Form Penawaran Harga Subcon Pekerjaan Gas Metering (18mei2022) - MNW
Form Penawaran Harga Subcon Pekerjaan Gas Metering (18mei2022) - MNW
I Material
I.1. Pengadaan Material On Skid Gas Metering System (by PTCS)
I.2. Pengadaan Material Off Skid Gas Metering System
II Jasa Konstruksi
II.1. Pekerjaan Persiapan
II.2. Project Management
II.3. Engineering
II.4. Transportasi Material
II.5. Pekerjaan Pengadaan Sales Gas Metering System
II.6. Pekerjaan Pengujian
II.7. Pekerjaan Sertifikasi
II.8. Penyelesaian Pekerjaan
A Sub Total Rp -
B Resiko dan Keuntungan Rp -
TOTAL (A+B) Rp -
C Dibulatkan Rp -
Pekerjaan : Pengadaan Sales Gas Metering Metering System
DAFTAR MATERIAL
SATUAN (Rp.)
NO JENIS MATERIAL SPESIFIKASI VOL.
MATERIAL
I.2. OFF SKID METERING
INSTRUMENTATION SCOPE
2 Instrumentation Off-Skid Metering 1 Lot
2.1 Field Instrument 1 Lot
Ball Valve, 2", 600# RF, Full Bore, ASTM A105 Body & Bonnet
Material, A182 F316 Wetted Part Material, MOV, TSO Thinkness
Blowdown Valve 1 Ea
and Class VI ANSI 70.2 Leakage Class, Limit Switch, c/w
Accessories.
Ball Valve, 10", 600# RF, Full Bore, ASTM A105 Body & Bonnet
Shutdown Valve Material, A182 F316 Wetted Part Material, TSO Thinkness and 1 Ea
Class VI ANSI 70.2 Leakage Class, Limit Switch, c/w Accessories.
Control Valve Size 8" 600# RF (VTA), Single Seat Globe Type,
ASTM A216 Gr. WCB Body Material, 316 SS Wetted Material,
Control Valve 1 Ea
Equal Percentage, Fail Close, c/w position transmitter and motor
operated.
DAFTAR MATERIAL
SATUAN (Rp.)
NO JENIS MATERIAL SPESIFIKASI VOL.
MATERIAL
Cable Gland 1/2" NPT, c/w Locknut, Sealing & Sleeve, Brass material,
Cable Gland for Hazardous Area.
40 Ea Rp 27,000
Cable Shrink 1/2", Flame Retardant PVC Shroud, Black Color, PVC 40 Ea Rp 500,000
Cable Lug, Pin Type for 1.5 & 2.5 mm2 Conductor Size, Tined,
Cable Lug Pin Type Insulated, Aluminum
1 Lot Rp 143,000
Cable Lug, Fork Type for 1.5 & 2.5 mm2 Conductor Size, Tined,
Cable Lug Fork Type Insulated, Aluminum
1 Lot Rp 143,000
Cable Lug, Ring Type for 1.5 & 2.5 mm2 Conductor Size, Tined,
Cable Lug Ring Type Insulated, Aluminum
1 Lot Rp 143,000
Tinned Copper Cable Lug 6mm2 Compression type with 6mm Stud Hole, c/w stud bolt and nut 1 Lot Rp 7,000
Tinned Copper Cable Lug 10mm2 Compression type with 10mm Stud Hole, c/w stud bolt and nut 1 Lot Rp 10,000
Tinned Copper Cable Lug 35mm2 Compression type with 35mm Stud Hole, c/w stud bolt and nut 1 Lot Rp 29,000
DAFTAR MATERIAL
SATUAN (Rp.)
NO JENIS MATERIAL SPESIFIKASI VOL.
MATERIAL
Cable Tray (Perforated Tray) 50mm (W) x 50mm (H) x 3000mm (L), Hot
Cable Tray (Perforated Tray) Dip Galvanized, c/w Cover & Accessories.
