PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

GENERAL RESIDENTIAL SERVICE


DESIGNATION:
GRS
AVAILABLE:
throughout Puerto Rico

APPLICATION:

This rate will apply to residential customers for domestic use. The Electric Power Authority (Authority)
will provide and install the meter in each residence or apartment and the client is responsible for
supplying the necessary facilities for its installation.

This rate may also apply in houses, apartments and other structures, which are intended primarily for
residential purposes, where no more than two rooms, in which the total connected load does not
exceed 500 watts, are used by the resident for professional purposes. or business; otherwise, the
General Service rate for Secondary Distribution Voltage (GSS) will be applied to both

uses, commercial and domestic, if not measured separately.

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, 2 or 3 wires, single-phase or three-phase; 120, 208 or 240 volts, at the
option of the Authority.

CHARGES IN BILLING PERIOD:

Client Monthly Charge:

$4.00

Monthly Charge for Energy:

$0.04944 per kWh for the first 425 kWh of monthly usage
$0.05564 per kWh for additional monthly usage

Date Filed: __________________ Original Sheet No. 1


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

Minimum Billing:

$4.00

RECONCILIATION AND RIDERS CLAUSES:

The GRS rate is subject to the following Riders:


1. Rider FCA - Fuel Purchase Charge Adjustment
2. Rider PPCA - Charge Adjustment for Purchase of Energy
3. Rider FOS - Fuel Allowance

4. Rider CILTA - Contribution in Lieu of Taxes (CELI) – Municipalities


5. Rider SUBA-HH – Human Aid Grants
6. Rider SUBA-NHH - Non-Help Grants for Humans
7. Rider EE – Energy Efficiency Charge
8. Rider NM - Net Measurement Credit

9. Rider SC - Securitization Charge


10. Rider QF – Purchases from Qualifying Facilities
(Parallel Generation)
11. Rider LP – Preserve Life Discount
12. Rider DD - Direct Debit
13. Rider TUP – Provisional Rate Reconciliation

Date Filed: __________________ Original Sheet No. 2


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

SPECIAL RESIDENTIAL SERVICE

DESIGNATION:

LRS

AVAILABLE:

throughout Puerto Rico

APPLICATION:

This rate will apply to residential customers who meet the criteria of the Nutritional Assistance Program, for
all domestic uses.

The Electric Power Authority (Authority) will provide and install the meter in each
residence or apartment and the client is responsible for supplying the necessary facilities for its installation.

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, 2 or 3 wires, single-phase or three-phase; 120, 208 or 240 volts, at the option
of the Authority.
POSITIONS:

Client Monthly Charge:

$3.00

Monthly Charge for Energy:

$0.02054 per kWh for the first 425 kWh of monthly usage
$0.05564 per kWh for additional monthly usage
Minimum Billing:

$3.00

Date Filed: __________________ Original Sheet No. 3


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The LRS fare is subject to the following Reconciliation and Riders Clauses:
1. Rider FCA - Fuel Purchase Charge Adjustment
2. Rider PPCA - Charge Adjustment for Purchase of Energy
3. Rider FOS - Fuel Allowance

4. Rider CILTA - Contribution in Lieu of Taxes (CELI) – Municipalities


5. Rider SUBA-HH – Human Aid Grants
6. Rider SUBA-NHH - Non-Help Grants for Humans
7. Rider EE – Energy Efficiency Charge
8. Rider NM - Net Measurement Credit

9. Rider SC - Securitization Charge


10. Rider QF – Purchases from Qualifying Facilities
(Parallel Generation)
11. Rider LP – Preserve Life Discount
12. Rider DD - Direct Debit
13. Rider TUP – Provisional Rate Reconciliation

Date Filed: __________________ Original Sheet No. 4


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RESIDENTIAL SERVICE FOR PUBLIC PROJECTS

DESIGNATION:

RH3

AVAILABLE:

throughout Puerto Rico

APPLICATION:

This rate will apply to residential clients of Public Housing Projects supported or subsidized totally or partially
by loans, donations, contributions or allocations from the federal, state or municipal government. The owner
will provide a complete electrical distribution system, adequate to serve the Project, with service connections
and meters in each residence or apartment in accordance with plans and specifications approved by the
Puerto Rico Electric Power Authority.

(Authority). Ownership of said system will be transferred to the Authority, who will bear the costs of operating
and maintaining the system. The service will be provided for all domestic uses.

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, 2 or 3 wires, single-phase or three-phase; 120, 208 or 240 volts, at the option
of the Authority.
POSITIONS:

Client Monthly Charge:

$2.00

Monthly Charge for Energy:

$0.00694 per kWh for the first 425 kWh of monthly usage
$0.05564 per kWh for additional monthly usage

Minimum Billing:

$2.00

Date Filed: __________________ Original Sheet No. 5


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The RH3 fare is subject to the following Reconciliation and Riders Clauses:
1. Rider FCA - Fuel Purchase Charge Adjustment
2. Rider PPCA - Charge Adjustment for Purchase of Energy
3. Rider FOS - Fuel Allowance

4. Rider CILTA - Contribution in Lieu of Taxes (CELI) – Municipalities


5. Rider SUBA-HH – Human Aid Grants
6. Rider SUBA-NHH - Non-Help Grants for Humans
7. Rider EE – Energy Efficiency Charge
8. Rider NM - Net Measurement Credit

9. Rider SC – Securitization Charge


10. Rider QF – Purchases from Qualifying Facilities
(Parallel Generation)
11. Rider LP – Preserve Life Discount
12. Rider DD - Direct Debit
13. Rider TUP – Provisional Rate Reconciliation

Date Filed: __________________ Original Sheet No. 6


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

FLAT RATE FOR PUBLIC RESIDENTIALS

UNDER THE OWNERSHIP OF THE PUBLIC HOUSING ADMINISTRATION

DESIGNATION:

RFR

AVAILABLE:

throughout Puerto Rico

APPLICATION:

The RFR rate was established by the Puerto Rico Power Authority (Authority) in accordance with the
provisions of Act 22-2016. The RFR rate is granted to customers who reside in a housing unit physically
located within a public housing project under the ownership of the Public Housing Administration for all
domestic uses.

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, 2 or 3 wires, single-phase or three-phase; 120, 208 or 240 volts, at the option
of the Authority.

POSITIONS:

RFR: 1 Room

Fixed charge $30.00 per month


Energy – In Excess of 600 kWh $0.05564 per kWh

RFR: 2 or 3 Rooms

Fixed charge $40.00 per month


Energy – In Excess of 800 kWh $0.05564 per kWh

RFR: 4 or 5 Rooms

Fixed charge $50.00 per month


Energy – In Excess of 1,000 kWh $0.05564 per kWh

Date Filed: __________________ Original Sheet No. 7


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The RFR fare is subject to the following Reconciliation Clauses and Riders, for
each kWh that exceeds the corresponding consumption limit (in kWh):
1. Rider FCA - Fuel Purchase Charge Adjustment
2. Rider PPCA - Charge Adjustment for Purchase of Energy
3. Rider CILTA - Contribution in Lieu of Taxes (CELI) - Municipalities
4. Rider SUBA-HH – Human Aid Grants
5. Rider SUBA-NHH - Non-Help Grants for Humans
6. Rider EE – Energy Efficiency Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchases from Qualifying Facilities
(Parallel Generation)
10. Rider DD - Direct Debit
11. Rider TUP – Provisional Rate Reconciliation

Date Filed: __________________ Original Sheet No. 8


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

GENERAL SERVICE AT SECONDARY DISTRIBUTION VOLTAGE

DESIGNATION:
GSS
AVAILABLE:
throughout Puerto Rico

APPLICABLE:

This rate will apply to any non-residential service with a load less than 50 kVA.
Also, it will apply to temporary electric power service for limited use in streets, carnivals and others.
The service will be provided through a connection point and a measurement point.

The Puerto Rico Electric Power Authority (Authority) will provide and install the meter. The client will
supply the necessary facilities for the installation of the meter, as well as those required to provide the
electricity service. The measurement will be carried out in accordance with this rate and the Regulation
that governs the Terms and Conditions
General for the Supply of Electric Power. The service will be provided and billed to the owner or legal
entity responsible for prompt payment for services rendered, as well as the deposit of the corresponding
bond.

Two or more industrial firms may contract the electricity service through a meter, if they meet all of the
following requirements:

1. Industrial firms will be owned by an owner or Parent Corporation.


2. The firms will be located in the same building or adjacent buildings in the
same property.
3. The firms will manufacture the same product or complementary products that are part of the
same article.
4. Firms may not have debts with the Authority at the time of requesting this
benefit.

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, single-phase or three-phase; 120, 208, 240 or 440 volts, at the option of
the Authority.

