DETAILED COST ESTIMATES FOR CIVIL CONSTRUCTION WORKS

(FISH TANK BUILDING (G+2 FLOORS) & BOUNDARY WALL CIVIL BOQ)

Boundary
Building

Amount
Floors
(G+2)

Total

Rate
wall
Sl.NO Description Unit

1 Excavation
1a 0-1.5M m3 942 276 1217 222 270232
3
1b 1.5-3.0M m 58 0 58 280 16330
3
2 Back filling with excavated soil m 821 227 1048 80 83867
3
3 Disposal of soil m 179 48 227 65 14771
3
4 Plinth filling with selected soils m 124 0 124 450 55948
5 M25 R.C Concrete
5a Footings / Raft m3 114 25 139 5850 814765
3
5b Columns m 62 11 73 6250 458525
3
5c Beams m 128 8 137 6250 853656
3
5d Slabs m 210 0 210 5850 1228500
3
5e Wall m 9 0 9 6250 58894
3
5f Staircase m 17 0 17 6250 108675
3
6 Brick work 230mm thick built in CM 1:6 m 212 36 248 5050 1253511
PCC M10 below the Foundations/Grade slab for
7 Mton 66 12 78 4950 385996
other than water retaining Structures
8 HYSD Reinforcement (Fe 500 - TMT Grade) Mton 48 4 52 87000 4565760
2
9 Normal Shuttering m
9a Footings / Raft m2 150 128 278 430 119609
2
9b Columns m 525 6 532 500 265870
2
9c Beams m 1078 25 1103 500 551390
2
9d Slabs m 1194 0 1194 430 513430
2
9e Wall m 126 0 126 500 62820
2
9f Staircase m 50 0 50 500 24840
10 Painting
External Painting-Walls above ground-One coat
10a of Primer & Two coats of waterproof cement m2 803 400 1203 280 336885
painting

Internal Painting-Walls above ground-One coat of


10b m2 1021 0 1021 260 265460
Primer & Two coats of plastic emulsion painting

10c Ceiling Paint m2 811 0 811 260 210860


Boundary
Building

Amount
Floors
(G+2)

Total

Rate
wall
Sl.NO Description Unit

11 Plastering
External Plastering - 20 mm thk with CM 1:3 with
11a m2 803 400 1203 450 541422
rough board finish
Internal Plastering - 12 mm thk with CM 1:3 with
11b m2 1021 0 1021 350 357350
neat cement finish
12 Joinery
12a Doors m2 20 0 20 4800 96768
2
12b Windows m 43 0 43 5200 224640
2
12c Ventilators m 13 0 13 4800 62208
20 mm thk Cement Flooring with Metallic Floor
13 m2 811 0 811 550 445962
hardener topping
14 100 MM thk - 1000 MM Wide Plinth protection work with
Rmt M15 Concrete
70 0 70 650 45370
15 50 THK - (1:2:4)DPC below the wall Rmt 42 80 122 420 51177
16 PVC Rain water down take pipe Rmt 135 0 135 110 14883
17 MS Gate - 5m x 3m Nos 0 1 1 40000 40000
TOTAL COST 14400373