Download as pdf or txt
Download as pdf or txt
You are on page 1of 71

LTE 

Radio Access, Rel. LTE
17A, Operating
Documentation, Issue 03

3MN-01961-0006-RJZZA

LTE B41a RRH8x20 (UZHD)
Site Preparation Guidelines 
DN194159312
Issue 05
Approval Date 2017/10/01
 
 
LTE B41a RRH8x20 (UZHD) Site Preparation Guidelines

The  information  in  this  document  applies  solely  to  the  hardware/software  product  (“Product”)  specified
herein, and only as specified herein. Reference to “Nokia” later in this document shall mean the respective
company within Nokia Group of Companies with whom you have entered into the Agreement (as defined
below).

This document is intended for use by Nokia's customers (“You”) only, and it may not be used except for the
purposes  defined  in  the  agreement  between  You  and  Nokia  (“Agreement”)  under  which  this  document  is
distributed. No part of this document may be used, copied, reproduced, modified or transmitted in any form
or  means  without  the  prior  written  permission  of  Nokia.  If  You  have  not  entered  into  an  Agreement
applicable to the Product, or if that Agreement has expired or has been terminated, You may not use this
document in any manner and You are obliged to return it to Nokia and destroy or delete any copies thereof.

The  document  has  been  prepared  to  be  used  by  professional  and  properly  trained  personnel,  and  You
assume  full  responsibility  when  using  it.  Nokia  welcomes  your  comments  as  part  of  the  process  of
continuous development and improvement of the documentation.

This  document  and  its  contents  are  provided  as  a  convenience  to  You.  Any  information  or  statements
concerning the suitability, capacity, fitness for purpose or performance of the Product are given solely on
an  “as  is”  and  “as  available”  basis  in  this  document,  and  Nokia  reserves  the  right  to  change  any  such
information  and  statements  without  notice.  Nokia  has  made  all  reasonable  efforts  to  ensure  that  the
content  of  this  document  is  adequate  and  free  of  material  errors  and  omissions,  and  Nokia  will  correct
errors  that  You  identify  in  this  document.  Nokia's  total  liability  for  any  errors  in  the  document  is  strictly
limited to the correction of such error(s). Nokia does not warrant that the use of the software in the Product
will be uninterrupted or error-free.

NO  WARRANTY  OF  ANY  KIND,  EITHER  EXPRESS  OR  IMPLIED,  INCLUDING  BUT  NOT  LIMITED  TO
ANY  WARRANTY  OF  AVAILABILITY,  ACCURACY,  RELIABILITY,  TITLE,  NON-INFRINGEMENT,
MERCHANTABILITY  OR  FITNESS  FOR  A  PARTICULAR  PURPOSE,  IS  MADE  IN  RELATION  TO  THE
CONTENT  OF  THIS  DOCUMENT.  IN  NO  EVENT  WILL  NOKIA  BE  LIABLE  FOR  ANY  DAMAGES,
INCLUDING BUT NOT LIMITED TO SPECIAL, DIRECT, INDIRECT, INCIDENTAL OR CONSEQUENTIAL
OR  ANY  LOSSES,  SUCH  AS  BUT  NOT  LIMITED  TO  LOSS  OF  PROFIT,  REVENUE,  BUSINESS
INTERRUPTION,  BUSINESS  OPPORTUNITY  OR  DATA  THAT  MAY  ARISE  FROM  THE  USE  OF  THIS
DOCUMENT  OR  THE  INFORMATION  IN  IT,  EVEN  IN  THE  CASE  OF  ERRORS  IN  OR  OMISSIONS
FROM THIS DOCUMENT OR ITS CONTENT.

This document is Nokia proprietary and confidential information, which may not be distributed or disclosed
to any third parties without the prior written consent of Nokia.

Nokia  is  a  registered  trademark  of  Nokia  Corporation.  Other  product  names  mentioned  in  this  document
may be trademarks of their respective owners.

Copyright © 2018 Nokia. All rights reserved.

f Important Notice on Product Safety
  This product may present safety risks due to laser, electricity, heat, and other sources of danger.

Only  trained  and  qualified  personnel  may  install,  operate,  maintain  or  otherwise  handle  this
product and only after having carefully read the safety information applicable to this product.

The  safety  information  is  provided  in  the  Safety  Information  section  in  the  “Legal,  Safety  and
Environmental Information” part of this document or documentation set.

Nokia is continually striving to reduce the adverse environmental effects of its products and services. We
would  like  to  encourage  you  as  our  customers  and  users  to  join  us  in  working  towards  a  cleaner,  safer
environment. Please recycle product packaging and follow the recommendations for power use and proper
disposal of our products and their components.

If you should have questions regarding our Environmental Policy or any of the environmental services we
offer, please contact us at Nokia for any additional information.

2 © 2018 Nokia DN194159312 Issue: 05
LTE B41a RRH8x20 (UZHD) Site Preparation Guidelines

Table of Contents
This document has 71 pages
   
1 About this document...................................................................... 6
1.1 Reason for new issue.....................................................................6
1.2 Intended audience..........................................................................6
1.3 Systems supported........................................................................ 6
1.4 Conventions used.......................................................................... 7
1.5 Related documentation.................................................................. 8
1.6 Related training.............................................................................. 8
1.7 Site preparation checklists............................................................. 9
1.8 Base station configuration sheets.................................................. 9
1.9 Document support..........................................................................9
1.10 Technical support......................................................................... 10
1.11 How to order.................................................................................10
1.12 How to comment.......................................................................... 10
   
2 Safety........................................................................................... 11
2.1 Safety .......................................................................................... 11
2.2 Safety - specific hazards.............................................................. 11
2.3 Product safety.............................................................................. 14
   
3 Product overview..........................................................................15
3.1 Functional description.................................................................. 15
3.2 RRH description........................................................................... 16
3.3 RRH weights and dimensions...................................................... 18
   
4 Site configurations........................................................................21
4.1 RF configurations......................................................................... 21
4.2 Common Public Radio Interface Configuration............................ 21
   
5 Basic site preparation requirements.............................................23
5.1 Environmental requirements........................................................ 23
5.2 Site requirements......................................................................... 24
5.3 RRH clearances........................................................................... 25
5.4 Site requirements for pole mount installations............................. 25
5.5 Site requirements for wall mount installations..............................30
   
6 Electrical power requirements......................................................34
6.1 Power requirements (general)......................................................34
6.2 Power consumption......................................................................34
6.3 DC requirements.......................................................................... 35
   
7 Antenna requirements..................................................................36
7.1 Antenna requirements..................................................................36
7.2 General antenna cable requirements...........................................36
   

DN194159312 Issue: 05 © 2018 Nokia 3
LTE B41a RRH8x20 (UZHD) Site Preparation Guidelines

8 Grounding and lightning protection requirements........................ 40
8.1 Grounding and surge protection requirements.............................40
8.2 Outdoor grounding system...........................................................42
8.3 Grounding examples.................................................................... 44
   
9 User alarm, and fiber optic requirements..................................... 47
9.1 General facilities requirements.....................................................47
9.2 Facilities requirements................................................................. 47
9.3 User alarm requirements..............................................................48
9.4 Fiber optic requirements.............................................................. 49
   
10 Appendix: Site preparation checklists.......................................... 51
10.1 SP-1 Site preparation general checklist....................................... 51
10.2 SP-2 Site preparation power source checklist............................. 52
10.3 SP-3 Site preparation grounding checklist................................... 53
10.4 SP-4 Site preparation RF antenna checklist................................ 54
10.5 SP-5 Site preparation GPS antenna checklist............................. 55
10.6 SP-6 Site preparation punch list sheet.........................................56
10.7 SP-6A Site preparation punchlist sheet....................................... 57
   
11 Appendix: Site information........................................................... 58
11.1 CSC-1 Cell site configuration information.................................... 58
   
12 Appendix: Electrical power requirements for 3rd party -48 V DC
power systems............................................................................. 61
12.1 Power requirements (general)......................................................61
12.2 Power system requirements.........................................................62
12.3 DC Power requirements...............................................................63
   
13 Appendix: Product conformance statements............................... 67
13.1 China............................................................................................67
   
14 Appendix: Abbreviations.............................................................. 69
14.1 Initialisms..................................................................................... 69
14.2 Acronyms..................................................................................... 71

4 © 2018 Nokia DN194159312 Issue: 05
LTE B41a RRH8x20 (UZHD) Site Preparation Guidelines

List of Tables
Table 1 Document changes for Issue 5.............................................................6

DN194159312 Issue: 05 © 2018 Nokia 5
   

About this document LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

1  About this document
This document covers the basic site preparation guidelines that should be used to plan
an Nokia B41a RRH8x20. Specific tasks are outlined that should be completed at the job
site before an installation can begin.
The list of the units

• B41a RRH8x20 SLI: 3JR41701AA

The B41a RRH8x20 is being discontinued with the last order date in the fourth quarter of
2016 and the end of product support in the fourth quarter of 2021. Contact your sales
team with questions.

1.1  Reason for new issue
The major changes introduced in this issue of the document are described in the
following paragraphs.

Table 1 Document changes for Issue 5
     
Feature/ enhancement Description Location

Editorial only Added a DN number Title page


Document changes Added DR6 statement that the RRH is being About this document
discontinued in the fourth quarter of 2016.
Nokia rebranding Editorial changes made to reflect the Throughout the
rebranding of Alcatel-Lucent to Nokia. document 
Documentation changes For Issue 2, the “Related documentation” Related documentation
section has been updated.
B41a RRH8x20 LR14.3.L GA delivery. entire document
B41a RRH8x20 Addressed comments. entire document
B41a RRH8x20 Created the first draft for new hardware entire document
B41a RRH8x20.

