BACK UP DATA

PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : MINGGU


LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 16 AGUSTUS 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+000 sd STA 0+100


PANJANG 100 m
L1 = 0.25 m H1 = 0.70 m H4 = 0.10 m
L2 = 0.60 m H2 = 0.05 m
L3 = 0.30 m H3 = 0.45 m

A1 = 0.25 X 0.75 = 0.19 m² X 100 m = 18.75 m³


A2 = 0.60 X 0.45 = 0.27 m² X 100 m = 27.00 m³
A3 = 0.25 X 0.75 = 0.19 m² X 100 m = 18.75 m³
A4 = 0.60 X 0.05 = 0.03 m² X 100 m = 3.00 m³
A5 = 0.30 X 0.75 = 0.23 m² X 100 m = 22.50 m³
A6 = 1.40 X 0.10 = 0.14 m² X 100 m = 14.00 m³
TOTAL GALIAN TANAH + BONGKARAN = 104.00 m³

STA 0+100 sd STA 0+143


PANJANG 43 m
L1 = 0.25 m H1 = 0.70 m H4 = 0.10 m
L2 = 0.60 m H2 = 0.05 m
L3 = 0.30 m H3 = 0.40 m

A1 = 0.25 X 0.75 = 0.19 m² X 43 m = 8.06 m³


A2 = 0.60 X 0.40 = 0.24 m² X 43 m = 10.32 m³
A3 = 0.25 X 0.75 = 0.19 m² X 43 m = 8.06 m³
A4 = 0.60 X 0.05 = 0.03 m² X 43 m = 1.29 m³
A5 = 0.30 X 0.75 = 0.23 m² X 43 m = 9.68 m³
A6 = 1.40 X 0.10 = 0.14 m² X 43 m = 6.02 m³
TOTAL GALIAN TANAH + BONGKARAN = 43.43 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : SENIN
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 17 AGUSTUS 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+143 sd STA 0+175


PANJANG 32 m
L1 = 0.25 m H1 = 0.70 m H4 = 0.10 m
L2 = 0.60 m H2 = 0.05 m
L3 = 0.30 m H3 = 0.40 m

A1 = 0.25 X 0.75 = 0.19 m² X 32 m = 6.00 m³


A2 = 0.60 X 0.40 = 0.24 m² X 32 m = 7.68 m³
A3 = 0.25 X 0.75 = 0.19 m² X 32 m = 6.00 m³
A4 = 0.60 X 0.05 = 0.03 m² X 32 m = 0.96 m³
A5 = 0.30 X 0.75 = 0.23 m² X 32 m = 7.20 m³
A6 = 1.40 X 0.10 = 0.14 m² X 32 m = 4.48 m³
TOTAL GALIAN TANAH + BONGKARAN = 32.32 m³

STA 0+175 sd STA 0+208


PANJANG 33 m
L1 = 0.25 m H1 = 0.70 m H4 = 0.10 m
L2 = 0.60 m H2 = 0.05 m
L3 = 0.30 m H3 = 0.45 m

A1 = 0.25 X 0.75 = 0.19 m² X 33 m = 6.19 m³


A2 = 0.60 X 0.45 = 0.27 m² X 33 m = 8.91 m³
A3 = 0.25 X 0.75 = 0.19 m² X 33 m = 6.19 m³
A4 = 0.60 X 0.05 = 0.03 m² X 33 m = 0.99 m³
A5 = 0.30 X 0.75 = 0.23 m² X 33 m = 7.43 m³
A6 = 1.40 X 0.10 = 0.14 m² X 33 m = 4.62 m³
TOTAL GALIAN TANAH + BONGKARAN = 34.32 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : SELASA
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 18 AGUSTUS 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+208 sd STA 0+250


PANJANG 42 m
L1 = 0.25 m H1 = 0.70 m H4 = 0.10 m
L2 = 0.60 m H2 = 0.05 m
L3 = 0.30 m H3 = 0.35 m

