This document provides a reconciliation of construction materials for a concrete structure at the 4A Head Regulator location. It shows that 1400 cement bags were drawn for the raft foundation but no cement has been consumed yet, leaving a variance of -1400 bags against the drawing quantity. The balances of fine aggregate, coarse aggregate and concrete are all in line with both the physical verification and consumption records.
This document provides a reconciliation of construction materials for a concrete structure at the 4A Head Regulator location. It shows that 1400 cement bags were drawn for the raft foundation but no cement has been consumed yet, leaving a variance of -1400 bags against the drawing quantity. The balances of fine aggregate, coarse aggregate and concrete are all in line with both the physical verification and consumption records.
This document provides a reconciliation of construction materials for a concrete structure at the 4A Head Regulator location. It shows that 1400 cement bags were drawn for the raft foundation but no cement has been consumed yet, leaving a variance of -1400 bags against the drawing quantity. The balances of fine aggregate, coarse aggregate and concrete are all in line with both the physical verification and consumption records.
Construction Materials Reconciliation Location :- 4A Head Regulator
Concrete Coarse aggregate (cum)
Sl.No Description Unit Grade Cement (bags) Fine aggregate (cum) Qty (cum) 10mm 20mm 40mm A Total Drawing Quantity cum B Cumulative Received cum C Stage-wise drawing qty details 1 Raft cum M15 5 1400 0 0 0 0 2 Side walls cum M15 0 0 0 0 0 3 Slab cum M15 0 0 0 0 0 Drawing Qty upto Slab level cum 1400 0 0 0 0 D Consumption Details 1 Raft cum M15 2 Side walls cum M15 3 Slab cum M15 Cumulative Consumption cum 0 0 0 0 0 E Balance Stock As per physical verification cum 0 0 0 0 0 As per consumption cum 0 0 0 0 0 F Variance 1 Against Drawing i) Raft cum -1400 0 0 0 0 ii) Side walls cum 0 0 0 0 0 iii) Slab cum 0 0 0 0 0 Total cum -1400 0 0 0 0 2 Against Physical Stock cum 0 0 0 0 0 NCC Limited Chitradurga Branch Canal Drip Pkg-3 Construction Materials Reconciliation Location :- 4A Head Regulator
Concrete Cement (bags) Coarse aggregate (cum)
Sl.No Description Unit Grade Fine aggregate (cum) Qty (cum) 10mm 20mm 40mm A Total Drawing Quantity cum B Cumulative Received cum D Consumption Details 1 Raft cum 2 Side walls cum 3 Slab cum Cumulative Consumption cum 0 0 0 0 0 E Balance Stock As per physical verification cum 0 0 0 0 0 As per consumption cum 0 0 0 0 0 F Variance 2 Against Physical Stock cum 0 0 0 0 0