1.2  Intended audience
This information product is intended for customers preparing a B41a RRH8x20 cell site.

1.3  Systems supported
The B41a RRH8x20 is intended to support 4G LTE technology.

6 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation About this document
Guidelines

1.4  Conventions used
The following conventions are used in this document:
Illustrations
The illustrations shown in this document are schematics. They do not contain all details
and exceptions, but are rather intended to highlight main points. Dimensions are shown
in millimeters with inches in parenthesis. As an example, 680.0 (26.77) equals 680
millimeters or 26.77 inches. Tolerances shall be held to 1.52 (.06) and are not
cumulative.

Standard cross-sections and wire diameter of round copper conductors
The following table is from CEI/IEC 60947-1:2004, Table 1, Standard cross-sections of
round copper conductors and approximate relationship between mm2 and AWG/ kcmil
sizes for reference. Additional wire sizes are included in this information product as
appropriate for the topic.
   

ISO rated cross-sectional area (mm2 ) AWG/ kcmil size

0.2 24
0.34 22
0.5 20
0.75 18
1 -
1.5 16
2.5 14
4 12
6 10
10 8
16 6
25 4
35 2
- 1
50 0 (1/0)
70 00 (2/0)
95 000 (3/0)
- 0000 (4/0)
120 250 kcmil
150 300 kcmil

DN194159312 Issue: 05 © 2018 Nokia 7
   

About this document LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

   

ISO rated cross-sectional area (mm2 ) AWG/ kcmil size

185 350 kcmil
- 400 kcmil
240 500 kcmil
300 600 kcmil
NOTE: The dash, when it appears, counts as a size when considering connecting capacity (see
7.1.7.2 in the standard).

Naming conventions
The B41a RRH8x20 may also be referred to as UZHD.

1.5  Related documentation
The following documents are referenced in this document or include additional
information relevant to the LTE eNodeB. Refer to LTE Radio Access Network - TDD
Customer Documentation Overview for the purpose of each document listed.
Company documents
The following documents may provide additional useful information:

• LTE B41a RRH8x20 (UZHD) - Installation Guide


• LTE B41a RRH8x20 (UZHD) - Technical Description
• 9926 BBU - Site Preparation Guidelines LTE and W-CDMA
• 9926 BBU - Installation Manual for LTE and W-CDMA
• 9926 Distributed Base Station (DBS) - LTE Baseband Unit (BBU) - Technical
Description
• Grounding and Lightning Protection Guidelines for Alcatel-Lucent Network Wireless
System Cell Sites

Other documents
Other documents as follows:

• Standard for Installation of Lightning Protection Systems


• Recommended Practices on Surge Voltages in Low Voltage AC Power Circuits
• Generic Requirements for Electronic Equipment Cabinets, Telcordia

1.6  Related training
Safety training in the following areas is required for personnel installing Nokia products
and associated equipment:

• Hazard Communication

8 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation About this document
Guidelines

• Lift Safety
• Hoist Safety
• Lock Out/Tag Out
• Accident/Incident Reporting.

Other related training is for:

• Integration into the cell site
• Operation, Administration, and Maintenance (OA&M).

1.7  Site preparation checklists
All site preparation activities, as well as adherence to the guidelines, should be verified
prior to the installation of the cell site equipment.
Various checklists and punchlist sheets have been provided in Appendix A of this
document to aid customers and Nokia personnel during a base station site Method of
Procedure (MOP) walk-through prior to the equipment installation.
Utilization of the checklists helps ensure a quality installation and provides a base station
site history file for later reference. The punchlist sheets are used to track completion of
any outstanding site preparation items, and to aid in the project management of
installation resources.

1.8  Base station configuration sheets
Configuration sheets are provided in Appendix B of this document to aid the Customer,
Equipment Engineering, and Wireless Project Management during the various stages of
product deployment. The configuration sheets are used to document the base station
equipment configuration, conditions, and other pertinent information for reference during
product deployment, and future additions. The configuration sheets should be completed
during the equipment engineering phase. Reference to this information during MOP
walk-through assists with completion of the site preparation checklists.

1.9  Document support
For support in using this or any other Nokia (former Alcatel-Lucent) document, please
call one of the following telephone numbers.
From United States

• If you are using a landline, a cellular phone or VoIP, dial this number: 1-888-582-
3688

From other countries

• If you are using a cellular phone or VoIP, dial this number: +1-630-224-2485
• If you are using a landline (phone without a plus [+] character), replace the plus sign
with your country's exit code. Dial this number: Exit code for the country of origin: 1-
630-224-2485. See the country-specific exit codes listed  here.

DN194159312 Issue: 05 © 2018 Nokia 9
   

About this document LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

These numbers apply for document support only. For details about product hardware,
software, and technical support, see the section "Technical support".

1.10  Technical support
For technical support, contact your local Nokia customer support team. See the  Nokia
Support web site ( http://networks.nokia.com/support) for contact information.

1.11  How to order
To order Nokia documents contact your local sales representative or use Nokia Online
Services (NOLS)  https://online.networks.nokia.com.

1.12  How to comment
To comment on this document, go to the  Online Comment Form 
(http://infodoc.alcatel-lucent.com/comments/) or e-mail your comments to the 
Comments Hotline  (comments@alcatel-lucent.com).

10 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Safety
Guidelines

2  Safety
This chapter covers safety precautions.

2.1  Safety
General precautions for installation procedures

f WARNING!
Failure to observe these safety precautions may result in personal injury or damage to
equipment.
– Read and understand all instructions.
– Follow all warnings and instructions marked on this product.
– Installation and maintenance procedures must be followed and performed by
trained personnel only.
– The equipment must be provided with a readily accessible disconnect device as
part of site preparation.
– Grounding and circuit continuity is vital for safe operation of the equipment. Never
operate the equipment with grounding/bonding conductor disconnected.
– Install only equipment identified in the product's installation manual. Use of other
equipment may result in an improper connection which could lead to fire or injury.
– Use caution when installing or modifying telecommunications lines.
– The product has multiple power inputs. Before servicing, Disconnect all inputs to
reduce the risk of energy hazards.
– For continued protection against risk of fire, all fuses used in this product must be
replaced only with fuses of the same type and rating.
– Never install telecommunications wiring during a lightning storm.
– Never install telecommunications connections in wet locations.
– Never touch uninsulated wiring or terminals carrying direct current or ringing
current, and never leave this wiring exposed. Protect and tape uninsulated wiring
and terminals to avoid risk of fire, electrical shock, and injury to personnel.
– Never spill liquids of any kind on the product.
– To reduce the risk of an electrical shock, do not disassemble the product. Opening
and removing covers and/or circuit boards may expose you to dangerous voltages
or other risks. Incorrect reassembly can cause electrical shock when the unit is
subsequently used.

2.2  Safety - specific hazards

f DANGER!  electric-shock
Working in severe weather can result in personal injury or death and damage to the
equipment.
Never install or perform maintenance during severe weather (high winds, lightning,
blizzards, hurricane etc.).

DN194159312 Issue: 05 © 2018 Nokia 11
   

Safety LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

f DANGER!  noxious-substance
Use of unspecified cleaning agents can result in personal injury.
Use only specified cleaning agents. Never use flammable solvents.
Always ensure there is adequate ventilation in the work area and wear the appropriate
personal protective equipment.

f DANGER!  laser
This equipment operates with invisible laser radiation. Laser radiation can cause
considerable injuries to the eyes.
Never look into the end of an exposed fiber or into an open optical connector when the
optical source is switched on. Always observe the laser warning instructions.

f WARNING!  electric-shock
Some parts of all electrical installations are energized. Failure to observe this fact and
the safety warnings may lead to bodily injury and property damage.
For this reason, only trained and qualified personnel (electrical workers as defined in
IEC 60215 + A1 or EN 60215) may install or service the installation.

f WARNING!  electric-shock
The power supply lines to the network element are energized. Contact with parts
carrying voltage can cause health problems, possibly including death, even hours after
the event.
Open and lockout the load disconnect switch in the distribution box to completely de-
energize the network element.

f WARNING!  electric-shock
This product may be connected to an AC main power supply and may contain an
internal battery supply. Disconnecting one power source may not de-energize the
system, and can lead to serious injury.
Disconnect and lock out the AC main power supply, if present, and the internal battery
supply, if present, before servicing the equipment.

f WARNING!  laser
The light from laser and high-radiance LED's may cause eye damage if absorbed by the
retina.