Date Filed: __________________ Original Sheet No. 9


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

POSITIONS:

Client Monthly Charge:


$5.00

Monthly Charge for Energy:


$0.08449 per kWh
Minimum Billing:

$5.00

RECONCILIATION AND RIDERS CLAUSES:

The GSS fare is subject to the following Reconciliation and Riders Clauses:
1. Rider FCA – Fuel Purchase Charge Adjustment
2. Rider PPCA – Charge Adjustment for Energy Purchase
3. Rider CILTA – Contribution in Lieu of Taxes (CELI) – Municipalities
4. Rider SUBA-HH – Human Aid Grants
5. Rider SUBA-NHH – Non-Aid Grants for Humans
6. Rider EE – Energy Efficiency Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchase from Qualifying Facilities
(Parallel Generation)
10. Rider CSW – Discount Churches and Social Welfare Organizations
11. Rider CIT – Credit for Tourism Sector Incentives
12. Rider CRA – Credit for Rural Aqueducts
13. Rider CAC – Condominium Common Areas
14. Rider DCS – Urban Center Subsidy

15. Rider TUP – Provisional Rate Reconciliation

Date Filed: __________________ Original Sheet No. 10


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

GENERAL SERVICE AT PRIMARY DISTRIBUTION VOLTAGE

DESIGNATION:
GSP
AVAILABLE:
throughout Puerto Rico

APPLICATION:

This rate will apply to industrial clients and commercial clients. The service will be provided through a
connection point and through a single meter.

The client will supply the facilities required to receive electric power service from the Puerto Rico
Electric Power Authority (Authority), including the substation. The transformers and related equipment
may be leased from the Authority, if they are available, following the procedures in force. The Authority
will provide and install the measurement system. The client is responsible for providing the necessary
facilities for the installation of the measurement system. The measurement will be made in accordance
with this rate and the Regulation that governs the General Terms and Conditions for the Supply of
Electric Power.

The service will be provided and billed to the owner or legal entity responsible for prompt payment for
services rendered, as well as the deposit of the corresponding bond.

Two or more industrial firms may contract the electricity service through a meter, if they meet all of the
following requirements:

1. Industrial firms will be owned by an owner or Parent Corporation.


2. The firms will be located in the same building or adjacent buildings in the
same property.
3. The firms will manufacture the same product or complementary products that are part of the
same article.
4. Firms may not have debts with the Authority at the time of requesting this
benefit.

Date Filed: __________________ Original Sheet No. 11


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, 3 or 4 wires, triphasic; 2,400; 4,160; 8,320; 13,200 volts, or other
primary distribution voltage, at the option of the Authority.

MAXIMUM DEMAND AND CONSUMPTION:

The consumption in kilowatt-hours and the maximum demand for each period will be determined
by the meter readings. The maximum demand in any month for each period
It will be the maximum demand registered during a period of 15 consecutive minutes in the month.
The demand will not include offsets due to Net Metering or the output of other generation equipment
owned by the customer.

CHARGES IN BILLING PERIOD:

Client Monthly Charge:

$200.00 per month

Monthly Charge for Energy:


$0.04694 per kWh for each of the first 300 kWh per kW of peak demand
$0.03894 per kWh for each additional kWh of consumption
Monthly Demand Charge:
$8.10 per kVA of maximum registered demand during a period of 15 consecutive minutes during
the billing month. The demand will not include offsets due to Net Metering or the output of other
generation equipment owned by the customer.
Excess Demand Charge:
If the maximum demand established in the month is greater than the contracted demand, the
excess over the latter will be billed at $10 per kVA.
Minimum Billing:

$605 plus Reconciliation Clauses and Riders

Date Filed: __________________ Original Sheet No. 12


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The GSP fare is subject to the following Reconciliation and Riders Clauses:
1. Rider FCA – Fuel Purchase Charge Adjustment
2. Rider PPCA – Charge Adjustment for Energy Purchase
3. Rider CILTA – Contribution in Lieu of Taxes (CELI) – Municipalities
4. Rider SUBA-HH – Human Aid Grants 5. Rider SUBA-NHH
– Non-Aid Grants for Humans 6. Rider EE – Energy Efficiency
Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchase from Qualifying Facilities
(Parallel Generation)
10. Rider CSW – Discount Churches and Social Welfare Organizations
11. Rider CIT – Credit for Tourism Sector Incentives 12. Rider
CAC – Condominium Common Areas

13. Rider LR – Charge Retention


14. Rider TUP – Provisional Rate Reconciliation

CONTRACT TERM:

One year; may be canceled after that term by notice by any of the parties with
sixty (60) days in advance.

Date Filed: __________________ Original Sheet No. 13


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

GENERAL SERVICE AT TRANSMISSION VOLTAGE

DESIGNATION:
GST
AVAILABLE:
throughout Puerto Rico

APPLICATION:

This rate will apply to commercial and industrial clients, connected to the transmission system, that
have a demand of 250 kVA or more, for general uses, including motor power, heating, cooling and
incidental lighting of industries, hotels and any other establishment. The service will be provided from
a single connection point and through a single meter.

The customer will supply the facilities required to receive electricity service from the Puerto Rico
Electric Power Authority (Authority), including the substation. The transformers and related equipment
may be leased from the Authority, if they are available, following the procedures in force. The Authority
will provide and install the measurement system. The client is responsible for providing the necessary
facilities for the installation of the measurement system. The measurement will be made in accordance
with this rate and the Regulation that governs the General Terms and Conditions for the Supply of
Electric Power.

The service will be provided and billed to the owner or legal entity responsible for prompt payment for
services rendered, as well as the deposit of the corresponding bond.

Two or more industrial firms may contract the electricity service through a meter, if they meet all of the
following requirements:

1. Industrial firms will be owned by an owner or Parent Corporation.


2. The firms will be located in the same building or adjacent buildings in the
same property.
3. The firms will manufacture the same product or complementary products that are part of the
same article.
4. Firms may not have debts with the Authority at the time of requesting this
benefit.

Date Filed: __________________ Original Sheet No. 14


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, triphasic; 38 kV or 115 kV, at the option of the Authority.

MAXIMUM DEMAND AND CONSUMPTION:

The consumption in kilowatt-hours and the maximum demand for each period will be determined
by the meter readings. The maximum demand in any month for each period
It will be the maximum demand registered during a period of 15 consecutive minutes in the month.
The demand will not include offsets due to Net Metering or the output of other generation equipment
owned by the customer.

CHARGES IN BILLING PERIOD:

Client Monthly Charge:

$450.00 per month

Monthly Charge for Energy:


$0.03650 per kWh for each of the first 300 kWh per kW of peak demand
$0.03250 per kWh for each additional kWh of consumption
Monthly Demand Charge:
$7.70 per kVA of the maximum registered demand during a period of 15 consecutive minutes
during the billing month. The demand will not include offsets due to Net Metering or the output of
other generation equipment owned by the customer.
Excess Demand Charge:
If the maximum demand established in the month is greater than the contracted demand, the
excess over the latter will be billed at $9.60 per kVA.
Minimum Billing:

$2,375 plus the Reconciliation Clauses and Riders

Date Filed: __________________ Original Sheet No. 15


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The GST rate is subject to the following Reconciliation Clauses and Riders:
1. Rider FCA – Fuel Purchase Charge Adjustment
2. Rider PPCA – Charge Adjustment for Energy Purchase
3. Rider CILTA – Contribution in Lieu of Taxes (CELI) – Municipalities
4. Rider SUBA-HH – Human Aid Grants 5. Rider SUBA-NHH
– Non-Aid Grants for Humans 6. Rider EE – Energy Efficiency
Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchase from Qualifying Facilities
(Parallel Generation)
10. Rider CSW – Discount Churches and Social Welfare Organizations
11. Rider CIT – Credit for Tourism Sector Incentives
12. Rider CRA – Credit for Rural Aqueducts
13. Rider CAC – Condominium Common Areas

14. Rider LR – Charge Retention


15. Rider TUP – Provisional Rate Reconciliation

CONTRACT TERM:

One year; may be canceled after that term by notice by any of the parties with
sixty (60) days in advance.

Date Filed: __________________ Original Sheet No. 16


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

TIME OF USE AT PRIMARY DISTRIBUTION VOLTAGE


DESIGNATION:
TOU-P
AVAILABLE:
throughout Puerto Rico

APPLICATION:

This rate will apply to commercial and industrial customers with a demand of 1,000 kVA or greater
than:

1. Transfer load from peak period to off-peak period


2. Add load in the off-peak period
3. Remove load from peak period

For customers with a demand between 1,000 kVA and 3,000 kVA, the following will apply:

1. A block of 10,000 kVA limits the transfer and increase of load in the period
off peak.
2. When this initial charging block is complete, the Puerto Rico Electric Power Authority
of Puerto Rico (Authority) will identify other blocks for new contracts. These blocks will
be determined based on the amount of kVA that the Authority needs to transfer during
off-peak periods. The Executive Director will authorize these additional blocks.

3. The concession of the rate will depend on the capacity of the Authority to assign generation
in the off-peak period.

The customer will supply the facilities required to receive electricity service from the Puerto Rico
Electric Power Authority (Authority), including the substation. The transformers and related
equipment may be leased from the Authority, if they are available, following the procedures in
force. The Authority will provide and install the measurement system. The client is responsible for
providing the necessary facilities for the installation of the measurement system. The measurement
will be made in accordance with this rate and the Regulation that governs the General Terms and
Conditions for the Supply of Electric Power.

Date Filed: __________________ Original Sheet No. 17


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

SPECIAL CONDITIONS:

1. The Director of Planning and Environmental Protection must approve the concession of
this fee.
2. The customer must inform the Authority of the actions taken to add or remove load or to
transfer load from the peak period to the off-peak period.
3. The client must provide the means of communication necessary for reading
remote from the meter.

