PRESSURE SYSTEM NO UZ-CC-WIP-TW-1232

N 4 TREATED WATER TO SEA WATER


DEAERATION TOWER CHEMICAL INJECTION SYSTEM
(16
15
K sO
-W-92AL-2B
CONT.. 280P028-045
LEGENDS
S-TNH-269P749-YTE2-045
PRESSURE SYSTEM PIPING
OTHER PIPING
(PSYK PIPE SUPPORT SR.NO.
-PIPE SUPPORT TYPE NO. ZAKUM DEVELOPMENT (OMPANY
INTEGRITY THREAT LOCATIONS (TL) FI DEPARTMENT
PROJECT: UPPER ZAKUM
PRESSURE SYSTEM INTEGRITY MANAGEMENT
SIZE LINE No. LINE SPEC. PIPE STD PSIM PROJECI
TLE
4 TW-9243 28 API 5L GRB TREATED WATER
SCHEMATIC ISOMETRIC DIAGRAM
A 08.04.2009 ISSUED FOR PSIM PROJECT. MEZ WRMKAZAD
REV DATE . DESCRIPTIOON 0D PE CE IE CENTRAL COMPLEX(CC)
TREATED WATER OPER.PRESS 271 PSIG. DRAWINGNo.
DRG INSL./THK. INSL/THK. SERVICE SCALE
P&ID A0-260-152-913 SHT.003 STRESS RLV. STRESS RLV 0PER.TEMP 65 F
OESIGN PRESs. PSIG. NTS P8842 A3 260 P 028 044
TEST PRESS. PSIG. 10S 0RONNO
GA
COATING SPEC DESIGN TEMP F