A1 = 0.25 X 0.75 = 0.19 m² X 42 m = 7.88 m³


A2 = 0.60 X 0.35 = 0.21 m² X 42 m = 8.82 m³
A3 = 0.25 X 0.75 = 0.19 m² X 42 m = 7.88 m³
A4 = 0.60 X 0.05 = 0.03 m² X 42 m = 1.26 m³
A5 = 0.30 X 0.75 = 0.23 m² X 42 m = 9.45 m³
A6 = 1.40 X 0.10 = 0.14 m² X 42 m = 5.88 m³
TOTAL GALIAN TANAH + BONGKARAN = 41.16 m³

STA 0+250 sd STA 0+268


PANJANG 18 m
L1 = 0.25 m H1 = 0.70 m H4 = 0.10 m
L2 = 0.60 m H2 = 0.05 m
L3 = 0.30 m H3 = 0.40 m

A1 = 0.25 X 0.75 = 0.19 m² X 18 m = 3.38 m³


A2 = 0.60 X 0.40 = 0.24 m² X 18 m = 4.32 m³
A3 = 0.25 X 0.75 = 0.19 m² X 18 m = 3.38 m³
A4 = 0.60 X 0.05 = 0.03 m² X 18 m = 0.54 m³
A5 = 0.30 X 0.75 = 0.23 m² X 18 m = 4.05 m³
A6 = 1.40 X 0.10 = 0.14 m² X 18 m = 2.52 m³
TOTAL GALIAN TANAH + BONGKARAN = 18.18 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : RABU
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 19 AGUSTUS 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+268 sd STA 0+300


PANJANG 32 m
L1 = 0.25 m H1 = 0.70 m H4 = 0.10 m
L2 = 0.60 m H2 = 0.05 m
L3 = 0.30 m H3 = 0.35 m

A1 = 0.25 X 0.75 = 0.19 m² X 32 m = 6.00 m³


A2 = 0.60 X 0.35 = 0.21 m² X 32 m = 6.72 m³
A3 = 0.25 X 0.75 = 0.19 m² X 32 m = 6.00 m³
A4 = 0.60 X 0.05 = 0.03 m² X 32 m = 0.96 m³
A5 = 0.30 X 0.75 = 0.23 m² X 32 m = 7.20 m³
A6 = 1.40 X 0.10 = 0.14 m² X 32 m = 4.48 m³
TOTAL GALIAN TANAH + BONGKARAN = 31.36 m³

STA 0+300 sd STA 0+323


PANJANG 23 m
L1 = 0.25 m H1 = 0.70 m H4 = 0.10 m
L2 = 0.60 m H2 = 0.05 m
L3 = 0.30 m H3 = 0.40 m

A1 = 0.25 X 0.75 = 0.19 m² X 23 m = 4.31 m³


A2 = 0.60 X 0.40 = 0.24 m² X 23 m = 5.52 m³
A3 = 0.25 X 0.75 = 0.19 m² X 23 m = 4.31 m³
A4 = 0.60 X 0.05 = 0.03 m² X 23 m = 0.69 m³
A5 = 0.30 X 0.75 = 0.23 m² X 23 m = 5.18 m³
A6 = 1.40 X 0.10 = 0.14 m² X 23 m = 3.22 m³
TOTAL GALIAN TANAH + BONGKARAN = 23.23 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : KAMIS
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 20 AGUSTUS 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+323 sd STA 0+360


PANJANG 37 m
L1 = 0.25 m H1 = 0.70 m H4 = 0.10 m
L2 = 0.60 m H2 = 0.05 m
L3 = 0.30 m H3 = 0.35 m

A1 = 0.25 X 0.75 = 0.19 m² X 37 m = 6.94 m³


A2 = 0.60 X 0.35 = 0.21 m² X 37 m = 7.77 m³
A3 = 0.25 X 0.75 = 0.19 m² X 37 m = 6.94 m³
A4 = 0.60 X 0.05 = 0.03 m² X 37 m = 1.11 m³
A5 = 0.30 X 0.75 = 0.23 m² X 37 m = 8.33 m³
A6 = 1.40 X 0.10 = 0.14 m² X 37 m = 5.18 m³
TOTAL GALIAN TANAH + BONGKARAN = 36.26 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : RABU
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 26 AGUSTUS 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+143 sd STA 0+155


PANJANG 12 m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 12 m = 2.55 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³
TOTAL PASANGAN BATU KALI = 2.55 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : KAMIS
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 27 AGUSTUS 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+155 sd STA 0+183