12 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Safety
Guidelines

w NOTICE:  Semiconductor devices can be damaged by electrostatic discharges.
The following rules must be complied with when handling any module containing
semiconductor components:

• Wear conductive or antistatic working clothes (for example, coat made of 100%
cotton).
• Wear the grounded wrist strap.
• Wear shoes with conductive soles on a conductive floor surface or conductive work
mat.
• Leave the modules in their original packaging until ready for use.
• Make sure there is no difference in potential between yourself, the workplace, and
the packaging before removing, unpacking, or packing a module.
• Hold the module only by the grip without touching the connection pins, tracks, or
components.
• Place modules removed from the equipment on a properly grounded approved ESD
work mat.
• Test or handle the module only with grounded tools on grounded equipment.
• Handle defective modules exactly like new ones to avoid causing further damage.

w NOTICE:  Sudden changes in the weather may lead to the formation of condensation
on components. Operating the unit when condensation moisture is present can destroy
the unit.
Units which show signs of condensation must be dried before installation.

f CAUTION!  laceration
The RRH and the components within may have sharp edges and burrs and contact may
cause cuts and lacerations.
Beware of sharp edges and burrs, especially when working on areas inside the RRH
difficult to access.
Wear appropriate personal protective equipment.

w NOTICE:  Tools left in the working area can cause short circuits during operation which
can lead to the destruction of units.
Make sure after finishing your work that no tools, testing equipment, flashlights, etc.,
have been left in or on the equipment.

w NOTICE:  Inadequate circulation of cooling air can cause some units to become too
warm. This can lead to operational impairment.
Cover all installation slots for unequipped units with blanking panels.

f CAUTION!  hot-surface
Touching a hot heater may cause burns.
Do not touch the heaters.
Before touching the units wait until they have cooled down, wear safety gloves and
clothes.

DN194159312 Issue: 05 © 2018 Nokia 13
   

Safety LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

w NOTICE:  Cleaning plastic containers and lids with abrasive and aggressive cleaning
agents may cause permanent damage.
Do not use solvents, paraffin, abrasive or aggressive cleaning fluids, abrasive or
aggressive antiseptic agents or abrasive or aggressive materials.

w NOTICE:  Cleaning with water or a high-pressure cleaner will damage the components
in the RRH.
The washing down of the equipment or RRH with water or a high-pressure cleaner is
not permitted.

f CAUTION!  lifting
Lifting this equipment by yourself can result in injury due to the size and weight of the
equipment.
Always use at least three people or a lifting device to move or position this equipment.

2.3  Product safety
Equipment safety
Safety information for this equipment can be found on various Caution, Warning, Danger,
information labels or instructions affixed to or included with the RRH, its internal
assemblies or included within this document. Informational and cautionary labels may
appear near the item they address or may be grouped in a single location on the
equipment. Warnings are typically adjacent to the hazard that is noted on the label. The
instructions, cautions and warnings found on these labels must be understood and
observed by all personnel involved with the equipment installation and maintenance.

14 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Product overview
Guidelines

3  Product overview
This chapter provides an overview of the B41a RRH8x20.

3.1  Functional description
General description
The B41a RRH8x20 product is the new generation of LTE cell site equipment.
B41a RRH8x20 supports part of 3GPP bands 41 (working band 2535 up to 2675MHz).
B41a RRH8x20 provides the RF transceiver, PA and filter functions typically found in the
conventional Node B. These two equipments are linked by optical fibres, carrying
downlink and uplink base band digital signals along with OAM information. B41a
RRH8x20 provides eight transmit path with 20W on each path, supporting high downlink
power and up to 3 carriers of 20MHz depending on the operating mode configuration.
RRH delivers 20W output power per antenna connector on 8 independent RF path.
The B41a RRH8x20 includes the following functions:

• Its own cooling system
• Eight (8) transmit paths of 60MHz instantaneous bandwidth and up to 20W per path
• The HW is capable of supporting up to three (3) LTE carriers of 20 MHz depending
on the operating mode
• Eight (8) receive paths of 60MHz instantaneous bandwidth
• Eight (8) Broadband Power Amplifiers of 140MHz bandwidth each
• Three (3) fibre interfaces carrying downlink and uplink base band signals, as well as
OAM information and timing signal
• One (1) AISG controller supporting Remote Electrical Tilt via the calibration (CAL)
port (OOK signal)
• A PSU (power supply unit) converting the input voltage into the target voltage for the
different internal units.

Product capabilities
The product capabilities in this release are:

• Indoor/Outdoor, -48 V DC
• Transmit Power 8Tx at 20W each
• Support part of 3GPP B41 (2535 up to 2675MHz)
• One alarm port supports 2 external user defined alarms
• Supports 20 MHz bandwidth
• RRH Mounting:
– pole
– wall

• Front access installation and service
• Bottom I/O panel access
• CPRI rate up to rate 7 (9.8G)

DN194159312 Issue: 05 © 2018 Nokia 15
   

Product overview LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

3.2  RRH description
RRH front-view (external)
The following figure shows the front-view of the B41a RRH8x20.

Cable interfaces
The RRH provides the following cable interface points:

• Three (3) rate 7 (9.8304Gbps) optical CPRI links using a Radial R2CT weatherized
plug connector
• Eight (8) antenna ports using a N type connector
• One (1) antenna calibration port using a N type connector
– RET support providing 20V DC-supply and OOK control interface
– Antenna calibration of RX RF chains
– Antenna calibration of TX RF chains

• One (1) AISG port for RET support providing 20V DC-supply and RS485 control
interface using a 8-pin IEC 60130-9 type connector
• One (1) alarm port for 2 external user-defined alarm inputs using a 8-pin IEC 60130-
9 type connector
• One (1) DC power input port providing -48V DC nominal and using a DC conduit box
• One (1) multicolor LED for visual status indication
• One (1) LMT port for test & debugging purpose (NOT FOR FIELD USAGE) using a
RJ45 type connector
• One (1) frame port for test & debugging purpose (NOT FOR FIELD USAGE) using a
SMB type connector

Bottom view of the RRH
The following figure shows the bottom view of the B41a RRH8x20.

16 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Product overview
Guidelines

Top view of the RRH
The following figure shows the top view of the B41a RRH8x20.

The following figure shows the eyebolts on top of the RRH.

DN194159312 Issue: 05 © 2018 Nokia 17
   

Product overview LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

Side view of the RRH
The following figure shows the side view of the B41a RRH8x20.

3.3  RRH weights and dimensions
Weights and dimensions
This topic covers the B41a RRH8x20 weights and dimensions.

18 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Product overview
Guidelines

Standard RRH weights and dimensions
The following table provides weights and dimensions for the B41a RRH8x20 without the
solar shield. The solar shield front kit for the Radio Remote Head has to be ordered
separately.
       
RRH configuration Weight Volume Overall dimensions height x width x depth
kg (litres) mm

B41a RRH8x20 < 21 < 24 390 x 445 x 138

RRH Overall dimensions
The following figure shows the overall dimensions of the RRH. The overall heights of the
RRH is measured from top to bottom, including connectors:

Miscellaneous hardware weights
The following table provides approximate weights for batteries and other miscellaneous
hardware.
   
Item Weight kg (lb.)

Pallet 13.5 (29.8)
Shipping box 4.9 (10.8)
Wall mounting brackets (2) 1.0 (2.15)

DN194159312 Issue: 05 © 2018 Nokia 19
   

Product overview LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

   
Item Weight kg (lb.)

Pole brackets (2) (standard) 1.3 (2.85)

20 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Site configurations
Guidelines

4  Site configurations
This chapter provides configuration information for the B41a RRH8x20.

4.1  RF configurations

The RF capacity is measured in sectors, carriers, and RF signal power. The RF capacity
determines what components appear in the RRH and what antenna connections are
required.

Physical RF connections
The base station can be connected to RRHs operating anywhere within the following
frequency.

• 2535MHz to 2675MHz (part of 3GPP B41)

The RRH accepts connections for:

• Eight RF antenna cables with N Type connectors.
• One RF antenna calibration port with a N Type connector.

RF configurations
The following configurations are supported.
     
Configuration RF connectors (per sector) RF signal power per carrier (nominal)

2500 MHz 8T8R 20W

4.2  Common Public Radio Interface Configuration

The Common Public Radio Interface (CPRI) of the TD-RRHs can be connected in the
following way to the Base Band Unit:

• Star configuration

Star configuration
The star configuration is used when the RRHs are being mounted far from each other,
but nearly equally spaced from the Base Band Unit.
This figure shows the star configuration:

DN194159312 Issue: 05 © 2018 Nokia 21
   

Site configurations LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

This illustration is just a schematic. The port connection varies depending on the eNodeB
database configuration.

22 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Basic site preparation requirements
Guidelines

5  Basic site preparation requirements
This chapter describes basic site preparation requirements for the B41a RRH8x20.

5.1  Environmental requirements
Outdoor environment
The RRH is weather-hardened, which enables it to operate in environments within the
conditions described in the following table.
   
Condition Specification

Operating Meets the requirements as specified in IEC 60721-3-4 “Classification of
temperature Groups of Environmental Parameters and their Severities Stationary use at
Non-weather protected locations” Classes 4K2/4Z5/4Z7/4B1/4C2/4S2/4M5.
Operates at full specification within the temperature range:

• -40°C/+50°C with 1kW/m² solar load
• -40°C/+55°C without solar load

The thermal test just use the TDD frame configuration 1. For TDD frame
configuration 5, it is up to +55°C and limited up to +50°C.
At cold start (-40°C), RRH is in normal operation and meet full specifications
in less than one hour from the power supply switch-on, assuming RRH is
connected to the d2U.

Relative humidity Operates to full specification within a relative humidity range of 2-100%
Operating altitude -100m to 4,000m
Acoustic noise No fans, the operation is silent and no vibrations are produced.
suppression
Special Climatic Withstand the over-turning force exerted by a wind speed of 200km/h as
Conditions defined by IEC 721-3-4 class 4Z5.
Vibration and Meets the requirements as specified in ETSI EN 60721-3-4; IEC 60721-3-4
Shock “Classification of Groups of Environmental Parameters and their Severities
Stationary use at Non-weather protected locations”: Classes
4K2/4Z5/4Z7/4B1/4C2/4S2/4M5.
Earthquake Meets the Zone 4 earthquake requirement as specified in IEC 721-2-6
Vibration and “Classification of environmental conditions” Part 2: Environmental conditions
Shock appearing in nature – Earthquake vibration and shock. RRH meets the
requirements as specified Chinese specification for seismic test of
Telecommunication Equipment specified in YD 5083-200.
Ingress protection Weather resistant to prevent ingress of rain, snow, dust, and other solid
foreign objects: RRH, once fully installed, meets the requirements as
specified a minimum level of IP65 as specified by IEC 529 “Degrees of
Protection Provided by Enclosures”.

