Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROJECT DAILY MONITORING SHEET

Contractor: MECHATRENDS CONTRACTORS CORPORATION Date :1 September ‘21# of Days :


Project : 2018 TK P1 RECONSTRUCTION Location : PSCPC TAGBILARAN BOHOL

Personnel Qty Equipment Qty Weather Chart


1 Chain block 2
Project In-charge Yellow - Sunny Red - Heavy Rain
2 Level block 2 Orange - Light Rain Blue - Lightning
Project Supervisor
1 Sling 4 storm
Safety Officer
1 Vertical clamps 2
QA/QC
Shackles 4
Office Staff
3 Tape line 1
Welder
1 Line yarn/guy line 2
Electrician
3 Welding machine 3
Fitter/Fabricator
Grinder 3
Carpenter / Mason
2 Ball hammer 2
Scaffolder
1 Erection jigs
Equipment Tender
Helper 1
TOTAL 16

Activities
1.) Hauling of Scaffold Materials
2.) Erection of Scaffolding for Gin Pole
3.) Final Check of Lay-out of Shell Nozzle( N3, N4, N5, N6, N1)
4.) Final Check of Lay-out of two units of Sump
5.)

Accomplishment
1.) Hauling of Materials
2.) Erection of Scaffold for Gin Pole (continuous)
3.) Final Check of Lay-out of Shell Nozzle( N3, N4, N5, N6, N1)
4.) Final Check of Lay-out of two units of Sump
5.)

Remarks
1.) Unexpected weather condition
2.)

Manpower List
Sn Name Designation Sn Name Designation
01 F. DOROMAL FOREMAN 10 A.ENRIQUEZ TENDER/RIGGER

02 M. DUMAHOD JR. FOREMAN 11 E. ORAPA HELPER

03 B. VILLAVER FITTER/FABRICATOR 12 S. ESPERAS SCAFFOLDER

04 M. MAGSAYO FITTER/SCAFFOLDER 13 J. GUINTO QA/QC

05 E. GELLADO FITTER/FABRICATOR 14 S. MAURICIO CEP

06 J.MABOLOC FITTER 15 C. BAGON SO3

07 J. PONTE WELDER 16

08 R. SALARDA WELDER 17

09 J. SALIBAY WELDER 18

Signatories Name Signature Date


Rhannie M. Garcia 1 September 2021
Project Supervisor
Safety Officer
Chito Bagon (SO3) .
Ace Montehermoso
TPE

You might also like