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, 3 or 4 wires, triphasic, 2,400; 4,160; 8,320; 13,200 volts or other
primary distribution voltage, at the option of the Authority.
CHARGES IN BILLING PERIOD:

Client Monthly Charge:

$200.00 per month

Monthly Charge for Energy:


$0.05779 per kWh during peak period, plus
$0.01879 per kWh during the off-peak period
Monthly Demand Charge:
$8.10 per kVA of maximum demand recorded during the peak period for a period of 15 consecutive
minutes during the billing month.
Plus

$1.10 per kVA of maximum registered demand during the off-peak period for a period of 15
consecutive minutes during the billing month.
Minimum Billing:

For customers with a demand of 3,000 kVA or greater:


$3,500 plus energy charge and Reconciliation Clauses and Riders

For customers with a demand of 1,000 kVA or greater and less than 3,000 kVA:
$1,300 plus energy charge and Reconciliation Clauses and Riders

Date Filed: __________________ Original Sheet No. 18


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

PERIODS:

Peak Period 9:00 am to 10:00 pm on weekdays (Monday through Friday), excluding certain holidays.

Period 10:00 pm to 9:00 am weekdays (Monday through Friday), all hours on weekends, and all
Outside hours during certain holidays.
Pico

Holidays are as follows: New Year; Kings Day; Holy Friday; Independence of the United
Days States; Constitution of the Commonwealth of Puerto Rico; Labor Day; Discovery of Puerto
Holidays Rico; Thanksgiving; Christmas.

MAXIMUM DEMAND AND CONSUMPTION:

The consumption in kilowatt-hours and the maximum demand for each period will be determined by the meter
readings. The maximum demand in any month for each period
It will be the maximum demand registered during a period of 15 consecutive minutes in the month. The demand
will not include offsets due to Net Metering or the output of other generation equipment owned by the customer.

Date Filed: __________________ Original Sheet No. 19


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The TOU-P fare is subject to the following Reconciliation Clauses and Riders:
1. Rider FCA – Fuel Purchase Charge Adjustment
2. Rider PPCA – Charge Adjustment for Energy Purchase
3. Rider CILTA – Contribution in Lieu of Taxes (CELI) – Municipalities
4. Rider SUBA-HH – Human Aid Grants 5. Rider SUBA-NHH
– Non-Aid Grants for Humans 6. Rider EE – Energy Efficiency
Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchase from Qualifying Facilities
(Parallel Generation)
10. Rider CSW – Discount Churches and Social Welfare Organizations
11. Rider CIT – Credit for Tourism Sector Incentives
12. Rider CRA – Credit for Rural Aqueducts
13. Rider CAC – Condominium Common Areas

14. Rider LR – Charge Retention


15. Rider TUP – Provisional Rate Reconciliation

CONTRACT TERM:

One year; may be canceled after that term by notice by any of the parties with
sixty (60) days in advance.

Date Filed: __________________ Original Sheet No. 20


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

TIME OF USE AT TRANSMISSION VOLTAGE


DESIGNATION:
TOU-T
AVAILABLE:
throughout Puerto Rico

APPLICATION:

This rate will apply to commercial and industrial customers with a demand of 1,000 kVA or greater
than:

1. Transfer load from peak period to off-peak period


2. Add load in the off-peak period
3. Remove load from peak period

For customers with a demand between 1,000 kVA and 3,000 kVA, the following will apply:

1. A block of 10,000 kVA limits the transfer and increase of load to period
off peak.
2. When this initial charging block is complete, the Puerto Rico Electric Power Authority
of Puerto Rico (Authority) will identify other blocks for new contracts. These blocks will
be determined based on the amount of kVA that the Authority needs to transfer during
off-peak periods. The Executive Director will authorize these additional blocks.

3. The concession of the rate will depend on the capacity of the Authority to assign generation
in off-peak periods.

The client will provide the substation. The transformers and related equipment may be leased
from the Authority, if they are available, following the procedures in force. The Authority will
provide and install the measurement system. The client is responsible for providing the necessary
facilities for the installation of the measurement system.

Date Filed: __________________ Original Sheet No. 21


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

SPECIAL CONDITIONS:

1. The Director of Planning and Environmental Protection must approve the concession of
this fee.
2. The customer must inform the Authority of the actions taken to add or remove load or to
transfer load from the peak period to the off-peak period.
3. The client must provide the means of communication necessary for reading
remote from the meter.

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, 3 or 4 wires, three-phase, 38 kV or 115 kV, at the option of the Authority.

CHARGES IN BILLING PERIOD:

Client Monthly Charge:

$450.00 per month

Monthly Charge for Energy:


$0. 04679 per kWh during peak period, plus $0.
01779 per kWh during off-peak period
Monthly Demand Charge:
$7.70 per kVA of maximum recorded demand during the peak period for a period of 15 consecutive
minutes during the billing month.
Plus

$1.00 per kVA of maximum registered demand during the off-peak period for a period of 15
consecutive minutes during the billing month.
Minimum Billing:

For customers with a demand of 3,000 kVA or greater:


$3,450 plus energy charge and Reconciliation Clauses and Riders
For customers with a demand of 1,000 kVA or greater and less than 3,000 kVA:
$1,450 plus energy charge and Reconciliation Clauses and Riders

Date Filed: __________________ Original Sheet No. 22


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

PERIODS:

Peak Period 9:00 am to 10:00 pm on weekdays (Monday through Friday), excluding certain holidays.

Period 10:00 pm to 9:00 am weekdays (Monday through Friday), all hours on weekends, and all
Outside hours during certain holidays.
Pico

Holidays are as follows: New Year; Kings Day; Holy Friday; Independence of the United
Days States; Constitution of the Commonwealth of Puerto Rico; Labor Day; Discovery of Puerto
Holidays Rico; Thanksgiving; Christmas.

MAXIMUM DEMAND AND CONSUMPTION:

The consumption in kilowatt-hours and the maximum demand for each period will be determined by the meter
readings. The maximum demand in any month for each period
It will be the maximum demand registered during a period of 15 consecutive minutes in the month. The demand
will not include offsets due to Net Metering or the output of other generation equipment owned by the customer.

Date Filed: __________________ Original Sheet No. 23


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The TOU-T fare is subject to the following Reconciliation Clauses and Riders:
1. Rider FCA – Fuel Purchase Charge Adjustment
2. Rider PPCA – Charge Adjustment for Energy Purchase
3. Rider CILTA – Contribution in Lieu of Taxes (CELI) – Municipalities
4. Rider SUBA-HH – Human Aid Grants 5. Rider SUBA-NHH
– Non-Aid Grants for Humans 6. Rider EE – Energy Efficiency
Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchase from Qualifying Facilities
(Parallel Generation)
10. Rider CSW – Discount Churches and Social Welfare Organizations
11. Rider CIT – Credit for Tourism Sector Incentives
12. Rider CRA – Credit for Rural Aqueducts
13. Rider LR – Charge Retention
14. Rider TUP – Provisional Rate Reconciliation

CONTRACT TERM:

One year; may be canceled after that term by notice by any of the parties with
sixty (60) days in advance.

Date Filed: __________________ Original Sheet No. 24


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

INDUSTRIAL SERVICE HIGH ENERGY USE (115 kV)

DESIGNATION:

LIS

AVAILABLE:

throughout Puerto Rico

APPLICATION:

Exclusively to industries with a demand equal to 12,000 kW or more, with a load factor equal to 80% or more
and a monthly average power factor of 95% or more.
Customers who for two consecutive months have a monthly load factor of less than 80% will have a monthly
charge for additional energy corresponding to the kilowatt hours necessary to obtain a load factor of 80%.
This will apply from the second month until the customer meets a monthly load factor of 80% or more.

The customer will supply the facilities required to receive electricity service from the Puerto Rico Electric
Power Authority (Authority), including the substation. The Authority will provide and install the measurement
system. The client is responsible for providing the necessary facilities for the installation of the measurement
system. The service will be provided and metered at a single connection point. The measurement will be
made in accordance with this rate and the Regulation that governs the General Terms and Conditions for the
Supply of Electric Power.

The service will be provided only when there is sufficient capacity available and, if the Authority
determines that the reliability of the line or sectionalizer at the point of connection is not adversely affected.

Date Filed: __________________ Original Sheet No. 25


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

SPECIAL CONDITIONS:

1. The connection point, conditions and improvements required for the interconnection
will be determined through consultation and coordination with the Divisions of:

a. Planning and Studies


b. Transmission and Distribution
c. Electrical System Operation

2. Two or more industries may contract electric service through a meter under this rate
as long as they meet the following requirements:

a. The industries total demand must meet the monthly requirement of having a
demand equal to 12,000 kW or more, a load factor of 80% or more, and an
average power factor of 95% or more.
b. Industries must be owned by the same owner or Corporation
Headquarters.

c. Interested industries must be up to date in the payment of their electricity bills.

3. The client must provide the means of communication necessary for the remote
reading of his meter.

4. The service will be provided and billed under a single responsibility in the name of
the owner or legal entity responsible for prompt payment for service provided, as
well as the deposit of the corresponding bond.