DN194159312 Issue: 05 © 2018 Nokia 23
   

Basic site preparation requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

   
Condition Specification

Storage Meets the requirements as specified IEC 721-3-1 “Classification of groups of
environmental parameters and their severities – Storage” Classes
1K4/1Z2/1Z3/1Z5/1B2/1C2(1C1)/1S3/1M2 (Weather protected, not
temperature controlled storage locations).
Transportation Meets the requirements as specified IEC 721-3-2 “Classification of groups of
environmental parameters and their severities – Transportation “Classes
2K3/2B2/2C2/2S2/2M1 (Careful transportation).

5.2  Site requirements
General requirements
The following general requirements must be met before the installation of the B41a
RRH8x20 site can begin:

• Adequate clearance must be provided for service access.
• DC electric service must be installed as described in Appendix C “Electrical power
requirements”.
• Back haul and user alarm facilities must be installed as described in User alarm, and
fiber optic requirements.
• Grounding electrode system must be installed.
• RF antenna runs must be installed (if required).
• Tower light power must be installed (if required).
• Tower light alarm must be installed (if required).
• Mounting bracket holes must be drilled.
• The environment must comply with limits listed in Environmental requirements.
• Cable supports and racks must be installed.

Cable support
All RF cable runs, DC cable runs, and facilities cable runs must be supported by a cable
support.
The required cable conduits must be provided.

Structural requirements
Pole, wall loading, and wind must be considered during site preparation.
In some cases, cell site equipment may not mount directly to wall without plate or
Unistrut to properly distribute the load.
The support structure must be designed in compliance with national building codes and
all other applicable codes.

24 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Basic site preparation requirements
Guidelines

5.3  RRH clearances
Minimum clearances table
The following table provides the minimum wall mount clearances recommended around
the RRH.
     
RRH-Side Clearances mm (inches) Comments

Front 914 (36) Installation access


Rear 50 (1.97) Zero rear clearance is allowed using supplied
mounting brackets.
Right 100 (3.94) Air flow
Left 100 (3.94) Air flow
Top 300 (11.82) Air flow
Bottom 300 (12) Cable routing

5.4  Site requirements for pole mount installations
Prepare site for pole mounting installation
The following are required to prepare a site for pole mounting installation of the RRH.

• Install DC runs
• Install grounding system
• Install Back haul runs
• Install RF runs
• Install user alarm runs

Pole mounting installation requirements
The following table provide the requirements for the different types of pole assemblies.

     
Pole Assembly Application Pole diameter mm

Small pole mounting Multiple RRHs installation at the same elevation 50 - 152


Large pole mounting Multiple RRHs installation at the same elevation 152 - 380

Pole mounting brackets
The figure below represents the small pole mounting kit.

DN194159312 Issue: 05 © 2018 Nokia 25
   

Basic site preparation requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

The figure below represents the large pole mounting kit.

26 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Basic site preparation requirements
Guidelines

Pole mounting example
The figure below represents the small pole mounting kit used with the B41a RRH8x20.

DN194159312 Issue: 05 © 2018 Nokia 27
   

Basic site preparation requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

The figure below represents the large pole mounting kit used with the B41a RRH8x20.

28 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Basic site preparation requirements
Guidelines

Example: The RRH with samll pole brackets on site.

DN194159312 Issue: 05 © 2018 Nokia 29
   

Basic site preparation requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

5.5  Site requirements for wall mount installations
Overview
This topic describes site requirements for RRH installation on a wall.

Wall mount brackets

f WARNING!
Before any hardware installation occurs, carefully read the section:
"Safety precautions for handling and placement"

w Various building materials and construction methods dictate that the RRH be fastened
to the wall with appropriate mounting hardware. It is the responsibility of the customer to
provide any necessary support material and structures to ensure that the installation will
be in compliance with Building Officials and Code Administrators (BOCA), Uniform
Building Code (UBC), and all local codes.

The following figure illustrates the mounting bracket that is required to mount the RRH on
a wall.

30 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Basic site preparation requirements
Guidelines

Prepare site for wall mount installation
The following are required to prepare a site for wall mount installation of the RRH.

• Install DC power runs
• Install grounding system
• Install Back haul
• Install RF runs
• Install user alarm runs.

Wall mounting shall comply with the applicable architectural codes listed on listed earlier
in this chapter.
Holes shall be pre-drilled with (customer supplied) anchor hardware, if mounting to a
concrete wall.

RRH wall mounting hardware
The following is an example of customer-supplied mounting hardware that is required to
mount struts to a solid concrete wall:

• Remote Radio Head (1)
• Wall Mounting accessory (1)
• Wall Mounting basement (1)
• M8 hex Screw (4)
• M12 plug expansion steel (2)
• M12 hex Screw (2)
• M12 washer plain (2)
• M12 washer SC-SPG (2)

Wall mount - basement and accessory pattern

DN194159312 Issue: 05 © 2018 Nokia 31
   

Basic site preparation requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

The following graphic shows the wall mounting basement for the RRH. The dimension
shown are in millimeters.

The following graphic shows the wall mounting accessory for the RRH. The dimension
shown are in millimeters.

Example: The RRH with wall mounting.

32 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Basic site preparation requirements
Guidelines

DN194159312 Issue: 05 © 2018 Nokia 33
   

Electrical power requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

6  Electrical power requirements
This chapter provides guidelines for the installation of electrical power to the cell site.

6.1  Power requirements (general)
General requirements
This section describes the DC power requirements for the Nokia equipment at the site.
DC power must also be provided for lighting and any additional DC-powered equipment
present at the site. The appropriate product information must be consulted to determine
the total DC power required for the equipment at the site.
As part of site preparation, the site must be equipped with the appropriate DC service
panel board, or DC branch circuit load center for supplying power to all DC equipment at
the site. All DC power wiring, distribution, and protection equipment must be installed
during site preparation and be ready for connection to the power equipment.

w All DC wiring and over-current protection must be installed in accordance with the local
electrical code in effect. An appropriate equipment ground connection is required before
commercial DC service can be connected to any equipment at the site.

Power options
The following table provides power options for the RRH.
   
Power options Comment

Non integrated power For the RRH, a DC power source external to the RRH must be provided.
See Appendix C for external power information.

Electrical rating
The B41a RRH8x20 must be connected to a -48V DC power supply.
The electrical rating of the RRH is marked on the nameplate of the unit as follows.
   
RRH DC

B41a RRH8x20 -48V (-38V/-57V), 15A

6.2  Power consumption
Power consumption (estimated)
The following table provides the power consumption for RRH.

34 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Electrical power requirements
Guidelines

   
RRH configuration Watts

Power consumption (maximum) at 160W RF Config1 (2DL:2UL): 466W
Config2 (3DL:1UL): 650W
Config5 (8DL:1UL): 810W

6.3  DC requirements
DC power requirements for non-integrated power
If an external power system will be used, refer to Appendix: Electrical power
requirements for 3rd party -48 V DC power systems for DC power requirements.

Battery backup requirements
Refer to Appendix: Electrical power requirements for 3rd party -48 V DC power systems
for various configuration power loads.

DN194159312 Issue: 05 © 2018 Nokia 35
   

Antenna requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

7  Antenna requirements
This chapter provides an overview of the antenna interface requirements for the RRH.

7.1  Antenna requirements
General requirements
The customer is responsible for providing the materials and arranging for the
construction of the entire RF path from the antennas to the interface plate during site
preparation. This includes any required grounding, surge protection, and additional
equipment in the RF path. It also includes any necessary support structures from the
antennas to the location of the base station.
The customer orders a base station and antenna jumper cables so that the external
antenna connectors (EAC) at the base station can be connected to the antennas.

Requirements to support location-based services
All of the requirements that follow in this topic apply if the customer intends to support
location-based services. The antennas referred to here are those for the main RF paths
for a single sector.
In order to support location-based services, the location of the antenna and the length as
well as the type antenna cables must be provided for use in calibration.
These values must be determined and recorded during site preparation.

Constraints on the antenna position
In order to support location-based services, all antennas that serve a sector must be
within a circle no more than 15 m in diameter.

7.2  General antenna cable requirements
General requirements
All cable runs must be appropriately supported in accordance with the connector and
cable manufacturer's instructions.
The appropriate type, length, and number of antenna jumper cables should be available
at the site for the start of the installation.
Grounding of the antenna feeder cable outer shield must be performed in accordance
with the ground kit manufacturer's instructions.
The following are general antenna requirements:

• We recommended antenna cables should be used.
• All antenna cable runs must be appropriately supported in accordance with the
connector and cable manufacturer's instructions.
• RF antenna jumpers are terminated with N-Male connectors.
• All antenna connectors should be IP68 rated.

36 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Antenna requirements
Guidelines

• RF cable on the calibration port (CAL) one-way loss should not be more than 5dB
between RRH and antenna
• Antenna and cable sweeps must be performed prior to the start of the installation.

w All RF/GPS cable connectors must be at least IP67 rated. (IP67 rating requirement, as
defined by IEC 60529, calls for total protection against dust and protection against
submersion in water.)

