Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Curriculum vitae

Experience: 29 years in OHL & sub stations projects


e.mail:veeru1213@yahoo.co.in
ph. no :+2347085086657
Qualification

Year Degree Institution


1998 BE (civil) Pacific institute of engineering and Management
1989 Diploma civil. Karnataka board of examination. Bangalore
Experience :

Name of organization: M/s Teshmont Power Consultants inc. London


Designation: Deputy Resident Manager
Customer : Transmission Corporation of Nigeria.
Duration : 24 months. From May 2018-- to – TILL

 330 kv DC OHL from lafia to new apo-143 kms .


 132 kv DC OHL from new apo –old apo -11kms.
 132 kv DC OHL from new apo to kuje s/s- 29 kms .
 132 kv DC OHL from kuje to west man -41 kms .
 2*150 Mva, 330/132 kv proposed new apo substation.
 2*150 Mva, 330/132/33/kv proposed west main substation.
 3*60 Mva, 132 /33 kv kuje substation .
 2*60 Mva, 132/33 kv proposed wumba /lokogoma substation.

Previous projects executed in Nigeria &Nepal. From 2014– to --2018

Name of Organization: M/s Aster infra structure services ltd .Nigeria

 Construction of 132 kv d/c transmission line from Oshogbo to Ede. Was


completed.
 Construction of bay extension at Osogbo s/s and construction of Ede substation.
 Gamo to shonga 132 kv dc transmission line.
 kefi to kowi, kowi to kachia 132 kv d/c transmission line

 Damak –kabeli 132kv dc line at Nepal

From 7oct 2013 to 11 April 2014


Construction of 400 kv jaipuram to Rangampet ohl, & 220 kv switching station
Zadcherla,
Name of organization: M/s GVPR engineer’s ltd
Designation : A.G.M (projects)
Customer : Ap Transco
Duration : 12 months

From may 2011 to 30th sep 2013


Name of organization: M/s ivrcl ltd.
Designation : Senior project manager (projects)
Construction of 765 kv. s/c &d/c from Angul to jharsuhguda ohl.
Duration : May2011 to 30th sep.2013.
a) construction of 765 k.v. s/c &d/c from Angul to jharsuhguda transmission line to the
length = 120km
b) Construction of 765 /400/132kv substation at angul.
Customer : power Grid Corporation of India ltd
Duration : May 2011 to june2012

2) Name of organization: M/s Ivrcl ltd.


Designation : senior project manager (projects)
400/220 kv ohl new sub-station/building/pump house/road/tower
foundation/trench/transformer foundation etc. at Gurgaon
Customer : power Grid Corporation of India ltd
Duration: 2011 -feb2012

3) Name of organization: M/s ivrcl ltd

Designation : senior manager (projects)


Construction of 765 kv Seoni –Nandanwadi transmission s/c line and bay extension of
765kv s/s at Seoni substation.

Client: power Grid Corporation of India ltd


Duration : 2012 to aug 2013

4) Name of organization: M/s ivrcl ltd


Designation : senior project manager
Construction of 220kv transmission line and sub-station
Customer : jseb
Duration : 2009 to May 2011

5) Name of organization: M/s Gammon India ltd


Designation : project manager
Construction of 220kv Dc transmission line from Raighad to saraipally to the length
of 85kms (including survey, foundation erection & stringing etc).
Customer : cseb

6) Madurai to Trivandrum 400kv transmission line to the length of 150kms

7) kotanandur to Krishna river crossing 500kv hvdc transmission line to the length of
250kms .

8) Nagarjuna sagar to khammam 400kv s/c transmission line to the length of 100
kms,

9) Gwalior to agra765kv transmission line to the length of 125 kms

10) Rihand to bhallabhghad 400kv dc line to the length of 1200 kms

Customer: pgcil,
Duration : 1992 to 2009.

11) Construction of: 400kv Nagarjuna sagar to Raichur s/c transmission line (work as
a site in charge)
Customer: : Ntpc
Duration : Dec 1989 to 1992

Responsibilities :
 Co-ordination among consultants, contractors and clients.
Finalization of requirements, estimates and Boq.

 Evaluation & execution of (sub) contracting works.

 Scheduling including material & manpower planning.

 Anchoring turnkey project execution (from grass root level) / on-site activities
and project review meetings to ensure completion of project well within time.

 implementation of quality procedures as per organizational standards

 Development of project schedules.

 Project progress tracking and monitoring.

 Delay tracking and monitoring system

 updating of schedule

 Site progress, pending activities, physical problem solution, local problem


manage, supplier billing, and deals with labor, layout, etc.

Personal details:-
Name R.veeranjaneyulu
Father’s name Mr.Ramaiah
sex Male
Marital status Married
Nationality Indian
Date of birth 30-06-1967
Language Telugu, Hindi, English.Kannada,Tamil,Yuruba,Housa
permanent R.veeranjaneyulu.
address H.No=!!-10-2/1Ramiredypet,Narasarao pet (.A.P)
i hereby declare that the above given particulars are true to the best of my knowledge
and belief.

R.veeranjaneyulu,

You might also like