NATURE OF THE SERVICE:


Alternating current, 60 Hertz, 3 or 4 wires, triphasic, 115 kV.

Date Filed: __________________ Original Sheet No. 26


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

CHARGES IN BILLING PERIOD:

Client Monthly Charge:

$450.00 per month

Monthly Charge for Energy:


$0.02496 per kWh for each of the first 584 kWh per kW of peak demand
$01896 per kWh for each additional kWh of consumption
Monthly Demand Charge:
$6.00 per kVA of the maximum registered demand during a period of 15 consecutive minutes
during the billing month. The demand will not include offsets due to Net Metering or the output of
other generation equipment owned by the customer.
Excess Demand Charge:
If the maximum demand established in the month is greater than the contracted demand, the
excess over the latter will be billed at $9.60 per kVA.
Minimum Billing:

$72,450 plus the Reconciliation Clauses and Riders

MAXIMUM DEMAND AND CONSUMPTION:

The consumption in kilowatt-hours and the maximum demand for each period will be determined
by the meter readings. The maximum demand in any month for each period will be the maximum
demand registered during a period of 15 consecutive minutes in the month. The demand will not
include offsets due to Net Metering or the output of other generation equipment owned by the
customer.

Date Filed: __________________ Original Sheet No. 27


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The LIS fare is subject to the following Reconciliation and Riders Clauses:
1. Rider FCA – Fuel Purchase Charge Adjustment
2. Rider PPCA – Charge Adjustment for Energy Purchase
3. Rider CILTA – Contribution in Lieu of Taxes (CELI) – Municipalities
4. Rider SUBA-HH – Human Aid Grants 5. Rider SUBA-NHH
– Non-Aid Grants for Humans 6. Rider EE – Energy Efficiency
Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchase from Qualifying Facilities
(Parallel Generation)
10. Rider LR – Charge Retention
11. Rider TUP – Provisional Rate Reconciliation

CONTRACT TERM:

One year. This Agreement is automatically renewed and may be terminated by giving one year's notice
to either party.

Date Filed: __________________ Original Sheet No. 28


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

GENERAL AGRICULTURAL SERVICE AND AQUEDUCT PUMPS


OPERATED BY RURAL COMMUNITIES

DESIGNATION:
GAS
AVAILABLE:
Rural Puerto Rico
APPLICATION:

This rate will apply to farmers and clients dedicated to animal husbandry. The service will be
provided for driving force, lighting, irrigation pumps, refrigeration and heating.
This rate will also apply to customers who operate pumps to provide aqueduct service exclusively
in rural communities; Incidental lighting related to this operation is permitted. The service will be
through a connection point and a measurement point for loads less than 50 kVA. The Puerto Rico
Electric Power Authority (Authority) will provide and install the meter. The client is responsible for
supplying the necessary facilities for the installation of the meter.

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, single-phase or three-phase; 120, 208, 240 volts, or other distribution
voltage at the option of the Authority.

CHARGES IN BILLING PERIOD:

Client Monthly Charge:

$10.00 per month

Monthly Charge for Energy:

$0.06179 per kWh

Minimum Billing:

$10.00

Date Filed: __________________ Original Sheet No. 29


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The GAS rate is subject to the following Reconciliation and Riders Clauses:
1. Rider FCA – Fuel Purchase Charge Adjustment
2. Rider PPCA – Charge Adjustment for Energy Purchase
3. Rider CILTA – Contribution in Lieu of Taxes (CELI) – Municipalities
4. Rider SUBA-HH – Human Aid Grants 5. Rider SUBA-NHH
– Non-Aid Grants for Humans 6. Rider EE – Energy Efficiency
Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchase from Qualifying Facilities
(Parallel Generation)
10. Rider CRA – Credit for Rural Aqueducts
11. Rider LR – Load Retention
12. Rider TUP – Provisional Rate Reconciliation

Date Filed: __________________ Original Sheet No. 30


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

OUTDOOR SPORTS PARKS LIGHTING


WHERE ADMISSION RIGHT IS CHARGED

DESIGNATION:
LP-13
AVAILABLE:
throughout Puerto Rico

APPLICATION:

This rate will apply to sports parks where an admission fee is charged that have a connected load
for outdoor lighting of 500 kW or more. The service will be through a delivery point and a
measurement point. The customer must provide all the electrical facilities required to supply the
service under this rate, including the substation. The metering system will be provided and installed
by the Puerto Rico Electric Power Authority (Authority). The client is responsible for providing the
necessary facilities for the installation of the meter.

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, triphasic; 3 or 4 wires, 2,400 V; 4,160V; 8,320V; 13,200 V, or other
primary distribution voltage at the option of the Authority.
CHARGES IN BILLING PERIOD:

Monthly Charge for Energy:

$0.09779 per kWh for each of the first 100 kWh per kW of peak demand
$0.08779 per kWh for each additional kWh of consumption

MINIMUM BILLING:

$1,200 plus the Reconciliation Clauses and Riders

Date Filed: __________________ Original Sheet No. 31


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The LP-13 fare is subject to the following Reconciliation and Riders Clauses:
1. Rider FCA – Fuel Purchase Charge Adjustment
2. Rider PPCA – Charge Adjustment for Energy Purchase
3. Rider CILTA – Contribution in Lieu of Taxes (CELI) – Municipalities
4. Rider SUBA-HH – Human Aid Grants 5. Rider SUBA-NHH
– Non-Aid Grants for Humans 6. Rider EE – Energy Efficiency
Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchase from Qualifying Facilities
(Parallel Generation)
10. Rider LR – Charge Retention
11. Rider TUP – Provisional Rate Reconciliation

Date Filed: __________________ Original Sheet No. 32


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

CABLE TV REPEATERS SERVICE

DESIGNATION:

some

AVAILABLE:

throughout Puerto Rico

APPLICATION:

This rate will apply to all cable TV repeaters.


NATURE OF THE SERVICE:

Alternating current, 60 Hertz, single-phase or three-phase; 120 volts or other distribution voltage, at the
option of the Authority.
CHARGES IN BILLING PERIOD:

Client Monthly Charge:

$5.00

Monthly Charge for Energy:

Volts kWh $
60 90 656 55.43
494 41.74

In the event that the Cable TV company installs, or the Authority determines that there is a repeater with a
consumption different from that presented in the table above, the monthly energy charge will be calculated based
on $0.08449 per kWh.

Minimum Billing:

$5.00

Date Filed: __________________ Original Sheet No. 33


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The CATV rate is subject to the following Reconciliation Clauses and Riders:
1. Rider FCA – Fuel Purchase Charge Adjustment
2. Rider PPCA – Charge Adjustment for Energy Purchase
3. Rider CILTA – Contribution in Lieu of Taxes (CELI) – Municipalities
4. Rider SUBA-HH – Human Aid Grants 5. Rider SUBA-NHH
– Non-Aid Grants for Humans 6. Rider EE – Energy Efficiency
Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchase from Qualifying Facilities
(Parallel Generation)
10. Rider LR – Charge Retention
11. Rider TUP – Provisional Rate Reconciliation

Date Filed: __________________ Original Sheet No. 34


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

GENERAL PUBLIC LIGHTING


DESIGNATION:
PLG

AVAILABLE:
throughout Puerto Rico

APPLICATION:

This rate will apply to the lighting of: streets, ball parks and other parks with free admission,
plazas, telephone booths, bus shelters, traffic lights and police screens. The Puerto Rico
Electric Power Authority (Authority) will provide the conservation and renovation of lamps,
arms, photocells, standard poles, wiring and other street lighting accessories, of systems that
have been assigned to the Authority and of "dusk- to-dawn". The Authority will not provide
the conservation and renovation of materials to: street lighting systems that have not been
assigned to the Authority, traffic lights, free admission parks, telephone booths, bus sheds
and police screens. The customer will pay for

materials, labor and other costs related to the installation or removal of the equipment
necessary for the connection with the Authority's system, except in cases where the contrary
is indicated.

The following services: street lighting, "dusk-to-dawn" and telephone booths will be controlled
by a photocell that activates each lamp at night and deactivates them during the day, in series
or multiple systems, at the option of the Authority. The photocell must be designed so that it
will turn off the lamp in the event that the photocell is damaged. Each lamp will be on for
approximately 4,000 hours in a year.

The following tables present an estimate of the consumption in kWh for each type of lamp in
street lighting systems. Also, the Authority will estimate the consumption of telephone booths,
bus sheds and police screens. For other uses, the service will be provided through a delivery
point and a meter provided and installed by the Authority. All services under this rate must
have a connected load of less than 50 kVA.

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, two wire, single phase, secondary distribution voltage.