Antenna installation
Antenna installations shall be performed in accordance with all applicable manufacturer's
recommendations, and national laws and regulations.
To ensure correct antenna installation, all necessary calculations and/or field
measurements shall be evaluated for compliance with applicable national laws or
regulations regarding exposure to electromagnetic fields. The antenna manufacturer or
supplier shall deliver all technical data necessary to perform this compliance evaluation
(e.g., antenna gain pattern, antenna dimensions, etc.). Information on the methodology
and results of the compliance evaluation shall be available for inspection by officials of
the governing authorities.

w Refer to “Antenna grounding and surge protection devices” for grounding and surge
protection requirements.

Antenna cable grounding
Grounding of the antenna cable outer shield must be performed in accordance with the
ground kit manufacturer's instructions and as outlined in Grounding and Lightning
Protection Guidelines for Alcatel-Lucent Network Wireless System Cell Sites.
The following diagram shows a typical method for connecting an antenna jumper cable.

RF antenna connections
The B41a RRH8x20 unit supports eight RF antenna connectors and one calibration port
on the bottom of the unit.
These are N-female connectors.
The following diagram shows jumper connectivity between RRH and Antenna.

DN194159312 Issue: 05 © 2018 Nokia 37
   

Antenna requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

RF antenna cable requirements
Each RRH can support a maximum of eight RF antennas and one calibration port for a
one-sector configuration with beamforming. The RF antenna cable must satisfy the
following requirements:

• Impedance: 50 ohms
• RF Insertion Loss between RRH and Antenna must satisfy Attenuation: < 5 dB
• The antenna jumper cables end (to the RRH) must be equipped with N-male
connector.
• Surge protection (optional)
• The antenna cables must be protected by a cable duct or protective cable pipes.
• properly grounded.

RF antenna jumper cable lengths
The RF antenna jumper cables at the RRH will have N-male connector. Max cable length
is 15m. The jumper cables may be ordered from Nokia and are available in the following
length:

• 2 m
• 3 m

38 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Antenna requirements
Guidelines

• 5 m
• 15 m

DN194159312 Issue: 05 © 2018 Nokia 39
   

Grounding and lightning protection requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

8  Grounding and lightning protection
requirements
This chapter provides information on grounding and lightning protection requirements for
the site.

8.1  Grounding and surge protection requirements
Grounding requirements
The cell site must be grounded with an integrated (multi-point) grounding system. The
equipment is susceptible to lightning surges due to its association with towers and
antennas. Therefore, it is imperative that the cell site be properly grounded and that a
low impedance path to earth (10 ohms or less) is provided. The grounding conductors
must be as straight and short as possible. No sharp bends or loops are permitted in
grounding conductors.
Refer to Grounding and Lightning Protection Guidelines for Alcatel-Lucent Network
Wireless System Cell Sites, for detailed grounding requirements.
The equipment warranty can be voided if the guidelines detailed in the local electrical
code in effect, as well as the Standard for Installation of Lightning Protection Systems
and Grounding and Lightning Protection Guidelines for Alcatel-Lucent Network Wireless
System Cell Sites are not followed.

w All grounding system material (cable, connectors, buses, etc.) must be of high quality
materials that resist deterioration and require little or no maintenance.

Antenna grounding and surge protection devices
When the RRH is installed in an outdoor environment, the lightning protection box is
mandatory, it must be installed closest of RRH.
Commercial AC power is susceptible to lightning surges and must be properly protected.
An appropriate surge protection device must be installed at the service entry point and
be connected directly to the grounding electrode system.
In outdoor case and in AC mode, the AC power supply must be connected to the AC
lightning protection box using an AC power cable without connector. As the RRH is only
powered in DC, an AC/DC convertor must be used. As such an AC power cable with
connector must be used from the AC lightning protection box to this AC/DC convertor.
The following figure shows the AC power supply usage.

In outdoor case and in DC mode, the DC power supply must be connected to the DC
lightning protection box using a DC power cable without connector.

40 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Grounding and lightning protection requirements
Guidelines

The following figure shows the DC power supply usage.

The RF antenna coaxial cables are susceptible to lightning surges and must be properly
protected.
The filter is equipped with 1/4 wave surge protector.
The surge protectors must be bonded to a nearby ground bus bar that is connected
directly to the grounding electrode system at two points when not located on the RRH.
The antenna cable shield must be bonded at the top of the tower near the antenna, and
at the bottom of the vertical run. If the tower is too high, the antenna cable shield must be
bonded at approximately 30 m (100 ft.) intervals. The tower or metallic support for the
antenna must also be bonded to the grounding electrode system.
Refer to the following page for more details on surge protector requirements.
The following diagram shows a typical surge protector installation and grounding.

DN194159312 Issue: 05 © 2018 Nokia 41
   

Grounding and lightning protection requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

8.2  Outdoor grounding system
Grounding electrode system requirements
The cell site must be equipped with a grounding electrode system (that is, buried ring
ground, copper clad rod, electrolytic rods, metallic water pipe, etc.). The cell site
grounding, including all RRHs and antenna cable shields, must be bonded to the
grounding electrode system.
The grounding electrode system shall be installed as part of site preparation with a
sufficient number of pigtails. Electrically conductive materials in the vicinity that are likely
to become energized must be connected together and to the grounding electrode system
in a manner that establishes an effective ground-fault current path.

42 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Grounding and lightning protection requirements
Guidelines

Buried ground conductors must be, at a minimum, 16 mm2 (#6 AWG) bare, solid, tinned
copper wire. Exterior ground conductors must be, at a minimum, 16 mm2 (#6 AWG)
either solid, bare, tinned copper or stranded, insulated (outdoor insulation to be sunlight-
resistant) copper cable.

Exothermic weld
Exothermic weld is recommended for grounding connections where practical. All below-
grade connections must be exothermically welded. Compression type, two-hole (0.75-
inch center) lugs or double crimp "C" taps are acceptable for above-ground connections.
The contact area where connections are made shall be prepared to a bare bright finish,
and be coated with an anti-oxidation material before connections are made.

Typical grounding configuration (concrete pad)
The following diagram shows a typical concrete pad grounding configuration.

Typical grounding configuration (platform)
The following diagram shows a typical platform grounding configuration.

DN194159312 Issue: 05 © 2018 Nokia 43
   

Grounding and lightning protection requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

8.3  Grounding examples
Grounding
Each RRH must be grounded.
The grounding point of B41a RRH8x20 is located at the two sides of the RRH.
The following figure shows the grounding point.

Wall mount grounding
The following figure shows an example of wall mount grounding.

44 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Grounding and lightning protection requirements
Guidelines

Pole mount grounding
The following figure shows an example of pole mount grounding.

DN194159312 Issue: 05 © 2018 Nokia 45
   

Grounding and lightning protection requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

6 AWGto2 AWG
c-tap

16mm2
(6 AWG)
ToRRH
35mm2
(2 AWG)

46 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation User alarm, and fiber optic requirements
Guidelines

9  User alarm, and fiber optic requirements
This chapter provides information on user alarm, and fiber optic requirements for the site.

9.1  General facilities requirements
General requirements
Each RRH utilizes up to three fiber optic lines and two user alarms.
The user alarm cables are twisted pair with weatherized DIN connectors on both end.
Each connector supports three user alarms. Each fiber optic cable has Duplex LC
connectors on both ends.
The facilities must be in place prior to installation of the RRH.
The alarm block must be located within 30 m (100 ft) to the RRH. The alarm block must
be equipped with appropriate interface to terminate the user alarms.

w Color code each cable to differentiate user alarm lines.

9.2  Facilities requirements
Primary protection (outdoor)
The signal protection inside the RRH provides primary and secondary protection for the
facilities cable(s). No external primary protection is required.

Primary protection (indoor)
The signal protection inside the RRH does not provide primary protection. As part of site
preparation, it is required for the service provider to supply and install appropriate
primary surge protection device at the user alarm block.

Connection overview
The following diagram shows how the cable and conduit is connected to the NIU.

DN194159312 Issue: 05 © 2018 Nokia 47
   

User alarm, and fiber optic requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

9.3  User alarm requirements
Overview
This topic covers requirements for the user alarm cables.
The RRH uses 2 user alarms.
The alarm cable is 15 m or 30 m long, and has the connection to an AISG connector.
The user alarm ports are equipped with surge protection.

User alarm cable option
The RRHs will support one of the user alarm cable described in the following table.

     
User alarm cable Connector type Cable length

4 Pair circular DIN male one end 15m (50 ft)


4 Pair circular DIN male one end 30m (100 ft)

User alarms wire colors and pinout configuration
Refer to table below for wire color-coding and pinout configuration:

     
Pin # Alarm # Color Code

1 Not used WH/BR
2 Not used GR

48 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation User alarm, and fiber optic requirements
Guidelines

     
Pin # Alarm # Color Code

3 Alarm 1 (P) WH/BL
4 Alarm 2 RTN (N) OR
5 Alarm 2 (P) WH/OR
6 Not used BR
7 Not used WH/GR
8 Alarm 1 RTN (N) BL

9.4  Fiber optic requirements
Overview
This topic covers requirements for connecting the fiber optic cables to the RRH.
The fiber optic cables have LC-ODC connections from BBU to each RRH
The fiber optic cables are outdoor rated. Cables are routed into the RRH through a
weatherized plug (R2CT plug), not through conduit.
The B41a RRH8x20 supports one type of optical connection, Single Mode Dual Fiber
optical connection.

