Running Head: Project calendar schedule 1

PMC-108-Providing water supplies in hilly areas

Submitted by- Ashish Dahiya

Project scope overview- To provide water supply in hilly areas of Himachal Pradesh by
water supply organization of Himachal from the source to households by 75 HP motor
pump.
Estimated Dates- 12 February 2022 to 10 September 2022

Milestones-

Milestones Time duration


 Identify the areas from where  15 Days
pipeline will pass.
 Identify the amount of raw  10 Days
materials and number of
equipment’s and labour needed.
 Choose the contactor and other  10 Days
supervisors which are needed.
 Start the work of laying the  3 Months
pipelines by digging the holes from
water source to households  2 Months
 Start laying the larger pipes from
source to the locality  1 Month
 Start laying the smaller pipes from
locality to doorstep  1 Month
 Start laying the meter pipes from
Project calendar schedule 2

doorsteps to houses  1 Month


 Start the supply of water
Project calendar schedule 3

Task Task name Starting date End date Duration


1 Identify the 7 February 25 February 15 days
areas from
where
pipeline will
pass.
.
.

2 Identify the 28 February 11 March 10 days


amount of raw
materials and
number of
equipment’s
and labour
needed
3 Choose the 14 March 25 March 10 days
contactor and
other
supervisors
which are
needed
4 Start the work 11 April 1 july 3 months
of laying the
pipelines by
digging the
holes from
water source to
households
5 Start 11 July 2 September 2 months
laying the
larger
pipes from
source to
the
locality

Start laying the 5 September 30 September


meter pipes
from doorsteps
to houses
Project calendar schedule 4

Start the supply 5th October Continuous


of water

2. Task and subtasks

Task 1. {Setting water supply}


1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8
{Identif {Identify {Choose {Start {Star {Start {Start {Start
y the the amount the the t laying laying the
areas of raw contactor work of layin the the supply
from materials and other laying g the smalle meter of
where and superviso the large r pipes pipes water}
pipeline number of rs which pipeline r from from
will equipment’ are s by pipe localit doorste
pass.} s and needed} digging s y to ps to
labour the from doorst houses}
needed} holes sour ep}
from ce to
water the
source local
to ity}
househ
olds}

1.1.1 1.2.1 1.3.1 1.4.1 1.5.1 1.6.1 1.7.1 1.8.1


Area Estimating Advertisi Calculating Determi Determini Determinin Testin
mapping the number ng on the ning the ng the g the g the
of contracto distance of number number of format of efficie
employees r and piping of required laying the ncy of
required superviso required small pipes in the water
Project calendar schedule 5

r pipes pipes house flow


positions in the
pipes
1.1.2 1.2.2 1.3.2 1.4.2 1.5.2 1.6.2 1.7.2 1.8.2
Ground Calculating Contactin Determinin Laying Laying the Connection Testin
markings the number g g directions of the small of meter g the
of material interview if water pipes in pipes to pipes in the functio
required s to flow the the house nality
determin tunnels doorsteps 0f
e the meter
capability pipes
1.1.3 1.2.3 1.3.3 1.4.3 1.5.3 1.6.3 1.7.3 1.8.3
Ground Establishin Recruitin Constructio Connect Connectin Testing the Supply
marking g plan of ga n of the ion of g the water flow ing
recording reaching contracto water the large small in the water
the r and supply pipe to pipes to house to all
employees superviso channels enable allow require
and the rs flow of water flow places
required water
materials

3. Schedule, resources and dependencies of project activities


Acti Identi Identify Choose Start Start Start Start Start the
vity fy the the the the layin layin layin supply of
areas amount contactor work g the g the g the water
from of raw and of large small meter
wher materials other layin r er pipes
e and superviso g the pipes pipes from
pipeli number rs which pipeli from from doors
ne of are nes sourc locali teps
will equipme needed by e to ty to to
pass. nt’s and diggi the doors house
labour ng locali tep s
needed the ty
holes
from
water
Project calendar schedule 6

sourc
e to
house
holds

Schedul
ed dates
Resourc Engineers Contracto Engineers Raw Labours Labours Labours Equipme
es r materials nt
Depend Start to Start to Start to Start to Start to Start to Finish to Start to
encies start start start finish finish finish finish finish

Assumptions  Start the project in right


weather conditions to avoid
and risk
 Provide regular updates and
work done in limited time
 No disturbance in work due to
any circumstance
Constraints  Approval of permits and
licences at specific time
 Work is done in set budget

Stakeholders  Government
 Contractor
 Engineers
 Supplier

Signatures  Government employee


 Contactors
 Project manager