Date Filed: __________________ Original Sheet No. 35


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

I. Tariff for Street and Highway Public Lighting in Systems Owned by the Authority (Codification 420)

a. High Pressure Sodium Lamps

Systems built at the cost of the client (Municipality, Public Agency, Builder, etc.), and the ownership
of said system was transferred or assigned to the Authority. The system must be on standard poles
for lighting.

capacity of the kWh


Lumens Basic charge
Lamp Monthly Monthly ($)
(watts)
50 3,300 19.7 $5.90
70 5,800 27.7 $6.32
100 9,500 39.0 $7.05
150 16,000 57.0 $7.89
200 22,000 84.7 $12.16
250 25,500 105.0 $13.32
400 50,000 161.7 $18.16

Plus the applicable Reconciliation Clauses and Riders , as shown at the end of the PLG section.

b. High Pressure Sodium Lamps

New systems built with Authority funds exclusively on existing poles used for the distribution system.

capacity of the kWh


Lumens Basic charge
Lamp Monthly Monthly ($)
(watts)
50 3,300 19.7 $8.95
70 5,800 27.7 $9.32
100 9,500 39.0 $10.10
150 16,000 57.0 $10.89
200 22,000 84.7 $13.16
250 25,500 105.0 $14.32

Plus the applicable Reconciliation Clauses and Riders , as shown at the end of the PLG section.

Date Filed: __________________ Original Sheet No. 36


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

c. Mercury lamps

This rate will apply to existing lighting systems on the effective date of this rate.

Lamp Capacity kWh Basic Monthly Charge Rural Area Monthly Basic
Lumens
(Watts) Monthly Urban Zone ($) Charge ($)
100 3,850 41.33 $5.82 $4.22
175 7,950 68.33 $7.83 $6.18
250 11,200 98.00 $13.41 $8.31
400 21,000 151.00 $28.03 $12.08
400
(Road 21,000 151.00 $25.03 (does not apply)
Authority)

Plus the applicable Reconciliation Clauses and Riders , as shown at the end of the PLG section.

II. Tariff for Public Street and Highway Lighting without Operating Costs,
Maintenance and Renewal of Materials

This rate will apply to high pressure sodium systems for street and highway public lighting. The charges
under this rate do not include the maintenance and renewal of the materials necessary to offer this service
from the point of delivery. The service will be metered with the exception of existing systems in which the
Authority determines that it is not possible to comply with this requirement.

POSITIONS:
Client Monthly Charge:

$5.00

Monthly Charge for Energy:

$0.07779 per kWh

Plus the applicable Reconciliation Clauses and Riders , as shown at the end of the PLG section.

Date Filed: __________________ Original Sheet No. 37


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

In existing systems in which the Authority determines that it is not possible to measure the service, the
charges for consumption will be as specified in the following table according to the capacity of each lamp
in watts.

capacity of the kWh


Lumens Basic charge
Lamp Monthly Monthly ($)
(watts)
50 3,300 19.7 $1.55
70 5,800 27.7 $2.22
100 9,500 39.0 $3.10
150 16,000 57.0 $4.44
200 22,000 84.7 $6.66
250 25,500 105.0 $8.32
400 50,000 161.7 $12.76

For any other type of luminaire, in non-metered systems, the basic charge will be calculated based on
7,779 cents for each kWh of monthly consumption.

Terms:

1. This rate will apply to customers who do not transfer the lighting system to the Authority, the
Authority does not accept their transfer or the system does not meet the Authority's standards.

2. The rate change of existing systems with standard equipment will be accepted only if the
municipality or association includes all of the standard equipment that it owns or controls.
This rate change is permanent; the Authority will not grant the rate again
with the costs of conservation and renovation of materials.

III. Luminarias Dusk to Dawn

This rate applies to dusk to dawn luminaires installed by the Authority on existing poles used for
distribution systems. If they are not available, the client will provide the necessary facilities for the
installation of the luminaires.

Date Filed: __________________ Original Sheet No. 38


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

Lamp Capacity kWh Basic charge


Kind of Lumens Monthly
Luminary Monthly
(watts) ($)
50 3,300 19.7 $8.95
High Sodium 70 5,800 27.7 $9.32
Pressure 100 9,500 39.0 $10.10
150 16,000 57.0 $10.89
200 22,000 84.7 $13.16
250 25,500 105.0 $14.32
Mercury 175 7,950 68.3 $5.78

Plus the applicable Reconciliation Clauses and Riders , as shown at the end of the PLG section.

The mercury luminaire rate will not be available to new customers.

IV. Public Places (Codification 422)

This rate applies to systems owned and controlled by municipalities or associations, with serial or multiple systems.
The Authority will provide and install the meter. The client is responsible for supplying the necessary facilities for the
installation of the meter.

POSITIONS:

Client Monthly Charge:

$5.00

Monthly Charge for Energy:

$0.04529 per kWh

Plus the applicable Reconciliation Clauses and Riders , as shown at the end of the PLG section.

Date Filed: __________________ Original Sheet No. 39


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

V. Traffic lights (Codification 423)

This rate will apply to systems owned and controlled by a municipality or agency. The Authority will provide and
install the meter. The client is responsible for supplying the necessary facilities for the installation of the meter.

POSITIONS:

Monthly Charge for Energy:

$0.05929 per kWh

Plus the applicable Reconciliation Clauses and Riders , as shown at the end of the PLG section.

SAW. Parks and Other Free Admission Courts (Codification 424)

This rate will apply to systems owned and controlled by government agencies, municipalities and associations. The
Authority will provide and install the meter. The client is responsible for supplying the necessary facilities for the
installation of the meter.

POSITIONS:

Client Monthly Charge:

$5.00

Monthly Charge for Energy:

$0.04529 per kWh

Plus the applicable Reconciliation Clauses and Riders , as shown at the end of the PLG section.

VII.Public Telephones

This rate will apply to all public telephone booths in Puerto Rico. The booth will have a fluorescent lamp with a
maximum capacity of 40 W.

Date Filed: __________________ Original Sheet No. 40


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

POSITIONS:

Monthly Basic Charge:

$1.51 per booth

Plus an adjustment charge as defined by the Reconciliation and Riders Clauses, based
on a monthly consumption of 14.66 kWh for each booth.

VII. Bus Sheds

This fee will apply to all bus shelters in Puerto Rico.

POSITIONS:

Monthly Basic Charge:

$7.51 for each bus shed

Plus an adjustment charge as defined by the Reconciliation and Riders Clauses, based on a
monthly consumption of 117 kWh for each shed.

IX. Police Screens

This rate will apply to all police screens in Puerto Rico.

POSITIONS:

Monthly Basic Charge:

$2.00 for each screen

Plus an adjustment charge as defined by the Reconciliation and Riders Clauses, based
on a monthly consumption of 77 kWh per screen.

Date Filed: __________________ Original Sheet No. 41


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The PLG rate is subject to the following Reconciliation Clauses and Riders:
1. Rider FCA – Fuel Purchase Charge Adjustment
2. Rider PPCA – Charge Adjustment for Energy Purchase
3. Rider CILTA – Contribution in Lieu of Taxes (CELI) – Municipalities
4. Rider SUBA-HH – Human Aid Grants 5. Rider SUBA-NHH
– Non-Aid Grants for Humans 6. Rider EE – Energy Efficiency
Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchase from Qualifying Facilities
(Parallel Generation)
10. Rider TUP – Provisional Rate Reconciliation

Date Filed: __________________ Original Sheet No. 42


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

UNMEASURED SERVICE FOR SMALL LOADS


DESIGNATION:
USSL
AVAILABLE:
throughout Puerto Rico

APPLICATION:

This rate will apply to the services of electrical equipment installed on the Authority's poles or
structures that operate 24 hours a day, with the exception of those equipment for which the Authority
has another rate available (example: Cable TV). The consumption of the equipment installed in each
pole or structure of the Authority may not exceed 200 kWh per month.

The installation of said equipment must comply with the current regulations, manuals, standards
and communications of the Authority, as well as the current National Electric Code and the National
Electric Safety Code. The client must submit to the Directorate of Transmission and Distribution, the
specifications and data of the manufacturer of the equipment that will be installed on the poles or
structures of the Authority. With this information, compliance with the aforementioned provisions will
be verified and the consumption estimate to bill this service will be determined. For this purpose, the
Authority reserves the right to install metering equipment.

The customer will be responsible for notifying the Authority of any change in the connected load and
in the amount of installed equipment no later than 30 days after the change. In the event that the
client does not comply with this provision, the Authority may require the installation of metering
equipment to bill the services at the applicable rate.

NATURE OF THE SERVICE:

Alternating current, 60 Hertz, single-phase or three-phase; secondary distribution voltage.


CHARGES IN BILLING PERIOD:

Client Monthly Charge:


$4.60 for each installation on Authority poles or structures
Monthly Charge for Energy:
$0.08449 per kWh

Date Filed: __________________ Original Sheet No. 43


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The USSL fare is subject to the following Reconciliation and Riders Clauses:
1. Rider FCA – Fuel Purchase Charge Adjustment
2. Rider PPCA – Charge Adjustment for Energy Purchase
3. Rider CILTA – Contribution in Lieu of Taxes (CELI) – Municipalities
4. Rider SUBA-HH – Human Aid Grants 5. Rider SUBA-NHH
– Non-Aid Grants for Humans 6. Rider EE – Energy Efficiency
Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchase from Qualifying Facilities
(Parallel Generation)
10. Rider LR – Charge Retention
11. Rider TUP – Provisional Rate Reconciliation

Date Filed: __________________ Original Sheet No. 44


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

SERVICE RATE FOR ELECTRICITY PRODUCERS


ON A LARGE SCALE
DESIGNATION:
PPBB
AVAILABLE:
throughout Puerto Rico

APPLICATION:

This rate applies to large-scale electricity producers, connected to the Authority's 230 kV bar,
that require service during test periods, scheduled maintenance or breakdowns of their
generating equipment. The generation units of the electricity producer must operate in parallel
with the Authority's system, with the prior consent of the Authority and subject to the terms and
conditions provided for this type of operation. The service will be provided through a delivery
point and through one or more meters as required. The electricity producer shall provide the
metering system, the necessary communication facilities for the remote reading of its meter,
and the equipment required for interconnection with the Authority.