• Single Mode Dual Fiber: two fibers are used; one fiber carrying the downlink signal
and a second one the uplink signal. The same Single Mode SFP transceiver is used
on both ends of the fiber. (up to 10 km)

Fiber optic cable function
Refer to table below for fiber optic cable function.
           
Cable Use Cable Number of lines Max. Connector type
type per cable Cables

Fiber Base Band Unit Single 2 1 LC


optic connection mode

R2CT weatherized plug
The weatherized plug needs to be ordered separately from the optical fiber. It can be
used either for indoor and outdoor usage.
The following figure represents the R2CT plug attached to the RRH plate (with the SFP
cage on the green board).

DN194159312 Issue: 05 © 2018 Nokia 49
   

User alarm, and fiber optic requirements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

50 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Appendix: Site preparation checklists
Guidelines

10  Appendix: Site preparation checklists
This section is for use by authorized personnel to verify completion of cell site
preparation activities prior to installation of base station equipment.
Contents
Included in this appendix are the following master sheets, from which a copy should be
made for each site preparation performed.

SP-1 Site preparation general checklist A - 3
SP-2 Site preparation power source checklist A - 5
SP-3 Site preparation grounding checklist A - 7
SP-4 Site preparation RF antenna checklist A - 10
SP-5 Site preparation GPS antenna checklist A - 12
SP-6 Site preparation punch list sheet A - 14
SP-6A Site preparation punch list sheet A - 15

SP-GEN cell site general information
Complete the following information about the cell site.

• Cell Site Name: ______________________
• Cell Site Address: ______________________
• Cell Site Access Contact Name: ______________________
• MTA Name: ______________________
• Cell Site #: ______________________
• Contact Phone #: ______________________.

10.1  SP-1 Site preparation general checklist
Purpose
The following items must be completed prior to the installation of the cell site equipment.
Circle the correct letter for the corresponding item descriptions.
           
Item # Description Yes No N/A Comments
(Y) (N)

1. Are cell site environmental conditions within equipment Y N N/A
specified operating range?
2. Has the required space been provided around equipment [i.e., Y N N/A
maintenance access, RRH(s), heat dissipation, safety]?
3. Has a Method of Procedure (MOP) been developed with the Y N N/A
installation supervisor?
4. Is cell translations information available? Y N N/A

DN194159312 Issue: 05 © 2018 Nokia 51
   

Appendix: Site preparation checklists LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

           
Item # Description Yes No N/A Comments
(Y) (N)

5. Has installer cell site equipment parameter sheet been Y N N/A
completed and reviewed with the installation supervisor?
6. Are CPRI fiber optic facilities installed, available and active? Y N N/A
7. Are optional AISG cables, connections and facilities installed? Y N N/A
8. Are user alarm facilities available and active? Y N N/A
9. Is adequate primary surge protection provided for the user Y N N/A
alarms?
10. Have the user alarm cables been installed and terminated at Y N N/A
the alarm interface?
11. Has all equipment been ordered and has delivery to site been Y N N/A
scheduled?
12. Have all necessary arrangements been made for access to Y N N/A
the site?
13. Have all necessary arrangements been made to get Y N N/A
equipment onto the site (crane, etc.)?

Completed by: ______________________
Date: _______

10.2  SP-2 Site preparation power source checklist
Purpose
The following items must be completed prior to the installation of the cell site equipment.
Circle the correct letter for the corresponding item descriptions.
           
Item # Description Yes No N/A Comments
(Y) (N)

1. Is AC / DC service available? Y N N/A
2. Have AC / DC service and conduits been approved by Y N N/A
local code?
3. Is AC / DC service equipped with surge protection at Y N N/A
service entry point?
4. Is AC / DC power source appropriate for equipment being Y N N/A
installed?
5. Does AC / DC service have proper circuit breaker Y N N/A
rating(s) and labeling?

52 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Appendix: Site preparation checklists
Guidelines

           
Item # Description Yes No N/A Comments
(Y) (N)

6. Is AC / DC circuit breaker(s) available and labeled for Y N N/A
power system?
7. Is AC / DC circuit breaker(s) available and labeled for Y N N/A
listed ancillary equipment?
A. Y N N/A
B. Y N N/A
C. Y N N/A
8. Do tower lighting, intrusion lighting, etc. feeds have Y N N/A
proper lightning protection?

10.3  SP-3 Site preparation grounding checklist
Purpose
The following items must be completed prior to the installation of the cell site equipment.
Circle the correct letter for the corresponding description items.
           
Item # Description Yes No N/A Comments
(Y) (N)

1. Is soil resistivity and site resistance test on file? Y N N/A
2. Has connection been provided to grounding electrode system? Y N N/A
If yes, circle all that apply:
A. Via a buried ring ground and driven rod(s)
B. Via a buried metallic and electrically continuous water pipe
C. Via driven ground rod(s) and/or plate(s)
D. Via electrolytic ground rod(s)
E. Via grounded building steel
F. Via grounded grid or radial

3. Is lighting mast(s) or air terminal(s) provided and bonded? Y N N/A
4. Is antenna support structure(s) grounded? Y N N/A
5. Is antenna tower bonded to grounding electrode system? Y N N/A
6. Are guy wires bonded to grounding electrode system? Y N N/A
7. Are antenna cable shields grounded at both ends? Y N N/A
8. If tower is greater than 60 meters (200 ft.) high, are antenna cable Y N N/A
shields grounded at mid-point and both ends?

DN194159312 Issue: 05 © 2018 Nokia 53
   

Appendix: Site preparation checklists LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

           
Item # Description Yes No N/A Comments
(Y) (N)

9. Is ice bridge bonded at both ends and 7.62-meter (25-foot) Y N N/A
intervals?
10. Are all ground connections in compliance with Nokia requirements Y N N/A
(exothermic weld, compression type with 2-hole lugs; properly
secured; anti-oxidant used on contact surface area)?
11. Are all grounding conductors routed as straight as possible with Y N N/A
no loops or sharp bends?
12. Is RRH support structure grounded? Y N N/A
13. Are metallic conduits bonded at both ends and 7.62-meters (25- Y N N/A
foot) intervals?
14. Are all fence corner posts and gate posts properly grounded Y N N/A
(including fence fabric and barbed wire, as applicable)?
15. Are all metallic objects within 1.8 meters (6 feet) bonded to the Y N N/A
grounding system?
16. Is AC / DC power supply equipped with a surge protection device Y N N/A
and is the device properly connected to the ground system?
17. Is tower light system (if installed) equipped with a surge protection Y N N/A
device and is the device properly connected to the ground
system?
18. Are the RF and GPS surge protection devices properly connected Y N N/A
to the ground system?

Completed by: ______________________
Date: _______

10.4  SP-4 Site preparation RF antenna checklist
Purpose
The following items must be completed prior to the installation of the RF cell site
equipment. Circle the correct letter for the corresponding item descriptions.
           
Item # Description Yes No N/A Comments
(Y) (N)

1. Is tower properly installed and secured? Y N N/A
2. Are all antenna cable runs installed? Y N N/A
3. Are all antenna cable runs properly terminated with 7/16 DIN Y N N/A
female connectors on the equipment side?
4. Are all cable connections torqued to the appropriate value? Y N N/A

54 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Appendix: Site preparation checklists
Guidelines

           
Item # Description Yes No N/A Comments
(Y) (N)

5. Are the RF and GPS antenna cables equipped with surge
protection devices?
6. Are all external cables UV rated? Y N N/A
7. Are antenna cable runs' demarcation points in proper Y N N/A
location?
8. Are antenna cable runs marked and in proper sequence per Y N N/A
applicable equipment drawings?
9. Are appropriate type, length and number of antenna cable Y N N/A
jumpers available?
10. Are appropriate drip loops provided for antenna cable runs Y N N/A
at turns and demarcation point?
11. Have antenna and cable sweeps been performed? Y N N/A
12. Are antennas properly installed and secured? Y N N/A
13. Are all antennas the proper type? Y N N/A
14. Are all antennas at proper azimuth? (0,120 or 240 degrees) Y N N/A
15. Are antennas at proper height? Y N N/A
16. Are antennas at proper tilt? Y N N/A
17. Have diversity antennas been properly separated? Y N N/A
18. Are antenna hatchplate and cable boots properly installed? Y N N/A

Completed by: ______________________
Date: _______

10.5  SP-5 Site preparation GPS antenna checklist
Purpose
The following items must be completed prior to the installation of the cell site equipment.
Circle the correct letter for the corresponding item descriptions.
           
Item # Description Yes No N/A Comments
(Y) (N)

1. Is antenna installed with base level within two degrees? Y N N/A
2. Is antenna installed with less than 25% of the sky masked by Y N N/A
obstruction?
3. Is GPS antenna located at least 3.05 m (10 ft.) vertically and Y N N/A
horizontally from any active transmit antenna?

DN194159312 Issue: 05 © 2018 Nokia 55
   

Appendix: Site preparation checklists LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

           
Item # Description Yes No N/A Comments
(Y) (N)

4. Are aggregate cable loss, cable VSWR, total cable length, cable Y N N/A
type, GPS antenna gain, KS list and serial numbers recorded in
the site installation records?
5. Is proper gain antenna installed for the total aggregate cable Y N N/A
loss and length?
6. Is measured cable VSWR within its specified value? Y N N/A
7. Is GPS antenna cable properly grounded, and equipped with Y N N/A
proper surge protection device?
8. Are proper service loops provided near antenna? Y N N/A
9. Is proper drip loop provided for the outdoor antenna jumper Y N N/A
cables?
10. Are cable connections torqued to the appropriate value? Y N N/A
12. Are all external cables UV rated? Y N N/A
13. Are antenna bracket, pipes, and antenna properly secured? Y N N/A
14. Was GPS antenna location verified for line of sight using a Y N N/A
Garmin 45XL test unit or equivalent?
15. Is GPS antenna location free of external interference (i.e., radio Y N N/A
stations, collocated equipment, etc.)?