20 Ea Rp 705,000
PIPING SCOPE
3 Piping Off-Skid Metering 1 Lot
3.1 Pipe 1 Lot
Carbon Steel Pipe Ø 10" Sch.100 SRL PIPE BE SEAMLESS ASME B36.10 SCH.100 (150 meter) 25 jts Rp 36,883,000
Carbon Steel Pipe Ø 2" Sch.80 SRL Sch. 80, API 5L Gr. B/ A106/ A53, SML/ERW BE SRL 3 jts Rp 1,533,000
Carbon Steel Pipe Ø 3" Sch.80 SRL Sch. 80, API 5L Gr. B/ A106/ A53, SML/ERW BE SRL 3 jts Rp 2,909,000
DAFTAR MATERIAL
SATUAN (Rp.)
NO JENIS MATERIAL SPESIFIKASI VOL.
MATERIAL
ELECTRICAL SCOPE
4 Electrical 1 Lot
4.1 Lighting 1 Lot
LED Pendant Light, 100W,10500 lumen, 50Hz, 220-240 V, hazardous
LED Pendant Light 100W area, class 1 div 2 c/w housing, bracket, reflector & accessories
7 EA Rp 12,929,000
Plug & Receptacle 1 phase Plug & Receptacle/Outlet 240 VAC, 1 Phase, Inbow ,Unclassified area 10 EA Rp 572,000
Rating busbar 200A, Short circuit 25kA, Incoming MCCB: 1ea MCCB 4P
Lighting Panel 32A , Outgoing MCCB: 3 ea MCB 2P 16A , 3 ea MCB 2P 10A , 4 ea 1 EA Rp 25,715,000
MCB 2P 6A, Wall Mounting
Cable Gland for armouredd cable, Explotion proof, For Hazardous Area
M20 Class 1 Div 2, Copper-Free Aluminium, C/W lock nut, earth lag, 10 Ea Rp 508,000
Coldshrink Sleave, And Tsc Epoxy Sealing Compound.
DAFTAR MATERIAL
SATUAN (Rp.)
NO JENIS MATERIAL SPESIFIKASI VOL.
MATERIAL
AC Split 1/2 PK, inverter, 240 Volts, 50 Hz, compressor, refrigerant pipe,
Air Conditioning (AC) Split 1/2 PK drain pipe & c/w mcb box pos jaga, accessories
2 Ea Rp 6,000,000
Rp 21,059,000
Rp 2,064,000
Rp 2,064,000
Rp 631,000
13,900.00
Rp 2,100,000
Rp 1,045,000
Rp 4,872,000
Rp -
Rp 6,429,000
Rp 7,150,000
Rp 5,740,000
Rp 8,550,000
Rp 14,850,000
Rp 13,600,000
Rp 56,160,000
Rp 9,200,000
Rp 22,800,000
Rp 78,700,000
Rp 108,400,000
Rp 92,900,000
Rp 3,600,000
Rp 5,300,000
Rp 15,000,000
Rp 2,100,000
Rp 1,080,000
Rp 20,000,000
Rp 143,000
Rp 143,000
Rp 143,000
Rp 7,000
Rp 10,000
Rp 29,000
Rp 29,280,000
13,900.00
Rp 14,100,000
Rp 232,145,000
Rp 922,075,000
Rp 4,599,000
Rp 8,727,000
Rp 15,000,000
Rp 10,000,000
Rp -
Rp -
Rp -
Rp 1,716,000
Rp 21,432,000
Rp 29,640,000
Rp 14,730,000
Rp 110,000
Rp 16,206,000
Rp 99,000
Rp 9,692,000
Rp 3,460,000
Rp 5,832,000
Rp 1,446,000
Rp 17,088,000
Rp 96,330,000
Rp 26,400,000
Rp 2,400,000
Rp 576,000
Rp 7,152,000
Rp 54,400,000
Rp 516,150,000
13,900.00
Rp 90,503,000
Rp 12,860,000
Rp 5,720,000
Rp 25,715,000
Rp 241,429,000
Rp 10,900,000
Rp 2,260,000
Rp 24,380,000
Rp 7,920,000
Rp 22,320,000
Rp 20,300,000
Rp 576,000
Rp 100,000
Rp 42,000
Rp 60,000
Rp 150,000
Rp 5,080,000
Rp 8,405,000
Rp 500,000
Rp 21,429,000
Rp 17,143,000
Rp 45,960,000
Rp 24,400,000
Rp 13,400,000
Rp 19,200,000
Rp 25,004,000
Rp 1,080,000
13,900.00
Rp 12,000,000
Rp 3,225,490,000
Rp -
Pekerjaan : Pengadaan Sales Gas Metering System
Instalasi dan interkoneksi Flowcomp & Gas Metering Cabinet dan Supervisory
1 1 Lot 100,000,000 XXXX 107,143,000 XXXX 100,000,000 XXXX 107,143,000 XXXX
Computer di Workstation
Modifikasi Sistem Monitoring Existing dari Sistem Hardware/Software Siemens
2 1 Lot 150,000,000 214,286,000 107,143,000 XXXX 150,000,000 214,286,000 107,143,000 XXXX
(PCS, HMI, etc.)
