the office
) 41 Streamlined data capture
41 On the road or in the basement
41 See what to do, show what
you’ve done
Pronto Xi Maintenance Management
42 Proof of Presence
42 Safety first
Contents
42 Mobile Service invoice
process attributes
42 Smart and easy
ntry 43 Predictive Q&A
43 Materials order
43 Links hub
43 Work Instructions
44 Serial attributes
45 Service in, service out
4
48 Pronto Xi Maintenance Management
p 4
48 Equipment register
iry 5
49 Preventive and
predictive maintenance
5
49 Work Order fault reason code
5
49 Return Pick to alternate warehouse
6
50 Component change out
7
51 Work order management
in 8
52 Works with Resource Management
9
53 Inventory management
9
53 Intelligence
Maintenance Management 3
Pronto Xi Maintenance Management
Mind your overheads
Reduce breakdowns and service costs by making sure
your equipment is in top shape, and that the right parts and
manpower are handy whenever something goes wrong.
Asset
& Facility: Maintenance
Maintenance Management
Management 49
5
Component change out
A rotable repair is where a new or previously repaired item or Maintenance
work order
Materials
requisition
Spare parts
warehouse
Pick slip Parts issued
component replaces a failed item, which in turn is repaired raised
as a work
onerequest and then reject,
of the components approve
of the repairor(the
setrepair
to a status
could
of defect uponmultiple
include review. Defects
items ofcan thenthe
which berotable
addressed;
item is just one
corrections and maintenance tasks planned and scheduled.
of many) Repair job Repair
Return
Transfer repaired part
raised completed
as spare
2. The repair
An estimate of the
of hours, rotable item
equipment anditself
parts required for
the task can also be generated. This information may be
predefined
An itemonofaplant
preventive maintenance
and equipment maytask andof
consist used as alarge
several
template for the work order.
components, for example, a truck will have an engine, drive
train,for
To allow suspension, pumps,
the capture of meter etc.readings,
The pressure to keep
comments a truck
and
on the road and productive requires that
actual downtime or duration, the status of a work orderits maintenance is
completed quickly. It is often
changes progressively until completion. more efficient to replace a large
or complex component than repair the component.
Maintenance
The plant work order
item is forecasting
quickly back to being productive and Plan complex maintenance routines with ease to extend the life of your assets
50
6 Pronto Xi Solutions Overview
Work order management
A wide range of reports and enquiries is available to allow
users to prioritise and plan work orders using information
such as plant item relationships.
and plans.
Asset
& Facility: Maintenance
Maintenance Management
Management 51
7
Maintenance work order planning
Enter maintenance requirements directly into Maintenance
as a work request and then reject, approve or set to a status
of defect upon review. Defects can then be addressed;
corrections and maintenance tasks planned and scheduled.
Maintenance work order planning
EnterAn estimate of requirements
maintenance hours, equipment andinto
directly parts required for
Maintenance
as a work request and then reject, approve or set to amay
the task can also be generated. This information be
status
predefined on a preventive maintenance task
of defect upon review. Defects can then be addressed; and used as a
template for the work order.
corrections and maintenance tasks planned and scheduled.
To allowof
An estimate forhours,
the capture of meter
equipment and readings, comments
parts required for and
actual downtime or duration, the status of a
the task can also be generated. This information may be work order
changes
predefined onprogressively
a preventive until completion.
maintenance task and used as a
template for the work order.
Maintenance work order forecasting Plan complex maintenance routines with ease to extend the life of your assets
To allow for the capture of meter readings, comments and
Using work order forecasting, Maintenance can generate
actual downtime or duration, the status of a work order
preventive maintenance work orders when they fall due.
changes progressively until completion.
Planned maintenance can be entered into the system,
transferred from a work request, or converted from a work
Works with Resource Management
Maintenance work order forecasting Maintenance
Plan complex maintenance management now the
routines with ease to extend works
with seamlessly
life of your assets
order forecast.
Using work order forecasting, Maintenance can generate Resource management to give a great boost to your
Once amaintenance
preventive work order has been
work generated
orders via the
when they fall forecasting
due. maintenance productivity.
process and issued to the person responsible
Planned maintenance can be entered into the system, for
maintenance,
transferred the plant
from a work workor
request, order is now from
converted in progress.
a work
Works with
You can Resource
prevent Management
scheduling issues and conflicts with planned
maintenance
Maintenance of plant items
management now by treating
works them as
seamlessly resources and
with
order forecast.
Work order priorities updating their availability information.
Resource management to give a great boost to yourGeneric resources can
Once a work order has been generated via the forecasting be associated with
maintenance productivity. your Maintenance Labour Categories. You
Maintenance supports work order classification and
process and issued to the person responsible for can also group and assign resources to work orders in one go
escalation by priority. The use of priority codes enables key You can
maintenance, the plant work order is now in progress. as a prevent scheduling
team, simplifying issues and conflicts
maintenance planning.with planned
Subcontractors
work to be planned, resulting in scheduling and execution of maintenance of plant items by treating them as resources and or
or users can accept or decline work orders, projects tasks
the work in a timely and efficient manner. updating their availability information. Generic resources can
Work order priorities rosters via email without logging onto Pronto Xi.
be associated with your Maintenance Labour Categories. You
Maintenance
Resourcesupports
planningwork order classification and can also group and assign resources to work orders in one go
escalation by priority. The use of priority codes enables key
A predicted workload for each labour type can be compared as a team, simplifying maintenance planning. Subcontractors
work to be planned, resulting in scheduling and execution of
against the available working hours to help identify potential or users can accept or decline work orders, projects tasks or
the work in a timely and efficient manner.
work overload. rosters via email without logging onto Pronto Xi.
Resource planning
A predicted workload for each labour type can be compared
against the available working hours to help identify potential
work overload.
52
8 Pronto Xi Solutions Overview
Inventory management
Manage your spare parts availability with Inventory
Management. Inventory control, warehousing and purchasing
are provided when linked to other modules of Pronto Xi.
Serial number tracking of component issues allows easy
identification of component items within a plant asset.
Intelligence
Perform effortless and deeper analysis into key aspects
of Maintenance using Pronto Xi Analytics Dimensions for
Maintenance. A prebuilt hierarchical data format is available
to allow intuitive analysis of Plant Items, Works Orders
and Work Order Transactions using easy drill-up and drill-
down navigation.
Asset
& Facility: Maintenance
Maintenance Management
Management 53
9
The right call
We’re always ready to adapt Pronto Xi
to perfectly fit your unique requirements.