Completed by: ______________________
Date: _______

10.6  SP-6 Site preparation punch list sheet
Purpose
The following punch list is used to track any outstanding site preparation items.
Item # Comment/Description Severity 1/2/3 (see below) Corrective Action Required
(Y/N) Completed Date

1. Equipment installation cannot occur until outage is rectified and will void warranty or
potentially cause personal injury.

56 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Appendix: Site preparation checklists
Guidelines

2. Equipment installation can occur but issue must be rectified prior to handoff to
customer or service turn-up so that the warranty is not voided.
3. Equipment installation, handoff to customer, or service turn-up can occur but not per
Lucent recommendations.

Inspection Checklist Completion Sign-Off (complete below)
Was the punchlist continuation sheet on the next page used? Yes or No
Inspector's Name: ______________________
Inspector's Signature: _____________________ Date: _________

10.7  SP-6A Site preparation punchlist sheet
Purpose
The following punchlist is used to track any outstanding site preparation items.
Item # Comment/Description Severity 1/2/3 Corrective Action Required
(Y/N) Completed Date

DN194159312 Issue: 05 © 2018 Nokia 57
   

Appendix: Site information LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

11  Appendix: Site information
This section is use by Customer Project Management to document cell site configuration
information.

11.1  CSC-1 Cell site configuration information
General base station information
Complete the following cell site information:
   
Cell Site information (provided by inspector)

Name
Address
Contact name
MTA name
Cell Site #
Contact Phone & Pager #

Installation type
Check all that apply:

• Indoor
• Outdoor
• Controlled Environment
• Uncontrolled Environment
• Concrete Pad
• Rooftop
• Other (Specify): __________

Base station sub-structure
Check all that apply:

• Concrete
• Wood floor
• Raised floor
• Non-Penetrating
• I-beam
• C-beam
• Platform

Earthquake zone rating
Check one:

58 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Appendix: Site information
Guidelines

• Zone 1
• Zone 2
• Zone 3
• Zone 4

Base station equipment
Complete the information for the installed equipment:
       
RRH Type Serial # # of Duplex/Triplex
sector

RRH
RRH
RRH
BBU

Antennas
Complete the following (if required):
Channel # (1-1999) _________
# of Carriers (1-9) _________
GPS Antenna KS/Model _________
Freq. Block (A-F) _________
GPS Cable Length (ft.) _________
GPS Antenna Gain (dB) _________
Antenna Type (N-N or N-DIN) _________
Quantity of Antenna Jumper Cables (1-15) _________

Power
Total # of Battery Strings _________
Power source

• +24 VDC
Integrated power?
• Yes
• No
External power?
Yes
No
Power co-located with base station equipment?
• Yes
• No

DN194159312 Issue: 05 © 2018 Nokia 59
   

Appendix: Site information LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

Other cell site equipment
Complete the following:
       
Equipment description Yes No N/A
(Y) (N)

Antenna Tower? Y N N/A
FAA Lighting? Y N N/A
Tower Light Alarm? Y N N/A
Ice Bridge? Y N N/A
Covering: (check one) ___ Cables Only ___ Cables and Equipment

Cable Tray or Ladder Racks? Y N N/A
Type of Ladder: (check one) ___ 5' Ladders ___ 12' Ladders ___ Other:
______

Antenna Cable Hatch Plate? Number of Entry Holes ____ Y N N/A
Facilities Ancillary Equipment? Y N N/A
Power Source: (check one) ___ AC ___ DC Voltage: (check one) ___ DC ___
rms

AC Service:
Size (amps) _____ Voltage (v) _____ Phase (1 or 3) _____

Non-Lucent Power Plant? Y N
NOTE: If YES, the customer is responsible for the power plant's configuration

Earthquake Bracing Required? Y N N/A
Tx/Rx Antenna? (mounting location) ___ Tower ___ Steel Structure ___ Y N N/A
Building ___ Antenna Support Structure
Cell Site Grounding? Y N
If YES, select all that apply: ___ Buried ring ground and driven rods ___
Buried metallic and electrically continuous water pipe ___ Down conductors
(Quantity: _____) ___ Electrolytic ground rod(s) (Quantity:_____) ___ Driven
ground rod(s) (Quantity:_____) ___ Grounded building steel ___ Ground grid
___ Ground radial(s) (Quantity:_____)

Collocated non-PCS equipment? Existing grounding system: ___ Single Point Y N
___ Integrated
Ground Bus? Y N
If YES, quantity: _____

60 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Appendix: Electrical power requirements for 3rd party
Guidelines -48 V DC power systems

12  Appendix: Electrical power requirements for
3rd party -48 V DC power systems
The purpose of this appendix is to provide power requirements for the radio equipment
RRH, in case a 3rd party power system is used.
IMPORTANT: All AC wiring and over-current protection must be installed in accordance
with the National Electric Code (NFPA-70) and local electrical codes. An appropriate
earth ground connection is required before commercial AC service can be connected to
any equipment at the site.

12.1  Power requirements (general)
Scope
This section specifies the DC power and power system alarm interface requirements for
the RRH equipment. Specifically DC power, DC feeder quantity, recommended DC
feeder wire gauge, and DC feeder circuit breaker type/rating. Some additional
information is included on power feeder connections and alarm connections to the RRH.
This section provides information on the quality and characteristics of the DC power to
be supplied to the RRH.
The power systems must provide uninterrupted DC power to the RRH. In the event of
loss of AC input power, the power system must continue to provide DC power for the
duration of the battery reserve.
The power system must be designed to support a fully configured site that consists of the
following: Two carrier, six sector configuration with up to two BBUs and up to six RRHs.
Designing a system that cannot support the fully configured system will limit the potential
for future growth. This section is intended for use by a customer specifying a power
system other than the standard Nokia power systems.
By meeting these requirements, the Nokia equipment referenced in this section should
meet the electrical and RF performance specifications of the customer supplied
equipment.

Standard reference document
We strongly recommends that the power system meet all applicable requirements
specified in the following documents. The appropriate requirements must be selected
from the documents listed in the table below, based on the "country of use." In addition,
adherence to all additional requirements mandated by the "country of use" is the
customer's responsibility. The power system must meet the specified UL and FCC
requirement documents in order for the equipment to maintain its UL and FCC
compliance. The references listed in the table may be obtained from the issuing agency
or their authorized distributors.

DN194159312 Issue: 05 © 2018 Nokia 61
   

Appendix: Electrical power requirements for 3rd party LTE B41a RRH8x20 (UZHD) Site Preparation
-48 V DC power systems Guidelines

     
Source Document #Issue # Title

IEC IEC-61000-4-5 2001 International Standard. Electromagnetic


Compatibility (EMC). Testing & Measurement
Techniques
IEEE IEEE/ANSIC62.34-1996 IEEE Standard for Performance of Low-Voltage
Surge-Protective Devices (Secondary
Arrestors)
Telcordia GR-063-CORE10-1995 Network Equipment-Building System (NEBS)
General Equipment Requirements
Telcordia GR-001089-CORE1-1994 Electrical Safety-Generic-Criteria for Network
Telecommunications Equipment GR-001089-
CORE
IEC IEC 609501999 Safety of Information Technology Equipment,
Including Electrical Business Equipment
IEC IEC 605291999 Degrees of Protection Provided by Enclosures

12.2  Power system requirements
General
This section specifies the mechanical, electrical, and environmental requirements the
power system must meet. The following requirements apply to indoor or outdoor power
systems only.
We strongly recommends that the power system meet the same environmental, safety,
and regulatory requirements as the Nokia equipment to maintain its safety and regulatory
certification.

Power interface requirements
The following table provides the interface requirements required to connect the RRHs to
a 3rd party power system.

Interface Requirement
Mechanical interface The customer is responsible for specifying all the mechanical
requirements for the power system such as dimensions, weights,
anchoring, grounding, conduit/cable interfaces, and installation features.
RRH interfaces All the power system electrical interfaces are located at the bottom of the
RRH.
For dimensions of the RRH, refer to Chapter 2 of this document.
Important: Under no circumstances must any modification (e.g. drilling)
be made to an RRH unless the modification is covered by an Alcatel-
Lucent "Change Notice."

Electrical interface The electrical interfaces between the power system and the RRH consist


requirements of DC power and power system alarms. All RRHs receive DC power
independently from the power system. All power system alarms interface
with the RRH.

62 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Appendix: Electrical power requirements for 3rd party
Guidelines -48 V DC power systems

Typical power system interface
The following diagram shows the electrical interfaces of a typical power system.

12.3  DC Power requirements
-48 V DC input requirements
The nominal -48 V DC power supplied to the RRH shall meet the requirements specified
in this section. All of the electronic equipment related to processing of calls, and the fans
in the BBU are powered from the -48 V DC power supplied to the equipment. The DC
power system shall be capable of providing constant power to the equipment over the
entire range of environmental condition for the "country of use".
The B41a RRH8x20 has one -48 V DC input feed rated at 15A.