The electricity producer must have a contract with the Authority (Contract for the Sale of Energy
to the Authority) for the exclusive sale of all the energy produced by it to the Authority. In said
contract, an equivalent availability of its generation units of at least 85 percent must be
guaranteed.

The electricity producer will have the option to request the following services:

1. Service during trial periods


2. Service during scheduled maintenance
3. backup service

NATURE OF THE SERVICE:


Alternating current, 60 Hertz, 3 or 4 wires, triphasic, 230 kV.

Date Filed: __________________ Original Sheet No. 45


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

DEFINITIONS:

For this rate, the following definitions apply:

1. Cargo contracted for service during trial period:


a. The capacity in kVA that the electricity producer contracts to serve its load
during the test period of the generating equipment.
2. Cargo contracted for service during maintenance period
programmed:
a. The capacity in kVA that the electricity producer contracts to be used only
during periods previously approved by the Authority as scheduled
maintenance periods of its generating units.

3. Cargo contracted for security service:


a. The capacity in kVA that the electricity producer contracts to serve its load
during failures of its generating equipment.
CHARGES IN BILLING PERIOD:

Client Monthly Charge:


$521.68
Monthly Charge for Energy:
$0.02811 per kWh
Monthly Demand Charge:
$8.58 per kVA
Excess Demand Charge:
If the maximum demand established in the month is greater than the contracted demand, the
excess over the latter will be billed at $11.59 per kVA.

MAXIMUM DEMAND AND CONSUMPTION:

The consumption in kilowatt-hours and the maximum demand for each period will be determined
by the meter readings. The maximum demand in any month for each period will be the maximum
demand registered during a period of 15 consecutive minutes in the month. The demand will not
include offsets due to Net Metering or the output of other generation equipment owned by the
customer.

Date Filed: __________________ Original Sheet No. 46


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

CONTRACTED FREIGHT DETERMINATION:

The electricity producer, through a signed contract, will establish the capacity requirements in
kVA for each of the requested services and this will be denoted as the contracted load. This
charge will be in force throughout the contract period, unless both parties agree to change it with
prior agreement. The Authority will exercise the right to establish the maximum kVA to be served
under this rate and is not required to serve a demand higher than 110% of the contracted quantity.
If for two consecutive billing periods the electricity producer's maximum demand exceeds the
contracted quantity, then the highest will be used as the new contracted load.

SPECIAL REQUIREMENTS:

A service fee equal to $8.58 per kVA of contracted load will be required for service during trial
periods. This service will be provided after the electricity producer makes the payment of the fee.
The electricity producer will contract additional test periods in blocks of five months, after the five
months of the initial test period. These additional trial periods will be subject to the service fee.
The Authority will officially certify the completion of the trial period of the generating units of the
electricity producer.

The scheduled maintenance period will be determined in accordance with the Contract for the
Sale of Energy to the Authority.

If the meter, energy and demand readings were made on the secondary side of the customer's
substation, the readings will refer to the primary side, which is the point of delivery, using a
correction factor to account for transformer losses.

CONTRACT TERM:

The contract term is five months for service during trial periods and one year for service during
periods of scheduled maintenance and backup service.

Date Filed: __________________ Original Sheet No. 47


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RECONCILIATION AND RIDERS CLAUSES:

The PPBB fare is subject to the following Reconciliation and Riders Clauses:
1. Rider FCA – Fuel Purchase Charge Adjustment
2. Rider PPCA – Charge Adjustment for Energy Purchase
3. Rider CILTA – Contribution in Lieu of Taxes (CELI) – Municipalities
4. Rider SUBA-HH – Human Aid Grants 5. Rider SUBA-NHH
– Non-Aid Human Grants
6. Rider EE – Energy Efficiency Charge
7. Rider NM - Net Measurement Credit

8. Rider SC – Securitization Charge


9. Rider QF – Purchase from Qualifying Facilities
(Parallel Generation)
10. Rider TUP – Provisional Rate Reconciliation

Date Filed: __________________ Original Sheet No. 48


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER – FUEL PURCHASE CHARGE ADJUSTMENT


DESIGNATION:
FCA
AVAILABLE:
throughout Puerto Rico

APPLICATION:

At all rates except the fixed block of the RFR rate.

The Fuel Purchase Charge Adjustment (FCA) is a reconciliation mechanism that recovers the cost of
fuel consumed in the Authority's generating units on a quarterly basis. The FCA will apply to all rates
of the Authority with the exception of the base use contained in the RFR rate.

The formula to calculate the Fuel Purchase Charge Adjustment factor is:

( + ó )
=
ÿ

Total Fuel Cost

The cost of the fuel purchased for all the generating plants of the Authority
for the three (3) months projected in the quarterly period. The estimated costs will be presented
monthly and will include all the details about the type of fuel that is projected to be consumed.

Reconciliation for the Prior Period


Funds recovered in excess or not recovered during the first two (2) months of the current quarterly
period and the last month of the previous quarterly period. The Authority must provide estimates of
the balance to be reconciled for each proposed quarterly filing of the FCA.

Date Filed: __________________ Original Sheet No. 49


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

Applicable Retail kWh Sales

Energy sales to all customer classes, including net consumption (ie imported energy – exported energy) of all net
metering customers.

Quarterly Filing

The Authority must file a proposed FCA factor before the end of the second week of the third month of each quarter
with the Puerto Rico Energy Bureau (PREB) that will be proposed to take effect with the first billing cycle of the first
month. of the following quarter. If a revised FCA factor is not approved, the previous quarter's FCA factor will remain
in effect until a new factor is approved.

Accelerated Adjustment

Each month, after the final fuel purchase cost and purchased power cost are available to the Authority, the company
will prepare a new estimate
comparing the estimated recovery of the purchase of fuel and purchase of energy for the quarterly period. If the
estimated fuel purchase and power purchase expenses deviated from the estimates by more than $20 million, the
Authority will re-estimate the Fuel Purchase and Power Purchase Charge Adjustment factors to provide an expected
value of zero for the quarterly period.

Date Filed: __________________ Original Sheet No. 50


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - ENERGY PURCHASE CHARGE ADJUSTMENT

DESIGNATION:
PPCA
AVAILABLE:
throughout Puerto Rico

APPLICATION:

At all rates except the fixed block of the RFR rate.

The Power Purchase Charge Adjustment (PPCA) is a reconciliation mechanism that recovers the
cost of purchased power on a quarterly basis. The PPCA will apply to all rates of the Authority
with the exception of the base use contained in the RFR rate.

The formula to calculate the APPCA factor is:

( í+ ó )
=
ÿ

Total Cost Purchase of Energy


The cost of purchased power sources and capacity for the three projected months in the quarterly
period. The estimated costs will be presented monthly and will include all the details about the
type of energy that is projected to be
purchased by the Authority.

Reconciliation for the Prior Period


Funds recovered in excess or not recovered during the first two (2) months of the current quarterly
period and the last month of the previous quarterly period. The Authority must provide estimates
of the balance to be reconciled for each proposed quarterly presentation of the PPCA.

Date Filed: __________________ Original Sheet No. 51


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

Applicable Retail kWh Sales

Energy sales to all customer classes, including net consumption (ie imported energy – exported energy) of all net
metering customers.

Quarterly Filing

The Authority must file a proposed PPCA factor before the end of the second week of the third month of each
quarter with the Puerto Rico Energy Bureau (PREB), which will be proposed to take effect with the first billing cycle
of the first month. of the following quarter. If a revised APPA factor is not approved, the prior quarter's APPA factor
will remain in effect until a new factor is approved.

Accelerated Adjustment

Each month, after the final fuel purchase cost and purchased power cost are available to the Authority, the company
will prepare a new estimate
comparing the estimated recovery of the purchase of fuel and purchase of energy for the quarterly period. If the
estimated fuel purchase and power purchase expenses deviated from the estimates by more than $20 million, the
Authority will re-estimate the Fuel Purchase and Power Purchase Charge Adjustment factors to provide an expected
value of zero for the quarterly period.

Date Filed: __________________ Original Sheet No. 52


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER – FUEL ALLOWANCE

DESIGNATION:

FOS

AVAILABLE:

throughout Puerto Rico

APPLICATION:

Subsidized rates General Residential Service (GRS) for the disabled, the elderly and university students;
Special Residential Service (LRS) and Residential Service for Public Projects (RH3), include the Fuel Subsidy
when the customer's monthly consumption does not exceed 500 kWh.

The Fuel Subsidy will apply to qualified residential customers with monthly consumption of up to 500 kWh. A
Fuel Allowance Factor will be calculated and adjusted quarterly to apply this allowance.