PANJANG 28 m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 28 m = 5.95 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³
TOTAL PASANGAN BATU KALI = 5.95 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : JUMAT
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 28 AGUSTUS 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+143 sd STA 0+159


PANJANG 16 m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 16 m = 3.40 m³
TOTAL PASANGAN BATU KALI = 3.40 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : SABTU
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 29 AGUSTUS 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+159 sd STA 0+183


PANJANG 24 m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 24 m = 5.10 m³
TOTAL PASANGAN BATU KALI = 5.10 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : SENIN
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 31 AGUSTUS 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+183 sd STA 0+193


PANJANG 10 m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 10 m = 2.13 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 10 m = 2.13 m³
TOTAL PASANGAN BATU KALI = 4.25 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : SELASA
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 01 SEPTEMBER 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+134 sd STA 0+143


PANJANG 9m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 9m = 1.91 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 9m = 1.91 m³
TOTAL PASANGAN BATU KALI = 3.83 m³

STA 0+193 sd STA 0+196


PANJANG 3m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 3m = 0.64 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 3m = 0.64 m³
TOTAL PASANGAN BATU KALI = 1.28 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : RABU
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 02 SEPTEMBER 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+125 sd STA 0+134


PANJANG 9m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 9m = 1.91 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 9m = 1.91 m³
TOTAL PASANGAN BATU KALI = 3.83 m³

STA 0+143 sd STA 0+145


PANJANG 2m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³
TOTAL PASANGAN BATU KALI = 0.00 m³

PLESTERAN
A1 = 0.80 + 0.80 = 1.60 m X 2m = 3.20 m²

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : JUMAT
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 04 SEPTEMBER 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+113 sd STA 0+120


PANJANG 7m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 7m = 1.49 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 7m = 1.49 m³
TOTAL PASANGAN BATU KALI = 2.98 m³

STA 0+145 sd STA 0+150


PANJANG 5m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³
TOTAL PASANGAN BATU KALI = 0.00 m³

PLESTERAN
A1 = 0.80 + 0.80 = 1.60 m X 5m = 8.00 m²

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : SABTU
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 05 SEPTEMBER 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+300 sd STA 0+306


PANJANG 6m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 6m = 1.28 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 6m = 1.28 m³
TOTAL PASANGAN BATU KALI = 2.55 m³

STA 0+150 sd STA 0+153


PANJANG 3m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³
TOTAL PASANGAN BATU KALI = 0.00 m³

PLESTERAN
A1 = 0.80 + 0.80 = 1.60 m X 3m = 4.80 m²

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : SENIN
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 07 SEPTEMBER 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+107 sd STA 0+113


PANJANG 6m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 6m = 1.28 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 6m = 1.28 m³
TOTAL PASANGAN BATU KALI = 2.55 m³

STA 0+153 sd STA 0+158


PANJANG 5m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³
TOTAL PASANGAN BATU KALI = 0.00 m³

PLESTERAN
A1 = 0.80 + 0.80 = 1.60 m X 5m = 8.00 m²

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : SELASA
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 08 SEPTEMBER 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+306 sd STA 0+312


PANJANG 6m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 6m = 1.28 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 6m = 1.28 m³
TOTAL PASANGAN BATU KALI = 2.55 m³

STA 0+137 sd STA 0+143


PANJANG 6m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³
TOTAL PASANGAN BATU KALI = 0.00 m³

PLESTERAN
A1 = 0.80 + 0.80 = 1.60 m X 6m = 9.60 m²

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : RABU
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 09 SEPTEMBER 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+102 sd STA 0+107


PANJANG 5m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 5m = 1.06 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 5m = 1.06 m³
TOTAL PASANGAN BATU KALI = 2.13 m³

STA 0+131 sd STA 0+137


PANJANG 6m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³
TOTAL PASANGAN BATU KALI = 0.00 m³

PLESTERAN
A1 = 0.80 + 0.80 = 1.60 m X 6m = 9.60 m²

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : KAMIS
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 10 SEPTEMBER 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+312 sd STA 0+316


PANJANG 4m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 4m = 0.85 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 4m = 0.85 m³
TOTAL PASANGAN BATU KALI = 1.70 m³