DC input power requirements
The DC power system shall be capable of providing constant DC power to all equipment
configurations listed in Chapter 5 of this document at the maximum power level. The
typical power level is the DC power consumption expected while the site is operating
with "busy hour" traffic and ambient temperature between 20° to 25° Celsius. The RRH
has constant power load characteristics.

Overload trip characteristics

DN194159312 Issue: 05 © 2018 Nokia 63
   

Appendix: Electrical power requirements for 3rd party LTE B41a RRH8x20 (UZHD) Site Preparation
-48 V DC power systems Guidelines

The following table provides the overload trip characteristic for the Airpax circuit breaker
with type 51 delay characteristics. If an alternate circuit breaker is used, it must have
equivalent overload trip.

 
Airpax model LEL/LML type 51 Overload Trip Time
(Seconds)

Rating 100% 125% 150% 200% 400% 600% 800% 1000%


Time No trip 0.5 - 6.5 0.3 - 3 0.1 - 1.2 0.3 - 0.5 0.011- 0.004 - 0.004 -
(sec.) 0.25 0.1 0.08

DC input voltage range and surge requirements
The normal DC input voltage range, the set point of float voltage for the battery and the
maximum float voltage set points for the RRH are provided in the following table.

   
Parameter Requirements

Voltage -48V DC nominal
Voltage Range -38V to -57V
Minimum RMS current rating for Supply 15A at –48V
Inrush current <3A for 200ms, total inrush period <300ms
supply load at 43dBm (20W) output power 650W
(Typical)

Default voltage
If a failure occurs with the DC Power system controller, the DC power system output
voltage shall remain within the range specified in the table above.

DC voltage regulation
The DC voltage shall be regulated to within ± 0.5% of the voltage set in the table above
under all conditions of line, load and temperature.

DC soft start
The DC voltage at input of the RRH shall not overshoot more than 3.5% of the set
voltage in the table above for a period of more than 100 milliseconds, under any
conditions.

Ripple and noise
The following table provides ripple and noise requirements. This requirement applies,
with or without batteries connected to the system, however the system is not intended to
operate without batteries.

64 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Appendix: Electrical power requirements for 3rd party
Guidelines -48 V DC power systems

       
RRH Ripple voltage Ripple voltage DC system
mVpp mVpp noise
(0 to 100 MHz) (mVrms) mV
(psophometric)

-48 VDC Not to exceed 250 100 Less than 2

Transient load response
For any step-load demand change of 10% to 90%, or 90% to 10%, on the DC power
system, the DC input voltage to the RRH shall remain within 5.0% and return to the 0.5%
regulation band within 300 milliseconds.

Backup power requirements
In the event of a commercial power failure, we recommends the DC power provided to
the RRH be backed up for a minimum of 30 minutes. The DC power to the equipment
shall not be interrupted during the transition from normal operation to backup operation
and vice versa.

w If the DC power supplied to the RRH is not equipped with backup power, undesirable
performance may be experienced during interruption and/or transients to the AC input
power.

High voltage shutdown
The DC power source may shut down if the output voltage reach the following values:
     
RRH Maximum voltage range(Volts DC) Maximum voltage for up to one second

-48V DC -59 to -60 -60

The DC power system shall not provide sustained voltage to the RRH at the maximum
voltage values, for more than one second, as shown in the table above. If a power
system failure occurs which causes loss of regulation resulting in voltage levels given in
the table above stated as the "maximum voltage range", the power system shall
shutdown or clamp its output voltage below -56.2 V DC (for -48 V DC systems) until the
problem is corrected.

Transient surge protection
The DC power system shall be designed to prevent surge transients at its input passing
through to the output and causing voltage transient in excess of -60 Volts (for -48 V DC
systems) to the RRH. Adequate transient surge protection shall be provided for the DC
feeders by running the feeders from the power system to equipment inside properly
grounded metallic conduit. In addition, surge protectors and/or surge suppressors may
be required to limit surge voltages to less than -60 Volts (for -48 V DC systems). If
external surge protection is required to meet this limit, it should be installed near the DC
input terminal of the RRH.

DC power grounding

DN194159312 Issue: 05 © 2018 Nokia 65
   

Appendix: Electrical power requirements for 3rd party LTE B41a RRH8x20 (UZHD) Site Preparation
-48 V DC power systems Guidelines

The -48 V DC return conductors shall be bonded to the frame ground system at the
output of the DC power system. For proper site grounding of the equipment, refer to
Nokia's, Grounding and Lightning Protection Guidelines for Alcatel-Lucent Network
Wireless System Cell Sites.

66 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Appendix: Product conformance statements
Guidelines

13  Appendix: Product conformance statements
This section presents the product conformance statements that apply to the TDD RRH.
In regions such as North America and the European Union, the statements that are
required are determined primarily by national or multi-national regulations. However, in
some regions, contract terms determine which statements are required.
The presence of the statement indicates that the product does comply with that
statement wherever it is required to do so.

13.1  China
Introduction
The statements that follow are the product conformance statements that apply to the
eNodeB when deployed in China.

EMC Compliance
The equipment complies with the following electromagnetic compatibility specifications:

• CISPR 22 Class B

Product safety conformance
The equipment complies with the following product safety specifications:

• EN 60950-1:2001
• EN 60215:1989

Optical transmitters
Nokia declares that eNodeB complies with the International Electrotechnical Commission
(IEC) standards IEC 60825-1 Edition 2.0 (2007) and IEC 60825-2 Edition 3.1 (2007). It is
a Class I/1 laser optical fiber communication systems "product" under the IEC
classifications.
This product is designed to ensure that personnel operating the product are not
endangered by laser radiation during normal operation and fault conditions. This product
does not present a risk of eye injury because it is fully enclosed and does not contain
embedded lasers greater than Class I/1 unless otherwise noted.

f CAUTION!  laser
Use of controls or adjustments or performance of procedures other than those specified
herein may result in hazardous laser radiation exposure.
Do not view directly into the laser beam with optical instruments such as a fiber
microscope because viewing of laser emission in excess of Class 1 limits significantly
increases the risk of eye damage.
Never look into the end of an exposed fiber or an open connector as long as the optical
source is switched on.
Ensure that the optical source is switched off before disconnecting optical fiber
connectors.

DN194159312 Issue: 05 © 2018 Nokia 67
   

Appendix: Product conformance statements LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

Packaging collection and recovery requirements
Countries, states, localities, or other jurisdictions may require that systems be
established for the return and/or collection of packaging waste from the consumer, or
other end user, or from the waste stream. Additionally, reuse, recovery, and/or recycling
targets for the return and/or collection of the packaging waste may be established.
For more information regarding collection and recovery of packaging and packaging
waste within specific jurisdictions, please contact the Nokia Services - Environmental
Health and Safety organization. For installations not performed by Nokia, please contact
the Nokia Customer Support Center at:
Technical Support Services, within China : +1 630 224 4672, prompt 2

Material content compliance
The People's Republic of China Ministry of Information Industry has published a
regulation (Order #39) and associated standards regarding restrictions on hazardous
substances (China RoHS). Currently, the legislation requires all Electronic and
Information Products (EIP) to comply with certain labeling and documentation
requirements. Nokia products manufactured on or after 1 March 2007, that are intended
for sale to customers in the China market, comply with these requirements.
In accordance with the People's Republic of China Electronic Industry Standard “Marking
for the Control of Pollution Caused by Electronic Information Product” (SJ/T11364-2006),
customers may access Nokia's Hazardous Substances Table information at either of the
following URLs (for the convenience of our diverse customer base):

• Access via the Nokia web site at:
http://www.alcatel-lucent.com/cn
• Access via the Nokia web site at:
http://www.alcatel-sbell.com.cn/product_solution/in4.asp

68 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Appendix: Abbreviations
Guidelines

14  Appendix: Abbreviations
This appendix lists abbreviations used in this document and the expanded form of those
abbreviations.

14.1  Initialisms
0-9

4G fourth generation

AWS Advanced Wireless Services

AISG Antenna Interface Standards Group

ALM Alarm

BS Base Station

CAL Calibration

CCM Channel Control Module

CEM Channel Element Module

CIC Customer Information Center

CPRI Common Public Radio Interface

d2U digital 2U-height box

eCCM enhanced Channel Control Module

eCEM enhanced Channel Element Modem

eNodeB evolved NodeB
( , eNB )

DN194159312 Issue: 05 © 2018 Nokia 69
   

Appendix: Abbreviations LTE B41a RRH8x20 (UZHD) Site Preparation
Guidelines

ETS European Telecommunications Standard

ETSI European Telecommunication Standards Institute

FDD frequency division duplex

GPS Global Positioning System

Hz Hertz

ISO International Standards Organization

LTE Long Term Evolution

LTE Long Term Evolution radio access network
RAN
( ,
eUT
RAN
, E-
UTR
AN )

LC Liquid Crystal

MHz megahertz

NE network element

OLCS Online Customer Support

PA Power Amplifier

70 © 2018 Nokia DN194159312 Issue: 05
   

LTE B41a RRH8x20 (UZHD) Site Preparation Appendix: Abbreviations
Guidelines

RRH Remote Radio Head

RF Radio Frequency

RS Recommended Standard (as in RS-485)

RS485 Industry standard serial connection

Rx Receiver, Receive side

TRDU Transmit Receive Duplex Unit

Tx Transmit

UE user equipment

WAN wide area network

XMS eXtended Management System

14.2  Acronyms
C

CPRI Common Public Radio Interface

PIN personal identification number

RAN radio access network

DN194159312 Issue: 05 © 2018 Nokia 71

You might also like