For the first $30 per barrel of fuel, excluding natural gas, customers under this subsidy will receive a credit
equal to the Fuel Subsidy Factor multiplied by the customer's monthly consumption in kWh, up to a consumption
of 400 kWh.

For customers with a consumption between 401 and 425 kWh, the customer will receive a credit equivalent to
the amount received with a consumption of 400 kWh.

For customers with a consumption between 426 kWh up to 500 kWh, the credit will be progressively reduced
from the credit received to 425 kWh to reach 0 to 500 kWh.

Monthly consumption
Formula
(kWh)
0 400 Fuel Subsidy Factor * kWh

401 425 Fuel Subsidy Factor *400


426 500 Fuel Subsidy Factor *(500-kWh)*400/75

Date Filed: __________________ Original Sheet No. 53


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER – ADJUST CONTRIBUTION INSTEAD OF TAX

DESIGNATION:
CILTA
AVAILABLE:
throughout Puerto Rico

APPLICATION:

At all rates except the fixed block of the RFR rate.

The Adjustment of the Contribution in Lieu of Taxes (CILTA) is a reconciliation mechanism that
recovers the cost of the CELI payments that the Authority must make
on an annual basis.

The CILTA will apply to all gross kWh consumed by customers served in all the Authority's rates,
with the exception of the base use contained in the Residential Fixed rate.

The formula to calculate the CILTA factor is:

(+ ó )
=
ÿ

CELI

The total payment of Contributions in Lieu of Taxes for the next projected twelve (12) months.
The estimated costs will be presented monthly and will include the qualified consumption of the
municipalities, excluding Public Lighting.

Reconciliation for the Prior Period


Funds recovered in excess or not recovered during the first ten months of the current annual
period and the last two months of the previous annual period.
The Authority must provide estimates of the balance to be reconciled for each annual presentation
proposed by CILTA.

Date Filed: __________________ Original Sheet No. 54


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

Applicable Retail kWh Sales

Energy sales to all customer classes, including net consumption (ie imported energy – exported energy) of all net
metering customers.

Annual Filing

The Authority must make a filing for a proposed CILTA factor before the end of the eleventh month of each annual
period with the Puerto Rico Energy Bureau (PREB) that will be proposed to enter into force with the first billing
cycle of the first month of the annual period. . If a revised CILTA factor is not approved, the previous year's CILTA
factor will remain in effect until a new factor is approved.

Date Filed: __________________ Original Sheet No. 55


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - SUBSIDIES, PUBLIC LIGHTING (MUNICIPAL) AND OTHER SUBSIDIES

HUMAN HELP GRANT


DESIGNATION:
SUBA-HH
AVAILABLE:
throughout Puerto Rico

APPLICATION:

At all rates except the fixed block of the RFR rate.

The Subsidy Aid Adjustment for Humans (SUBA-HH) is a reconciliation mechanism that recovers
the cost of certain subsidies that the Authority must provide, that the Authority must make, on an
annual basis. The SUBA-HH will be applicable to all the gross kWh consumed by the clients
served in all the rates of the Authority, with the exception of the base use contained in the
Residential Fixed Rate.

The formula to calculate the SUBA-HH factor is:

( + ó )
ÿ=

Date Filed: __________________ Original Sheet No. 56


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

subsidies

Subsidies classified by the Puerto Rico Energy Bureau (PREB) as Aid for Humans. According to Order CEPR-
AP-2015-0001 of January 10, 2017, these subsidies are:

1. Credit for Consumption of Electrical Equipment Necessary to Preserve Life


2. Residential Service Rate for Public Projects - RH3
3. Special Residential Service Rate - LRS (Nutritional Assistance Program)
4. Fixed Rate for Public Housing under the Ownership of the Public Housing Administration (RFR)

5. Residential Fuel Subsidy


6. Public Lighting (Municipal)
7. Works of the Puerto Rico Energy Bureau

Reconciliation for the Prior Period

Funds recovered in excess or not recovered during the first ten months of the current annual period and the last
two months of the previous annual period.
The Authority must provide estimates of the balance to be reconciled for each proposed annual presentation of
the SUBA-HH.

Applicable Retail kWh Sales

Energy sales to all customer classes, including net consumption (ie imported energy – exported energy) of all net
metering customers.

Annual Filing

The Authority must make a filing for a proposed SUBA-HH factor before the end of the eleventh month of each
annual period with the Puerto Rico Energy Bureau (PREB) that will be proposed to enter into force with the first
billing cycle of the first month of the annual period. If a revised SUBA-HH factor is not approved, the previous
year's SUBA HH factor will remain in effect until a new factor is approved.

Date Filed: __________________ Original Sheet No. 57


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - SUBSIDIES, PUBLIC LIGHTING (MUNICIPAL) AND OTHER SUBSIDIES

GRANT NO HELP FOR HUMAN

DESIGNATION:

SUBA-NHH

AVAILABLE:

throughout Puerto Rico

APPLICATION:

At all rates except the fixed block of the RFR rate.

The Subsidy Non-Help Adjustment for Humans (SUBA-NHH) is a reconciliation mechanism that recovers the cost
of certain subsidies that the Authority must provide, that the Authority must make, on an annual basis. The SUBA-
NHH will be applicable to all gross kWh consumed by customers served at all rates of the Authority, with the
exception of the base use contained in the Residential Fixed Rate.

The formula to calculate the SUBA-NHH factor is:

( + ó )
ÿ
=
ÿ

Date Filed: __________________ Original Sheet No. 58


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

subsidies

Subsidies classified by the Puerto Rico Energy Bureau (PREB) as No Help for Humans.
According to Order CEPR-AP-2015-0001 of January 10, 2017, these subsidies are:

1. Rate Similar to the Residential Rate for Churches and Social Welfare
Organizations
2. General Agricultural Service Rate - GAS
3. Credit for Incentives for the Tourism Sector (Hotel Discount)
4. Residential Rate for Communal or Rural Aqueducts
5. Credit to Small Merchants in Urban Centers (Subsidy 10%
Downtown)
6. Residential Rate to Common Areas of Residential Condominiums
7. Law 73-2008 Industrial Tax Credit 8. Irrigation
District

Reconciliation for the Prior Period


Funds recovered in excess or not recovered during the first ten months of the current annual
period and the last two months of the previous annual period.
The Authority must provide estimates of the balance to be reconciled for each proposed
annual filing of the SUBA-NHH.

Applicable Retail kWh Sales


Energy sales to all customer classes, including net consumption (ie imported energy –
exported energy) of all net metering customers.

Annual Filing

The Authority must make a filing for a proposed SUBA-HH factor before the end of the
eleventh month of each annual period with the Puerto Rico Energy Bureau (PREB) that will
be proposed to enter into force with the first billing cycle of the first month of the annual
period. If a revised SUBA-NHH factor is not approved, the previous year's SUBA NHH factor
will remain in effect until a new factor is approved.

Date Filed: __________________ Original Sheet No. 59


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - MEDICIÓN NETA CREDIT

DESIGNATION:
NM

AVAILABLE:
throughout Puerto Rico

APPLICATION:
For all tariffs with metered output.

The Net Metering credit is calculated from customer bills according to the provisions of Law
114-2007, as amended. Customers with a Net Metering Agreement with the Authority will
receive a monthly credit for the energy produced by their system and exported to the Authority's
electrical system, up to the customer's monthly consumption in kWh, subject to other limitations
as detailed in Law 114. -2007, as amended, and the corresponding Regulations. The monthly
credit for customers with a Net Metering Agreement will be effective at the beginning of the
billing period after
installation or configuration of the appropriate meter. For each billing period, the Authority will
measure the energy consumed by the customer (inflow) and the energy exported by the
customer's system to the Authority's system (outflow).

Each Net Metering customer must pay for the net energy supplied by the Authority the full rate
for its class, including the base rate, fuel charge,
energy purchase, CELI charge, SUBA-HH charge, SUBA-NHH charge and EE charge, subject
to the following:

1. Each billing period, in which the energy exported by the customer is less
that the energy supplied by the Authority, the credit for exported energy must be
the sum of: the base rate energy charge, fuel charge,
purchase of energy, SUBA-HH charge, SUBA-NHH charge, CELI charge and EE charge.

2. If during a billing period, the energy exported by the client is equal to or greater than the
energy supplied by the Authority, the credit will be limited by the energy supplied by the
Authority in that billing period. The energy exported in excess will be accumulated to be
used during the next billing period.
3. If there is any surplus energy accumulated at the end of the current fiscal year, it will be
accredited as provided by law, and the corresponding Regulations, currently as explained
below
Date Filed: __________________ Original Sheet No. 60
Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

a. Seventy-five percent (75%) of the excess energy stored must be


purchased by the Authority at the rate of 10 cents per kilowatt-hour (¢/kWh) or
the resulting amount in ¢/kWh, once fuel charges and energy purchases are
subtracted from the total ¢/kWh, whichever is greater ; Y

b. The remaining twenty-five percent (25%) will be granted to the Authority to be


distributed in credit or reductions on public school electric bills.

Date Filed: __________________ Original Sheet No. 61


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - LOAD RETENTION


DESIGNATION:
LR

AVAILABLE:
throughout Puerto Rico

APPLICATION:
At all rates.