STA 0+125 sd STA 0+131


PANJANG 6m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³
TOTAL PASANGAN BATU KALI = 0.00 m³

PLESTERAN
A1 = 0.80 + 0.80 = 1.60 m X 6m = 9.60 m²

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : JUMAT
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 11 SEPTEMBER 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+316 sd STA 0+320


PANJANG 4m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 4m = 0.85 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 4m = 0.85 m³
TOTAL PASANGAN BATU KALI = 1.70 m³

STA 0+296 sd STA 0+299


PANJANG 3m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³
TOTAL PASANGAN BATU KALI = 0.00 m³

PLESTERAN
A1 = 0.80 + 0.80 = 1.60 m X 3m = 4.80 m²

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : KAMIS
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 03 SEPTEMBER 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+120 sd STA 0+125


PANJANG 5m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 5m = 1.06 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 5m = 1.06 m³
TOTAL PASANGAN BATU KALI = 2.13 m³

STA 0+296 sd STA 0+300


PANJANG 4m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 4m = 0.85 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 4m = 0.85 m³
TOTAL PASANGAN BATU KALI = 1.70 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : SABTU
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 12 SEPTEMBER 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

STA 0+320 sd STA 0+322


PANJANG 2m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 2m = 0.43 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 2m = 0.43 m³
TOTAL PASANGAN BATU KALI = 0.85 m³

STA 0+322 sd STA 0+324


PANJANG 2m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m

A1 = 0.25 X 0.85 = 0.21 m² X 2m = 0.43 m³


A2 = 0.80 X 0.05 = 0.04 m² X 0m = 0.00 m³
A3 = 0.25 X 0.85 = 0.21 m² X 0m = 0.00 m³
TOTAL PASANGAN BATU KALI = 0.43 m³

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
BACK UP DATA
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN DRAINASE HARI : SABTU
LOKASI : JALAN S. GUMBASA - S. DOLAGO - S. MALEI TANGGAL : 12 SEPTEMBER 2015
INSTANSI : DINAS PEKERJAAN UMUM KOTA PALU KONTRAK :
KONTRAKTOR PELAKSANA : CV. DWIPUTRA KARSA UTAMA TANGGAL :
KONSULTAN PENGAWAS : CV. ART NOUVEAU ENGINEERING KONTRAK / TANGGAL : 01/KONT-DRS.CK/PU/VII/2015
TANGGAL : 23 JULI 2015

PEKERJAAN GALIAN TANAH DENGAN ALAT STA 0+320 sd STA 0+322


PANJANG (P) 2 m
L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m
L3 = 0.80 m H3 = 0.05 m
L4 = 0.80 m
L4' = 0.80 m
A1 = L1 X H1+H2 X 2.00 X P = 0.85 m³

L4' + L4
A2 = X H3 X P = 0.08 m³
2

A3 = L4 X H2 X P = 0.08 m³
TOTAL GALIAN = 0.00 m³

PEKERJAAN PASANGAN BATU KALI CAMP 1:4 STA 0+322 sd STA 0+324
PANJANG 2 m

L1 = 0.25 m H1 = 0.80 m
L2 = 0.80 m H2 = 0.05 m
L4 = 0.80 m

PEK. PASANGAN BATU KALI


A4 = L1 X H1+H2 X 2.00 X P = 0.43 m³

PEK. COR LANTAI


A5 = L4 X H2 X P = 0.08 m³
PEK PLASTERAN
A. = H1 X P X 2.00 = 1.60 m²
PEK ACIAN
B. = H1 X P X 2.00 = 1.60 m²

DIBUAT OLEH:
KONSULTAN PENGAWAS
CV ART NOU VEAU

SAKINAH, ST
INSPECTOR
GAMBAR TIPE 1
L1 L2 L1

H1
A1 A3
H3 A2 H3

A4 H2

GAMBAR TIPE 3
L1 L2 L1

A1

H1

A1

H2

GAMBAR TIPE 4
L1 L2 L1

H1
A1 A3
A1 A3

A2 H2
GAMBAR TIPE 2
L3 L1 L2 L1

H1
A5 A1 A3
A2

A4 H2

A6 H4

GAMBAR TIPE 5
L3 L1 L2 L1

H1
A5 A1 A3
H3 A2

A4 H2

GAMBAR TIPE 5