Modifikasi Sistem Monitoring Existing dari Sistem Hardware/Software
3 1 Lot 150,000,000 XXXX XXXX XXXX 150,000,000 XXXX XXXX XXXX
Honeywell (DCS,ESS,FGS,etc.)
4 Modifikasi Sistem CCTV Existing 1 Lot 50,000,000 XXXX XXXX XXXX 50,000,000 XXXX XXXX XXXX
5 Modifikasi Sistem Fire Alarm Control Panel Existing 1 Lot 50,000,000 XXXX XXXX XXXX 50,000,000 XXXX XXXX XXXX
Pekerjaan Perbaikan Instrument Eksisting Meliputi Material, Kalibrasi Set
2.2
Point, Pemasangan, Lengkap Dengan Aksesoris :
1 Level Controller : 5 Lot/Unit 15,000,000 1,429,000 715,000 XXXX 75,000,000 7,145,000 3,575,000 XXXX
2 Pressure Controller : 2 Lot/Unit 15,000,000 1,429,000 715,000 XXXX 30,000,000 2,858,000 1,430,000 XXXX
3 Blowdown Valve 1 Lot/Unit 15,000,000 1,429,000 715,000 XXXX 15,000,000 1,429,000 715,000 XXXX
(termasuk penggantian pilot valve, regulator & gauge, limit switch & position
indikator, tubing & fitting)
4 Pressure Safety Valve 1 Lot/Unit 15,000,000 1,429,000 715,000 XXXX 15,000,000 1,429,000 715,000 XXXX
(termasuk penggantian spring valve)
SUB. TOTAL II.5.2
3 Pekerjaan Civil
1 Pekerjaan Shelter Metering 1 Lot
2 Pekerjaan Control Room/Panel Room 1 Lot
3 Pekerjaan Pondasi Skid Metering 1 Lot
4 Pekerjaan Dinding Turap & Pagar Harmonika 1 Lot
Pekerjaan : Pengadaan Sales Gas Metering System
Rp.
25,715,000
287,500,000
164,592,000
205,740,000
80,000,000
200,000,000
71,429,000
Rp 1,034,976,000
240,000,000
180,000,000
162,000,000
300,000,000
150,000,000
Rp 1,032,000,000
70,000,000
160,000,000
100,000,000
90,000,000
Rp 420,000,000
56,250,000
62,500,000
156,250,000
225,000,000
Rp 500,000,000
8,700,000
48,500,000
2,916,000
1,460,000
60,750,000
4,716,000
2,360,000
98,250,000
9,432,000
2,360,000
TOTAL
Rp.
12,576,000
66,810,000
2,572,000
8,860,000
32,150,000
1,376,000
11,524,000
4,480,000
21,861,000
13,400,000
21,390,000
Rp 436,443,000
207,143,000
471,429,000
150,000,000
50,000,000
50,000,000
85,720,000
34,288,000
17,144,000
17,144,000
Rp 1,082,868,000
TOTAL
Rp.
Rp 1,200,000,000
8,001,000
11,430,000
6,430,000
3,715,000
43,572,000
4,000,000
800,000
9,200,000
5,280,000
21,600,000
14,000,000
30,250,000
40,500,000
30,750,000
14,450,000
5,000,000
28,000,000
14,000,000
8,500,000
7,500,000
Rp 306,978,000
60,750,000
49,848,000
100,877,000
64,286,000
TOTAL
Rp.
14,286,000
48,000,000
42,000,000
Rp 380,047,000
45,000,000
56,250,000
24,000,000
Rp 125,250,000
30,000,000
70,000,000
600,000,000
Rp 700,000,000
Rp 7,218,562,000