The Load Hold Rider will be available to any customer who can document that there is an option
to reduce or eliminate the Authority's electricity consumption, either by relocation or installation
of an alternate power source. This rider 's intent is to provide a discount when necessary to retain
cargo that would otherwise be lost, provided the discounted rate generates revenue that exceeds
the incremental cost of serving the cargo. The discounts will not be greater than necessary, will
not encourage excessive consumption and will not constitute an obstacle to the development of
cheap renewable energies.

Discount Estimate

The Authority will conduct a study and estimate whether the discounted rate generates revenue
that exceeds the incremental cost of serving the customer's load. A discount will only be offered
in cases where the discounted cost of serving the customer exceeds the Authority's marginal
cost of service.

The estimated discount will be applied to the applicable rate of the Authority in which the client
will receive service.

Review and Approval by the Puerto Rico Energy Bureau


When an agreement is completed by the Authority and the client, it must be filed with the
Puerto Rico Energy Bureau (PREB). Any customer-specific information will be kept confidential.
The Puerto Rico Energy Bureau will have sixty (60) days to decide on the request and approve
or disapprove the agreement. If the contract is approved, the Authority will execute the agreement.

Date Filed: __________________ Original Sheet No. 62


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

Recovery of Discounts
The Authority will recover any discount approved by the Puerto Rico Energy Bureau
(PREB) in the SUBA clause.

Date Filed: __________________ Original Sheet No. 63


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - ENERGY EFFICIENCY

DESIGNATION:
EE
AVAILABLE:
throughout Puerto Rico

APPLICATION:

At all rates except the fixed block of the RFR rate

The Energy Efficiency Rider is a mechanism that provides cost recovery for all expenses
associated with the implementation and administration of energy efficiency programs operated
by or on behalf of the Authority. Program costs will be recovered through a charge per kilowatt-
hour (kWh) for all customers, the Energy Efficiency Charge (EEC).

The formula to calculate the EEC is:

( + ó )
=
ÿ

Total Cost of EE Programs


The total cost of energy efficiency programs administered by or on behalf of the Authority
that are approved by the Puerto Rico Energy Bureau.

Reconciliation for the Prior Period


Funds recovered in excess or not recovered during the first ten months of the current
annual period and the last two months of the previous annual period. The Authority must
provide estimates of the balance to be reconciled for each proposed annual filing of the
EEC.

Date Filed: __________________ Original Sheet No. 64


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

Applicable Retail kWh Sales

Energy sales to all customer classes, including net consumption (ie imported energy – exported energy)
of all net metering customers.

Annual Filing

The Authority must make a filing for a proposed EEC factor before the end of the eleventh month of
each annual period with the PREB that will be proposed to take effect with the first billing cycle of the
first month of the annual period.
If a revised EEC factor is not approved, the previous year's EEC factor will remain in effect until a new
factor is approved.

Date Filed: __________________ Original Sheet No. 65


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

Rider – Securitization Charge

PLACEHOLDER FOR SECURITIZATION CHARGE

Date Filed: __________________ Original Sheet No. 66


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

Rider - Purchase from Qualifying Facilities


(Parallel Generation)

DESIGNATION:
QF

AVAILABLE:
In all of Puerto Rico.
APPLICATION:

This rider will apply to all customers that operate thermal electricity generation that qualifies as a
Qualified Installation "Qualifying Facility" under the "Public Utility Regulatory and Policy Act" of
1978. In addition, the installation must comply with the requirements of 18 CFR § 292.203 ( b)
and 292.205 for the operation, efficiency and use of energy production, and be certified as QF in
accordance with 18 CFR § 292.207.

INTERCONNECTION REQUIREMENTS

The Puerto Rico Electric Power Authority (Authority) will require an interconnection agreement for all
customers receiving compensation under this rider. Copies of the standard interconnection agreements
are available upon request to the Authority.
The customer shall install all appropriate metering facilities to record all energy flows necessary to bill and
pay in accordance with the charges and payments contained in this rider and the applicable customer rate.

BILLING PERIOD CREDITS:

A credit in the billing period will be paid to the customer for the total production of the Qualifying Facility
on a kWh basis. Net Metering is not available for Thermal Qualified Installations.

voltage level Compensation for Compensation for


Firm Generation Generation Not Firm
Transmission $0.0638 $0.0583
primary $0.0755 $0.0613
High school $0.0767 $0.0623

Firm Service is defined as the output provided by the Qualified Facility to the Authority, which the Authority
could reasonably respond to serve the native load. All other departures will be considered Not Signed.

Date Filed: __________________ Original Sheet No. 67


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER – TEAM DISCOUNT PRESERVE LIFE

DESIGNATION:
LP

AVAILABLE:
throughout Puerto Rico

APPLICATION:

At all residential rates except the RFR rate. Ordered by Law 3 of December 20, 1985, Law
164-1996, Law 152-1998, Law 79-2007 and Law 22-2016.

Discount Provided

Qualified customers under the RH3 and LRS rates will receive a credit equivalent to the cost
of electricity consumption associated with health-related equipment necessary to preserve life.

Qualified clients under the GRS Rate will receive a credit equivalent to fifty (50) percent of
the cost of electricity consumption associated with the equipment related to health necessary
to preserve life.

Date Filed: __________________ Original Sheet No. 68


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - DISCOUNT CHURCHES AND SOCIAL WELFARE ORGANIZATIONS

DESIGNATION:
CSW
AVAILABLE:
throughout Puerto Rico

APPLICATION:

To all places of worship and other public welfare organizations. Ordered by Law 61-1992, Law
182-2002 and Law 22-2016.

Discount Provided

The General Residential Service (GRS) rate, instead of the applicable commercial rate, is available
to qualified Churches and other public welfare organizations.

Date Filed: __________________ Original Sheet No. 69


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - CREDIT FOR INCENTIVES IN THE TOURISM SECTOR

DESIGNATION:
CIT

AVAILABLE:
throughout Puerto Rico

APPLICATION:
To all qualified hotels, state-owned hotels or guest houses.
Ordered by Law 101 of July 9, 1985, Law 266-2002, Law 232-2003 and Law 22-2016.

Discount Provided

A discount of up to 11% credit of the total monthly energy bill.

Date Filed: __________________ Original Sheet No. 70


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - CREDIT FOR RURAL AQUEDUCTS

DESIGNATION:
CRA
AVAILABLE:
throughout Puerto Rico

APPLICATION:
Available for rural aqueducts that do not belong to the Puerto Rico Aqueduct and Sewer
Authority (PRASA), mandated by Law 4-2004.

Discount Provided

Qualifying facilities will be billed at the GRS residential rate.

Date Filed: __________________ Original Sheet No. 71


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - CONDO COMMON AREAS

DESIGNATION:
CAC
AVAILABLE:
throughout Puerto Rico

APPLICATION:
This rider is available for the common areas of condominiums that are measured separately,
as established by Law 199-2008.

Discount Provided

The General Residential Service (GRS) rate, instead of the applicable commercial rate, is
available for qualified common areas in condominiums intended for residential purposes.

Date Filed: __________________ Original Sheet No. 72


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - URBAN CENTERS SUBSIDY

DESIGNATION:
DCS
AVAILABLE:
throughout Puerto Rico

APPLICATION:
This rider is available for small businesses operating in urban centers,
as defined by Law 169-2004.

Discount Provided

A 10% credit to the basic rate of the total monthly energy bill is granted to small businesses
in the city center, up to a maximum of $40, as established by law.

Date Filed: __________________ Original Sheet No. 73


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - CONTRIBUTIVE CREDIT

DESIGNATION:
ITC

AVAILABLE:
throughout Puerto Rico

APPLICATION:

This rider is available to industries, as established by Law 73-2008 and Law 22-2016, that
receive a tax credit that can be used to pay for electricity consumption.

Discount Provided

Electricity bill credit.

Date Filed: __________________ Original Sheet No. 74


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

RIDER - DIRECT DEBIT

DESIGNATION:
DD

AVAILABLE:
throughout Puerto Rico

APPLICATION:
This rider is available to residential customers who choose to set up service where funds are
automatically withdrawn to the customer's account for their monthly electric bill.

Discount Provided

The customer will receive a ten (10) percent discount for the base rate portion of their bill.

Date Filed: __________________ Original Sheet No. 75


Issued by: _____________ Replacing: None
Effective Date: ______________
Machine Translated by Google

PUERTO RICO ELECTRIC POWER AUTHORITY

RATES FOR ELECTRICITY SERVICE AND RIDERS

PROVISIONAL RATE RECONCILIATION

DESIGNATION:
TUP
AVAILABLE:
throughout Puerto Rico

APPLICATION:

This rider is effective when the Authority is authorized to implement a provisional rate increase that has
been recovered below or in excess of the final authorized rate increase.

Adjustment factor

Customers will receive a rebate factor based on a per kilowatt-hour calculation. Upon completion of the
Adjustment Factor, PREPA will provide a final reconciliation to PREB, detailing any pending recovery
below or in excess of the Provisional Rate.

Date Filed: __________________ Original Sheet No. 76


Issued by: _____________ Replacing: None
Effective Date: ______________